RU2007149547A - Чувствительное к состоянию электросети устройство управления - Google Patents
Чувствительное к состоянию электросети устройство управления Download PDFInfo
- Publication number
- RU2007149547A RU2007149547A RU2007149547/09A RU2007149547A RU2007149547A RU 2007149547 A RU2007149547 A RU 2007149547A RU 2007149547/09 A RU2007149547/09 A RU 2007149547/09A RU 2007149547 A RU2007149547 A RU 2007149547A RU 2007149547 A RU2007149547 A RU 2007149547A
- Authority
- RU
- Russia
- Prior art keywords
- load
- value
- physical parameter
- energy consumption
- parameter
- Prior art date
Links
- 238000005265 energy consumption Methods 0.000 claims abstract 37
- 230000003247 decreasing effect Effects 0.000 claims abstract 5
- 230000005611 electricity Effects 0.000 claims abstract 5
- 238000000034 method Methods 0.000 claims 23
- 230000001419 dependent effect Effects 0.000 claims 10
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/24—Arrangements for preventing or reducing oscillations of power in networks
- H02J3/241—The oscillation concerning frequency
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/10—The network having a local or delimited stationary reach
- H02J2310/12—The local stationary network supplying a household or a building
- H02J2310/14—The load or loads being home appliances
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/242—Home appliances
Landscapes
- Power Engineering (AREA)
- Engineering & Computer Science (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Control Of Eletrric Generators (AREA)
- Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
- Air Conditioning Control Device (AREA)
- Soil Working Implements (AREA)
- Photoreceptors In Electrophotography (AREA)
- Soundproofing, Sound Blocking, And Sound Damping (AREA)
- Control Of Throttle Valves Provided In The Intake System Or In The Exhaust System (AREA)
- Braiding, Manufacturing Of Bobbin-Net Or Lace, And Manufacturing Of Nets By Knotting (AREA)
- Feedback Control In General (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Paper (AREA)
- Selective Calling Equipment (AREA)
- Telephone Function (AREA)
- Communication Control (AREA)
Abstract
1. Устройство управления для управления потреблением энергии нагрузкой в электрической сети, причем упомянутое устройство управления содержит: ! средство для измерения в течение периода времени значений физического параметра электросети, причем упомянутый физический параметр варьируется в зависимости от соотношения между выработкой электричества и нагрузкой на электросеть; ! средство для определения основанного на статистике значения физического параметра электросети из прошлых снятых показаний упомянутых значений физического параметра электросети; и ! средство для увеличения или уменьшения потребления энергии упомянутой нагрузкой, упомянутое варьирование зависит от текущего физического параметра упомянутой электросети, относительно упомянутого основанного на статистике значения. ! 2. Устройство управления по п.1, содержащее: ! средство для увеличения или уменьшения потребления энергии упомянутой нагрузкой, когда текущее значение упомянутого измеренного физического параметра электросети достигает значения срабатывания; и ! средство для определения упомянутого значения срабатывания, причем упомянутое определение упомянутого значения срабатывания зависит от упомянутого основанного на статистике значения, и ! в котором a) средство для определения упомянутого значения срабатывания содержит средство для произвольного обеспечения упомянутого значения срабатывания между определенным верхним или нижним значением физического параметра электросети и упомянутым основанным на статистике значении, и/или ! в котором b) упомянутое устройство управления содержит средство измерения значения физическ�
Claims (31)
1. Устройство управления для управления потреблением энергии нагрузкой в электрической сети, причем упомянутое устройство управления содержит:
средство для измерения в течение периода времени значений физического параметра электросети, причем упомянутый физический параметр варьируется в зависимости от соотношения между выработкой электричества и нагрузкой на электросеть;
средство для определения основанного на статистике значения физического параметра электросети из прошлых снятых показаний упомянутых значений физического параметра электросети; и
средство для увеличения или уменьшения потребления энергии упомянутой нагрузкой, упомянутое варьирование зависит от текущего физического параметра упомянутой электросети, относительно упомянутого основанного на статистике значения.
2. Устройство управления по п.1, содержащее:
средство для увеличения или уменьшения потребления энергии упомянутой нагрузкой, когда текущее значение упомянутого измеренного физического параметра электросети достигает значения срабатывания; и
средство для определения упомянутого значения срабатывания, причем упомянутое определение упомянутого значения срабатывания зависит от упомянутого основанного на статистике значения, и
в котором a) средство для определения упомянутого значения срабатывания содержит средство для произвольного обеспечения упомянутого значения срабатывания между определенным верхним или нижним значением физического параметра электросети и упомянутым основанным на статистике значении, и/или
в котором b) упомянутое устройство управления содержит средство измерения значения физического параметра нагрузки, причем упомянутый физический параметр представляет энергию, накопленную нагрузкой; при этом упомянутое определение значения срабатывания дополнительно зависит от упомянутого измеренного физического параметра нагрузки.
3. Устройство управления для управления потреблением энергии нагрузкой в электрической сети, причем упомянутое устройство управления содержит:
средство для измерения физического параметра электросети, причем упомянутый физический параметр варьируется в зависимости от соотношения между выработкой электричества и нагрузкой на электросеть;
средство для измерения физического параметра нагрузки, причем упомянутый физический параметр нагрузки представляет энергию, накопленную нагрузкой;
средство для варьирования потребления энергии упомянутой нагрузкой, когда значение упомянутого физического параметра электросети достигает значения срабатывания; и
средство для определения значения срабатывания, причем упомянутое определение значения срабатывания зависит от упомянутого измеренного физического параметра нагрузки и дополнительно основано на произвольном значении.
4. Устройство управления по любому из пп.2 и 3, в котором упомянутое средство для варьирования содержит средство для сравнения упомянутого значения срабатывания с текущим измеренным физическим параметром электросети.
