KR101151866B1 - 거푸집 작업발판의 인양방법 - Google Patents
거푸집 작업발판의 인양방법 Download PDFInfo
- Publication number
- KR101151866B1 KR101151866B1 KR1020100003275A KR20100003275A KR101151866B1 KR 101151866 B1 KR101151866 B1 KR 101151866B1 KR 1020100003275 A KR1020100003275 A KR 1020100003275A KR 20100003275 A KR20100003275 A KR 20100003275A KR 101151866 B1 KR101151866 B1 KR 101151866B1
- Authority
- KR
- South Korea
- Prior art keywords
- formwork
- rail
- scaffold
- formwork scaffold
- cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
- E04G11/28—Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/002—Workplatforms, railings; Arrangements for pouring concrete, attached to the form
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
그 기술적인 구성은, 콘크리트 벽체에 타설된 앵커볼트에 하부의 슈 어댑터를 나사 결합에 의해 착설하고, 상기 슈 어댑터를 상측 지지프레임 사이로 유압호스를 개재하여 유압펌프와 연설된 실린더를 삽입하여 실린더 하단부를 결합핀으로 고정시키며, 이때 상기 슈 어댑터내에 형성되는 사선형의 가이드 채널에 횡설된 걸림쇠가 레일의 걸림부에 걸려 고정되는 동작에 의해 레일과 연결된 거푸집 작업발판을 지지하면서, 상기 실린더의 상단부를 재차 상부의 슈 어댑터의 결합핀에 고정시키며, 상기 슈 어댑터의 걸림쇠가 레일의 걸림부에 걸려 레일 및 이와 연설되는 거푸집 작업발판을 인양시키게 되고, 이때 유압펌프 및 유압호스와 연결된 실린더는 다음 인양될 작업발판에 위치한 작업자가 리모콘의 작동에 의해, 거푸집 작업발판의 인양 작동을 수행하며, 상기 거푸집 작업발판 인양 완료시, 거푸집 작업발판과 연결된 레일을 벽체 상측에 앵커볼트를 통해 고정된 슈 어댑터에 고정시, 상기 거푸집 작업발판과 연결된 레일의 상단부에 볼 스크류가 횡설되는 레일 안내구를 설치하고, 상기 레일 안내구의 전방 걸림턱을 슈 어댑터의 결합핀에 계지하여, 상기 볼 스크류의 회전 동작으로, 기울어진 레일의 상단부를 벽체에 사전에 설치한 슈 어댑터에 정확하게 수직상태로 조절되어 고정하며, 상기 실린더의 하강에 의해 원위치로 복귀되고, 2번째 인양될 거푸집 작업발판에 실린더를 설치하고, 인양이 완료된 거푸집 작업발판에 유압호스를 개재하여 작업자 및 유압펌프가 위치되어 2번째 거푸집 작업발판의 인양 동작을 수행하는 한편, 상기와 동일하게 반복하여 인양될 거푸집 작업발판에 실린더를 설치하고, 인양이 완료된 거푸집 작업발판에 유압호스를 개재하여 작업자 및 유압펌프가 위치되어 거푸집 작업발판의 인양 동작을 수행하는 것을 요지로 한다.
Description
도 2는 종래 거푸집 작업발판의 인양시 거푸집 작업발판이 실린더에 의하여 상단으로 인양되는 상태의 측면 구조도.
도 3은 종래 거푸집 작업발판이 인양된 상태의 정면 구조도.
도 4는 본 발명에 의한 거푸집 작업발판의 인양방법의 벽체 및 레일에 설치되는 슈 어댑터 및 실린더의 개략 분해사시도.
도 5는 본 발명의 거푸집 작업발판의 인양방법의 레일에 슈 어댑터가 설치되어 인양하는 상태의 결합상태도.
도 6은 본 발명의 거푸집 작업발판의 인양방법의 벽체에 슈 어댑터 및 실린더가 설치되는 상태의 측면 구조도.
