RU2518178C2 - Система и способ для управления электроэнергетической системой - Google Patents

Система и способ для управления электроэнергетической системой Download PDF

Info

Publication number
RU2518178C2
RU2518178C2 RU2010150352/07A RU2010150352A RU2518178C2 RU 2518178 C2 RU2518178 C2 RU 2518178C2 RU 2010150352/07 A RU2010150352/07 A RU 2010150352/07A RU 2010150352 A RU2010150352 A RU 2010150352A RU 2518178 C2 RU2518178 C2 RU 2518178C2
Authority
RU
Russia
Prior art keywords
data
electric power
event
substation
network
Prior art date
Application number
RU2010150352/07A
Other languages
English (en)
Other versions
RU2010150352A (ru
Inventor
Джеффри Д. ТАФТ
Original Assignee
Эксенчер Глоубл Сервисиз Лимитед
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to US12729408P priority Critical
Priority to US61/127,294 priority
Priority to US20185608P priority
Priority to US61/201,856 priority
Application filed by Эксенчер Глоубл Сервисиз Лимитед filed Critical Эксенчер Глоубл Сервисиз Лимитед
Priority to PCT/US2009/000888 priority patent/WO2009136975A2/en
Publication of RU2010150352A publication Critical patent/RU2010150352A/ru
Application granted granted Critical
Publication of RU2518178C2 publication Critical patent/RU2518178C2/ru

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D4/00Tariff metering apparatus
    • G01D4/002Remote reading of utility meters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/0006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network for single frequency AC networks
    • H02J13/0013Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network for single frequency AC networks characterised by transmission structure between the control or monitoring unit and the controlled or monitored unit
    • H02J13/0017Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network for single frequency AC networks characterised by transmission structure between the control or monitoring unit and the controlled or monitored unit with direct transmission between the control or monitoring unit and the controlled or monitored unit
    • H02J13/0062Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network for single frequency AC networks characterised by transmission structure between the control or monitoring unit and the controlled or monitored unit with direct transmission between the control or monitoring unit and the controlled or monitored unit using a data transmission bus
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. by electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. by electricity meters by electronic methods
    • G01R22/061Details of electronic electricity meters
    • G01R22/063Details of electronic electricity meters related to remote communication
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B15/00Systems controlled by a computer
    • G05B15/02Systems controlled by a computer electric
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00016Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/007Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources
    • H02J3/0073Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources for providing alternative feeding paths between load and source when the main path fails, e.g. transformers, busbars
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00022Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00022Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission
    • H02J13/00026Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission involving a local wireless network, e.g. Wi-Fi, ZigBee or Bluetooth
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/0006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network for single frequency AC networks
    • H02J13/0013Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network for single frequency AC networks characterised by transmission structure between the control or monitoring unit and the controlled or monitored unit
    • H02J13/0017Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network for single frequency AC networks characterised by transmission structure between the control or monitoring unit and the controlled or monitored unit with direct transmission between the control or monitoring unit and the controlled or monitored unit
    • H02J13/0075Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network for single frequency AC networks characterised by transmission structure between the control or monitoring unit and the controlled or monitored unit with direct transmission between the control or monitoring unit and the controlled or monitored unit using radio means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/7838
    • Y02E60/7853
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/30State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/221General power management systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/30Smart metering, e.g. specially adapted for remote reading
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/124Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Abstract

Изобретение относится к области электротехники и может быть использовано в энергетических системах. Технический результат заключается в улучшении управления сетями электроэнергетической системы. Интеллектуальная энергосистема для улучшения управления энергосистемой общего пользования включает в себя использование датчиков на различных участках энергосистемы общего пользования, с применением технологии передачи данных и компьютерной технологии, таких как дополнительные структуры шины, для обновления электроэнергетической системы таким образом, чтобы она могла работать более эффективно и надежно, и для поддержания дополнительных услуг для потребителей. Интеллектуальная энергосистема может включать в себя распределенное интеллектуальное средство в энергосистеме общего пользования (отдельное от интеллектуальных средств центра управления), включающее в себя устройства, которые генерируют данные на разных участках энергосистемы, анализируют сгенерированные данные и автоматически модифицируют работу участка электроэнергетической системы. 6 н. и 40 з.п. ф-лы, 37 ил.

Description

Область техники, к которой относится изобретениеFIELD OF THE INVENTION

Настоящее изобретение, в общем, относится к системе и способу для управления электроэнергетической системой и, более конкретно, к системе и к способу для сбора данных в разных частях электроэнергетической системы и анализа собранных данных для управления электроэнергетической системой.The present invention generally relates to a system and method for controlling an electric power system, and more particularly, to a system and method for collecting data in different parts of an electric power system and analyzing collected data for controlling an electric power system.

Уровень техникиState of the art

Электроэнергетическая система может включать в себя генерирование электроэнергии, и/или передачу электроэнергии, и/или распределение электроэнергии. Электроэнергия может генерироваться с использованием электростанций, таких как угольные тепловые электростанции, атомные электростанции и т.д. С целью повышения эффективности, напряжение генерируемой электроэнергии повышают до очень высокого уровня (такого как 345 кВ) и передают через линии электроэнергетической системы. Линии электроэнергетической системы могут передавать электроэнергию на большие расстояния, например, по линиям электроэнергетической системы штата или через международные границы, до тех пор, пока она не достигнет своего потребителя, занимающегося оптовой продажей, который может представлять собой компанию, которой принадлежит локальная сеть распределения. Линии электроэнергетической системы могут заканчиваться в подстанции передачи, на которой может осуществляться снижение очень высокого уровня напряжения до промежуточного напряжения (такого, как 138 кВ). Из подстанции электроэнергетической системы меньшие линии электроэнергетической системы (такие как вспомогательные линии электроэнергетической системы) передают промежуточное напряжение в распределительные подстанции. В распределительных подстанциях промежуточное напряжение снова может быть понижено до "среднего напряжения" (например, от 4 кВ до 23 кВ). Одна или больше подающих цепей могут исходить из распределительных подстанций. Например, от четырех до десяти распределительных цепей могут исходить из распределительной подстанции. Подающая цепь представляет собой 3-х фазную цепь, содержащую 4 провода (три провода для каждой из 3 фаз и один провод нейтральный). Подающие цепи могут быть направлены либо над землей (на опорах), либо под землей. Напряжение подающих цепей может быть периодически отобрано, используя распределительные трансформаторы, которые понижают напряжение со "среднего напряжения" до напряжения потребителя (например, 120В). Напряжение потребителя может затем использоваться потребителем.An electric power system may include generating electricity and / or transmitting electricity and / or distributing electricity. Electricity can be generated using power plants such as coal-fired thermal power plants, nuclear power plants, etc. In order to increase efficiency, the voltage of the generated electricity is increased to a very high level (such as 345 kV) and transmitted through the lines of the electric power system. Power system lines can transmit electricity over long distances, for example, through state power lines or across international borders, until it reaches its wholesale consumer, which may be a company that owns a local distribution network. The lines of an electric power system can terminate in a transmission substation where a very high voltage level can be reduced to an intermediate voltage (such as 138 kV). From the substation of the electric power system, smaller lines of the electric system (such as auxiliary lines of the electric system) transmit intermediate voltage to the distribution substations. In distribution substations, the intermediate voltage can again be reduced to "medium voltage" (for example, from 4 kV to 23 kV). One or more supply circuits may originate from distribution substations. For example, four to ten distribution circuits can come from a distribution substation. The supply circuit is a 3-phase circuit containing 4 wires (three wires for each of the 3 phases and one neutral wire). Feeding chains can be directed either above the ground (on poles) or underground. The voltage of the supply circuits can be periodically selected using distribution transformers, which reduce the voltage from the "medium voltage" to the voltage of the consumer (for example, 120V). The consumer voltage can then be used by the consumer.

Одна или более энергетических компаний могут управлять электроэнергетической системой, включая в себя управление отказами, техническое обслуживание и обновления, относящиеся к электроэнергетическим системам. Однако управление электроэнергетической системой часто неэффективно и дорого стоит. Например, энергетическая компания, которая управляет локальной распределительной сетью, может выполнять управление в случае отказов сети, которые могут возникать в цепях подачи электроэнергии или в цепях, называемых поперечными цепями, которые представляют собой ответвления от цепей подачи электроэнергии. Управление локальной распределительной сетью часто происходит на основе телефонных звонков потребителей, вызванных перерывом в работе, или связано с полевыми работами сотрудников, которые осуществляют проверку локальной распределительной сети на местах.One or more energy companies can manage the electricity system, including failure management, maintenance, and updates related to the electricity systems. However, managing the power system is often inefficient and expensive. For example, an energy company that manages a local distribution network can manage in the event of network failures that may occur in power supply circuits or in circuits called transverse circuits, which are branches from power supply circuits. Management of the local distribution network often takes place on the basis of telephone calls from consumers caused by a break in work, or is associated with fieldwork by employees who check the local distribution network in the field.

Энергетические компании постоянно пытаются модернизировать электроэнергетические системы, используя цифровую технологию, иногда называемую "интеллектуальной энергосистемой". Например, более интеллектуальные счетчики (иногда называемые "интеллектуальными счетчиками") представляют собой определенный тип усовершенствованного счетчика, который более подробно идентифицирует потребление, чем обычный счетчик. Интеллектуальный счетчик может затем передавать свою информацию через какую-нибудь сеть обратно в локальную коммунальную службу для мониторинга и с целью начисления счетов (телеметрия). Хотя все эти достигнутые в последнее время усовершенствования и обновления электроэнергетической системы являются полезными, требуется дополнительное усовершенствование. Поступили отчеты о том, что только в Соединенных Штатах половина генерируемой электроэнергии не используется, половина пропускной способности сетей электроэнергетической системы на большое расстояние не используется, и две трети локального распределения в стране не используются. Поэтому, очевидно, существует потребность в улучшении управления сетями электроэнергетической системы.Energy companies are constantly trying to upgrade power systems using digital technology, sometimes referred to as the “smart grid”. For example, more intelligent meters (sometimes called “smart meters”) are a certain type of advanced meter that identifies consumption in more detail than a regular meter. The smart meter can then transfer its information through some network back to the local utilities for monitoring and for the purpose of charging bills (telemetry). While all these recent improvements and updates to the power system are useful, further improvement is required. Reports have been received that only in the United States half of the generated electricity is not used, half of the transmission capacity of the electricity grid networks is not used for a long distance, and two-thirds of the local distribution in the country are not used. Therefore, obviously, there is a need to improve the management of electric grid systems.

Сущность изобретенияSUMMARY OF THE INVENTION

Предложена интеллектуальная энергосистема для улучшения управлением энергетической системой общего пользования. Интеллектуальная энергосистема, как раскрыто в настоящем описании, включает в себя использование датчиков в различных частях энергосистемы, использование технологий передачи данных и вычислительных технологий (таких как дополнительные структуры шины) для обновления существующей электроэнергетической системы так, чтобы она могла работать более эффективно и надежно, и для поддержания дополнительных услуг для потребителей. Интеллектуальная энергосистема, как раскрыто в данном описании, может обновлять традиционные сети или "системы" передачи и распределения электроэнергии, например, путем использования надежной двунаправленной передачи данных, усовершенствованных датчиков и распределенных компьютеров (включающих в себя дополнительные интеллектуальные возможности по передаче и/или распределению электроэнергии). Интеллектуальная энергосистема может дополнительно включать в себя дополнительные функции в центральном пункте управления для управления операциями, детектированием и коррекцией неисправностей, управления ресурсами и т.д.An intelligent energy system is proposed to improve the management of a public energy system. An intelligent power system, as described herein, includes the use of sensors in various parts of the power system, the use of data and computing technologies (such as additional bus structures) to upgrade an existing power system so that it can operate more efficiently and reliably, and to maintain additional services for consumers. An intelligent power system, as described herein, can update traditional networks or “systems” of power transmission and distribution, for example, by using reliable bi-directional data transmission, advanced sensors and distributed computers (including additional intelligent power transmission and / or distribution capabilities) ) The smart energy system may additionally include additional functions at the central control point for controlling operations, detecting and correcting faults, managing resources, etc.

Один пример системы управления, которая может выполнять управление интеллектуальной энергосистемой, раскрытой ниже, представляет собой Эталонную архитектуру информационного предприятия интеллектуальной энергосистемой (ниже сокращенно называется INDE). Эталонная архитектура INDE обеспечивает интегрирование интеллектуальных или "умных" энергосетей в индустрию по производству электроэнергии (или другие виды индустрии). Кроме того, управление электроэнергетической системой может быть улучшено при использовании услуг передачи данных по интеллектуальной энергосистеме (ниже сокращенно называются INDS). Ниже раскрыт набор процессов и ресурсов, которые помогают разрабатывать интеллектуальные энергосистемы. Такой набор ресурсов и способов содержит набор решений INDE. INDE включает в себя: эталонную архитектуру INDE, которая может содержать шаблон для данных широкой интеллектуальной энергосистемы, а также для управления аналитическими данными и интегрированием предприятия; аналитические средства и средства получения данных и обработки в режиме реального времени, которые могут включать в себя распределенные архитектуры и воплощение аналитических средств для высокоскоростного анализа интеллектуальных энергосистем; ресурсы для транспортирования данных и архитектуры сохранения данных, которые могут включать в себя элементы решения при управлении данными на основе открытых стандартов; аналитические приложения для транзакций конечного пользователя, которые могут включать в себя воплощение широкого диапазона характеристик систем, охватывающих анализ, качество электроэнергии, степень использования ресурсов сети и управление ресурсами сети; и процесс развития интеллектуальной энергосистемы, который может содержать методику анализа существующей сети для предоставления определенных коммунальных услуг и определять рекомендации для улучшения текущей сети для предоставления определенных коммунальных услуг в одном или больше аспектах интеллектуальной энергосистемой.One example of a control system that can perform control of an intelligent power system disclosed below is the Reference Architecture of an Information Enterprise Intelligent Power System (hereinafter abbreviated as INDE). The INDE reference architecture enables the integration of smart or smart grids into the electricity generation industry (or other industries). In addition, the management of the power system can be improved by using data transmission services over the intelligent power system (hereinafter referred to as INDS for short). The following is a set of processes and resources that help develop smart energy systems. This set of resources and methods contains a set of INDE solutions. INDE includes: the INDE reference architecture, which can contain a template for data from a wide intelligent power system, as well as for managing analytical data and enterprise integration; analytical tools and tools for receiving data and processing in real time, which may include distributed architectures and the embodiment of analytical tools for high-speed analysis of smart energy systems; resources for data transportation and data storage architecture, which may include decision elements in data management based on open standards; analytical applications for end-user transactions, which may include the implementation of a wide range of system characteristics, covering analysis, power quality, utilization of network resources and network resource management; and a process for developing an intelligent energy system, which may include a methodology for analyzing an existing network to provide certain utility services and determining recommendations for improving the current network for providing certain utility services in one or more aspects of the intelligent energy system.

Различные аспекты эталонной архитектуры INDE могут улучшать структуру и управление сетями электроснабжения. Например, эталонная архитектура INDE может включать в себя множество сетевых шин для передачи данных различных типов, включающих в себя: (i) множество шин могут быть специально выделены для различных типов данных, таких как рабочие/не рабочие данные, данные о событии, данные о подключаемости сети и данные о местоположении сети; и (ii) используя структуру из множества шин, обеспечивается возможность доставки данных в множество мест назначения. Множество шин могут содержать разные сегменты в одной шине или могут содержать отдельные шины. Множество шин можно использовать для транспортирования различных типов данных в другие процессы интеллектуальной энергосистемой (такие как контроллер с центральным расположением). В качестве альтернативы, один или более типов данных можно передавать с использованием одной шины так же, как и другие типы данных (такие как данные о событии, передаваемые под одной и той же шине, что и рабочие /не рабочие данные). В этом случае, данные о событии могут быть переданы, используя специальный протокол для данных по обработке события.Various aspects of the INDE reference architecture can improve the design and management of power networks. For example, the INDE reference architecture may include multiple network buses for transmitting various types of data, including: (i) many buses may be specifically allocated for various types of data, such as operating / non-operating data, event data, data about network connectivity and network location data; and (ii) using a multi-bus structure, data can be delivered to multiple destinations. A plurality of tires may contain different segments in one tire or may contain separate tires. Many buses can be used to transport various types of data to other processes with an intelligent power system (such as a centrally located controller). Alternatively, one or more data types may be transmitted using the same bus in the same way as other data types (such as event data transmitted under the same bus as the working / non-working data). In this case, event data can be transmitted using a special protocol for event processing data.

В качестве другого примера, эталонная архитектура INDE может включать в себя распределенный интеллект в электроэнергетической системе, включающий в себя: (i) устройства, которые генерируют данные в разных частях энергосистемы (такие как измерительные устройства на подстанциях, счетчики в помещениях потребителей, датчики на линии); (ii) устройства, которые анализируют генерируемые данные (такие как обработка событий на подстанциях, на линии электроэнергетической системы и т.д., и центр управления для анализа данных, для определения, произошло ли конкретное событие) таким образом, что анализ может быть выполнен в разных точках в сети электропитания и/или в центре управления; и (iii) устройства, которые автоматически модифицируют работу участка электроэнергетической системы (например, модифицируют работу на подстанции на основе определенного события).As another example, the INDE reference architecture may include distributed intelligence in an electric power system, including: (i) devices that generate data in different parts of the power system (such as metering devices in substations, meters in consumer premises, sensors on the line ); (ii) devices that analyze the generated data (such as processing events in substations, on the lines of the electric power system, etc., and a control center for analyzing data to determine if a particular event has occurred) so that analysis can be performed at different points in the power supply network and / or in the control center; and (iii) devices that automatically modify the operation of a portion of the electric power system (for example, modify the operation of a substation based on a specific event).

Например, отдельные компоненты в электроэнергетической системе, которые являются удаленными от центрального органа управления электроэнергетической системой, могут включать в себя интеллектуальные свойства (такие как возможности по обработке и сохранению данных) для анализа состояния сетей электроэнергетической системы (такого как анализ неисправности) и/или для автоматического исправления неисправностей. Один такой индивидуальный компонент может содержать подстанцию электроэнергетической системы, которая может включать в себя датчики, по меньшей мере один процессор и по меньшей мере одно устройство - накопитель. Подстанция может использовать датчик для определения данных для участка электроэнергетической системы и может использовать анализ определяемых данных с помощью процессора и устройства накопления, для определения состояния участка электроэнергетической системы (например, определение, возникла ли неисправность на участке электроэнергетической системы), и/или может автоматически корректировать определенную неисправность. Таким образом, подстанция может автоматически изменять по меньшей мере один аспект управления участком электроэнергетической системы до запроса от центрального органа управления электроэнергетической системы, который принимает измеренные данные, и/или до запроса центрального органа управления, анализирующего измеренные данные.For example, individual components in the electric power system that are remote from the central governing body of the electric power system may include intellectual properties (such as data processing and storage capabilities) for analyzing the state of the electric system networks (such as a fault analysis) and / or automatic troubleshooting. One such individual component may comprise a substation of an electric power system, which may include sensors, at least one processor and at least one storage device. The substation can use a sensor to determine data for a section of the electricity system and can use the analysis of the detected data using a processor and storage device to determine the condition of the section of the electricity system (for example, to determine if a malfunction has occurred in the area of the electricity system), and / or can automatically correct certain malfunction. Thus, the substation can automatically change at least one aspect of the control of a section of the electric power system prior to a request from the central governing body of the electric power system that receives the measured data, and / or to the request of the central governing body analyzing the measured data.

В качестве другого примера, отдельные компоненты в электроэнергетической системе, которые являются интеллектуальными сами по себе, могут взаимодействовать для анализа и/или управления состоянием электроэнергетической системы. Используя дополнительную возможность передачи данных по множеству шин, компоненты в области электроэнергетической системы могут выполнять обмен информацией, например данными, определенными в электроэнергетической системе, и/или отказами, определенными в результате анализа. Развернутые компоненты могут, таким образом, работать вместе с или без центрального органа управления, для определения состояния электроэнергетической системы и/или коррекции отказов в электроэнергетической системе.As another example, individual components in an electric power system that are intelligent in themselves can interact to analyze and / or control the state of the electric power system. Using the additional ability to transmit data across multiple buses, components in the field of the power system can exchange information, for example, data defined in the power system, and / or failures determined by the analysis. The deployed components can thus work with or without a central control to determine the state of the power system and / or to correct failures in the power system.

Распределенные интеллектуальные способности могут дополнительно включать в себя распределенное сохранение. Например, устройства электроэнергетической системы (такие как подстанции) могут иметь накопители данных, связанные с ними. Накопитель данных может быть расположен рядом с подстанцией (например, может быть связан с процессором подстанции). Устройства электроэнергетической системы могут сохранять данные в накопителе данных (включающем в себя данные датчика, аналитические данные и т.д.). Устройства электроэнергетической системы могут затем передавать в центр управления ссылку на место сохранения данных (например, указатель на адрес, по которому содержатся данные в устройстве сохранения). Центр управления может сохранять эту ссылку в центральном накопителе данных (таком как база данных). Таким образом, когда центр управления выполняет поиск возможности обновления данных, центральное управление может обращаться к соединению в центральном накопителе данных, передавать запрос в сетевое устройство (такое как подстанция) запрашивать данные, связанные с этим соединением, и принимать ответ из сетевого устройства, содержащий данные, связанные с соединением.Distributed intelligence may further include distributed storage. For example, power system devices (such as substations) may have data storage devices associated with them. The data storage device may be located near the substation (for example, it may be connected to the substation processor). Devices of the electric power system can store data in a data storage device (including sensor data, analytical data, etc.). The devices of the electric power system can then transmit to the control center a link to the data storage location (for example, a pointer to the address where the data is stored in the storage device). The control center can store this link in a central data storage device (such as a database). Thus, when the control center searches for the possibility of updating data, the central control can access the connection in the central data storage device, send a request to a network device (such as a substation) to request data associated with this connection, and receive a response from the network device containing the data related to the connection.

Еще в одном другом примере, INDS может улучшить управление электроэнергетической системой в нескольких аспектах, включающих в себя измерение состояния электроэнергетической системы, не влияющее на рабочий сбор и сохранение данных, управление событиями, уменьшение объема передаваемых сигналов, интеллектуальные свойства анализа простоя, интеллектуальные свойства анализа неисправностей, мониторинг удаленными ресурсами (включая в себя мониторинг одним или больше ресурсом в пределах электроэнергетической системы), мониторинг качества электропитания (например, множество форм колебаний тока/напряжения), измерение рабочих характеристик системы (таких как надежность, в отношении того, является ли питание включенным или выключенным), инициирование порядка работы, управление метаданными, агент уведомления, сбор метаданных, анализ транзакции, процессы управления сетью и анализ в режиме реального времени.In yet another example, INDS can improve the management of the power system in several aspects, including measuring the state of the power system without affecting the working collection and storage of data, managing events, reducing the amount of transmitted signals, intellectual properties of downtime analysis, intellectual properties of fault analysis monitoring by remote resources (including monitoring by one or more resources within the power system); monitoring the quality of electric power supply (for example, many forms of current / voltage fluctuations), measuring system performance (such as reliability regarding whether the power is on or off), initiating an order of work, managing metadata, notification agent, collecting metadata, transaction analysis, processes network management and analysis in real time.

В еще одном другом примере INDS может улучшать управление электроэнергетической системой, используя преимущество модульной конструкции эталонной архитектуры INDE. Это может позволить использовать другие модели бизнеса, кроме используемых в данный момент времени (такие как аутсорсинг (передача стороннему подрядчику некоторых функций) одной или больше функций), и обеспечивает возможность эффективного управления множеством сетей электропитания. В еще одном другом примере определенная электроэнергетическая система может быть проанализирована для определения, какие аспекты эталонной архитектуры INDE или INDS следует применять для обновления операций определенной сети электропитания.In yet another example, INDS can improve power system management by taking advantage of the modular design of the INDE reference architecture. This may allow the use of other business models than those currently used (such as outsourcing (transferring some functions to a third-party contractor) of one or more functions), and provides the ability to effectively manage multiple power networks. In yet another example, a specific power system can be analyzed to determine which aspects of the INDE or INDS reference architecture should be used to update the operations of a specific power network.

Другие системы, способы, свойства и преимущества будут или станут понятными для специалиста в данной области техники после исследования следующих чертежей и подробного описания изобретения. При этом предполагается, что все такие дополнительные системы, способы, свойства и преимущества, которые должны быть включены в настоящее описание, находятся в пределах объема изобретения и должны быть защищены следующей формулой изобретения.Other systems, methods, properties and advantages will or will become apparent to a person skilled in the art after examination of the following drawings and a detailed description of the invention. It is assumed that all such additional systems, methods, properties and advantages that should be included in the present description are within the scope of the invention and should be protected by the following claims.

Краткое описание чертежейBrief Description of the Drawings

На фиг.1А-С показаны блок-схемы одного примера общей архитектуры сети электроснабжения.FIGS. 1A-C are block diagrams of one example of a general power supply network architecture.

На фиг.2 показана блок-схема ядра INDE, представленного на фиг.1.FIG. 2 shows a block diagram of the INDE core of FIG. 1.

На фиг.3А-С показаны блок-схемы другого примера общей архитектуры сети электропитания.3A-C are block diagrams of another example of a general power network architecture.

На фиг.4 показана блок-схема подстанции INDE, представленной на фиг.1 и 3. Figure 4 shows a block diagram of the substation INDE, presented in figures 1 and 3.

На фиг.5А-В показаны блок-схемы устройства INDE, представленного на фиг.1А-С и 3А-С.FIGS. 5A-B are block diagrams of the INDE device of FIGS. 1A-C and 3A-C.

На фиг.6 показана блок-схема еще одного примера общей архитектуры сети электропитания.Figure 6 shows a block diagram of another example of a common power network architecture.

На фиг.7 показана блок-схема другого примера общей архитектуры сети электропитания.7 shows a block diagram of another example of a common power network architecture.

На фиг.8 показана блок-схема, включающая в себя список некоторых примеров процессов возможности наблюдения.FIG. 8 is a flowchart including a list of some examples of observability processes.

На фиг.9А-В представлены структурные схемы потока обработки в процессах измерения и операций состояния электроэнергетической системы.On figa-B presents the structural diagram of the processing flow in the measurement processes and operations of the state of the electric power system.

На фиг.10 показана блок-схема последовательности операций процесса обработки не рабочих данных.10 shows a flowchart of a non-operational data processing process.

На фиг.11 показана блок-схема последовательности операций процессов управления событием.11 shows a flowchart of an event management process.

На фиг.12А-С иллюстрируются схемы потока обработки процессов передачи сигналов в ответе на запрос (DR).12A-C illustrate flow diagrams of a signaling process in response to a request (DR).

На фиг.13А-В иллюстрируются блок-схемы процессов интеллектуального анализа простоя в работе.13A-B illustrate flowcharts of downtime mining processes.

На фиг.14А-С иллюстрируются блок-схемы последовательности операций процессов интеллектуального анализа отказа.On figa-C illustrates a flowchart of the processes of intelligent failure analysis.

На фиг.15А-В иллюстрируются блок-схемы последовательности операций процессов управления метаданными.15A-B illustrate flowcharts of metadata management processes.

На фиг.16 иллюстрируется блок-схема последовательности операций процесса агента уведомления.FIG. 16 illustrates a flowchart of a notification agent process.

На фиг.17 иллюстрируется блок-схема последовательности операций процессов сбора измеренных данных (AMI).17 illustrates a flowchart of a measurement data acquisition (AMI) process.

На фиг.18A-D показан пример схемы взаимозависимости объекта, которую можно использовать для представления базы данных подключаемости на уровне базовой линии.FIGS. 18A-D show an example of an object interdependence scheme that can be used to represent a connectivity database at a baseline level.

На фиг.19А-В иллюстрируется пример графика потока разработки детального плана.On figa-b illustrates an example of a graph of the flow of development of a detailed plan.

Подробное описание изобретенияDETAILED DESCRIPTION OF THE INVENTION

В качестве общего обзора предпочтительные варианты воплощения, описанные ниже, относятся к способу и системе для управления электроэнергетической системой. Как более подробно описано ниже, определенные аспекты относятся к самой сети электроснабжения (включающие в себя аппаратные средства и программное средство при передаче электроэнергии и/или распределении электричества). Кроме того, определенные аспекты относятся к функциональным возможностям центрального управления электроэнергетической системой. Эти функциональные возможности могут быть сгруппированы по двум категориям - операции и применения. Услуги операций позволяют коммунальному предприятию отслеживать и управлять инфраструктурой интеллектуальной электроэнергетической системы (такой как применение, сеть, серверы, датчики и т.д.).As a general overview, the preferred embodiments described below relate to a method and system for controlling an electric power system. As described in more detail below, certain aspects relate to the power supply network itself (including hardware and software for power transmission and / or distribution of electricity). In addition, certain aspects relate to the functionality of the central control of the electric power system. These functionalities can be grouped into two categories - operations and applications. Operations services allow a utility to monitor and manage the infrastructure of an intelligent power system (such as application, network, servers, sensors, etc.).

Как более подробно описано ниже, возможности применения могут относиться к измерениям и управлению самой сетью. В частности, услуги приложений обеспечивают возможность выполнения функций, которые могут быть важны для самой интеллектуальной энергосистемы, и могут включать в себя: (1) процессы сбора данных; (2) процессы установления категорий для данных и процессы обеспечения постоянства характеристик; и (3) процессы, обеспечивающие возможность наблюдения. Как более подробно описано ниже, используя эти процессы, обеспечивается возможность "наблюдать" за сетью, анализировать данные и получать информацию о сети.As described in more detail below, applications may relate to measurements and management of the network itself. In particular, application services provide the ability to perform functions that may be important to the smart grid itself, and may include: (1) data collection processes; (2) processes for establishing categories for data and processes for ensuring constancy of characteristics; and (3) processes that enable observation. As described in more detail below, using these processes, it is possible to "monitor" the network, analyze data and obtain information about the network.

Описание архитектуры высокого уровня INDEDescription of the high-level architecture INDE

Общая архитектураGeneral architecture

Возвращаясь к чертежам, на которых одинаковыми номерами ссылочных позиций обозначены одинаковые элементы, на фиг. 1А-С представлен один пример общей архитектуры INDE. Эта архитектура может использоваться как опорная модель, которая обеспечивает сбор данных из конца в конец, транспортирование, сохранение и управление данными интеллектуальной энергосистемой; она может также обеспечивать аналитические данные и аналитическое управление, а также интеграцию предыдущего в процессы и системы коммунальной службы. Следовательно, ее можно рассматривать как архитектуру в масштабах предприятия. Определенные элементы, такие как оперативное управление и аспекты самой сети, более подробно описаны ниже.Returning to the drawings, in which the same reference numerals denote the same elements, in FIG. 1A-C show one example of a general INDE architecture. This architecture can be used as a reference model, which provides data collection from end to end, transportation, storage and management of data by an intelligent power system; it can also provide analytical data and analytical management, as well as the integration of the previous one into the processes and systems of public utilities. Consequently, it can be considered as enterprise-wide architecture. Certain elements, such as operational management and aspects of the network itself, are described in more detail below.

Архитектура, представленная на фиг.1А-С, может включать в себя вплоть до четырех шин данных и интегрирования: (1) шина 146 высокоскоростных данных датчика (которые могут включать в себя рабочие и не рабочие данные); (2) специально выделенная шина 147 обработки события (которое может включать в себя данные события); (3) шина 130 операционной услуги (которая может использоваться для предоставления информации об интеллектуальной энергосистемой обратно в приложение операционного отдела предприятия коммунальной службы); и (4) шина услуги предприятия для систем информационных технологий операционного отдела (показаны на фиг.1А-С как шина 114 среды интегрирования) предприятия, предназначенная для обслуживающего предприятия информационных технологий 115. Отдельные шины для передачи данных могут быть сформированы одним или больше способами. Например, две или больше шин передачи данных, такие как шина 146 высокоскоростной передачи данных датчиков и шина 147 обработки события, могут представлять собой разные сегменты одной шины передачи данных. В частности, шины могут иметь сегментированную структуру или платформу. Как более подробно описано ниже, аппаратные и/или программные средства, такие как один или больше переключателей, можно использовать для направления данных по разным сегментам шины передачи данных.The architecture shown in FIGS. 1A-C may include up to four data and integration buses: (1) high-speed sensor data bus 146 (which may include operational and non-operational data); (2) a dedicated event processing bus 147 (which may include event data); (3) an operating service bus 130 (which can be used to provide information about the smart grid back to the application of the operations department of a utility company); and (4) an enterprise service bus for the information technology systems of the operations department (shown in FIGS. 1A-C as bus 114 of the integration environment) of an enterprise intended for a service IT enterprise 115. Separate data buses can be formed in one or more ways. For example, two or more data buses, such as a high-speed sensor data bus 146 and an event processing bus 147, may be different segments of the same data bus. In particular, the tires may have a segmented structure or platform. As described in more detail below, hardware and / or software, such as one or more switches, can be used to route data across different segments of the data bus.

