RU2117738C1 - Method for erection of prefabricated reinforced concrete floors - Google Patents

Method for erection of prefabricated reinforced concrete floors Download PDF

Info

Publication number
RU2117738C1
RU2117738C1 RU96114961A RU96114961A RU2117738C1 RU 2117738 C1 RU2117738 C1 RU 2117738C1 RU 96114961 A RU96114961 A RU 96114961A RU 96114961 A RU96114961 A RU 96114961A RU 2117738 C1 RU2117738 C1 RU 2117738C1
Authority
RU
Russia
Prior art keywords
erection
slabs
reinforced concrete
concrete floors
reinforcement
Prior art date
Application number
RU96114961A
Other languages
Russian (ru)
Other versions
RU96114961A (en
Inventor
С.В. Прохоров
А.Г. Мальцев
Original Assignee
Марийский государственный технический университет
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Марийский государственный технический университет filed Critical Марийский государственный технический университет
Priority to RU96114961A priority Critical patent/RU2117738C1/en
Application granted granted Critical
Publication of RU2117738C1 publication Critical patent/RU2117738C1/en
Publication of RU96114961A publication Critical patent/RU96114961A/en

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

FIELD: construction engineering. SUBSTANCE: this generally relates to erection of buildings and structures and particularly to erection of reinforced concrete floors which are rectangular in plan. According to method, erection of floors includes assembling of prefabricated ribbed slabs with subsequent tensioning of their high-tensile reinforcement. Reinforcement is inserted through bores provided in lateral ribs of slabs and is tensioned there. This procedure utilizes reserve of strength and rigidity of floor components in lateral direction. EFFECT: higher efficiency. 2 dwg

Description

Изобретение относится к строительству, преимущественно, многоэтажных зданий с перекрытиями, прямоугольными в плане. The invention relates to the construction, mainly of multi-storey buildings with ceilings, rectangular in plan.

Известен способ возведения сборных железобетонных перекрытий, включающий монтаж балочных плит, то есть плит, работающих в продольном направлении. A known method of construction of precast concrete floors, including the installation of beam slabs, that is, slabs operating in the longitudinal direction.

В этом перекрытии не используются резервы прочности и жесткости элементов в поперечном направлении. This overlap does not use the reserves of strength and stiffness of the elements in the transverse direction.

Задачей изобретения является использование резервов прочности и жесткости элементов перекрытия в поперечном направлении. The objective of the invention is the use of reserves of strength and stiffness of the elements of the ceiling in the transverse direction.

Поставленная задача достигается тем, что в способе возведения сборных железобетонных плит, включающем монтаж сборных плит, монтируют сборные ребристые плиты с каналами в поперечных ребрах с последующим натяжением высокопрочной арматуры, которую протягивают и напрягают в каналах поперечных ребер. The problem is achieved in that in the method of erecting precast concrete slabs, including mounting precast slabs, assembled precast ribbed slabs with channels in the transverse ribs, followed by tensioning of high-strength reinforcement, which is stretched and tensioned in the channels of the transverse ribs.

На фиг. 1 изображена схема укладки плит перекрытий; на фиг. 2 - разрез А-А на фиг. 1. In FIG. 1 shows a scheme for laying floor slabs; in FIG. 2 is a section AA in FIG. one.

на чертежах обозначены: 1 - ребристые плиты перекрытия, 2 - напрягаемая арматура, протягиваемая в каналах поперечных ребер, 3 - напрягаемая арматура, укладываемая при изготовлении ребристых плит. the drawings indicate: 1 - ribbed floor slabs, 2 - tensile reinforcement stretched in the channels of the transverse ribs, 3 - tensile reinforcement laid in the manufacture of ribbed slabs.

Возможность осуществления изобретения обеспечивается такой последовательностью операций:
- на предприятии строительной индустрии изготавливают сборные ребристые плиты, в которых предварительно сделаны сквозные каналы (с применением извлекаемых или неизвлекаемых каналообразователей) на всю длину поперечных ребер (020 - 030 мм);
- после укладки плит в проектное положение (их монтажа) в каналах протягивают высокопрочную арматуру - стержни или канаты из стали классов соответственно А-IV...А -VII и В-II;
- с помощью переносных домкратов производится натяжение указанной арматуры.
The possibility of carrying out the invention is provided by the following sequence of operations:
- at the enterprise of the construction industry, prefabricated ribbed plates are made in which through channels are preliminarily made (using removable or non-removable channel formers) for the entire length of the transverse ribs (020 - 030 mm);
- after laying the plates in the design position (their installation), high-strength reinforcement is pulled in the channels - rods or ropes made of steel of classes A-IV ... A-VII and B-II, respectively;
- using portable jacks, the tension of the specified reinforcement is made.

