SG141277A1 - A method of contemporaneously constructing more than one semi- submersible rig using transverse skidding - Google Patents
A method of contemporaneously constructing more than one semi- submersible rig using transverse skiddingInfo
- Publication number
- SG141277A1 SG141277A1 SG200606560-1A SG2006065601A SG141277A1 SG 141277 A1 SG141277 A1 SG 141277A1 SG 2006065601 A SG2006065601 A SG 2006065601A SG 141277 A1 SG141277 A1 SG 141277A1
- Authority
- SG
- Singapore
- Prior art keywords
- hull
- semi
- rig
- constructing
- dry dock
- Prior art date
Links
- 230000013011 mating Effects 0.000 abstract 2
- 230000000284 resting effect Effects 0.000 abstract 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C3/00—Launching or hauling-out by landborne slipways; Slipways
- B63C3/04—Launching or hauling-out by landborne slipways; Slipways by sideways movement of vessel
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/003—Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B77/00—Transporting or installing offshore structures on site using buoyancy forces, e.g. using semi-submersible barges, ballasting the structure or transporting of oil-and-gas platforms
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/02—Supports for the drilling machine, e.g. derricks or masts specially adapted for underwater drilling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
- B63B73/40—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by joining methods
- B63B73/43—Welding, e.g. laser welding
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Ocean & Marine Engineering (AREA)
- Fluid Mechanics (AREA)
- Combustion & Propulsion (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Transportation (AREA)
- Chemical & Material Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Automatic Assembly (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
- Drying Of Solid Materials (AREA)
- Earth Drilling (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SG200606560-1A SG141277A1 (en) | 2006-09-25 | 2006-09-25 | A method of contemporaneously constructing more than one semi- submersible rig using transverse skidding |
KR1020087015432A KR101395773B1 (ko) | 2006-09-25 | 2007-09-24 | 횡방향 스키딩을 이용하여 하나 이상의 반 잠수형 리그의동시 건조 방법 |
CN2007800027727A CN101370708B (zh) | 2006-09-25 | 2007-09-24 | 一种应用横向滑动同时建造一个以上的半潜水钻探平台的方法 |
PCT/SG2007/000321 WO2008039155A1 (en) | 2006-09-25 | 2007-09-24 | A method of contemporaneously constructing more than one semi-submersible rig using transverse skidding |
TW096135741A TWI380932B (zh) | 2006-09-25 | 2007-09-26 | 使用橫向滑行同時建構超過一個半沈式鑽探平台的方法 |
NO20082967A NO338374B1 (no) | 2006-09-25 | 2008-07-04 | Fremgangsmåte for samtidig konstruksjon av mer enn én halvt nedsenkbar rigg ved hjelp av tversgående slisking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SG200606560-1A SG141277A1 (en) | 2006-09-25 | 2006-09-25 | A method of contemporaneously constructing more than one semi- submersible rig using transverse skidding |
Publications (1)
Publication Number | Publication Date |
---|---|
SG141277A1 true SG141277A1 (en) | 2008-04-28 |
Family
ID=38882244
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SG200606560-1A SG141277A1 (en) | 2006-09-25 | 2006-09-25 | A method of contemporaneously constructing more than one semi- submersible rig using transverse skidding |
Country Status (6)
Country | Link |
---|---|
KR (1) | KR101395773B1 (ko) |
CN (1) | CN101370708B (ko) |
NO (1) | NO338374B1 (ko) |
SG (1) | SG141277A1 (ko) |
TW (1) | TWI380932B (ko) |
WO (1) | WO2008039155A1 (ko) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200461867Y1 (ko) * | 2010-03-02 | 2012-08-09 | 에스티엑스조선해양 주식회사 | 선박의 런칭시스템 |
KR101948124B1 (ko) * | 2012-10-08 | 2019-02-15 | 대우조선해양 주식회사 | 로로선의 상부 파트 블록의 운송방법과 이를 이용한 블록의 탑재 공법 |
CN105480380B (zh) * | 2015-11-25 | 2017-10-27 | 中国海洋石油总公司 | 张力腿平台上部模块与下部浮体结构的合拢工艺 |
CN106956755A (zh) * | 2016-01-08 | 2017-07-18 | 上海船厂船舶有限公司 | 滑板组 |
CN106184615B (zh) * | 2016-06-30 | 2018-10-30 | 海阳中集来福士海洋工程有限公司 | 半潜式平台的建造方法 |
