CN101839033A CN 201010205775 CN201010205775A CN101839033A CN 101839033 A CN101839033 A CN 101839033A CN 201010205775 CN201010205775 CN 201010205775 CN 201010205775 A CN201010205775 A CN 201010205775A CN 101839033 A CN101839033 A CN 101839033A
Authority
CN
China
Prior art keywords
closed
section steel
steel deck
principal rod
iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010205775
Other languages
Chinese (zh)
Inventor
翟雷
荣军成
安凤杰
杨凯明
胡大川
贺国强
蒋利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN 201010205775 priority Critical patent/CN101839033A/en
Publication of CN101839033A publication Critical patent/CN101839033A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The invention relates to a closed-section profiled steel sheet-concrete combined floor and a construction method thereof. The combined floor comprises a closed-section profiled steel sheet and concrete cast on the closed-section profiled steel sheet which is laid on steel beams of a steel structure main body, the bottom of the closed-section profiled steel sheet is fixedly connected with the steel beams, a top support is erected under the closed-section profiled steel sheet between steel beams, a lower iron forced bar is arranged in each wave trough of the closed-section profiled steel sheet, and an upper iron forced bar is correspondingly arranged above each lower iron forced bar, connected with the lower iron forced bar by a tensile bar and erected on an upper iron distribution bar into a groined shape. In the invention, the closed-section profiled steel sheet is also utilized as a floor bottom die to save construction material. By using the construction method, the construction period can be shortened, the cost can be decreased, the structural bearing force requirement is met, and the construction quality is ensured so that the invention is particularly suitable for public construction structures with high fireproof requirement.

