US20020059763A1 - Pre-fabricated bathroom - Google Patents

Pre-fabricated bathroom Download PDF

Info

Publication number
US20020059763A1
US20020059763A1 US09/851,373 US85137301A US2002059763A1 US 20020059763 A1 US20020059763 A1 US 20020059763A1 US 85137301 A US85137301 A US 85137301A US 2002059763 A1 US2002059763 A1 US 2002059763A1
Authority
US
United States
Prior art keywords
bathroom unit
unit
bathroom
installation
slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US09/851,373
Inventor
Tin Wong
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MADISON CONSULTING SERVICES Ltd
YAU LEE CONSTRUCTION Co Ltd
Original Assignee
MADISON CONSULTING SERVICES Ltd
YAU LEE CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MADISON CONSULTING SERVICES Ltd, YAU LEE CONSTRUCTION Co Ltd filed Critical MADISON CONSULTING SERVICES Ltd
Assigned to YAU LEE CONSTRUCTION COMPANY LIMITED reassignment YAU LEE CONSTRUCTION COMPANY LIMITED ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: WONG, TIN CHEUNG
Assigned to MADISON CONSULTING SERVICES LIMITED reassignment MADISON CONSULTING SERVICES LIMITED ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: YAU LEE CONSTRUCTION COMPANY LIMITED
Publication of US20020059763A1 publication Critical patent/US20020059763A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34869Elements for special technical purposes, e.g. with a sanitary equipment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34815Elements not integrated in a skeleton
    • E04B1/34823Elements not integrated in a skeleton the supporting structure consisting of concrete

