SU1079785A1 - Method of constructing a multistorey building by adding floors from below - Google Patents

Method of constructing a multistorey building by adding floors from below Download PDF

Info

Publication number
SU1079785A1
SU1079785A1 SU802903784A SU2903784A SU1079785A1 SU 1079785 A1 SU1079785 A1 SU 1079785A1 SU 802903784 A SU802903784 A SU 802903784A SU 2903784 A SU2903784 A SU 2903784A SU 1079785 A1 SU1079785 A1 SU 1079785A1
Authority
SU
USSR - Soviet Union
Prior art keywords
formwork
columns
floor
building
floors
Prior art date
Application number
SU802903784A
Other languages
Russian (ru)
Inventor
Иван Петрович Коскин
Original Assignee
Проектная Мастерская N4 Института "Приморгражданпроект"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Проектная Мастерская N4 Института "Приморгражданпроект" filed Critical Проектная Мастерская N4 Института "Приморгражданпроект"
Priority to SU802903784A priority Critical patent/SU1079785A1/en
Application granted granted Critical
Publication of SU1079785A1 publication Critical patent/SU1079785A1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Изобретение относитс  к строительству зданий из монолитного железобетона подращиванием этажей. Известен способ возведени  многоэтажного здани  подращиванием этажей, включающий сооружение фундаментов, монтаж опалубки, последовательное изготовление в ней монтажных элементов на этаж здани , начина  с верхнего этажа и цикличный подъем их в проектное положение с помощью гидродомкратов с временным опиранием на промежуточных отметках на колонны 1. Подъем монтажного блока в проектное положение осуществл ют без опалубки, а стены выполн ют сборными. Целью изобретени   вл етс  повыщение сокращение производительности труда и сроков строительства, снижение материалоемкости и стоимости здани . Поставленна  цель достигаетс  тем, что согласно способу возведени  многоэтажного здани  подращиванием этажей, включающем сооружение фундамента, монтаж опалубки, последовательное изготовление в ней монтажных элементов на этаж здани , начина  с верхнего этажа, и цикличный подъем их в проектное положение р помощью гидродомкратов с временным опиранием на промежуточных отметках на колонны , в опалубке изготавливают наружные стены за одно целое с перекрытием на этаж здани  и перегородками, подъем изготовленного монтажного элемента осуществл ют в опалубке, а после временного опирани  подн того монтажного элемента опалубку опускают в исходное положение, при этом колонны, оснащенные поворотными консол ми , устанавливают за пределами наружных щитов опалубки, опирание на промежуточных отметках осуществл ют с помощью поворотных консолей, а опалубку соедин ют с колоннами с возможностью вертикального перемещени . Полы выполн ют по всей площади этажа после изготовлени  монтажного элемента до его подъема. Опалубк} соедин ют с колоннами с помощью разъемных муфт, имеющих возможность перемещени  по колоннам. На фиг. 1-5 схематически показаны этапы монтажа здани ; на фиг. 6 - детали опалубки. До начала работ строительную площадку в пределах площади опалубки с раскрытыми фасадными щитами наружных стен освобождают от существующей застройки или растительности. Далее устраивают фундаменты 1 под несущие посто нные и временные инвентарные колонны. Устанавливают временные инвентарные колонны 2, монтируют на них так же инвентарные подкрановые балки 3 и оборудование дл  произ водства всех работ, например, кран-балки 4 с навесными рабочими органами 5 (тельферы , бетоноукладчики, виброуплотнители и др.). С помощью этого оборудовани  и бетоносмесительного агрегата, бетононасоса (или другого оборудовани ) бетонируют основание под полы цокольного (первого) этажа. На основание устанавливают опалубку 6, соедин   ее подвижными муфтами 7 с колоннами 2. Раскрывают фасадные щиты 8 наружных стен, укладывают на них оконные и дверные блоки 9 с откосной облицовкой 10, выполн ют наружный облицовочный слой 11 (рулонный, плиточный и т. п.) утепл ющий слой 12 и арматуру несущей части наружной стены 13. В это же врем  монтируют дверные заполнени , арматурные каркасы, трубопроводы и отопительные устройства 14 в полост х внутренних стен и перегородок и на опалубке 15 перекрыти . Далее фасадные щиты 8 опалубки поднимают и бетонируют всю конструкцию монтажного блока верхнего этажа 16. После тепловлажностной обработки уложенного бетона набор им расчетной прочности и устройства кровли, изготовленный верхний этаж вместе с опалубкой, посредством телескопических гидродомкратов 17 поднимают на высоту, на 60-70 см, превыщающую высоту одного этажа, и с помощью консолей 18 опирают на инвентарные колонны 2. Далее вертикальные щиты сердечников, образующих комнаты этажа 19, отрывают от поверхностей забетонированных стен и перегородок (устройства дл  отрыва не показаны) и опалубку с помощью тех же домкратов 17 опускают на высоту одного этажа. Между опалубкой (над цилиндрами гидродомкратов) и подн тым этажом устанавливают прокладочные элементы 20 и опалубку вновь поднимают на высоту одного этажа, еще раз поднима  при этом верхний этаж блока. В этой позиции его уже нижней своей частью закрепл ют на инвентарных колоннах, а опалубку опускают в исходную позицию дл  повторени  операций по изготовлению и подъему всех последующих этажей. После бетонировани  стен и перекрыти  может устраиватьс  звукоизол ци  под полы, чистые полы , монтируютс  объемные блоки санитарно-технических узлов со смонтированным сантехоборудованием, встроенные щкафь и т. д. Крепление в промежуточной позиции после первого подъема осуществл етс  к выщесмонтированным этажам с помощью специальных т г, заложенных в каналах на пересечени х основных осей и сварки закладных деталей. После стыковки стен и перекрыти  цокольного этажа с выщележащими, опалубку опускают и перемещают на следующую захватку дл  возведени  новой блок-секции, а под возведенной - устраивают посто нные колонны 21 и демонтируют временные