KR20090030794A - 환상관 지지 구조의 시공 방법 - Google Patents
환상관 지지 구조의 시공 방법 Download PDFInfo
- Publication number
- KR20090030794A KR20090030794A KR1020070096345A KR20070096345A KR20090030794A KR 20090030794 A KR20090030794 A KR 20090030794A KR 1020070096345 A KR1020070096345 A KR 1020070096345A KR 20070096345 A KR20070096345 A KR 20070096345A KR 20090030794 A KR20090030794 A KR 20090030794A
- Authority
- KR
- South Korea
- Prior art keywords
- annular
- box girder
- annular tube
- piece
- blast furnace
- Prior art date
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/16—Tuyéres
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
Description
Claims (4)
- 상하 방향으로 설치된 필라들과 상기 필라들의 상부를 연결하는 박스 빔을 포함하고, 고로 둘레에 설치된 박스 거더;상기 박스 거더와 환상관 둘레를 감싸는 행거 브래킷을 연결하여 환상관을 박스 거더에 고정하는 텐션 로드; 및상기 박스 거더의 이웃한 필라와 상기 환상관을 연결하여 환상관의 진동을 차단하는 스태빌라이저 로드를 포함하는 고로 환상관 지지 구조.
- 고로 둘레에 환상관을 시공하는 방법에 있어서,설치될 환상관 피이스의 일부에 행거 브래킷을 설치하고, 설치될 환상관 피이스의 전체에 리프트 러그를 설치하는 단계(a);행거 브래킷이 설치된 환상관 피이스를 리프트 러그에 와이어 로프를 연결하여 인양하는 단계(b);인양된 환상관 피이스의 행거 브래킷과 박스 거더를 길이 조정이 가능한 텐션 로드로 연결하여 고정하는 단계(c);상기 단계(a)에서 리프트 러그만 설치된 환상관 피이스를 인양하고, 상기 단계(c)에서 박스 거더에 고정 연결된 환상관 피이스들과 서로 용접하여 연결하는 단계(d); 및양단이 박스 거더의 이웃한 두 개의 필라에 각각 고정되고, 그 중앙부가 환 상관에 접하는 스태빌라이저 로드를 설치하는 단계(e)를 포함하고,상기 단계(a)에서,설치될 환상관 피이스 중 절반에는 행거 브래킷이 두 개씩 설치되고,행거 브래킷이 설치된 환상관 피이스에는 하나의 리프트 러그가 용접에 의해 설치되며,행거 브래킷이 설치되지 않은 환상관 피이스에는 두 개의 리프트 러그가 용접에 의해 설치되고,행거 브래킷이 설치된 환상관 피이스상기 리프트 러그는 환상관 피이스 중 일부에만 용접에 의해 설치되며,상기 단계(b)에서,인양 작업은 윈치 또는 크레인에 의해 이루어지고,상기 단계(c)에서,상기 텐션 로드는 상기 박스 거더의 상단으로부터 하단을 관통하여 설치되고, 두 개 이상이 상기 행거 브래킷과 상기 박스 거더를 연결하는데 사용되며,상기 텐션 로드의 길이 조정은 텐션 로드를 박스 거더 상단에서 고정하는 너트의 회전에 의해 이루어지고,상기 단계(d)에서,박스 거더에 고정 연결된 환상관 피이스는 상기 텐션 로드의 길이를 조정하여 높이 및 균형을 조정한 후 용접되며,상기 단계(d)에서,리프트 러그만 설치된 환상관 피이스는 소정의 거리로 이격되고 그 사이의 거리를 조정할 수 있는 두 개의 도르래들의 외측을 와이어 로프가 둘러싼 상태에서 위치에 의해 인양되는 환상관 시공 방법.
- 제2항에 있어서,상기 단계(e)에서는 상기 도르래들 사이의 거리를 조정하여 리프트 러그만 설치된 환상관 피이스들의 높이 및 균형을 조절하는 것을 특징으로 하는 환상관 시공 방법.