Definitions

  • This invention relates to a method for constructing and installing a prefabricated bathroom in multi-storey buildings.
  • the present invention relates to a method for constructing and installing a pre-fabricated bathroom in multi-storey buildings which overcomes the disadvantages of the traditional methods of construction and the prior art.
  • the invention requires the construction of a fully self-contained bathroom unit, which is constructed with lightweight concrete and reinforcement. Concealed conduits are cast in the wall together with mesh reinforcement. Openings for windows, flues, drainage and doors are then formed. The precast bathroom is completed with waterproofing and internal fitting works. The entire unit can then be transferred to the site for installation as and when required.
  • An advantage of the invention is that considerable time is saved in the installation of the bathroom and the number of workmen required for the construction and installation of the bathroom are reduced.
  • a further advantage of the present invention is that as the bathrooms are precast in a factory it is possible to exercise greater degree of quality control which results in a higher standard of finished product.
  • the prefabricated bathroom units can be tested prior to delivery to the site which minimizes remedial action to cure defects.
  • the method of installation of the pre-fabricated bathroom unit on-site requires the entire pre-fabricated structure to be seated on a foundation which is laid for this purpose. Once the pre-fabricated bathroom unit is seated in place precast slabs can then be laid on top of the unit to form the next storey and construction can then proceed. The bathroom can then be finished while construction proceeds.
  • Wall reinforcements are then fixed to the slab to create the four walls of the bathroom unit itself. Building services conduits are provided in the wall and slabs to enable piping and wiring to be installed. Light boxes are also provided and fixed to the wall reinforcement. Steel hooks are also fixed in the reinforcement to enable the entire unit to be lifted and moved to the desired location.
  • the roof slab and walls of the prefabricated bathroom can also be cast in one pour when light weight formwork types such as timber, steel or aluminium are used.
  • the bottom surface of the base slab is disposed with recesses so that it can sit on the floor which has been prepared for its installation.
  • Leveled bedding or bearing pads are disposed at various points on the floor slab for the bathroom unit to sit on. A layer of cement sand slurry is then applied to the floor area where the bathroom unit will sit.
  • a thin strip of suitable compressible material is then attached to the structural wall and the openings in structural wall for the window and drainage outlet.
  • the pre-fabricated bathroom unit can then be lowered to sit on the leveled bearing pads.
  • the installation of the pre-fabricated bathroom unit itself can be completed by the joint between the external wall and the bathroom unit being filled with non-shrink grout to the edge of the joint to form a water tight seal.
  • Precast slabs can then placed on top of the bathroom unit to form the next floor.
  • a topping slab is then cast in situ to complete the floor of the next storey up.
  • the installation cycle can then continue with the erection of the external precast facade of the next floor.
  • FIGS. 1 to 4 illustrate the production sequence of the prefabricated bathroom.
  • FIG. 1 shows the slab reinforcement and the concreted slab.
  • FIG. 2 shows wall reinforcement fixed to the sides of the concrete slab and the entire wall reinforcement being encased in steel moulding ready for concreting.
  • FIG. 3 shows the bathroom unit with 4 walls and the slab to which formwork is attached to cast the roof.
  • FIG. 4 shows the finished layout of the prefabricated bathroom.
  • FIGS. 5 - 9 illustrates the installation sequence of the prefabricated bathroom on-site.
  • FIG. 5 shows the external structural wall where the prefabricated bathroom will be located which is recessed to accommodate the bathroom unit.
  • FIG. 6 shows the preparation of the structural wall to receive the bathroom unit.
  • FIG. 7 shows the bathroom unit being seated on the bearing pad.
  • FIG. 8 shows the bathroom unit installed at the structural wall.
  • FIG. 9 shows the placement of the precast floor slabs on the bathroom unit to commence construction of the floor above.
  • FIG. 10 shows an elevation of one wall of the prefabricated bathroom.
  • FIG. 11 shows a cross section of the bathroom wall.
  • the open roof space of the bathroom unit can then be completed by formwork ( 8 ) being attached to the opening at the top of the bathroom unit.
  • the roof slab ( 9 ) can then be cast.
  • the roof slab ( 9 ) and the walls of the prefabricated bathroom can be cast in one pour when lightweight formwork such as timber is used. Water proofing, internal tiling and other finishing work can then be carried out to complete the bathroom unit.
  • FIGS. 5 - 9 illustrate the installation sequence of the prefabricated bathroom unit on site.
  • the location where the bathroom unit will sit ( 15 ) is levelled out and is then provided with levelled bearing pads ( 11 ) at various points and a layer of cement sand slurry.
  • the external structural wall ( 12 ) has openings for windows and drainage ( 14 ) which correspond with the openings on the bathroom unit ( 5 and 6 ).
  • the external structural wall ( 12 ) is also disposed with a recess ( 13 ) to ensure a tight fit for the bathroom unit.
  • a thin strip of compressible material is then attached to the inner face of the external structural wall and the inner face of the various openings ( 16 ).
  • the prefabricated unit is then lowered into place, using the steel hooks ( 7 ) for lifting purposes, so that the unit sits on the levelled bearing pads ( 11 ).
  • the bottom surface of the base slab of the bathroom unit is disposed with recesses ( 18 ) to ensure that there is a tight fit between the floor ( 17 ) and the bathroom unit.
  • the joint between the bathroom unit and the external wall ( 19 ) can be filled with non shrink grout to the edges of the joint to create a water tight finish. Entry can be gained to the bathroom unit through the door of the unit ( 20 ) to enable internal final touching up to be carried out.
  • Precast slabs ( 21 ) are then laid on top of the bathroom unit to create the floor of the level above.
  • a topping slab can then be cast in situ to complete the floor and work can then commence on the installation of the external precast facade of the floor above.

Abstract

A method of construction and installation of a self contained bathroom unit which is capable of installation in multi-storey buildings. The bathroom unit may be fabricated at a site remote to the site of installation and can be transported to the site as and when required. The bathroom walls are cast with conduits and spaces for light boxes and openings for windows and drainage. Hooks are also cast into the walls to enable the bathroom unit to be lifted to the desired location. The bathroom units are seated on a foundation which is laid for this purpose. The top slab of the bathroom unit can then be used as the formwork and a topping slab is cast in situ to form the floor of the next floor.