Предлагаемый способ обеспечивает работу диска перекрытия в двух направлениях, которая достигается созданием сил трения на продольных кромках балочных плит, вызываемых предварительным натяжением высокопрочной арматуры 2 и стягиванием плит в поперечном направлении, в результате чего перекрытие из независимо работающих элементов превращается в двухмерную конструкцию (ортотропную плиту), опертую по четырем сторонам, т.е. по внешнему контуру. При этом благодаря переходу от одноосного напряженно-деформированного состояния к двухосному состоянию величины наибольших изгибающих моментов в пролете уменьшаются в 1,5 - 3,4 раза (в зависимости от соотношения размеров перекрытия в плане). The proposed method provides the work of the overlapping disk in two directions, which is achieved by the creation of friction forces on the longitudinal edges of the beam plates caused by the preliminary tensioning of high-strength reinforcement 2 and pulling the plates in the transverse direction, as a result of which the overlap turns from independently working elements into a two-dimensional structure (orthotropic plate) supported on four sides, i.e. along the outer contour. At the same time, due to the transition from a uniaxial stress-strain state to a biaxial state, the values of the greatest bending moments in the span decrease by 1.5 - 3.4 times (depending on the aspect ratio of the overlap).

Claims (1)

Способ возведения сборных железобетонных перекрытий, включающий монтаж сборных плит, отличающийся тем, что монтируют сборные ребристые плиты с каналами в поперечных ребрах с последующим натяжением высокопрочной арматуры, которую протягивают и напрягают в каналах поперечных ребер. The method of construction of precast concrete floors, including the installation of precast slabs, characterized in that they mount precast ribbed slabs with channels in the transverse ribs, followed by tensioning of high-strength reinforcement, which is stretched and tensioned in the channels of the transverse ribs.
RU96114961A 1996-07-24 1996-07-24 Method for erection of prefabricated reinforced concrete floors RU2117738C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU96114961A RU2117738C1 (en) 1996-07-24 1996-07-24 Method for erection of prefabricated reinforced concrete floors

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU96114961A RU2117738C1 (en) 1996-07-24 1996-07-24 Method for erection of prefabricated reinforced concrete floors

Publications (2)

Publication Number Publication Date
RU2117738C1 true RU2117738C1 (en) 1998-08-20
RU96114961A RU96114961A (en) 1998-11-27

Family

ID=20183750

Family Applications (1)

Application Number Title Priority Date Filing Date
RU96114961A RU2117738C1 (en) 1996-07-24 1996-07-24 Method for erection of prefabricated reinforced concrete floors

Country Status (1)

Country Link
RU (1) RU2117738C1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2522712C1 (en) * 2013-05-30 2014-07-20 Российская Федерация, От Имени Которой Выступает Министерство Промышленности И Торговли Российской Федерации Method for construction of reinforced concrete deck intersection with large span
RU2686737C1 (en) * 2018-08-22 2019-04-30 Сергей Иванович Титков Bearing element of prefabricated reinforced concrete overlap, precast reinforced concrete overlap
WO2020190163A1 (en) * 2019-03-18 2020-09-24 Лев Маркович ЗАРЕЦКИЙ Method for producing multispan, reinforced-concrete floors

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Евдокимов В.И. и др. Монтаж конструкций гражданских, промышленных и сельскохозяйственных зданий. - Л.: Стройиздат, 1984, с.111 - 113. *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2522712C1 (en) * 2013-05-30 2014-07-20 Российская Федерация, От Имени Которой Выступает Министерство Промышленности И Торговли Российской Федерации Method for construction of reinforced concrete deck intersection with large span
RU2686737C1 (en) * 2018-08-22 2019-04-30 Сергей Иванович Титков Bearing element of prefabricated reinforced concrete overlap, precast reinforced concrete overlap
WO2020190163A1 (en) * 2019-03-18 2020-09-24 Лев Маркович ЗАРЕЦКИЙ Method for producing multispan, reinforced-concrete floors

Similar Documents

Publication Publication Date Title
US5305572A (en) Long span post-tensioned steel/concrete truss and method of making same
CN105908881A (en) Novel bidirectional inverted-T-shaped beam combined floor
CN101839033A (en) Closed-section profiled steel sheet-concrete combined floor and construction method thereof
WO2017219063A1 (en) Method for constructing a concrete floor in a multistorey building
CN108104345B (en) Large-span prestressed lightweight aggregate concrete superimposed sheet
RU2117738C1 (en) Method for erection of prefabricated reinforced concrete floors
US20040107660A1 (en) Composite floor system
EP0432177B1 (en) A system comprising a connector beam and a connector plate
JP3999591B2 (en) Seismic control structure of concrete structure with fiber reinforced cementitious material
PL128494B1 (en) Ceiling,in particular for dwelling houses and method of making the same
JP2997253B1 (en) Construction method of concrete structure
CN111663696A (en) Formwork-free self-bearing prefabricated rib beam concrete hollow laminated slab
JP3942973B2 (en) Seismic control structure of concrete structure with fiber reinforced cementitious material
RU2020210C1 (en) Framework of multistory building
GB2281572A (en) Truss for e.g. bridges
RU2049884C1 (en) Device for reconstruction of wooden floor
SU1726687A1 (en) Method of constructing prefabricated-monolithic floor
RU2137886C1 (en) Method for erection of multistory framework building
KR20040018808A (en) Deck panel of reinforced concrete slab
KR200186307Y1 (en) Deck panel of reinforced concrete slab
JP7270412B2 (en) Reinforcement structure of masonry building
RU2199636C2 (en) Covering of building
RU2194127C2 (en) Reinforced-concrete frame of building or structure
SU1261998A1 (en) Beam
RU2037612C1 (en) Floor for skeleton free building