В качестве другого примера, две или больше шины передачи данных могут быть построены на отдельных шинах, таких как отдельные физические шины с использованием аппаратных средств, необходимых для транспортирования данных по отдельным шинам. В частности, каждая из шин может включать в себя кабели, отдельные друг от друга. Кроме того, некоторые или все из отдельных шин могут быть одного типа. Например, одна или больше шин могут содержать локальную сеть (ЛВС), такую как Ethernet®, организованную по неэкранированному кабелю с витой парой и Wi-Fi. Как более подробно описано ниже, аппаратные средства и/или программные средства, такие как маршрутизатор, могут использоваться для направления данных среди данных в одну шину из разных физических шин.As another example, two or more data buses can be built on separate buses, such as separate physical buses using the hardware necessary to transport data on separate buses. In particular, each of the tires may include cables that are separate from each other. In addition, some or all of the individual tires may be of the same type. For example, one or more buses may contain a local area network (LAN), such as Ethernet®, organized over unshielded twisted-pair cable and Wi-Fi. As described in more detail below, hardware and / or software, such as a router, can be used to route data among data on the same bus from different physical buses.

В качестве другого примера, две или больше шины могут быть организованы в разных сегментах в отдельной структуре шины, и одна или больше шин могут быть организованы в виде отдельных физических шин. В частности, шина 146 высокоскоростной передачи данных датчиков и шина 147 обработки события могут представлять собой разные сегменты в одной шине передачи данных, в то время как шина среды 114 интегрирования предприятия может представлять собой физически отдельную шину.As another example, two or more tires may be arranged in different segments in a separate bus structure, and one or more tires may be arranged as separate physical buses. In particular, the high-speed sensor data bus 146 and the event processing bus 147 can be different segments on the same data bus, while the bus of the enterprise integration medium 114 can be a physically separate bus.

Хотя на фиг.1А-С представлены четыре шины, меньшее или большее количество шин может использоваться для передачи четырех описанных типов данных. Например, отдельная несегментированная шина может использоваться для передачи данных датчика и данных обработки события (сводя общее количество шин к трем), как описано ниже. И система может работать без шины 130 операционных услуг и/или шины 114 среды интегрирования предприятия.Although four buses are shown in FIGS. 1A-C, fewer or more buses may be used to transmit the four described data types. For example, a single non-segmented bus can be used to transmit sensor data and event processing data (reducing the total number of buses to three), as described below. And the system can operate without bus 130 operational services and / or bus 114 environment integration enterprise.

Среда IT может быть SOA-совместимой. Архитектура, ориентированная на услугу (SOA), представляет собой архитектурный стиль компьютерной системы для формирования и использования процессов для бизнеса, упакованных как услуги, в течение их жизненного цикла. SOA также определяет и предусматривает IT инфраструктуру, которая обеспечивает для различных приложений возможность обмена данными и участие в процессах, направленных на бизнес. Хотя использование SOA и шины обслуживания предприятия является необязательным.IT environment can be SOA compliant. Service Oriented Architecture (SOA) is the architectural style of a computer system for shaping and using business processes packaged as services throughout their life cycle. SOA also defines and provides for an IT infrastructure that enables data exchange and participation in business-oriented processes for various applications. Although the use of SOA and enterprise service bus is optional.

На фигурах представлены разные элементы в пределах общей архитектуры, такие как следующие: (1) ядро 120 INDE; (2) подстанция 180 INDE; и (3) устройство 188 INDE. Такое разделение элементов в пределах общей архитектуры представлено с целью иллюстрации. Можно использовать другое разделение элементов. Архитектура INDE может использоваться для поддержки как распределенного, так и централизованного подходов к интеллектуальной энергосистеме и для предоставления механизмов, обеспечивающих возможность работы в масштабе крупных воплощений.The figures show various elements within the general architecture, such as the following: (1) core 120 INDE; (2) substation 180 INDE; and (3) 188 INDE device. This separation of elements within the general architecture is presented for the purpose of illustration. You can use a different separation of elements. The INDE architecture can be used to support both distributed and centralized approaches to the smart grid and to provide mechanisms that enable large scale implementations.

Эталонная архитектура INDE представляет собой один пример технической архитектуры, которая может быть воплощена. Например, она может представлять собой пример мета-архитектуры, используемой для предоставления исходной точки для развития любого количества конкретных технических архитектур, по одной для каждого из решений коммунальной службы, как описано ниже. Таким образом, конкретное решение для конкретных коммунальных служб также может включать в себя один, некоторые или все из элементов эталонной архитектуры INDE. И эталонная архитектура INDE может предоставлять стандартизированную исходную точку для развития решения. Ниже описана методология определения конкретной технической архитектуры для определенной электрораспределительной сети.The INDE reference architecture is one example of a technical architecture that can be implemented. For example, it may be an example of a meta-architecture used to provide a starting point for the development of any number of specific technical architectures, one for each of the utilities, as described below. Thus, a specific solution for specific utilities may also include one, some or all of the elements of the INDE reference architecture. And the INDE reference architecture can provide a standardized starting point for developing a solution. The following describes the methodology for determining a specific technical architecture for a particular distribution network.

Эталонная архитектура INDE может представлять собой архитектуру для всего предприятия. Ее назначение может состоять в том, чтобы обеспечивать основу для управления из конца в конец данными электроэнергетической системы и также обеспечить анализ и интегрирование их в системы и процессы коммунального обслуживания электроэнергетической системы. Поскольку такие технологии интеллектуальной электроэнергетической системы влияют на каждый аспект бизнес-процессов коммунального обслуживания, следует учитывать, что и эти эффекты существуют не только на уровне сети, операций и на уровне помещения потребителя, но также и на уровне операционного отдела и уровне предприятия. Следовательно, эталонная архитектура INDE может обращаться и в действительности обращается к уровню SOA предприятия, например, для поддержки среды SOA с целью формирования интерфейса. Такой подход не следует использовать как требование того, что коммунальные службы должны преобразовывать свою существующую IT среду в SOA прежде, чем интеллектуальная энергосистема сможет быть построена и сможет использоваться. Шина обслуживания предприятия представляет собой полезный механизм, который способствует интегрированию IT, но она не требуется для воплощения остального решения интеллектуальной энергосистемой. Приведенное ниже описание фокусируется на различных компонентах элементов интеллектуальной энергосистемой INDE.The INDE reference architecture can be an enterprise-wide architecture. Its purpose may be to provide a basis for managing end-to-end data of the electric power system and also to provide analysis and integration into the public service systems and processes of the electric power system. Since such technologies of the smart electric power system affect every aspect of the business processes of public utilities, it should be borne in mind that these effects exist not only at the network level, operations and at the consumer premises level, but also at the level of the operations department and enterprise level. Consequently, the INDE reference architecture can access and actually accesses the enterprise SOA layer, for example, to support an SOA environment to form an interface. This approach should not be used as a requirement that utilities must transform their existing IT environment into SOA before the smart grid can be built and used. An enterprise service bus is a useful mechanism that facilitates IT integration, but it is not required to implement the rest of the solution with an intelligent power system. The description below focuses on the various component components of the INDE smart grid.

Группы компонентов INDEComponent Groups INDE

Как описано выше, разные компоненты в эталонной архитектуре INDE могут включать в себя, например: (1) ядро 120 INDE; (2) подстанцию 180 INDE; и (3) устройство 188 INDE. В следующих разделах описаны эти три примера групп элементов эталонной архитектуры INDE и предусмотрено описание компонентов каждой группы.As described above, various components in the INDE reference architecture may include, for example: (1) INDE core 120; (2) substation 180 INDE; and (3) 188 INDE device. The following sections describe these three examples of groups of elements of the INDE reference architecture and describe the components of each group.

Ядро INDEKernel INDE

На фиг.2 показано ядро 120 INDE, которое представляет собой часть эталонной архитектуры INDE, которая может быть размещена в операционном центре управления, как показано на фиг. 1А-С. Ядро 120 INDE может содержать унифицированную архитектуру данных для сохранения данных сети и схемы интегрирования для обеспечения возможности для аналитиков работы с этими данными. Такая архитектура данных может использовать Общую информационную модель (CIM) Международной электротехнической комиссии (IEC, МЭК) как ее схему на самом высоком уровне. CIM IEC представляет собой стандарт, разработанный электроэнергетической промышленностью, который был официально принят IEC, с целью обеспечения возможности обмена информацией о конфигурации и состоянии электроэнергетической системы для программного обеспечения приложений.FIG. 2 shows an INDE core 120, which is part of an INDE reference architecture that can be hosted in a control center, as shown in FIG. 1A-C. Kernel 120 INDE may contain a unified data architecture for storing network data and integration schemes to provide analysts with the opportunity to work with this data. Such a data architecture can use the General Information Model (CIM) of the International Electrotechnical Commission (IEC, IEC) as its highest level design. CIM IEC is a standard developed by the electricity industry that has been formally adopted by the IEC to enable the exchange of information about the configuration and status of the electricity system for application software.

Кроме того, такая архитектура данных может использовать межплатформенное программное обеспечение 134 федерации для подключения других типов коммунальных данных (таких как, например, данные измерений, рабочие данные и данные предыстории, файлы регистрации и файлы событий), и файлы обеспечения подключения, и файлы метаданных в одной архитектуре данных, которая может иметь одну точку входа для доступа к приложениям высокого уровня, включающим в себя приложения предприятия. Системы, работающие в режиме реального времени, могут также обращаться к хранилищам ключевых данных через шину высокоскоростной передачи данных, и несколько хранилищ могут принимать данные в режиме реального времени. Данные различных типов могут транспортироваться по одной или более шин в интеллектуальной энергосистеме. Как описано ниже, в блоке 180 подстанции INDE данные подстанции могут быть собраны и могут храниться локально на подстанции. В частности, база данных, которая может быть связана и может быть расположена рядом с подстанцией, может содержать данные подстанции. Аналитики, обращающиеся к уровню подстанции, также могут работать на компьютерах подстанции и сохранять результаты в базе данных подстанции, при этом все или часть данных могут быть переданы в центр управления.In addition, such a data architecture can use federation middleware 134 to connect other types of utility data (such as, for example, measurement data, operational data and historical data, log files and event files), and connectivity files and metadata files in one data architecture that can have one entry point for accessing high-level applications, including enterprise applications. Real-time systems can also access key data stores via the high-speed data bus, and multiple stores can receive real-time data. Various types of data can be transported over one or more buses in an intelligent power system. As described below, in block 180 of the substation INDE, the substation data can be collected and stored locally at the substation. In particular, a database that can be connected and located near a substation can contain substation data. Analysts referring to the substation level can also work on substation computers and save the results in the substation database, while all or part of the data can be transferred to the control center.

Типы передаваемых данных могут включать в себя рабочие и не рабочие данные, события, данные обеспечения подключения сети и данные о местоположении в сети. Рабочие данные могут включать в себя, но не ограничиваются этим, состояние переключения, состояние линии подачи энергии, состояние конденсатора, состояние участка, состояние счетчика, состояние FCI, состояние датчика линии, напряжение, ток, активную мощность, реактивную мощность и т.д. Не рабочие данные могут включать в себя, но не ограничиваются этим, качество мощности, надежность мощности, общее состояние ресурса, данные о нагрузке и т.д. Рабочие и не рабочие данные могут быть транспортированы с использованием шины 146 рабочих/не рабочих данных. Приложение, занимающееся сбором данных при передаче электроэнергии и/или распределении электроэнергии в электрораспределительной сети, может быть ответственным за передачу некоторых или всех данных в шину 146 рабочих/не рабочих данных. Таким образом, приложения, которым требуется такая информация, могут быть выполнены с возможностью получения этих данных путем подписки на информацию или осуществление услуг, которые могут сделать эти данные доступными.Types of transmitted data may include operational and non-operational data, events, network connectivity data, and network location data. Operational data may include, but is not limited to, switching state, power supply line state, capacitor state, section state, counter state, FCI state, line sensor state, voltage, current, active power, reactive power, etc. Non-operational data may include, but are not limited to, power quality, power reliability, general resource status, load data, etc. Work and non-work data can be transported using the bus 146 work / non-work data. An application that collects data during power transmission and / or distribution of electricity in the distribution network may be responsible for transferring some or all of the data to the work / non-work data bus 146. Thus, applications that require such information can be configured to receive this data by subscribing to information or providing services that can make this data available.

События могут включать в себя сообщения и/или сигналы тревоги, поступающие из различных устройств и датчиков, которые составляют часть интеллектуальной энергосистемы, как описано ниже. События могут быть непосредственно сгенерированы из устройств и датчиков интеллектуальной энергосистемой, а также могут быть сгенерированы различными аналитическими приложениями, на основе данных результатов измерения, полученных из этих датчиков и устройств. Примеры событий могут включать в себя перерыв в работе счетчика, сигнал тревоги измерителя, перерыв в работе трансформатора и т.д. Компоненты сети, такие как устройства сети (интеллектуальные датчики мощности (например, датчик со встроенным процессором, который может быть запрограммирован для обеспечения возможности цифровой обработки), датчики температуры и т.д.), компоненты энергетической системы, которые включают в себя дополнительные встроенные возможности обработки (RTU и т.д.), интеллектуальные энергосистемы счетчиков (состояние счетчика, показания счетчика и т.д.) и мобильные, установленные на местах устройства (события простоя в работе, порядок окончания работы и т.д.) могут генерировать данные события, рабочие и не рабочие данные. Данные события, генерируемые интеллектуальной энергосистемой, могут быть переданы через шину 147 события.Events may include messages and / or alarms from various devices and sensors that form part of the smart grid, as described below. Events can be directly generated from devices and sensors by an intelligent power system, and can also be generated by various analytical applications, based on data from measurement results obtained from these sensors and devices. Examples of events may include a break in the operation of the meter, a meter alarm, a break in the operation of the transformer, etc. Network components such as network devices (smart power sensors (e.g. a sensor with an integrated processor that can be programmed to provide digital processing capabilities), temperature sensors, etc.), power system components that include additional built-in capabilities processing (RTU, etc.), smart meter energy systems (meter status, meter readings, etc.) and mobile installed on the device’s places (downtime events, work completion order s, etc.) can generate event data, working and non-working data. The event data generated by the smart grid can be transmitted via the event bus 147.

Данные о подключаемости сети могут определять общую компоновку сети коммунального предприятия. Может существовать базовая компоновка, которая определяет физическую компоновку компонентов сети (подстанции, сегменты, питающие линии, трансформаторы, переключатели, устройства автоматического повторного включения, измерители, датчики, столбы коммунальных служб и т.д.) и возможность их взаимного соединения во время установки. Основываясь на событиях в пределах сети (отказы компонентов, активность по техническому обслуживанию и т.д.), подключаемость сети может постоянно изменяться. Как более подробно описано ниже, структура того, как данные сохраняют, а также комбинация данных обеспечивает историческое воссоздание структуры сети в различные прошедшие моменты времени. Данные о подключаемости сети могут выделяться из системы Географической информации (ГИС) на периодической основе, по мере того как подготавливают модификации коммунальной сети, и такую информацию обновляют в приложении ГИС.Network connectivity data can determine the overall network layout of a utility. There may be a basic layout that defines the physical layout of network components (substations, segments, power lines, transformers, switches, automatic reconnection devices, meters, sensors, utility poles, etc.) and the possibility of their interconnection during installation. Based on events within the network (component failures, maintenance activity, etc.), network connectivity can constantly change. As described in more detail below, the structure of how data is stored, as well as the combination of data, provide a historical re-creation of the network structure at various past times. Network connectivity data can be extracted from the Geographic Information System (GIS) on a periodic basis as utility network modifications are prepared, and such information is updated in the GIS application.

Данные о местоположении в сети могут включать в себя информацию о компоненте сети для сети передачи данных. Такую информацию можно использовать для передачи сообщений и информации в определенный компонент сети. Данные о местоположении в сети могут быть либо введены вручную в базу данных интеллектуальной энергосистемой, по мере того как новые компоненты интеллектуальной энергосистемой устанавливают или удаляют из системы управления ресурсами, если эта информация поддерживается извне.Network location data may include network component information for a data network. Such information can be used to transmit messages and information to a specific network component. Network location data can either be manually entered into the database by the smart grid as new smart grid components are installed or removed from the resource management system, if this information is supported externally.

Как описано более подробно ниже, данные могут быть переданы из различных компонентов сети (таких как подстанция 180 INDE и/или устройство 188 INDE). Эти данные могут быть переданы по проводам в ядро 120 INDE по беспроводным каналам, по проводам или используя комбинацию обоих подходов. Данные могут быть приняты в сетях 160 передачи данных коммунальной службы, которые могут передавать эти данные в устройство 190 направления по маршруту. Устройство 190 направления по маршруту может содержать программное средство и/или аппаратное средство для управления маршрутизацией данных в сегмент шины (когда шина содержит сегментированную структуру шины) или в отдельную шину. Устройства формирования маршрута может содержать один или больше переключателей или маршрутизатор. Устройство 190 направления по маршруту может содержать устройство подключения к сети, программное обеспечение и аппаратные средства которого направляют и/или передают данные по маршруту в одну или больше из шин. Например, устройство 190 направления по маршруту может выполнять маршрутизацию рабочих и не рабочих данных в шину 146 рабочих/не рабочих данных. Маршрутизатор также может направлять по маршруту данные события в шину 147 события.As described in more detail below, data may be transmitted from various network components (such as substation 180 INDE and / or device 188 INDE). This data can be transmitted over the wire to the 120 INDE core over the air, over the wire, or using a combination of both. Data can be received on utility data networks 160, which can transmit this data to route device 190. The route guiding device 190 may comprise software and / or hardware for controlling the routing of data to a bus segment (when the bus contains a segmented bus structure) or to a separate bus. Routing devices may include one or more switches or a router. The route guidance device 190 may comprise a network connection device, the software and hardware of which route and / or transmit route data to one or more of the buses. For example, a route direction device 190 can route working and non-working data to a working / non-working data bus 146. The router can also route event data to the event bus 147.

Устройство 190 направления по маршруту может определять, как направлять данные, на основе одного или больше способов. Например, устройство направления 190 направления по маршруту может проверять один или больше заголовков передаваемых данных для определения, следует ли направлять эти данные в сегмент для шины 146 рабочих/не рабочих данных или в сегмент для шины 147 события. В частности, один или больше заголовков среди данных могут обозначать, являются ли данные рабочими/не рабочими данными (таким образом, что устройство 190 направления по маршруту направляет данные в шину 146 рабочих/не рабочих данных) или являются ли данные данными события (таким образом, что устройство 190 направления по маршруту направляет эти данные в шину 147 события). В качестве альтернативы, устройство 190 направления по маршруту может проверять полезную нагрузку данных для определения типа данных (например, устройство 190 направления по маршруту может проверять формат данных для определения, являются ли эти данные рабочими/не рабочими данными или данными события).A route guiding device 190 may determine how to direct data based on one or more methods. For example, a route direction device 190 may check one or more headers of the transmitted data to determine whether to send this data to a segment for the working / non-working data bus 146 or to a segment for the event bus 147. In particular, one or more headers among the data may indicate whether the data is operational / non-operational data (such that the route guiding device 190 routes the data to the operating / non-operational data bus 146) or whether the data is event data (thus that the device 190 directions along the route sends this data to the bus 147 events). Alternatively, the route direction device 190 may check the data payload to determine the type of data (for example, the route direction device 190 may check the data format to determine if this data is operational / non-operational data or event data).

Один из накопителей, таких как хранилище 137 рабочих данных, в котором содержатся рабочие данные, может быть воплощен как действительно распределенная база данных. Другие из накопителей, в которых содержатся данные предыстории (идентифицированные как данные 136 предыстории на фиг.1 и 2), могут быть воплощены как распределенная база данных. Другие "концы" этих двух баз данных могут быть расположены в группе подстанции 180 INDE (описана ниже). Кроме того, события могут быть сохранены непосредственно в любом из нескольких накопителей данных через шину обработки сложных событий. В частности, события могут быть сохранены в журналах 135 регистрации событий, которые могут представлять собой хранилище для всех событий, которые были опубликованы в шине 147 событий. Журнал регистрации событий может сохранять один, некоторые или все из следующего: id события; тип события; источник события; приоритет события и время генерирования события. Шина 147 события не обязательно должна содержать долгосрочные события, обеспечивая сохранность для всех событий.One of the drives, such as the storage 137 of the working data, which contains the working data, can be embodied as a truly distributed database. Other of the drives containing historical data (identified as historical data 136 in FIGS. 1 and 2) may be embodied as a distributed database. The other "ends" of these two databases can be located in the 180 INDE substation group (described below). In addition, events can be stored directly in any of several data storage devices via the complex event processing bus. In particular, events can be stored in event logs 135, which can be a repository for all events that were published on the event bus 147. The event log can save one, some or all of the following: event id; type of event; event source; event priority and event generation time. The event bus 147 does not have to contain long-term events, ensuring safety for all events.

Накопление данных может осуществляться таким образом, что данные могут быть как можно ближе расположены к источнику, или может осуществляться удобным для осуществления на практике путем. В одном варианте осуществления это может включать в себя, например, сохранение данных подстанции в подстанции 180 INDE. Но такие данные также могут потребоваться на уровне 116 центра управления операциями для того, чтобы можно было принимать решения других типов, в которых учитывается уровень сети на значительно более гранулированном уровне. Совместно с подходом распределенных интеллектуальных возможностей может быть принят подход распределенных данных для того, чтобы способствовать доступности к данным на всех уровнях решения, благодаря использованию соединения с базой данных и с применимыми услугами данных. Таким образом, решение для сохранения данных предыстории (которые могут быть доступным на уровне 116 центра управления операциями) может быть аналогично принятому для хранилища рабочих данных. Данные могут быть сохранены локально на подстанции, и связи с базой данных, сконфигурированные в центре управления для экземпляра хранилища, позволяют обеспечивать доступ к данным в отдельных подстанциях. Аналитические средства подстанции могут работать локально на подстанции, используя локальное хранилище данных. Исторический/совместный анализ может быть выполнен на уровне 116 центра управления операциями путем доступа к данным в локальных подстанциях, используя соединения с базой данных. В качестве альтернативы, данные могут быть сохранены централизованно в ядре 120 INDE. Однако, учитывая объем данных, который может потребоваться передавать из устройств 188 INDE, хранение данных в устройствах 188 INDE может быть предпочтительным. В частности, если существуют тысячи или десятки тысяч подстанций (что может произойти в электроэнергетической системе), объем данных, который может потребоваться передавать в ядро 120 INDE, может создать бутылочное горлышко при передаче данных.The accumulation of data can be carried out in such a way that the data can be located as close as possible to the source, or can be carried out in a way convenient for implementation in practice. In one embodiment, this may include, for example, storing substation data in the INDE substation 180. But such data may also be required at level 116 of the operations control center in order to be able to make other types of decisions that take into account the network level at a much more granular level. In conjunction with the distributed intelligence approach, a distributed data approach can be adopted to facilitate access to data at all levels of the solution, through the use of a database connection and applicable data services. Thus, the solution for storing historical data (which may be available at level 116 of the operations control center) may be similar to that adopted for the operational data warehouse. Data can be stored locally at the substation, and database connections configured in the control center for the storage instance allow access to data in separate substations. Substation analytics can work locally in a substation using local data storage. Historical / collaborative analysis can be performed at level 116 of the operations control center by accessing data in local substations using database connections. Alternatively, data may be stored centrally in the 120 INDE core. However, given the amount of data that may need to be transferred from the INDE devices 188, storing data in the INDE devices 188 may be preferable. In particular, if there are thousands or tens of thousands of substations (which can happen in the power system), the amount of data that may need to be transferred to the 120 INDE core can create a bottleneck in data transfer.

В конечном итоге, ядро 120 INDE может программировать или управлять одной, некоторыми или всеми подстанциями 180 INDE или устройством 188 INDE электроэнергетической системы (описана ниже). Например, ядро 120 INDE может модифицировать программирование (например, загрузку обновленной программы) или может предоставлять команду управления для управления любым аспектом подстанции 180 INDE или устройства 188 INDE (например, управление датчиками или аналитическими средствами). Другие элементы, не представленные на фиг.2, могут включать в себя различные элементы интегрирования для поддержки такой логической архитектуры.Ultimately, the INDE core 120 may program or control one, some, or all of the INDE substations 180 or the power system device 188 INDE (described below). For example, the INDE core 120 may modify the programming (e.g., downloading an updated program) or may provide a control command to control any aspect of the INDE substation 180 or the INDE device 188 (e.g., controlling sensors or analytic means). Other elements not shown in FIG. 2 may include various integration elements to support such a logical architecture.

В таблице 1 описаны определенные элементы ядра 120 INDE, как представлено на фиг.2.Table 1 describes certain elements of the core 120 INDE, as presented in figure 2.

Figure 00000001
Figure 00000001

Figure 00000002
Figure 00000002

Как описано в таблице 1, шина 146 данных в режиме реального времени (которая связывается с рабочими и не рабочими данными) и шина 147 сложной обработки события в режиме реального времени (которая связывается с данными обработки события) объединены в одну шину 346. Пример этого представлен в блок-схеме 300 на фиг. 3А-С.As described in Table 1, the real-time data bus 146 (which communicates with operational and non-operational data) and the real-time complex event processing bus 147 (which communicates with the event processing data) are combined into a single bus 346. An example of this is presented in block diagram 300 of FIG. 3A-C.

Как показано на фиг. 1А-С, шины могут быть отдельными с целью повышения характеристик. Для обработки СЕР низкая латентность может быть важной для определенных приложений, в которых выполняют обработку очень крупных пульсаций сообщения. Большая часть потоков данных в сети, с другой стороны, является более или менее постоянной, за исключением цифровых файлов записи отказов, но они обычно могут быть получены на управляемой основе, в то время как пакетная передача событий является асинхронной и случайной.As shown in FIG. 1A-C, tires may be separate to enhance performance. For CEP processing, low latency can be important for certain applications in which very large message ripple processing is performed. Most of the data streams on the network, on the other hand, are more or less constant, with the exception of digital fault recording files, but they can usually be obtained in a controlled manner, while packet event transmission is asynchronous and random.

На фиг. 1, кроме того, показаны дополнительные элементы в центре 116 управления операциями, отдельном от ядра 120 INDE. В частности, на фиг. 1 дополнительно представлен головной узел (узлы) 153 сбора данных измерений, система, которая отвечает за обмен данными со счетчиками (такой как сбор данных от них и предоставление собранных данных в коммунальную службу). Система 154 управления ответом по запросу представляет собой систему, которая связывается с оборудованием в одном или больше помещениях потребителя, управление которыми может осуществляться коммунальной службой. Система 155 управления перерывами в работе представляет собой систему, которая помогает коммунальной службе управлять перерывами в работе, путем отслеживания местоположения перерывов в работе, управляя тем, что было выделено, и тем, как должна быть устранена проблема. Система 156 управления производством и потреблением энергии представляет собой систему управления на уровне системы передачи, которая управляет устройствами в подстанциях (например) сети передачи. Система 157 управления распределением представляет собой систему управления на уровне системы распределения, которая управляет устройствами в подстанциях и устройствами подачи (например) распределительной сети. Услуги 158 IP сети представляют собой подборку услуг, работающих на одном или больше серверах, которые поддерживают передачу данных типа IP (такую как DHCP и FTP). Система 159 отправки мобильных данных представляет собой систему, которая передает/принимает сообщения в терминалы мобильных данных, установленные на месте. Инструменты 152 анализа потоков цепей нагрузки, планирования анализа освещения и имитации сети представляют собой набор инструментов, используемых коммунальными услугами в ходе конструкторских работ, анализа и планирования сети. IVR (интегрированный голосовой отклик) и управление 151 вызовами представляют собой системы, которые управляют вызовами потребителей (автоматизированными или с использованием обслуживающего персонала). Входящие телефонные вызовы, относящиеся к перерывам в работе оборудования, могут быть автоматически или вручную введены и переданы в систему 155 управления перерывами в работе. Система 150 управления работой представляет собой систему, которая отслеживает исправляет порядком работы. Система 149 географической информации представляет собой базу данных, которая содержит информацию о том, где географически расположены ресурсы и как эти ресурсы соединены вместе. Если среда имеет архитектуру, ориентированную на услуги (SOA), поддержка 148 операций SOA представляет собой набор услуг для поддержки среды SOA.In FIG. 1, furthermore, additional elements are shown in an operation control center 116 separate from the INDE core 120. In particular, in FIG. 1 additionally presents the head node (nodes) 153 of the collection of measurement data, a system that is responsible for exchanging data with meters (such as collecting data from them and providing the collected data to the utility). On-demand response management system 154 is a system that communicates with equipment in one or more customer premises that can be managed by a utility. The interruption management system 155 is a system that helps the utility to manage interruptions by tracking the location of interruptions, controlling what was allocated and how the problem should be fixed. Energy production and consumption management system 156 is a transmission system level control system that controls devices in substations (e.g.) of a transmission network. Distribution control system 157 is a control system at the level of a distribution system that controls devices in substations and supply devices (for example) of a distribution network. Services 158 IP networks are a collection of services running on one or more servers that support IP type data transfer (such as DHCP and FTP). The mobile data sending system 159 is a system that transmits / receives messages to mobile data terminals installed in place. Tools 152 analysis of flows of load circuits, planning analysis of lighting and simulation of a network are a set of tools used by utilities in the course of design work, analysis and planning of the network. IVR (integrated voice response) and 151 call management are systems that manage customer calls (automated or using attendants). Incoming telephone calls related to equipment outages can be automatically or manually entered and transferred to the outage management system 155. System 150 management work is a system that monitors corrects the order of work. The geographic information system 149 is a database that contains information about where the resources are geographically located and how these resources are connected together. If your environment has a Service Oriented Architecture (SOA), supporting 148 SOA operations is a set of services to support your SOA.

Одна или больше систем в центре 116 управления операциям, который находится за пределами ядра 120 INDE, представляют собой системы - продукт наследия, который может иметь коммунальная служба. Примеры таких систем - продуктов наследия включают в себя поддержку 148 операции SOA, систему 149 географической информации, систему 150 управления работой, управление 151 вызовами, инструменты 152 анализа цепей и потоков нагрузки, планирования, анализа освещения и имитации сети, головной узел (узлы) 153 сбора измеренных данных, систему 154 управления откликом по запросу, систему 155 управления перерывами в работе, систему 156 управления производством и потреблением энергии, систему 157 управления распределением, систему 158 IP сети и систему 159 отправки мобильных данных. Однако такие системы - продукты наследия, могут не иметь возможности обрабатывать или работать с данными, которые принимают из интеллектуальной энергосистемы. Ядро 120 INDE может быть выполнено с возможностью приема данных из интеллектуальной энергосистемы, обработки этих данных из интеллектуальной энергосистемы и передачи обработанных данных в одну или больше систем - продуктов наследия таким образом, что системы - продукты наследия могут использовать (например, определенное форматирование, относящееся к системе - продукту наследия). Таким образом, ядро 120 INDE можно рассматривать как межплатформенное программное обеспечение.One or more of the systems in the operations control center 116, which is located outside the INDE core 120, are systems — a legacy product that a utility can have. Examples of such legacy product systems include support for 148 SOA operations, a geographic information system 149, an operation management system 150, 151 call management, tools 152 for analyzing network and load flows, planning, lighting analysis and network simulation, head node (s) 153 collection of measured data, on-demand response management system 154, interruption management system 155, energy production and consumption management system 156, distribution management system 157, IP network system 158 and mob sending system 159 ial data. However, such systems, legacy products, may not be able to process or work with data that is received from an intelligent power system. The core 120 INDE may be configured to receive data from the smart grid, process that data from the smart grid, and transfer the processed data to one or more legacy systems such that legacy systems can use (e.g., specific formatting related to system - a product of heritage). Thus, the core 120 INDE can be seen as cross-platform software.