Description

  • This invention relates to a method for constructing and installing a prefabricated bathroom in multi-storey buildings. [0001]
  • In the construction of multi-storey buildings the installation of a bathroom usually takes a considerable time as the bathroom has to be created on-site. Work on the bathroom requires the erection of the panels/walls forming the bathroom i.e. the framework for the bathroom, to be erected onsite while the construction is in progress. This process is labor and time intensive which results in increase in cost. [0002]
  • The construction of pre-fabricated bathroom's is known in the art, see Korean patent No. 10-244019. The prior art discloses the construction of the framework of the bathroom panel by panel, in a modular fashion. This process is in itself time and labor-intensive and may not yield cost savings when utilized in multi-storey buildings. [0003]
  • One of the disadvantages of the present method of construction of bathroom units is that as each bathroom is individually fabricated on site it is difficult to maintain quality consistency. [0004]
  • Yet further disadvantages with the present method are that as there is substantial work to be done on site to create the bathroom it takes longer before waterproofing and tiling work can commence, drainage cannot be tested until the bathroom has been assembled. Further the walls of the bathroom unit need to be cut on site to provide recesses for building services conduits. [0005]
  • The present invention relates to a method for constructing and installing a pre-fabricated bathroom in multi-storey buildings which overcomes the disadvantages of the traditional methods of construction and the prior art. [0006]
  • The invention requires the construction of a fully self-contained bathroom unit, which is constructed with lightweight concrete and reinforcement. Concealed conduits are cast in the wall together with mesh reinforcement. Openings for windows, flues, drainage and doors are then formed. The precast bathroom is completed with waterproofing and internal fitting works. The entire unit can then be transferred to the site for installation as and when required. [0007]
  • An advantage of the invention is that considerable time is saved in the installation of the bathroom and the number of workmen required for the construction and installation of the bathroom are reduced. [0008]
  • Yet a further advantage of the present invention is that as the bathrooms are precast in a factory it is possible to exercise greater degree of quality control which results in a higher standard of finished product. The prefabricated bathroom units can be tested prior to delivery to the site which minimizes remedial action to cure defects. [0009]
  • As the building services conduits are cast in the factory no further cutting of the panel walls is necessary to make recesses for building services conduits. [0010]
  • This results in faster construction time and overall savings. As the prefabricated bathroom is constructed as an entire self-contained unit it results in better waterproofing compared with the traditional method of construction. [0011]
  • The method of installation of the pre-fabricated bathroom unit on-site requires the entire pre-fabricated structure to be seated on a foundation which is laid for this purpose. Once the pre-fabricated bathroom unit is seated in place precast slabs can then be laid on top of the unit to form the next storey and construction can then proceed. The bathroom can then be finished while construction proceeds. [0012]
  • The method of construction and installation will now be described in detail. [0013]
  • Method of Construction [0014]
  • The construction of the pre-fabricated bathroom unit is achieved by the following series of steps: [0015]
  • 1. Slab reinforcement is fixed to allow the creation of the floor. Concrete of the desired strength is poured over the reinforcement to create the floor slab. [0016]
  • 2. Wall reinforcements are then fixed to the slab to create the four walls of the bathroom unit itself. Building services conduits are provided in the wall and slabs to enable piping and wiring to be installed. Light boxes are also provided and fixed to the wall reinforcement. Steel hooks are also fixed in the reinforcement to enable the entire unit to be lifted and moved to the desired location. [0017]
  • 3. Steel moulds other then fixed around the wall reinforcement. Concrete of suitable strength is then poured into the mould to create the walls of the bathroom. [0018]
  • 4. Once the floor and walls of the pre-fabricated bathroom have been cast, steel moulds are then stripped and formwork is fixed to the open roof space of the unit to allow the roof slab to be cast. [0019]
  • 5. The roof slab and walls of the prefabricated bathroom can also be cast in one pour when light weight formwork types such as timber, steel or aluminium are used. [0020]
  • 6. Waterproofing, tiling and finish works inside the prefabricated bathroom unit are carried out. [0021]
  • This entire process is carried out off-site and the completed pre-fabricated bathroom unit is then ready to be transported to site as and when it is needed. [0022]
  • The bottom surface of the base slab is disposed with recesses so that it can sit on the floor which has been prepared for its installation. [0023]
  • Installation [0024]
  • At the site the area where the pre-fabricated bathroom will sit which is adjacent to the external structural wall, is marked out and cleared. The external structural wall is recessed to accommodate the bathroom unit and to ensure the walls bathroom unit and the structural wall have a tight fit. [0025]