- 제2항에 있어서,송풍지관들을 각각 인양하여 환상관에 용접하여 설치하는 단계를 더 포함하는 것을 특징으로 하는 환상관 시공 방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070096345A KR100899358B1 (ko) | 2007-09-21 | 2007-09-21 | 환상관 지지 구조의 시공 방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070096345A KR100899358B1 (ko) | 2007-09-21 | 2007-09-21 | 환상관 지지 구조의 시공 방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090030794A true KR20090030794A (ko) | 2009-03-25 |
KR100899358B1 KR100899358B1 (ko) | 2009-05-26 |
Family
ID=40697040
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070096345A KR100899358B1 (ko) | 2007-09-21 | 2007-09-21 | 환상관 지지 구조의 시공 방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100899358B1 (ko) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102012148B1 (ko) * | 2019-01-04 | 2019-08-19 | 오세현 | 버슬 파이프 시공 및 해체방법 |
KR102015752B1 (ko) * | 2019-08-12 | 2019-08-28 | 오세현 | 버슬 파이프 시공 및 해체방법 |
CN118653025A (zh) * | 2024-08-19 | 2024-09-17 | 山东东泰铜业股份有限公司 | 一种带有支架机构的保护套管 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3745946B2 (ja) * | 2000-07-14 | 2006-02-15 | 山九株式会社 | 高炉送風支管系の構築方法と構築用装置 |
JP4659290B2 (ja) * | 2001-07-27 | 2011-03-30 | 山九株式会社 | 送風支元管の取付け用調整装置 |
JP4349173B2 (ja) * | 2004-03-18 | 2009-10-21 | Jfeスチール株式会社 | 環状管の組立方法およびその支持構造 |
JP4530841B2 (ja) * | 2004-12-27 | 2010-08-25 | 山九株式会社 | 熱風環状管の設置方法 |
-
2007
- 2007-09-21 KR KR1020070096345A patent/KR100899358B1/ko active IP Right Grant
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102012148B1 (ko) * | 2019-01-04 | 2019-08-19 | 오세현 | 버슬 파이프 시공 및 해체방법 |
KR102015752B1 (ko) * | 2019-08-12 | 2019-08-28 | 오세현 | 버슬 파이프 시공 및 해체방법 |
CN118653025A (zh) * | 2024-08-19 | 2024-09-17 | 山东东泰铜业股份有限公司 | 一种带有支架机构的保护套管 |
Also Published As
Publication number | Publication date |
---|---|
KR100899358B1 (ko) | 2009-05-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101509049A (zh) | 高炉炉内冷却壁及炉衬的施工方法 | |
KR100899358B1 (ko) | 환상관 지지 구조의 시공 방법 | |
JP2010053441A (ja) | 高炉炉体の建設および改修の方法 | |
CN108342532A (zh) | 一种不破坏炉壳更换高炉冷却壁的装置及其更换方法 | |
JP2017019885A (ja) | コークス炉の建設方法 | |
CN100567507C (zh) | 高炉炉体的拆除方法 | |
KR102012148B1 (ko) | 버슬 파이프 시공 및 해체방법 | |
CN115354113A (zh) | 一种炼钢转炉炉体的保护性拆除方法 | |
CN109810716B (zh) | 用于干熄焦炉牛腿砖和冷却段砌体同时更换的施工方法 | |
CN208815048U (zh) | 一种高炉炉内保护棚支撑装置 | |
JP4592860B2 (ja) | 高炉構成部材の据え付け方法 | |
JP5750362B2 (ja) | 塔状構造物の解体工法 | |
KR100958304B1 (ko) | 고로의 개수 방법 | |
KR102015752B1 (ko) | 버슬 파이프 시공 및 해체방법 | |
CN101724738A (zh) | 压力容器制造厂用竖立式热处理炉 | |
JP7496739B2 (ja) | 混銑車内にて固化した銑鉄塊を除去する銑鉄塊の除去方法 | |
KR101929684B1 (ko) | 코크스로 보수를 위한 방열판 설치 방법 | |
KR101929685B1 (ko) | 코크스로 보수를 위한 방열판 설치 및 철거용 지그 세트 | |
CN218620891U (zh) | 一种炼铁高炉内检修用的可伸缩活动作业平台 | |
CN112139695B (zh) | 高炉炉壳中间段的更换方法 | |
JP5260135B2 (ja) | 出銑口装置の設置方法および出銑口装置。 | |
JP7436813B2 (ja) | 高炉内補修用具及びその設置方法 | |
CN103791720A (zh) | 一种大型拱形多孔高温电炉炉顶结构 | |
JP2020186448A (ja) | 高炉改修における炉底冷却方法 | |
JP4220926B2 (ja) | 高炉の改修工法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130520 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20140522 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20150518 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20160425 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20170502 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20180531 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20190520 Year of fee payment: 11 |