Центр 116 управления операциями, включающий в себя ядро 120 INDE, может связываться с предприятием IT 115. Вообще говоря, функции предприятия IT 115 содержат операции операционного отдела. В частности, предприятие IT 115 может использовать шину 114 среды интегрирования предприятия для передачи данных в различные системы в пределах предприятия IT 115, включая в себя хранилище 104 данных бизнеса, интеллектуальное приложение 105 бизнеса, систему 106 планирования ресурсов предприятия, различные финансовые системы 107, систему 108 информации потребителя, систему 109 человеческих ресурсов, систему 110 управления ресурсами, поддержку 111 SOA предприятия, сетевую систему 112 управления и систему 113 передачи сообщений на предприятие. IT 115 предприятия может дополнительно включать в себя портал 103 для связи с Интернет 101 через брандмауэр 102.The operations management center 116, including the INDE core 120, can communicate with the IT 115 enterprise. Generally speaking, the functions of the IT 115 enterprise include operations of the operations department. In particular, IT 115 enterprise can use the bus 114 of the enterprise integration environment to transfer data to various systems within IT 115 enterprise, including business data storage 104, business intelligent application 105, enterprise resource planning system 106, various financial systems 107, system 108 consumer information, human resource system 109, resource management system 110, enterprise SOA support 111, network management system 112, and enterprise messaging system 113. Enterprise IT 115 may further include a portal 103 for communicating with the Internet 101 through a firewall 102.

Подстанция INDESubstation INDE

На фиг. 4 иллюстрируется пример архитектуры высокого уровня для группы подстанции 180 INDE. Эта группа может содержать элементы, которые фактически содержатся на подстанции 170 в помещении существенного управления одной или больше услугами, совместно расположенными с электронными средствами и системами подстанции.In FIG. 4 illustrates an example high-level architecture for a substation group 180 INDE. This group may contain elements that are actually contained in the substation 170 in the premises of the substantial control of one or more services shared with the electronic means and systems of the substation.

В таблице 2, приведенной ниже, представлен список и описаны определенные элементы группы подстанции 180 INDE. Услуги 171 безопасности сохранения данных могут представлять собой часть события подстанции; в качестве альтернативы, они могут быть интегрированы с группой 180 подстанции INDE.Table 2 below provides a list and describes certain elements of the 180 INDE substation group. Data storage security services 171 may be part of a substation event; alternatively, they can be integrated with group 180 of INDE substation.

Figure 00000003
Figure 00000003

Как описано выше, разные элементы в пределах интеллектуальной энергосистемы могут включать в себя дополнительные функции, включающие в себя дополнительные возможности обработки/аналитические возможности и ресурсы базы данных. Использование таких дополнительных функций с различными элементами в интеллектуальной энергосистеме обеспечивает возможность использования распределенных архитектур с централизованным управлением и администрированием приложений и работой сети. Для обеспечения возможности выполнения функций, рабочих характеристик и причин масштабирования, интеллектуальная энергосистема, включающая в себя от тысячи до десятков тысяч подстанций 180 INDE и от десятков тысяч до миллионов устройств сети, может включать в себя передачу данных распределенной обработки, управление данными и процессами.As described above, the various elements within the smart grid can include additional functions, including additional processing / analytic capabilities and database resources. The use of such additional functions with various elements in an intelligent power system provides the possibility of using distributed architectures with centralized management and administration of applications and network operation. To provide the ability to perform functions, performance, and reasons for scaling, an intelligent power system, including from thousands to tens of thousands of 180 INDE substations and from tens of thousands to millions of network devices, can include distributed data processing, data and process management.

Подстанция 180 INDE может включать в себя один или больше процессоров и одно или больше запоминающих устройств (таких как не рабочие данные 181 подстанции и рабочие данные 182 подстанции). Нерабочие данные 181 подстанции и рабочие данные 182 подстанции могут быть связаны с и расположены рядом с подстанцией, например расположены на подстанции 180 INDE. Подстанция 180 INDE может дополнительно включать в себя компоненты интеллектуальной энергосистемы, которые отвечают за возможность наблюдения интеллектуальной энергосистемы на уровне подстанции. Компоненты подстанции 180 INDE могут обеспечивать три первичные функции: получение и сохранение рабочих данных в распределенном хранилище рабочих данных; получение не рабочих данных и сохранение их среди данных предыстории; и локальная аналитическая обработка в режиме реального времени (такая как на субсекундном уровне). Обработка может включать в себя цифровую обработку сигналов формы напряжений и тока, обработку детектирования и классификации, включающую в себя обработку потока событий; и передачу результатов обработки в локальные системы и устройства, а также в системы центра 116 управления операциями. Передача данных между подстанцией 180 INDE и другими устройствами в сети может осуществляться по проводам, по беспроводным каналам или с использованием комбинации проводных и беспроводных каналов передачи данных. Например, передача данных из подстанции 180 INDE в центр 116 управления операциями может осуществляться по проводам. Подстанция 180 INDE может передавать данные, такие как рабочие/не рабочие данные или данные события, в центр 116 управления операциями. Устройство 190 направления по маршруту может направлять передаваемые данные в одну из операционной/не операционной шины 146 данных или в шину 147 события.Substation 180 INDE may include one or more processors and one or more storage devices (such as non-operating data 181 substation and operating data 182 substation). The non-operational data 181 of the substation and the operational data 182 of the substation can be associated with and located near the substation, for example, located at the substation 180 INDE. Substation 180 INDE may further include smart grid components that are responsible for monitoring the smart grid at the substation level. The components of the 180 INDE substation can provide three primary functions: receiving and storing working data in a distributed storage of working data; receiving non-operational data and storing them among historical data; and local analytical processing in real time (such as at the subsecond level). Processing may include digital processing of voltage and current waveforms, detection and classification processing including processing an event stream; and transferring the processing results to local systems and devices, as well as to the systems of the operations management center 116. Data transmission between the 180 INDE substation and other devices in the network can be carried out by wire, via wireless channels, or using a combination of wired and wireless data channels. For example, data transmission from the INDE substation 180 to the operation control center 116 may be by wire. The INDE substation 180 may transmit data, such as operational / non-operational data or event data, to the operations control center 116. The route guiding device 190 may forward the transmitted data to one of the operating / non-operating data bus 146 or to the event bus 147.

Оптимизация отклика на запрос для управления потерей распределения также может быть выполнена здесь. Такая архитектура соответствует принципам архитектуры распределенного приложения, описанного выше.Optimization of the response to the request to control distribution loss can also be done here. Such an architecture complies with the principles of the distributed application architecture described above.

Например, данные подключаемости могут быть дублированы в подстанции 170 и в центре 116 управления операциями, обеспечивая, таким образом, для подстанции 170 возможность независимой работы, даже если сеть передачи данных, обеспечивая связь с центром 116 управления операциями, не выполняет свои функции. С помощью такой информации (подключаемости), сохраненной локально, аналитическое средство подстанции может быть выполнено локально, даже если канал передачи данных с центром управления операциями будет неработоспособным.For example, the connectivity data can be duplicated in the substation 170 and in the operation control center 116, thus providing for the substation 170 the possibility of independent operation, even if the data network, providing communication with the operation control center 116, does not perform its functions. With the help of such information (connectivity) stored locally, the analytical tool of the substation can be performed locally, even if the data channel with the operations control center is inoperative.

Аналогично, данные операции могут быть дублированы в центре 116 управления операциями и в подстанциях 170. Данные от датчиков и устройств, связанных с определенной подстанцией, могут быть собраны, и самое последнее измерение может быть сохранено в этом хранилище данных на подстанции. Структуры данных в хранилище рабочих данных могут быть одинаковыми, и, следовательно, связи базы данных можно использовать для обеспечения доступа без перерывов к данным, которые находятся в подстанциях через экземпляр хранилища рабочих данных в центре управления. Это обеспечивает ряд преимуществ, включающих в себя устранение дублирования данных и обеспечение средствами аналитического анализа данных на подстанции, которые являются более чувствительными и возникают локально, и не могут полагаться на доступность передачи данных за пределами подстанции. Средства анализа данных на уровне центра 116 управления операциями могут в меньшей степени зависеть от времени (поскольку центр 116 управления операциями типично может исследовать данные предыстории для распознавания структур, которые являются более предсказуемыми, чем консервативными), и может быть выполнен с возможностью работы с проблемами сети, если они возникают.Similarly, these operations can be duplicated at the operations control center 116 and at substations 170. Data from sensors and devices associated with a particular substation can be collected, and the most recent measurement can be stored in this data warehouse at the substation. The data structures in the working data warehouse can be the same, and therefore database connections can be used to provide access without interruption to the data that is in the substations through an instance of the working data warehouse in the control center. This provides a number of advantages, including the elimination of data duplication and the provision of analytical data analysis tools at substations, which are more sensitive and occur locally and cannot rely on the availability of data transmission outside the substation. The data analysis tools at the level of the operations control center 116 may be less time dependent (since the operations control center 116 typically can examine historical data to recognize patterns that are more predictable than conservative) and can be configured to deal with network problems if they arise.

В конечном итоге, данные предыстории могут быть сохранены локально в подстанции, и копия данных может быть сохранена в центре управления. Или могут быть выполнены связи базы данных с экземпляром хранилища в центре 116 управления операциями, обеспечивая доступ центра управления операциями к данным в отдельных подстанциях. Аналитические средства подстанции могут быть выполнены локально в подстанции 170, используя локальный накопитель данных. В частности, используя дополнительное интеллектуальное средство и возможности по сохранению в подстанции, для подстанции обеспечивается возможность самостоятельного анализа и самостоятельной коррекции без воздействия со стороны центрального учреждения. В качестве альтернативы, анализ данных предыстории/коллективных данных также может быть выполнен на уровне центра 116 управления операциями путем доступа к данным в отдельной локальной подстанции, используя связи с базой данных.Ultimately, historical data can be stored locally in the substation, and a copy of the data can be stored in the control center. Or, the database may be associated with the storage instance in the operations control center 116, providing access to the data from the operations control center in separate substations. Substation analytical tools may be performed locally in substation 170 using a local data storage. In particular, using an additional intellectual tool and storage capabilities in the substation, the substation is provided with the possibility of independent analysis and independent correction without impact from the central institution. Alternatively, the analysis of historical data / collective data can also be performed at the level of the operations control center 116 by accessing the data in a separate local substation using database connections.

Устройство INDEDevice INDE

Группа устройств 188 INDE может содержать любое количество устройств в пределах интеллектуальной энергосистемы, включающей в себя различные датчики, находящиеся в пределах интеллектуальной энергосистемой, такие как различные устройства 189 сети распределения (например, датчики в линиях на линиях электроэнергетической системы), счетчики 163 в помещениях потребителя и т.д. Группа устройства 188 INDE может содержать устройство, добавленное к сети с определенными функциями (такое как интеллектуальный модуль удаленного терминала (RTU), который включает в себя специальные программы), или может содержать существующее устройство в пределах сети с добавленными функциями (такое как существующий RTU, установленный на вершине столба существующей архитектуры, который уже установлен на месте в сети, и который может быть запрограммирован для формирования интеллектуального датчика линии или интеллектуального устройства сети). Устройство 188 INDE может дополнительно включать в себя один или больше процессоров и одно или больше запоминающих устройств.The device group 188 INDE may contain any number of devices within the smart grid, including various sensors within the smart grid, such as various devices 189 of the distribution network (for example, sensors in the lines on the lines of the power system), meters 163 in the premises of the consumer etc. The device group 188 INDE may include a device added to the network with certain functions (such as an intelligent remote terminal module (RTU), which includes special programs), or may contain an existing device within the network with added functions (such as an existing RTU, mounted on top of a pillar of existing architecture, which is already installed in place on the network, and which can be programmed to form an intelligent line sensor or smart device s). The INDE device 188 may further include one or more processors and one or more storage devices.

Существующие устройства в сети могут не быть открытыми с точки зрения программного обеспечения, и могут не иметь возможности поддержки современных сетей или программных услуг. Существующие устройства в сети, возможно, были спроектированы для получения и сохранения данных, касающихся случайной неработоспособности некоторых других устройств, такие как переносной компьютер, или передачи командных файлов через линию PSTN в удаленный хост-компьютер по требованию. Такие устройства могут не быть спроектированы для работы в среде цифровой сети, работающей в режиме реального времени. В этих случаях данные устройства в сети могут быть получены на уровне 170 подстанции или на уровне 116 центра управления операциями, в зависимости от того, как существующая сеть была разработана. В случае сетей счетчиков, нормально, когда данные получают из механизма сбора данных счетчиков, поскольку измерительные электроэнергетические системы обычно являются закрытыми,, и в них невозможно осуществлять адресацию непосредственно к счетчикам. По мере развития этих сетей, счетчики и другие устройства в сети могут получать возможность индивидуальной адресации, поэтому данные могут быть транспортированы непосредственно в то место, где они требуются, что может не потребоваться в центре 116 управления операциями, но может быть нужным где-либо в другом месте в сети.Existing devices on the network may not be open in terms of software, and may not be able to support modern networks or software services. Existing devices on the network may have been designed to receive and store data regarding the accidental inoperability of some other devices, such as a laptop computer, or transferring batch files via the PSTN line to a remote host computer on demand. Such devices may not be designed to work in a real-time digital network environment. In these cases, these devices in the network can be obtained at substation 170 or at the level 116 of the operations control center, depending on how the existing network was developed. In the case of meter networks, it is normal for the data to be obtained from the meter data collection mechanism, since the measuring electric power systems are usually closed, and it is impossible to address directly to the meters in them. As these networks evolve, meters and other devices on the network can be individually addressed, so data can be transported directly to the place where it is needed, which may not be needed at the operations control center 116, but may be needed somewhere in elsewhere on the network.

Устройства, такие как индикаторы неисправности сети, могут быть объединены с картами интерфейса беспроводной сети, предназначенными для подключения к беспроводной сети с невысоким уровнем скорости (например, 100 кбит/с). Эти устройства могут сообщать о статусе по отклонениям и осуществлять заранее запрограммированные функции. Уровень интеллектуальности многих устройств, подключенных к сети, может быть повышен при использовании локальных интеллектуальных RTU. Вместо установки RTU на вершине столба, которые спроектированы как устройства замкнутой архитектуры с фиксированной функцией, RTU можно использовать как устройства с открытой архитектурой, которые могут быть запрограммированы третьими сторонами и которые можно использовать как устройство 188 INDE в эталонной архитектуре INDE. Кроме того, счетчики в помещениях потребителей могут использоваться как датчики. Например, счетчики могут измерять потребление (например, сколько энергии было израсходовано, с целью начисления счетов) и могут измерять напряжение (для использования при оптимизации вольт/VAr).Devices, such as network failure indicators, can be combined with wireless interface cards designed to connect to a wireless network at a low speed level (for example, 100 kbit / s). These devices can report status on deviations and carry out pre-programmed functions. The intelligence level of many devices connected to the network can be enhanced by using local intelligent RTUs. Instead of installing RTUs at the top of the pillar, which are designed as devices of closed architecture with a fixed function, RTUs can be used as devices with an open architecture that can be programmed by third parties and which can be used as an 188 INDE device in the INDE reference architecture. In addition, meters in consumer premises can be used as sensors. For example, meters can measure consumption (for example, how much energy has been used up for billing purposes) and can measure voltage (for use in optimizing volts / VAr).

На фиг.5А-В представлен пример архитектуры группы устройств 188 INDE. В Таблице 3 описаны некоторое элементы устройства 188 INDE. Интеллектуальное устройство сети может включать в себя встроенный процессор, таким образом, что элементы обработки выполнены в меньшей степени как услуги SOA и в большей степени как процедуры библиотеки программ, работающие в реальном времени, поскольку группа устройств воплощена на специализированном DSP, работающем в режиме реального времени, или в микропроцессоре.FIGS. 5A-B illustrate an example architecture of a device group 188 INDE. Table 3 describes some elements of the 188 INDE device. An intelligent network device may include an embedded processor such that the processing elements are less implemented as SOA services and more like real-time program library procedures, since the device group is embodied in a dedicated real-time DSP , or in a microprocessor.

Figure 00000004
Figure 00000004

На фиг.1А дополнительно представлено помещение 179 потребителя, которое может включать в себя один или больше интеллектуальных счетчиков 163, установленный внутри дома дисплей 165, один или больше датчиков 166 и один или больше элементов 167 управления. На практике датчики 166 могут регистрировать данные в одном или больше устройствах в помещении 179 потребителя. Например, датчик 166 может регистрировать данные в различных основных устройствах, установленных в помещении 179 потребителя, таких как печь, нагреватель воды, кондиционер воздуха и т.д. Данные от одного или больше датчиков 166 могут быть переданы в интеллектуальный счетчик 163, который может упаковывать эти данные для передачи в центр 116 управления операциями через сеть 160 передачи данных коммунальной службы. Установленный в доме дисплей 165 может предоставлять для потребителя в помещении потребителя выходное устройство для просмотра в режиме реального времени данных, собранных из интеллектуального счетчика 163 и одного или больше датчиков 166. Кроме того, входное устройство (такое как клавиатура) может быть связано с установленным в доме дисплеем 165 так, что потребитель может связываться с центром 116 управления операциями. В одном варианте осуществления установленный в доме дисплей 165 может содержать компьютер, установленный в помещении потребителя.On figa additionally presents the premises 179 of the consumer, which may include one or more smart meters 163, mounted inside the house display 165, one or more sensors 166 and one or more control elements 167. In practice, sensors 166 can record data in one or more devices in a customer room 179. For example, the sensor 166 can record data in various basic devices installed in the room 179 of the consumer, such as a stove, water heater, air conditioning, etc. Data from one or more sensors 166 may be transmitted to smart meter 163, which may package this data for transmission to operation control center 116 via utility data transmission network 160. An in-house display 165 may provide an outlet device for a consumer in a consumer premises to view in real time the data collected from the smart meter 163 and one or more sensors 166. In addition, an input device (such as a keyboard) may be associated with home display 165 so that the consumer can communicate with the operations management center 116. In one embodiment, a home-mounted display 165 may include a computer installed in a consumer’s room.

Помещение 165 потребителя может дополнительно включать в себя элементы 167 управления, которые могут управлять одним или больше устройствами в помещении 179 потребителя. При этом можно управлять различными устройствами в помещении 179 потребителя, такими как нагреватель, кондиционер воздуха и т.д., в зависимости от команд, поступающих из центра 116 управления операциями.Consumer room 165 may further include controls 167 that can control one or more devices in consumer premises 179. You can control various devices in the room 179 of the consumer, such as a heater, air conditioning, etc., depending on the commands received from the center 116 operations control.

Как представлено на фиг.1А, помещение 169 потребителя может связываться различными способами, например через Интернет 168, телефонную коммутируемую сеть общего пользования (PSTN) 169 или через выделенную линию (например, коллектор 164). Через любой из представленных каналов передачи данных можно передавать данные из одного или больше помещений 179 потребителя. Как показано на фиг. 1, одно или больше помещений 179 потребителя могут содержать интеллектуальную сеть 178 счетчика (содержащую множество интеллектуальных счетчиков 163), передающих данные в коллектор 164 для передачи в центр 116 управления операциями через сеть 160 управления коммунальной службы. Кроме того, различные источники распределенного устройства 162 генерирования/сохранения энергии (например, солнечные панели и т.д.) могут передавать данные в элемент управления 161 монитором для передачи данных в центр 116 управления операциями через сеть 160 управления коммунальными услугами.As shown in FIG. 1A, consumer premises 169 can be connected in various ways, for example, via the Internet 168, a public switched telephone network (PSTN) 169, or through a dedicated line (eg, collector 164). Through any of the presented data channels, data can be transmitted from one or more rooms 179 of the consumer. As shown in FIG. 1, one or more customer premises 179 may comprise a smart meter network 178 (comprising a plurality of smart meters 163) transmitting data to a collector 164 for transmission to an operation control center 116 through a utility service control network 160. In addition, various sources of the distributed energy generating / storing device 162 (e.g., solar panels, etc.) can transmit data to the monitor control 161 for transmitting data to the operation control center 116 via the utility management network 160.

Как описано выше, устройства электроэнергетической системы расположены за пределами центра 116 управления операциями и могут включать в себя возможности обработки и/или сохранения. Эти устройства могут включать в себя подстанцию 180 INDE и устройство 188 INDE. В дополнение к отдельным устройствам в электроэнергетической системе, включающим в себя дополнительные интеллектуальные способности, отдельные устройства могут связываться с другими устройствами в электроэнергетической системе для обмена информацией (включая в себя данные датчиков и/или аналитические данные (такие как данные события)), для анализа состояния электроэнергетической системы (например, для определения отказов) и для изменения состояния электроэнергетической системы (например, для коррекции отказов). В частности, отдельные устройства могут использовать следующее: (1) интеллектуальные способности (например, возможности обработки); (2) сохранение (например, упомянутое выше распределенное сохранение); и (3) передачу данных (например, такую как использование одной или больше шин, описанных выше). Таким образом, отдельные устройства в электроэнергетической системе могут связываться и взаимодействовать друг с другом без контроля со стороны центра 116 управления операциями.As described above, power system devices are located outside the operations control center 116 and may include processing and / or storage capabilities. These devices may include an INDE substation 180 and an INDE device 188. In addition to individual devices in the electric power system, including additional intellectual capabilities, individual devices can communicate with other devices in the electric power system to exchange information (including sensor data and / or analytical data (such as event data)), for analysis the state of the electric power system (for example, for determining failures) and for changing the state of the electric power system (for example, for correcting failures). In particular, individual devices may use the following: (1) intellectual abilities (for example, processing capabilities); (2) storage (e.g., the distributed storage mentioned above); and (3) data transmission (for example, such as using one or more of the buses described above). Thus, the individual devices in the electric power system can communicate and interact with each other without control from the operations control center 116.

Например, архитектура INDE, описанная выше, может включать в себя устройство, которое измеряет по меньшей мере один параметр, касающийся цепи подачи энергии. Это устройство может дополнительно включать в себя процессор, который отслеживает этот измеряемый параметр, касающийся цепи подачи энергии, и анализирует измеренный параметр для определения состояния цепи подачи энергии. Например, анализ измеренного параметра может заключаться в сравнении измеренного параметра с заданным пороговым значением и/или может заключаться в анализе тенденции. Одним из таких измеренных параметров может быть измерение формы колебаний, а одним из таких анализов может быть определение того, указывает ли эта измеренная форма колебаний на неисправность в цепи подачи энергии. Устройство может дополнительно связываться с одной или больше подстанциями. Например, конкретная подстанция может передавать энергию в конкретную цепь подачи питания. Устройство может детектировать состояние этой конкретной цепи подачи питания и определить, возникла ли неисправность в этой конкретной цепи подачи питания. Устройство может быть связано с подстанцией. Подстанция может анализировать неисправность, которая была определена этим устройством, и может предпринимать корректирующее действие в зависимости от неисправности (например, уменьшить мощность, подаваемую в цепь питания). В этом примере, где устройство передает данные, указывающие на неисправность (основанные на анализе формы колебаний), подстанция может изменять мощность, подаваемую в цепь питания, в центр 116 управления операциями. Или подстанция может комбинировать данные, обозначающие неисправность, с информацией от других датчиков с тем, чтобы дополнительно улучшить анализ неисправности. Подстанция может дополнительно передавать в центр 116 управления операциями такую информацию, как перерыв в работе интеллектуального приложения (такого, как описано со ссылкой на фиг.13А-В), и/или информацию о неисправности интеллектуального приложения (такого, как описано со ссылкой на фиг.14А-С). Таким образом, центр 116 управления операциями может определять неисправность и может определять протяженность перерыва в работе (например, количество домов, на которые повлияла неисправность). Таким образом, устройство, определяющее состояние цепи подачи энергии, может работать во взаимодействии с подстанцией для коррекции потенциальной неисправности, с необходимостью вмешательства или без необходимости вмешательства центра 116 управления операциями.For example, the INDE architecture described above may include a device that measures at least one parameter relating to a power supply circuit. This device may further include a processor that monitors this measured parameter regarding the power supply circuit, and analyzes the measured parameter to determine the state of the power supply circuit. For example, analysis of a measured parameter may consist of comparing the measured parameter with a predetermined threshold value and / or may include analyzing a trend. One of these measured parameters may be the measurement of the waveform, and one of such analyzes may be to determine whether this measured waveform indicates a malfunction in the power supply circuit. The device may further communicate with one or more substations. For example, a particular substation may transmit energy to a particular power supply circuit. The device can detect the status of this particular power supply circuit and determine if a malfunction has occurred in this particular power supply circuit. The device may be connected to a substation. The substation can analyze the malfunction that was detected by this device, and can take a corrective action depending on the malfunction (for example, reduce the power supplied to the power circuit). In this example, where the device transmits data indicating a malfunction (based on waveform analysis), the substation can change the power supplied to the power circuit to the operation control center 116. Or, the substation may combine data indicating a fault with information from other sensors in order to further improve the analysis of the fault. The substation may further transmit to the operation control center 116 information such as an interruption in the operation of the smart application (such as described with reference to FIGS. 13A-B) and / or information about the malfunction of the smart application (such as described with reference to FIG. .14A-C). Thus, the operations control center 116 can determine the malfunction and can determine the length of the interruption (for example, the number of houses affected by the malfunction). Thus, the device that determines the state of the power supply circuit can work in conjunction with the substation to correct a potential malfunction, with or without the need for intervention by the operation control center 116.

В качестве другого примера, датчик в линии, который включает в себя дополнительные интеллектуальные возможности, используя возможность обработки и/или запоминающего устройства, может производить данные о состоянии сети на участке сети (таком как цепь подачи энергии). Данные о состоянии сети могут совместно использоваться с системой управления 155 откликом на запрос в центре 116 управления операциями. Система 155 управления откликом на запрос может управлять одним или больше устройствами в местах потребителя в цепи подачи энергии в ответ на данные о состоянии сети из датчика линии. В частности, система 155 управления откликом на запрос может передавать команды в автоматизированную систему 156 управления энергией и/или в систему 157 управления распределением для уменьшения нагрузки на цепь подачи энергии, путем отключения устройств в местах потребителей, которые принимают энергию из цепи подачи энергии в ответ на обозначение датчиком в линии перерывов в работе цепи подачи энергии. Таким образом, датчик в линии, в комбинации с системой 155 управления откликом на запрос, может автоматически переключать нагрузку с неисправной цепи подачи энергии и затем изолировать эту нагрузку.As another example, an in-line sensor, which includes additional intelligence, using the processing and / or storage capabilities, can produce network status data on a network section (such as an energy supply circuit). Network status data may be shared with the response management system 155 at the operation control center 116. The query response control system 155 may control one or more devices at a consumer site in the power supply circuit in response to network status data from a line sensor. In particular, the request response control system 155 may transmit commands to the automated energy management system 156 and / or to the distribution control system 157 to reduce the load on the energy supply circuit by disconnecting devices in consumer locations that receive energy from the energy supply circuit in response on the designation by the sensor in the line of breaks in the operation of the energy supply circuit. Thus, the in-line sensor, in combination with the query response control system 155, can automatically switch the load from the faulty power supply circuit and then isolate this load.

В еще одном другом примере, одно или больше реле в электроэнергетической системе может иметь микропроцессор, который связан с ними. Такие реле могут связываться с другими устройствами и/или базами данных, резидентно установленными в сети подачи питания, для определения неисправности и/или управления сетью подачи питания.In yet another example, one or more relays in a power system may have a microprocessor that is coupled to them. Such relays can communicate with other devices and / or databases resident in the power supply network to detect a malfunction and / or control the power supply network.

Концепция и архитектура INDSINDS concept and architecture

Модель интеллектуальных данных и данных интеллектуальной энергосистемы/аналитических услуг, предоставляемых на основе аутсорсингаOutsourced data mining and smart grid data / analytical services model

Одно из применений архитектуры интеллектуальной энергосистемой обеспечивает для коммунальной службы возможность подписки на управление данными сети и аналитические услуги, при сохранении собственных традиционных систем управления и соответствующих операционных систем. В этой модели коммунальные службы могут устанавливать собственные датчики и устройства сети (как описано выше) и могут или владеть, или оперировать системой передачи данных для транспортирования данных сети, или могут получать эти данные на основе аутсорсинга. Данные сети могут поступать из коммунальных служб в удаленный сайт размещения, на котором размещены услуги обработки данных интеллектуальной энергосистемой (INDS), где данными можно управлять, данные можно сохранять и анализировать. Коммунальная служба может затем подписываться на услуги предоставления данных и анализа в соответствии с соответствующей моделью финансовых услуг. Коммунальная служба может исключить необходимость начальных инвестиций, представляющих капитальные затраты и текущие затраты на управление, поддержку и обновления данных интеллектуальной энергосистемой /аналитической инфраструктуры, в обмен на платежи. Эталонная архитектура INDE, описанная выше, сама по себе поддерживает описанную здесь компоновку с предоставлением данных из внешнего источника.One of the applications of the architecture of the smart energy system provides the utility with the possibility of subscribing to network data management and analytical services, while maintaining its own traditional control systems and associated operating systems. In this model, utilities can install their own sensors and network devices (as described above) and can either own or operate a data transmission system to transport network data, or can receive this data based on outsourcing. Network data can come from utilities to a remote hosting site that hosts data processing services by the Intelligent Energy System (INDS), where data can be managed, data can be saved and analyzed. The utility may then subscribe to data and analysis services in accordance with the corresponding financial services model. The utility can eliminate the need for upfront investments representing capital expenditures and the running costs of managing, maintaining and updating data from the smart grid / analytical infrastructure in exchange for payments. The INDE reference architecture described above itself supports the layout described here with the provision of data from an external source.

Архитектура INDS для услуг интеллектуальной энергосистемыINDS architecture for smart grid services

Для воплощения модели услуг INDS, эталонная архитектура INDE может быть разделена на группы элементов, которые могут быть размещены дистанционно, и на элементы, которые могут оставаться в коммунальной службе. На фиг.6А-С иллюстрируется, как архитектура коммунальной службы может выглядеть после того, как ядро 120 INDE становится удаленным. Сервер может быть включен как часть ядра 120 INDE, который может действовать как интерфейс для удаленных систем. Для систем коммунальных услуг это может выглядеть как виртуальное ядро 602 INDE.To implement the INDS service model, the INDE reference architecture can be divided into groups of elements that can be placed remotely and elements that can remain in the utility. FIGS. 6A-C illustrate how a utility service architecture may look after the INDE core 120 becomes remote. The server can be included as part of the 120 INDE kernel, which can act as an interface to remote systems. For utilities, this may look like the 602 INDE virtual core.

Как представлено на общей блок-схеме 600 на фиг.6А-С, подстанция 180 INDE и группы устройств 188 INDE являются неизменными по сравнению с тем, что представлено на фиг. 1А-С. Структура из множества шин также все еще может использоваться в коммунальной службе.As shown in the general block diagram 600 of FIGS. 6A-C, the INDE substation 180 and the group of INDE devices 188 are unchanged from what is shown in FIG. 1A-C. The multi-tire structure can also still be used in the public service.

