US20040107660A1 - Composite floor system - Google Patents

Composite floor system Download PDF

Info

Publication number
US20040107660A1
US20040107660A1 US10/667,033 US66703303A US2004107660A1 US 20040107660 A1 US20040107660 A1 US 20040107660A1 US 66703303 A US66703303 A US 66703303A US 2004107660 A1 US2004107660 A1 US 2004107660A1
Authority
US
United States
Prior art keywords
framing
primary
framing members
members
shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/667,033
Inventor
Serge Moreau
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Groupe Canam Inc
Original Assignee
Canam Manac Group Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Canam Manac Group Inc filed Critical Canam Manac Group Inc
Assigned to LE GROUPE CANAM MANAC INC. reassignment LE GROUPE CANAM MANAC INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: MOREAU, SERGE
Publication of US20040107660A1 publication Critical patent/US20040107660A1/en
Assigned to GROUPE CANAM INC. reassignment GROUPE CANAM INC. CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: LE GROUPE CANAM MANAC INC.
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
    • E04C3/294Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete of concrete combined with a girder-like structure extending laterally outside the element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/10Load-carrying floor structures formed substantially of prefabricated units with metal beams or girders, e.g. with steel lattice girders
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/14Load-carrying floor structures formed substantially of prefabricated units with beams or girders laid in two directions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/08Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with apertured web, e.g. with a web consisting of bar-like components; Honeycomb girders
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C2003/0486Truss like structures composed of separate truss elements
    • E04C2003/0491Truss like structures composed of separate truss elements the truss elements being located in one single surface or in several parallel surfaces