5. Устройство управления по любому из пп.2 и 3, в котором средство для варьирования потребления энергии нагрузкой сконфигурировано так, чтобы варьировать потребление энергии нагрузкой с тем, чтобы поддерживать измеренный физический параметр нагрузки в рамках центральных пределов, и дополнительно сконфигурировано так, чтобы варьировать потребление энергии, когда упомянутое значение физического параметра электросети достигает значения срабатывания.
6. Устройство управления по п.5, зависимому от п.2 или 3, в котором упомянутое средство определения значения срабатывания сконфигурировано так, чтобы определять значение срабатывания в зависимости от значения измеренного физического параметра нагрузки относительно его минимального и максимального значений.
7. Устройство управления по п.5, зависимому от п.2 или 3 в котором упомянутое средство определения упомянутого значения срабатывания содержит средство задания профиля значений срабатывания, варьирующегося с упомянутым физическим параметром нагрузки, при этом упомянутый профиль такой, что чем более недавно варьировалось потребление энергии нагрузкой, тем дальше значение срабатывания от основанного на статистике значения из последних выборок физического параметра электросети.
8. Устройство управления по п.2 или 3, в котором упомянутое средство определения упомянутого значения срабатывания содержит средство задания профиля значений срабатывания, варьирующегося с упомянутым физическим параметром нагрузки, при этом на упомянутый профиль влияет произвольное значение.
9. Устройство управления по п.1, в котором упомянутый измеренный физический параметр электросети - это измеренная частота электросети.
10. Устройство управления по п.1, в котором упомянутое средство для варьирования сконфигурировано так, чтобы варьировать упомянутое потребление энергии посредством переключения потребления энергии между первым состоянием увеличения энергии, накопленной нагрузкой, и вторым состоянием снижения энергии, накопленной нагрузкой.
11. Устройство управления для управления потреблением энергии нагрузкой в электрической сети, причем упомянутое устройство управления содержит:
средство определения произвольной задержки;
средство для задержки начала потребления энергии упомянутой нагрузки на случайно выбранный интервал времени после того, как мощность первоначально предоставлена в устройство управления.
12. Устройство управления для управления потреблением энергии нагрузкой в электрической сети, для поддерживания физического параметра нагрузки в рамках верхних и нижних пределов, причем упомянутое устройство управления содержит:
средство для измерения физического параметра нагрузки;
средство для обеспечения верхних и нижних пределов измеренного физического параметра нагрузки; и
средство для повышения верхнего и/или нижнего предела измеренного физического параметра со скоростью, меньшей максимального потребления энергии нагрузкой, после того, как мощность первоначально предоставлена в устройство управления.
13. Способ управления потреблением энергии нагрузкой в электрической сети, причем упомянутый способ содержит этапы, на которых:
измеряют в течение периода времени значения физического параметра электросети, причем упомянутый физический параметр варьируется в зависимости от соотношения между выработкой электричества и нагрузкой на электросеть;
определяют основанное на статистике значение физического параметра электросети из прошлых снятых показаний упомянутых значений физического параметра электросети; и
увеличивают или уменьшают потребление энергии упомянутой нагрузкой, упомянутое варьирование зависит от текущего физического параметра упомянутой электросети, относительно упомянутого основанного на статистике значения.
14. Способ по п.13, содержащий этапы, на которых:
варьируют потребление энергии упомянутой нагрузкой, когда текущее значение упомянутого измеренного физического параметра электросети достигает значения срабатывания; и
определяют упомянутое значение срабатывания, причем упомянутое определение упомянутого значения срабатывания зависит от упомянутого центрального значения.
15. Способ по п.14, в котором упомянутое определение упомянутого значения срабатывания содержит функцию для произвольного обеспечения упомянутого значения срабатывания между определенным верхним или нижним значением физического параметра электросети и упомянутым центральным значением.
16. Способ по п.14, содержащий этап, на котором измеряют значение физического параметра нагрузки, причем упомянутый физический параметр представляет энергию, накопленную нагрузкой, при этом упомянутое определение значения срабатывания дополнительно зависит от упомянутого измеренного физического параметра нагрузки.
17. Способ по п.15, содержащий этап, на котором измеряют значение физического параметра нагрузки, причем упомянутый физический параметр представляет энергию, накопленную нагрузкой, при этом упомянутое определение значения срабатывания дополнительно зависит от упомянутого измеренного физического параметра нагрузки.
18. Способ управления потреблением энергии нагрузкой в электрической сети, причем упомянутый способ содержит этапы, на которых:
измеряют значение физического параметра электросети, причем упомянутый физический параметр варьируется в зависимости от соотношения между выработкой электричества и нагрузкой на электросеть;
измеряют физический параметр нагрузки, причем упомянутый физический параметр нагрузки представляет энергию, накопленную нагрузкой;
варьируют потребление энергии упомянутой нагрузкой, когда значение упомянутого физического параметра электросети достигает значения срабатывания; и
определяют значение срабатывания, причем упомянутое определение значения срабатывания зависит от упомянутого измеренного физического параметра нагрузки и дополнительно основано на произвольном значении.
19. Способ по любому из пп.14-18, в котором упомянутое варьирование содержит этап, на котором сравнивают упомянутое значение срабатывания с текущим измеренным физическим параметром электросети.
20. Способ по любому из пп.14-18, в котором варьирование потребления энергии нагрузкой содержит этапы, на которых варьируют потребление энергии нагрузкой с тем, чтобы поддерживать измеренный физический параметр нагрузки в пределах управления, и дополнительно варьируют потребление энергии, когда упомянутое значение физического параметра электросети достигает значения срабатывания.
