SU1348528A1 - Method of safeguarding mine workings - Google Patents

Method of safeguarding mine workings Download PDF

Info

Publication number
SU1348528A1
SU1348528A1 SU864048125A SU4048125A SU1348528A1 SU 1348528 A1 SU1348528 A1 SU 1348528A1 SU 864048125 A SU864048125 A SU 864048125A SU 4048125 A SU4048125 A SU 4048125A SU 1348528 A1 SU1348528 A1 SU 1348528A1
Authority
SU
USSR - Soviet Union
Prior art keywords
cut
wells
lava
boreholes
roof
Prior art date
Application number
SU864048125A
Other languages
Russian (ru)
Inventor
Александр Александрович Жданкин
Николай Александрович Жданкин
Хамит Баденович Есмагамбетов
Original Assignee
А. А. Ждаикнн, И. А. Жллнкин и X Б. F.CM;II амбстои
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by А. А. Ждаикнн, И. А. Жллнкин и X Б. F.CM;II амбстои filed Critical А. А. Ждаикнн, И. А. Жллнкин и X Б. F.CM;II амбстои
Priority to SU864048125A priority Critical patent/SU1348528A1/en
Application granted granted Critical
Publication of SU1348528A1 publication Critical patent/SU1348528A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

И.«)прет1 ИИ( огностч   к об.ласти loj)- нок) де, 1а и м. б. испо.п,.ковано дл  ох|)аиы 11оддсржн и1ем1,1х ta .лавамн выработок при 6eciu , iHKOH()H техно,101НИ добычи угл  земным способом. J,(Mi сок)а1цение затрат на (})ормироваине отрезной наччи на и,ласгах с мошной труднообруиюемои KJWB- ;1ей. ()ль стенкн выработки 1 на рассто нии , ранном 0,15 ее Н ирин1)1, бур т отсечные скважины 2, пересекающие всю MOHUiocTii иепосрелствепно11 и часть основ- нон крове, II) нод уг, 1ом в сторону ,тавы. (.кважины 2 зар жают и взрывают. Таким образом формируют виереди лавы отрез- И1,1е 1не, 1и к кров,че. Д,1ину скважин 2 нриннмаюг равной 1,2 м ишрины выработки. Зур т скважины до пересечени  ими границы II зоны сдвижени  пород нод уг,1ом 70 75 . IIoc, ie взрывани  зар дов в скважинах 2 и (()()рмировани  отрезных щелей над и нод выработкой, зона сдвижени  пород проходит но границе П. При необходимости отрезную iue, ib формируют и в ночве выработки , симмет|)ично И1е, 1м в кровле. Д,1ина скважины 3 ири формировании доио, 1ни- гельной iiuMH равна 1,6 1иирины выработки. 1 :.1Г()-,1Ы, 2 н,т. (Л /4-х} со 00 СП го 00II. “) Pret 1 AI (fire to the area of power loj) - Nok) de, 1a and m. B. ispo.p., for oh | | aiy 11odsrzhn i1em1,1kh ta. lamn workings at 6eciu, iHKOH () H techno, 101NI coal mining by the earth method. J, (Mi juice) cost per unit (}) of cutting the cutting edge at the top of the hardest pumping equipment KJWB-; 1st. () or the walls of the excavation 1 at a distance of 0.15 of its H irin1) 1, cut-off boreholes 2, crossing the entire MOHUiocTii and the contiguous11 and part of the basal bed, II) corner, 1 in the direction, tavy. (The boreholes 2 are charged and blown up. Thus, the lava parts of the lava are cut so that the I, 1, 1, 1, 1, and the shelter, th. D, 1 of the wells 2 lines of the water equal to 1.2 m of the output. Surge of the well before they cross the border of zone II displacement of rocks node, 1st 70 75. IIoc, i.e. detonations in boreholes 2 and () () () forming cut-off slots above and node development, the zone of displacement of rocks passes along the border P. If necessary, cut-off iue, ib is formed and at night development, symmettically | IaIe, 1m in the roof. D, 1a well 3, and the formation of a dyo, 1igelnogo iiuH is equal to 1.6 1iryrina output. 1: .1Г () -, 1Ы, 2 n, t. (L / 4-x} from 00 SP th 00

Description

И:5(.)Г)нчч Иие относитс  к горному телу и .можог бьп 1) ис1И). 1Ьзонаио дл  охраны под- лержииасмых ли лавами выработок при бес- целиковой технологии добычи угл  подземным способом.AND: 5 (.) D) nchch Yie refers to the mountain body and can be 1) used). 1Zonioi for the protection of the presence of lavas at the openings with the aimless technology of coal mining by the underground method.

Целью и,)брете11и   вл етс  сокращение :1атраг на ({)ормирование отрез К)й iue. in на пластах с мощной трудн()обру 11аемой кровлей.The goal and,) brethes is the reduction: 1 drag on (() the formation of a segment K) st iue. in on seams with a powerful hard () roof.