Definitions

  • the present invention relates generally to composite steel and concrete floor systems of the type including reinforced concrete slabs supported by secondary framing members such as steel joists, which in turn are spanned across primary framing members, such as hot rolled steel, beams, girders, or trusses. More particularly, it concerns a composite concrete floor system comprising secondary framing members provided with shear shoes at their ends. These shear shoes are adapted to provide to the whole system an increased resistance to horizontal shear forces.
  • the secondary framing members also referred to as steel joists
  • the steel deck is installed, and then the studs are welded through the metal decking on the steel top chord.
  • the installation of the shear studs on the site of construction creates quality problems due to the very nature of the welding process. Also, since the installation of these studs is weather dependant, another drawback encountered with such “on site” installation comes from the fact that it is often very difficult to schedule the skilled labour required and to manage such schedule so as to follow the fast pace of structural steel erection program.
  • a framing system for a composite concrete floor of the type comprising horizontally extending primary framing members supporting secondary framing members spanning across the primary framing members, the primary and secondary framing members being made of a metallic structural material.
  • Each of the secondary members has two opposite ends provided with a shear shoe that is fixed to the primary members by means of a structural joint sufficient to provide a shear connection between the concrete floor and the primary framing members.
  • the metallic structural material is preferably steel or any other metallic structural material known in the art.
  • the present invention is thus not limited to steel framing members. Therefore, whenever reference is made throughout the present description to steel beams, steel joists, one should understand beams, joists or framing members made of a metallic structural material.
  • the shear shoes of the secondary members preferably consist of an iron angle having one horizontally extending face fixed by means of the structural joint to a horizontal face of a respective one of the primary framing members, and one vertically extending face fixed to said secondary framing member.
  • the structural joint is selected from the group consisting of a weld joint and a bolt joint.
  • the present invention forms a mechanical shear connection for primary framing members which does not create a tripping hazard during erection and prior to the composite stage, when the concrete floor slab has been formed and is cured, which shear connection effectively transfers horizontal shear forces to the primary frame members.
  • the present invention provides, among other things, all the advantages of composite steel/concrete floor slab construction, with the added advantage of an efficient horizontal shear connection to primary steel floor members, allowing a continuous poured slab for an entire floor of a building to be formed with no tripping hazards for iron workers, due to shear connectors.
  • Such a structure is also designed by structural engineers to meet all other loads encountered in usual building construction.
  • the present invention provides a method of assembling the framing members to concrete.
  • the method comprises the steps of:
  • the step of fixing consists of welding the shoes to the primary framing members.
  • the secondary framing members have a continuous shear connector.
  • the shear connector is a continuous top chord adapted to be embedded in the concrete floor.
  • the present invention further provides a new end shoe concept or a novel end shoe for connecting the joist to the beam.
  • the invention also provides a novel joist with an end shoe which serves as the shear connector for the beam to which it is attached.
  • FIG. 1 is an overhead perspective view of a composite floor in accordance with the present invention, with the concrete slab partially removed to show the steel frame members;
  • FIG. 2 is a cross-sectional view through a floor system in accordance with a first preferred embodiment of the invention, the cross-sectional view being perpendicular to a primary framing member;
  • FIG. 3 is a cross-sectional view at right angle to the section of FIG. 2 along line 3 - 3 and showing the shear force applied on a shear shoe;
  • FIG. 4 is a cross-sectional view of the mounting of secondary frame members in the form of open web steel joists on a primary steel beam member of the floor system of FIG. 2;
  • FIG. 5 is a cross-sectional view of a primary frame truss supporting open web steel joists
  • FIG. 6 is an enlarged perspective view of the frame members of FIG. 5;
  • FIG. 7 is an end elevation view of a frame truss or joist girder for use in the floor system of the invention
  • FIG. 8 is an end elevation view of the joist truss supporting two joists of the present invention.
  • FIG. 9 is a plan view of the joist truss supporting a plurality of open web joists of the invention.
  • FIGS. 10 and 11 are side elevation views of joist truss girders before and after the concrete has been poured;
  • FIG. 12 is a plan view of a primary framing member supporting staggered secondary framing members, with end shoes welded to the primary framing member;
  • FIG. 13 is a cross-sectional view through a floor system in accordance with a second preferred embodiment of the invention, the cross section being perpendicular to a primary framing member;
  • FIG. 14 is a cross-sectional view at right angle to the section of FIG. 13 along line 14 - 14 , and showing the shear force applied on a shear shoe;
  • FIG. 15 is a cross-sectional view of the mounting of secondary framing members in the form of open web steel joists on a primary steel beam member of the floor system shown in FIG. 13.
  • FIG. 1 there is shown, in perspective, an overhead view of a composite floor system of the invention.
  • a primary framing member 11 which is shown here as a steel truss or girder, supports a plurality of secondary framing members 12 formed as open web steel joists which span perpendicularly between adjacent primary framing members (not shown).
  • Each joist 12 is provided with an end shoe 13 on each end of the joist for attachment to the primary framing member 11 .
  • FIG. 6 shows this in greater detail, as explained below.
  • the primary framing member 12 used is a HambroTM joist provided with an S-shaped top chord which forms a shear connector between the primary framing member 12 and the concrete slab 14 .
  • a concrete slab 14 with reinforcing mesh 15 is poured onto form-work (not shown for simplicity) and embeds the top chord 16 of the joists 12 and the top chord 17 of the primary framing members 11 .
