CN105480380B - 张力腿平台上部模块与下部浮体结构的合拢工艺 - Google Patents
张力腿平台上部模块与下部浮体结构的合拢工艺 Download PDFInfo
- Publication number
- CN105480380B CN105480380B CN201510829196.XA CN201510829196A CN105480380B CN 105480380 B CN105480380 B CN 105480380B CN 201510829196 A CN201510829196 A CN 201510829196A CN 105480380 B CN105480380 B CN 105480380B
- Authority
- CN
- China
- Prior art keywords
- tlp
- slideway
- lower float
- upper module
- tension leg
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B75/00—Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Wind Motors (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510829196.XA CN105480380B (zh) | 2015-11-25 | 2015-11-25 | 张力腿平台上部模块与下部浮体结构的合拢工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510829196.XA CN105480380B (zh) | 2015-11-25 | 2015-11-25 | 张力腿平台上部模块与下部浮体结构的合拢工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105480380A CN105480380A (zh) | 2016-04-13 |
CN105480380B true CN105480380B (zh) | 2017-10-27 |
Family
ID=55667737
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510829196.XA Active CN105480380B (zh) | 2015-11-25 | 2015-11-25 | 张力腿平台上部模块与下部浮体结构的合拢工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105480380B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105836049B (zh) * | 2016-04-26 | 2017-09-12 | 中国海洋石油总公司 | 张力腿平台的陆地整体合拢工艺 |
CN109625172A (zh) * | 2018-12-18 | 2019-04-16 | 海洋石油工程(青岛)有限公司 | 半潜式平台上部组块与下部浮体结构滑道提升合拢的工艺 |
CN109625174A (zh) * | 2018-12-18 | 2019-04-16 | 海洋石油工程(青岛)有限公司 | 半潜式平台上部组块与下部浮体结构滑道顶升合拢的工艺 |
CN109625173B (zh) * | 2018-12-18 | 2020-12-08 | 海洋石油工程(青岛)有限公司 | 用于海工模块建造的工艺 |
CN112937797B (zh) * | 2021-03-19 | 2022-05-31 | 中海石油(中国)有限公司 | 圆筒型fpso合拢对接方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU992303A1 (ru) * | 1981-05-27 | 1983-01-30 | Предприятие П/Я В-8221 | Способ постройки и спуска на воду самоподъемной плавучей платформы и устройство дл его осуществлени |
CN1139470A (zh) * | 1994-01-25 | 1997-01-01 | 彼特.G.怀伯罗 | 张力支柱平台及其安装方法 |
FR2837461A1 (fr) * | 2002-03-22 | 2003-09-26 | Technip Coflexip | Structure de transport, d'installation et de demantelement d'un pont d'une plate-forme petroliere fixe et procede de mise en oeuvre d'une telle structure |
CN101370708A (zh) * | 2006-09-25 | 2009-02-18 | 裕廊船厂有限公司 | 一种应用横向滑动同时建造一个以上的半潜水钻探平台的方法 |
CN101804849A (zh) * | 2010-04-15 | 2010-08-18 | 南通中远船务工程有限公司 | 用于海上油气开发的半潜式平台的建造方案 |
CN104802928A (zh) * | 2014-05-13 | 2015-07-29 | 中集海洋工程研究院有限公司 | 半潜式平台的建造合拢方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS55102792A (en) * | 1979-01-31 | 1980-08-06 | Ishikawajima Harima Heavy Ind Co Ltd | Construction method of semi-submersible structure |
JPS587015A (ja) * | 1981-07-03 | 1983-01-14 | Mitsui Eng & Shipbuild Co Ltd | 高揚程着地式昇降作業台の脚組立方法 |
-
2015
- 2015-11-25 CN CN201510829196.XA patent/CN105480380B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU992303A1 (ru) * | 1981-05-27 | 1983-01-30 | Предприятие П/Я В-8221 | Способ постройки и спуска на воду самоподъемной плавучей платформы и устройство дл его осуществлени |
CN1139470A (zh) * | 1994-01-25 | 1997-01-01 | 彼特.G.怀伯罗 | 张力支柱平台及其安装方法 |
FR2837461A1 (fr) * | 2002-03-22 | 2003-09-26 | Technip Coflexip | Structure de transport, d'installation et de demantelement d'un pont d'une plate-forme petroliere fixe et procede de mise en oeuvre d'une telle structure |
CN101370708A (zh) * | 2006-09-25 | 2009-02-18 | 裕廊船厂有限公司 | 一种应用横向滑动同时建造一个以上的半潜水钻探平台的方法 |
CN101804849A (zh) * | 2010-04-15 | 2010-08-18 | 南通中远船务工程有限公司 | 用于海上油气开发的半潜式平台的建造方案 |
CN104802928A (zh) * | 2014-05-13 | 2015-07-29 | 中集海洋工程研究院有限公司 | 半潜式平台的建造合拢方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105480380A (zh) | 2016-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105480380B (zh) | 张力腿平台上部模块与下部浮体结构的合拢工艺 | |
US20130092069A1 (en) | Integrally equipped heavy draught floating type oil production platform with unconditional stability and offshore installation method thereof | |
CN104743058B (zh) | 张力腿平台上部组块浮托安装的方法 | |
Liu et al. | Offshore platform integration and floatover technology | |
CN101804849A (zh) | 用于海上油气开发的半潜式平台的建造方案 | |
CN103883273A (zh) | 利用饱和潜水支持船上的双吊机安装立管的方法 | |
CN104210627A (zh) | 用于自升式平台平地建造下水的装置及方法 | |
WO2019000757A1 (zh) | 一种船舶过驳中的加水方法 | |
CN102409650A (zh) | 一种浅水海洋导管架平台的安装方法 | |
CN201685997U (zh) | 利用浮船坞造船的工装 | |
CN101817393B (zh) | 利用浮船坞造船的方法 | |
CN107399412B (zh) | Mopu的建造方法 | |
CN107117269A (zh) | 一种适用于北极的新型半潜式海洋平台及使用方法 | |
CN102661444B (zh) | 海洋石油平台深水双管系的安装方法 | |
CN104802950A (zh) | 一种自升式水下浮体张力腿平台及其建造方法 | |
CN110155263B (zh) | 一种圆筒形半潜式钻井平台 | |
Zeng et al. | Challenges and solutions of an ultra-deepwater dry tree system for drilling and production in the Gulf of Mexico | |
CN107323618A (zh) | 一种用于超深水作业的新型张力腿平台的串联多浮筒式混合系泊定位系统 | |
CN103465742B (zh) | 步履式半潜两栖工程船 | |
Maher et al. | Floatover deck installation for spars | |
Leverette et al. | The tension leg platform: from Hutton to Big Foot | |
KR101707412B1 (ko) | 해저 브리지 시스템 | |
Zhang et al. | Application of a newly built semi-submersible vessel for transportation of a tension leg platform | |
Ye et al. | A Viable Dry Tree Semi-Submersible Concept with Tapered Columns | |
Liu et al. | Platform Integration and Stationing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing Co-patentee after: Offshore Oil Engineering Co., Ltd. Patentee after: China Offshore Oil Group Co., Ltd. Co-patentee after: Offshore Oil Engineering (Qingdao) Co., Ltd. Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing Co-patentee before: Offshore Oil Engineering Co., Ltd. Patentee before: China National Offshore Oil Corporation Co-patentee before: Offshore Oil Engineering (Qingdao) Co., Ltd. |
|
CP01 | Change in the name or title of a patent holder |