Ядро 120 INDE может быть размещено дистанционно, как показано в блок-схеме 700 на фиг.7. В месте размещения ядро 120 INDE может быть установлено в соответствии с необходимостью, для поддержки абонентов INDS с коммунальной службой (представлена как североамериканский центр 702 размещения INDS). Каждое ядро 120 может представлять собой модульную систему, таким образом, что добавление новых абонентов представляет собой стандартную операцию. Часть, отдельная от коммунальной услуги электроэнергетической системы, может управлять и поддерживать программное средство для одного, некоторых или всех ядер 120 INDE, а также приложений, которые загружают из сайта размещения INDS в каждые из подстанций 180 INDE коммунальной службы и в устройства 188 INDE.The core 120 INDE can be placed remotely, as shown in the block diagram 700 in Fig.7. At the location, the 120 INDE core can be installed as needed to support INDS subscribers with utilities (represented as the North American INDS Placement Center 702). Each core 120 may be a modular system, so that adding new subscribers is a standard operation. A part separate from the utility service of the power system can manage and maintain software for one, some or all of the INDE 120 cores, as well as applications that are downloaded from the INDS hosted site to each of the utility service substations 180 INDE and to the 188 INDE devices.

Для того чтобы способствовать передаче данных, могут использоваться услуги передачи данных с большой полосой пропускания и низкой задержкой, например, через сеть 704 (например, MPLS или другую WAN), которая может достигать центра операций коммунальных услуг абонента, а также сайта размещения INDS. Как показано на фиг. 7, могут обслуживаться различные регионы, такие как Калифорния, Флорида и Огайо. Такая модульность операций не только позволяет обеспечить эффективное управление различными сетями. Она также обеспечивает лучшее управления между сетями. Возникают случаи, когда отказ в одной сети может повлиять на операции в соседней сети. Например, неисправность сети Огайо может иметь каскадный эффект на операции в соседней сети, например центрально-атлантической сети. Используя модульную структуру, как показано на фиг. 7, обеспечивается возможность операций управления между сетями для отдельных сетей. В частности, общая система INDS (которая включает в себя процессор и запоминающее устройство) может управлять взаимодействием между различными ядрами 120 INDE. Это может уменьшить возможность катастрофического отказа, который каскадно передается от одной сети в другую. Например, отказ в сети Огайо может каскадно быть передан в соседнюю сеть, такую как центрально-атлантическая сеть. Ядро 120 INDE, предназначенное для управления сетью Огайо, может сделать попытку коррекции неисправности в сети Огайо. И общая система INDS может делать попытку уменьшения возможности возникновения каскадной неисправности в соседних сетях.In order to facilitate data transfer, data services with high bandwidth and low latency can be used, for example, through a network 704 (eg, MPLS or another WAN), which can reach the subscriber's operations center, as well as the INDS hosting site. As shown in FIG. 7, various regions such as California, Florida, and Ohio may be served. Such modularity of operations not only allows for efficient management of various networks. It also provides better management between networks. There are cases when a failure in one network can affect operations in a neighboring network. For example, an Ohio network failure can have a cascading effect on operations in a neighboring network, such as the Central Atlantic network. Using a modular structure as shown in FIG. 7, control operations between networks for individual networks are provided. In particular, the general INDS system (which includes a processor and a storage device) can control the interaction between the various INDE cores 120. This can reduce the possibility of a catastrophic failure, which is cascaded from one network to another. For example, an Ohio network failure can be cascaded to a neighboring network, such as the Central Atlantic network. The Ohio 120 INDE Kernel can attempt to troubleshoot an Ohio network. And the general INDS system may attempt to reduce the possibility of a cascading failure in neighboring networks.

Конкретные примеры функций ядра INDEConcrete Examples of INDE Kernel Functions

Как показано на фиг.1, 6 и 7, различные функции (представленные блоками) включены в ядро 120 INDE, две из которых представлены как услуги 121 управления данными счетчика (MDMS) и средства анализа и услуги 122 счетчиков. Благодаря модульности архитектуры, могут быть внедрены различные функции, такие как MDMS 121 и аналитические средства и услуги 122 счетчиков.As shown in FIGS. 1, 6 and 7, various functions (represented by blocks) are included in the INDE core 120, two of which are represented as counter data management services (MDMS) 121 and analysis tools and services 122 counters. Due to the modularity of the architecture, various functions can be implemented, such as MDMS 121 and analytical tools and services 122 meters.

Процессы обеспечения возможности наблюденияSurveillance Processes

Как описано выше, одна функция услуг приложений может включать в себя процессы обеспечения возможности наблюдения. Процессы обеспечения возможности наблюдения могут обеспечивать для коммунальной службы возможность "наблюдать" за сетью. Эти процессы могут быть ответственными за интерпретацию необработанных данных, полученных из всех датчиков и устройств по сети, и преобразования их в действующую информацию. На фиг. 8 представлен список некоторых примеров процессов обеспечения возможности наблюдения.As described above, one application service function may include monitoring processes. Monitoring processes can provide the utility with the ability to "monitor" the network. These processes may be responsible for interpreting the raw data received from all sensors and devices over the network and converting them into valid information. In FIG. Figure 8 provides a list of some examples of surveillance processes.

На фиг.9А-В представлена блок-схема последовательности операций 900 процессов управления состоянием и операций сети. Как можно видеть, сканер данных может запрашивать данные счетчиков, как показано в блоке 902. Запрос может быть передан в одно или больше устройств, установленных в сети, в компьютеры подстанций и в датчики RTU на линии. В ответ на запрос устройства могут собирать данные операций, как показано в блоках 904, 908, 912, и могут передавать данные (такие как одни, некоторые или все из рабочих данных, такие как данные о напряжении, токе активной мощности и реактивной мощности), как показано в блоках 906, 910, 914. Сканер данных может собирать данные операций, как показано в блоке 926, и может передавать эти данные в накопитель данных операций, как показано в блоке 928. Накопитель данных операций может сохранять данные операций, как показано в блоке 938. Накопитель данных операций может дополнительно передавать краткую характеристику этих данных в накопитель данных предыстории, как показано в блоке 940, и накопитель данных предыстории может сохранять краткую характеристику этих данных, как показано в блоке 942.9A-B are a flowchart of 900 state management processes and network operations. As you can see, the data scanner can request counter data, as shown in block 902. The request can be transmitted to one or more devices installed on the network, to substation computers, and to RTU sensors on the line. In response to a request, devices can collect operation data, as shown in blocks 904, 908, 912, and can transmit data (such as one, some, or all of the operating data, such as voltage, active current, and reactive power), as shown in blocks 906, 910, 914. The data scanner may collect operation data, as shown in block 926, and may transmit this data to the operation data storage device, as shown in block 928. The operation data storage device may store operation data, as shown in block 938. The data storage operations a brief description of further transmit these data in the history data storage, as shown in block 940, and a history data storage device may store a brief description of the data, as shown in block 942.

Приложение состояния счетчика может передавать запрос на получение данных счетчика в DCE счетчика, как показано в блоке 924, который в свою очередь передает этот запрос в один или больше счетчиков для сбора данных счетчиков, как показано в блоке 920. В ответ на этот запрос один или больше счетчиков собирают данные счетчика, как показано в блоке 916, и передают данные напряжения в измеритель DCE, как показано в блоке 918. Измеритель DCE может собирать данные напряжения, как показано в блоке 922, и передавать эти данные в блок запроса данных, как показано в блоке 928. Приложение состояния счетчика может принимать данные счетчика, как показано в блоке 930, и определять, относятся ли они к процессу с одним значением или к состоянию сети с профилем напряжения, как показано в блоке 932. Если они относятся к процессу с одним значением, данные счетчика передают в запрашивающий процесс, как показано в блоке 936. Если данные счетчика предназначены для сохранения и определения состояния сети в будущем, данные счетчика сохраняют в накопителе рабочих данных, как показано в блоке 938. Накопитель рабочих данных дополнительно передает краткие характеристики данных в накопитель предыстории, как показано в блоке 940, и накопитель предыстории сохраняет краткие характеристики данных, как показано в блоке 942.The counter status application may send a request for counter data to the counter DCE, as shown in block 924, which in turn passes this request to one or more counters to collect counter data, as shown in block 920. In response to this request, one or more counters collect counter data, as shown in block 916, and transmit voltage data to the DCE meter, as shown in block 918. The DCE meter can collect voltage data, as shown in block 922, and transmit this data to the data request block, as shown at lock 928. The counter status application can receive counter data, as shown in block 930, and determine whether they relate to a process with a single value or to the network status with a voltage profile, as shown in block 932. If they relate to a process with a single value , the counter data is transmitted to the requesting process, as shown in block 936. If the counter data is intended to save and determine the network status in the future, the counter data is stored in the operating data storage device, as shown in block 938. The operational data storage is additional additionally transmits the brief characteristics of the data to the history store, as shown in block 940, and the history store stores the brief characteristics of the data, as shown in block 942.

На фиг.9А-В дополнительно иллюстрируются действия, относящиеся к ответу на запрос (DR). Ответ на запрос относится к механизму динамического запроса для управления потреблением потребителя электроэнергии в ответ на условия предоставления, например, для того, чтобы потребитель электроэнергии уменьшил потребление в критическое время или в ответ на рыночные цены. Это может включать в себя фактическое сокращения используемой энергии или начало генерирования на месте, которое может быть подключено или может не быть подключено параллельно сети. С точки зрения эффективности энергии, некоторые средства используют меньше энергии для выполнения тех же задач, на постоянной основе или всякий раз при выполнении задачи. В ответ на запрос потребитель, использующий одну или больше систем управления, может избавляться от нагрузок в ответ на запрос из коммунальной службы или в соответствии с условиями цен на рынке. Услуги (освещение, устройства, кондиционирование воздуха) могут быть уменьшены в соответствии с заранее запланированной схемой приоритетов нагрузки во время критических периодов. Альтернатива отключению нагрузки представляет собой генерирование на месте электроэнергии для подачи ее в сеть потребления электроэнергии. При условиях плотной подачи электричества отклик на запрос может существенно уменьшить пиковую цену и, в общем, снижать неустойчивость тарифов на электричество.9A-B further illustrate actions related to request response (DR). A response to a request refers to a dynamic request mechanism for controlling the consumption of electricity by the consumer in response to the terms of provision, for example, so that the electricity consumer reduces consumption at a critical time or in response to market prices. This may include the actual reduction in energy used or the start of on-site generation, which may or may not be connected in parallel to the network. In terms of energy efficiency, some tools use less energy to perform the same tasks, on an ongoing basis or whenever a task is performed. In response to a request, a consumer using one or more control systems can get rid of the load in response to a request from the utility or in accordance with market price conditions. Services (lighting, devices, air conditioning) can be reduced in accordance with a pre-planned load priority scheme during critical periods. An alternative to disconnecting the load is generating on-site electricity to supply it to the electricity consumption network. Under conditions of dense electricity supply, the response to a request can significantly reduce the peak price and, in general, reduce the instability of electricity tariffs.

Отклик на запрос может обычно использоваться для обозначения механизмов, используемых для поощрения потребителей к снижению потребления, в результате чего уменьшается пиковая потребность в электричестве. Поскольку электроэнергетические системы обычно имеют такие размеры, чтобы они соответствовали пиковой потребности (плюс запас на ошибку и непредвиденные события), уменьшения потребности к пиковому потреблению может снизить общие требования к установке и капитальным затратам. В зависимости от конфигурации и возможностей генерирования, однако, ответ на запрос также можно использовать для увеличения запроса (нагрузки) во время крупносерийного производства и при низком спросе. Некоторые системы могут поэтому поощрять накопление энергии для выравнивания между периодами низкого и высокого потребления (или низких и высоких тарифов). По мере того как в системе растет пропорция не постоянных источников электроэнергии, таких как ветряные установки, отклик на запрос может становиться все более важным для эффективного управления электроэнергетической системой.Response to a request can usually be used to identify mechanisms used to encourage consumers to reduce consumption, resulting in reduced peak demand for electricity. Since power systems are typically sized to match peak demand (plus margin for error and unforeseen events), reducing peak demand can reduce overall installation requirements and capital costs. Depending on the configuration and generation capabilities, however, the response to the request can also be used to increase the request (load) during large-scale production and with low demand. Some systems may therefore encourage energy storage to balance between periods of low and high consumption (or low and high tariffs). As the proportion of non-permanent sources of electricity, such as wind turbines, grows in a system, response to a request can become more and more important for the efficient management of an electric power system.

Приложения состояния. DR могут запрашивать доступные ресурсы DR, как показано в блоке 954. Система управления DR может затем запрашивать доступные ресурсы из одного или больше домашних устройств DR, как показано в блоке 948. Одно или больше домашних устройств может собирать доступные ресурсы DR в ответ на запрос, как показано в блоке 944, и передавать доступные ресурсы DR и данные отклика в систему управления DR, как показано в блоке 946. Система управления DR может собирать ресурсы DR и данные отклика, как показано в блоке 950, и передавать доступные ресурсы DR и данные отклика в приложение состояния DR, как показано в блоке 952. Приложение состояния DR может принимать ресурсы DR и данные отклика, как показано в блоке 956, и передавать данные ресурса и данные отклика в накопительных рабочих данных, как показано в блоке 958. Накопитель рабочих данных может сохранять доступные ресурсы DR и данные отклика, как показано в блоке 938. Накопитель рабочих данных может дополнительно передавать краткие характеристики данных в накопитель данных предыстории, как показано в блоке 940, и накопитель данных предыстории может сохранять краткие характеристики данных, как показано в блоке 942.State applications. DRs may request available DR resources, as shown in block 954. The DR control system may then request available resources from one or more DR home devices, as shown in block 948. One or more home devices may collect available DR resources in response to a request, as shown in block 944, and transmit available DR resources and response data to the DR control system, as shown in block 946. The DR control system can collect DR resources and response data, as shown in block 950, and transmit available DR resources and response data in pr a DR status mapping as shown in block 952. A DR status application can receive DR resources and response data, as shown in block 956, and transmit resource data and response data in cumulative operational data, as shown in block 958. The operational data store may store available DR resources and response data, as shown in block 938. The operational data storage device may further transmit brief data characteristics to the historical data storage device, as shown in block 940, and the historical data storage device may store short Characteristics of data, as shown in block 942.

Компьютер подстанции может запрашивать данные приложения из приложения подстанции, как показано в блоке 974. В ответ приложение подстанции может запрашивать приложение из устройства подстанции, как показано в блоке 964. Устройство подстанции может собирать данные приложения, как показано в блоке 960, и передавать данные приложения в устройство подстанции (эти данные могут включать в себя одни, некоторые или все из таких данных, как напряжение, ток, активная мощность и реактивная мощность), как показано в блоке 962. Приложение подстанции может собирать данные приложения, как показано в блоке 966, и передавать данные приложения в блок запроса (который может представлять собой компьютер подстанции), как показано в блоке 968. Компьютер подстанции может принимать данные приложения, как показано в блоке 970, и передавать эти данные приложения в накопитель рабочих данных, как показано в блоке 972.The substation computer can request application data from the substation application, as shown in block 974. In response, the substation application can request the application from the substation device, as shown in block 964. The substation device can collect application data, as shown in block 960, and transmit application data into the substation device (this data may include one, some or all of such data as voltage, current, active power and reactive power), as shown in block 962. The substation application may take application data, as shown in block 966, and transmit application data to the request block (which may be a substation computer), as shown in block 968. The substation computer can receive application data, as shown in block 970, and transmit this application data to the data storage device, as shown in block 972.

Процесс обработки данных измерений и рабочих данных состояния сети может содержать передачу состояния сети и топологии сети в определенный момент времени, а также предоставлять эту информацию в другие системы и накопители данных. Подпроцессы могут включать в себя: (1) измерение и захват информации о состоянии сети (это относится к рабочим данным, относящимся к сети, которые были описаны выше; (2) передачу информации о состоянии сети в другие аналитические приложения (это обеспечивает для других приложений, таких как аналитические приложения, доступ к данным состоянии сети); (3) сохранение краткой характеристики состояния сети в накопителе данных подключаемости/рабочих данных (это обеспечивает возможность обновления информации о состоянии сети в накопителе данных подключаемости/рабочих данных в соответствующем формате, а также передачу этой информации в накопитель данных предыстории для сохранения таким образом, что топология сети может быть получена для этой точки времени в более позднее время); (4) предоставление топологии сети в определенные моменты времени на основе принятой по умолчанию подключаемости и текущего состояния сети (это обеспечивает топологию сети в данный момент времени, путем применения кратких характеристик для данной точки времени состояния сети в накопителе данных предыстории для основной подключаемости в накопителе данных подключаемости, как более подробно описано ниже); и (5) предоставление информации о топологии сети в приложения после запроса.The process of processing measurement data and network state operational data may include transmitting the network status and network topology at a certain point in time, as well as providing this information to other systems and data storage devices. Subprocesses may include: (1) measuring and capturing network status information (this relates to network-related operational data described above; (2) transferring network status information to other analytic applications (this provides for other applications such as analytical applications, access to network state data); (3) saving a brief description of the network state in the connectivity data / operational data storage (this provides the ability to update information about the network status in the data storage under switchability / operating data in the appropriate format, as well as transferring this information to the history data store for storage so that the network topology can be obtained for this point in time at a later time); (4) providing the network topology at certain points in time based on the default connectivity and the current state of the network (this provides the topology of the network at a given time, by applying brief characteristics for a given point in time of the network state in the data storage device for basic connectivity in the connectivity data storage, as more fully described below); and (5) providing network topology information to applications upon request.

Что касается подпроцесса (4), топология сети может быть выведена для заданного времени, например в режиме реального времени, 30 секунд назад, 1 месяц назад и т.д. Для воссоздания топологии сети можно использовать множество баз данных и программу для доступа к данным во множестве баз данных, для восстановления топологии сети. Одна база данных может содержать реляционную базу данных, которая содержит основные данные подключаемости ("база данных подключаемости"). База данных подключаемости может содержать информацию о топологии сети, встроенную для определения модели подключаемости по основной линии. Информация о ресурсах и топологии может обновляться в этой базе данных на периодической основе, в зависимости от обновлений электроэнергетической системы, таких как добавление или модификация цепей в электроэнергетической системы (например, дополнительные цепи подачи энергии, которые были добавлены в электроэнергетической системе). База данных подключаемости может рассматриваться как "статичная" в том, что она не изменяется. База данных подключаемости может изменяться, если возникают изменения в структуре сетей электроэнергетической системы. Например, если существуют модификации в цепях подачи электроэнергии, такие как добавление цепи подачи электроэнергии, база данных подключаемости может изменяться.As for subprocess (4), the network topology can be displayed for a given time, for example, in real time, 30 seconds ago, 1 month ago, etc. To recreate the network topology, you can use many databases and a program to access data in many databases, to restore the network topology. One database may contain a relational database that contains basic connectivity data (a "connectivity database"). The connectivity database may contain information about the network topology built-in to determine the connectivity model for the main line. Information on resources and topology may be updated in this database on a periodic basis, depending on updates to the power system, such as adding or modifying circuits in the power system (for example, additional power circuits that have been added to the power system). The connectivity database can be considered “static” in that it does not change. The connectivity database may change if changes occur in the network structure of the power system. For example, if modifications exist in the power supply circuits, such as the addition of the power supply circuit, the connectivity database may change.

Один пример структуры 1800 базы данных подключаемости может быть выведен из иерархической модели, представленной на фиг.18A-D. Структура 1800 разделена на четыре секции, при этом фигура 18А представляет собой верхнюю левую секцию, фигура 18В представляет собой верхнюю правую секцию, фигура 18С представляет собой нижнюю левую секцию и фигура 18D представляет собой нижнюю правую секцию. В частности, на фиг.18A-D показан пример диаграммы взаимозависимостей объектов, которые представляют собой абстрактный способ представления базы данных подключаемости к основной линии. Иерархическая модель на фиг.18A-D может содержать метаданные, которые описывают электроэнергетическую систему и могут описывать различные компоненты сети и взаимосвязи между компонентами.One example of the connectivity database structure 1800 may be inferred from the hierarchical model of FIGS. 18A-D. Structure 1800 is divided into four sections, wherein Figure 18A represents the upper left section, Figure 18B represents the upper right section, Figure 18C represents the lower left section, and Figure 18D represents the lower right section. In particular, FIGS. 18A-D show an example of a diagram of the interdependencies of objects, which are an abstract way of representing the connectivity database to the main line. The hierarchical model of FIGS. 18A-D may comprise metadata that describe a power system and may describe various network components and relationships between components.

Вторая база данных может использоваться для сохранения "динамических" данных. Вторая база данных может содержать нереляционную базу данных. Один пример нереляционной базы данных может содержать базу данных предыстории, в которой содержится временная последовательность не рабочих данных, а также рабочие данные предыстории. База данных предыстории может содержать последовательность "простых" записей, таких как: (1) временной штамп; (2) идентификатор устройства; (3) значение данных и (4) статус устройства. Кроме того, сохраненные данные могут быть сжаты. В связи с этим, рабочие/не рабочие данные в электроэнергетической системе могут быть сохранены просто, и ими можно управлять даже при том, что значительный объем данных может быть доступным. Например, данные объемом порядка 5 терабайт могут быть доступны в режиме онлайн в любой момент времени для использования для воссоздания топологии сети. Поскольку эти данные сохранены в виде простой записи (например, без организационного подхода), обеспечивается возможность повышения эффективности при сохранении данных. Как более подробно описано ниже, доступ к данным может осуществляться с помощью специфичной метки, такой как временной штамп.A second database can be used to store "dynamic" data. The second database may contain a non-relational database. One example of a non-relational database may include a history database, which contains a time sequence of non-operational data, as well as historical operating data. The history database may contain a sequence of “simple” entries, such as: (1) a time stamp; (2) device identifier; (3) data value; and (4) device status. In addition, stored data can be compressed. In this regard, working / non-working data in the power system can be stored simply and can be managed even though a significant amount of data may be available. For example, data of about 5 terabytes can be available online at any time for use to recreate the network topology. Since this data is stored as a simple record (for example, without an organizational approach), it is possible to increase efficiency when saving data. As described in more detail below, data can be accessed using a specific mark, such as a time stamp.

Различным аналитическим средствам сети может понадобиться принимать в качестве входных данных топологию сети в определенный момент времени. Например, аналитические средства, относящиеся к качеству энергии, надежности, состоянию ресурсов и т.д., могут использовать топологию сети в качестве входных данных. Для определения топологии сети можно выполнять оценку модели подключаемости в основной линии, как она определена данными в базе данных подключаемости. Например, если требуется топология определенной цепи подачи энергии, модель подключаемости основной линии может определять различные переключатели в определенной цепи подачи энергии в электроэнергетической системе. После чего может произойти обращение к базе данных предыстории (на основе определенного времени) для определения значения переключений в определенной цепи подачи энергии. Затем программа может комбинировать данные из модели подключаемости основной линии и базы данных предыстории для генерирования представления определенной цепи подачи энергии в определенный момент времени.Various analytical tools of the network may need to take the topology of the network at a certain point in time as input. For example, analytical tools related to energy quality, reliability, resource status, etc., can use the network topology as input. To determine the network topology, you can evaluate the connectivity model in the main line as it is defined by the data in the connectivity database. For example, if the topology of a specific power supply circuit is required, the connectivity model of the main line can define various switches in a specific power supply circuit in an electric power system. After that, a reference to the history database (based on a certain time) can occur to determine the value of the switching in a certain energy supply circuit. The program can then combine the data from the connectivity model of the main line and the history database to generate a view of a specific power supply circuit at a specific point in time.

Более сложный пример для определения топологии сети может включать в себя множество цепей подачи питания (например, цепь А подачи энергии и цепь В подачи энергии), которые имеют переключатели промежуточной горизонтальной связи и переключатели разделения на секции. В зависимости от состояний переключателей для некоторых переключателей (например, переключателя промежуточной горизонтальной связи и/или переключателей разделения на секции), секции цепей подачи электроэнергии могут принадлежать цепи А подачи энергии или цепи В подачи энергии. Программа, которая определяет топологию сети, может обращаться к данным как из модели подключаемости основной линии, так и из базы данных предыстории для определения подключаемости в определенный момент времени (например, какие цепи принадлежат цепи А подачи энергии или цепи В подачи энергии).A more complex example for determining the network topology may include a plurality of power supply circuits (for example, power supply circuit A and power supply circuit B) that have intermediate horizontal communication switches and section division switches. Depending on the state of the switches for some switches (for example, an intermediate horizontal communication switch and / or partitioning switches), sections of the power supply circuits may belong to the power supply circuit A or the power supply circuit B. A program that determines the network topology can access data from both the main line connectivity model and the history database to determine connectivity at a specific point in time (for example, which circuits belong to power supply circuit A or power supply circuit B).

На фиг.10 иллюстрируется блок-схема 1000 операций для процессов, не связанных с не рабочими данными. Приложения выделения не рабочих данных могут запрашивать не рабочие данные, как показано в блоке 1002. В ответ на это сканер данных может собирать не рабочие данные, как показано в блоке 1004, где с помощью различных устройств в электроэнергетической системе, таких как сетевые устройства, компьютеры подстанций и сенсор RTU в линии, он может собирать не рабочие данные, как показано в блоках 1006, 1008, 1110. Как описано выше, не рабочие данные могут включать в себя температуру, качество энергии и т.д. Различные устройства в электроэнергетической системы, такие как сетевые устройства, компьютеры подстанции и датчик RTU в линии, могут передавать не рабочие данные в сканер данных, как показано в блоках 1012, 1014, 1116. Сканер данных может собирать не рабочие данные, как показано в блоке 1018, и передавать эти не рабочие данные в приложение выделения не рабочих данных, как показано в блоке 1020. Приложение выделения не рабочих данных может собирать не рабочие данные, как показано в блоке 1022, и передавать собранные не рабочие данные в накопитель данных предыстории, как показано в блоке 1024. Накопитель данных предыстории может принимать не рабочие данные, как показано в блоке 1026, сохранять не рабочие данные, как показано в блоке 1028, и передавать не рабочие данные в одно или больше аналитических приложений, как показано в блоке 1030.10, a flowchart of 1000 operations for processes not associated with non-operational data is illustrated. Non-operational data extraction applications may request non-operational data, as shown in block 1002. In response, a data scanner may collect non-operational data, as shown in block 1004, where, using various devices in the power system, such as network devices, computers substations and RTU sensor in the line, it can collect non-working data, as shown in blocks 1006, 1008, 1110. As described above, non-working data can include temperature, energy quality, etc. Various devices in the power system, such as network devices, substation computers, and an RTU sensor in line, can transmit non-operational data to a data scanner, as shown in blocks 1012, 1014, 1116. A data scanner can collect non-operational data, as shown in a block 1018, and transfer this non-operational data to the non-operational data extraction application, as shown in block 1020. The non-operational data extraction application may collect non-operational data, as shown in block 1022, and transfer collected non-operational data to the data storage device historical data, as shown in block 1024. The historical data storage device may receive non-operational data, as shown in block 1026, save non-operational data, as shown in block 1028, and transfer non-operational data to one or more analytical applications, as shown in block 1030.

На фиг. 11 иллюстрируется блок-схема 1100 последовательности операций для процессов управления событием. Данные могут быть сгенерированы из различных устройств на основе различных событий в электроэнергетической системе и могут быть переданы через шину 147 событий. Например, механизм сбора данных измерения может передавать информацию уведомления о перерывах подачи/восстановления энергии в шину события, как показано в блоке 1102. Линейные датчики RTU генерируют сообщение об отказе и могут передавать сообщение об отказе в шину события, как показано в блоке 1104. Аналитическое средство подстанции может генерировать сообщение о неисправности и/или о перерыве в работе и может передавать такое сообщение о неисправности и/или о перерыве в работе в шину событий, как показано в блоке 1106.In FIG. 11 illustrates a flowchart 1100 for event management processes. Data can be generated from various devices based on various events in the power system and can be transmitted via the event bus 147. For example, the measurement data collection mechanism may transmit power supply / recovery interruption notification information to the event bus, as shown in block 1102. RTU line sensors generate a failure message and may transmit a failure message to the event bus, as shown in block 1104. Analytical the substation means may generate a failure and / or interruption message and may transmit such a failure and / or interruption message to the event bus, as shown in block 1106.

Накопитель данных предыстории может передавать поведение сигнала в шину события, как показано в блоке 1108. И различные процессы могут передавать данные через шину 147 события. Например, интеллектуальный процесс неисправности, описанный более подробно со ссылкой на фиг.14А-С, может передавать событие анализа неисправности через шину события, как показано в блоке 1110. Интеллектуальный процесс перерыва в работе, описанный более подробно со ссылкой на фиг.13А-В, может передавать событие перерыва в работе через шину события, как показано в блоке 1112. Шина события может собирать различные события, как показано в блоке 1114. И услуги обработки сложного события (СЕР) могут обрабатывать события, переданные через шину события, как показано в блоке 1120. Услуги СЕР могут обрабатывать запросы по множеству конкурирующим высокоскоростным потокам сообщений о событиях в режиме реального времени. После обработки услуги СЕР данные события могут быть переданы через шину события, как показано в блоке 1118. И накопитель данных предыстории может принимать через шину события одну или больше регистрационных записей событий для сохранения, как показано в блоке 1116. Кроме того, данные события могут быть приняты одним или больше приложениями, таким как система (OMS) управления перерывами в работе, интеллектуальное средство перерыва в работе, аналитическое средство неисправности и т.д., как показано в блоке 1122. Таким образом, шина события может передавать данные события в приложение, исключая, таким образом, проблему "бункера", из-за которой данные становятся не доступными для других устройств или других приложений.The history data accumulator may transmit signal behavior to the event bus, as shown in block 1108. And various processes may transmit data via the event bus 147. For example, the smart fault process, described in more detail with reference to FIGS. 14A-C, can transmit a fault analysis event through the event bus, as shown in block 1110. The smart shutdown process, described in more detail with reference to FIGS. 13A-B , can send an interruption event through the event bus, as shown in block 1112. The event bus can collect various events, as shown in block 1114. And complex event processing (CER) services can process events transmitted through the event bus, to to shown in block 1120. The CEP Services can handle requests for a variety of competing high-speed stream of messages about events in real time. After processing the CER service, event data can be transmitted via the event bus, as shown in block 1118. And the history data store can receive one or more event logs via the event bus for storage, as shown in block 1116. In addition, the event data can be accepted by one or more applications, such as an interruption management system (OMS), an intelligent interruption management tool, a fault analytic tool, etc., as shown in block 1122. Thus, the event bus can transfer event data to the application, thus eliminating the “bunker” problem, which makes the data inaccessible to other devices or other applications.