  • the end shoes 13 of the joists 12 are fixed to the primary framing member 11 by means of a structural joint 15 sufficient to provide a shear connection between the concrete floor 14 and the primary framing members 12 .
  • the shear shoe thus acts as a shear connector able to transfer the horizontal loading from the slab to the primary framing member by the end shoe structurally fixed to the primary framing member 11 .
  • the structural joint 15 is preferably a weld joint between the shear shoe 13 and the primary framing member 11 , the weld having a length sufficiently long so as to provide such structural joint.
  • an end shoe Hambro D500TM with a concrete slab of 23 ⁇ 4 inches reinforced by a wire mesh 6 ⁇ 6 ⁇ fraction (6/6) ⁇ fixed to the primary framing members by a weld of at least 2 inches provided on each side of the shoe can provide a capacity of 30.2 Kips per shoe.
  • the total capacity provided will be the number of shoes installed on the primary framing member by 30.2 Kips per shoe.
  • FIG. 2 shows a primary framing member in the form of a steel beam 11 ′ supporting a joist 12 fitted with an end shoe 13 welded to the beam 11 ′. This weld is shown in greater detail in FIG. 6 below.
  • the end shoe 13 is also referred to hereinafter as a “shear shoe”.
  • FIG. 3 the same beam 11 ′ as shown in FIG. 2 is shown in elevation, with the arrow 20 indicating the direction of the horizontal shear force.
  • the combination of the joist 12 , the end shoe 13 and the welding of the end shoe 12 to the primary member 11 creates a shear connector to resist the horizontal shear forces between the slab 14 and the primary framing member 11 or 11 ′.
  • the advantages of this new shear connector are many.
  • the shear shoe 13 performs a double function of supporting the gravity load on the joist and also provides a mechanical shear connector able to transfer the bond between the slab 14 and the primary framing member 11 .
  • This type of shear connection also avoids the tripping hazard on the site, according to labour union rules, and increases erection speed of the steel building frame.
  • the present invention features the use of special ends or shear shoes 13 which act as shear connectors to the flange of a steel beam or the top chord of a truss.
  • the shoe 13 is also a gravity shoe for the secondary steel framing member 12 and shear connector tested and designed according to the capacity required for the composite trusses.
  • the welding between the top chord of the truss or beam forming the primary framing member 11 and the shoe 13 is designed according to the capacity required.
  • the open web joist of the secondary framing members 12 can be used in a deck-slab system such as Hambro MD2000TM system or with a removable plywood system such as Hambro D500TM.
  • single shoe connectors 13 can be used, or groups of connectors.
  • the total capacity in bond will be the total capacity of all shoe connectors and other connectors.
  • FIG. 4 illustrates a pair of open web joist secondary members 12 , which may be aligned or staggered, mounted on a primary framing member 11 .
  • Each joist 12 is provided with a dual purpose shear shoe 13 which is welded to the joist 12 in manufacture, and delivered to the job-site, ready for installation. Each shoe 13 is then welded or bolted to the top flange of the regular beam primary framing member 11 .
  • FIG. 5 illustrates a pair of joists 12 with shear shoes 13 mounted on a primary truss framing member 11 . As before the shoes are welded to the top flanges of the truss 11 . In both of these cases, horizontal shear between the primary framing member and the slab is transferred from the slab to the primary framing member by the shear shoes 13 .
  • FIG. 6 is a perspective view from above of the connection of the secondary open web joists 12 and the primary truss framing member 11 .
  • Welds 21 are provided on both sides of shear shoes 13 to fix the shoes 13 to the top flanges of the truss 11 .
  • FIG. 7 is a vertical section of a primary steel truss framing member 11 consisting of a bottom chord formed of angles 30 welded back-to-back between web members 32 which in turn are welded to a gusset plate 32 which in turn is welded to a back-to-back top chord angle 33 .
  • the vertical legs of the angles 33 are slotted at intervals, the slots being staggered, and rod segments 34 are welded to the vertical legs of the angles 33 .
  • FIG. 8 shows the connection of primary and secondary framing members using the truss of FIG. 7, integrating the whole frame structure to resist horizontal shear forces, and support the gravity load of the floor system.
  • FIG. 9 is a plan view of a portion of a floor frame system 10 including a primary truss 11 , and secondary joists 12 with end shoes 13 , in which the joists are aligned rather than staggered.
  • FIGS. 10 and 11 show alternate truss configurations depending on building requirements, FIG. 10 being the standard configuration and FIG. 11 being a configuration for maximum size openings in the truss for accommodating large ducts.
  • FIG. 12 is a plan view of a primary steel beam framing member 11 supporting staggered secondary open web joist members 12 with shear shoes 13 welded to the member 11 . Such staggering of the secondary members is required when shear connectors are required at intervals less than the normal joist spacing.
  • the floor system comprises a primary framing member in the form of a steel beam 11 ′ supporting a joist 12 fitted with an end shoe 13 welded to the beam 11 ′, the whole structure supporting a concrete floor 14 .
  • the difference between the first preferred embodiment shown in FIGS. 2 to 12 and the second embodiment resides mainly in the fact that, in the first embodiment, the shear shoes 13 are embedded in the concrete, whereas the shear shoes 13 in the second embodiment are not, the concrete being poured on top of the secondary framing members 12 .
  • FIG. 14 the same beam as shown in FIG. 13 is shown in elevation, with the arrow 20 indicating the direction of the horizontal shear force.
  • the combination of the primary framing member 12 , the end shoe 13 and the welding of the end shoe 13 to the primary framing member 11 creates a shear connector to resist the horizontal shear forces between the slab 14 and the primary framing member 11 or 11 ′.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention concerns a framing system for a composite concrete floor, the framing system comprising horizontally extending primary framing members supporting secondary framing members across the primary framing members. Each of the secondary framing members has two opposite ends provided with a shear shoe fixed to the primary framing members by means of a structural joint sufficient to provide a shear connection between the concrete floor and the primary framing members. Thanks to these shear shoes, the framing system of the invention has an increased resistance to horizontal shear forces as compared to prior art concrete floor systems.