21. Способ по п.19, в котором варьирование потребления энергии нагрузкой содержит этапы, на которых варьируют потребление энергии нагрузкой с тем, чтобы поддерживать измеренный физический параметр нагрузки в пределах управления, и дополнительно варьируют потребление энергии, когда упомянутое значение физического параметра электросети достигает значения срабатывания.
22. Способ управления по п.20, зависимому от п.16, в котором определение значения срабатывания содержит определение значения срабатывания в зависимости от значения измеренного физического параметра нагрузки относительно его минимального и максимального значений.
23. Способ управления по п.20, зависимому от п.17, в котором определение значения срабатывания содержит определение значения срабатывания в зависимости от значения измеренного физического параметра нагрузки относительно его минимального и максимального значений.
24. Способ управления по п.20, зависимому от п.18, в котором определение значения срабатывания содержит определение значения срабатывания в зависимости от значения измеренного физического параметра нагрузки относительно его минимального и максимального значений.
25. Способ управления по п.20, зависимому от п.16, в котором упомянутое определение упомянутого значения срабатывания содержит задание профиля значений срабатывания, варьирующегося с упомянутым физическим параметром нагрузки, при этом упомянутый профиль такой, что чем более недавно варьировалось потребление энергии нагрузкой, тем дальше значение срабатывания от основанного на статистике значения, определенного из прошлых снятых показаний физического параметра электросети.
26. Способ управления по п.20, зависимому от п.17, в котором упомянутое определение упомянутого значения срабатывания содержит задание профиля значений срабатывания, варьирующегося с упомянутым физическим параметром нагрузки, при этом упомянутый профиль такой, что чем более недавно варьировалось потребление энергии нагрузкой, тем дальше значение срабатывания от основанного на статистике значения, определенного из прошлых снятых показаний физического параметра электросети.
27. Способ управления по п.20, зависимому от п.18, в котором упомянутое определение упомянутого значения срабатывания содержит задание профиля значений срабатывания, варьирующегося с упомянутым физическим параметром нагрузки, при этом упомянутый профиль такой, что чем более недавно варьировалось потребление энергии нагрузкой, тем дальше значение срабатывания от основанного на статистике значения, определенного из прошлых снятых показаний физического параметра электросети.
28. Способ по п.13, в котором упомянутый измеренный физический параметр электросети - это измеренная частота электросети.
29. Способ по п.13, в котором упомянутое варьирование содержит этап, на котором варьируют упомянутое потребление энергии посредством переключения потребления энергии между первым состоянием увеличения энергии, накопленной нагрузкой, и вторым состоянием снижения энергии, накопленной нагрузкой.
30. Способ управления потреблением энергии нагрузкой в электрической сети, причем упомянутый способ содержит этап, на котором:
предоставляют устройство управления, упомянутое устройство управления определяет произвольное количество времени;
задерживают начало потребления энергии упомянутой нагрузки на произвольно выбранное количество времени после того, как мощность первоначально предоставлена в устройство правления.
31. Способ управления потреблением энергии нагрузкой в электрической сети, для поддерживания физического параметра нагрузки в рамках верхних и нижних пределов, причем упомянутый способ содержит этапы, на которых:
измеряют физический параметр нагрузки;
обеспечивают верхние и нижние пределы измеренного физического параметра нагрузки; и
повышают верхний и/или нижний предел измеренного физического параметра со скоростью, меньшей максимального потребления энергии нагрузкой, после того, как мощность первоначально предоставлена в устройство управления.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GBGB0511361.8A GB0511361D0 (en) | 2005-06-03 | 2005-06-03 | Grid responsive control device |
GB0511361.8 | 2005-06-03 |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2007149547A true RU2007149547A (ru) | 2009-07-20 |
Family
ID=34835108
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2007149547/09A RU2007149547A (ru) | 2005-06-03 | 2006-06-01 | Чувствительное к состоянию электросети устройство управления |
Country Status (16)
Country | Link |
---|---|
US (3) | US20100072817A1 (ru) |
EP (3) | EP2273647A2 (ru) |
JP (1) | JP5121024B2 (ru) |
KR (1) | KR101314075B1 (ru) |
CN (1) | CN101238625B (ru) |
AT (1) | ATE520187T1 (ru) |
BR (1) | BRPI0611013B1 (ru) |
DK (2) | DK1891724T3 (ru) |
ES (1) | ES2371355T3 (ru) |
GB (4) | GB0511361D0 (ru) |
MX (1) | MX2007015099A (ru) |
MY (1) | MY140313A (ru) |
PL (1) | PL1891724T3 (ru) |