На фиг.12А-С иллюстрируется блок-схема 1200 последовательности операций процесса передачи сигналов ответа на запрос (DR). DR может запрашиваться приложением операции распределения, как показано в блоке 1244. В ответ на это состояние/подключаемость сети может собирать данные доступности DR, как показано в блоке 1202, и может передавать эти данные, как показано в блоке 1204. Приложение операции распределения может распределять оптимизацию доступности DR, как показано в блоке 1246, через шину события (блок 1254), в одну или больше систем управления DR. Система управления DR может передавать информацию DR и сигналы в одно или больше помещений потребителя, как показано в блоке 1272. Одно или больше помещений потребителя могут принимать сигналы DR, как показано в блоке 1266, и передавать ответ DR, как показано в блоке 1268. Менеджер DR может принимать ответ DR, как показано в блоке 1274, и передавать ответы DR в одну, некоторые или все шину 146 рабочих данных, базу данных начисления счетов и базу данных маркетинга, как показано в блоке 1276. База данных начисления счетов и база данных маркетинга могут принимать ответы, как показано в блоках 1284, 1288. Шина 146 данных операций также может принимать ответы, как показано в блоке 1226, и передавать ответы DR и доступные ресурсы в подборку данных DR, как показано в блоке 1228. Подборка данных DR может обрабатывать ответы DR и доступные ресурсы, как показано в блоке 1291, и передавать данные в шину данных операций, как показано в блоке 1294. Шина данных операций может принимать доступность и отклик DR, как показано в блоке 1230, и передавать ее в состояние/подключаемость сети. Состояние/подключаемость сети может принимать данные, как показано в блоке 1208. Принятые данные могут использоваться для определения данных о состоянии сети, которые могут быть переданы (блок 1206) через шину данных операций (блок 1220). Приложение операции распределения может принимать данные о состоянии сети (как сообщение о событии для оптимизации DR), как показано в блоке 1248. Используя данные о состоянии сети, и доступность DR, и отклик, приложение операции распределения может запустить оптимизацию распределения для генерирования данных распределения, как показано в блоке 1250. Данные распределения могут быть получены с помощью шины рабочих данных, как показано в блоке 1222, и могут быть переданы в приложение выделения подключаемости, как показано в блоке 1240. Шина рабочих данных может передавать данные (блок 1224) в приложение операции распределения, которая, в свою очередь, может передавать один или больше сигналов DR в одну или больше систем управления DR (блок 1252). Шина события может собирать сигналы для каждой из одной или больше систем управления DR (блок 1260) и передавать сигналы DR в каждой из систем управления DR (блок 1262). Система управления DR может затем обрабатывать сигналы DR, как описано выше.12A-C illustrate a flowchart 1200 of a process for transmitting a request for response (DR) signal. DR can be requested by the distribution operation application, as shown in block 1244. In response to this state / network connectivity, it can collect DR availability data, as shown in block 1202, and can transmit this data, as shown in block 1204. The distribution operation application can distribute optimizing DR availability, as shown in block 1246, through an event bus (block 1254), into one or more DR control systems. The DR control system can transmit DR information and signals to one or more customer premises, as shown in block 1272. One or more consumer rooms can receive DR signals, as shown in block 1266, and transmit a DR response, as shown in block 1268. Manager The DR may receive a DR response, as shown in block 1274, and transmit DR responses to one, some, or all of the operational data bus 146, the billing database, and the marketing database, as shown in block 1276. The billing database and the marketing database can take from years, as shown in blocks 1284, 1288. The operation data bus 146 can also receive responses, as shown in block 1226, and transmit DR responses and available resources to the DR data selection, as shown in block 1228. The DR data collection can process DR responses and available resources, as shown in block 1291, and transmit data to the operation data bus, as shown in block 1294. The operation data bus may receive the availability and DR response, as shown in block 1230, and transfer it to the network state / connectivity. The network status / connectivity can receive data, as shown in block 1208. The received data can be used to determine network status data that can be transmitted (block 1206) via the operation data bus (block 1220). The distribution operation application may receive network status data (as an event message for DR optimization), as shown in block 1248. Using the network status data and DR availability and response, the distribution operation application may trigger distribution optimization to generate distribution data. as shown in block 1250. Distribution data can be obtained using the operational data bus, as shown in block 1222, and can be transferred to the connectivity allocation application, as shown in block 1240. Worker bus yes data can transmit data (block 1224) to the application of the distribution operation, which, in turn, can transmit one or more DR signals to one or more DR control systems (block 1252). An event bus may collect signals for each of one or more DR control systems (block 1260) and transmit DR signals in each of the DR control systems (block 1262). The DR control system may then process the DR signals as described above.

Накопитель данных предыстории для операций передачи данных может передавать данные в шину события, как показано в блоке 1214. Накопитель данных предыстории для операций передачи данных также может передавать данные портфеля генерирования, как показано в блоке 1212. Или устройство управления ресурсом, такое как Ventyx®, может запрашивать информацию виртуальной электроэнергетической установки (VPP), как показано в блоке 1232. Шина рабочих данных может собирать данные VPP, как показано в блоке 1216, и передавать данные в устройство управления ресурсом, как показано в блоке 1218. Устройство управления ресурсом может собирать данные VPP, как показано в блоке 1234, может запускать оптимизацию системы, как показано в блоке 1236, и передавать сигналы VPP в шину события, как показано в блоке 1238. Шина события может принимать сигналы VPP, как показано в блоке 1256, и передавать сигналы VPP в приложение операций распределения, как показано в блоке 1258. Приложение операции распределения может затем принимать и обрабатывать сообщения события, как описано выше.A history data store for data operations may transfer data to the event bus, as shown in block 1214. A history data store for data operations may also transmit data of a generation portfolio, as shown in block 1212. Or a resource management device such as Ventyx®, may request virtual power plant installation (VPP) information, as shown in block 1232. The operational data bus may collect VPP data, as shown in block 1216, and transmit data to the resource control device, to to shown in block 1218. The resource control device can collect VPP data, as shown in block 1234, can trigger system optimization, as shown in block 1236, and transmit VPP signals to the event bus, as shown in block 1238. The event bus can receive signals VPP, as shown in block 1256, and transmit VPP signals to the distribution operation application, as shown in block 1258. The distribution operation application can then receive and process event messages, as described above.

Приложение выделения соединения может выделять данные нового потребителя, как показано в блоке 1278, которые должны быть переданы в базу данных маркетинга, как показано в блоке 1290. Данные нового потребителя могут быть переданы в базу данных состояния/подключаемости сети, как показано в блоке 1280, таким образом, что база данных подключаемости и состояния сети может принимать новые данные подключаемости DR, как показано в блоке 1210.The connection highlighting application may highlight new consumer data, as shown in block 1278, which should be transferred to the marketing database, as shown in block 1290. The new consumer data can be transferred to the network status / connectivity database, as shown in block 1280, so that the connectivity and network status database can receive new DR connectivity data, as shown in block 1210.

Оператор может передавать один или больше сигналов отмены, когда это применимо, как показано в блоке 1242. Сигналы отмены могут быть переданы в приложение операции распределения. Сигнал отмены может быть передан в систему управления потреблением энергии, как показано в блоке 1264, базу данных начисления счетов, как показано в блоке 1282, и/или в базу данных маркетинга, как показано в блоке 1286.An operator may transmit one or more cancel signals, as applicable, as shown in block 1242. Cancel signals may be transmitted to the distribution operation application. The cancellation signal can be transmitted to the energy management system, as shown in block 1264, the billing database, as shown in block 1282, and / or to the marketing database, as shown in block 1286.

На фиг.13А-В иллюстрируется блок-схема 1300 последовательности операций интеллектуальных процессов перерывов в работе. Различные устройства и приложения могут передавать уведомления о перерыве подачи энергии, как показано в блоках 1302, 1306, 1310, 1314, 1318. События перерывов подачи энергии могут быть собраны с помощью шины события, как показано в блоке 1324, которая может передавать события о прекращении подачи энергии в комплексную обработку события (СЕР), как показано в блоке 1326. Кроме того, различные устройства и приложения могут передавать состояние подачи энергии, как показано в блоке 1304, 1308, 1312, 1316, 1320. СЕР может принимать сообщения о прекращении и установлении подачи энергии (блок 1330), обрабатывать эти события (блок 1332) и передавать данные события (блок 1334). Интеллектуальное приложение о прекращении работы может принимать данные события (блок 1335) и запрашивать состояние сети и данные подключения сети (блок 1338). Шина рабочих данных может принимать запрос о состоянии сети и данные подключаемости (блок 1344) и передавать их в один или в оба накопитель рабочих данных и накопитель данных предыстории. В ответ на это накопитель рабочих данных и накопитель предыстории данных могут передавать состояние сети и данные подключаемости (блоки 1352, 1354) через шину рабочих данных (блок 1346) в интеллектуальное приложение прекращения подачи энергии (блок 1340). Определяют, обозначают ли данные состояния сети и данные подключаемости, было ли такое отключение мгновенным, как показано в блоке 1342. Если это так, такие мгновенные отключения передают через шину рабочих данных (блок 1348) в базу мгновенных отключений для сохранения (блок 1350). В противном случае формируют случай прекращения подачи энергии (блок 1328), и данные случая прекращения подачи энергии сохраняют и обрабатывают с помощью системы управления прекращением подачи энергии (блок 1322).13A-B, a flowchart 1300 of intelligent work interruptions is illustrated. Various devices and applications can send power interruption notifications, as shown in blocks 1302, 1306, 1310, 1314, 1318. Power interruption events can be collected using an event bus, as shown in block 1324, which can send interruption events supplying energy to the complex event processing (CEP), as shown in block 1326. In addition, various devices and applications can transmit the power supply state, as shown in block 1304, 1308, 1312, 1316, 1320. CEP may receive termination messages and by Aci energy (block 1330), process the events (block 1332) and send event data (block 1334). An intelligent shutdown application may receive event data (block 1335) and request network status and network connection data (block 1338). The operational data bus may receive a request for network status and connectivity data (block 1344) and transfer them to one or both of the operational data storage and historical data storage. In response to this, the operational data storage device and the data history storage device can transmit the network state and connectivity data (blocks 1352, 1354) via the operating data bus (block 1346) to the smart power cut application (block 1340). It is determined whether the network status data and the connectivity data indicate whether such a trip was instantaneous, as shown in block 1342. If so, such instantaneous trips are transmitted via the operating data bus (block 1348) to the instantaneous shutdown database for storage (block 1350). Otherwise, a power cut case is formed (block 1328), and power cut case data is stored and processed using the power cut control system (block 1322).

Интеллектуальные процессы прекращения подачи энергии могут: детектировать прекращение подачи энергии; классифицировать и регистрировать мгновенные прекращения подачи энергии; определять протяженность прекращения подачи энергии; определять первопричину (первопричины) прекращения подачи энергии; отслеживать восстановление подачи энергии; поднимать событие прекращения подачи энергии и обновлять показатели рабочих характеристик системы.Intelligent power cut processes can: detect power cuts; classify and record instantaneous power cuts; determine the extent of the power cut; determine the root cause (s) of the power cut; Track energy recovery Raise a power cut event and update system performance

На фиг.14А-С показана блок-схема 1400 последовательности операций интеллектуального процесса неисправности. Комплексная обработка события может запрашивать данные из одного или больше устройств, как показано в блоке 1416. Например, состояние сети и подключаемость в ответ на запрос могут передавать данные состояния сети и подключаемости в сложную обработку события, как показано в блоке 1404. Аналогично, накопитель данных предыстории в ответ на запрос может передавать состояние переключателя в режиме реального времени, в комплексную обработку события, как показано в блоке 1410. И комплексная обработка события может принимать состояние сети, данные подключаемости и состояние переключателя, как показано в блоке 1418. Аналитические средства подстанции могут запрашивать данные о неисправности, как показано в блоке 1428. Данные неисправности могут быть переданы в множество устройств, таких как датчики RTU линии, и компьютеры подстанции, как показано в блоках 1422, 1424. Различные данные неисправности, состояние сети, данные подключаемости и состояние переключателей могут быть переданы в аналитическое средство подстанции для детектирования события и определения его характеристик, как показано в блоке 1430. Шина события также может принимать сообщения о событии (блок 1434) и передавать сообщения о событии в аналитические средства подстанции (блок 1436). Аналитические средства подстанции могут определить тип события, как показано в блоке 1432. Для событий модификации защиты и управления компьютеры подстанции могут принимать сообщение события неисправности, как показано в блоке 1426. Для всех других типов событий события могут быть приняты шиной события (блок 1438) и могут быть переданы в комплексную обработку события (блок 1440). Комплексная обработка события может принимать данные события (блок 1420) для последующей обработки. Аналогично, состояние сети и подключаемость могут передавать данные о состоянии сети в комплексную обработку события, как показано в блоке 1406. И хранилище общей информационной модели (CIM) может передавать метаданные в приложение комплексной обработки события, как показано в блоке 1414.FIGS. 14A-C are a flowchart 1400 of a smart fault process. Comprehensive event processing may request data from one or more devices, as shown in block 1416. For example, network status and connectivity in response to a request can transmit network status and connectivity data to complex event processing, as shown in block 1404. Similarly, a data storage device in response to a request, the history can transmit the state of the switch in real time to the complex event processing, as shown in block 1410. And the complex event processing can take the network state, data on switchability and state of the switch, as shown in block 1418. The substation's analytic tools can request fault data, as shown in block 1428. The fault data can be transmitted to many devices, such as RTU line sensors, and substation computers, as shown in blocks 1422 , 1424. Various fault data, network status, connectivity data, and switch status can be transferred to the substation analytic tool to detect the event and determine its characteristics, as shown in b Ther 1430 event bus may also receive the event message (block 1434) and send messages in the event analytics substations (block 1436). The substation's analytic tools can determine the type of event, as shown in block 1432. For protection and control modification events, the substation computers can receive a fault event message, as shown in block 1426. For all other types of event events, events can be received by the event bus (block 1438) and can be transferred to the complex event processing (block 1440). Complex event processing may receive event data (block 1420) for subsequent processing. Similarly, network status and connectivity can transmit network status data to complex event processing, as shown in block 1406. And the common information model (CIM) repository can transfer metadata to the complex event processing application, as shown in block 1414.

Приложение комплексной обработки события может передавать сообщение о событии неисправности, как показано в блоке 1420. Шина события может принимать сообщение (блок 1442) и передавать сообщение о событии в интеллектуальное приложение неисправности (блок 1444). Интеллектуальное приложение неисправности может принимать данные события (блок 1432) и запрашивать состояние сети, данные подключаемости и состояние переключения, как показано в блоке 1456. В ответ на запрос состояния сети и подключаемость передают данные о состоянии сети и подключаемости (блок 1408), и накопитель данных предыстории передает данные о состоянии переключателя (блок 1412). Интеллектуальное средство неисправности принимает данные (блок 1458), анализирует эти данные и передает данные события (блок 1460). Данные события могут быть приняты с помощью шины события (блок 1446) и переданы в файл регистрации неисправности (блок 1448). Файл регистрации неисправности может регистрировать данные события (блок 1402). Данные события также могут быть приняты шиной рабочих данных (блок 1462) и переданы в одно или больше приложений (блок 1464). Например, интеллектуальное приложение перерыва работы может принимать данные события (блок 1466), описанные выше со ссылкой на фиг. 13А-В. Система управления работой может также принимать данные события в форме заказа на работу, как показано в блоке 1468. И другие запрашивающие приложения могут принимать данные события, как показано в блоке 1470.The integrated event processing application may transmit a failure event message, as shown in block 1420. The event bus may receive a message (block 1442) and transmit the event message to the intelligent failure application (block 1444). The smart fault application can receive event data (block 1432) and request network status, connectivity data, and switching status, as shown in block 1456. In response to a request for network status and connectivity, they transmit network and connectivity data (block 1408), and the drive historical data transmits data on the state of the switch (block 1412). The smart fault tool receives data (block 1458), analyzes this data, and transmits event data (block 1460). These events can be received using the event bus (block 1446) and transferred to the fault log file (block 1448). The fault log file may log event data (block 1402). These events can also be received by the operating data bus (block 1462) and transmitted to one or more applications (block 1464). For example, an interruption smart application may receive event data (block 1466) described above with reference to FIG. 13A-B. The operation management system may also receive event data in the form of a work order, as shown in block 1468. And other requesting applications may receive event data, as shown in block 1470.

Интеллектуальная обработка неисправности может отвечать за интерпретацию данных сети для получения информации о текущих и потенциальных неисправностях в сети. В частности, неисправности могут быть детектированы с использованием интеллектуальной обработки неисправности. Неисправность обычно представляет собой короткое замыкание цепи, вызванное неисправностями в оборудовании коммунальной службы или в формирования альтернативного пути для протекания тока, например, в случае обрыва проводов линии электроэнергетической системы передач. Такая обработка может использоваться для детектирования типичных неисправностей (типично обрабатываемых с помощью обычного оборудования детектирования и защиты от неисправностей: реле, плавкие предохранители и т.д.), а также неисправностей, связанных с высоким импедансом в сети, которые не так просто детектировать, используя цепи неисправностей,Intelligent fault processing may be responsible for interpreting network data to obtain information about current and potential network problems. In particular, faults can be detected using intelligent fault handling. A malfunction is usually a short circuit caused by malfunctions in the utility equipment or in the formation of an alternative path for current flow, for example, in the event of a break in the wires of an electric transmission system line. Such processing can be used to detect typical faults (typically handled by conventional fault detection and protection equipment: relays, fuses, etc.), as well as faults associated with high impedance in the network, which are not so easy to detect using fault circuit

Интеллектуальный процесс устранения неисправности также может классифицировать и разделять неисправности по категориям. Это позволяет классифицировать и разделять неисправности на категории. В настоящее время не существует стандарт для систематической организации и классификации неисправностей. Стандарт де-факто может быть установлен для них и может быть воплощен.The smart troubleshooting process can also classify and categorize faults. This allows you to classify and categorize faults. There is currently no standard for the systematic organization and classification of faults. A de facto standard can be set for them and can be implemented.

Интеллектуальный процесс устранения неисправности может дополнительно характеризовать неисправности.An intelligent troubleshooting process can further characterize malfunctions.

Интеллектуальный процесс устранения неисправности может также определять местоположение неисправности. Определение местоположения неисправности в распределительной системе может представлять собой трудную задачу из-за большой сложности и трудностей, связанных с уникальными характеристиками распределительной системы, такими как несбалансированная нагрузка, ответвление трех, двух и одной фазы, отсутствие датчиков/средств измерения, разные типы неисправностей, разные случаи коротких замыканий, изменяющиеся условия нагрузки, длинные линии подачи энергии с множеством ответвлений и сетевых конфигураций, которые не документированы. Этот процесс обеспечивает возможность использования разных технологий для изоляции местоположения неисправности с большей точностью, чем позволяет технология.The smart troubleshooting process can also locate the fault. Locating a fault in a distribution system can be a difficult task due to the great complexity and difficulties associated with the unique characteristics of the distribution system, such as unbalanced load, branching of three, two and one phases, lack of sensors / measuring instruments, different types of faults, different cases of short circuits, changing load conditions, long power lines with many branches and network configurations that are not documented. This process makes it possible to use different technologies to isolate the location of the fault with greater accuracy than the technology allows.

Интеллектуальные средства неисправности, кроме того, позволяют находить события неисправности. В частности, такой процесс может формировать и может публиковать события неисправностей в шине событий, как только неисправность была детектирована, классифицирована, разделена на категории, охарактеризована и изолирована. Этот процесс также может отвечать за сбор, фильтрацию, сортировку и устранения публикации неисправностей таким образом, чтобы было представлено событие индивидуальной неисправности, вместо множества сообщений, основанных на необработанных событиях, которые типично возникают во время неисправности. В конечном итоге, интеллектуальные средства неисправности могут регистрировать события неисправности в базе данных регистрации событий.Intelligent fault facilities also enable fault events to be detected. In particular, such a process can generate and publish fault events in the event bus as soon as a fault has been detected, classified, categorized, characterized and isolated. This process may also be responsible for collecting, filtering, sorting, and eliminating the publication of faults in such a way that an individual fault event is presented, instead of many messages based on unprocessed events that typically occur during a fault. Ultimately, smart fault tools can record fault events in the event log database.

На фиг. 15А-В иллюстрируется блок-схема 1500 последовательности операций процессов управления метаданными. Процессы управления метаданными могут включать в себя: управление списком пунктов; и управление подключаемостью при передаче данных и управление протоколом; и наименование/трансляция элемента; управление фактором калибровки датчика; и управление данными топологии сети в режиме реального времени. Приложение выделения основной подключаемости может запрашивать данные основной подключаемости, как показано в блоке 1502. Система географической информации (GIS) может принимать запрос (блок 1510) и передавать данные в приложение выделения основной подключаемости (блок 1512). Приложение выделения основной подключаемости может принимать данные (блок 1504), выделять, преобразовывать и загружать данные (блок 1506) и передавать данные основной подключаемости в хранилище данных подключаемости (блок 1508). Хранилище данных подключаемости может после этого принимать данные, как показано в блоке 1514.In FIG. 15A-B illustrate a flowchart 1500 of a metadata management process. Metadata management processes may include: managing a list of items; and data connectivity management and protocol management; and name / translation of the item; sensor calibration factor management; and real-time network topology data management. The primary connectivity allocation application may request primary connectivity data, as shown in block 1502. The Geographic Information System (GIS) may receive the request (block 1510) and transmit data to the primary connectivity allocation application (block 1512). The primary connectivity extraction application can receive data (block 1504), extract, convert, and download data (block 1506) and transfer the primary connectivity data to the connectivity data store (block 1508). The connectivity data store may then receive data, as shown in block 1514.

Хранилище данных подключаемости может содержать специальный накопитель данных, который содержит информацию о подключаемости компонентов сети для подачи электроэнергии. Как показано на фиг.15А-В, эта информация может быть получена типично из системы географической информации (GIS) для коммунальных услуг, которые содержат встроенную информацию географического местоположения компонентов, которые составляют сеть. Данные в этом хранилище данных описывают иерархическую информацию обо всех компонентах сети (подстанция, линии подачи энергии, секции, сегменты, ответвления, Т-секции, прерыватели цепи, устройство автоматического повторного включения, переключатель и т.д. - в основном все ресурсы). Хранилище данных может иметь информацию о ресурсах и подключаемости, как встроенную информацию.The connectivity data store may contain a special data storage device that contains information about the connectivity of network components for power supply. As shown in FIGS. 15A-B, this information can typically be obtained from a geographic information system (GIS) for utilities that contain embedded geographic location information of the components that make up the network. The data in this data warehouse describes hierarchical information about all network components (substation, power supply lines, sections, segments, branches, T-sections, circuit breakers, automatic reconnection device, switch, etc. - basically all resources). A data warehouse may have resource and connectivity information as embedded information.

Приложение выделения метаданных может запрашивать метаданные для ресурсов сети, как показано в блоке 1516. База данных метаданных может принимать запрос (блок 1524) и передавать метаданные (блок 1526), приложение выделения метаданных может получать метаданные (блок 1518), выделять, преобразовывать и загружать метаданные (блок 1520) и передавать метаданные в хранилище данных CIM (блок 1522).A metadata extraction application may request metadata for network resources, as shown in block 1516. A metadata database may receive a request (block 1524) and transmit metadata (block 1526), a metadata extraction application may receive metadata (block 1518), extract, convert and load metadata (block 1520) and transmit metadata to the CIM data store (block 1522).

Хранилище данных CIM (общая информационная модель) может затем сохранять данные, как показано в блоке 1528. CIM может устанавливать форматы стандарта коммунальной службы для представления данных коммунальной службы. Интеллектуальная энергосистема INDE может способствовать доступности информации из интеллектуальной энергосистемы в формате стандарта коммунальной службы. И хранилище данных CIM может способствовать преобразованию конкретных данных INDE в один или больше форматов, таких как предписанный стандартный формат коммунальной службы.The CIM data warehouse (general information model) can then store data, as shown in block 1528. CIM can set the utility standard formats for representing utility data. Intelligent Energy System INDE can facilitate the availability of information from the Intelligent Energy System in the format of a utility standard. And the CIM data warehouse can help transform specific INDE data into one or more formats, such as the prescribed standard utility format.

Приложение выделения ресурса может запрашивать информацию о новом ресурсе, как показано в блоке 1530. Регистр ресурса может принимать запрос (блок 1538) и может передавать информацию о новом ресурсе (блок 1540). Приложение выделения ресурса может принимать информацию о новом ресурсе (блок 1532), преобразовывать и загружать данные (блок 1534) и передавать информацию о новом ресурсе в хранилище данных CIM (блок 1536).A resource allocation application may request information about a new resource, as shown in block 1530. The resource register may receive a request (block 1538) and may transmit information about a new resource (block 1540). A resource allocation application can receive information about a new resource (block 1532), convert and load data (block 1534), and transfer information about a new resource to the CIM data store (block 1536).

Приложение выделения подключаемости DR может запрашивать данные подключаемости DR, как показано в блоке 1542. Шина рабочих данных может передавать запрос на данные подключаемости DR в базу данных маркетинга, как показано в блоке 1548. База данных маркетинга может принимать запрос (блок 1554), преобразовывать с выделением, загружать данные подключаемости DR (блок 1556) и передавать данные подключаемости DR (блок 1558). Шина рабочих данных может передавать данные подключаемости DR в приложение выделения подключаемости DR (блок 1550). Приложение выделения подключаемости DR может принимать данные подключаемости DR (блок 1544) и передавать данные подключаемости DR (блок 1546) через шину рабочих данных (блок 1552) в базу данных состояния сети и подключаемости DM, которая содержит данные подключаемости DR (блок 1560).A DR connectivity allocation application may request DR connectivity data, as shown in block 1542. A business data bus may send a request for DR connectivity data to a marketing database, as shown in block 1548. The marketing database may receive a request (block 1554), convert from by highlighting, load DR connectivity data (block 1556) and transmit DR connectivity data (block 1558). The operational data bus may transmit DR connectivity data to the DR connectivity allocation application (block 1550). The DR connectivity allocation application can receive DR connectivity data (block 1544) and transmit DR connectivity data (block 1546) via the operation data bus (block 1552) to the network status and DM connectivity database, which contains DR connectivity data (block 1560).

На фиг.16 показана блок-схема 1600 последовательности операций процесса агента уведомления. Абонент уведомления может регистрироваться на веб-странице, как показано в блоке 1602. Абонент уведомления может формировать/модифицировать/удалять параметры списка просмотра сценария, как показано в блоке 1604. Веб-страница может содержать список просмотров сформированного/модифицированного/удаленного сценария, как показано в блоке 1608, и хранилище данных CIM может формировать список тегов данных, как показано в блоке 1612. Услуга трансляции названия может транслировать теги данных для накопителя данных предыстории (блок 1614) и передавать эти теги данных (блок 1616). Веб-страница может передавать список тегов данных (блок 1610) через шину рабочих данных, которая принимает список тегов данных (блок 1622) и передает его в агент уведомления (блок 1624). Агент уведомления получает список (блок 1626), удостоверяет и объединяет списки (блок 1628) и проверяет в накопителе данных предыстории сценарии уведомления (блок 1630). Если будут найдены исключения, соответствующие сценариям (блок 1632), будет передано уведомление (блок 1634). Шина события принимает уведомление (блок 1618) и передает его подписчику уведомления (блок 1620). Подписчик уведомления может принимать уведомление через предпочтительную среду, такую как текстовое сообщение, электронную почту, вызов по телефону и т.д., как показано в блоке 1606.16, a flowchart 1600 of a notification agent process is shown. The notification subscriber can register on the web page, as shown in block 1602. The notification subscriber can create / modify / delete the parameters of the script viewing list, as shown in block 1604. The web page may contain a list of views of the generated / modified / deleted script, as shown at block 1608, and the CIM data store may generate a list of data tags, as shown in block 1612. A name translation service can translate data tags for a historical data store (block 1614) and transmit these EGI data (block 1616). A web page can send a list of data tags (block 1610) through a working data bus that receives a list of data tags (block 1622) and passes it to the notification agent (block 1624). The notification agent receives the list (block 1626), certifies and merges the lists (block 1628), and checks the notification scripts in the history data store (block 1630). If exceptions matching scripts are found (block 1632), a notification will be sent (block 1634). The event bus receives the notification (block 1618) and passes it to the notification subscriber (block 1620). The notification subscriber may receive the notification through a preferred medium, such as a text message, email, phone call, etc., as shown in block 1606.

На фиг.17 показана блок-схема 1700 последовательности операций процесса сбора данных счетчика (AMI). Современное устройство сбора может запрашивать данные электросчетчика, находящегося в помещениях, как показано в блоке 1706. Один или больше электросчетчиков, находящихся в помещении, могут собирать данные электросчетчика, находящегося в помещении, в ответ на запрос (блок 1702) и передавать данные электросчетчика, находящегося в помещении (блок 1704). Современный блок сбора может принимать данные электросчетчика, находящегося в помещении (блок 1708), и передавать их в шину рабочих данных (блок 1710). Механизм сбора данных счетчика может запрашивать коммерческие и промышленные данные счетчиков, как показано в блоке 1722. Один или больше коммерческих и промышленных данных счетчиков могут собирать коммерческие и промышленные данные счетчиков в ответ на запрос (блок 1728) и передавать коммерческие и промышленные данные счетчиков (блок 1730). Механизм сбора данных счетчика может принимать коммерческие и промышленные данные счетчиков (блок 1724) и передавать их в шину рабочих данных (блок 1726).17 shows a flowchart 1700 of a counter data acquisition (AMI) process. A modern collection device may request data from an electric meter located in the rooms, as shown in block 1706. One or more electric meters located in a room can collect data from a electric meter located in a room in response to a request (block 1702) and transmit data from the electric meter located indoors (block 1704). A modern collection unit can receive data from an electric meter located in the room (block 1708) and transmit them to the operating data bus (block 1710). A meter data collection mechanism may request commercial and industrial meter data, as shown in block 1722. One or more commercial and industrial meter data may collect commercial and industrial meter data in response to a request (block 1728) and transmit commercial and industrial meter data (block 1730). The counter data collection mechanism may receive commercial and industrial counter data (block 1724) and transmit them to the operating data bus (block 1726).

Шина рабочих данных может принимать данные счетчика, находящегося в помещении, коммерческие и промышленные данные счетчика (блок 1712) и передавать эти данные (блок 1714). Эти данные могут быть приняты базой данных хранилища данных счетчика (блок 1716) или могут быть приняты процессором начисления счетов (блок 1718), которые могут быть, в свою очередь, переданы в одну или больше систем, таких как система CRM (управления взаимосвязями с потребителями) (блок 1720).The operating data bus can receive the data of the meter located in the room, commercial and industrial data of the meter (block 1712) and transmit this data (block 1714). This data may be received by the meter data warehouse database (block 1716) or may be received by the billing processor (block 1718), which may, in turn, be transmitted to one or more systems, such as a CRM (customer relationship management) system ) (block 1720).

Процессы наблюдаемости могут дополнительно включать в себя процессы мониторинга удаленными ресурсами. Мониторинг ресурсами в пределах электроэнергетической системы может оказаться трудноосуществимым. Могут существовать разные участки электроэнергетической системы, некоторые из которых являются весьма дорогостоящими. Например, подстанции могут включать в себя силовые трансформаторы (стоимостью вплоть до 1 миллиона $) и прерыватели цепей. Часто коммунальные службы могут мало что сделать, если вообще могут сделать что-нибудь, для анализа ресурсов и обеспечения максимального использования этих ресурсов. Вместо этого, фокус коммунальной службы обычно направлен на обеспечение поддержания подачи электроэнергии потребителю. В частности, коммунальные службы фокусируют свою работу на планируемых инспекциях (которые обычно происходят через заданные интервалы), или на техническом обслуживании "на основе события" (которое может возникать, когда на участке сети возникает неисправность).Observational processes may further include monitoring processes by remote resources. Monitoring resources within the power system can be difficult. There may be different sections of the electric power system, some of which are very expensive. For example, substations may include power transformers (costing up to $ 1 million) and circuit breakers. Often, utilities can do little, if anything, to analyze resources and maximize the use of these resources. Instead, the focus of public utilities is usually to ensure that the supply of electricity to the consumer is maintained. In particular, utilities focus their work on planned inspections (which usually occur at set intervals), or on “event-based” maintenance (which can occur when a malfunction occurs on a network section).

Вместо типичных планируемых инспекций или технического обслуживания "на основе события", процесс мониторинга удаленным ресурсом может фокусироваться на техническом обслуживании на основе условия. В частности, если один участок (или вся) электроэнергетической системы может быть оценен (например, на периодической или постоянной основе), может быть улучшено состояние электроэнергетической системы.Instead of typical planned inspections or “event-based” maintenance, the monitoring process by the remote resource may focus on condition-based maintenance. In particular, if one section (or all) of the electric power system can be evaluated (for example, on a periodic or continuous basis), the condition of the electric power system can be improved.

Как описано выше, данные могут быть сгенерированы в различных участках электроэнергетической системы и переданы в (или к ним может быть открыт доступ) центральное учреждение. Данные могут затем использоваться центральным учреждением для определения состояния сети. В отличие от анализа состояния сети, центральное учреждение может выполнять мониторинг степени использования. Как правило, оборудование в электроэнергетической системы работает с использованием заметных запасов для обеспечения безопасности. Одна из причин этого состоит в том, что компании коммунального обслуживания консервативны по своей природе и стремятся поддерживать подачу электроэнергии потребителю в пределах широкого участка ошибок. Другая причина этого состоит в том, что компании коммунального обслуживания, осуществляющие мониторинг сети, могут не знать о размерах части используемого оборудования в электроэнергетической системе. Например, если энергетическая компания передает электроэнергию через определенную цепь подачи энергии, энергетическая компания может не иметь средств, с помощью которых она могла бы узнать, находится ли передаваемый уровень электроэнергии рядом с пределом возможностей цепи подачи электроэнергии (например, цепь подачи электроэнергии может быть чрезмерно нагрета). В связи с этим компании коммунальных служб могут недостаточно использовать один или больше участков электроэнергетической системы.As described above, data can be generated in various parts of the electricity system and transmitted to (or can be accessed by) the central office. Data can then be used by the central office to determine the status of the network. Unlike network condition analysis, a central office can monitor the degree of utilization. Typically, equipment in an electric power system operates using conspicuous reserves to ensure safety. One reason for this is that utility companies are conservative in nature and strive to maintain electricity supplies to consumers over a wide range of errors. Another reason for this is that utility companies monitoring the network may not be aware of the size of the portion of equipment used in the electricity system. For example, if an energy company transmits electricity through a specific energy supply circuit, the energy company may not have the means by which it could find out if the transmitted level of electricity is close to the limit of the power supply circuit (for example, the power supply circuit may be excessively heated ) In this regard, utilities may not use enough of one or more sections of the electricity system.