Description

    FIELD OF THE INVENTION
  • The present invention relates generally to composite steel and concrete floor systems of the type including reinforced concrete slabs supported by secondary framing members such as steel joists, which in turn are spanned across primary framing members, such as hot rolled steel, beams, girders, or trusses. More particularly, it concerns a composite concrete floor system comprising secondary framing members provided with shear shoes at their ends. These shear shoes are adapted to provide to the whole system an increased resistance to horizontal shear forces. [0001]
  • BACKGROUND OF THE INVENTION
  • In composite floor structures, it is known to couple the concrete and steel components to provide composite action, thereby reducing the amount of material in the floor system for a given required strength. By using the concrete slab as the top chord of a composite beam, a significant reduction in the amount of steel in the floor system is achieved. Such floor systems are known in the art. One well known system of secondary members is sold as the Hambro™ structural system. This system is disclosed in U.S. Pat. No. 5,544,464. [0002]
  • In residential buildings, it is common to arrange the structure to span open web joists between load bearing walls, and no primary framing members are required to support the joists. In larger structures, the joists are generally supported by primary framing members in the form of steel beams or trusses. This is particularly the case for steel framed buildings which are erected as steel columns connected by and supporting primary steel framing members. Secondary steel framing members, for example in the form of open web steel joists, are spanned across the primary members, and loads are transferred by the primary members to the columns, and to the foundations of the building. [0003]
  • These structures must resist to many forces, both horizontal and vertical and, as such, their design is complex and require the application of much scientific skill and knowledge. One of the forces encountered in these structures is known as horizontal shear. This is a horizontal force which occurs along the longitudinal top of primary and secondary frame members. The Hambro™ joist described in U.S. Pat. No. 5,544,464 is provided with a unique S-shaped top chord which, when embedded in the concrete slab, forms a shear connector to prevent slippage from occurring between the concrete slab and the joist, due to horizontal shear along the joist. [0004]
  • Various forms of shear connectors have been developed for the primary steel framing members, the most common being the headed shear stud, or Nelson™ stud, an elongated vertical device, which has an enlarged head, much like an oversized nail. This stud is welded to the steel beam after the beam has been connected to the structure during erection. This stud provides the necessary shear capacity between the embedded stud and the concrete slab, thereby providing a composite steel beam or girder. The stud is intended to be imbedded in the concrete, thereby transferring horizontal shear forces from the slab to the beam. [0005]
  • The most cost effective way to provide shear studs is to install them in the shop. However, one drawback with such shear connector is that these studs constitute a tripping hazard for steel workers who have to walk on these beams during erection of the frame. The seriousness of the problem is highlighted by the fact that for more than 25 years, the International Ironworker Agreement has rejected the use of such studs on steel beams. These rules were adopted by safety committees as they were formed in Canada and the USA, such as OSHA. In order to overcome that problem, the studs are generally welded to the primary steel members on the site of construction. In such a case, the secondary framing members (also referred to as steel joists) are first installed on the primary steel member, then the steel deck is installed, and then the studs are welded through the metal decking on the steel top chord. The installation of the shear studs on the site of construction creates quality problems due to the very nature of the welding process. Also, since the installation of these studs is weather dependant, another drawback encountered with such “on site” installation comes from the fact that it is often very difficult to schedule the skilled labour required and to manage such schedule so as to follow the fast pace of structural steel erection program. [0006]
  • Other examples of concrete floor systems are given in U.S. Pat. Nos. 4,729,201; 6,061,992; U.S. 2003/0024205; U.S. 2003/0084629; U.S. Pat. Nos. 4,454,695; 4,700,519 and 4,592,184. [0007]
  • Thus there is a need for a new form of shear connector for the primary framing members which leaves the top flange essentially flat for walking purposes, and avoids the installation and scheduling problems. [0008]
  • SUMMARY OF THE INVENTION
  • In accordance with the present invention, that object is achieved with a framing system for a composite concrete floor of the type comprising horizontally extending primary framing members supporting secondary framing members spanning across the primary framing members, the primary and secondary framing members being made of a metallic structural material. Each of the secondary members has two opposite ends provided with a shear shoe that is fixed to the primary members by means of a structural joint sufficient to provide a shear connection between the concrete floor and the primary framing members. [0009]
  • The metallic structural material is preferably steel or any other metallic structural material known in the art. The present invention is thus not limited to steel framing members. Therefore, whenever reference is made throughout the present description to steel beams, steel joists, one should understand beams, joists or framing members made of a metallic structural material. [0010]
  • The shear shoes of the secondary members preferably consist of an iron angle having one horizontally extending face fixed by means of the structural joint to a horizontal face of a respective one of the primary framing members, and one vertically extending face fixed to said secondary framing member. [0011]
  • Also preferably, the structural joint is selected from the group consisting of a weld joint and a bolt joint. [0012]
  • As can be appreciated, the present invention forms a mechanical shear connection for primary framing members which does not create a tripping hazard during erection and prior to the composite stage, when the concrete floor slab has been formed and is cured, which shear connection effectively transfers horizontal shear forces to the primary frame members. [0013]
  • Thus, the present invention provides, among other things, all the advantages of composite steel/concrete floor slab construction, with the added advantage of an efficient horizontal shear connection to primary steel floor members, allowing a continuous poured slab for an entire floor of a building to be formed with no tripping hazards for iron workers, due to shear connectors. Such a structure is also designed by structural engineers to meet all other loads encountered in usual building construction. [0014]
  • In a further aspect, the present invention provides a method of assembling the framing members to concrete. The method comprises the steps of: [0015]
  • providing primary and secondary framing members made of a metallic structural material, each of the secondary framing members having two opposite ends provided with a shoe; [0016]
  • placing the primary framing members in parallel relation; [0017]
  • placing the secondary framing members across the primary members with the shoes bearing on the primary framing members; and [0018]
  • fixing the shoes to the primary framing members with a structural joint sufficient to provide a shear connection for said primary members. [0019]
  • Preferably, the step of fixing consists of welding the shoes to the primary framing members. Also preferably, the secondary framing members have a continuous shear connector. [0020]
  • More preferably, the shear connector is a continuous top chord adapted to be embedded in the concrete floor. [0021]
  • The present invention further provides a new end shoe concept or a novel end shoe for connecting the joist to the beam. The invention also provides a novel joist with an end shoe which serves as the shear connector for the beam to which it is attached.[0022]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • These and other objects and advantages of the invention will become apparent upon reading the detailed description and upon referring to the drawings in which: [0023]
  • FIG. 1 is an overhead perspective view of a composite floor in accordance with the present invention, with the concrete slab partially removed to show the steel frame members; [0024]
  • FIG. 2 is a cross-sectional view through a floor system in accordance with a first preferred embodiment of the invention, the cross-sectional view being perpendicular to a primary framing member; [0025]
  • FIG. 3 is a cross-sectional view at right angle to the section of FIG. 2 along line [0026] 3-3 and showing the shear force applied on a shear shoe;
  • FIG. 4 is a cross-sectional view of the mounting of secondary frame members in the form of open web steel joists on a primary steel beam member of the floor system of FIG. 2; [0027]
  • FIG. 5 is a cross-sectional view of a primary frame truss supporting open web steel joists; [0028]
  • FIG. 6 is an enlarged perspective view of the frame members of FIG. 5; [0029]
  • FIG. 7 is an end elevation view of a frame truss or joist girder for use in the floor system of the invention; [0030]
  • FIG. 8 is an end elevation view of the joist truss supporting two joists of the present invention; [0031]
  • FIG. 9 is a plan view of the joist truss supporting a plurality of open web joists of the invention; [0032]