RU (1) | RU2007149547A (ru) |
TW (1) | TWI452795B (ru) |
WO (1) | WO2006128709A2 (ru) |
Families Citing this family (127)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB0511361D0 (en) * | 2005-06-03 | 2005-07-13 | Responsiveload Ltd | Grid responsive control device |
ES2569495T3 (es) * | 2006-02-15 | 2016-05-11 | Mitsubishi Denki Kabushiki Kaisha | Sistema estabilizador de sistema de energía |
DK1914419T3 (en) * | 2006-10-19 | 2015-12-21 | Siemens Ag | Wind energy installation and method for controlling the output power from a wind power installation |
ITTO20070016A1 (it) * | 2007-01-11 | 2008-07-12 | Indesit Co Spa | Metodo per la misura della frequenza di rete ed utenza elettrica che implementa tale metodo |
US20110182094A1 (en) * | 2007-08-13 | 2011-07-28 | The Powerwise Group, Inc. | System and method to manage power usage |
FI121041B (fi) * | 2007-11-20 | 2010-06-15 | Kone Corp | Teholähteen kuormituksen rajoittaminen |
GB2455107B (en) * | 2007-11-28 | 2010-03-31 | Cp Electronics Ltd | Frequency sensitive lighting control device |
KR101470631B1 (ko) * | 2008-03-12 | 2014-12-08 | 엘지전자 주식회사 | 공기 조화기의 제어방법 |
US8204632B2 (en) * | 2008-06-03 | 2012-06-19 | Electric Power Research Institute, Inc. | Emergency frequency load shedding scheme |
GB2467981A (en) * | 2009-01-26 | 2010-08-25 | Rltec Ltd | Smart Responsive Electrical Load |
GB2463548B8 (en) | 2008-09-22 | 2011-08-10 | Responsiveload Ltd | Smart responsive electrical load |
DK200801782A (en) * | 2008-12-15 | 2010-06-16 | Danfoss Ventures As | Power saving system and method |
US8706650B2 (en) * | 2009-01-14 | 2014-04-22 | Integral Analytics, Inc. | Optimization of microgrid energy use and distribution |
JP5256052B2 (ja) * | 2009-01-14 | 2013-08-07 | 一般財団法人電力中央研究所 | 電力負荷制御装置、電力負荷制御方法および電力負荷制御プログラム |
US8805597B2 (en) * | 2009-02-10 | 2014-08-12 | Steffes Corporation | Electrical appliance energy consumption control |
US8205106B2 (en) | 2009-02-24 | 2012-06-19 | International Business Machines Corporation | Energy load management method and system |
US8201000B2 (en) | 2009-02-24 | 2012-06-12 | International Business Machines Corporation | Computing load management method and system |
JP4821875B2 (ja) * | 2009-03-25 | 2011-11-24 | パナソニック電工株式会社 | 負荷制御システム |
DE102009027802A1 (de) * | 2009-07-17 | 2011-01-27 | BSH Bosch und Siemens Hausgeräte GmbH | Haushaltsgerät und Verfahren zum Betreiben eines Haushaltsgeräts |
GB2473422A (en) * | 2009-07-20 | 2011-03-16 | Responsiveload Ltd | Controlling consumption by a load |
GB0913038D0 (en) * | 2009-07-27 | 2009-09-02 | Rltec Ltd | Dynamic demand grid monitoring |
US8548636B2 (en) * | 2009-09-25 | 2013-10-01 | Lawrence Livermore National Secuirty, LLC. | Engineered setpoints for autonomous distributed sensors and actuators |
US8249756B2 (en) * | 2009-11-23 | 2012-08-21 | International Business Machines Corporation | Method, device and system for responsive load management using frequency regulation credits |
US9331483B2 (en) | 2009-12-17 | 2016-05-03 | Battelle Memorial Institute | Thermal energy storage apparatus, controllers and thermal energy storage control methods |
US8478452B2 (en) | 2010-04-06 | 2013-07-02 | Battelle Memorial Institute | Grid regulation services for energy storage devices based on grid frequency |
CN102971928A (zh) * | 2010-06-29 | 2013-03-13 | 西门子公司 | 根据电网负载接通终端设备 |
US8768529B2 (en) * | 2010-07-20 | 2014-07-01 | General Electric Company | Grid frequency rate limiting system |
US8965592B2 (en) * | 2010-08-24 | 2015-02-24 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for blackout protection |
US9008850B2 (en) | 2010-08-24 | 2015-04-14 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for under-frequency blackout protection |
US10310480B2 (en) | 2010-08-24 | 2019-06-04 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for under-frequency blackout protection |
US20120047921A1 (en) | 2010-11-22 | 2012-03-01 | General Electric Company | Dsm enabling of electro mechanically controlled refrigeration systems |
US8504216B2 (en) * | 2010-11-22 | 2013-08-06 | General Electric Company | DSM enabling of electro mechanically controlled refrigeration systems |
JP5427762B2 (ja) * | 2010-12-16 | 2014-02-26 | 株式会社日立製作所 | 電力変換装置、電力変換装置の制御装置及び電力変換装置の制御方法 |
GB2486649A (en) | 2010-12-21 | 2012-06-27 | Responsiveload Ltd | Remotely controlled autonomous responsive load |
GB201103161D0 (en) | 2011-02-23 | 2011-04-06 | Rltec Ltd | Virtual power station |
DE102011006609A1 (de) * | 2011-03-31 | 2012-10-04 | BSH Bosch und Siemens Hausgeräte GmbH | Steuervorrichtung für einen elektrischen Verbraucher |
EP2702657B1 (en) | 2011-04-27 | 2016-02-24 | Steffes Corporation | Energy storage device control |
US20120290103A1 (en) * | 2011-05-11 | 2012-11-15 | Quang Binh Dam | Systems and methods for use in improving operation of utility equipment |