инвентарные колонны 2. Таким образом, после стыковки этажей считаютс  законченными и разводки инженерных сетей. Сантехнические приборы в кухн х, навешиваемые на стены, монтируютс  после стыковки этажей. Соединение воедино всех этажей осуществл етс  т гами , пропущенными в каналах на пересечени х основных осей стен, образованных в процессе формовани  этажей и в дальнейшем инъецируемых раствором. Отдел / / X гЛ6 This invention relates to the construction of monolithic reinforced concrete buildings by growing floors. There is a method of erection of a multi-storey building by growing floors, including the construction of foundations, installation of formwork, sequential manufacture of mounting elements in it on the floor of the building, starting from the upper floor and their cyclical lifting to the design position using intermediate jacks on columns 1. Lifting the assembly unit to the design position is carried out without formwork, and the walls are prefabricated. The aim of the invention is to increase the reduction in labor productivity and construction time, the reduction of material consumption and the cost of the building. The goal is achieved in that according to the method of erection of a multi-storey building by growing floors, including the construction of the foundation, installation of formwork, sequential production of mounting elements in it on the floor of the building, starting from the upper floor, and cyclical lifting them to the design position using hydraulic jacks with temporary support intermediate marks on the columns, in the formwork, the outer walls are made in one piece with overlapping on the floor of the building and partitions; in the formwork, and after a temporary support of the raised mounting element, the formwork is lowered to its original position, while the columns equipped with swivel brackets are installed outside the outer shields of the formwork, supported on the intermediate marks using rotary consoles, and the formwork is connected with columns with the possibility of vertical movement. The floors are made over the entire floor area after the assembly element is made before it is lifted. The formwork} is connected to the columns by means of detachable sleeves having the ability to move around the columns. FIG. Figures 1-5 show schematically the steps for installing a building; in fig. 6 - formwork details. Prior to the commencement of work, the construction site within the area of the formwork with the exposed facade walls of the outer walls is freed from the existing buildings or vegetation. Next, arrange bases 1 for bearing permanent and temporary inventory columns. Temporary inventory columns 2 are installed, inventory crane girders 3 and equipment for all works, for example, crane girders 4 with mounted working bodies 5 (telphers, concrete pavers, vibrating compactors, etc.), are also mounted on them. With the help of this equipment and a concrete mixing plant, a concrete pump (or other equipment), the foundation is concrete under the floors of the basement (first) floor. A formwork 6 is installed on the base, connected by its movable sleeves 7 to the columns 2. The facade panels of the outer walls are opened 8, window and door blocks 9 are laid on them with the facing 10, the outer facing layer 11 is made (rolled, tile, etc.). ) the heat insulation layer 12 and the reinforcement of the bearing part of the outer wall 13. At the same time, door fillings, reinforcement cages, piping and heating devices 14 are mounted in the cavities of the inner walls and partitions and on the ceiling formwork 15. Next, the facade panels 8 of the formwork raise and concrete the entire construction of the upper floor installation unit 16. After the heat-moisture treatment of the laid concrete, the design of the design strength and roofing made by the top floor together with the formwork are raised to a height of 60-70 cm by means of telescopic hydraulic jacks above the height of one floor, and with the help of consoles 18 they rest on inventory columns 2. Next, the vertical shields of the cores forming the rooms of floor 19 are torn off the surfaces of the concreted walls and lane town (separation apparatus not shown) and the formwork by the same jack 17 is lowered to the height of one storey. Gasket elements 20 are installed between the formwork (above the cylinders of the hydraulic jacks) and the raised floor and the formwork is raised to the height of one floor again, while raising the upper floor of the block again. In this position, its lower part is fixed on the inventory columns, and the formwork is lowered to the initial position to repeat the operations for the manufacture and lifting of all subsequent floors. After concreting the walls and blocking, sound insulation can be arranged for floors, clean floors, volumetric blocks of sanitary fittings with installed sanitary equipment, built-in boards, etc., are mounted. Fastening in an intermediate position after the first ascent is carried out to the newly constructed floors using special t embedded in the channels at the intersections of the main axes and the welding of embedded parts. After docking the walls and blocking the basement with the leaching out, the formwork is lowered and moved to the next grab for building a new block section, and under the erected permanent columns 21 are arranged and the temporary inventory columns 2 are dismantled. Thus, after docking the floors are considered finished and wiring engineering networks. Plumbing fixtures in kitchens that are hung on the walls are installed after docking the floors. The joining together of all the floors is carried out by joints skipped in the channels at the intersections of the main axes of the walls formed in the process of molding the floors and subsequently injected with the solution. Department / / X GL6