  • FIGS. 10 and 11 are side elevation views of joist truss girders before and after the concrete has been poured; [0033]
  • FIG. 12 is a plan view of a primary framing member supporting staggered secondary framing members, with end shoes welded to the primary framing member; [0034]
  • FIG. 13 is a cross-sectional view through a floor system in accordance with a second preferred embodiment of the invention, the cross section being perpendicular to a primary framing member; [0035]
  • FIG. 14 is a cross-sectional view at right angle to the section of FIG. 13 along line [0036] 14-14, and showing the shear force applied on a shear shoe; and
  • FIG. 15 is a cross-sectional view of the mounting of secondary framing members in the form of open web steel joists on a primary steel beam member of the floor system shown in FIG. 13.[0037]
  • DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS OF THE INVENTION
  • In the following description, similar features in the drawings have been given similar reference numerals and in order to lighten the figures, some elements are not referred to in some figures if they were already identified in a precedent figure. [0038]
  • Referring to FIG. 1, there is shown, in perspective, an overhead view of a composite floor system of the invention. A [0039] primary framing member 11, which is shown here as a steel truss or girder, supports a plurality of secondary framing members 12 formed as open web steel joists which span perpendicularly between adjacent primary framing members (not shown). Each joist 12 is provided with an end shoe 13 on each end of the joist for attachment to the primary framing member 11. FIG. 6 shows this in greater detail, as explained below. Preferably, the primary framing member 12 used is a Hambro™ joist provided with an S-shaped top chord which forms a shear connector between the primary framing member 12 and the concrete slab 14. A concrete slab 14 with reinforcing mesh 15 is poured onto form-work (not shown for simplicity) and embeds the top chord 16 of the joists 12 and the top chord 17 of the primary framing members 11. The end shoes 13 of the joists 12 are fixed to the primary framing member 11 by means of a structural joint 15 sufficient to provide a shear connection between the concrete floor 14 and the primary framing members 12.
  • The shear shoe thus acts as a shear connector able to transfer the horizontal loading from the slab to the primary framing member by the end shoe structurally fixed to the primary framing [0040] member 11. The structural joint 15 is preferably a weld joint between the shear shoe 13 and the primary framing member 11, the weld having a length sufficiently long so as to provide such structural joint. Although not simple, the determination of shear capacity between two components is of common knowledge for a person in the art. Hence, such person, having knowledge of the forces applied on the floor, the length and height of the primary and secondary framing members used for the floor system, knows how to calculate the shear necessary to develop the composite action between secondary and primary framing members and the right spacing between the connectors. As for example, in one preferred embodiment, an end shoe Hambro D500™ with a concrete slab of 2¾ inches reinforced by a wire mesh 6×6 {fraction (6/6)} fixed to the primary framing members by a weld of at least 2 inches provided on each side of the shoe can provide a capacity of 30.2 Kips per shoe. The total capacity provided will be the number of shoes installed on the primary framing member by 30.2 Kips per shoe.
  • FIG. 2 shows a primary framing member in the form of a [0041] steel beam 11′ supporting a joist 12 fitted with an end shoe 13 welded to the beam 11′. This weld is shown in greater detail in FIG. 6 below. The end shoe 13 is also referred to hereinafter as a “shear shoe”.
  • In FIG. 3, the [0042] same beam 11′ as shown in FIG. 2 is shown in elevation, with the arrow 20 indicating the direction of the horizontal shear force. The combination of the joist 12, the end shoe 13 and the welding of the end shoe 12 to the primary member 11 creates a shear connector to resist the horizontal shear forces between the slab 14 and the primary framing member 11 or 11′.
  • The advantages of this new shear connector are many. First, there is the utilization of the [0043] joist end shoe 13 designed and analyzed to provide a bond included in each secondary framing member 11. The shear shoe 13 performs a double function of supporting the gravity load on the joist and also provides a mechanical shear connector able to transfer the bond between the slab 14 and the primary framing member 11. This type of shear connection also avoids the tripping hazard on the site, according to labour union rules, and increases erection speed of the steel building frame.
  • The present invention features the use of special ends or [0044] shear shoes 13 which act as shear connectors to the flange of a steel beam or the top chord of a truss. The shoe 13 is also a gravity shoe for the secondary steel framing member 12 and shear connector tested and designed according to the capacity required for the composite trusses. The welding between the top chord of the truss or beam forming the primary framing member 11 and the shoe 13 is designed according to the capacity required. The open web joist of the secondary framing members 12 can be used in a deck-slab system such as Hambro MD2000™ system or with a removable plywood system such as Hambro D500™.
  • Depending on the loading and span of the primary framing [0045] member 11, single shoe connectors 13 can be used, or groups of connectors. The total capacity in bond will be the total capacity of all shoe connectors and other connectors.
  • FIG. 4 illustrates a pair of open web joist [0046] secondary members 12, which may be aligned or staggered, mounted on a primary framing member 11. Each joist 12 is provided with a dual purpose shear shoe 13 which is welded to the joist 12 in manufacture, and delivered to the job-site, ready for installation. Each shoe 13 is then welded or bolted to the top flange of the regular beam primary framing member 11. Similarly, FIG. 5 illustrates a pair of joists 12 with shear shoes 13 mounted on a primary truss framing member 11. As before the shoes are welded to the top flanges of the truss 11. In both of these cases, horizontal shear between the primary framing member and the slab is transferred from the slab to the primary framing member by the shear shoes 13.
  • FIG. 6 is a perspective view from above of the connection of the secondary [0047] open web joists 12 and the primary truss framing member 11. Welds 21 are provided on both sides of shear shoes 13 to fix the shoes 13 to the top flanges of the truss 11.
  • FIG. 7 is a vertical section of a primary steel [0048] truss framing member 11 consisting of a bottom chord formed of angles 30 welded back-to-back between web members 32 which in turn are welded to a gusset plate 32 which in turn is welded to a back-to-back top chord angle 33. The vertical legs of the angles 33 are slotted at intervals, the slots being staggered, and rod segments 34 are welded to the vertical legs of the angles 33.
  • This novel truss construction provides a strong, light primary framing member with maximum openings in the web through which building services such as heating, plumbing, electricity, and communication services can be located. FIG. 8 shows the connection of primary and secondary framing members using the truss of FIG. 7, integrating the whole frame structure to resist horizontal shear forces, and support the gravity load of the floor system. [0049]
  • FIG. 9 is a plan view of a portion of a [0050] floor frame system 10 including a primary truss 11, and secondary joists 12 with end shoes 13, in which the joists are aligned rather than staggered.
  • FIGS. 10 and 11 show alternate truss configurations depending on building requirements, FIG. 10 being the standard configuration and FIG. 11 being a configuration for maximum size openings in the truss for accommodating large ducts. [0051]
  • FIG. 12 is a plan view of a primary steel [0052] beam framing member 11 supporting staggered secondary open web joist members 12 with shear shoes 13 welded to the member 11. Such staggering of the secondary members is required when shear connectors are required at intervals less than the normal joist spacing.
  • Referring to FIG. 13, a concrete floor system according to a second preferred embodiment of the invention is illustrated. As for the first preferred embodiment shown in FIG. 2, the floor system comprises a primary framing member in the form of a [0053] steel beam 11′ supporting a joist 12 fitted with an end shoe 13 welded to the beam 11′, the whole structure supporting a concrete floor 14. The difference between the first preferred embodiment shown in FIGS. 2 to 12 and the second embodiment resides mainly in the fact that, in the first embodiment, the shear shoes 13 are embedded in the concrete, whereas the shear shoes 13 in the second embodiment are not, the concrete being poured on top of the secondary framing members 12.
  • In FIG. 14, the same beam as shown in FIG. 13 is shown in elevation, with the [0054] arrow 20 indicating the direction of the horizontal shear force. The combination of the primary framing member 12, the end shoe 13 and the welding of the end shoe 13 to the primary framing member 11 creates a shear connector to resist the horizontal shear forces between the slab 14 and the primary framing member 11 or 11′.
  • Although preferred embodiments of the present invention have been described in detail herein and illustrated in the accompanying drawings, it is to be understood that the invention is not limited to these precise embodiments and that various changes and modifications may be effected therein without departing from the scope or spirit of the present invention. [0055]