CN108001630B (zh) * | 2017-11-28 | 2020-05-05 | 海洋石油工程(青岛)有限公司 | 大型模块的装船工艺 |
CN109533226A (zh) * | 2018-12-23 | 2019-03-29 | 大连理工大学 | 一种用于船舶的纵横向移船系统及其工作方法 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS56154381A (en) * | 1980-04-26 | 1981-11-28 | Mitsui Eng & Shipbuild Co Ltd | Construction of semi-submersible rig |
TW370501B (en) * | 1996-07-27 | 1999-09-21 | Orca Marine Company Ltd | Floating dock |
JP3871418B2 (ja) * | 1997-10-30 | 2007-01-24 | 大成建設株式会社 | 海洋構造物の構築方法 |
US6374764B1 (en) * | 1998-11-06 | 2002-04-23 | Exxonmobil Upstream Research Company | Deck installation system for offshore structures |
US6935810B2 (en) * | 2003-06-11 | 2005-08-30 | Deepwater Technologies, Inc. | Semi-submersible multicolumn floating offshore platform |
GB2430915B (en) * | 2003-06-11 | 2007-10-17 | Deepwater Technologies Inc | Semi-submersible multicolumn floating offshore platform |
SG135929A1 (en) * | 2003-10-17 | 2007-10-29 | Jurong Shipyard Pte Ltd | A method of constructing a semi-submersible vessel using dry dock mating |
KR100525710B1 (ko) * | 2004-03-12 | 2005-11-03 | 휘선건설(주) | 케이슨 진수대 및 이를 이용한 케이슨 진수방법 |
KR100949891B1 (ko) * | 2004-10-08 | 2010-03-25 | 현대중공업 주식회사 | 육상건조된 선박의 횡방향 진수공법과 그 장치 |
KR100623201B1 (ko) * | 2004-12-13 | 2006-09-14 | Stx조선주식회사 | 스키드 론칭시스템을 이용한 육상 선박 건조 및 진수방법 |
-
2006
- 2006-09-25 SG SG200606560-1A patent/SG141277A1/en unknown
-
2007
- 2007-09-24 WO PCT/SG2007/000321 patent/WO2008039155A1/en active Application Filing
- 2007-09-24 KR KR1020087015432A patent/KR101395773B1/ko active IP Right Grant
- 2007-09-24 CN CN2007800027727A patent/CN101370708B/zh active Active
- 2007-09-26 TW TW096135741A patent/TWI380932B/zh active
-
2008
- 2008-07-04 NO NO20082967A patent/NO338374B1/no unknown
Also Published As
Publication number | Publication date |
---|---|
CN101370708A (zh) | 2009-02-18 |
WO2008039155A1 (en) | 2008-04-03 |
KR20090076796A (ko) | 2009-07-13 |
TWI380932B (zh) | 2013-01-01 |
NO338374B1 (no) | 2016-08-15 |
CN101370708B (zh) | 2012-01-25 |
TW200833558A (en) | 2008-08-16 |
NO20082967L (no) | 2008-07-04 |
KR101395773B1 (ko) | 2014-05-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
TW200833558A (en) | A method of contemporaneously constructing more than one semi-submersible rig using transverse skidding | |
WO2005118963A3 (en) | Ballasting offshore platform with buoy assistance | |
WO2008155667A3 (en) | Extension bridges and methods of tender assist | |
WO2007101155A3 (en) | Battered column tension leg platform | |
TW200628362A (en) | Method for building ship on ground and launching ship using skid launching system | |
CN105813938B (zh) | 船型结构物 | |
WO2004110855A3 (en) | Semi-submersible multicolumn floating offshore platform | |
WO2005072221A3 (en) | Ballast system for tension leg platform | |
US8534213B2 (en) | Skid shoe assembly for loading and transporting large structures | |
AU751345B2 (en) | Method to transport and install a deck | |
MX2009005403A (es) | Estructura para transporte, instalacion y desmantelamiento de un puente de una plataforma petrolera y proceso para usar tal estructura. | |
NO20062140L (no) | Fremgangsmate for a konstruere et halvt neddykkbart fartoy ved a benytte torrdokkmontering | |
WO2006104501A3 (en) | Method for deploying floating platform | |
CN202272149U (zh) | 侧船体可相对于主船体移动的三体船 | |
EP2364909B1 (en) | Deep Water Offshore Apparatus Assembly Method | |
US20120006247A1 (en) | Skid beam assembly for loading and transporting large structures | |
US9022693B1 (en) | Rapid deployable floating production system | |
WO2004002812A3 (en) | Self-elevating offshore structure | |
CN107100570A (zh) | 采油树下放导向工装的下部基座 | |
Ji et al. | Spar Deck Float-Over Feasibility Study for West Africa Environment Condition | |
KR20150003734U (ko) | 육상 건조 작업을 위한 잭업 리그의 레그 레벨링 커넥터 | |
AU2010216203B2 (en) | Skid shoe assembly for loading and transporting large structures | |
Chianis | ADVANCEMENTS IN TENSION LEG PLATFORM TECHNOLOGY | |
CN105651531A (zh) | 月池车试验平台 | |
UA35772U (ru) | Погружная платформа со стабилизирующими колоннами, которые опираются на грунт |