US9331480B2 (en) * | 2011-05-31 | 2016-05-03 | Cisco Technology, Inc. | Variable topology distributed intelligence for utility grid control operation services |
GB201113426D0 (en) * | 2011-08-03 | 2011-09-21 | Responsiveload Ltd | Responsive load control method |
US9128130B2 (en) | 2011-09-15 | 2015-09-08 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for synchronizing distributed generation systems |
DE102011055251A1 (de) * | 2011-11-10 | 2013-05-16 | Evonik Industries Ag | Verfahren zur Erbringung von Regelleistung unter Berücksichtigung einer variablen Sollfrequenz |
DE102011055228A1 (de) * | 2011-11-10 | 2013-05-16 | Evonik Degussa Gmbh | Verfahren zur Bereitstellung von Regelleistung mit einem Energiespeicher unter Ausnutzung von Toleranzen beim Zeitpunkt der Regelleistungserbringung |
DE102011055229A1 (de) | 2011-11-10 | 2013-05-16 | Evonik Degussa Gmbh | Verfahren zur Bereitstellung von Regelleistung mit einem Energiespeicher unter Ausnutzung von Toleranzen bei der Bestimmung der Frequenzabweichung |
DE102011055249A1 (de) * | 2011-11-10 | 2013-05-16 | Evonik Degussa Gmbh | Verfahren zur Erbringung von Regelleistung zur Stabilisierung eines Wechselstromnetzes |
DE102011055231A1 (de) | 2011-11-10 | 2013-05-16 | Evonik Industries Ag | Verfahren zur Bereitstellung von Regelleistung |
DE102012201315A1 (de) * | 2012-01-31 | 2013-08-01 | Siemens Aktiengesellschaft | Verfahren zur Stabilisierung eines Spannungsversorgungsnetzes |
DE102012201833A1 (de) * | 2012-02-08 | 2013-08-08 | Siemens Aktiengesellschaft | Verfahren zur Stabilisierung eines intelligenten Spannungsversorgungsnetzes (Smart Grid) |
CA2925490C (en) | 2012-06-01 | 2020-04-14 | Bipco-Soft R3 Inc. | Power control device |
US9647495B2 (en) | 2012-06-28 | 2017-05-09 | Landis+Gyr Technologies, Llc | Power load control with dynamic capability |
DE102012016846A1 (de) * | 2012-08-27 | 2014-02-27 | Robert Bosch Gmbh | Verfahren zum Betrieb eines dezentralen Stromerzeugers |
DE102012218889A1 (de) | 2012-10-17 | 2014-04-17 | Robert Bosch Gmbh | Verfahren und Vorrichtung zum Übertragen von elektrischer Leistung |
JP5253617B1 (ja) * | 2012-10-18 | 2013-07-31 | 三菱電機株式会社 | 管理装置、管理システム、管理方法及びプログラム |
CN103117885B (zh) * | 2012-12-07 | 2016-04-13 | 长沙理工大学 | 基于des理论的智能配电网终端通讯异常自动探测方法 |
CN103178533A (zh) * | 2013-01-31 | 2013-06-26 | 天津大学 | 温控负荷的变参与度频率控制方法及控制器 |
EP2763264A1 (de) * | 2013-02-01 | 2014-08-06 | Jörg Kurscheid | Steuervorrichtung eines intelligenten Stromnetzes |
EP2954568B1 (en) | 2013-02-07 | 2017-01-04 | Danfoss A/S | All compliant electrode |
JP6319289B2 (ja) | 2013-03-01 | 2018-05-09 | 日本電気株式会社 | 需給調整システム、需給調整方法ならびに需給調整プログラム |
US10418833B2 (en) * | 2015-10-08 | 2019-09-17 | Con Edison Battery Storage, Llc | Electrical energy storage system with cascaded frequency response optimization |
DE102013204600A1 (de) * | 2013-03-15 | 2014-09-18 | Senvion Se | Windkraftanlage mit Frequenzmessung |
WO2014177264A2 (en) | 2013-04-29 | 2014-11-06 | Welsengen Limited | Apparatus and method for managing stored energy |
KR102194207B1 (ko) * | 2013-10-18 | 2020-12-22 | 대우조선해양 주식회사 | 분전반 회로 선정장치 및 선정방법 |
GB2515358B (en) * | 2013-11-06 | 2017-01-18 | Reactive Tech Ltd | Grid Frequency Response |
US9692243B2 (en) | 2013-11-19 | 2017-06-27 | Panasonic Intellectual Property Management Co., Ltd. | Frequency regulation method, frequency regulation apparatus, and storage battery system |
FR3015142B1 (fr) * | 2013-12-16 | 2018-01-12 | Institut Polytechnique De Grenoble | Procede de stabilisation d'un reseau electrique par delestage de charges |
DE102014000917A1 (de) * | 2014-01-28 | 2015-07-30 | Rwe Deutschland Ag | REGELVORRlCHTUNG FÜR ElNE ELEKTRlSCHE ANLAGE ZUM WlEDERANFAHREN DER ELEKTRlSCHEN ANLAGE NACH EINEM STROMAUSFALL |
CA3142753A1 (en) | 2014-01-31 | 2015-08-06 | Steffes Corporation | Power consumption management through energy storage devices |
GB2510735B (en) * | 2014-04-15 | 2015-03-04 | Reactive Technologies Ltd | Frequency response |
JP5915957B2 (ja) * | 2014-06-06 | 2016-05-11 | パナソニックIpマネジメント株式会社 | 充放電制御装置および充放電制御方法 |
US10042374B2 (en) * | 2014-06-13 | 2018-08-07 | Siemens Gamesa Renewable Energy A/S | Method and apparatus for determining a weakened grid condition and controlling a power plant in a manner appropriate to the grid condition |
US20160013646A1 (en) * | 2014-07-14 | 2016-01-14 | Heart Transverter, S.A. | Load management, metering, and demand response module |
JP2016025693A (ja) * | 2014-07-17 | 2016-02-08 | 通研電気工業株式会社 | 分散電源系統連系時の系統制御システム、装置、及び方法 |
US10199825B2 (en) * | 2014-08-11 | 2019-02-05 | Abb Schweiz Ag | Control of a microgrid |
JP5724024B1 (ja) * | 2014-08-15 | 2015-05-27 | 株式会社 商船三井 | 船内電力システムの制御方法、船内電力システム、及び、船舶 |
DE102014116873A1 (de) * | 2014-11-18 | 2016-05-19 | Rwe Deutschland Ag | Zuschaltvorrichtung für eine elektrische Anlage zum zeitverzögerten Anfahren nach Empfang eines Steuersignals |