도 7은 본 발명의 거푸집 작업발판 인양방법의 레일 및 이와 연설되는 거푸집 작업발판을 인양시키는 상태의 측면 구조도.
도 8은 본 발명의 거푸집 작업발판 인양방법의 거푸집 작업발판과 연결된 레일을 벽체 상측에 고정된 슈 어댑터에 고정시키는 상태의 측면 구조도.
도 9는 본 발명의 거푸집 작업발판 인양방법의 거푸집 작업발판 인양 완료 상태의 측면 구조도.
도 10은 본 발명의 거푸집 작업발판과 연결된 레일의 상단부에 레일 안내구를 통해 기울어진 레일의 상단부를 수직상태로 조절하는 상태의 측면 구조도.
도 11은 도 10의 요부 측면 구조도.
도 12a 12f는 본 발명에 의한 거푸집 작업발판의 인양방법에 의한 인양 순서를 도시한 개략 구성도.
* 도면의 주요부분에 대한 부호의 설명 *
100...레일 110...슈 어댑터
111...플랜지부 120...걸림 돌기
130...실린더 140...앵커볼트
150...지지프레임 151...결합핀
152...가이드암 153...가이드 채널
154,,,걸림쇠 160...유압펌프
161...유압호스 170...볼 스크류
180...레일 안내구 190...가이드편
191...걸림턱 a...거푸집 작업발판
Claims (1)
- 내부에 콘크리트를 타설하여 타설면을 형성한 후, 거푸집 작업발판의 거푸집을 후진하여 탈형하고, 상기 타설면의 상단에 슈 어댑터를 설치하며, 인양할 작업발판 하단 슈 어댑터에 유압펌프와 연결된 실린더를 설치하여 거푸집 작업발판을 상부로 인양하고, 인양되는 거푸집 작업발판의 레일 상단이 상부의 슈 어댑터에 삽입되어 고정되며, 상승한 거푸집 작업발판을 고정하고 실린더를 해체한 후, 다음 거푸집 작업발판으로 이동시켜 설치하여 재차 다음 거푸집 작업발판을 상부로 인양하는 거푸집 작업발판의 인양방법에 있어서,
콘크리트 벽체에 타설된 앵커볼트에 하부의 슈 어댑터를 나사 결합에 의해 착설하고, 상기 슈 어댑터를 상측 지지프레임 사이로 유압호스를 개재하여 유압펌프와 연설된 실린더를 삽입하여 실린더 하단부를 결합핀으로 고정시키며, 이때 상기 슈 어댑터내에 형성되는 사선형의 가이드 채널에 횡설된 걸림쇠가 레일의 걸림부에 걸려 고정되는 동작에 의해 레일과 연결된 거푸집 작업발판을 지지하면서, 상기 실린더의 상단부를 재차 상부의 슈 어댑터의 결합핀에 고정시키는 단계;
상기 슈 어댑터의 걸림쇠가 레일의 걸림부에 걸려 레일 및 이와 연설되는 거푸집 작업발판을 인양시키게 되며, 이때 유압펌프 및 유압호스와 연결된 실린더는 다음 인양될 작업발판에 위치한 작업자가 리모콘의 작동에 의해, 거푸집 작업발판의 인양 작동을 수행하는 단계;
상기 거푸집 작업발판 인양 완료시, 거푸집 작업발판과 연결된 레일을 벽체 상측에 앵커볼트를 통해 고정된 슈 어댑터에 고정시, 상기 거푸집 작업발판과 연결된 레일의 상단부에 볼 스크류가 횡설되는 레일 안내구를 설치하고, 상기 레일 안내구의 전방 걸림턱을 슈 어댑터의 결합핀에 계지하여, 상기 볼 스크류의 회전 동작으로, 기울어진 레일의 상단부를 벽체에 사전에 설치한 슈 어댑터에 정확하게 수직상태로 조절되어 고정하는 단계;
상기 실린더의 하강에 의해 원위치로 복귀되고, 2번째 인양될 거푸집 작업발판에 실린더를 설치하고, 인양이 완료된 거푸집 작업발판에 유압호스를 개재하여 작업자 및 유압펌프가 위치되어 2번째 거푸집 작업발판의 인양 동작을 수행하는 단계; 및
상기와 동일하게 반복하여 인양될 거푸집 작업발판에 실린더를 설치하고, 인양이 완료된 거푸집 작업발판에 유압호스를 개재하여 작업자 및 유압펌프가 위치되어 거푸집 작업발판의 인양 동작을 수행하는 단계;로 이루어진 것을 특징으로 하는 거푸집 작업발판의 인양방법.