  • Leveled bedding or bearing pads are disposed at various points on the floor slab for the bathroom unit to sit on. A layer of cement sand slurry is then applied to the floor area where the bathroom unit will sit. [0026]
  • A thin strip of suitable compressible material is then attached to the structural wall and the openings in structural wall for the window and drainage outlet. The pre-fabricated bathroom unit can then be lowered to sit on the leveled bearing pads. The installation of the pre-fabricated bathroom unit itself can be completed by the joint between the external wall and the bathroom unit being filled with non-shrink grout to the edge of the joint to form a water tight seal. [0027]
  • Precast slabs can then placed on top of the bathroom unit to form the next floor. A topping slab is then cast in situ to complete the floor of the next storey up. The installation cycle can then continue with the erection of the external precast facade of the next floor.[0028]
  • The method of construction and installation will now be described by reference to the drawings. [0029]
  • FIGS. [0030] 1 to 4 illustrate the production sequence of the prefabricated bathroom.
  • FIG. 1 shows the slab reinforcement and the concreted slab. [0031]
  • FIG. 2 shows wall reinforcement fixed to the sides of the concrete slab and the entire wall reinforcement being encased in steel moulding ready for concreting. [0032]
  • FIG. 3 shows the bathroom unit with [0033] 4 walls and the slab to which formwork is attached to cast the roof.
  • FIG. 4 shows the finished layout of the prefabricated bathroom. [0034]
  • FIGS. [0035] 5-9 illustrates the installation sequence of the prefabricated bathroom on-site.
  • FIG. 5 shows the external structural wall where the prefabricated bathroom will be located which is recessed to accommodate the bathroom unit. [0036]
  • FIG. 6 shows the preparation of the structural wall to receive the bathroom unit. [0037]
  • FIG. 7 shows the bathroom unit being seated on the bearing pad. [0038]
  • FIG. 8 shows the bathroom unit installed at the structural wall. [0039]
  • FIG. 9 shows the placement of the precast floor slabs on the bathroom unit to commence construction of the floor above. [0040]
  • FIG. 10 shows an elevation of one wall of the prefabricated bathroom. [0041]
  • FIG. 11 shows a cross section of the bathroom wall.[0042]
  • In order to create the precast bathroom steel reinforcement is shaped into a mesh ([0043] 1) to form the basis of the slab. Concrete is then poured over the mesh to create the slab (2). Wall reinforcements (3) are then fixed to the slab (2) to create the four walls of the bathroom unit. Internal conduits (10) to facilitate cabling for light fitments and steel hooks (7) to facilitate lifting of the bathroom units are provided in the wall reinforcements (3). Space for light control boxes (22) are cast into the wall together with the conduits (10) to avoid the necessity for any cutting work once the bathroom unit has been erected and hence speed up the installation process. Openings for windows (5) and drainage (6) are also provided for in the wall reinforcement.
  • Steel moulds ([0044] 4) are then fixed around the wall reinforcement (3) into which concrete is poured to cast the walls.
  • Once the slab and walls have been cast in concrete the open roof space of the bathroom unit can then be completed by formwork ([0045] 8) being attached to the opening at the top of the bathroom unit. The roof slab (9) can then be cast.
  • Alternatively the roof slab ([0046] 9) and the walls of the prefabricated bathroom can be cast in one pour when lightweight formwork such as timber is used. Water proofing, internal tiling and other finishing work can then be carried out to complete the bathroom unit.
  • FIGS. [0047] 5-9 illustrate the installation sequence of the prefabricated bathroom unit on site.
  • The location where the bathroom unit will sit ([0048] 15) is levelled out and is then provided with levelled bearing pads (11) at various points and a layer of cement sand slurry. The external structural wall (12) has openings for windows and drainage (14) which correspond with the openings on the bathroom unit (5 and 6). The external structural wall (12) is also disposed with a recess (13) to ensure a tight fit for the bathroom unit.
  • A thin strip of compressible material is then attached to the inner face of the external structural wall and the inner face of the various openings ([0049] 16).
  • The prefabricated unit is then lowered into place, using the steel hooks ([0050] 7) for lifting purposes, so that the unit sits on the levelled bearing pads (11). The bottom surface of the base slab of the bathroom unit is disposed with recesses (18) to ensure that there is a tight fit between the floor (17) and the bathroom unit.
  • Once the bathroom unit is seated at the desired location the joint between the bathroom unit and the external wall ([0051] 19) can be filled with non shrink grout to the edges of the joint to create a water tight finish. Entry can be gained to the bathroom unit through the door of the unit (20) to enable internal final touching up to be carried out.
  • Precast slabs ([0052] 21) are then laid on top of the bathroom unit to create the floor of the level above. A topping slab can then be cast in situ to complete the floor and work can then commence on the installation of the external precast facade of the floor above.