Description

Closed-section steel deck-concrete combined floor and job practices thereof
Technical field
The present invention relates to a kind of floor framing, superstructure and job practices thereof in particularly a kind of steel building.
Background technology
In the construction of construction work, because the design difference of engineering structures, except that the concrete building structures of widespread usage, the application of steel work is more and more, and especially steel work had obtained the development of advancing by leaps and bounds in China in recent years in the public building design.
Traditional concrete structure superstructure has been difficult to adapt to the demand of modern architecture construction because the circulation material input is many, the reinforcing bar materials are big, form of construction work is complicated.At present the profiled sheet that uses of building has advantages such as light unit weight, intensity height, construction be quick, is good constructional materials and member.Profiled sheet can combine with concrete and make composite floor, can save wooden form and can be used as load-carrying members.But problems such as that existing profiled sheet also exists in construction is not good with the concrete structure binding ability, amount of reinforcement big, structural strength and fireproof performance are bad, influence is used.
Summary of the invention
The invention provides a kind of closed-section steel deck-concrete combined floor and job practices thereof, solve the problem that stress performance is bad, construction material consumption is big of existing profiled sheet and concrete combined floor.
The technical solution adopted for the present invention to solve the technical problems is: this closed-section steel deck-concrete combined floor, comprise closed-section steel deck and the concrete that is cast on the closed-section steel deck, described closed-section steel deck is layed on the girder steel of steel work main body, fixedly connected with girder steel in the bottom of closed-section steel deck, closed-section steel deck below between the girder steel has been set up and has been shored, be provided with a following iron principal rod in each wave trough of closed-section steel deck, and correspondence is provided with iron principal rod on above every following iron principal rod, socket by lacing wire between following iron principal rod and the last iron principal rod, last iron principal rod is erected on the iron distribution bar, and the two sets up into groined type.
Described closed-section steel deck one side has overhanging button limit, stretches the button limit in opposite side has, and the del that is intervally distributed with the end opening closure between the button limit of both sides is pressed rib.
Described closed-section steel deck is fixing by peg and girder steel welding.
Described shore to set up by horizontal support bar, vertical rod form, and between vertical rod top and closed-section steel deck bottom, be placed with flitch.
The job practices of this closed-section steel deck-concrete combined floor, construction sequence is as follows: step 1, lay closed-section steel deck on the girder steel of steel work main body, set up below the closed-section steel deck between the girder steel and shore.
After step 2, closed-section steel deck are laid and finished, that closed-section steel deck is fixing with peg and girder steel welding.
Step 3, in each wave trough of closed-section steel deck, place a following iron principal rod, and below reinforcing bar, place the concrete cover cushion block.
Step 4, above following iron principal rod corresponding place one on the iron principal rod, will go up the iron principal rod and be erected on the iron distribution bar.
Step 5, after down iron principal rod and last iron principal rod are in place, the two is socketed fixing by lacing wire.
Step 6, to reinforcing bar, shore check and accept again errorless after, concreting on closed-section steel deck.
The maintenance of sprinkling water after step 7, the concrete final set, curing time must not be less than 7 days.
Step 8, treat that concrete reaches design limit compressive strength after, dismounting is shored.
Beneficial effect of the present invention is as follows: closed-section steel deck-concrete combined floor of the present invention, closed-section steel deck directly plays the double floor bottom mould effect of serving as except that as the structure construction material, saves template.In addition, closed-section steel deck fire endurance height, after floor was finished, the sprayed fire proofing coating again in closed-section steel deck bottom played the effect of protection environment, and fireproof performance was good.Simultaneously, the pressure rib of closed-section steel deck plays action of steel bars, therefore, places a following iron principal rod and can satisfy structural requirement in each wave trough of closed-section steel deck, has reduced amount of reinforcement, saves steel, thereby makes this composite floor weight reduction.Because closed-section steel deck is connected on the girder steel by nail solder, peg has played the effect of transmitting the concrete shearing, and span 〉=3m between the girder steel, so only need the closed-section steel deck bottom between girder steel to set up support system, easy construction one.
Closed-section steel deck-concrete combined floor has been broken the floor slab construction mode of traditional concrete structure, embodied and utilized the double construction advantages such as floor bottom mould of doing of closed-section steel deck, it is good to have saved construction material, the weight reduction of floor, floor stress performance.This job practices can shorten the construction period, reduce construction cost, satisfies the structural bearing force request simultaneously, guarantees workmanship, is particularly useful for the high public building structure of fire protection requirement.
Description of drawings
The present invention is further described below in conjunction with drawings and Examples.
Fig. 1 is a structural representation of the present invention.
Fig. 2 is the structural representation of A-A section among Fig. 1.
Fig. 3 is the structural representation of closed-section steel deck.
Reference numeral: 1-girder steel, 2-peg, 3-closed-section steel deck, 3.1-del are pressed and are stretched iron principal rod, the last iron principal rod of 5-, 6-concrete, the last iron distribution bar of 7-, 8-lacing wire, 9-flitch, 10-horizontal support bar, 11-vertical rod under button limit, the 4-in rib, the overhanging button of 3.2-limit, 3.3-wave trough, the 3.4-.
The specific embodiment
Embodiment is referring to Fig. 1, shown in Figure 2, this closed-section steel deck-concrete combined floor, comprise closed-section steel deck 3 and the concrete 6 that is cast on the closed-section steel deck, described closed-section steel deck 3 is layed on the girder steel 1 of steel work main body, fixedlyed connected with girder steel 1 by peg 2 in the bottom of closed-section steel deck 3, closed-section steel deck 3 belows between the girder steel have been set up and have been shored, be provided with a following iron principal rod 4 in each wave trough 3.3 of closed-section steel deck 3, and correspondence is provided with iron principal rod 5 on above every following iron principal rod 4, socket by lacing wire 8 between following iron principal rod 4 and the last iron principal rod 5, last iron principal rod 5 is erected on the iron distribution bar 7, and the two sets up into groined type.
Referring to shown in Figure 3, described closed-section steel deck 3 one sides have overhanging button limit 3.2, stretch button limit 3.4 in opposite side has, and the del that is intervally distributed with the end opening closure between the button limit of both sides is pressed rib 3.1.
The job practices of this closed-section steel deck-concrete combined floor, construction sequence is as follows: step 1, on the girder steel 1 of steel work main body, lay closed-section steel deck 3, setting up to shore below the closed-section steel deck between the girder steel 3 (shores the same with conventional template supporting way, to establish relatively independent horizontal support bar 10 during support, vertical rod 11 and add an amount of bridging, and placing flitch 9 between vertical rod top and the closed-section steel deck bottom on closed-section steel deck before people's operation, to check conscientiously whether support is firm, can hurt sb.'s feelings after infallible and make peg and carry out reinforcement construction).
After step 2, closed-section steel deck are laid and finished, that closed-section steel deck 3 usefulness pegs 2 are fixing with girder steel 1 welding.
Step 3, place a following iron principal rod 4 in each wave trough of closed-section steel deck, and place the concrete cover cushion block below reinforcing bar, cushion block is quincuncial arrangement, and every 20-30cm arranges one.
Step 4, above following iron principal rod 4 corresponding place one on iron principal rod 5, will go up iron principal rod 5 and be erected on the iron distribution bar 7.
Step 5, after following iron principal rod 4 and last iron principal rod 5 are in place, the two is socketed fixing by lacing wire 8.
Step 6, to reinforcing bar, shore check and accept again errorless after, concreting 6 on closed-section steel deck.
The maintenance of sprinkling water after step 7, concrete 6 final set, curing time must not be less than 7 days.
Step 8, treat that concrete reaches design limit compressive strength after, dismounting is shored.