На фнг. 1 представлена схема ведени  очистных работ (вид в плане) по бесцеликовой технологии; на фиг. 2 сечение А А на фиг. I.On fng. Figure 1 shows a scheme for the maintenance of sewage works (plan view) according to the objectiveless technology; in fig. 2 section A A in FIG. I.

Вдоль стенки вырабогки I, расположенной со стороны Biiie.MOMHoro п)острапства, впередп монтажной камеры бур т отсечш к- скважины в кровле 2 и почве 3. /1о отхода лавы от монтажной камеры скважины 2 и 3 зар жают и взрывают. Таким образом ({)ор- мирун г симметричные относи гельпо uein- ральпой п. юскосги п.часта отрезные lue/in в кров.ле и почве, при этом досгигаетс  независимое сдвижение нород над (юд) выработкой 4 от обп1нх зон сдвижепи  пад (под) выемочн1)м пространством 5- (Скважины бур т до пересечени  ими границы зоШ) сдвижени  пород П. После взрывани  зар дов в скважинах и формировани  отрезных |це. пад и под jbipa6oTKH зопа сдвнже 1и  проходит по границе 11 . Л.Along the wall of excavation I, located on the side of Biiie.MOMHoro o), the installation chamber is being drilled to cut off the well in the roof 2 and the soil 3. / 1 o from the installation chamber of the well 2 and 3. Thus ({) the organizers are symmetrical in relation to the gelpoin ueinralpoy n. Yoskosg n. Often detachable lue / in in the roof and the soil, at the same time an independent displacement of the genus over (yud) production 4 from the total zones of the shear pad ( sub) excavation 1) space 5- (Wells are drilled until they cross the boundary of the zone) moving rocks P. After the explosions of charges in the wells and the formation of cutting | tse. pad and under jbipa6oTKH zop sdnnzhe 1 and passes along the border 11. L.

00

5five

00

5five

скважин в кровле принимают равной 1,2 1нирин1,1 выработки и бур т с наклоно.м в сторону выработанного пространстве под уг- , 1ом 70 75. Прн необходимости отрезную nie. ib формируют и в почве выработки, в iTOM с.п чае скважины бур т длиной, рав- Hoii I ,(i ширинь выработки.wells in the roof are assumed to be 1.2 1nirin1.1 of production and drill with a slope in the direction of the developed space at an angle of 70 70 75. The need for a cut-off nie. ib is also formed in the soil of the workings, in iTOM, the well is drilled with a length equal to Hoii I, (i is the width of the workings.

Формула и.юпретени Formula and Juvenile

1.(дюсоб oxj)aHbi горной выработки, включающий фор.мирование впереди . швы отрезной щели путем бурени  и взрывани  отсечных скважин, пересекающих всю мощность неносредственной и часть основной кровли нод углом в сторону лавы, отличающийс  тем, что, с целью сокращени  затрат на формирова}1ие отрезной щели на пластах с мониюй труднообру пае 1ой кровлей , скважины зак.1адываю1 на рассто нии от стенки выработки, равном 0,15 ее п ирины, и бур т скважииы до пересечени  ими гра- ниц|)1 движени  пород д,. 1ин()й 1,2 ширины вь1|)аботкп И)Д углом 70 75°.1. (duxob oxj) aHbi mine workings, including for. Formation ahead. the seams of the cutting gap by drilling and blasting cut-off wells intersecting all the power of the non-direct and part of the main roof of the node with an angle to the side of the lava, characterized in that, in order to reduce the cost of forming a cut-off slot on the seams with difficult ground to the first roof, .1 I guess 1 at a distance from the wall of the excavation, equal to 0.15 of its length, and drill wells until they cross the boundaries of the | 1 movement of rocks d ,. 1in () nd 1.2 widths 11 |) operation I) D angle of 70-75 °.

2.(люсоб по н. I, итличающиис  тем, что в почве вырабогки ф(.)рми)ук) 1 донолпи- те,чьную щель, симмет|)ичнук) щели н кровле, а длину скважин при формировании донол- иите.11)Ной щели принимают paBiioii 1,) щирп- Hiji выработки.2. (lyusob by n. I, and it is distinguished by the fact that in the soil we have f (.) Rm) mk) 1 donolpite, common gap, symmett | ihnuk) slit n roof, and the length of the wells during the formation of donolit. 11) Noah slots take paBiioii 1,) schirp- Hiji production.