Claims (14)

What is claimed is:
1. A framing system for a composite concrete floor, the framing system comprising horizontally extending primary framing members supporting secondary framing members across the primary framing members, said primary and secondary framing members being made of a metallic structural material, each of said secondary framing members having two opposite ends provided with a shear shoe, said shear shoe being fixed to said primary framing members by means of a structural joint sufficient to provide a shear connection between said concrete floor and said primary framing members.
2. A framing system as defined in claim 1, wherein said shear shoes of each secondary framing member comprise an iron angle having:
one horizontally extending face fixed by means of said structural joint to a horizontal face of a respective one of said primary framing members, and
one vertically extending face fixed to said secondary framing members.
3. A framing system as defined in claim 2, wherein said structural joint is selected from the group consisting of a weld joint and a bolt joint.
4. A framing system as defined in claim 3, wherein said structural joint is a weld joint.
5. A framing system as defined in claim 1, wherein said secondary framing members have continuous shear connection to the concrete floor.
6. A framing system as defined in claim 5, wherein said secondary framing members have a top chord embedded in the concrete floor, thereby providing said shear connection to the concrete floor.
7. A framing system as defined in claim 1, wherein said primary framing member is a truss.
8. A framing system as defined in claim 1, wherein said primary framing member is a steel beam.
9. A framing system as defined in claim 8, wherein said secondary framing members are open-web steel joint.
10. A framing system as defined in claim 1, wherein said metallic structural material is steel.
11. A method of erecting a framing system for a composite concrete floor comprising the steps of:
providing primary and secondary framing members made of a metallic structural material, each of said secondary framing members having two opposite ends provided with a shoe;
placing said primary framing members in parallel relation;
placing said secondary framing members transversally between said primary framing members with said shoes bearing on the primary framing members; and
fixing said shoes to said primary framing members with a structural joint sufficient to provide a shear connection for said primary framing members.
12. A method as defined in claim 11, wherein said step of fixing consists of welding said shoes to the primary framing members.
13. A method as defined in claim 11, wherein said secondary framing members have a continuous shear connector.
14. A method as claimed in claim 13, wherein said shear connector is a continuous top chord adapted to be embedded in said concrete floor.
US10/667,033 2002-09-20 2003-09-22 Composite floor system Abandoned US20040107660A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CA002404535A CA2404535A1 (en) 2002-09-20 2002-09-20 Composite floor system
CA2,404,535 2002-09-20

Publications (1)

Publication Number Publication Date
US20040107660A1 true US20040107660A1 (en) 2004-06-10

Family

ID=32075099

Family Applications (1)

Application Number Title Priority Date Filing Date
US10/667,033 Abandoned US20040107660A1 (en) 2002-09-20 2003-09-22 Composite floor system

Country Status (2)