Claims (4)

1. closed-section steel deck-concrete combined floor, comprise closed-section steel deck (3) and be cast in concrete (6) on the closed-section steel deck, it is characterized in that: described closed-section steel deck (3) is layed on the girder steel (1) of steel work main body, fixedly connected with girder steel (1) in the bottom of closed-section steel deck (3), closed-section steel deck between the girder steel (3) below has been set up and has been shored, be provided with a following iron principal rod (4) in each wave trough (3.3) of closed-section steel deck (3), and correspondence is provided with a upward iron principal rod (5) above every following iron principal rod (4), socket by lacing wire (8) between following iron principal rod (4) and the last iron principal rod (5), last iron principal rod (5) is erected on the iron distribution bar (7), and the two sets up into groined type;
Described closed-section steel deck (3) one sides have overhanging button limit (3.2), stretch button limit (3.4) in opposite side has, and the del that is intervally distributed with the end opening closure between the button limit of both sides is pressed rib (3.1).
2. closed-section steel deck-concrete combined floor according to claim 1 is characterized in that: described closed-section steel deck (3) is fixing with girder steel (1) welding by peg (2).
3. closed-section steel deck-concrete combined floor according to claim 1, it is characterized in that: described shoring by horizontal support bar (10), vertical rod (11) set up and formed, and is placed with flitch (9) between vertical rod (11) top and closed-section steel deck (3) bottom.
4. job practices as closed-section steel deck-concrete combined floor any as described in the claim 1~3 is characterized in that construction sequence is as follows:
Step 1, go up at the girder steel (1) of steel work main body and to lay closed-section steel deck (3), the closed-section steel deck between girder steel (3) below is set up and is shored;
After step 2, closed-section steel deck are laid and finished, that closed-section steel deck (3) is fixing with girder steel (1) welding with peg (2);
Step 3, in each wave trough of closed-section steel deck, place a following iron principal rod (4), and below reinforcing bar, place the concrete cover cushion block;
Step 4, correspondingly in following iron principal rod (4) top place one and go up iron principal rod (5), will go up iron principal rod (5) to be erected on the iron distribution bar (7);
Step 5, after down iron principal rod (4) and last iron principal rod (5) are in place, the two is socketed fixing by lacing wire (8);
Step 6, to reinforcing bar, shore check and accept again errorless after, concreting on closed-section steel deck (6);
The maintenance of sprinkling water after step 7, concrete (6) final set, curing time must not be less than 7 days;
Step 8, treat that concrete reaches design limit compressive strength after, dismounting is shored.
CN 201010205775 2010-06-22 2010-06-22 Closed-section profiled steel sheet-concrete combined floor and construction method thereof Pending CN101839033A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010205775 CN101839033A (en) 2010-06-22 2010-06-22 Closed-section profiled steel sheet-concrete combined floor and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010205775 CN101839033A (en) 2010-06-22 2010-06-22 Closed-section profiled steel sheet-concrete combined floor and construction method thereof

Publications (1)

Publication Number Publication Date
CN101839033A true CN101839033A (en) 2010-09-22

Family

ID=42742676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010205775 Pending CN101839033A (en) 2010-06-22 2010-06-22 Closed-section profiled steel sheet-concrete combined floor and construction method thereof

Country Status (1)