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020100003275A KR101151866B1 (ko) | 2010-01-13 | 2010-01-13 | 거푸집 작업발판의 인양방법 |
| SG2012049896A SG182387A1 (en) | 2010-01-13 | 2011-01-05 | Lifting method for formwork working platform |
| MYPI2012003019A MY163896A (en) | 2010-01-13 | 2011-01-05 | Lifting method for formwork working platform |
| PCT/KR2011/000037 WO2011087234A2 (ko) | 2010-01-13 | 2011-01-05 | 거푸집 작업발판의 인양방법 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020100003275A KR101151866B1 (ko) | 2010-01-13 | 2010-01-13 | 거푸집 작업발판의 인양방법 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20110083186A KR20110083186A (ko) | 2011-07-20 |
| KR101151866B1 true KR101151866B1 (ko) | 2012-05-31 |
Family
ID=44304776
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020100003275A Active KR101151866B1 (ko) | 2010-01-13 | 2010-01-13 | 거푸집 작업발판의 인양방법 |
Country Status (4)
| Country | Link |
|---|---|
| KR (1) | KR101151866B1 (ko) |
| MY (1) | MY163896A (ko) |
| SG (1) | SG182387A1 (ko) |
| WO (1) | WO2011087234A2 (ko) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103422662A (zh) * | 2013-09-10 | 2013-12-04 | 湖南长大建设集团股份有限公司 | 用于电梯井现浇的整体移动式施工平台及其使用方法 |
| KR101438191B1 (ko) * | 2013-06-03 | 2014-09-05 | (주)노전 | 자동 상승장치 |
| KR20190140273A (ko) | 2018-06-11 | 2019-12-19 | 서보산업 주식회사 | 접이식 작업대를 갖는 갱폼 |
| KR20250173766A (ko) * | 2024-06-04 | 2025-12-11 | 삼성물산 주식회사 | 레일 하강 어셈블리 및 이를 사용하여 레일을 하강시키는 방법 |
Families Citing this family (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9181719B2 (en) * | 2010-04-14 | 2015-11-10 | Vsl International Ag | Adjustable formwork climber for casting a protruding region of a structure |
| CN102505845B (zh) * | 2011-11-17 | 2014-07-02 | 柳雪春 | 高层建筑快速机械化施工的方法 |
| CN102493635B (zh) * | 2011-11-30 | 2013-11-20 | 深圳市特辰科技股份有限公司 | 升降脚手架自动定位及防坠装置 |
| CN102767278A (zh) * | 2012-08-03 | 2012-11-07 | 李明昆 | 一种高层建筑施工用液压爬架 |
| KR101429343B1 (ko) * | 2012-08-08 | 2014-08-12 | 삼목에스폼 주식회사 | 멀티 레일 클라이밍 장치 |
| CN102828608A (zh) * | 2012-09-21 | 2012-12-19 | 南京道广建筑模板有限公司 | 高层建筑施工液压爬升保护装置 |
| CN103362296A (zh) * | 2013-05-24 | 2013-10-23 | 陈伟明 | 一种附着式升降棚架或脚手架 |
| CN105178585A (zh) * | 2015-02-11 | 2015-12-23 | 中建四局第三建筑工程有限公司 | 配合外立面穿插施工的集成式施工升降平台构筑方法 |
| KR101828318B1 (ko) * | 2016-06-09 | 2018-03-30 | 김태성 | 노후 구조물 철거장치 및 철거방법 |
| DE102017217715A1 (de) * | 2017-10-05 | 2019-04-11 | Peri Gmbh | Hydraulik-Anordnung mit vernetzten Hydraulikaggregaten sowie Kletterschalung und Verfahren zum Bewegen der Kletterschalung mit einer solchen Hydraulik-Anordnung |