В 16 Г9At 16 G9

1818

,А.у,У/М, A.y., U / M

Фиг.З фFig.Z f

4040

20 17 6 ка внутренних поверхностей стен и потолков осуществл етс  на уровне II-III этажа. Ориентировочное врем  изготовлени  и монтажа одного монтажного блока 1-2 сут. Однако и этот срок может быть сокращен применением таких приемов, как теплова  обработка бетона в опалубке и т. п., которые позвол ет осуществить предлагаемый способ. /C4VVO N V N VVVV4 79 220 17 6 ka of the internal surfaces of walls and ceilings is carried out at the level of the II-III floors. Approximate production time and installation of one installation block 1-2 days. However, this period can also be shortened by applying such methods as heat treatment of concrete in formwork, etc., which the proposed method allows to carry out. / C4VVO N V N VVVV4 79 2

6 ерш. 6 ruff

Claims (3)

57) 1. СПОСОБ ВОЗВЕДЕНИЯ МНОГОЭТАЖНОГО ЗДАНИЯ ПОДРАЩИВАНИЕМ ЭТАЖЕЙ, включающий сооружение фундамента, монтаж опалубки, последовательное изготовление в ней монтажных элементов на этаж здания, начиная с верхнего этажа, и цикличный подъем их в проектное положение с помощью гидродомкратов с временным опиранием на промежуточных отметках на колонны, отличающийся тем, что, с целью повышения производительности труда, сокращения сроков строительства, снижения материалоемкости и стоимости здания, в опалубке изготавливают наружные и внутренние стены за одно целое с перекрытием на этаж здания и перегородками, подъем изготовленного монтажного элемента осуществляют в опалубке при высоте цикла в один этаж, а после временного опирания поднятого монтажного элемента опалубку опускают в исходное положение, при этом колонны, оснащенные поворотными консолями, устанавливают за пределами наружных щитов опалубки, опирание на промежуточных отметках осуществляют с помощью поворотных консолей, а опалубку соединяют с колоннами с возможностью вертикального перемещения.57) 1. METHOD OF ESTABLISHING A MULTI-STOREY BUILDING BY GROWING FLOORS, including the construction of a foundation, the installation of formwork, the sequential production of mounting elements on the building floor, starting from the top floor, and their cyclic lifting to the design position using hydraulic jacks with temporary support on intermediate marks on columns, characterized in that, in order to increase labor productivity, reduce construction time, reduce material consumption and the cost of the building, external and internal with In one piece with the ceiling on the building floor and partitions, the manufactured mounting element is hoisted in the formwork at a cycle height of one floor, and after temporary support of the raised mounting element, the formwork is lowered to its original position, while the columns equipped with rotary consoles are installed outside external formwork panels, resting on intermediate marks is carried out using rotary consoles, and the formwork is connected to the columns with the possibility of vertical movement. 2. Способ по π. 1, отличающийся тем, что полы выполняют по всей площади этажа после изготовления монтажного элемента в опалубке до его подъема.2. The method according to π. 1, characterized in that the floors are performed over the entire floor area after the manufacture of the mounting element in the formwork before it is lifted. 3. Способ по π. 1, отличающийся тем, что опалубку соединяют с колоннами при помощи разъемных муфт, , имеющих возможность перемещения по колоннам.3. The method according to π. 1, characterized in that the formwork is connected to the columns using detachable couplings having the ability to move around the columns.