US9822507B2 (en) | 2014-12-02 | 2017-11-21 | Cnh Industrial America Llc | Work vehicle with enhanced implement position control and bi-directional self-leveling functionality |
CN104505859A (zh) * | 2014-12-29 | 2015-04-08 | 吴位跃 | 水电站孤网运行联动并网发电时调速器的使用方法 |
DE102015102449A1 (de) * | 2015-02-20 | 2016-08-25 | Alpiq Intec Ag | Energieübertragungssteuerung zwischen Energieversorgungsnetz und Endnutzereinrichtungen basierend auf Energiefluss und Netzqualität |
US9798342B2 (en) | 2015-02-23 | 2017-10-24 | Schweitzer Engineering Laboratories, Inc. | Detection and correction of fault induced delayed voltage recovery |
CA2923930C (en) * | 2015-03-19 | 2019-09-17 | Battelle Memorial Institute | Primary frequency control through simulated droop control with electric loads |
WO2016164341A1 (en) | 2015-04-06 | 2016-10-13 | Solarreserve Technology, Llc | Electrical power systems incorporating thermal energy storage |
US10852706B2 (en) * | 2015-07-28 | 2020-12-01 | Battelle Memorial Institute | Extracting maximal frequency response potential in controllable loads |
WO2017019136A1 (en) * | 2015-07-28 | 2017-02-02 | Battelle Memorial Institute | Frequency threshold determination for frequency-responsive load controllers |
US10222083B2 (en) | 2015-10-08 | 2019-03-05 | Johnson Controls Technology Company | Building control systems with optimization of equipment life cycle economic value while participating in IBDR and PBDR programs |
US10190793B2 (en) | 2015-10-08 | 2019-01-29 | Johnson Controls Technology Company | Building management system with electrical energy storage optimization based on statistical estimates of IBDR event probabilities |
US10389136B2 (en) | 2015-10-08 | 2019-08-20 | Con Edison Battery Storage, Llc | Photovoltaic energy system with value function optimization |
US10564610B2 (en) | 2015-10-08 | 2020-02-18 | Con Edison Battery Storage, Llc | Photovoltaic energy system with preemptive ramp rate control |
US10742055B2 (en) | 2015-10-08 | 2020-08-11 | Con Edison Battery Storage, Llc | Renewable energy system with simultaneous ramp rate control and frequency regulation |
US10222427B2 (en) | 2015-10-08 | 2019-03-05 | Con Edison Battery Storage, Llc | Electrical energy storage system with battery power setpoint optimization based on battery degradation costs and expected frequency response revenue |
US11210617B2 (en) | 2015-10-08 | 2021-12-28 | Johnson Controls Technology Company | Building management system with electrical energy storage optimization based on benefits and costs of participating in PDBR and IBDR programs |
US10197632B2 (en) | 2015-10-08 | 2019-02-05 | Taurus Des, Llc | Electrical energy storage system with battery power setpoint optimization using predicted values of a frequency regulation signal |
US10700541B2 (en) | 2015-10-08 | 2020-06-30 | Con Edison Battery Storage, Llc | Power control system with battery power setpoint optimization using one-step-ahead prediction |
US10250039B2 (en) | 2015-10-08 | 2019-04-02 | Con Edison Battery Storage, Llc | Energy storage controller with battery life model |
US10283968B2 (en) | 2015-10-08 | 2019-05-07 | Con Edison Battery Storage, Llc | Power control system with power setpoint adjustment based on POI power limits |
US10554170B2 (en) | 2015-10-08 | 2020-02-04 | Con Edison Battery Storage, Llc | Photovoltaic energy system with solar intensity prediction |
US10418832B2 (en) * | 2015-10-08 | 2019-09-17 | Con Edison Battery Storage, Llc | Electrical energy storage system with constant state-of charge frequency response optimization |
US9912158B2 (en) | 2016-03-16 | 2018-03-06 | Schweitzer Engineering Laboratories, Inc. | Decentralized generator control |
US9906041B2 (en) | 2016-03-16 | 2018-02-27 | Schweitzer Engineering Laboratories, Inc. | Decentralized generator control |
US20190190266A1 (en) * | 2016-05-10 | 2019-06-20 | Systemex-Energies Inc. | Power control device and related methods |
US10135250B2 (en) | 2016-05-25 | 2018-11-20 | Schweitzer Engineering Laboratories, Inc. | Inertia compensated load tracking in electrical power systems |
GB201609687D0 (en) | 2016-06-02 | 2016-07-20 | Open En Ltd | System and method for controlling an electrical load |
GB2551393A (en) * | 2016-06-17 | 2017-12-20 | Upside Energy Ltd | A system and method for controlling devices in a power distribution network |
US10778012B2 (en) | 2016-07-29 | 2020-09-15 | Con Edison Battery Storage, Llc | Battery optimization control system with data fusion systems and methods |
US10594153B2 (en) | 2016-07-29 | 2020-03-17 | Con Edison Battery Storage, Llc | Frequency response optimization control system |
DE102016219726A1 (de) * | 2016-10-11 | 2018-04-12 | Bayerische Motoren Werke Aktiengesellschaft | Verfahren zur Steuerung des elektrischen Ladens einer Gruppe von Fahrzeugen |
WO2018148835A1 (en) | 2017-02-15 | 2018-08-23 | Simon Jasmin | Power control device |
