PL3953122T3 - Instalacja produkcyjna oraz sposób wytwarzania tubingu betonowego systemu obudowy tuneli - Google Patents

Instalacja produkcyjna oraz sposób wytwarzania tubingu betonowego systemu obudowy tuneli

Info

Publication number
PL3953122T3
PL3953122T3 PL20721159.0T PL20721159T PL3953122T3 PL 3953122 T3 PL3953122 T3 PL 3953122T3 PL 20721159 T PL20721159 T PL 20721159T PL 3953122 T3 PL3953122 T3 PL 3953122T3
Authority
PL
Poland
Prior art keywords
producing
tunnel excavation
concrete segment
production system
production
Prior art date
Application number
PL20721159.0T
Other languages
English (en)
Inventor
Stefan Medel
Original Assignee
Herrenknecht Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Herrenknecht Ag filed Critical Herrenknecht Ag
Publication of PL3953122T3 publication Critical patent/PL3953122T3/pl

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25JMANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
    • B25J11/00Manipulators not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25JMANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
    • B25J5/00Manipulators mounted on wheels or on carriages
    • B25J5/02Manipulators mounted on wheels or on carriages travelling along a guideway
    • B25J5/04Manipulators mounted on wheels or on carriages travelling along a guideway wherein the guideway is also moved, e.g. travelling crane bridge type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25JMANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
    • B25J9/00Programme-controlled manipulators
    • B25J9/0009Constructional details, e.g. manipulator supports, bases
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • B28B11/245Curing concrete articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • B28B15/002Mobile plants, e.g. on vehicles or on boats
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B17/00Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
    • B28B17/0063Control arrangements
    • B28B17/0081Process control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B5/00Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping
    • B28B5/04Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping in moulds moved in succession past one or more shaping stations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • B28B7/0014Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0029Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
    • B28B7/0035Moulds characterised by the way in which the sidewalls of the mould and the moulded article move with respect to each other during demoulding
    • B28B7/0044Moulds characterised by the way in which the sidewalls of the mould and the moulded article move with respect to each other during demoulding the sidewalls of the mould being only tilted away from the sidewalls of the moulded article, e.g. moulds with hingedly mounted sidewalls
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/38Treating surfaces of moulds, cores, or mandrels to prevent sticking
    • B28B7/386Cleaning
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/086Methods of making concrete lining segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Structural Engineering (AREA)
  • Robotics (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Automation & Control Theory (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Moulds, Cores, Or Mandrels (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
PL20721159.0T 2019-04-07 2020-04-07 Instalacja produkcyjna oraz sposób wytwarzania tubingu betonowego systemu obudowy tuneli PL3953122T3 (pl)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102019109084 2019-04-07
PCT/EP2020/059943 WO2020208046A2 (de) 2019-04-07 2020-04-07 Produktionsanlage und verfahren zur herstellung eines betontübbings eines tunnelausbausystems

Publications (1)

Publication Number Publication Date
PL3953122T3 true PL3953122T3 (pl) 2025-04-14

Family

ID=67220630

Family Applications (2)

Application Number Title Priority Date Filing Date
PL20721159.0T PL3953122T3 (pl) 2019-04-07 2020-04-07 Instalacja produkcyjna oraz sposób wytwarzania tubingu betonowego systemu obudowy tuneli
PL20721158.2T PL3953121T3 (pl) 2019-04-07 2020-04-07 Szalunek do wytwarzania tubingu betonowego dla systemu obudowy tunelu

Family Applications After (1)

Application Number Title Priority Date Filing Date
PL20721158.2T PL3953121T3 (pl) 2019-04-07 2020-04-07 Szalunek do wytwarzania tubingu betonowego dla systemu obudowy tunelu

Country Status (12)

Country Link
US (2) US20220250277A1 (pl)
EP (6) EP3722058A1 (pl)
AU (2) AU2020271386A1 (pl)
CA (2) CA3134789A1 (pl)
ES (2) ES2988348T3 (pl)
HR (2) HRP20250321T1 (pl)
HU (2) HUE068257T2 (pl)
IL (2) IL287000A (pl)
PL (2) PL3953122T3 (pl)
RS (2) RS66664B1 (pl)
SG (2) SG11202111147TA (pl)
WO (2) WO2020208006A2 (pl)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112278760B (zh) * 2020-11-06 2022-04-01 广东博智林机器人有限公司 预制构件转运系统及转运方法
CN112523778B (zh) * 2020-12-02 2023-06-16 广东磐龙交通环境设施工程有限公司 一种轨道交通管片预埋连接套筒
CN113021610A (zh) * 2021-03-12 2021-06-25 修武县奥德隆科技有限责任公司 用于超低能耗房屋装配墙板的智能化生产线
CN113681704A (zh) * 2021-08-26 2021-11-23 成都锐龙机械制造有限公司 一种梁的预制装置及其应用的控制系统
IT202100029252A1 (it) * 2021-11-18 2023-05-18 Fama Srl Cassaforma e procedimento per la produzione di conci gettati
CN115008594B (zh) * 2022-06-22 2024-02-06 一鸣建设集团有限公司 一种建筑隔墙板流水线生产系统
CN115614063B (zh) * 2022-11-23 2023-09-29 中国安能集团第三工程局有限公司 一种隧道二次衬砌模板台车
DE102023124388A1 (de) * 2023-09-11 2025-03-13 FUCHS Europoles Wind GmbH Konisches oder zylindrisches Ringsegment, Spannbetonturm und Verfahren zur Herstellung eines Ringsegments
CN116968164B (zh) * 2023-09-12 2024-02-06 江苏丰和隧道设备有限公司 一种智能化的盾构管片蒸养出库控制方法及系统
EP4621166A1 (en) 2024-03-19 2025-09-24 Siemens Gamesa Renewable Energy Innovation & Technology, S.L. Method for manufacturing a tower, tower and casting mold

Family Cites Families (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1887648U (de) * 1962-01-20 1965-02-10 Bauunternehmung Lorenz Resting, Hoch-Tief-Stahlbeton und Industriebau, Lünen-Brambauer Vorgefertigte reihbare Zelle zum Beschleunigen des Abbindens von Betonfertigteilen
SE318510B (pl) * 1966-12-17 1969-12-08 W Schneider
JPS5263216A (en) * 1975-11-20 1977-05-25 P S Concrete Mold for production of concrete segment
JPS54152027A (en) * 1978-05-22 1979-11-29 Agency Of Ind Science & Technol Separation and purification of chlorophyll
JPS5751864Y2 (pl) * 1978-07-22 1982-11-11
JPS5794103A (en) * 1980-12-03 1982-06-11 Daikin Ind Ltd Hydraulic circuit
GB2127343B (en) * 1982-09-03 1986-07-30 Myrayarn Limited Improvements in or relating to methods of casting concrete articles
JPH0354127Y2 (pl) * 1984-09-20 1991-11-28
FR2581923B1 (fr) * 1985-02-20 1988-04-08 Alskanor Const Maisons Ind Moule ouvrant pour obtention de pieces notamment en beton
JPH04189506A (ja) * 1990-11-26 1992-07-08 Nippon Pressed Concrete Co Ltd コンクリートセグメント製作用型枠
DE19511744C2 (de) * 1995-03-30 1997-08-14 Ytong Ag Vorrichtung zur Betätigung von Verriegelungseinrichtungen an einer Schalungsform für Beton, insbesondere für Gasbeton
JP2001047421A (ja) * 1999-08-11 2001-02-20 Fujimi Koken Kk 型枠装置
WO2004065086A2 (de) * 2003-01-20 2004-08-05 Roland Weber Mobile, kompakte und flexible feldfabrik
DE202006016561U1 (de) * 2006-10-30 2007-03-08 Kastner, Erich Vorrichtung zum Herstellen von Fertigteilen aus aushärtbarer Gießmasse
DE102007032236B4 (de) * 2007-07-11 2009-04-16 Rekers Betonwerk Gmbh & Co. Kg Schalung zur Herstellung von Betonfertigteilen
CN101486229A (zh) * 2009-02-10 2009-07-22 江苏工业学院 隧道混凝土管片钢模液压驱动铰链开合装置
DE102009051583A1 (de) * 2009-10-21 2011-04-28 IPR-Intelligente Peripherien für Roboter GmbH Robotersystem und Verfahren zum Verlegen eines Schienenstrangs
DE102012010664A1 (de) * 2012-05-31 2012-12-13 Daimler Ag Produktionsanlage mit einer Mehrzahl von Arbeitsstationen und Verfahren zum Betreiben einer solchen Produktionsanlage
BR112015023238B1 (pt) * 2013-03-14 2022-03-03 Solidia Technologies, Inc Sistema de cura para curar um material que requer co2 como um reagente de cura
CN103726857B (zh) * 2013-11-28 2017-01-04 江苏牧羊控股有限公司 一种盾构管片柔性模具
CN105082346B (zh) * 2015-02-09 2019-02-19 中交第三航务工程局有限公司 一种盾构管片预制智能流水生产线
CN206158755U (zh) * 2016-11-16 2017-05-10 中铁工程装备集团机电工程有限公司 一种盾构管片生产模具
MX2017009909A (es) * 2017-07-31 2019-02-08 German Becerril Hernandez Sistema automatizado de construccion robotizado y metodo de construccion.
CN207359319U (zh) * 2017-10-31 2018-05-15 中建七局第四建筑有限公司 一种移动光伏智能一体化标养室
CN207495750U (zh) * 2017-11-20 2018-06-15 上海隧道工程有限公司构件分公司 用于水泥管片圆弧面自动收水抹平系统的龙门架运动装置
CN107901208A (zh) * 2017-12-07 2018-04-13 郑州市第建筑工程集团有限公司 预制钢筋混凝土管片全自动生产线
CN107932697A (zh) * 2017-12-15 2018-04-20 周兆弟 一种合模螺栓
CN208359048U (zh) * 2018-06-07 2019-01-11 中国水利水电夹江水工机械有限公司 一种管片水养搬运系统
CN109159273A (zh) * 2018-10-24 2019-01-08 中建科技有限公司 地下综合预制管廊混凝土预制构件的自动化生产方法
CN109227899A (zh) * 2018-11-21 2019-01-18 扬州牧羊隧道设备有限公司 一种新型隧道衬砌管片模具

Also Published As

Publication number Publication date
EP3953122B1 (de) 2025-01-29
US20220250277A1 (en) 2022-08-11
EP4397455A3 (de) 2024-10-02
CA3134789A1 (en) 2020-10-15
US20220168921A1 (en) 2022-06-02
EP3892429A1 (de) 2021-10-13
EP3953121A2 (de) 2022-02-16
PL3953121T3 (pl) 2024-11-12
HRP20250321T1 (hr) 2025-04-25
EP3953121B1 (de) 2024-07-24
NZ781063A (en) 2024-07-05
IL287001A (en) 2021-12-01
AU2020271618A1 (en) 2021-10-21
WO2020208006A2 (de) 2020-10-15
SG11202111146SA (en) 2021-11-29
HRP20241259T1 (hr) 2024-12-06
ES2988348T3 (es) 2024-11-20
WO2020208006A3 (de) 2020-12-10
RS66664B1 (sr) 2025-05-30
EP3953121C0 (de) 2024-07-24
EP3722058A1 (de) 2020-10-14
EP3953122C0 (de) 2025-01-29
IL287000A (en) 2021-12-01
EP3953122A2 (de) 2022-02-16
CA3134788A1 (en) 2020-10-15
HUE068257T2 (hu) 2024-12-28
EP4520498A2 (de) 2025-03-12
EP4520498A3 (de) 2025-05-07
AU2020271386A1 (en) 2021-10-28
EP4397455A2 (de) 2024-07-10
RS65995B1 (sr) 2024-10-31
ES3015142T3 (en) 2025-04-29
HUE071056T2 (hu) 2025-08-28
WO2020208046A3 (de) 2020-12-03
WO2020208046A2 (de) 2020-10-15
SG11202111147TA (en) 2021-11-29

Similar Documents

Publication Publication Date Title
PL3953122T3 (pl) Instalacja produkcyjna oraz sposób wytwarzania tubingu betonowego systemu obudowy tuneli
IL281911A (en) Prestressed reinforced concrete pipe pile and a production method thereof
SG11202110350UA (en) Method and system of constructing an underground tunnel
PL3793961T3 (pl) Materiał budowlany wytworzony z surowej, wydobytej ziemi gliniastej, sposób przygotowania takiego materiału budowlanego i układ przygotowania takiego materiału budowlanego
SG10202001021YA (en) Method of Producing a Substrate and System for Producing a Substrate
GB2584936B (en) A precast brick panel and method of manufacture
HUE061146T2 (hu) Betontömb elõállítására szolgáló eljárás
GB202303112D0 (en) A method of modelling a production system
GB2613875B (en) A method for the production of concrete
EP3106608A3 (en) A tunneling machine and a method of excavating a tunnel
KR102118636B9 (ko) 지하터널 형성용 구조물 설치 방법
GB202113960D0 (en) system and method for e-fuel production
SI3914570T1 (sl) Dodatek za beton in metoda za proizvodnjo omenjenega betona
PL3835021T3 (pl) Urządzenie i sposób do wytwarzania zaprawy tynkarskiej
PL4169687T3 (pl) Sposób wytwarzania bloczków betonowych
SI4069912T1 (sl) Postopek izdelave konstrukcijskega sistema
GB2591691B (en) Method and system of constructing an underground tunnel
GEU20242183Y (en) Method for cement production
LT3884138T (lt) Iškasos atraminiai lankai ir iškasos atraminės konstrukcijos gamybos būdas
ZA202201207B (en) Method for constructing reinforced concrete artificial pillars
GB201909973D0 (en) A method for producing cement
ZA202110931B (en) Surrounding rock tunnel tunneling construction method
ZA202109138B (en) Safe maintenance method of highway tunnel structure
ZA202006506B (en) Roof tile and method for producing a roof tile
GB202306637D0 (en) Mining method