Claims (9)

1. A method of construction of a self contained bathroom unit capable of installation in multi-storey buildings wherein the bathroom unit may be prefabricated at a site remote from the installation site and wherein the bathroom unit consists of a slab unit, four wall units and a roof unit all of which are constructed using reinforcement and concrete of the appropriate strength and wherein the said bathroom unit may be disposed with conduits and with openings and spaces within the wall units in accordance with the design of the building and wherein the slab unit may be disposed with recesses on the bottom surface.
2. A method of construction of a bathroom unit as claimed in claim 1 above wherein the base of the bathroom unit is cast by pouring concrete of the appropriate strength over slab reinforcement of the desired size.
3. A method of construction of a bathroom unit as claimed in claim 1 above wherein the walls of the unit are formed by fixing reinforcement of the appropriate configuration to the slab unit and wherein hooks and conduits are disposed within the wall reinforcement and wherein the wall reinforcement is disposed with suitable openings and spaces and wherein the reinforcement is surrounded by suitable formwork and wherein concrete of the appropriate strength is poured into the formwork.
4. A method of construction of a bathroom unit as claimed in claim 1 wherein the roof slab is cast by fixing formwork in the roof space of the precast bathroom unit and pouring concrete over the formwork.
5. A method of installation of a prefabricated bathroom unit in a multi-storey building wherein the bathroom unit may be seated on suitable levelled pads disposed at various points on the floor surface where the unit will be installed and wherein a layer of cement sand slurry has been applied to the floor surface.
6. A method of installation of a prefabricated bathroom unit as claimed in claim 5 above wherein a layer of suitable compressible material may be attached by suitable means to the inner face of the external structural walls and openings in the structural walls
7. A method of installation of a prefabricated bathroom unit as claimed in claim 5 above wherein the joint between the structural wall and the bathroom unit may be sealed by means of a non-shrink grout of other suitable non-shrink material.
8. A method of installation of a prefabricated bathroom unit as claimed in claim 5 above wherein the top slab of the bathroom unit may be used to form the formwork for the topping slab which forms the floor of the unit above and which maybe cast in situ.
9. A method of installation of a prefabricated bathroom unit as claimed in claim 5 above where in the inner face of the structural walls may be disposed with a recess.
US09/851,373 2000-05-19 2001-05-09 Pre-fabricated bathroom Abandoned US20020059763A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB0012036.0 2000-05-19
GB0012036A GB2362659A (en) 2000-05-19 2000-05-19 Self-contained bathroom unit construction method

Publications (1)

Publication Number Publication Date
US20020059763A1 true US20020059763A1 (en) 2002-05-23

Family

ID=9891869

Family Applications (1)

Application Number Title Priority Date Filing Date
US09/851,373 Abandoned US20020059763A1 (en) 2000-05-19 2001-05-09 Pre-fabricated bathroom

Country Status (6)