Country Link
CN (1) CN101839033A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102454294A (en) * 2010-10-18 2012-05-16 五冶集团上海有限公司 Construction method of reinforced concrete and steel structure storage bin combined frame structure
CN102852255A (en) * 2012-08-15 2013-01-02 杨众 Combined floor for same-level drainage toilet and construction method
CN102877582A (en) * 2012-10-16 2013-01-16 北京工业大学 Composite floor with steel bar trusses, profiled steel plate and regenerated concrete, and manufacturing method for composite floor
CN102995746A (en) * 2012-11-21 2013-03-27 广州建筑股份有限公司 Beam slab node of renewable hybrid combined floor slab made of U-shaped steel-encased renewable hybrid beam and construction method thereof
CN103233537A (en) * 2013-04-27 2013-08-07 杨众 Heavy-load superimposed overhead terrace and construction method
CN103741877A (en) * 2013-12-30 2014-04-23 北京工业大学 Lattice anti-shearing device-steel-profiled steel plate-renewable concrete combination beam and production method
CN104452980A (en) * 2014-11-28 2015-03-25 天津大学 Assembled adjustable toggle pin for connecting profiled steel sheet and I-shaped steel beam
CN104818849A (en) * 2015-05-17 2015-08-05 中铁二十局集团第六工程有限公司 Construction method for space curved rib girder steel structure
CN109469242A (en) * 2018-10-30 2019-03-15 浙江中南建设集团有限公司 A kind of profiled sheet-regeneration concrete composite floor and its construction method
CN110359705A (en) * 2019-06-28 2019-10-22 五冶集团上海有限公司 A kind of fast disassembly type support device and its application method
CN112095877A (en) * 2020-08-28 2020-12-18 中冶(上海)钢结构科技有限公司 Steel bar net type floor support plate and mounting method thereof
CN114961302A (en) * 2022-07-08 2022-08-30 中建三局集团有限公司 Large-span high-roof profiled steel sheet composite floor slab construction auxiliary device and method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29820985U1 (en) * 1998-10-07 1999-01-28 Frisch, Hans, 89343 Jettingen-Scheppach Shear reinforcement element for shear reinforcement of reinforced concrete slabs and reinforced concrete slabs
CN1553021A (en) * 2003-06-03 2004-12-08 张英保 Assembled floor cover
CN2714671Y (en) * 2004-08-12 2005-08-03 上海拜特钢结构设计有限公司 Closed pressing steel plate combined floor board
AU784892B2 (en) * 2000-09-11 2006-07-20 Onesteel Reinforcing Pty Limited A composite beam
CN200971577Y (en) * 2006-10-23 2007-11-07 百安力钢结构应用科技有限公司 Bearing plate
CN101509295A (en) * 2008-10-07 2009-08-19 百安力钢结构应用科技有限公司 Fibre concrete-profiled steel sheet combination floor
CN101575890A (en) * 2009-06-05 2009-11-11 中建三局第二建设工程有限责任公司 Girder and profiled steel sheet concrete combined floor construction method without support of hack lever
EP2116660A2 (en) * 2008-05-08 2009-11-11 ARCELORMITTAL Construction Deutschland GmbH Steel-concrete floor
CN101691787A (en) * 2009-09-22 2010-04-07 中铁十二局集团建筑安装工程有限公司 Converse construction process for middle-high steel structure building

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29820985U1 (en) * 1998-10-07 1999-01-28 Frisch, Hans, 89343 Jettingen-Scheppach Shear reinforcement element for shear reinforcement of reinforced concrete slabs and reinforced concrete slabs
AU784892B2 (en) * 2000-09-11 2006-07-20 Onesteel Reinforcing Pty Limited A composite beam
CN1553021A (en) * 2003-06-03 2004-12-08 张英保 Assembled floor cover
CN2714671Y (en) * 2004-08-12 2005-08-03 上海拜特钢结构设计有限公司 Closed pressing steel plate combined floor board
CN200971577Y (en) * 2006-10-23 2007-11-07 百安力钢结构应用科技有限公司 Bearing plate
EP2116660A2 (en) * 2008-05-08 2009-11-11 ARCELORMITTAL Construction Deutschland GmbH Steel-concrete floor
CN101509295A (en) * 2008-10-07 2009-08-19 百安力钢结构应用科技有限公司 Fibre concrete-profiled steel sheet combination floor
CN101575890A (en) * 2009-06-05 2009-11-11 中建三局第二建设工程有限责任公司 Girder and profiled steel sheet concrete combined floor construction method without support of hack lever
CN101691787A (en) * 2009-09-22 2010-04-07 中铁十二局集团建筑安装工程有限公司 Converse construction process for middle-high steel structure building