SU802903784A 1980-02-05 1980-02-05 Method of constructing a multistorey building by adding floors from below SU1079785A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802903784A SU1079785A1 (en) 1980-02-05 1980-02-05 Method of constructing a multistorey building by adding floors from below

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802903784A SU1079785A1 (en) 1980-02-05 1980-02-05 Method of constructing a multistorey building by adding floors from below

Publications (1)

Publication Number Publication Date
SU1079785A1 true SU1079785A1 (en) 1984-03-15

Family

ID=20887003

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802903784A SU1079785A1 (en) 1980-02-05 1980-02-05 Method of constructing a multistorey building by adding floors from below

Country Status (1)

Country Link
SU (1) SU1079785A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2716319C1 (en) * 2019-04-16 2020-03-11 Игидали Алибекович Ашурбегов Method of erection of buildings and structures

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Baumaschine und Bautechnik, 1971, № 11. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2716319C1 (en) * 2019-04-16 2020-03-11 Игидали Алибекович Ашурбегов Method of erection of buildings and structures
WO2020214055A1 (en) * 2019-04-16 2020-10-22 Игидали Алибекович АШУРБЕГОВ Method for erecting buildings and structures

Similar Documents

Publication Publication Date Title
US20020059763A1 (en) Pre-fabricated bathroom
CN101769008B (en) Method for constructing quake-proof masonry house by utilizing prefabricated constructional column ring beams
EP0060885A1 (en) Building construction system component parts and method for assembling same
GB1451611A (en) Building construction
US3239990A (en) Multi-storey buildings
SU1079785A1 (en) Method of constructing a multistorey building by adding floors from below
EA009928B1 (en) Method of constructing strip foundations with longitudinal groove, a foundation element and holding/leveling device provided therefor
US4029286A (en) Apparatus for the construction of ceiling in multi-story concrete buildings
RU2678750C1 (en) Buildings and structures with bearing monolithic reinforced concrete structures construction method using the reinforced concrete wall panels
AU2003269072B2 (en) In-situ construction of concrete building
GB2320737A (en) Semi precast method of construction of multi-storey buildings
JPS61109827A (en) Construction of basement
JP3105044B2 (en) How to build a unit building
AU2004203867B2 (en) A building system
RU2820548C1 (en) Method of reconstruction of buildings and structures
SU1048093A1 (en) Method of erecting multistorey building by floor-rising technique
RU190322U1 (en) Device for the construction of multi-storey underground structures
SU737600A1 (en) Method of making a floor in sliding form
RU2105849C1 (en) Method for erection of box-type monolithic garages by flow-line procedure
RU2192522C2 (en) Process of manufacture of monolithic floor panels and gear for its realization
RU2617813C2 (en) The method of erection of prefabricated multi-storey reinforced concrete frame of a building
SU1067174A1 (en) Sliding forms
RU3952U1 (en) SLIDING FORMWORK FOR ESTABLISHING WALLS AND FLOORS
SU1557295A1 (en) Method of erecting multistorey building by method of storey lifting
SU1675520A1 (en) Method for erection of building from in-situ-cast reinforced concrete