фцз. 1ftsz one

Claims (2)

Формула изобретенияClaim 1. Способ охраны горной выработки, включающий формирование впереди лавы отрезной щели путем бурения и взрывания отсечных скважин, пересекающих всю мощность непосредственной и часть основной1. A method for protecting mining, including the formation of a cutting gap ahead of the lava by drilling and blasting shut-off wells that intersect all the direct power and part of the main 15 кровли под углом в сторону лавы, отличающийся тем, что, с целью сокращения затрат на формирование отрезной щели на пластах с мощной труднообрушаемой кровлей, скважины закладываю! на расстоянии от стенки выработки, равном 0,15 ее ширины, 20 и бурят скважины до пересечения ими границы движения пород длиной 1,2 ширины выработки под углом 70 75°.15 roofs at an angle to the side of the lava, characterized in that, in order to reduce the cost of forming a cut-off gap in the formations with a powerful hard-to-collapse roof, I lay the wells! at a distance from the wall of the mine, equal to 0.15 of its width, 20 and drill wells until they cross the boundary of rock movement with a length of 1.2 mine widths at an angle of 70 75 °. 2. Способ по и. I, отличающийся тем, что в почве выработки формируют дополни-2. The method according to and. I, characterized in that in the soil the workings form additional 25 тельную щель, симметричную щели в кровле, а длину скважин при формировании дополнительной щели принимают равной 1,6 ширины выработки.25 slit, symmetric to the gap in the roof, and the length of the wells when forming an additional gap is taken equal to 1.6 of the width of the output. Обрезные щелиTrim slots Фиг. 1FIG. 1
SU864048125A 1986-02-26 1986-02-26 Method of safeguarding mine workings SU1348528A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864048125A SU1348528A1 (en) 1986-02-26 1986-02-26 Method of safeguarding mine workings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864048125A SU1348528A1 (en) 1986-02-26 1986-02-26 Method of safeguarding mine workings

Publications (1)

Publication Number Publication Date
SU1348528A1 true SU1348528A1 (en) 1987-10-30

Family

ID=21230526

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864048125A SU1348528A1 (en) 1986-02-26 1986-02-26 Method of safeguarding mine workings

Country Status (1)

Country Link
SU (1) SU1348528A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470270B (en) * 2013-09-10 2015-04-08 安徽理工大学 Deep well ingate supporting structure and construction method thereof
US10677055B2 (en) * 2015-06-24 2020-06-09 Manchao He Fractured roof 110 mining method entry-side anti-collapsed structure
CN115182729A (en) * 2022-08-02 2022-10-14 安徽理工大学 Inclined coal seam small coal pillar penetrating deep cutting shallow pouring gangue blocking roadway protection technology and top cutting position determination method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470270B (en) * 2013-09-10 2015-04-08 安徽理工大学 Deep well ingate supporting structure and construction method thereof
US10677055B2 (en) * 2015-06-24 2020-06-09 Manchao He Fractured roof 110 mining method entry-side anti-collapsed structure
CN115182729A (en) * 2022-08-02 2022-10-14 安徽理工大学 Inclined coal seam small coal pillar penetrating deep cutting shallow pouring gangue blocking roadway protection technology and top cutting position determination method
CN115182729B (en) * 2022-08-02 2023-03-21 安徽理工大学 Inclined coal seam small coal pillar penetrating deep cutting shallow pouring gangue blocking roadway protection technology and top cutting position determination method

Similar Documents

Publication Publication Date Title
CN109611146B (en) Separation layer water drainage grouting method
Cooper Subsidence resulting from the dissolution of Permian gypsum in the Ripon area; its relevance to mining and water abstraction
SU1348528A1 (en) Method of safeguarding mine workings
RU2215146C1 (en) Method of salt deposit mining
RU2011824C1 (en) Method for mining thick steep coal seams under fires on upper horizon
RU2081250C1 (en) Method for protection of undermined buildings
RU2013548C1 (en) Method for mining mineral deposits at large depth
SU836364A1 (en) Method of preventing dynamic phenomena at working of coal beds
US5031963A (en) Method of downhole hydraulicking mineral resources
RU2471990C1 (en) Method to mine sloping and inclined coal beds of average capacity
SU62185A1 (en) Tunnel tunneling method
SU934004A1 (en) Method of roof control at mining of mineral beds
RU2107818C1 (en) Method for development of flat and inclined seams of minerals
SU1191582A1 (en) Method of solid roof composition
SU1348454A1 (en) Method of protecting objects against adverse effects of underground workings
SU1023167A1 (en) Method of preventing sudden outburst at excavating steep seams
SU1155774A1 (en) Method of traversing with bed-following workings the zones of increased rock pressure formed by pillars of coal and marginal parts of adjoining beds
SU1559156A1 (en) Method of safeguarding bed-type adjoining mine workings
SU883440A1 (en) Solid roof control method
SU973856A1 (en) Method of safeguarding preparotary workings
SU1705576A1 (en) Method of protection of mine vertical shafts
RU2111358C1 (en) Method of mining of mineral beds at large depths
SU735804A1 (en) Method of protecting preparatory mine working
SU1255714A1 (en) Method of controlling solid roof in pillar mining of bed deposits
SU899953A1 (en) Method of mining thick sloping coal beds in horizontal layers