Коммунальные службы также обычно тратят существенную сумму денег для добавления возможностей к электроэнергетической системе по мере повышения нагрузки в электроэнергетической системе (то есть по мере увеличения потребляемой электроэнергии). В связи с неосведомленностью коммунальных служб, коммунальные службы выполняют ненужное обновление сетей электроэнергетической системы. Например, сети подачи электроэнергии, которые не работают рядом с пределом их возможности, тем не менее, могут быть модернизированы путем замены проводников (то есть, провода большего размера укладывают в сети подачи электроэнергии), или могут быть проложены дополнительные сети подачи электроэнергии. Стоимость только такой операции является существенной.Utilities also usually spend a substantial amount of money to add opportunities to the electricity system as the load on the electricity system increases (that is, as the energy consumption increases). Due to the lack of awareness of utilities, utilities perform unnecessary updating of the electricity network. For example, power supply networks that do not work close to their limits, however, can be upgraded by replacing conductors (that is, larger wires are laid in power supply networks), or additional power supply networks can be laid. The cost of only such an operation is substantial.

Процессы удаленного мониторинга ресурсов позволяют отслеживать различные аспекты сетей электроэнергетической системы, например: (1) анализ существующего состояния ресурса для одного или больше участков сети; (2) анализ будущего состояния ресурса одного или больше участков сети; и (3) анализ использования одного или больше участков сети. Вначале один или больше датчиков могут измерять и передавать в процесс удаленного мониторинга ресурса данные для определения текущего состояния определенного участка сети. Например, датчик на силовом трансформаторе может обеспечивать индикатор состояния путем измерения рассеиваемых газов трансформатором. Процесс удаленного мониторинга ресурса может затем использовать аналитические инструменты для определения, находится ли определенный участок сети (такой как силовой трансформатор) в хорошем состоянии или в плохом состоянии. Если определенный участок сети находится в плохом состоянии, может быть произведен ремонт этого конкретного участка сети.Remote resource monitoring processes allow you to monitor various aspects of the networks of the electric power system, for example: (1) analysis of the existing state of the resource for one or more sections of the network; (2) analysis of the future state of the resource of one or more sections of the network; and (3) analysis of the use of one or more network sections. Initially, one or more sensors can measure and transmit data to a remote resource monitoring process to determine the current state of a specific network section. For example, a sensor on a power transformer may provide a status indicator by measuring the dissipated gases by a transformer. The remote resource monitoring process can then use analytical tools to determine if a specific section of the network (such as a power transformer) is in good condition or in poor condition. If a specific network section is in poor condition, this particular network section may be repaired.

Кроме того, процесс удаленного мониторинга ресурсами может анализировать данные, генерируемые из участков сети, для прогнозирования будущего состояния ресурса участков сети. Существуют причины, которые вызывают нагрузку на электрические компоненты. Факторы нагрузки не обязательно могут быть постоянными и могут быть переменными. Датчики могут обеспечить индикатор нагрузки на определенный участок электроэнергетической системы. Процесс удаленного мониторинга ресурсом может регистрировать результаты измерения нагрузок, как обозначено данными датчиков, и может анализировать результат измерения нагрузок, для прогнозирования будущего состояния участка электроэнергетической системы. Например, процесс удаленного мониторинга ресурсом может использовать анализ на основе тенденции для прогнозирования, когда может произойти отказ на определенном участке сети, и может заранее запланировать техническое обслуживание ко времени (или одновременно с), когда может произойти отказ на определенном участке сети. Таким образом, процесс удаленного мониторинга ресурсом может прогнозировать срок службы определенного участка сети и, таким образом, определять, не является ли срок службы участка сети слишком коротким (то есть, не израсходован ли ресурс этого участка сети слишком быстро).In addition, the remote resource monitoring process can analyze the data generated from the network sections to predict the future state of the resource of the network sections. There are reasons that cause stress on electrical components. Load factors may not necessarily be constant and may be variable. Sensors can provide an indicator of the load on a specific section of the power system. The process of remote monitoring by a resource can record the results of the measurement of loads, as indicated by the data of the sensors, and can analyze the result of the measurement of loads to predict the future state of the site of the electric power system. For example, a remote monitoring process by a resource may use trend-based analysis to predict when a failure may occur in a specific network section, and may schedule maintenance ahead of time (or at the same time) when a failure in a certain network section may occur. Thus, the process of remote monitoring by a resource can predict the service life of a certain network section and, thus, determine whether the service life of a network section is too short (that is, if the resource of this network section is used up too quickly).

Кроме того, процессы удаленного мониторинга ресурсами могут анализировать степень использования участка электроэнергетической системы, для лучшего управления электроэнергетической системой. Например, процессы удаленного мониторинга ресурсами могут анализировать цепь подачи энергии для определения ее операционных возможностей. В этом примере цепи подачи электроэнергии процессы удаленного мониторинга ресурсами могут определять, что цепь подачи электроэнергии в настоящее время работает с нагрузкой 70%. Процессы удаленного мониторинга ресурсами могут дополнительно рекомендовать, чтобы определенная цепь подачи электроэнергии работала с более высоким процентом использования (например, 90%), поддерживая все еще при этом приемлемый запас для обеспечения безопасности. Процесс удаленного мониторинга ресурсами может, таким образом, обеспечивать возможность эффективного увеличения способностей работы просто путем анализа степени использования.In addition, remote monitoring processes by resources can analyze the degree of utilization of a section of the electric power system, for better control of the electric power system. For example, remote resource monitoring processes can analyze the energy supply chain to determine its operational capabilities. In this example of the power supply circuit, remote resource monitoring processes can determine that the power supply circuit is currently operating at 70% load. Remote resource monitoring processes may additionally recommend that a particular power supply circuit operate with a higher utilization percentage (e.g. 90%) while still maintaining an acceptable margin for safety. The process of remote monitoring of resources can, thus, provide the ability to effectively increase the ability to work simply by analyzing the degree of use.

Методика определения конкретной технической архитектурыMethodology for determining a specific technical architecture

Существуют разные методики определения конкретной технической архитектуры, которые может использовать один, некоторые или все из элементов эталонной архитектуры INDE. Методика может включать в себя множество этапов. Во-первых, этап основной линии может быть выполнен при генерировании документации, для существующего состояния коммунальной службы, и может быть выполнена оценка готовности для перехода к интеллектуальной энергосистемой. Во-вторых, этап определения требований может быть выполнен при генерировании определения требуемого состояния и детальных требований для перехода в это состояние.There are different techniques for determining a specific technical architecture that one, some or all of the elements of the INDE reference architecture can use. A technique may include many steps. Firstly, the main line stage can be performed when generating documentation for the current state of the utility service, and a readiness assessment for the transition to an intelligent power system can be performed. Secondly, the requirements determination step can be performed when generating the determination of the required state and detailed requirements for transitioning to this state.

В-третьих, может быть предусмотрен этап разработки решения, состоящий в генерировании определения архитектурных компонентов решения, которые обеспечивают возможность работы интеллектуальной энергосистемой, включающей в себя измерение, мониторинг и управление. Для архитектуры INDE это может включать в себя измерительные устройства, сеть передачи данных для передачи данных из устройств в приложение ядра 120 INDE, приложение ядра 120 INDE при этом должно продолжать работу и реагировать на эти данные, аналитические приложения интерпретировать данные, архитектура данных моделирует измеренные и интерпретированные данные, архитектура интегрирования выполняет обмен данными и информацией между INDE и системами коммунальной службы, технологическая инфраструктура обеспечивает работу различных приложений и баз данных, и стандартов, следование которым может быть обеспечено для обеспечения возможности компактного и эффективного решения в соответствии с отраслевым стандартом.Thirdly, a solution development phase may be provided, which consists in generating a definition of the architectural components of the solution, which provide the ability to work with an intelligent power system, including measurement, monitoring and control. For the INDE architecture, this may include measuring devices, a data network for transferring data from devices to the INDE 120 application, the 120 INDE kernel application should continue to work and respond to this data, analytical applications should interpret the data, the data architecture models the measured and interpreted data, the integration architecture performs the exchange of data and information between INDE and public utility systems, the technological infrastructure provides the work of various applications and of data, and standards that can be followed to ensure a compact and efficient solution in accordance with an industry standard.

В-четвертых, моделирование значения может быть выполнено при генерировании определения ключевых показателей эффективности и факторов успеха для интеллектуальной энергосистемы и воплощения возможности измерения и определения характеристик системы в отношении требуемых факторов рабочих характеристик. Приведенное выше раскрытие относится к аспекту разработки архитектуры в соответствии с этапом 3.Fourth, value modeling can be performed by generating definitions of key performance indicators and success factors for an intelligent power system, and embodying the ability to measure and determine system performance with respect to required performance factors. The above disclosure relates to an architectural development aspect in accordance with step 3.

На фиг.19А-В представлен пример графика потока разработки детального плана. В частности, на фиг.19А-В иллюстрируется поток обработки этапов, которые могут быть предприняты для определения требований к интеллектуальной энергосистеме и этапов, которые могут быть выполнены для воплощения интеллектуальной энергосистемы. Процесс разработки интеллектуальной энергосистемы может начаться с разработки видения интеллектуальной энергосистемы, которое позволяет получить основные очертания общих целей проекта, которые могут привести к процессу общего плана действий при разработке интеллектуальной энергосистемы. Процесс общего плана действий может привести к подробной разработке деталей и моделирования значений.On figa-b presents an example of a graph of the flow of development of a detailed plan. In particular, FIGS. 19A-B illustrate the processing flow of steps that can be taken to determine requirements for an intelligent power system and steps that can be performed to implement an intelligent power system. The process of developing an intelligent energy system can begin with developing a vision of an intelligent energy system that allows you to get the basic outline of the overall objectives of the project, which can lead to the process of a general plan of action for the development of an intelligent energy system. The overall action plan process can lead to detailed detail development and value modeling.

Подробная разработка деталей может обеспечить методологический подход к определению интеллектуальной энергосистемы в контексте всего предприятия коммунальной службы. Разработка деталей может включать в себя общий план действий, который может привести к разработке основной линии и оценке систем (BASE) и к определению требований и выбору аналитических средств (RDAS). Процесс RDAS может формировать подробное определение конкретной интеллектуальной энергосистемы коммунальной службы.Detailed development of the details can provide a methodological approach to the definition of an intelligent energy system in the context of the entire utility service enterprise. The development of details may include a general plan of action, which may lead to the development of a baseline and system assessment (BASE) and to the identification of requirements and the selection of analytical tools (RDAS). The RDAS process can formulate a detailed definition of a specific smart utility grid.

Процесс BASE может устанавливать исходную точку для коммунальной службы в отношении систем, электроэнергетических систем, устройств и приложений, для поддержки возможностей интеллектуальной энергосистемы. Первая часть процесса состоит в определении материально-производственных средств сети, которые могут включать в себя: структуру сети (например, генерирующие мощности, линии электроэнергетической системы, подстанции электроэнергетической системы, вспомогательные линии электроэнергетической системы, распределительные подстанции, распределительные цепи подачи электроэнергии, классы напряжения); устройства сети (такие как переключатели, устройства автоматического повторного включения, конденсаторы, регуляторы, компенсаторы падения напряжения, взаимные соединения в линиях подачи электроэнергии); автоматика подстанции (например, IED, ЛВС подстанции, инструменты, RTU/компьютеры станции); распределительная автоматика (такая как конденсатор и управление переключением; средства локализации неисправности и элементы управления преобразованием нагрузки; системы координации LTC; DMS; система управления откликом на запрос); и датчики сети (такие как датчик, величины, варианты использования и подсчет в распределительных сетях, по линиям электроэнергетической системы и в подстанциях); и т.д. После окончания разработки материально-производственных средств может быть сформирована оценка коммунальной службы в отношении модели готовности к развертыванию интеллектуальной энергосистемой высокого уровня. Модель потока данных, в том виде, как они существуют, и схемы систем также могут быть сформированы.The BASE process can set the starting point for utilities regarding systems, power systems, devices, and applications to support the capabilities of an intelligent power system. The first part of the process consists in determining the material and production means of the network, which may include: the network structure (for example, generating capacities, lines of the electric power system, substations of the electric power system, auxiliary lines of the electric power system, distribution substations, distribution circuits for supplying electricity, voltage classes) ; network devices (such as switches, automatic reconnection devices, capacitors, regulators, voltage drop compensators, interconnections in power supply lines); substation automation (e.g. IED, substation LAN, tools, RTU / station computers); distribution automation (such as capacitor and switching control; fault localization tools and load conversion controls; LTC coordination systems; DMS; request response control system); and network sensors (such as a sensor, values, use cases and counting in distribution networks, along lines of the power system and in substations); etc. After the development of material and production facilities is completed, an assessment of the utility service can be formed in relation to the readiness model for deployment by a high-level intelligent energy system. A model of the data flow, in the form in which they exist, and system diagrams can also be formed.

Процесс конфигурации архитектуры (ARC) может разработать предварительную техническую архитектуру интеллектуальной энергосистемой для коммунальных служб, путем комбинирования информации из процесса BASE, требований и ограничений из процесса RDAS и эталонной архитектуры INDE, для получения технической архитектуры, которая удовлетворяет определенным потребностям коммунальной службы и которая использует преимущество соответствующих унаследованных систем, и соответствует ограничениям, которые существуют в данной коммунальной службе. Использование эталонной архитектуры INDE позволяет исключить необходимость изобретения специальной архитектуры и обеспечивает то, что накопленный опыт и лучшие практики будут применены для разработки решения. Это также позволяет гарантировать то, что решение сможет максимально использовать повторно используемые ресурсы интеллектуальной энергосистемой.The Architecture Configuration Process (ARC) can develop a preliminary technical architecture for the smart utility grid by combining the information from the BASE process, the requirements and limitations of the RDAS process and the INDE reference architecture to provide a technical architecture that meets the specific needs of the utility and takes advantage relevant legacy systems, and complies with the restrictions that exist in a given utility service. The use of the INDE reference architecture eliminates the need for inventing a special architecture and ensures that the accumulated experience and best practices are applied to develop the solution. It also helps to ensure that the solution can maximize the use of reusable resources by the smart grid.

Процесс конфигурации архитектуры сети датчика (SNARC) может обеспечивать основу для получения последовательности решений, которые определяют архитектуру сети распределенных датчиков для поддержки интеллектуальной энергосистемой. Такая структура может иметь структуру в виде последовательности решений, каждое из которых ориентировано на определенный аспект архитектуры сети датчиков. После принятия таких решений может быть сформирована схема структуры сети датчиков.The sensor network architecture configuration process (SNARC) can provide the basis for obtaining a sequence of decisions that define the architecture of a distributed sensor network to support the smart grid. Such a structure may have a structure in the form of a sequence of decisions, each of which is oriented to a specific aspect of the sensor network architecture. After making such decisions, a sensor network structure diagram may be generated.

Выделение датчиков через процесс рекурсии Т-участка (SATSECTR), который может обеспечить основу для определения количества датчиков, которые должны быть размещены в распределительной сети, для получения заданного уровня наблюдаемости с учетом ограничений по затратам. Этот процесс также позволяет определять типы датчиков и их места расположения.The selection of sensors through the T-section recursion process (SATSECTR), which can provide a basis for determining the number of sensors that must be placed in the distribution network, to obtain a given level of observability, taking into account cost restrictions. This process also allows you to determine the types of sensors and their location.

Процесс разработки шаблона оценки и компонентов элементов решения (SELECT) может обеспечить основу для оценки типов компонентов решения и обеспечивает конструктивный шаблон для каждого класса. Шаблон может содержать опорную модель для спецификаций для каждого из элементов решения. Такие шаблоны можно затем использовать для запроса расценок поставщика и поддержки оценок поставщика/продукта.The process of developing an assessment template and decision element components (SELECT) can provide a basis for evaluating the types of solution components and provides a constructive template for each class. The template may contain a reference model for specifications for each of the elements of the solution. Such templates can then be used to request supplier quotes and support supplier / product ratings.

Процесс планирования обновления для приложений и сетей (UPLAN) может обеспечить развитие плана по обновлению существующих систем коммунальных служб, приложений и сетей так, чтобы они были готовы к интегрированию в решение интеллектуальной энергосистемой. Процесс оценки риска и планирования управления (RAMP) может обеспечить оценку риска, связанную с определенными элементами решения интеллектуальной энергосистемой, созданными в процессе ARC. Процесс UPLAN может выполнять оценку уровня риска для идентифицированных элементов риска и обеспечивает план действия для уменьшения риска прежде, чем коммунальная служба примет решение на строительство. Процесс анализа изменений и планирования управления (CHAMP) может анализировать процесс и организационные изменения, которые могут потребоваться для коммунальной службы, для освоения сумм инвестиций в интеллектуальную сеть и может обеспечить высокий уровень плана управления, для осуществления этих изменений синхронно с развертыванием интеллектуальной энергосистемой. Процесс CHAMP может привести к генерированию детального плана.The upgrade planning process for applications and networks (UPLAN) can ensure that a plan is developed to upgrade existing utilities, applications, and networks so that they are ready to be integrated into the smart grid solution. The Risk Assessment and Management Planning (RAMP) process can provide a risk assessment associated with certain elements of a smart grid solution created in the ARC process. The UPLAN process can carry out a risk assessment for identified risk elements and provides an action plan to reduce risk before the utility decides to build. The Change Analysis and Management Planning Process (CHAMP) can analyze the process and organizational changes that may be required by the utility to absorb the amount of investment in the smart grid and can provide a high level of management plan to implement these changes in parallel with the deployment of the smart grid. The CHAMP process can lead to the generation of a detailed plan.

Общий план и процесс моделирования значений могут привести к спецификации метрических значений, которые могут привести к оценке стоимости и преимуществ. Оценка может привести к построению одного или больше положений, таких как положение о тарифе и положение о бизнесе, которые, в свою очередь, могут привести к закрытию положения. Выход разработки детального плана и моделирования значений может быть передан в коммунальную службу для утверждения, в результате чего могут быть выполнены обновления системы коммунальной службы и развертывание интеллектуальной энергосистемой, и действия по уменьшению риска. После чего сеть может быть спроектирована, построена и тестирована и затем введена в работу.The overall plan and process of modeling values can lead to a specification of metric values, which can lead to an assessment of cost and benefits. An assessment may lead to the construction of one or more provisions, such as a tariff regulation and a business regulation, which, in turn, may lead to closure of the regulation. The output of developing a detailed plan and modeling the values can be submitted to the utility for approval, as a result of which updates to the utility system and deployment by the smart grid can be carried out, and actions to reduce risk. Then the network can be designed, built and tested and then put into operation.

Хотя настоящее изобретение было представлено и описано в связи с предпочтительными вариантами осуществления, очевидно, что определенные изменения и модификации в дополнение к упомянутым выше, могут быть выполнены на основе основных свойств настоящего изобретения. Кроме того, существует множество разных типов компьютерного программного обеспечения и аппаратных средств, которое можно использовать при выполнении на практике настоящего изобретения, и изобретение не ограничено описанными выше примерами. Изобретение было описано со ссылкой на действия и символические представления операций, которые выполняют одним или больше электронными устройствами. Также следует понимать, что такие действия и операции включают в себя манипуляции, выполняемые модулем обработки электронного устройства данных, представляющих электрические сигналы, в структурированной форме. Такая манипуляция трансформирует данные или поддерживает их в определенных местах в системе памяти электронного устройства, которая изменяет конфигурацию или другим образом изменяет работу электронного устройства хорошо понятным способом для специалистов в данной области техники. Структуры данных, где содержат эти данные, представляют собой физические места расположения в запоминающем устройстве, которые имеют определенные свойства, определенные форматом данных. В то время как изобретение было описано в приведенном выше контексте, оно не должно быть ограничительным, поскольку для специалистов в данной области техники будет понятно, что описанные действия и операции также могут быть воплощены в аппаратных средствах. В соответствии с этим, заявитель стремится защитить все варианты и модификации, находящиеся в пределах действительного объема настоящего изобретения. При этом предполагается, что изобретение будет определено следующей формулой изобретения, включая все его эквиваленты.Although the present invention has been presented and described in connection with preferred embodiments, it is obvious that certain changes and modifications in addition to those mentioned above can be made based on the basic features of the present invention. In addition, there are many different types of computer software and hardware that can be used to practice the present invention, and the invention is not limited to the examples described above. The invention has been described with reference to actions and symbolic representations of operations that are performed by one or more electronic devices. It should also be understood that such actions and operations include manipulations performed by a processing unit of an electronic data device representing electrical signals in a structured form. Such manipulation transforms data or supports them in certain places in the memory system of an electronic device, which changes the configuration or otherwise changes the operation of the electronic device in a well-understood way for specialists in this field of technology. The data structures that contain this data are physical locations in the storage device that have certain properties defined by the data format. While the invention has been described in the above context, it should not be limiting, as it will be understood by those skilled in the art that the described acts and operations can also be embodied in hardware. Accordingly, the applicant seeks to protect all variations and modifications that fall within the true scope of the present invention. It is assumed that the invention will be defined by the following claims, including all its equivalents.

Claims (46)