Country Link
US (1) US20040107660A1 (en)
CA (1) CA2404535A1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050235590A1 (en) * 2002-07-17 2005-10-27 Pace Malcolm J Apparatus and method for composite concrete and steel floor construction
US20070137133A1 (en) * 2005-11-28 2007-06-21 Bartoli N.V. Building system, beam element, column and method
US20080000177A1 (en) * 2005-04-25 2008-01-03 Siu Wilfred W Composite floor and composite steel stud wall construction systems
US20080022622A1 (en) * 2004-06-25 2008-01-31 Cook Christopher John Fothergi Controlling Cracks in Cementitious Materials
US7730692B1 (en) 2006-04-05 2010-06-08 Alliance Trutrus, Llc Truss bearing
US20100242396A1 (en) * 2004-10-27 2010-09-30 Jankovec Scott G Suspended Ceiling System
US20120117911A1 (en) * 2009-07-14 2012-05-17 John Trenerry Building Floor Structure and Process for Forming Same
CN103711244A (en) * 2013-12-30 2014-04-09 中国十七冶集团有限公司 Double-layer all-steel structure floor slab embedded with steel channel beam
US20140165496A1 (en) * 2012-12-19 2014-06-19 John Louis Vanker Truss configuration
US10221581B2 (en) * 2015-06-24 2019-03-05 Brian O. Phillips Convertible floor panel assembly, composite floor structure, and method for filling an orchestra opening adjacent a theater stage
US20190257081A1 (en) * 2018-02-21 2019-08-22 Scott Edward Heatly Precast modular structural building system and method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2447374A1 (en) 2003-10-30 2005-04-30 Le Groupe Canam Manac Inc. Improved steel joist
CN103669718B (en) * 2013-12-26 2015-07-29 南京工业大学 Corrugated web deck-molding utilization rate rectangle punches accessory

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US24205A (en) * 1859-05-31 Machine for drying fibrous substances
US84629A (en) * 1868-12-01 Improved boot-crimper
US3392499A (en) * 1966-05-02 1968-07-16 Ira J. Mcmanus Steel joist connection
US3527007A (en) * 1968-08-12 1970-09-08 Ira J Mcmanus Steel joist connection and end connection therefor
US3596421A (en) * 1969-01-21 1971-08-03 Elkhart Bridge & Iron Co Structural beam for supporting concrete flooring
US3683580A (en) * 1970-10-08 1972-08-15 Ira J Mcmanus Composite end connection for steel joists
US3728835A (en) * 1970-11-05 1973-04-24 I Mcmanus Composite concrete slab and steel joist construction
US3913296A (en) * 1973-10-01 1975-10-21 Hambro Structural Systems Ltd End support shoe for composite joist
US3945168A (en) * 1968-11-04 1976-03-23 Hambro Structural Systems Limited Reusable spanner bar
US4056908A (en) * 1975-08-07 1977-11-08 Mcmanus Ira J Composite concrete slab and steel joist construction
US4333280A (en) * 1978-08-23 1982-06-08 Verco Manufacturing, Inc. Shear load resistant structure
US4432178A (en) * 1982-06-01 1984-02-21 Steel Research Incorporated Composite steel and concrete floor construction
US4454692A (en) * 1981-10-30 1984-06-19 Epic Metals Corporation Metal deck raceway construction
US4592184A (en) * 1984-07-16 1986-06-03 Joel I. Person Composite floor system
US4653237A (en) * 1984-02-29 1987-03-31 Steel Research Incorporated Composite steel and concrete truss floor construction
US4683698A (en) * 1986-07-11 1987-08-04 Butler Manufacturing Company Load transfer clip for roof panel support trusses
US4700519A (en) * 1984-07-16 1987-10-20 Joel I. Person Composite floor system
US4729201A (en) * 1982-08-13 1988-03-08 Hambro Structural Systems Ltd. Double top chord
US5544464A (en) * 1994-04-05 1996-08-13 Canam Hambro Composite steel and concrete floor system
US5941035A (en) * 1997-09-03 1999-08-24 Mega Building System Ltd. Steel joist and concrete floor system
US6061992A (en) * 1997-05-15 2000-05-16 Le Groupe Canam Manac Inc. Composite steel/concrete column

Patent Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US24205A (en) * 1859-05-31 Machine for drying fibrous substances
US84629A (en) * 1868-12-01 Improved boot-crimper
US3392499A (en) * 1966-05-02 1968-07-16 Ira J. Mcmanus Steel joist connection
US3527007A (en) * 1968-08-12 1970-09-08 Ira J Mcmanus Steel joist connection and end connection therefor
US3945168A (en) * 1968-11-04 1976-03-23 Hambro Structural Systems Limited Reusable spanner bar
US3596421A (en) * 1969-01-21 1971-08-03 Elkhart Bridge & Iron Co Structural beam for supporting concrete flooring
US3683580A (en) * 1970-10-08 1972-08-15 Ira J Mcmanus Composite end connection for steel joists
US3728835A (en) * 1970-11-05 1973-04-24 I Mcmanus Composite concrete slab and steel joist construction
US3913296A (en) * 1973-10-01 1975-10-21 Hambro Structural Systems Ltd End support shoe for composite joist
US4056908A (en) * 1975-08-07 1977-11-08 Mcmanus Ira J Composite concrete slab and steel joist construction
US4333280A (en) * 1978-08-23 1982-06-08 Verco Manufacturing, Inc. Shear load resistant structure
US4454692A (en) * 1981-10-30 1984-06-19 Epic Metals Corporation Metal deck raceway construction
US4454692B1 (en) * 1981-10-30 1986-10-07
US4432178A (en) * 1982-06-01 1984-02-21 Steel Research Incorporated Composite steel and concrete floor construction
US4729201A (en) * 1982-08-13 1988-03-08 Hambro Structural Systems Ltd. Double top chord
US4653237A (en) * 1984-02-29 1987-03-31 Steel Research Incorporated Composite steel and concrete truss floor construction
US4592184A (en) * 1984-07-16 1986-06-03 Joel I. Person Composite floor system
US4700519A (en) * 1984-07-16 1987-10-20 Joel I. Person Composite floor system
US4683698A (en) * 1986-07-11 1987-08-04 Butler Manufacturing Company Load transfer clip for roof panel support trusses
US5544464A (en) * 1994-04-05 1996-08-13 Canam Hambro Composite steel and concrete floor system
US6061992A (en) * 1997-05-15 2000-05-16 Le Groupe Canam Manac Inc. Composite steel/concrete column
US5941035A (en) * 1997-09-03 1999-08-24 Mega Building System Ltd. Steel joist and concrete floor system