Country Link
US (1) US20020059763A1 (en)
JP (1) JP2002004610A (en)
CN (1) CN1324975A (en)
AU (1) AU4388901A (en)
GB (1) GB2362659A (en)
SG (1) SG99899A1 (en)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1728982A2 (en) 2005-06-04 2006-12-06 IBS Filtran Kunststoff-/Metallerzeugnisse GmbH Device and method for mounting a component in an oil sump
ES2319136A1 (en) * 2006-01-31 2009-05-04 Arquitectura Research, S.L. Adaptable and perfectible modular system for the construction of bathrooms. (Machine-translation by Google Translate, not legally binding)
CN102777033A (en) * 2011-03-17 2012-11-14 有利华建筑预制件有限公司 Method for mounting prefabricated kitchen
US20140352232A1 (en) * 2012-01-23 2014-12-04 Inter Hospitality Holding B.V. Method and system for construction of a building
US8950132B2 (en) 2010-06-08 2015-02-10 Innovative Building Technologies, Llc Premanufactured structures for constructing buildings
US8978324B2 (en) 2010-06-08 2015-03-17 Innovative Building Technologies, Llc Pre-manufactured utility wall
US9027307B2 (en) 2010-06-08 2015-05-12 Innovative Building Technologies, Llc Construction system and method for constructing buildings using premanufactured structures
USD765266S1 (en) 2013-07-22 2016-08-30 Vastint Hospitablity B.V. Prefabricated module design
WO2016134423A1 (en) * 2015-02-27 2016-09-01 Hickory Design Pty Ltd Modular room
US9464436B2 (en) 2012-01-23 2016-10-11 Vastint Hospitality B.V. Prefabricated panel for a building
US9493940B2 (en) 2010-06-08 2016-11-15 Innovative Building Technologies, Llc Slab construction system and method for constructing multi-story buildings using pre-manufactured structures
US9631359B2 (en) * 2012-01-23 2017-04-25 Vastint Hospitality B.V. Prefabricated module for a building
US10041289B2 (en) 2014-08-30 2018-08-07 Innovative Building Technologies, Llc Interface between a floor panel and a panel track
AU2015100344B4 (en) * 2014-09-30 2018-08-30 Blythe Assets Pty Ltd Building system and method
US10260250B2 (en) 2014-08-30 2019-04-16 Innovative Building Technologies, Llc Diaphragm to lateral support coupling in a structure
US10323428B2 (en) 2017-05-12 2019-06-18 Innovative Building Technologies, Llc Sequence for constructing a building from prefabricated components
US10329764B2 (en) 2014-08-30 2019-06-25 Innovative Building Technologies, Llc Prefabricated demising and end walls
US10364572B2 (en) 2014-08-30 2019-07-30 Innovative Building Technologies, Llc Prefabricated wall panel for utility installation
US10487493B2 (en) 2017-05-12 2019-11-26 Innovative Building Technologies, Llc Building design and construction using prefabricated components
US10508442B2 (en) 2016-03-07 2019-12-17 Innovative Building Technologies, Llc Floor and ceiling panel for slab-free floor system of a building
US10676923B2 (en) 2016-03-07 2020-06-09 Innovative Building Technologies, Llc Waterproofing assemblies and prefabricated wall panels including the same
US20200199868A1 (en) * 2018-12-19 2020-06-25 Yau Lee Wah Construction Materials (Huizhou) Company Limited Prefabricated bathroom and methods for constructing and installing the same
US10724228B2 (en) 2017-05-12 2020-07-28 Innovative Building Technologies, Llc Building assemblies and methods for constructing a building using pre-assembled floor-ceiling panels and walls
US10900224B2 (en) 2016-03-07 2021-01-26 Innovative Building Technologies, Llc Prefabricated demising wall with external conduit engagement features
US10961710B2 (en) 2016-03-07 2021-03-30 Innovative Building Technologies, Llc Pre-assembled wall panel for utility installation
US11054148B2 (en) 2014-08-30 2021-07-06 Innovative Building Technologies, Llc Heated floor and ceiling panel with a corrugated layer for modular use in buildings
US11098475B2 (en) 2017-05-12 2021-08-24 Innovative Building Technologies, Llc Building system with a diaphragm provided by pre-fabricated floor panels

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2900673B1 (en) * 2006-05-03 2008-08-08 Scorim Sarl HOUSING MODULE WITH ANGULAR REINFORCEMENT
BRPI0801081A (en) * 2008-01-03 2008-11-04 Dos Santos Sidnei Borges production system and quick assembly of room modules and building coverage for home construction or other
CN101603373B (en) * 2008-06-13 2012-03-21 深圳海龙建筑制品有限公司 Ceramsite concrete, integral prefabricated ceramsite concrete washroom and production method of ceramsite concrete
CN102230339A (en) * 2011-03-17 2011-11-02 有利华建筑预制件有限公司 Prefabricated kitchen and construction and installation method thereof
CN102230338A (en) * 2011-03-17 2011-11-02 有利华建筑预制件有限公司 Prefabricated toilet and construction method and installation method thereof
CN102777032B (en) * 2011-03-17 2015-04-15 有利华建筑预制件有限公司 Installation method of prefabricated toilet
ES2431441B1 (en) * 2012-04-24 2014-07-31 Manuel FERNÁNDEZ MATA Prefabricated concrete block house and manufacturing process of said monoblock house.
CN111456252A (en) * 2020-05-06 2020-07-28 有利华建材(惠州)有限公司 Steel assembled synthetic concrete building and construction method thereof