| DE102018202097A1 (de) * | 2018-02-12 | 2019-08-14 | Peri Gmbh | Klettersystem und Verfahren zum Betrieb eines Klettersystems |
| KR102396527B1 (ko) | 2020-05-27 | 2022-05-10 | 서현수 | 작업발판 인양장치 |
| CN113775161B (zh) * | 2021-09-10 | 2022-06-07 | 广州达蒙安防科技有限公司 | 一种一次性附墙顶升机构及方法 |
| CN115897982B (zh) * | 2023-01-10 | 2025-03-21 | 中铁十九局集团有限公司 | 一种建筑行业用便于调节的爬架系统 |
| CN118815156B (zh) * | 2024-09-18 | 2024-12-17 | 山西八建集团有限公司 | 一种建筑工程施工用立柱铝合金模板固定结构 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08144514A (ja) * | 1994-11-17 | 1996-06-04 | Hory Corp | 昇降機能を備えた足場付型枠装置及び足場付型枠装置を利用したコンクリート壁等の構築方法 |
| US20030052249A1 (en) | 2000-01-18 | 2003-03-20 | Thomas Waldschmitt | Wall climbing form hoist |
| WO2005054604A1 (es) | 2003-11-27 | 2005-06-16 | Ulma C Y E, S. Coop. | Sistema trepador para encofrados, andamios y cargas en general |
| KR100647977B1 (ko) | 2005-09-15 | 2006-11-23 | 페리유한회사 | 탈부착되는 실린더와 이동되는 펌프가 구비된 거푸집작업발판의 인양방법 |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102006026201B4 (de) * | 2006-06-06 | 2008-04-10 | Doka Industrie Gmbh | Selbstklettersystem |
| KR101053798B1 (ko) * | 2008-12-31 | 2011-08-03 | 진성토건 주식회사 | 거푸집 자동승강 장치 및 이를 이용한 거푸집 자동승강방법 |
-
2010
- 2010-01-13 KR KR1020100003275A patent/KR101151866B1/ko active Active
-
2011
- 2011-01-05 SG SG2012049896A patent/SG182387A1/en unknown
- 2011-01-05 WO PCT/KR2011/000037 patent/WO2011087234A2/ko not_active Ceased
- 2011-01-05 MY MYPI2012003019A patent/MY163896A/en unknown
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08144514A (ja) * | 1994-11-17 | 1996-06-04 | Hory Corp | 昇降機能を備えた足場付型枠装置及び足場付型枠装置を利用したコンクリート壁等の構築方法 |
| US20030052249A1 (en) | 2000-01-18 | 2003-03-20 | Thomas Waldschmitt | Wall climbing form hoist |
| WO2005054604A1 (es) | 2003-11-27 | 2005-06-16 | Ulma C Y E, S. Coop. | Sistema trepador para encofrados, andamios y cargas en general |
| KR100647977B1 (ko) | 2005-09-15 | 2006-11-23 | 페리유한회사 | 탈부착되는 실린더와 이동되는 펌프가 구비된 거푸집작업발판의 인양방법 |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101438191B1 (ko) * | 2013-06-03 | 2014-09-05 | (주)노전 | 자동 상승장치 |
| CN103422662A (zh) * | 2013-09-10 | 2013-12-04 | 湖南长大建设集团股份有限公司 | 用于电梯井现浇的整体移动式施工平台及其使用方法 |
| KR20190140273A (ko) | 2018-06-11 | 2019-12-19 | 서보산업 주식회사 | 접이식 작업대를 갖는 갱폼 |
| KR20250173766A (ko) * | 2024-06-04 | 2025-12-11 | 삼성물산 주식회사 | 레일 하강 어셈블리 및 이를 사용하여 레일을 하강시키는 방법 |
| KR102910807B1 (ko) * | 2024-06-04 | 2026-01-12 | 삼성물산 주식회사 | 레일 하강 어셈블리 및 이를 사용하여 레일을 하강시키는 방법 |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2011087234A2 (ko) | 2011-07-21 |
| WO2011087234A3 (ko) | 2011-11-10 |
| SG182387A1 (en) | 2012-08-30 |
| KR20110083186A (ko) | 2011-07-20 |
| MY163896A (en) | 2017-11-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR20110083186A (ko) | 거푸집 작업발판의 인양방법 | |
| CN109736578B (zh) | 一种装配式建筑对位安装辅助定位装置 | |
| US9175487B2 (en) | Self-climbing perimetric protection system for construction works in buildings | |
| KR20100001123U (ko) | 자립 오토 클라이밍장치 및 이를 이용한 자립 오토클라이밍 시스템 | |
| KR101553966B1 (ko) | 외벽설치 타워크레인 등반장치 | |
| CN102877637A (zh) | 一种解决悬挑梁底部墙面施工操作平台的方法 | |
| KR20090020246A (ko) | 자립 오토 클라이밍 시스템 및 이를 이용한 방법 | |
| KR20120131710A (ko) | 케이지 레일 클라이밍 시스템 | |
| CN114508231B (zh) | 一种工字钢组件快速组合施工方法 | |
| CN211447720U (zh) | 爬升式电梯井道施工操作平台 | |
| KR20070000811U (ko) | 갱폼 상승유도기 | |
| CN102747831B (zh) | 套轨式电动附着升降脚手架 | |
| KR100647977B1 (ko) | 탈부착되는 실린더와 이동되는 펌프가 구비된 거푸집작업발판의 인양방법 | |
| KR101062138B1 (ko) | 가설대 조임 장치 및 방법 | |
| KR100475544B1 (ko) | 고층건물의 콘크리트벽체 시공을 위한 거푸집 승강시스템 | |
| KR100934376B1 (ko) | 상승 및 하강 가능한 승강 작업대 및 그 이동 방법 | |
| KR101146735B1 (ko) | 오토 클라이밍 시스템 폼 | |
| KR20210146573A (ko) | 작업발판 인양장치 | |
| KR101213276B1 (ko) | 외단열 시공 겸용 시스템 거푸집, 외벽 및 외단열 시공 방법 | |
| KR200425807Y1 (ko) | 인양형 갱폼 | |
| KR20110139620A (ko) | 안전 레일 클라이밍 시스템을 이용한 마감 시공 방법 | |
| KR20070005533A (ko) | 갱폼 | |
| KR200417331Y1 (ko) | 갱폼 리프트 | |
| KR100895614B1 (ko) | 건축물 시공방법 | |
| KR200366291Y1 (ko) | 고층건물의 콘크리트벽체 시공을 위한 거푸집 승강시스템 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| PG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-PG1501 |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 4 |
|
| FPAY | Annual fee payment |
Payment date: 20160329 Year of fee payment: 5 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 5 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 6 |
|
| FPAY | Annual fee payment |
Payment date: 20180329 Year of fee payment: 7 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 7 |
|
| FPAY | Annual fee payment |
Payment date: 20190327 Year of fee payment: 8 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 8 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 9 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 10 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 11 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 12 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 13 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 14 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 15 |
|
| U11 | Full renewal or maintenance fee paid |
Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-OTH-PR1001 (AS PROVIDED BY THE NATIONAL OFFICE) Year of fee payment: 15 |