1. Базовая структура интегрирования для обеспечения связи множества компонентов электросети и энергетической системы с центральным органом управления электроэнергетической системы, который управляет электроэнергетической системой, причем указанное множество компонентов электросети и энергетической системы выполнено с возможностью генерировать рабочие данные и данные событий в электроэнергетической системе, содержащая:
рабочую шину, выполненную с возможностью передачи рабочих данных в центральный орган управления электроэнергетической системы, причем рабочие данные содержат по меньшей мере одно измерение в режиме реального времени напряжения, тока, активной мощности или реактивной мощности по меньшей мере для части электроэнергетической системы; и
шину событий, выполненную с возможностью передачи данных событий в центральный орган управления электроэнергетической системы, причем шина событий отделена от рабочей шины, данные событий являются отличными от измерений в режиме реального времени, причем получены из указанных измерений в режиме реального времени и содержат по меньшей мере одно аналитическое определение, касающееся работы электроэнергетической системы, основанное на указанном по меньшей мере одном измерении в режиме реального времени,
при этом рабочая шина выполнена с возможностью передавать рабочие данные и не передавать данные событий, а
шина событий выполнена с возможностью передавать данные событий и не передавать рабочие данные.
1. The basic structure of integration to ensure the connection of many components of the power grid and the energy system with the central governing body of the power system, which controls the power system, and the specified set of components of the grid and power system is configured to generate operating data and event data in the power system, containing:
a work bus configured to transmit working data to a central control element of the electric power system, the working data comprising at least one real-time measurement of voltage, current, active power or reactive power for at least a part of the electric power system; and
an event bus configured to transmit event data to a central control element of the electric power system, the event bus being separated from the working bus, the event data being different from real-time measurements, moreover, obtained from said measurements in real time and containing at least one analytical definition regarding the operation of the electric power system, based on the specified at least one measurement in real time,
while the working bus is configured to transmit working data and not transmit event data, and
the event bus is configured to transmit event data and not transmit operational data.
2. Базовая структура интегрирования по п.1, дополнительно содержащая по меньшей мере один переключатель, выполненный с возможностью анализа по меньшей мере части принимаемых данных и с возможностью направлять эти данные к рабочей шине или шине событий.2. The basic integration structure according to claim 1, further comprising at least one switch configured to analyze at least a portion of the received data and with the ability to direct this data to the operating bus or event bus.
3. Базовая структура интегрирования по п.1, дополнительно содержащая маршрутизатор, выполненный с возможностью анализа по меньшей мере части принимаемых данных и с возможностью направления этих данных к рабочей шине или шине событий.3. The basic integration structure according to claim 1, further comprising a router configured to analyze at least a portion of the received data and with the possibility of directing this data to the operational bus or event bus.
4. Базовая структура интегрирования по п.3, в которой маршрутизатор выполнен с возможностью анализировать по меньшей мере один заголовок в данных для определения, следует ли направлять эти данные к рабочей шине или к шине событий.4. The basic integration structure according to claim 3, in which the router is configured to analyze at least one header in the data to determine whether to send this data to the work bus or to the event bus.
5. Базовая структура интегрирования по п.3, в которой маршрутизатор расположен в центральном органе управления электроэнергетической системой.5. The basic integration structure according to claim 3, in which the router is located in the central authority of the electric power system.
6. Базовая структура интегрирования по любому из пп.1-5, в которой рабочая шина выполнена с возможностью дополнительно передавать не рабочие данные, причем не рабочие данные включают качество электроэнергии, и/или надежность подачи электроэнергии, и/или состояние ресурсов, и/или данные по нагрузке.6. The basic integration structure according to any one of claims 1 to 5, in which the working bus is configured to additionally transmit non-operational data, and non-operational data include the quality of electricity, and / or the reliability of power supply, and / or the state of resources, and / or load data.
7. Базовая структура интегрирования по п.6, дополнительно содержащая шину услуги, выполненную с возможностью связи между центральным органом управления электроэнергетической системой и системой начисления счетов, причем шина услуги выполнена отдельно от рабочей шины и шины событий.7. The basic integration structure of claim 6, further comprising a service bus configured to communicate between the central authority of the electric power system and the billing system, the service bus being separate from the business bus and the event bus.
8. Базовая структура интегрирования по любому из пп.1-5, в которой рабочая шина функционально соединена с базой данных накопителя рабочих данных, а также с системой управления перерывами в работе, и/или системой управления энергией, и/или системой управления распределением.8. The basic integration structure according to any one of claims 1 to 5, in which the working bus is functionally connected to the database of the operational data storage device, as well as to the interruption management system, and / or the energy management system, and / or the distribution control system.
9. Базовая структура интегрирования по п.8, в которой рабочая шина функционально соединен с базой данных накопителя рабочих данных и системой управления перерывами в работе, системой управления энергией и системой управления распределением.9. The basic integration structure of claim 8, in which the working bus is functionally connected to the database of the storage of operational data and the system for managing interruptions in operation, an energy management system and a distribution management system.
10. Базовая структура интегрирования по любому из пп.1-5, в которой шина событий функционально соединена с базой данных накопителя регистрации событий, а также с системой управления перерывами в работе, и/или системой управления энергией, и/или системой управления распределением.10. The basic integration structure according to any one of claims 1 to 5, in which the event bus is functionally connected to the database of the event recording drive, as well as to the interruption management system, and / or the energy management system, and / or the distribution control system.
11. Базовая структура интегрирования по п.7, в которой шина событий функционально соединена с базой данных накопителя регистрации событий, а также с системой управления перерывами в работе, системой управления энергией и системой управления распределением.11. The basic integration structure according to claim 7, in which the event bus is functionally connected to the database of the event recording drive, as well as to the interruption management system, the energy management system and the distribution control system.
12. Базовая структура интегрирования по п.1, дополнительно содержащая
сервер, связанный с рабочей шиной и шиной событий, а также выполненный с возможностью принимать и сохранять рабочие данные, причем сервер дополнительно выполнен с возможностью:
анализировать рабочие данные в отношении по меньшей мере одной базы правил;
генерировать по меньшей мере одно событие на основе указанного анализа; и
посылать по меньшей мере одно событие по меньшей мере в один компонент электросети и энергетической системы для запуска самовосстановления по меньшей мере на участке электроэнергетической системы.
12. The basic integration structure according to claim 1, further comprising
a server associated with the work bus and the event bus, as well as configured to receive and save working data, and the server is additionally configured to:
analyze operational data regarding at least one rule base;
generate at least one event based on the specified analysis; and
send at least one event to at least one component of the power grid and the energy system to trigger self-healing in at least a portion of the power system.
13. Базовая структура интегрирования по п.12, в которой сервер находится на подстанции электроэнергетической системы, причем по меньшей мере одно событие запускает изменение в работе указанной подстанции.13. The basic integration structure of claim 12, wherein the server is located at a substation of an electric power system, wherein at least one event triggers a change in operation of said substation.
14. Базовая структура интегрирования по п.12, в которой сервер дополнительно выполнен с возможностью генерировать порядок работы для передачи в центральный орган управления электроэнергетической системы.14. The basic integration structure of claim 12, wherein the server is further configured to generate a work order for transmission to a central authority of the electric power system.
15. Способ передачи рабочих данных и данных событий от множества компонентов электросети и энергетической системы в центральный орган управления электроэнергетической системы, который управляет электроэнергетической системой, включающий:
передачу, по меньшей мере, частично по радиосвязи, рабочих данных в центральный орган управления электроэнергетической системы по рабочей шине, причем рабочие данные содержат по меньшей мере одно измерение, выполненное в режиме реального времени, напряжения, тока, активной мощности или реактивной мощности по меньшей мере для части электроэнергетической системы; и
передачу по меньшей мере частично по радиосвязи данных событий в центральный орган управления электроэнергетической системы по шине событий, причем шина событий выполнена отдельно от рабочей шины, при этом данные событий являются отличными от измерений в режиме реального времени, причем получены из указанных измерений в режиме реального времени и содержат по меньшей мере одно аналитическое определение, касающееся работы электроэнергетической системы, основанное на указанном по меньшей мере одном измерении в режиме реального времени,
при этом рабочие данные передают через рабочую шину и не передают через шину событий, а
данные о событии передают через шину событий и не передают через рабочую шину.
15. A method for transmitting operational data and event data from a plurality of components of the power grid and the power system to a central governing body of the power system, which controls the power system, including:
transmitting, at least partially by radio communication, the operating data to the central control element of the electric power system via the operating bus, the operating data comprising at least one measurement made in real time of voltage, current, active power or reactive power of at least for part of the electric power system; and
transmission of event data at least partially by radio link to the central governing body of the electric power system via the event bus, the event bus being separate from the working bus, the event data being different from real-time measurements, and obtained from these measurements in real time and contain at least one analytical definition regarding the operation of an electric power system based on said at least one real-time measurement,
in this case, the working data is transmitted via the working bus and not transmitted through the event bus, but
event data is transmitted via the event bus and not transmitted via the working bus.
16. Способ по п.15, в котором дополнительно:
анализируют по меньшей мере часть принятых данных; и
направляют данные к рабочей шине или шине событий.
16. The method according to clause 15, in which additionally:
analyze at least a portion of the received data; and
send data to the work or event bus.
17. Способ по п.15 или 16, в котором по рабочей шине дополнительно передают не рабочие данные, причем не рабочие данные содержат данные о качестве электроэнергии, и/или надежности подачи электроэнергии, и/или состоянии ресурсов, и/или данные о нагрузке.17. The method according to clause 15 or 16, in which non-operational data is additionally transmitted via the operating bus, and non-operational data contains data on the quality of electricity, and / or reliability of power supply, and / or the state of resources, and / or data on the load .
18. Способ по п.15, в котором компоненты электросети и энергетической системы дополнительно содержат одно или более устройство интеллектуальной сети счетчиков.18. The method according to clause 15, in which the components of the mains and energy system additionally contain one or more devices of an intelligent network of meters.
19. Способ по п.15, в котором дополнительно:
осуществляют фильтрацию с помощью шины событий множества потоков событий для интерпретации указанного множества потоков событий в соответствии по меньшей мере с одной схемой событий, и
пересылают с помощью шины событий указанную интерпретацию множества потоков событий по меньшей мере к одному компоненту из множества компонентов электросети и энергетической системы.
19. The method according to clause 15, in which additionally:
filtering using the event bus of multiple event streams to interpret the specified multiple event streams in accordance with at least one event pattern, and
using the event bus, the specified interpretation of the plurality of event streams is sent to at least one component of the plurality of components of the power grid and the power system.
20. Способ по п.15, в котором дополнительно:
принимают и сохраняют рабочие данные с помощью сервера, связанного с рабочей шиной и шиной событий;
анализируют с помощью сервера рабочие данные в отношении по меньшей мере одного правила;
генерируют с помощью сервера по меньшей мере одно событие на основе указанного анализа; и
пересылают с помощью сервера указанное по меньшей мере одно событие по меньшей мере к одному из указанных компонентов электросети и энергетической системы, с тем чтобы запустить самовосстановление по меньшей мере участка электроэнергетической системы.
20. The method according to clause 15, in which additionally:
receive and save operational data using a server connected to the operational bus and the event bus;
analyze, with the help of the server, operational data regarding at least one rule;
generate at least one event using the server based on the specified analysis; and
sending the specified at least one event via the server to at least one of the indicated components of the power grid and the power system in order to start self-healing of at least a portion of the power system.
21. Способ по п.20, в котором сервер размещен на подстанции электроэнергетической системы, при этом дополнительно запускают с помощью сервера изменение работы указанной подстанции на основе указанного по меньшей мере одного события.21. The method according to claim 20, in which the server is located at the substation of the electric power system, while further triggering by the server a change in the operation of the specified substation based on the specified at least one event.
22. Способ по п.20, в котором дополнительно с помощью сервера генерируют порядок работы для передачи к центрального органу управления электроэнергетической системы.22. The method according to claim 20, in which additionally using the server generate an operating procedure for transmission to the central authority of the electric power system.
23. Система управления данными для электроэнергетической системы, причем электроэнергетическая система содержит центральный орган управления электроэнергетической системы для управления электроэнергетической системой и множество устройств в пределах электроэнергетической системы, содержащая:
накопитель данных, связанный с устройством, расположенным на участке электроэнергетической системы, накопитель данных расположен рядом с указанным устройством, причем устройство измеряет электрический параметр на участке электроэнергетической системы, причем накопитель данных содержит множество мест в запоминающем устройстве для сохранения измеренного электрического параметра; и
центральный накопитель данных, связанный с центральным органом управления электроэнергетической системы, причем центральный накопитель содержит ссылку на места в запоминающем устройстве накопителя данных.
23. A data management system for an electric power system, the electric power system comprising a central governing body of the electric power system for controlling the electric power system and a plurality of devices within the electric power system, comprising:
a data storage device associated with a device located on a portion of the electric power system, a data storage device is located next to the specified device, the device measuring an electrical parameter on a section of the electric power system, the data storage device having many places in a storage device for storing the measured electrical parameter; and
a central data storage device connected to a central control element of the electric power system, the central storage device containing a link to places in the storage device of the data storage device.
24. Система управления данными по п.23, в которой указанное устройство в электроэнергетической системе является подстанцией.24. The data management system of claim 23, wherein said device in a power system is a substation.
25. Система управления данными по п.24, в которой накопитель данных, связанный с подстанцией, содержит запоминающее устройство, которое расположено в подстанции или на подстанции.25. The data management system according to claim 24, wherein the data storage device associated with the substation comprises a storage device that is located in the substation or substation.
26. Система управления данными по п.24, в которой подстанция передает указанную ссылку в центральный орган управления электроэнергетической системы;
при этом центральный орган управления электроэнергетической системы сохраняет эту ссылку в центральном накопителе данных.
26. The data management system according to paragraph 24, in which the substation transfers the specified link to the central authority of the electric power system;
at the same time, the central governing body of the electric power system stores this link in the central data storage device.
27. Система управления данными по п.26, в которой центральный орган управления электроэнергетической системы обращается к этой ссылке в центральном накопителе данных;
при этом центральный орган управления электроэнергетической системы передает запрос в подстанцию, запрашивая данные, связанные с этой ссылкой; и
центральный орган управления электроэнергетической системы принимает ответ из подстанции, содержащий данные, связанные с этой ссылкой.
27. The data management system according to claim 26, wherein the central authority of the electric power system accesses this link in a central data storage device;
at the same time, the central governing body of the electric power system transmits the request to the substation, requesting data related to this link; and
the central governing body of the electric power system receives a response from the substation containing data associated with this link.
28. Система управления данными по п.26, в которой подстанция дополнительно передает по меньшей мере один заголовок, связанный с ссылкой;
при этом центральный орган управления электроэнергетической системы содержит:
первый участок шины для передачи рабочих данных в центральный орган управления электроэнергетической системы, причем рабочие данные содержат по меньшей мере одно измерение, выполненное в режиме реального времени, напряжения, тока, активной мощности или реактивной мощности по меньшей мере для части электроэнергетической системы; и
второй участок шины для передачи данных событий в центральный орган управления электроэнергетической системы, причем второй участок выполнен отдельно от первого участка, данные событий являются данными, отличными от измерения, выполненного в режиме реального времени, получены из этого измерения и содержат по меньшей мере одно аналитическое определение, касающееся работы электроэнергетической системы, основанное на указанном по меньшей мере одном измерении в режиме реального времени,
при этом рабочие данные передаются через первый участок и не передаются через второй участок, а
данные о событии передаются через второй участок и не передаются через первый участок.
28. The data management system of claim 26, wherein the substation further transmits at least one header associated with the link;
the central governing body of the electric power system contains:
a first portion of a bus for transmitting operating data to a central control element of the electric power system, the working data comprising at least one measurement made in real time of voltage, current, active power or reactive power for at least a part of the electric system; and
the second section of the bus for transmitting event data to the central control element of the electric power system, the second section being made separately from the first section, the event data is data other than the measurement performed in real time, obtained from this measurement and contain at least one analytical definition regarding operation of an electric power system based on said at least one real-time measurement,
while the working data is transmitted through the first section and not transmitted through the second section, and
event data is transmitted through the second section and is not transmitted through the first section.
29. Система управления данными по п.23, в которой данные сохраняются в определенном месте в запоминающем устройстве в накопителе данных;
причем в центральном накопителе данных сохраняются ссылки на место в запоминающем устройстве в накопителе данных, но не сохраняются данные, сохраненные в этом месте в запоминающем устройстве.
29. The data management system according to item 23, in which the data is stored in a specific place in the storage device in the data storage device;
moreover, in the central data storage device, references to a place in the storage device in the data storage device are stored, but data stored in this place in the storage device is not stored.
30. Система управления данными по п.23, в которой по меньшей мере одно из множества устройств в электроэнергетической системе содержит счетчик в помещении потребителя.30. The data management system according to item 23, in which at least one of the many devices in the electric power system contains a counter in the consumer’s premises.
31. Система управления электроэнергетической системой для управления электроэнергетической системой, содержащей множество устройств электросети, характеризующаяся тем, что содержит:
центральный орган управления электроэнергетической системы для управления электроэнергетической системой;
первое устройство сети, расположенное на первом участке электроэнергетической системы, причем первое устройство содержит:
первый датчик для измерения электрического параметра на первом участке электроэнергетической системы;
первый процессор для анализа измеренного электрического параметра на первом участке электроэнергетической системы и определения события на основе измеренного электрического параметра, и
второе устройство сети, расположенное на втором участке электроэнергетической системы, причем второе устройство содержит:
второй процессор для приема события, определенного первым устройством сети, для модификации по меньшей мере участка электроэнергетической системы, содержащего второй участок, на основе указанного события, и для передачи в центральный орган управления электроэнергетической системы информации, обозначающей модификацию указанного по меньшей мере участка электроэнергетической системы.
31. The control system of the electric power system for controlling the electric power system containing a plurality of power supply devices, characterized in that it contains:
the central governing body of the electric power system for managing the electric power system;
a first network device located in a first portion of the electric power system, the first device comprising:
a first sensor for measuring an electrical parameter in a first portion of an electric power system;
a first processor for analyzing the measured electrical parameter in a first portion of the electric power system and determining an event based on the measured electrical parameter, and
a second network device located on the second section of the electric power system, the second device comprising:
a second processor for receiving an event detected by the first network device, for modifying at least a portion of the electric power system containing the second section, based on the specified event, and for transmitting information to the central control body of the electric power system indicating modification of the specified at least section of the electric power system.
32. Система управления электроэнергетической системы по п.31, в которой второе устройство сети модифицирует указанный участок электроэнергетической системы без вмешательства центрального органа управления электроэнергетической системы.32. The control system of the electric power system according to p, in which the second network device modifies the specified section of the electric power system without the intervention of the central authority of the electric power system.
33. Система управления электроэнергетической системы по п.31, в которой второе устройство сети является подстанцией.33. The control system of the electric power system according to p, in which the second network device is a substation.
34. Система управления электроэнергетической системы по п.33, в которой по меньшей мере одна цепь подачи электроэнергии выходит из подстанции;
причем первый датчик первого устройства сети измеряет электрический параметр по меньшей мере для части цепи подачи электроэнергии.
34. The control system of the electric power system according to claim 33, wherein the at least one power supply circuit exits the substation;
moreover, the first sensor of the first network device measures the electrical parameter for at least part of the power supply circuit.
35. Система управления электроэнергетической системы по п.34, в которой второе устройство сети дополнительно содержит второй датчик для измерения электрического параметра на втором участке электроэнергетической системы;
причем второй процессор анализирует событие, определенное первым устройством сети, и электрический параметр на втором участке электроэнергетической системы для модификации по меньшей мере участка электроэнергетической системы.
35. The control system of the electric power system according to clause 34, in which the second network device further comprises a second sensor for measuring an electrical parameter in the second section of the electric power system;
moreover, the second processor analyzes the event detected by the first network device, and the electrical parameter in the second section of the electric power system to modify at least a section of the electric power system.
36. Система управления электроэнергетической системы по п.35, в которой подстанция дополнительно содержит накопитель данных, связанный с подстанцией и расположенный рядом с подстанцией, причем накопитель данных содержит множество мест в запоминающем устройстве для сохранения измеренного электрического параметра на втором участке электроэнергетической системы.36. The control system of the electric power system according to clause 35, in which the substation further comprises a data storage device associated with the substation and located next to the substation, and the data storage device contains many places in the storage device for storing the measured electrical parameter in the second section of the electric power system.
37. Способ для системы управления данными для электроэнергетической системы, причем электроэнергетическая система содержит центральный орган управления электроэнергетической системы для управления электроэнергетической системой и множество устройств в электроэнергетической системе, включающий:
измерение электрического параметра на участке электроэнергетической системы, используя электрическое устройство, расположенное на указанном участке электроэнергетической системы;
сохранение измеренного электрического параметра в определенном месте в запоминающем устройстве накопителя данных, причем устройство-накопитель данных связано с электрическим устройством и расположено рядом с этим устройством;
передачу в центральный накопитель данных, связанный с центральным органом управления электроэнергетической системы, указанного местоположения в запоминающем устройстве указанного устройства-накопителя данных.
37. A method for a data management system for an electric power system, the electric power system comprising a central governing body of the electric power system for controlling the electric power system and a plurality of devices in the electric power system, including:
measuring an electrical parameter in a portion of an electric power system using an electrical device located in a specified portion of an electric power system;
storing the measured electrical parameter in a specific place in the storage device of the data storage device, and the data storage device is connected to an electrical device and is located next to this device;
transmitting to the central data storage device associated with the central control body of the electric power system, the specified location in the storage device of the specified data storage device.
38. Способ по п.37, в котором устройство в электроэнергетической системе является подстанцией.38. The method according to clause 37, in which the device in the electric power system is a substation.
39. Способ по п.38, в котором накопитель данных, связанный с подстанцией, содержит запоминающее устройство, которое расположено в подстанции или на подстанции.39. The method of claim 38, wherein the data storage device associated with the substation comprises a storage device that is located in the substation or substation.
40. Способ по п.38, в котором подстанция передает ссылку в центральный орган управления электроэнергетической системы;
причем центральный орган управления электроэнергетической системы сохраняет ссылку в центральном накопителе данных.
40. The method according to § 38, in which the substation transfers the link to the central authority of the electric power system;
moreover, the central governing body of the electric power system stores the link in the central data storage device.
41. Способ по п.40, в котором центральный орган управления электроэнергетической системы обращается к указанной ссылке в центральном накопителе данных;
при этом центральный орган управления электроэнергетической системы передает запрос в подстанцию, запрашивая данные, связанные с этой ссылкой; и
центральный орган управления электроэнергетической системы принимает ответ от подстанции, содержащий данные, связанные с этой ссылкой.
41. The method according to clause 40, in which the Central authority of the electric power system refers to the specified link in the Central data store;
at the same time, the central governing body of the electric power system transmits the request to the substation, requesting data related to this link; and
the central governing body of the electric power system receives a response from the substation containing data associated with this link.
42. Подстанция на первом участке электроэнергетической системы, содержащая:
интерфейс связи, выполненный с возможностью взаимодействовать с устройством электросети, находящимся во втором участке электроэнергетической системы, при этом указанное устройство электросети выполнено с возможностью измерять электрический параметр во втором участке электроэнергетической системы, анализировать измеренный электрический параметр во втором участке электроэнергетической системы и определять событие исходя из измеренного электрического параметра, причем интерфейс связи выполнен с возможностью принимать указанное событие; и
процессор, взаимодействующий с указанным интерфейсом связи, выполненный с возможностью:
принимать событие, определенное указанным устройством электросети,
изменять первый участок электроэнергетической системы исходя из принятого события, и
передавать в центральный орган управления электроэнергетической системы информацию, указывающую на изменение указанного первого участка электроэнергетической системы.
42. A substation in the first section of the electric power system, comprising:
a communication interface configured to interact with a power supply device located in the second section of the power system, while the specified power supply device is configured to measure an electrical parameter in the second section of the power system, analyze the measured electrical parameter in the second section of the power system and determine the event based on the measured electrical parameter, and the communication interface is configured to receive the specified the Events; and
a processor interacting with the specified communication interface, configured to:
receive an event defined by the specified power supply device,
change the first section of the electric power system based on the received event, and
transmit to the central governing body of the electric power system information indicating a change in said first section of the electric power system.
43. Подстанция по п.42, характеризующаяся тем, что выполнена с возможностью изменения первого участка электроэнергетической системы без вмешательства центрального органа управления электроэнергетической системы.43. The substation according to claim 42, characterized in that it is configured to change the first section of the electric power system without the intervention of the central governing body of the electric power system.
44. Подстанция по п.42, в которой питающая линия выходит из подстанции, при этом интерфейс связи выполнен с возможностью принимать от устройства электросети измеренный электрический параметр по меньшей мере для части указанной питающей линии.44. The substation of claim 42, wherein the supply line exits the substation, wherein the communication interface is configured to receive a measured electrical parameter from at least a portion of said supply line from the power supply device.
45. Подстанция по п.44, дополнительно содержащая датчик, выполненный с возможностью измерять электрический параметр на первом участке электроэнергетической системы, при этом процессор выполнен с возможностью анализировать событие, определенное устройство электросети и измеренный электрический параметр из датчика, с тем чтобы изменить указанный первый участок электроэнергетической системы.45. The substation according to claim 44, further comprising a sensor configured to measure an electrical parameter in a first portion of an electric power system, wherein the processor is configured to analyze an event, a specific power supply device, and a measured electrical parameter from a sensor so as to change said first portion electric power system.
46. Подстанция по п.45, дополнительно содержащая накопитель данных, связанный с подстанцией и находящийся вблизи подстанции, при этом накопитель данных содержит множество мест расположения запоминающих устройств, выполненных с возможностью сохранения указанного измеренного электрического параметра из датчика. 46. The substation according to item 45, further containing a data storage device associated with the substation and located near the substation, while the data storage device contains many locations of memory devices configured to store the specified measured electrical parameter from the sensor.
RU2010150352/07A 2008-05-09 2009-02-11 Система и способ для управления электроэнергетической системой RU2518178C2 (ru)

Priority Applications (5)

Application Number Priority Date Filing Date Title
US12729408P true 2008-05-09 2008-05-09
US61/127,294 2008-05-09
US20185608P true 2008-12-15 2008-12-15
US61/201,856 2008-12-15
PCT/US2009/000888 WO2009136975A2 (en) 2008-05-09 2009-02-11 Method and system for managing a power grid

Publications (2)

Publication Number Publication Date
RU2010150352A RU2010150352A (ru) 2012-06-20
RU2518178C2 true RU2518178C2 (ru) 2014-06-10

Family

ID=41259350

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2010150352/07A RU2518178C2 (ru) 2008-05-09 2009-02-11 Система и способ для управления электроэнергетической системой

Country Status (14)

Country Link
US (3) US9534928B2 (ru)
EP (2) EP2286497B1 (ru)
JP (1) JP5616330B2 (ru)
CN (2) CN102084569B (ru)
AU (1) AU2009244877B2 (ru)
BR (1) BRPI0911954A2 (ru)
CA (3) CA2723892C (ru)
HK (2) HK1154708A1 (ru)
MY (1) MY152237A (ru)
NZ (1) NZ589088A (ru)
RU (1) RU2518178C2 (ru)
SG (2) SG10201606766QA (ru)
WO (1) WO2009136975A2 (ru)
ZA (1) ZA201200914B (ru)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU182060U1 (ru) * 2018-02-16 2018-08-02 Акционерное общество "Аэроприбор-Восход" Модуль распределения электропитания
RU2699048C1 (ru) * 2018-09-27 2019-09-03 Руслан Анатольевич Травников Способ агрегированного управления пространственно распределенной электрической нагрузкой
RU2720318C1 (ru) * 2019-11-29 2020-04-28 Публичное акционерное общество "Транснефть" (ПАО "Транснефть") Централизованное интеллектуальное электронное устройство системы автоматизированной электрической подстанции
RU2735580C1 (ru) * 2017-05-08 2020-11-03 Вебасто Се Способ передачи по меньшей мере одной команды управления и устройство управления