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2037895A (en) * 1931-11-05 1936-04-21 Gugler Eric Building construction
US3162863A (en) * 1962-09-27 1964-12-29 Albert L Wokas Prefabricated bathrooms and prefabricated restrooms
BE641890A (en) * 1962-12-29
GB1460111A (en) * 1974-02-22 1976-12-31 Galvagni M Three-dimensional pre-fabricated structural elements to be assembled in habitation units
AU527272B2 (en) * 1979-06-14 1983-02-24 Hanford Pty. Ltd. Concrete from module
DE2940884A1 (en) * 1979-10-09 1981-04-23 Hans Wien Scheidl Prefab. bathroom or toilet room cell - has reinforcement linking concrete walls, ceiling and floor, of same thickness as rendering
EP0229460B1 (en) * 1985-11-15 1990-07-25 Australian Stratacore Holdings Ltd Improved building system for multi-storey buildings

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1728982A2 (en) 2005-06-04 2006-12-06 IBS Filtran Kunststoff-/Metallerzeugnisse GmbH Device and method for mounting a component in an oil sump
ES2319136A1 (en) * 2006-01-31 2009-05-04 Arquitectura Research, S.L. Adaptable and perfectible modular system for the construction of bathrooms. (Machine-translation by Google Translate, not legally binding)
US10190309B2 (en) 2010-06-08 2019-01-29 Innovative Building Technologies, Llc Slab construction system and method for constructing multi-story buildings using pre-manufactured structures
US8950132B2 (en) 2010-06-08 2015-02-10 Innovative Building Technologies, Llc Premanufactured structures for constructing buildings
US8978324B2 (en) 2010-06-08 2015-03-17 Innovative Building Technologies, Llc Pre-manufactured utility wall
US9027307B2 (en) 2010-06-08 2015-05-12 Innovative Building Technologies, Llc Construction system and method for constructing buildings using premanufactured structures
US9382709B2 (en) 2010-06-08 2016-07-05 Innovative Building Technologies, Llc Premanufactured structures for constructing buildings
US10145103B2 (en) 2010-06-08 2018-12-04 Innovative Building Technologies, Llc Premanufactured structures for constructing buildings
US9493940B2 (en) 2010-06-08 2016-11-15 Innovative Building Technologies, Llc Slab construction system and method for constructing multi-story buildings using pre-manufactured structures
CN102777033A (en) * 2011-03-17 2012-11-14 有利华建筑预制件有限公司 Method for mounting prefabricated kitchen
US20140352232A1 (en) * 2012-01-23 2014-12-04 Inter Hospitality Holding B.V. Method and system for construction of a building
US9464436B2 (en) 2012-01-23 2016-10-11 Vastint Hospitality B.V. Prefabricated panel for a building
US9556632B2 (en) * 2012-01-23 2017-01-31 Vastint Hospitality B.V. Method and system for construction of a building
US9631359B2 (en) * 2012-01-23 2017-04-25 Vastint Hospitality B.V. Prefabricated module for a building
USD765266S1 (en) 2013-07-22 2016-08-30 Vastint Hospitablity B.V. Prefabricated module design
USD867616S1 (en) 2013-07-22 2019-11-19 Vastint Hospitality B.V. Prefabricated module
US10975590B2 (en) 2014-08-30 2021-04-13 Innovative Building Technologies, Llc Diaphragm to lateral support coupling in a structure
US11060286B2 (en) 2014-08-30 2021-07-13 Innovative Building Technologies, Llc Prefabricated wall panel for utility installation
US11054148B2 (en) 2014-08-30 2021-07-06 Innovative Building Technologies, Llc Heated floor and ceiling panel with a corrugated layer for modular use in buildings
US10329764B2 (en) 2014-08-30 2019-06-25 Innovative Building Technologies, Llc Prefabricated demising and end walls
US10364572B2 (en) 2014-08-30 2019-07-30 Innovative Building Technologies, Llc Prefabricated wall panel for utility installation
US10041289B2 (en) 2014-08-30 2018-08-07 Innovative Building Technologies, Llc Interface between a floor panel and a panel track
US10260250B2 (en) 2014-08-30 2019-04-16 Innovative Building Technologies, Llc Diaphragm to lateral support coupling in a structure
AU2015100344B4 (en) * 2014-09-30 2018-08-30 Blythe Assets Pty Ltd Building system and method
WO2016134423A1 (en) * 2015-02-27 2016-09-01 Hickory Design Pty Ltd Modular room
US10961710B2 (en) 2016-03-07 2021-03-30 Innovative Building Technologies, Llc Pre-assembled wall panel for utility installation
US10900224B2 (en) 2016-03-07 2021-01-26 Innovative Building Technologies, Llc Prefabricated demising wall with external conduit engagement features
US10508442B2 (en) 2016-03-07 2019-12-17 Innovative Building Technologies, Llc Floor and ceiling panel for slab-free floor system of a building
US10676923B2 (en) 2016-03-07 2020-06-09 Innovative Building Technologies, Llc Waterproofing assemblies and prefabricated wall panels including the same
US10724228B2 (en) 2017-05-12 2020-07-28 Innovative Building Technologies, Llc Building assemblies and methods for constructing a building using pre-assembled floor-ceiling panels and walls
US11098475B2 (en) 2017-05-12 2021-08-24 Innovative Building Technologies, Llc Building system with a diaphragm provided by pre-fabricated floor panels
US10487493B2 (en) 2017-05-12 2019-11-26 Innovative Building Technologies, Llc Building design and construction using prefabricated components
US10323428B2 (en) 2017-05-12 2019-06-18 Innovative Building Technologies, Llc Sequence for constructing a building from prefabricated components
US20200199868A1 (en) * 2018-12-19 2020-06-25 Yau Lee Wah Construction Materials (Huizhou) Company Limited Prefabricated bathroom and methods for constructing and installing the same
US10982427B2 (en) * 2018-12-19 2021-04-20 Yau Lee Wah Construction Materials (Huizhou) Company Limited Prefabricated bathroom and methods for constructing and installing the same