US10312694B2 (en) | 2017-06-23 | 2019-06-04 | Schweitzer Engineering Laboratories, Inc. | Mode-based output synchronization using relays and a common time source |
NL2019163B1 (en) * | 2017-07-03 | 2019-01-14 | Peeeks B V | System for controlling the energy exchange between an asset and an electrical grid |
US11159044B2 (en) | 2017-07-14 | 2021-10-26 | Battelle Memorial Institute | Hierarchal framework for integrating distributed energy resources into distribution systems |
DE102017121461A1 (de) * | 2017-09-15 | 2019-03-21 | Innogy Se | Verfahren zum Betreiben eines Energiespeichers |
EP3711131A1 (en) | 2018-01-26 | 2020-09-23 | Grid Edge Limited | Energy management system |
US10381835B1 (en) | 2018-02-09 | 2019-08-13 | Schweitzer Engineering Laboratories, Inc. | Electric power generator selection, shedding, and runback for power system stability |
US10476268B2 (en) | 2018-02-09 | 2019-11-12 | Schweitzer Engineering Laboratories, Inc. | Optimized decoupling and load shedding |
US11159020B2 (en) * | 2018-02-09 | 2021-10-26 | University Of Tennessee Research Foundation | Hybrid dynamic demand control for power system frequency regulation |
CA3036879A1 (en) * | 2018-03-16 | 2019-09-16 | Feng Pan | Integrated solution techniques for security constrained unit commitment problem |
US11159022B2 (en) | 2018-08-28 | 2021-10-26 | Johnson Controls Tyco IP Holdings LLP | Building energy optimization system with a dynamically trained load prediction model |
US11163271B2 (en) | 2018-08-28 | 2021-11-02 | Johnson Controls Technology Company | Cloud based building energy optimization system with a dynamically trained load prediction model |
CN109599893B (zh) * | 2018-12-05 | 2022-04-05 | 国网辽宁省电力有限公司大连供电公司 | 一种考虑光伏和储能的负荷恢复算法 |
CN109347114A (zh) * | 2018-12-20 | 2019-02-15 | 江苏恒变电力设备有限公司 | 一种用于掘进机的箱式变压器 |
GB201906325D0 (en) | 2019-05-03 | 2019-06-19 | Open Energi Ltd | A control method and system for operating an electric component |
TWI713289B (zh) * | 2019-07-05 | 2020-12-11 | 友達光電股份有限公司 | 負載控制系統及負載控制方法 |
EP4005050A4 (en) * | 2019-07-29 | 2023-10-18 | Enphase Energy, Inc. | METHOD AND DEVICE FOR AUTOMATICALLY NESTING CLOCKED LOADS IN A MICRONETWORK |
CN110867851B (zh) * | 2019-11-25 | 2023-06-09 | 国网河北省电力有限公司高邑县供电分公司 | 一种开关站结构设计方法 |
US11133675B2 (en) | 2020-01-21 | 2021-09-28 | Enphase Energy, Inc. | Method and apparatus for synchronizing start-up of grid-forming inverters |
EP4148556A4 (en) * | 2020-05-27 | 2023-07-05 | Huawei Technologies Co., Ltd. | RANDOM NUMBER GENERATION APPARATUS AND METHOD |
CN112564134B (zh) * | 2020-12-22 | 2023-02-24 | 南方电网科学研究院有限责任公司 | 电网一次调频备用容量配置的方法、装置、设备及介质 |
CN115425658B (zh) * | 2022-09-22 | 2024-05-28 | 国网山东省电力公司淄博供电公司 | 一种电网精准切负荷系统地调主配网间数据交互方法 |
Family Cites Families (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4317049A (en) | 1979-09-17 | 1982-02-23 | Massachusetts Institute Of Technology | Frequency adaptive, power-energy re-scheduler |
US4510398A (en) * | 1983-12-13 | 1985-04-09 | Honeywell Inc. | Add/shed load control according to multiple add/shed sequences |
US4612619A (en) * | 1984-08-06 | 1986-09-16 | Honeywell Inc. | Energy management load leveling |
EP0402362A4 (en) * | 1988-02-23 | 1991-11-13 | Alcatel N.V. | Electrical load shedding circuit |
DE4020294A1 (de) * | 1990-06-26 | 1992-01-02 | Krug Mathias | Elektrischer schalter der mit zeitverzoegerung mehrere outputs schaltet |
US5436510A (en) * | 1992-07-03 | 1995-07-25 | Euro Cp S.A.R.L. | Method and a system for globally managing electric power in a network within a dwelling or the like |
ATE172063T1 (de) * | 1992-09-01 | 1998-10-15 | Nazir Dosani | Leistungssteuergerät |
US5424903A (en) * | 1993-01-12 | 1995-06-13 | Tandy Corporation | Intelligent power switcher |
US5963457A (en) * | 1994-03-18 | 1999-10-05 | Hitachi, Ltd. | Electrical power distribution monitoring system and method |
JPH08103025A (ja) * | 1994-09-30 | 1996-04-16 | Mitsubishi Electric Corp | 負荷管理制御装置 |
US5572438A (en) * | 1995-01-05 | 1996-11-05 | Teco Energy Management Services | Engery management and building automation system |
SE505745C3 (sv) * | 1996-01-18 | 1997-10-06 | Asea Brown Boveri | Anordning foer styrning av en regulatorutrustning foer daempning av effektsvaengningar i en kraftlinje |
US5905442A (en) * | 1996-02-07 | 1999-05-18 | Lutron Electronics Co., Inc. | Method and apparatus for controlling and determining the status of electrical devices from remote locations |
US6949464B1 (en) | 1998-09-03 | 2005-09-27 | Micron Technology, Inc. | Contact/via force fill techniques |
US6490448B1 (en) * | 1999-12-10 | 2002-12-03 | Motorola, Inc. | Snap to grid variable beam size digital beamforming system |
GB2361118B (en) | 2000-04-07 | 2002-05-29 | Responsiveload Ltd | Responsive load system |
US6519509B1 (en) * | 2000-06-22 | 2003-02-11 | Stonewater Software, Inc. | System and method for monitoring and controlling energy distribution |