Families Citing this family (221)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8468040B1 (en) * 2004-05-14 2013-06-18 Joseph Jolly Hayden System and method for identifying and upgrading a transmission grid
US20120284790A1 (en) * 2006-09-11 2012-11-08 Decision-Zone Inc. Live service anomaly detection system for providing cyber protection for the electric grid
US9354083B2 (en) 2006-09-15 2016-05-31 Itron, Inc. Home area networking (HAN) with low power considerations for battery devices
US10295969B2 (en) 2007-08-28 2019-05-21 Causam Energy, Inc. System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management
US9130402B2 (en) 2007-08-28 2015-09-08 Causam Energy, Inc. System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management
US8890505B2 (en) 2007-08-28 2014-11-18 Causam Energy, Inc. System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management
US9177323B2 (en) 2007-08-28 2015-11-03 Causam Energy, Inc. Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same
US8805552B2 (en) 2007-08-28 2014-08-12 Causam Energy, Inc. Method and apparatus for actively managing consumption of electric power over an electric power grid
US8806239B2 (en) 2007-08-28 2014-08-12 Causam Energy, Inc. System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators
US8073558B2 (en) 2007-10-05 2011-12-06 Honeywell International Inc Critical resource notification system and interface device
US8965719B1 (en) 2008-03-07 2015-02-24 Versify Solutions, Inc. Universal performance monitor for power generators
US8606686B1 (en) 2008-03-07 2013-12-10 Versify Solutions, Inc. System and method for gathering and performing complex analyses on power data from multiple remote sources
US8761948B1 (en) 2008-04-25 2014-06-24 Versify Solutions, Inc. System and method for managing and monitoring renewable energy power generation
US20110004446A1 (en) 2008-12-15 2011-01-06 Accenture Global Services Gmbh Intelligent network
CN102084569B (zh) * 2008-05-09 2014-02-19 埃森哲环球服务有限公司 用于管理电网的方法和系统
US8121741B2 (en) * 2008-05-09 2012-02-21 International Business Machines Corporation Intelligent monitoring of an electrical utility grid
WO2010008479A2 (en) 2008-06-25 2010-01-21 Versify Solutions, Llc Aggregator, monitor, and manager of distributed demand response
US7945401B2 (en) * 2008-06-30 2011-05-17 International Business Machines Corporation Distributed intelligent remote terminal units
US8352091B2 (en) * 2009-01-02 2013-01-08 International Business Machines Corporation Distributed grid-interactive photovoltaic-based power dispatching
PT2394329E (pt) 2009-02-09 2016-01-19 Younicos Inc Descarga de baterias
AT528836T (de) 2009-02-11 2011-10-15 Accenture Global Services Ltd Verfahren und system zur reduktion des zufuhrschaltungsverlusts mithilfe einer befehlsreaktion
US10223167B2 (en) * 2009-04-24 2019-03-05 Rockwell Automation Technologies, Inc. Discrete resource management
US8892540B2 (en) 2009-04-24 2014-11-18 Rockwell Automation Technologies, Inc. Dynamic sustainability search engine
US8321187B2 (en) 2009-04-24 2012-11-27 Rockwell Automation Technologies, Inc. Process simulation utilizing component-specific consumption data
US9129231B2 (en) 2009-04-24 2015-09-08 Rockwell Automation Technologies, Inc. Real time energy consumption analysis and reporting
US9406036B2 (en) 2009-04-24 2016-08-02 Rockwell Automation Technologies, Inc. Discrete energy assignments for manufacturing specifications
US10013666B2 (en) 2009-04-24 2018-07-03 Rockwell Automation Technologies, Inc. Product lifecycle sustainability score tracking and indicia
MX2011009052A (es) * 2009-05-07 2012-02-28 Dominion Resources Inc VOLTAGE CONSERVATION USING ADVANCED MEASUREMENT INFRASTRUCTURE AND CENTRALIZED VOLTAGE CONTROL IN THE SUBSTATION.
EP2264967B1 (en) * 2009-06-17 2017-12-13 ABB Schweiz AG Inter-bay substation automation application
US9634488B2 (en) * 2009-06-26 2017-04-25 Abb Schweiz Ag Load scheduling optimization in distributed system
US8782190B2 (en) 2009-07-17 2014-07-15 Honeywell International, Inc. Demand response management system
US8676953B2 (en) 2009-07-17 2014-03-18 Honeywell International Inc. Use of aggregated groups for managing demand response resources
US9818073B2 (en) 2009-07-17 2017-11-14 Honeywell International Inc. Demand response management system
US8671191B2 (en) * 2009-07-17 2014-03-11 Honeywell International Inc. Installation system for demand response resources
US8671167B2 (en) 2009-07-17 2014-03-11 Honeywell International Inc. System for providing demand response services
US8667132B2 (en) 2009-07-17 2014-03-04 Honeywell International Inc. Arrangement for communication about and management of a resource using a mobile device
US9124535B2 (en) 2009-07-17 2015-09-01 Honeywell International Inc. System for using attributes to deploy demand response resources
US9137050B2 (en) 2009-07-17 2015-09-15 Honeywell International Inc. Demand response system incorporating a graphical processing unit
US9274518B2 (en) 2010-01-08 2016-03-01 Rockwell Automation Technologies, Inc. Industrial control energy object
US8738190B2 (en) * 2010-01-08 2014-05-27 Rockwell Automation Technologies, Inc. Industrial control energy object
US8630882B2 (en) * 2010-01-13 2014-01-14 International Business Machines Corporation Implementing an optimal intelligent enterprise architecture via virtualization, information intelligence, social computing and green environmental considerations
WO2011091312A1 (en) 2010-01-22 2011-07-28 Illinois Tool Works Inc. Smart grid welding system
EP2348596A1 (en) * 2010-01-25 2011-07-27 Accenture Global Services Limited Analytics for consumer power consumption
CN101799681A (zh) * 2010-02-10 2010-08-11 刘文祥 智能电网
US8918842B2 (en) * 2010-02-19 2014-12-23 Accenture Global Services Limited Utility grid command filter system
US20110238583A1 (en) * 2010-03-26 2011-09-29 Palo Alto Research Center Incorporated Technique for aggregating reactive power loads
US8558551B2 (en) 2010-04-21 2013-10-15 Schweitzer Engineering Laboratories Inc Fault location in electric power delivery systems
US8525522B2 (en) 2010-04-21 2013-09-03 Schweitzer Engineering Laboratories Inc Fault location in electric power delivery systems
JP5556334B2 (ja) * 2010-04-23 2014-07-23 東京電力株式会社 電力系統信頼性評価システム
US8471520B2 (en) 2010-05-04 2013-06-25 Xtreme Power Inc. Managing renewable power generation
KR101173415B1 (ko) * 2010-05-11 2012-08-10 엘에스산전 주식회사 에너지 표시장치 및 그 방법
US8924033B2 (en) 2010-05-12 2014-12-30 Alstom Grid Inc. Generalized grid security framework
DE102010021070A1 (de) 2010-05-19 2011-11-24 Siemens Aktiengesellschaft Verfahren zur Regelung der Stabilität eines elektrichen Versorgungsnetzwerks
US8712596B2 (en) * 2010-05-20 2014-04-29 Accenture Global Services Limited Malicious attack detection and analysis
US8417221B2 (en) * 2010-06-08 2013-04-09 At&T Intellectual Property I, L.P. Interactive personalized e-experience system and method for visual voice mail
US9063715B2 (en) * 2010-06-10 2015-06-23 Hewlett-Packard Development Company, L. P. Management of a virtual power infrastructure
CN102289340A (zh) * 2010-06-21 2011-12-21 中国电信股份有限公司 数据稽核平台及方法
JP5583507B2 (ja) * 2010-07-29 2014-09-03 株式会社日立製作所 スマートグリッドの監視制御方法及び装置
RU2541911C2 (ru) * 2010-07-30 2015-02-20 Эксенчер Глоубл Сервисиз Лимитед Интеллектуальное ядро системы
US20120054712A1 (en) * 2010-08-25 2012-03-01 Smartsynch, Inc. System and method for enabling creation and execution of localized applications in utility networks through device-specific programming
US8942954B2 (en) 2010-09-16 2015-01-27 Schweitzer Engineering Laboratories, Inc. Fault location in a non-homogeneous electric power line
US10228001B2 (en) 2010-09-22 2019-03-12 Hubbell Incorporated Transmission line measuring device and method for connectivity
WO2012039767A1 (en) 2010-09-22 2012-03-29 Hubbell Incorporated Transmission line measuring device and method for connectivity and monitoring
US8024077B2 (en) * 2010-10-06 2011-09-20 San Diego Gas & Electric Company Smart transformer
US8738351B2 (en) * 2010-10-12 2014-05-27 International Business Machines Corporation Historic storage of dual layer power grid connectivity model
US8849469B2 (en) 2010-10-28 2014-09-30 Microsoft Corporation Data center system that accommodates episodic computation
US8725758B2 (en) 2010-11-19 2014-05-13 International Business Machines Corporation Video tag sharing method and system
KR20120087274A (ko) * 2010-12-23 2012-08-07 한국전자통신연구원 건물 에너지 관리를 위한 emm 클라이언트 시스템, emm 관제 시스템 및 emm 관제 플랫폼과 emm 클라이언트 시스템의 원격 건물 관리 방법
US8626354B2 (en) 2011-01-28 2014-01-07 Honeywell International Inc. Approach for normalizing automated demand response events in energy management control systems
US8630744B2 (en) 2011-01-28 2014-01-14 Honeywell International Inc. Management and monitoring of automated demand response in a multi-site enterprise
US9153001B2 (en) 2011-01-28 2015-10-06 Honeywell International Inc. Approach for managing distribution of automated demand response events in a multi-site enterprise
JP5195951B2 (ja) * 2011-02-23 2013-05-15 横河電機株式会社 情報管理装置及び情報管理システム
CN103703654B (zh) * 2011-03-24 2016-04-06 施耐德电气有限责任公司 合并单元及操作合并单元的方法
US20120253538A1 (en) * 2011-03-28 2012-10-04 Russell Raymond Method and System for Generating and Optimizing the Capacity Ratings of an Electric Power System Facility
US9589241B2 (en) 2011-03-31 2017-03-07 The United States Of America As Represented By The Secretary Of The Navy Electrical resource controller
US8718829B2 (en) 2011-04-01 2014-05-06 International Business Machines Corporation Energy grid device commissioning method and system
CN102801154B (zh) * 2011-05-27 2014-11-26 国际商业机器公司 电力网络骨干拓扑结构的提取方法和装置
US9331480B2 (en) 2011-05-31 2016-05-03 Cisco Technology, Inc. Variable topology distributed intelligence for utility grid control operation services
US9450454B2 (en) 2011-05-31 2016-09-20 Cisco Technology, Inc. Distributed intelligence architecture with dynamic reverse/forward clouding
US20120316688A1 (en) * 2011-06-08 2012-12-13 Alstom Grid Coordinating energy management systems and intelligent electrical distribution grid control systems
US20120316696A1 (en) * 2011-06-08 2012-12-13 Alstom Grid Multi-level topologytopography for electrical distribution grid control
US9641026B2 (en) 2011-06-08 2017-05-02 Alstom Technology Ltd. Enhanced communication infrastructure for hierarchical intelligent power distribution grid
US8965590B2 (en) 2011-06-08 2015-02-24 Alstom Grid Inc. Intelligent electrical distribution grid control system data
US9281689B2 (en) 2011-06-08 2016-03-08 General Electric Technology Gmbh Load phase balancing at multiple tiers of a multi-tier hierarchical intelligent power distribution grid
KR20150002901A (ko) * 2011-06-14 2015-01-07 가부시끼가이샤 도시바 정보 통합 제어 시스템과 정보 처리 프로그램, 사회 인프라 운용 시스템, 운용 방법, 로컬 장치, 서버 장치 및 프로그램
US9207735B2 (en) * 2011-08-02 2015-12-08 Gram Power, Inc. Power management device and system
JP5775399B2 (ja) * 2011-09-02 2015-09-09 中部電力株式会社 耐雷設備のダメージ評価方法、耐雷設備のダメージ評価装置、変圧器のダメージ評価方法、変圧器のダメージ評価装置
US8872667B2 (en) 2011-09-13 2014-10-28 International Business Machines Corporation Fault isolation and service restoration in an electric grid
US20130064178A1 (en) * 2011-09-13 2013-03-14 Adishesha CS System For Monitoring Electrical Power Distribution Lines In A Power Grid Using A Wireless Sensor Network
US8674843B2 (en) * 2011-09-13 2014-03-18 International Business Machines Corporation System and method for detecting and localizing abnormal conditions and electrical faults in an electrical grid
US8660868B2 (en) 2011-09-22 2014-02-25 Sap Ag Energy benchmarking analytics
US8751036B2 (en) 2011-09-28 2014-06-10 Causam Energy, Inc. Systems and methods for microgrid power generation management with selective disconnect
US9225173B2 (en) 2011-09-28 2015-12-29 Causam Energy, Inc. Systems and methods for microgrid power generation and management
US8862279B2 (en) 2011-09-28 2014-10-14 Causam Energy, Inc. Systems and methods for optimizing microgrid power generation and management with predictive modeling
US8791704B2 (en) 2011-10-11 2014-07-29 Schweitzer Engineering Laboratories Inc. Fault-type identification for electric power delivery systems
US9160172B2 (en) * 2011-10-12 2015-10-13 General Electric Company Systems and methods for adaptive possible power determinaton in power generating systems
US9293914B2 (en) 2011-11-04 2016-03-22 Kohler Co Power management system that includes a generator controller
US9043037B2 (en) 2011-11-10 2015-05-26 International Business Machines Corporation Monitoring and optimizing an electrical grid state
US9037306B2 (en) 2011-11-10 2015-05-19 International Business Machines Corporation Monitoring and optimizing an electrical grid state
US8942856B2 (en) * 2011-12-22 2015-01-27 General Electric Company Power converter and methods of controlling the same
CN102521398B (zh) * 2011-12-23 2013-06-19 清华大学 变电站-调度中心两级分布式电网的建模方法
CN102545212B (zh) * 2012-01-10 2014-01-29 中国电力科学研究院 一种电能质量集中监控与辅助管理决策支持系统
US20130181845A1 (en) * 2012-01-13 2013-07-18 Itron, Inc. Ami network with workforce management hotspot access
US9853448B2 (en) * 2012-01-17 2017-12-26 General Electric Company Systems and methods for coordinating electrical network optimization
MY168153A (en) 2012-02-13 2018-10-11 Accenture Global Services Ltd Electric vehicle distributed intelligence
WO2013126460A1 (en) * 2012-02-20 2013-08-29 Engineered Electric Company Micro grid power distribution unit
US20130214602A1 (en) * 2012-02-20 2013-08-22 Engineered Electric Company Method and system for generator control
US9535481B2 (en) 2012-02-20 2017-01-03 Engineered Electric Company Power grid remote access
DE102012101799A1 (de) 2012-03-02 2013-09-05 ropa development GmbH Netzinfrastrukturkomponente, Verbundsystem mit einer Mehrzahl von Netzinfrastrukturkomponenten sowie Verwendung des Verbundsystems
US8797851B2 (en) 2012-04-18 2014-08-05 International Business Machines Corporation Locating traffic reduction utilities in communication networks
US9396504B2 (en) * 2012-04-18 2016-07-19 Abb Research Ltd. Centralized control center for electrical network computational services
US8909358B2 (en) * 2012-06-01 2014-12-09 Sap Ag Method and system for complex smart grid infrastructure assessment
CN102722851B (zh) * 2012-06-08 2015-11-18 上海市电力公司 一种基于智能电网技术的多数据接口综合线损管理系统
US20130332240A1 (en) * 2012-06-08 2013-12-12 University Of Southern California System for integrating event-driven information in the oil and gas fields
CN102707156B (zh) * 2012-06-08 2015-07-01 上海市电力公司 一种基于智能电网技术的线损精细化精确比对方法
US9461471B2 (en) 2012-06-20 2016-10-04 Causam Energy, Inc System and methods for actively managing electric power over an electric power grid and providing revenue grade date usable for settlement
US9207698B2 (en) 2012-06-20 2015-12-08 Causam Energy, Inc. Method and apparatus for actively managing electric power over an electric power grid
US9465398B2 (en) 2012-06-20 2016-10-11 Causam Energy, Inc. System and methods for actively managing electric power over an electric power grid
US9563215B2 (en) 2012-07-14 2017-02-07 Causam Energy, Inc. Method and apparatus for actively managing electric power supply for an electric power grid
CN102800033A (zh) * 2012-07-25 2012-11-28 天津市电力公司 一种配电生产与营销业务集成系统
US8983669B2 (en) * 2012-07-31 2015-03-17 Causam Energy, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
US9513648B2 (en) 2012-07-31 2016-12-06 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US10861112B2 (en) 2012-07-31 2020-12-08 Causam Energy, Inc. Systems and methods for advanced energy settlements, network-based messaging, and applications supporting the same on a blockchain platform
WO2015183517A1 (en) * 2014-05-29 2015-12-03 Causam Energy, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
US9252915B1 (en) * 2012-08-15 2016-02-02 Washington State University Systematic adaptation of data delivery
US9403441B2 (en) 2012-08-21 2016-08-02 Cooper Technologies Company Autonomous management of distribution transformer power load
CN103679306A (zh) * 2012-08-31 2014-03-26 国际商业机器公司 节省楼宇能源消耗的方法和系统
JP2014054081A (ja) * 2012-09-07 2014-03-20 Toshiba Corp 変電所自動化システム
US20140081704A1 (en) 2012-09-15 2014-03-20 Honeywell International Inc. Decision support system based on energy markets
US9553455B2 (en) * 2012-10-11 2017-01-24 Siemens Aktiengesellschaft Use of demand response to enable improved power supply restoration planning
US9685887B2 (en) 2012-10-12 2017-06-20 Younicos Inc. Controlling power conversion systems
US8849715B2 (en) 2012-10-24 2014-09-30 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US9389850B2 (en) 2012-11-29 2016-07-12 Honeywell International Inc. System and approach to manage versioning of field devices in a multi-site enterprise
CN103064882B (zh) * 2012-12-03 2016-05-04 国家电网公司 适用于电力调度自动化系统的商用库故障隔离方法
US9368968B2 (en) 2012-12-28 2016-06-14 Younicos, Inc. Responding to local grid events and distributed grid events
US9276425B2 (en) 2012-12-28 2016-03-01 Younicos Inc. Power management systems with dynamic target state of charge
CN105164716A (zh) * 2013-03-07 2015-12-16 西门子公司 电力网中的需求调整
US9563218B2 (en) 2013-03-15 2017-02-07 Dominion Resources, Inc. Electric power system control with measurement of energy demand and energy efficiency using t-distributions
US9620959B2 (en) 2013-03-15 2017-04-11 Accenture Global Services Limited Enhanced grid reliability through predictive analysis and dynamic action for stable power distribution
US9678520B2 (en) 2013-03-15 2017-06-13 Dominion Resources, Inc. Electric power system control with planning of energy demand and energy efficiency using AMI-based data analysis
US9842372B2 (en) 2013-03-15 2017-12-12 Rockwell Automation Technologies, Inc. Systems and methods for controlling assets using energy information determined with an organizational model of an industrial automation system
US9501804B2 (en) 2013-03-15 2016-11-22 Rockwell Automation Technologies, Inc. Multi-core processor for performing energy-related operations in an industrial automation system using energy information determined with an organizational model of the industrial automation system
US9423848B2 (en) 2013-03-15 2016-08-23 Rockwell Automation Technologies, Inc. Extensible energy management architecture
US9847639B2 (en) 2013-03-15 2017-12-19 Dominion Energy, Inc. Electric power system control with measurement of energy demand and energy efficiency
CA2846342A1 (en) * 2013-03-15 2014-09-15 Open Access Technology International, Inc. Use of demand response (dr) and distributed energy resources (der) to mitigate the impact of variable energy resources (ver) in power system operation
US9553453B2 (en) 2013-03-15 2017-01-24 Dominion Resources, Inc. Management of energy demand and energy efficiency savings from voltage optimization on electric power systems using AMI-based data analysis
US9582020B2 (en) 2013-03-15 2017-02-28 Dominion Resources, Inc. Maximizing of energy delivery system compatibility with voltage optimization using AMI-based data control and analysis
US9911163B2 (en) 2013-03-15 2018-03-06 Rockwell Automation Technologies, Inc. Systems and methods for determining energy information using an organizational model of an industrial automation system
CN103199493B (zh) * 2013-04-19 2015-04-01 山东电力集团公司 分布式联网继电保护整定计算系统实现方法
CN103325004B (zh) * 2013-05-20 2016-08-03 国家电网公司 电网gis服务管理系统
US9058234B2 (en) * 2013-06-28 2015-06-16 General Electric Company Synchronization of control applications for a grid network
CN105431712B (zh) * 2013-06-28 2018-10-09 飞利浦灯具控股公司 数据记录设备
US9424614B2 (en) 2013-07-03 2016-08-23 International Business Machines Corporation Updating distribution management system model responsive to real-time asset identification and location inputs
US9691076B2 (en) 2013-07-11 2017-06-27 Honeywell International Inc. Demand response system having a participation predictor
US9989937B2 (en) 2013-07-11 2018-06-05 Honeywell International Inc. Predicting responses of resources to demand response signals and having comfortable demand responses
US10346931B2 (en) 2013-07-11 2019-07-09 Honeywell International Inc. Arrangement for communicating demand response resource incentives
CN103439629B (zh) * 2013-08-05 2016-11-02 国家电网公司 基于数据网格的配电网故障诊断系统
WO2015021322A2 (en) * 2013-08-09 2015-02-12 Utilidata, Inc. Systems and methods for estimating conservation allocation with partial ami
KR101493815B1 (ko) * 2013-08-21 2015-03-02 한국환경공단 통신포트를 구분하여 사용하는 전기 자동차 충전 시스템 및 이를 위한 통신 방법
CN103489062B (zh) * 2013-09-04 2017-09-05 广东电网公司佛山供电局 基于cim模型的计划停电方法及装置
US9648143B2 (en) 2013-10-03 2017-05-09 Duke Energy Corporation Methods of processing data corresponding to a device that corresponds to a gas, water, or electric grid, and related devices and computer program products
US9722665B2 (en) 2013-12-23 2017-08-01 Duke Energy Corporation Communication nodes and sensor devices configured to use power line communication signals, and related methods of operation
CN103812220B (zh) * 2014-02-18 2016-04-06 国家电网公司 一种基于标准化处理技术的故障全息系统及其方法
US9665078B2 (en) 2014-03-25 2017-05-30 Honeywell International Inc. System for propagating messages for purposes of demand response
CN104113135B (zh) * 2014-05-16 2017-01-04 国家电网公司 事故变电站间隔故障快速定位方法
US10234835B2 (en) 2014-07-11 2019-03-19 Microsoft Technology Licensing, Llc Management of computing devices using modulated electricity
US9933804B2 (en) * 2014-07-11 2018-04-03 Microsoft Technology Licensing, Llc Server installation as a grid condition sensor
CN109004644A (zh) 2014-07-17 2018-12-14 3M创新有限公司 用于协调信号注入以理解和保持公用设施网格中信号注入模式之间正交性的系统和方法
CN106537356B (zh) 2014-07-17 2020-03-10 3M创新有限公司 公用电网中信号注入的系统和方法
JP6599428B2 (ja) 2014-07-17 2019-10-30 スリーエム イノベイティブ プロパティズ カンパニー グリッドの異常重大度を表す現場でのセンサ応答データパターンを分類するためのシステム及び方法
US9979192B2 (en) 2014-07-29 2018-05-22 General Electric Company System and method for controlling a power distribution network
CN104182908B (zh) * 2014-08-18 2018-03-30 国家电网公司 一种电网仿真计算数据分片处理方法
CA2998101A1 (en) * 2014-09-08 2016-03-17 Christopher Robert Debone Grid tied, real time adaptive, distributed intermittent power
TWI560966B (ru) * 2014-10-03 2016-12-01
CN104299051A (zh) * 2014-10-10 2015-01-21 国家电网公司 一种用于电网工程技术经济性分析评论的网络系统
CN104317868B (zh) * 2014-10-17 2017-12-15 中国南方电网有限责任公司 一种基于单前置多scada应用的调控一体化方法
US10116560B2 (en) 2014-10-20 2018-10-30 Causam Energy, Inc. Systems, methods, and apparatus for communicating messages of distributed private networks over multiple public communication networks
US9785126B2 (en) 2014-11-25 2017-10-10 Rockwell Automation Technologies, Inc. Inferred energy usage and multiple levels of energy usage
US9798343B2 (en) 2014-11-25 2017-10-24 Rockwell Automation Technologies, Inc. Quantifying operating strategy energy usage
US9798306B2 (en) 2014-11-25 2017-10-24 Rockwell Automation Technologies, Inc. Energy usage auto-baseline for diagnostics and prognostics
US20160182309A1 (en) * 2014-12-22 2016-06-23 Rockwell Automation Technologies, Inc. Cloud-based emulation and modeling for automation systems
JP6580145B2 (ja) 2015-01-16 2019-09-25 スリーエム イノベイティブ プロパティズ カンパニー グリッド出力を改善するグリッド行動を選択するためのシステム及び方法
US20160209454A1 (en) 2015-01-19 2016-07-21 Patrick McCammon Wireless Power Line Sensor
CN104599196B (zh) * 2015-02-06 2017-11-03 云南电力调度控制中心 一种后台模型数据订阅发布技术的实现方法
US9825463B2 (en) 2015-02-12 2017-11-21 The Mitre Corporation Devices and systems for distributed power-grid monitoring
JP6343245B2 (ja) * 2015-03-25 2018-06-13 株式会社日立製作所 設備不良予測システム、設備不良予測装置、及び設備不良予測方法
CN104820890B (zh) * 2015-04-29 2017-12-22 贵州电网公司电力调度控制中心 一种电力调度设备模型与电网生产设备信息融合方法
WO2017027682A1 (en) 2015-08-11 2017-02-16 Delta Energy & Communications, Inc. Enhanced reality system for visualizing, evaluating, diagnosing, optimizing and servicing smart grids and incorporated components
US10732656B2 (en) 2015-08-24 2020-08-04 Dominion Energy, Inc. Systems and methods for stabilizer control
CN105182250B (zh) * 2015-08-24 2017-12-12 北京国电通网络技术有限公司 一种非侵入式分布式电源出力监测装置
WO2017041093A1 (en) 2015-09-03 2017-03-09 Delta Energy & Communications, Inc. System and method for determination and remediation of energy diversion in a smart grid network
CN108603900A (zh) 2015-09-24 2018-09-28 地球网络股份有限公司 远程感测以导出校准功率测量
US10528654B2 (en) * 2015-10-05 2020-01-07 EasyPower LLC Facilitating analysis of a electrical power system
WO2017070648A1 (en) 2015-10-22 2017-04-27 Delta Energy & Communications, Inc. Augmentation, expansion and self-healing of a geographically distributed mesh network using unmanned aerial vehicle technology
US10708151B2 (en) * 2015-10-22 2020-07-07 Level 3 Communications, Llc System and methods for adaptive notification and ticketing
WO2017070646A1 (en) 2015-10-22 2017-04-27 Delta Energy & Communications, Inc. Data transfer facilitation across a distributed mesh network using light and optical based technology
CN105448066A (zh) * 2015-12-01 2016-03-30 苏州新宏博智能科技股份有限公司 能耗监测的智能响应终端
EP3342099B1 (en) * 2015-12-08 2020-02-05 Siemens Aktiengesellschaft Automatic identification of a network node causing a network outage
US10592564B2 (en) * 2016-01-22 2020-03-17 Aerinet Solutions, L.L.C. Real-time outage analytics and reliability benchmarking system
CN105548779B (zh) * 2016-02-02 2018-12-07 中国农业大学 一种低压配电网无功运行状态的预警方法及系统
US10791020B2 (en) 2016-02-24 2020-09-29 Delta Energy & Communications, Inc. Distributed 802.11S mesh network using transformer module hardware for the capture and transmission of data
US10814893B2 (en) 2016-03-21 2020-10-27 Ge Global Sourcing Llc Vehicle control system
CN106291159A (zh) * 2016-06-24 2017-01-04 国网江苏省电力公司南京供电公司 一种主站侧配电自动化信号智能验收装置及验收方法
US10652633B2 (en) 2016-08-15 2020-05-12 Delta Energy & Communications, Inc. Integrated solutions of Internet of Things and smart grid network pertaining to communication, data and asset serialization, and data modeling algorithms
US20200033393A1 (en) * 2016-09-28 2020-01-30 Andium Inc. Electrical transmission line sensing
EP3301773B1 (en) * 2016-09-30 2020-06-03 ABB Schweiz AG Controlling an energy storage system
CN106878466B (zh) * 2017-04-07 2018-03-27 贵州黔源电力股份有限公司 一种水电机组数据管理和设备控制一体化平台
US10541556B2 (en) 2017-04-27 2020-01-21 Honeywell International Inc. System and approach to integrate and manage diverse demand response specifications for multi-site enterprises
CN106950426A (zh) * 2017-05-03 2017-07-14 国网四川省电力公司电力科学研究院 基于广域同步测量的三相电能表及其测量方法
EP3679539A1 (en) * 2017-09-06 2020-07-15 Landis+Gyr Innovations, Inc. Voice-activated energy management system
CN108022002B (zh) * 2017-10-23 2020-07-14 国网浙江省电力公司经济技术研究院 一种基于支持张量机的中性点接地方式决策方法及系统
US10432759B2 (en) 2017-10-30 2019-10-01 International Business Machines Corporation Centralized chromatic pluralizing of internet of things (IOT) communication
US10587560B2 (en) * 2017-11-07 2020-03-10 General Electric Company Unified real-time and non-real-time data plane
FR3075969B1 (fr) * 2017-12-21 2020-09-18 Electricite De France FAULT DETECTION DEVICE IN THE MONITORING OF AN ELECTRICAL NETWORK
WO2019224539A1 (en) * 2018-05-22 2019-11-28 Neuville Grid Data Management Limited Methods and apparatus for the sensing, collecting, transmission, storage, and dissemination of high-resolution power grid electrical measurement data
WO2020036745A1 (en) * 2018-08-14 2020-02-20 Carrier Corporation Generation of demand response events based on grid operations and faults
CN109144990A (zh) * 2018-09-03 2019-01-04 国网浙江省电力有限公司信息通信分公司 一种基于元数据驱动的电力通信大数据质量管理方法
US10859639B2 (en) 2018-10-02 2020-12-08 Schweitzer Engineering Laboratories, Inc. Fault-type identification in an electric power delivery system using composite signals
CN109521372B (zh) * 2018-10-24 2020-11-27 安徽立卓智能电网科技有限公司 一种分布式新能源并网数据分析诊断系统
US10791421B1 (en) * 2019-09-03 2020-09-29 Cox Communications, Inc. Hyper-localization based edge-converged telemetry
CN110571931B (en) * 2019-09-11 2021-01-19 中国南方电网有限责任公司 Remote interaction system for real-time operation data of power grid

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000048288A1 (en) * 1999-02-08 2000-08-17 Nu-Lec Industries Pty Ltd Electrical distribution system automation
US6624532B1 (en) * 2001-05-18 2003-09-23 Power Wan, Inc. System and method for utility network load control
RU2264019C2 (ru) * 1999-08-20 2005-11-10 ВРЭП С.п.А. Устройство, система и способ текущего контроля бытового электроприбора
RU2273874C2 (ru) * 2001-08-07 2006-04-10 Сименс Акциенгезелльшафт Способ эксплуатации технической установки и система управления процессом эксплуатации технической установки
US20060259201A1 (en) * 1992-11-17 2006-11-16 Health Hero Network, Inc. Home power management system

Family Cites Families (72)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4781119A (en) 1984-09-10 1988-11-01 Davis James G Solar-rapid rail mass transit system
US5735492A (en) 1991-02-04 1998-04-07 Pace; Joseph A. Railroad crossing traffic warning system apparatus and method therefore
US5455776A (en) 1993-09-08 1995-10-03 Abb Power T & D Company Inc. Automatic fault location system
US5513061A (en) * 1993-12-09 1996-04-30 Long Island Lighting Company Apparatus and method for distributing electrical power
JP3288193B2 (ja) 1994-12-28 2002-06-04 東芝システム開発株式会社 電力情報広域ネットワークシステム
US7046682B2 (en) 1997-02-12 2006-05-16 Elster Electricity, Llc. Network-enabled, extensible metering system
US5923269A (en) 1997-06-06 1999-07-13 Abb Power T&D Company Inc. Energy meter with multiple protocols for communication with local and wide area networks
JPH1145101A (ja) 1997-07-25 1999-02-16 Tokyo Electric Power Co Inc:The 監視制御システム
US6437692B1 (en) 1998-06-22 2002-08-20 Statsignal Systems, Inc. System and method for monitoring and controlling remote devices
US6104978A (en) 1998-04-06 2000-08-15 General Electric Company GPS-based centralized tracking system with reduced energy consumption
US6553336B1 (en) 1999-06-25 2003-04-22 Telemonitor, Inc. Smart remote monitoring system and method
JP2001045645A (ja) 1999-07-30 2001-02-16 Central Res Inst Of Electric Power Ind 電力系統の広域保護システムと方法、およびプログラム記録媒体
AT421178T (de) * 2000-03-10 2009-01-15 Abb Schweiz Ag Verfahren und vorrichtung zur stabilitätsbewertung eines elektrischen energieversorgungsnetzes
IT1320415B1 (it) 2000-06-09 2003-11-26 Skf Ind Spa Metodo ed apparecchiatura per rilevare e segnalare condizioni dideragliamento in un veicolo ferroviario.
SE519943C2 (sv) 2000-12-14 2003-04-29 Abb Ab Method for fault location in a transmission line
US7062359B2 (en) 2000-12-29 2006-06-13 Abb Ab Substation control system
US20020103772A1 (en) 2001-01-31 2002-08-01 Bijoy Chattopadhyay System and method for gathering of real-time current flow information
US7058710B2 (en) 2001-02-22 2006-06-06 Koyo Musen Corporation Collecting, analyzing, consolidating, delivering and utilizing data relating to a current event
JP3631689B2 (ja) 2001-03-30 2005-03-23 関西電力株式会社 電力供給関連業務用の情報管理システム
ES2364451T3 (es) 2001-05-21 2011-09-02 Abb Research Ltd. Predicción de estabilidad para una red eléctrica de potencia.
US6985803B2 (en) 2001-05-30 2006-01-10 General Electric Company System and method for monitoring the condition of a vehicle
US7117215B1 (en) * 2001-06-07 2006-10-03 Informatica Corporation Method and apparatus for transporting data for data warehousing applications that incorporates analytic data interface
JP4229602B2 (ja) * 2001-08-03 2009-02-25 株式会社東芝 機器監視/運転支援方法
JP2003110508A (ja) * 2001-09-28 2003-04-11 Hitachi Kokusai Electric Inc 基地局監視制御システム
DE60119555T2 (de) 2001-12-21 2007-03-08 Abb Schweiz Ag Ermittlung der Betriebsgrenzwerte in einem Energieverteilungsnetz
JP4053308B2 (ja) * 2002-02-15 2008-02-27 富士通株式会社 上位及び下位中継装置並びにネットワーク装置
CN1639649B (zh) * 2002-02-25 2010-11-17 通用电气公司 用于有条件触发的系统数据捕获的方法和系统
US6667610B2 (en) 2002-03-11 2003-12-23 Gregory Hubert Piesinger Apparatus and method for identifying cable phase in a three-phase power distribution network
US7031859B2 (en) 2002-03-11 2006-04-18 Piesinger Gregory H Apparatus and method for identifying cable phase in a three-phase power distribution network
JP2003299263A (ja) * 2002-03-29 2003-10-17 Mitsubishi Electric Corp 監視制御システム
US6662124B2 (en) 2002-04-17 2003-12-09 Schweitzer Engineering Laboratories, Inc. Protective relay with synchronized phasor measurement capability for use in electric power systems
EP1408595B1 (en) 2002-10-10 2017-06-14 ABB Research Ltd. Determining parameters of an equivalent circuit representing a transmission section of an electrical network
BR0314881A (pt) 2002-10-25 2005-08-02 S & C Electric Co Method and apparatus for controlling an electrical power system in response to circuit abnormalities
US7213789B1 (en) 2003-04-29 2007-05-08 Eugene Matzan System for detection of defects in railroad car wheels
WO2004099503A1 (de) 2003-05-12 2004-11-18 Franz Plasser Bahnbaumaschinen-Industriegesellschaft Mbh Kontrollvorrichtung und verfahren zur überwachung eines arbeitszuges
US7689323B2 (en) 2003-05-13 2010-03-30 Siemens Aktiengesellschaft Automatic generation control of a power distribution system
US7739138B2 (en) * 2003-05-19 2010-06-15 Trimble Navigation Limited Automated utility supply management system integrating data sources including geographic information systems (GIS) data
CN2629320Y (zh) * 2003-06-03 2004-07-28 东南大学 电力系统变电站自动化系统中专用通信管理机
JP4538203B2 (ja) 2003-06-09 2010-09-08 トヨタ自動車株式会社 エネルギー管理装置
US7299503B2 (en) * 2003-06-26 2007-11-20 International Business Machines Corporation Apparatus and method for location specific authentication using powerline networking
WO2005015366A2 (en) 2003-08-08 2005-02-17 Electric Power Group, Llc Real-time performance monitoring and management system
US7013203B2 (en) * 2003-10-22 2006-03-14 General Electric Company Wind turbine system control
US20050125104A1 (en) 2003-12-05 2005-06-09 Wilson Thomas L. Electrical power distribution control systems and processes
US8108184B2 (en) 2004-01-15 2012-01-31 Bruce Fardanesh Methods and systems for power systems analysis: a non-iterative state solver/estimator for power systems operation and control
GB0402739D0 (en) 2004-02-09 2004-03-10 Saviso Group Ltd Methods and apparatus for routing in a network
US7239238B2 (en) 2004-03-30 2007-07-03 E. J. Brooks Company Electronic security seal
JP4459733B2 (ja) 2004-06-25 2010-04-28 株式会社日立情報制御ソリューションズ 電力系統監視制御システム及び情報管理方法
US20060038672A1 (en) * 2004-07-02 2006-02-23 Optimal Licensing Corporation System and method for delivery and management of end-user services
US8315636B2 (en) * 2005-02-24 2012-11-20 Cisco Technology, Inc. Techniques for distributing data among nodes based on dynamic spatial/organizational state of a mobile node
US20060224336A1 (en) 2005-04-05 2006-10-05 Charles Petras System and method for transmitting power system data over a wide area network
US20060259255A1 (en) 2005-04-05 2006-11-16 Anderson James C Method of visualizing power system quantities using a configurable software visualization tool
US7444248B2 (en) 2005-04-29 2008-10-28 General Electric Company System and method for synchronized phasor measurement
US7708232B2 (en) 2005-05-19 2010-05-04 Progressive Rail Technologies, Inc. Railroad car lateral instability and tracking error detector
JP4498220B2 (ja) 2005-06-06 2010-07-07 東芝システムテクノロジー株式会社 情報処理システム、方法およびプログラム並びに遠方監視制御装置
JP4755473B2 (ja) 2005-09-30 2011-08-24 東日本旅客鉄道株式会社 信号制御システム
US7480580B2 (en) 2005-10-18 2009-01-20 Schweitzer Engineering Laboratories, Inc. Apparatus and method for estimating synchronized phasors at predetermined times referenced to an absolute time standard in an electrical system
EP1780858A1 (en) * 2005-10-31 2007-05-02 ABB Technology AG Arrangement and method for protecting an electric power system
AU2006330903B2 (en) 2005-12-23 2012-07-12 Asf-Keystone, Inc Railroad train monitoring system
DE502006007460D1 (de) * 2006-08-16 2010-08-26 Siemens Ag Anordnung mit zumindest einer mit einem energieübertragungsnetz in verbindung stehenden messeinrichtung und verfahren zu deren betrieb
US7630863B2 (en) 2006-09-19 2009-12-08 Schweitzer Engineering Laboratories, Inc. Apparatus, method, and system for wide-area protection and control using power system data having a time component associated therewith
US8332567B2 (en) 2006-09-19 2012-12-11 Fisher-Rosemount Systems, Inc. Apparatus and methods to communicatively couple field devices to controllers in a process control system
US7558703B2 (en) * 2006-11-01 2009-07-07 Abb Research Ltd. Electrical substation monitoring and diagnostics
US7472026B2 (en) 2006-12-22 2008-12-30 General Electric Company Multi-ended fault location system
US20080177678A1 (en) 2007-01-24 2008-07-24 Paul Di Martini Method of communicating between a utility and its customer locations
US7620517B2 (en) 2007-02-05 2009-11-17 Abb Research Ltd. Real-time power-line sag monitoring using time-synchronized power system measurements
US20090089359A1 (en) 2007-09-27 2009-04-02 Rockwell Automation Technologies, Inc. Subscription and notification in industrial systems
WO2009068034A1 (en) * 2007-11-26 2009-06-04 Vestas Wind Systems A/S Method and system for registering events in wind turbines of a wind power system
US8775104B2 (en) * 2007-12-17 2014-07-08 Jose R. Marti Method and system for protecting an electrical power transmission network
US8672273B2 (en) 2008-01-09 2014-03-18 International Business Machines Corporation Rail car sensor network
US20090187344A1 (en) * 2008-01-19 2009-07-23 Brancaccio Daniel S System, Method, and Computer Program Product for Analyzing Power Grid Data
US8000913B2 (en) * 2008-01-21 2011-08-16 Current Communications Services, Llc System and method for providing power distribution system information
CN102084569B (zh) * 2008-05-09 2014-02-19 埃森哲环球服务有限公司 用于管理电网的方法和系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060259201A1 (en) * 1992-11-17 2006-11-16 Health Hero Network, Inc. Home power management system
WO2000048288A1 (en) * 1999-02-08 2000-08-17 Nu-Lec Industries Pty Ltd Electrical distribution system automation
RU2264019C2 (ru) * 1999-08-20 2005-11-10 ВРЭП С.п.А. Устройство, система и способ текущего контроля бытового электроприбора
US6624532B1 (en) * 2001-05-18 2003-09-23 Power Wan, Inc. System and method for utility network load control
RU2273874C2 (ru) * 2001-08-07 2006-04-10 Сименс Акциенгезелльшафт Способ эксплуатации технической установки и система управления процессом эксплуатации технической установки

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2735580C1 (ru) * 2017-05-08 2020-11-03 Вебасто Се Способ передачи по меньшей мере одной команды управления и устройство управления
RU182060U1 (ru) * 2018-02-16 2018-08-02 Акционерное общество "Аэроприбор-Восход" Модуль распределения электропитания
RU2699048C1 (ru) * 2018-09-27 2019-09-03 Руслан Анатольевич Травников Способ агрегированного управления пространственно распределенной электрической нагрузкой
WO2020067934A1 (ru) * 2018-09-27 2020-04-02 Акционерное Общество "Фэском" Способ агрегированного управления пространственно распределенной электрической нагрузкой
RU2720318C1 (ru) * 2019-11-29 2020-04-28 Публичное акционерное общество "Транснефть" (ПАО "Транснефть") Централизованное интеллектуальное электронное устройство системы автоматизированной электрической подстанции

Also Published As

Publication number Publication date
CA3028486C (en) 2020-10-27
CN103762723A (zh) 2014-04-30
SG10201606766QA (en) 2016-10-28
CN102084569B (zh) 2014-02-19
HK1154708A1 (zh) 2012-04-27
EP2286497B1 (en) 2016-05-04
BRPI0911954A2 (pt) 2016-07-19
US20090281673A1 (en) 2009-11-12
US9534928B2 (en) 2017-01-03
US20090281674A1 (en) 2009-11-12
MY152237A (en) 2014-09-15
CA2723892A1 (en) 2009-11-12
WO2009136975A3 (en) 2010-09-23
US10833532B2 (en) 2020-11-10
HK1197320A1 (zh) 2015-01-09
EP2286497A2 (en) 2011-02-23
US8509953B2 (en) 2013-08-13
CN102084569A (zh) 2011-06-01
NZ589088A (en) 2013-02-22
EP3098935A1 (en) 2016-11-30
WO2009136975A2 (en) 2009-11-12
JP2011523545A (ja) 2011-08-11
WO2009136975A9 (en) 2010-01-28
CA2934005A1 (en) 2009-11-12
AU2009244877B2 (en) 2012-07-19
CN103762723B (zh) 2017-04-12
ZA201200914B (en) 2020-02-26
SG190640A1 (en) 2013-06-28
CA2934005C (en) 2019-03-05
CA3028486A1 (en) 2009-11-12
RU2010150352A (ru) 2012-06-20
AU2009244877A1 (en) 2009-11-12
CA2723892C (en) 2016-10-04
JP5616330B2 (ja) 2014-10-29
US20170170685A1 (en) 2017-06-15

Similar Documents

Publication Publication Date Title
Northcote-Green et al. Control and automation of electrical power distribution systems
US20200220351A1 (en) Systems and Methods for Model-Driven Demand Response
Dileep A survey on smart grid technologies and applications
Bayindir et al. Smart grid technologies and applications
US9501555B2 (en) Real-time data management for a power grid
Etherden et al. Virtual power plant for grid services using IEC 61850
Momoh Smart grid: fundamentals of design and analysis
Esmaili et al. Redundant observability PMU placement in the presence of flow measurements considering contingencies
CN103366312B (zh) 一种智能变电站云系统
US20200379494A1 (en) Systems and methods for grid operating systems in electric power systems
Gungor et al. A survey on smart grid potential applications and communication requirements
US8712596B2 (en) Malicious attack detection and analysis
Fan et al. The evolution of distribution
US8924033B2 (en) Generalized grid security framework
US8321194B2 (en) Real time microgrid power analytics portal for mission critical power systems
US7409303B2 (en) Identifying energy drivers in an energy management system
Shahidehpour et al. Communication and control in electric power systems: applications of parallel and distributed processing
CN103226890B (zh) 远程集抄智能用电系统及其集抄方法
US8521337B1 (en) Systems and methods for operating electrical supply
Bhatt et al. An instrumentation engineer’s review on smart grid: Critical applications and parameters
CN103597707B (zh) 具有动态反向/正向云化的分布式智能架构
CN103872782B (zh) 一种电能质量数据综合服务系统
US6618709B1 (en) Computer assisted and/or implemented process and architecture for web-based monitoring of energy related usage, and client accessibility therefor
US8265798B2 (en) System and method of curtailing energy production within congestive grid operating environments
US20140351010A1 (en) System and method of democratizing power to create a meta-exchange