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102454294A (en) * 2010-10-18 2012-05-16 五冶集团上海有限公司 Construction method of reinforced concrete and steel structure storage bin combined frame structure
CN102454294B (en) * 2010-10-18 2015-08-12 五冶集团上海有限公司 Steel concrete and steel structure storage bin combined frame structure construction method
CN102852255A (en) * 2012-08-15 2013-01-02 杨众 Combined floor for same-level drainage toilet and construction method
CN102852255B (en) * 2012-08-15 2016-03-09 杨众 A kind of co-layer draining washroom composite floor and construction method
CN102877582B (en) * 2012-10-16 2015-04-29 北京工业大学 Composite floor with steel bar trusses, profiled steel plate and regenerated concrete, and manufacturing method for composite floor
CN102877582A (en) * 2012-10-16 2013-01-16 北京工业大学 Composite floor with steel bar trusses, profiled steel plate and regenerated concrete, and manufacturing method for composite floor
CN102995746A (en) * 2012-11-21 2013-03-27 广州建筑股份有限公司 Beam slab node of renewable hybrid combined floor slab made of U-shaped steel-encased renewable hybrid beam and construction method thereof
CN102995746B (en) * 2012-11-21 2014-12-03 广州建筑股份有限公司 Beam slab node of renewable hybrid combined floor slab made of U-shaped steel-encased renewable hybrid beam and construction method thereof
CN103233537A (en) * 2013-04-27 2013-08-07 杨众 Heavy-load superimposed overhead terrace and construction method
CN103741877A (en) * 2013-12-30 2014-04-23 北京工业大学 Lattice anti-shearing device-steel-profiled steel plate-renewable concrete combination beam and production method
CN103741877B (en) * 2013-12-30 2016-07-06 北京工业大学 Ladder lattice shear resistance system-steel-profiled sheet-regeneration concrete combination beam and the practice
CN104452980A (en) * 2014-11-28 2015-03-25 天津大学 Assembled adjustable toggle pin for connecting profiled steel sheet and I-shaped steel beam
CN104818849A (en) * 2015-05-17 2015-08-05 中铁二十局集团第六工程有限公司 Construction method for space curved rib girder steel structure
CN104818849B (en) * 2015-05-17 2017-02-01 中铁二十局集团第六工程有限公司 Construction method for space curved rib girder steel structure
CN109469242A (en) * 2018-10-30 2019-03-15 浙江中南建设集团有限公司 A kind of profiled sheet-regeneration concrete composite floor and its construction method
CN110359705A (en) * 2019-06-28 2019-10-22 五冶集团上海有限公司 A kind of fast disassembly type support device and its application method
CN112095877A (en) * 2020-08-28 2020-12-18 中冶(上海)钢结构科技有限公司 Steel bar net type floor support plate and mounting method thereof
CN114961302A (en) * 2022-07-08 2022-08-30 中建三局集团有限公司 Large-span high-roof profiled steel sheet composite floor slab construction auxiliary device and method

Similar Documents

Publication Publication Date Title
CN101839033A (en) Closed-section profiled steel sheet-concrete combined floor and construction method thereof
CN104594523A (en) Prestress splicing method for fabricated shear wall
CN201695550U (en) Closed profiled steel sheet-concrete combined floor
CN101260696A (en) Assembled reinforcing steel bar concrete hollow floor slab
CN100458051C (en) Combined reinforced concrete hollow floorslab
CN108894423A (en) Assembled integral composite slab with profiled steel sheeting and installation and application
CN100370104C (en) Combined reinforced concrete hollow floor slab
CN100449072C (en) Combined reinforced concrete hollow floorslab
CN101200945B (en) Combined reinforced bar concrete hollow core floor slab
CN100363569C (en) Combined reinforced concrete hollow floorslab
CN100373022C (en) Combined reinforced concrete hollow floorslab
RU112693U1 (en) REINFORCED CONCRETE BUILDING FRAME
CN100408774C (en) Combined reinforced concrete hollow floorslab
CN100449074C (en) Combined reniforced concrete hollow floorslab
CN100501054C (en) Combined reinforced concrete hollow floorslab
CN101382001A (en) Combined reinforced concrete cassette ceiling
CN102296733A (en) Combined reinforced concrete hollow floor slab
CN101333835B (en) Composite reinforcing steel bar concrete hollow floor slab
CN100424291C (en) Combined reinforced concrete hollow floorslab
CN101200943B (en) Combined reinforced bar concrete hollow core floor slab
CN100408773C (en) Combined reinforced concrete hollow floor slab
CN101255728B (en) Combined reinforced concrete hollow floor
CN100449071C (en) Combined reinforced concrete hollow floorslab
CN101200944B (en) Combined reinforced bar concrete hollow core floor slab
CN101200942B (en) Combined reinforced bar concrete hollow core floor slab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100922