Also Published As

Publication number Publication date
GB2362659A (en) 2001-11-28
AU4388901A (en) 2001-11-22
JP2002004610A (en) 2002-01-09
SG99899A1 (en) 2003-11-27
GB0012036D0 (en) 2000-07-05
CN1324975A (en) 2001-12-05

Similar Documents

Publication Publication Date Title
US20020059763A1 (en) Pre-fabricated bathroom
CN101818527B (en) Assembled integral shear wall structure system and construction method thereof
US7665250B2 (en) System for construction of a compression structure with corner blocks, key blocks, and corner block supports
US4314430A (en) Core building system
CN102116061A (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN107558626A (en) A kind of prefabricated assembled wall structure and the method using this structure building house
CN106522359A (en) Total-prefabricated rural residential class composite wall structure system and construction method thereof
CN103306497B (en) Shock prevention and strengthening construction method for existing brickwork dwelling house fabricated structure
AU2010354402A1 (en) Method for producing compact modules for construction
CN1079130C (en) Construction method of 3D architeccture system for house building
KR20170000255A (en) Construction method for bathroom and Bathroom using the same
CN109505352A (en) Integrated hollow wall assembly construction technology synchronous with concrete frame structure
RU2421580C1 (en) Method to erect site-cast skeleton building with decorative outer finish
WO1992021834A1 (en) Precast insulated concrete panel for prefabricated building structure
RU55804U1 (en) RESIDENTIAL FRAME BUILDING, BUILDING FRAME AND BUILDING WALL
CN208280410U (en) Precast concrete entirety ground floor for kitchen and toilet
GB2320737A (en) Semi precast method of construction of multi-storey buildings
CN112761245A (en) Assembled reinforced concrete building main body structure and installation construction method thereof
CN112144675A (en) Precast concrete reversed ridge with overhanging reinforcing steel bars and construction method
RU2057865C1 (en) Method for erecting buildings of monolithic concrete and reinforced concrete with monolithic facing
CN109779312A (en) The blank integral vacuum toilet of fulgurite separate type, wall setting water pipe groove and hole
CN109779310A (en) A kind of co-layer draining blank integral vacuum toilet of outer wall provided pipe line groove hole
CN109779317A (en) Fulgurite is embedded, the blank integral vacuum toilet of wall setting water pipe groove
CN109779311A (en) The hard-cover integral vacuum toilet of fulgurite separate type, wall setting water pipe groove and hole
RU2794678C1 (en) Method for manufacturing a reinforced concrete block room for a mobile workshop for block housing construction

Legal Events

Date Code Title Description
AS Assignment

Owner name: YAU LEE CONSTRUCTION COMPANY LIMITED, HONG KONG

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:WONG, TIN CHEUNG;REEL/FRAME:012393/0040

Effective date: 20011122

Owner name: MADISON CONSULTING SERVICES LIMITED, VIRGIN ISLAND

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:YAU LEE CONSTRUCTION COMPANY LIMITED;REEL/FRAME:012393/0045

Effective date: 20000531

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO PAY ISSUE FEE