WO2002007365A2 (en) * | 2000-07-13 | 2002-01-24 | Nxegen | System and method for monitoring and controlling energy usage |
US6489834B2 (en) * | 2001-03-16 | 2002-12-03 | Hewlett-Packard Company | System and method utilizing on-chip voltage monitoring to manage power consumption |
JP3819722B2 (ja) * | 2001-03-30 | 2006-09-13 | 三菱電機株式会社 | 電圧変動補償装置 |
JP3923765B2 (ja) * | 2001-09-18 | 2007-06-06 | 株式会社日立製作所 | 電気機器システム |
US7227281B2 (en) * | 2002-06-14 | 2007-06-05 | Hewlett-Packard Development Company, L.P. | Causing operation of load in alternate, reduced peak power mode |
US7464551B2 (en) * | 2002-07-04 | 2008-12-16 | Alstom Technology Ltd. | Method for operation of a power generation plant |
US7149605B2 (en) * | 2003-06-13 | 2006-12-12 | Battelle Memorial Institute | Electrical power distribution control methods, electrical energy demand monitoring methods, and power management devices |
US7010363B2 (en) * | 2003-06-13 | 2006-03-07 | Battelle Memorial Institute | Electrical appliance energy consumption control methods and electrical energy consumption systems |
GB2407440B (en) * | 2003-09-23 | 2006-02-22 | Responsiveload Ltd | Grid stabilising system |
GB2407947A (en) | 2003-11-05 | 2005-05-11 | Nokia Corp | Distributing digital rights for DVB broadcast data to mobile terminals over, and in response to requests over, a separate PLMN cellular network |
GB0511361D0 (en) * | 2005-06-03 | 2005-07-13 | Responsiveload Ltd | Grid responsive control device |
-
2005
- 2005-06-03 GB GBGB0511361.8A patent/GB0511361D0/en not_active Ceased
-
2006
- 2006-05-30 TW TW095119168A patent/TWI452795B/zh active
- 2006-05-31 MY MYPI20062505A patent/MY140313A/en unknown
- 2006-06-01 EP EP20100012857 patent/EP2273647A2/en not_active Withdrawn
- 2006-06-01 CN CN2006800287382A patent/CN101238625B/zh active Active
- 2006-06-01 DK DK06754058T patent/DK1891724T3/da active
- 2006-06-01 WO PCT/EP2006/005252 patent/WO2006128709A2/en active Application Filing
- 2006-06-01 BR BRPI0611013-4A patent/BRPI0611013B1/pt active IP Right Grant
- 2006-06-01 MX MX2007015099A patent/MX2007015099A/es active IP Right Grant
- 2006-06-01 AT AT06754058T patent/ATE520187T1/de active
- 2006-06-01 RU RU2007149547/09A patent/RU2007149547A/ru unknown
- 2006-06-01 JP JP2008514020A patent/JP5121024B2/ja active Active
- 2006-06-01 PL PL06754058T patent/PL1891724T3/pl unknown
- 2006-06-01 DK DK10013210T patent/DK2273648T3/da active
- 2006-06-01 US US11/921,362 patent/US20100072817A1/en not_active Abandoned
- 2006-06-01 KR KR1020087000157A patent/KR101314075B1/ko active IP Right Grant
- 2006-06-01 EP EP20100013210 patent/EP2273648B1/en active Active
- 2006-06-01 EP EP20060754058 patent/EP1891724B1/en active Active
- 2006-06-01 ES ES06754058T patent/ES2371355T3/es active Active
- 2006-06-02 GB GB0610923A patent/GB2426878B/en active Active
- 2006-06-02 GB GB0711763A patent/GB2436253B/en active Active
- 2006-06-02 GB GB0711762A patent/GB2436252C/en active Active
-
2010
- 2010-11-29 US US12/927,907 patent/US20110190958A1/en not_active Abandoned
- 2010-11-29 US US12/927,892 patent/US8396607B2/en active Active
Also Published As
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2007149547A (ru) | Чувствительное к состоянию электросети устройство управления | |
JP2008543256A5 (ru) | ||
RU2011109200A (ru) | Электрическая установка | |
US9288876B2 (en) | Method and device for automatically controlling state indicator of terminal device | |
JP2008092792A5 (ru) | ||
CA2742611A1 (en) | Current limiting power generation control device and method | |
WO2015078200A1 (zh) | 一种充电方法及装置 | |
WO2012065078A3 (en) | System and method to measure and control power consumption in a residential or commercial building via a wall socket to ensure optimum energy usage therein | |
CA2443450A1 (en) | Method and apparatus for controlling power drawn from an energy converter | |
WO2009001615A1 (ja) | 予測制御システム | |
RU2012117532A (ru) | Устройство и способ управления энергетической установкой | |
TW200642249A (en) | Switching regulator over voltage reduction circuit and method | |
GB2431784A (en) | Anti dry-boil control for kettle using rate of change of temperature | |
RU2013143725A (ru) | Способ тестирования элемента пельтье и малогабаритное электрическое устройство с элементом пельтье и защитным устройством | |
RU2014109778A (ru) | Система регулирования паровой турбины для поддержания синхронизации и способ ее осуществления | |
US20120113557A1 (en) | Electronic circuit breaker | |
CN115642660A (zh) | 充电控制方法、装置、电子设备及计算机可读存储介质 | |
CN203732639U (zh) | 电弧故障检测保护装置 | |
CN102832102B (zh) | 确定场效应管老化条件的方法、场效应管老化方法及场效应管筛选方法 | |
CN102427005B (zh) | 一种断路器保护参数自动整定方法及一种断路器 | |
CN202171754U (zh) | 一种多路恒温控制器 | |
WO2003054562A3 (de) | Verfahren zur überprüfung der elektrischen sicherheit eines haushaltgeräts und entsprechendes haushaltgerät | |
CN110244115B (zh) | 一种基于信号连接性的负载开关事件检测方法及系统 | |
WO2011044749A1 (zh) | 精密脱扣器 | |
CN201838997U (zh) | 开机保护电路 |