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050235590A1 (en) * 2002-07-17 2005-10-27 Pace Malcolm J Apparatus and method for composite concrete and steel floor construction
US7721497B2 (en) * 2002-07-17 2010-05-25 Pace Malcolm J Apparatus and method for composite concrete and steel floor construction
US20080022622A1 (en) * 2004-06-25 2008-01-31 Cook Christopher John Fothergi Controlling Cracks in Cementitious Materials
US20100242396A1 (en) * 2004-10-27 2010-09-30 Jankovec Scott G Suspended Ceiling System
US8006454B2 (en) * 2004-10-27 2011-08-30 Chicago Metallic Corporation Suspended ceiling system
US20080000177A1 (en) * 2005-04-25 2008-01-03 Siu Wilfred W Composite floor and composite steel stud wall construction systems
US20070137133A1 (en) * 2005-11-28 2007-06-21 Bartoli N.V. Building system, beam element, column and method
US7730692B1 (en) 2006-04-05 2010-06-08 Alliance Trutrus, Llc Truss bearing
US20120117911A1 (en) * 2009-07-14 2012-05-17 John Trenerry Building Floor Structure and Process for Forming Same
US9803363B2 (en) * 2009-07-14 2017-10-31 Holdip Pty Ltd. Building floor structure and process for forming same
US20140165496A1 (en) * 2012-12-19 2014-06-19 John Louis Vanker Truss configuration
US8919071B2 (en) * 2012-12-19 2014-12-30 Patco, Llc Truss configuration
US20150107182A1 (en) * 2012-12-19 2015-04-23 Patco, Llc Truss configuration
US9163404B2 (en) * 2012-12-19 2015-10-20 Patco, Llc Truss configuration
CN103711244A (en) * 2013-12-30 2014-04-09 中国十七冶集团有限公司 Double-layer all-steel structure floor slab embedded with steel channel beam
US10221581B2 (en) * 2015-06-24 2019-03-05 Brian O. Phillips Convertible floor panel assembly, composite floor structure, and method for filling an orchestra opening adjacent a theater stage
US20190257081A1 (en) * 2018-02-21 2019-08-22 Scott Edward Heatly Precast modular structural building system and method
US10550565B2 (en) * 2018-02-21 2020-02-04 Scott Edward Heatly Precast modular structural building system and method
US20200131754A1 (en) * 2018-02-21 2020-04-30 Scott Edward Heatly Precast modular structural building method
US11306473B2 (en) * 2018-02-21 2022-04-19 Scott Edward Heatly Precast modular structural building method

Also Published As

Publication number Publication date
CA2404535A1 (en) 2004-03-20

Similar Documents

Publication Publication Date Title
US9518401B2 (en) Open web composite shear connector construction
CA2358747C (en) Ring beam/lintel system
US20190257081A1 (en) Precast modular structural building system and method
US8161691B2 (en) Precast composite structural floor system
CA1208030A (en) Composite steel and concrete floor construction
US4115971A (en) Sawtooth composite girder
Griffis Some design considerations for composite-frame structures
US8297017B2 (en) Precast composite structural floor system
US20080000177A1 (en) Composite floor and composite steel stud wall construction systems
CA2206830A1 (en) High rise steel column
CA2271403A1 (en) Bolted metal joist
US8453406B2 (en) Precast composite structural girder and floor system
US20040107660A1 (en) Composite floor system
US20210025164A1 (en) Pre-stressed intersecting modular truss and concrete decking floor system
JP2006316580A (en) Corrugated steel plate web pc composite beam and construction method of bridge using corrugated steel plate web pc composite beam
US8381485B2 (en) Precast composite structural floor system
CN111411721A (en) Assembly type prefabricated floor slab secondary beam combined component
WO2022150224A9 (en) Modular composite action panel and structural systems using same
AU2011248977B2 (en) Precast composite structural girder, floor system, and method for forming floor system
CA2441737C (en) Composite floor system
CN111424869A (en) Concrete floor secondary beam combined prefabricated part and manufacturing method
WO2019025928A1 (en) Title of invention: pre-stressed intersecting modular truss and concrete decking floor system
CA2592820A1 (en) Composite floor and composite steel stud wall construction systems
CN111411722A (en) Prefabricated superimposed beam slab suitable for assembly system
RU2134751C1 (en) Framework of building and method of its erection

Legal Events

Date Code Title Description
AS Assignment

Owner name: LE GROUPE CANAM MANAC INC., CANADA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:MOREAU, SERGE;REEL/FRAME:014872/0294

Effective date: 20031216

AS Assignment

Owner name: GROUPE CANAM INC., CANADA

Free format text: CHANGE OF NAME;ASSIGNOR:LE GROUPE CANAM MANAC INC.;REEL/FRAME:017168/0995

Effective date: 20050101

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION