KR100785634B1 - Continuation structure of prestressed concrete composite beam bridge and method thereof - Google Patents
Continuation structure of prestressed concrete composite beam bridge and method thereof Download PDFInfo
- Publication number
- KR100785634B1 KR100785634B1 KR1020060105586A KR20060105586A KR100785634B1 KR 100785634 B1 KR100785634 B1 KR 100785634B1 KR 1020060105586 A KR1020060105586 A KR 1020060105586A KR 20060105586 A KR20060105586 A KR 20060105586A KR 100785634 B1 KR100785634 B1 KR 100785634B1
- Authority
- KR
- South Korea
- Prior art keywords
- precast
- psc
- psc beam
- bridge
- beams
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/02—Bridges characterised by the cross-section of their bearing spanning structure of the I-girder type
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/04—Bearings; Hinges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/28—Concrete reinforced prestressed
- E01D2101/285—Composite prestressed concrete-metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
도1 내지 도9는 본 발명의 제1실시예에 따른 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조에 관한 것으로,1 to 9 are related to the continuity structure of the prestressed concrete composite beam bridge according to the first embodiment of the present invention,
도1은 본 발명의 제1실시예에 따른 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조를 도시한 평면도1 is a plan view showing a continuity structure of a prestressed concrete composite beam bridge according to a first embodiment of the present invention.
도2는 도1의 측면도Figure 2 is a side view of Figure 1
도3은 도1의 절단선 Ⅲ-Ⅲ에 따른 단면도3 is a cross-sectional view taken along the cutting line III-III of FIG.
도4는 도1의 'A'부분의 상세 구조를 도시한 사시도4 is a perspective view showing a detailed structure of part 'A' of FIG.
도5는 도4의 프리캐스트 받침빔의 형상을 도시한 정면도5 is a front view showing the shape of the precast receiving beam of FIG.
도6은 도1의 'B'부분의 상세 구조를 도시한 사시도FIG. 6 is a perspective view showing a detailed structure of a portion 'B' of FIG.
도7은 도6의 죔기구의 구성을 도시한 사시도Figure 7 is a perspective view showing the configuration of the fastening mechanism of Figure 6
도8는 도2의 프리스트레스트 콘트리트 합성빔에 내설된 2차 연속 텐던이 표시된 합성빔의 구성을 도시한 측면도FIG. 8 is a side view showing the configuration of a composite beam in which secondary continuous tendons embedded in the prestressed concrete composite beam of FIG. 2 are displayed; FIG.
도9은 도2의 프리캐스트 PSC빔에 1차 텐던이 표시되는 형상을 도시한 사시도9 is a perspective view showing a shape in which primary tendons are displayed on the precast PSC beam of FIG.
도10은 도1의 프리캐스트 PSC빔으로부터 교축직각 방향으로 돌출된 다이어프램을 상호 일체화시킨 형상을 도시한 도면FIG. 10 is a view showing a shape in which the diaphragms protruding from the precast PSC beam of FIG.
도11 내지 도14는 본 발명의 제2실시예에 따른 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조에 관한 것으로11 to 14 relate to the continuity structure of the prestressed concrete composite beam bridge according to the second embodiment of the present invention.
도11은 도1에 적용 가능한 부분 바닥판이 일체로 제작된 PSC 부분 합성빔의 형상을 도시한 사시도FIG. 11 is a perspective view showing a shape of a PSC partial composite beam in which a partial bottom plate applicable to FIG. 1 is integrally manufactured;
도12는 도11의 PSC 부분 합성빔이 적용된 경우 도1의 ‘A'부분의 상세 구조를 도시한 사시도12 is a perspective view illustrating a detailed structure of a portion 'A' of FIG. 1 when the PSC partial composite beam of FIG. 11 is applied.
도13은 도11의 PSC 부분 합성빔이 적용된 경우 도1의 ‘B'부분의 상세 구조를 도시한 사시도FIG. 13 is a perspective view illustrating a detailed structure of a portion 'B' of FIG. 1 when the PSC partial composite beam of FIG. 11 is applied.
도14은 도11의 PSC 부분 합성빔을 이용하여 교량의 최종 바닥판을 형성하기 위한 구성을 도시한 도면FIG. 14 shows a configuration for forming a final bottom plate of a bridge using the PSC partial composite beam of FIG.
도15 내지 도16은 본 발명의 제3실시예에 따른 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조에 관한 것으로,15 to 16 relate to the continuation structure of the prestressed concrete composite beam bridge according to the third embodiment of the present invention,
도15는 본 발명의 제2실시예에 따른 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조를 도시한 평면도15 is a plan view showing the sequencing structure of the prestressed concrete composite beam bridge according to the second embodiment of the present invention.
도16은 도15의 측면도Figure 16 is a side view of Figure 15
도17 내지 도22는 본 발명의 제4실시예에 따른 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조에 관한 것으로,17 to 22 are related to the continuation structure of the prestressed concrete composite beam bridge according to the fourth embodiment of the present invention,
도17은 본 발명의 제4실시예에 따른 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조의 평면도17 is a plan view of the continuity structure of the prestressed concrete composite beam bridge according to the fourth embodiment of the present invention.
도18은 도17의 측면도Figure 18 is a side view of Figure 17
도19는 도17의 'E'부분의 상세 구조를 도시한 사시도19 is a perspective view showing a detailed structure of a portion 'E' of FIG.
도20은 도17의 'D'부분의 상세 구조를 도시한 사시도20 is a perspective view showing a detailed structure of a portion 'D' of FIG.
도21은 도17의 프리캐스트 PSC빔의 구성을 도시한 사시도21 is a perspective view showing the structure of the precast PSC beam of FIG.
도22는 도17의 프리캐스트 PSC빔의 측면도Figure 22 is a side view of the precast PSC beam of Figure 17;
** 도면의 주요 부분에 대한 부호의 설명 ** ** Description of symbols for the main parts of the drawing **
10, 20, 30: 교각10, 20, 30: piers
100,200,300: 프리스트레스트 콘크리트[PSC] 합성빔 교량의 연속화 구조100,200,300: Continuous structure of prestressed concrete [PSC] composite beam bridge
110,210,310: 프리캐스트 중간 프리캐스트 받침빔 110,210,310: precast intermediate precast beam
110a,120a,310a,320a: 거치 돌기110a, 120a, 310a, 320a: mounting turning
112,312: 프리캐스트 받침빔 보강텐던 112,312: precast stand beam reinforcement tendon
111,121,211,221,311,321:영구베어링111,121,211,221,311,321: Permanent Bearing
112a: 받침용 보강텐던 정착구 112a: reinforcement tendon anchor
120,220,320: 프리캐스트 단부 프리캐스트 받침빔 120,220,320: precast end precast beam
130,230,330: PSC 합성빔 130a,230a,330a: 거치홈130,230,330: PSC
130b,230b,330b; 연결돌기 130c: 보강헌치130b, 230b, 330b; Connecting
131,231,331: PSC 합성빔 2차 연속텐던 132,332: PSC 합성빔 1차 텐던131,231,331: PSC composite beam secondary continuous tendon 132,332: PSC composite beam primary tendon
131a: 인장 정착구 131c: 정착구긴장용 콘크리트블 럭131a:
132a,332a: 인장 정착구 132b: 고정 정착구132a, 332a: tensile
134,334: 탠던 삽입용 쉬즈관 140,240,340: 모르타르 134,334: Sheath pipe for tandon insertion 140,240,340: mortar
150,250,350: 프리캐스트 다이어프램 151,351: 다이어프램 보강텐던 150,250,350: Precast diaphragm 151,351: Diaphragm reinforcement tendon
152,252,352: 현장타설 콘크리트 160,360: 죔기구152,252,352: Cast-in-place concrete 160,360: Fastening mechanism
161: 2차 고강도 강봉 (재긴장용) 161a: 인장 너트161: secondary high strength steel bar (for retension) 161a: tension nut
162,362: 1차 고강도 강봉 162a,362a: 인장 너트162,362: primary high
162b,362b: 고정 너트 162c: 강봉 삽입용 쉬즈관162b and 362b:
163: 지지판 170: 콘크리트 바닥판163: support plate 170: concrete base plate
171,371: 프리캐스트 부분 바닥판 172,372: 현장타설 콘크리트 바닥판 171,371: precast partial deck 172,372: cast-in-place concrete deck
180: 바닥 거푸집 181: 훰타이 강봉 180: formwork 181: 훰 tai steel rod
181a: 고정 너트 182: 강재 빔 181a: fixing nut 182: steel beam
183: 콘크리트 스페이서
330': 프리캐스트 세그먼트 PSC 빔183: concrete spacer
330 ': precast segmented PSC beam
335: 프리캐스트 프리캐스트 변단면 PSC빔 335a: 제2 거치돌기 335: precast precast edge
335b: 제2 거치홈 336: 1차 연결용 직선텐던 335b: second mounting groove 336: linear tendon for primary connection
336a: 인장 정착구 363c: 텐던 삽입용 쉬즈관 336a: tension anchor 363c: sheath tube for tendon insertion
390: 임시 교각 391: 임시 받침 390: temporary pier 391: temporary support
399: 프리캐스트 세그먼트 PSC빔 연결용 현장타설 콘크리트399: Cast-in-place concrete for precast segment PSC beam connection
본 발명은 프리스트레스트 콘크리트 합성빔(Prestressed Concrete Composite Beam, 이하 간단히 "PSC 합성빔"이라 한다) 교량의 연속화 구조 및 그 공법에 관한 것으로, 연속교의 구조 거동을 안정적으로 확보함과 동시에 시공이 간단하고 저렴한 PSC 합성빔 교량의 연속화 구조 및 그 공법에 관한 것이다. The present invention relates to a continuous structure of a prestressed concrete composite beam (hereinafter, simply referred to as a "PSC composite beam") bridge and its construction method, while stably securing the structural behavior of the continuous bridge and at the same time the construction is simple. A continuous structure of an inexpensive PSC composite beam bridge and a method thereof are provided.
단순보가 연속적으로 시공된 교량은 중간 지점부인 교각에서 부 모멘트가 발생함에 따라 차량이나 철도가 지나는 바닥판 상부 균열을 초래하는 문제점을 가지고 있었다. 이에 따라, 바닥판의 균열을 줄이고자 다수의 단순보가 하나의 거동을 할 수 있도록 하는 연속화 공법이 제안되었다.Bridges constructed with simple beams had a problem of causing cracks in the upper deck of vehicles or railways as secondary moments occurred in the piers, which are intermediate points. Accordingly, in order to reduce cracking of the bottom plate, a sequencing method has been proposed in which a plurality of simple beams can perform a single behavior.
이를 구체적으로 살펴보면, 원대연이 고안하여 대한민국 등록특허공보 제349,864호의 "프리스트레스트 콘크리트 합성 아이빔 교량의 구조적 연속화 공법"은, 프리캐스트 PSC빔(Precast prestressed concrete I-beam)을 공장 또는 교량가설현장에 인접한 제작장에서 미리 제작하여 1차 텐던(Tenon)을 긴장한 후 현장으로 운반하고, 상기 프리캐스트 PSC빔을 크레인을 이용하여 교각 상단에 설치한 임시 받침 위에 거치하고, 임시 받침 위에 거치된 상기 프리캐스트 PSC빔의 종 방향을 따라 2차 연속 텐던들을 전 경간에 걸쳐 연속적으로 연결시켜 배치하는 동시에 프리캐스트 PSC빔을 교축직각 방향으로 연결하는 가로보 및 종 방향으로 연결하는 중간 지점 상단의 현장 이음부를 철근에 의해 서로 구조적으로 연결한 후 현장타설 콘크리트를 타설 및 양생하고, 상기 2차 연속 텐던 중의 일부를 긴장하여 프리캐스트 PSC빔을 구조적으로 연결시키고, 상기 프리캐스트 PSC빔 및 가로보 위에 바닥판 콘크리트를 타설하여 단면을 합성상태로 만든 다음에 나머지 2차 연속 텐던을 긴장하여 상부 바닥판에 프리스트레싱을 도입하여 전 구간 연속교량을 완성시키는 것을 특징으로 하는 프리스트레스트 콘크리트 합성 아이빔 교량의 구조적 연속화 공법을 개시하고 있다. In detail, the "structural continuity method of prestressed concrete composite i-beam bridge" of the Republic of Korea Patent Publication No. 349,864, designed by Wondaeyeon, the precast PSC beam (Precast prestressed concrete I-beam) adjacent to the factory or bridge construction site After pre-fabricating at the production site, the first Tendon is tensioned and transported to the site, and the precast PSC beam is mounted on a temporary support installed on the top of the pier using a crane, and the precast PSC mounted on the temporary support. Reinforce the site joints at the top of the intermediate point connecting the precast PSC beams in the longitudinal direction and connecting the precast PSC beams in the longitudinal direction while simultaneously arranging the second consecutive tendons along the longitudinal direction of the beam. Structurally connect each other and then cast and cure concrete, and the second continuous A part of the dun is tensioned to structurally connect the precast PSC beam, and the bottom plate concrete is placed on the precast PSC beam and the cross beam to make a cross section, and then the remaining second continuous tendons are tensioned to the upper floor plate. Disclosed is a structural sequencing method of prestressed concrete composite i-beam bridge, characterized in that the prestressing is introduced to complete the continuous bridge for the entire section.
그러나, 상기 공법은, 종 방향으로 배열된 2개의 프리캐스트 PSC빔을 연속화하기 위하여, 프리캐스트 PSC빔을 임시받침 위에 거치시킨 상태에서 인접한 프리캐스트 PSC빔 사이에 콘크리트를 현장 타설해야 하는 번거로움을 야기할 뿐만 아니라, 임시받침을 제거한 후 타설 양생된 콘크리트의 하측에 영구받침을 다시 설치해야 하므로, 그 공정이 지나치게 오래 소요되고 까다로운 문제점이 있었다. However, this method avoids the hassle of placing concrete between adjacent precast PSC beams with the precast PSC beam mounted on a temporary support in order to continually align two precast PSC beams arranged in the longitudinal direction. Not only cause, but after removing the temporary support, the permanent support must be reinstalled on the lower side of the cured concrete, the process takes too long and has a difficult problem.
더욱이, 상기 방법은 인접한 2개의 프리캐스트 PSC빔의 연속화하기 위하여 현장 타설되는 아이빔 사이를 철근 커플러를 사용하여 강제로 연결시키는 데, 이 공종에는 많은 시간이 소요되어 경제성이 저하되는 문제점도 있었다.In addition, the method forcibly connects between two adjacent precast PSC beams by using a reinforcing bar coupler between reinforcement beams. However, this work takes a lot of time and has a problem of lowering economic efficiency.
본 발명은 상술한 바와 같은 문제점을 해결하기 위하여, 보다 간단한 공정으로 시공하여 제작의 편의를 도모하며, 저렴할 뿐만 아니라 짧은 공사 기간 동안에 시공할 수 있는 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조 및 그 공법을 제공하는 것을 그 목적으로 한다.In order to solve the problems described above, the present invention provides a simplification of the production by construction in a simpler process, and a continuous structure of the prestressed concrete composite beam bridge that can be constructed during a short construction period as well as inexpensive construction and its method Its purpose is to provide.
또한, 본 발명의 다른 목적은 교각기둥에 작용하는 인장응력을 최소화하고 교각기둥에 압축응력이 주로 작용하도록 하여 교각을 콤팩트하며 저렴하고 미적으 로 시공할 수 있도록 하는 것이다. In addition, another object of the present invention is to minimize the tensile stress acting on the piers pillars and compressive stress mainly acts on the piers pillars so that the piers can be compact, inexpensive and aesthetically constructed.
그리고, 본 발명은 교각 주위의 상판에 작용하는 부 모멘트를 최소화할 수 있도록 함과 동시에 프리캐스트 PSC빔의 중앙부 하단에 과도한 정 모멘트에 의한 인장응력이 도입되는 것을 방지할 수 있도록 하는 것을 목적으로 한다. In addition, an object of the present invention is to minimize the minor moment acting on the upper plate around the piers and to prevent the introduction of tensile stress due to excessive positive moment in the lower end of the center portion of the precast PSC beam. .
또한, 본 발명은 제작장에서 완성 바닥판 두께 보다 얇은 일부 두께로 형성된 부분 바닥판과 일체의 프리캐스트 콘크리트 부분 합성빔을 교각 상부 위의 프리캐스트 받침빔에 연결시키고, 기 설치된 부분 바닥판을 이용한 간단한 시스템 거푸집으로 최종 바닥판의 두께가 되도록 콘크리트를 타설함으로써, 종래에 동바리에 의해 바닥판 거푸집이 지지되도록 한 상태에서 콘크리트를 타설하여 바닥판을 시공하는 것에 비하여, 바닥판을 보다 원활하고 저렴하며 간단한 공정으로 프리캐스트 빔에 합성되는 시공을 행할 수 있도록 하는 것을 다른 목적으로 한다. In addition, the present invention is connected to the precast concrete partial composite beam integral with the partial bottom plate formed in a part thickness thinner than the finished bottom plate in the fabrication site to the precast receiving beam on the top of the piers, and using the pre-installed partial bottom plate By placing concrete to be the thickness of the final slab with a simple system formwork, the slab is smoother and cheaper than the construction of the slab by placing concrete while supporting the slab formwork by the copper bar. Another object of the present invention is to enable construction to be synthesized in a precast beam by a simple process.
그리고, 본 발명의 다른 목적은 두 개의 프리캐스트 PSC 합성빔을 프리캐스트 받침빔을 중심으로 연결하는 경우에 사용하는 2차 고강도 강봉을 재긴장(Restressing) 할 수 있는 시스템으로 설치 시공하여, 사용 교량이 과다 사용하중 작용 시 연속교로 인해서 추가 발생 할 수 있는 교각 주의의 부 모멘트에 의한 인장응력을 기 설치된 2차 고강도 강봉을 재긴장 하여 상쇄시킴으로써 구조물의 유지관리를 원활히 할 수 있도록 하는 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조 및 그 공법을 제공하는 것이다.Another object of the present invention is to install and install a secondary high-strength steel rod used in the case of connecting two precast PSC composite beams around a precast receiving beam as a system capable of restressing and using bridges. Prestressed concrete that facilitates maintenance of the structure by retightening the secondary high-strength steel rods already installed to offset the tensile stress due to minor moments of pier caution, which may be additionally generated by continuous bridges during this overload operation A continuous structure of a composite beam bridge and a method thereof are provided.
본 발명은 상술한 바와 같은 목적을 달성하기 위하여, 교각 상부(코핑)의 영구베어링에 지지되도록 미리 제작된 프리캐스트 받침빔을 거치시키는 프리캐스트 받침빔 거치 단계와; 미리 제작된 프리캐스트 PSC빔의 1차 텐던을 긴장시킨 후, 상기 프리캐스트 받침빔에 양단이 지지되도록 상기 프리캐스트 받침빔의 교축직각 방향으로 다수 거치시키는 프리캐스트 PSC빔 거치 단계와; 상기 프리캐스트 받침빔과 상기 프리캐스트 PSC빔 사이의 간극을 충진하는 충진 단계와; 상기 프리캐스트 받침빔과 이와 교축 방향으로 인접한 상기 프리캐스트 PSC빔을 연결 고정시키는 단계와; 상기 프리캐스트 PSC빔의 상면에 바닥판을 형성하여 콘크리트 합성빔을 형성하는 합성빔 형성 단계와; 상기 프리캐스트 PSC빔에 2차 연속 텐던을 긴장하여 프리스트레스를 도입하는 단계를; 포함하여 구성된 것을 특징으로 하는 프리스트레스트 콘크리트 합성빔 교량의 연속화 공법을 제공한다.The present invention provides a precast receiving beam mounting step of mounting a precast receiving beam pre-fabricated to be supported by the permanent bearing of the pier (coping) to achieve the object as described above; A precast PSC beam mounting step of tensioning the primary tendons of the precast PSC beams pre-fabricated and then placing the pretend PSC beams in the axially orthogonal direction of the precast support beams so that both ends thereof are supported by the precast support beams; A filling step of filling a gap between the precast receiving beam and the precast PSC beam; Coupling and fixing the precast receiving beam and the precast PSC beam adjacent thereto in the axial direction; A composite beam forming step of forming a concrete composite beam by forming a bottom plate on an upper surface of the precast PSC beam; Tensioning a second consecutive tendon in the precast PSC beam to introduce prestress; It provides a continuous method of prestressed concrete composite beam bridge, characterized in that configured to include.
참고로, 본 발명의 명세서 및 특허청구범위에서의 "교각"은 교량을 중간 지점부에서 지지하는 기둥만을 의미하는 것이 아니라 교량의 양단을 지지하는 기둥(일반적으로 "교대"라는 용어로 사용되는 부분)을 포함하는 것으로 정의하기로 한다.For reference, in the specification and claims of the present invention, "pier" does not mean only a pillar supporting the bridge at an intermediate point portion, but a pillar supporting both ends of the bridge (generally used as the term "shift"). Will be defined as including).
이는, 미리 프리캐스트로 제작된 프리캐스트 받침빔을 교각 상부의 영구베어링에 거치시킨 상태에서, 크레인으로 프리캐스트 PSC빔을 인상하여 교각 위의 프리캐스트 받침빔에 단순히 거치시킨 후, 교축 방향으로 각각 인접한 2개의 프리캐스트 PSC빔을 프리캐스트 받침빔에 상호 연결하는 1,2차 고강도 강봉 등의 수단으로 프리캐스트 PSC빔을 긴장하여 서로 연결시키고, 프리캐스트 PSC빔에 설치된 2차 연속 텐던을 긴장하여 프리스트레스를 도입함으로써, 교각에 지지되는 다수의 단순보 형태의 교량을 연속화 시키기 위함이다. 이를 통해, 짧은 공사 기간 내에도 시공을 할 수 있을 뿐만 아니라 합성빔 교량의 연속화 공종이 매우 단순하게 된다. In the state where the precast receiving beam made of precast is mounted on the permanent bearing on the upper part of the piers, the precast PSC beam is raised by a crane and simply mounted on the precast receiving beam on the piers, respectively, in the axial direction. The precast PSC beams are tensioned and connected to each other by means of first and second high-strength steel rods interconnecting two adjacent precast PSC beams to the precast support beams, and the second continuous tendons installed in the precast PSC beams are tensioned. By introducing prestress, this is to continually continually bridge a number of simple beams supported by the piers. Through this, construction can be performed even within a short construction period, and the sequential construction of the composite beam bridge is very simple.
보다 구체적으로는, 임시적으로 프리캐스트 PSC빔을 거치시키기 위한 임시받침을 설치한 후 임시받침을 다시 제거해야 하는 종래의 공법과는 달리, 본 발명은 임시받침을 사용하지 않고 프리캐스트 받침빔을 지지하는 영구베어링을 한번만 설치하므로, 시공이 매우 간단해진다. More specifically, unlike the conventional method of temporarily installing the temporary support for mounting the precast PSC beam temporarily and then removing the temporary support, the present invention supports the precast support beam without using the temporary support. Since the permanent bearing is installed only once, the construction becomes very simple.
또한, 종래의 공법은 교축 방향으로 인접한 2개의 프리캐스트 PSC빔을 연속화하기 위하여, 중간 지점(교각) 상단의 현장 이음 부를 철근 커플러에 의해 구조적으로 연결한 후에 콘크리트를 타설 양생시키는 공정이 필수적으로 수반되었지만, 본 발명에 따른 공법은 교축 방향으로 각각 인접한 2개의 프리캐스트 PSC빔을 프리캐스트 받침빔에 상호 연결한 1,2차 고강도 강봉으로 프리캐스트 PSC빔을 긴장하여 서로 연결시키고, 프리캐스트 PSC빔에 설치된 2차 연속 텐던(131)을 긴장하여 프리스트레스를 도입함으로써 연속화 되므로, 인접한 프리캐스트 PSC빔을 철근 커플러로 연결하는 공종을 제거할 수 있으며, 프리캐스트로 제작된 프리캐스트 받침빔을 적용함에 따라 콘크리트를 타설, 양생 할 필요가 없어지므로, 연속화를 구현하는 공종이 보다 단순해지고 시공 기간을 크게 단축시킬 수 있다. In addition, in the conventional method, in order to continually connect two adjacent precast PSC beams in the axial direction, a process of pouring concrete after structuring the site joints at the upper end of the intermediate point (pier) by a rebar coupler is essential. However, the method according to the present invention is the first and second high-strength steel rods interconnecting two precast PSC beams adjacent to each other in the axial direction to the precast receiving beams to tension and connect the precast PSC beams to each other, and to precast PSC beams. Since it is continuous by introducing the prestress by tensioning the second
더욱이, 교축직각 방향으로 배열되는 프리캐스트 PSC빔을 지지하는 베어링(받침)을 프리캐스트 PSC빔의 개수와 동일한 개수로 교각의 교축직각 방향을 따라 분포시켜야 하는 종래의 공법과 달리, 본 발명에 따른 공법은 하나의 프리캐스트 받침빔이 교각 상부에 빔 형태로 교축직각 방향 거치되므로, 프리캐스트 받침빔을 지지할 수 있는 2개 내지 3개 정도의 소량의 영구베어링만으로 교각 위의 구조물을 지지할 수 있게 된다. Furthermore, unlike the conventional method in which bearings (supports) for supporting precast PSC beams arranged in the perpendicular direction of the axial direction must be distributed along the axial direction of the pier in the same number as the number of precast PSC beams, In the construction method, since one precast receiving beam is mounted on the pier at the top of the pier in the form of a beam, it is possible to support the structure on the pier with only two or three small bearings capable of supporting the precast receiving beam. Will be.
나아가, 프리캐스트 받침빔의 저면에 배치되는 영구베어링은 그 간격이 교량의 상판으로부터 전달되는 활하중에 따른 편심 하중에 견딜 수 있는 정도이면 충분하게 된다. 따라서, 종래에는 교축직각 방향으로 배열되는 프리캐스트 PSC빔을 하나하나의 베어링으로 지지해야 하므로, 교각 상부의 교축직각 방향으로의 폭이 교량의 폭에 대응되는 길이로 형성되어야 하고, 이에 따라, 교각의 교축직각 방향 끝단부에 있는 베어링에 작용하는 활하중 및 분포 사하중에 의하여 교각기둥 및 기초구조물에는 인장응력이 작용하게 되므로, 이 교각에 작용하는 인장응력에 견딜 수 있도록 교각기둥 및 기초구조물을 과대하게 설계해야 하는 부수적인 문제점이 있었다. 그러나, 본 발명은, 교량의 바닥판에 작용하는 사용하중 및 사하중이 교축 방향으로 설치된 프리캐스트 PSC빔에 전달되고, 이 하중은 교축직각 방향으로 설치된 프리캐스트 받침빔에 작용한다. 즉, 프리캐스트 받침빔에 작용되는 하중은 교각 상부의 상대적인 중앙부에 집중 배치된 베어링에 전달되므로, 바닥판으로부터 프리캐스트 PSC빔, 프리캐스트 받침빔을 거쳐 교각에 전달되는 하중은 주로 교각기둥에 압축응력이 주로 지배되므로 교각을 안정성이 있고 경제적으로 시공할 수 있게 된다. 따라서, 본 발명에 따른 프리스트레스트 콘크리트 합성빔 교량의 연속화 공법에 따라 교량을 시공함에 있어 교축직각 방향으로 연장되는 교각 상부(코핑)의 일부 부위(20')를 제거할 수 있고, 영구베어링에 전달되는 하중이 교각 상부의 중간 주변에 작용되므로 이로 인해 교각에 작용하는 모멘트가 최소화 되어 인장응력 성분이 거의 소멸되므로, 교각에는 중력 방향의 압축응력이 주로 작용되어 교각기둥 및 기초구조물의 크기를 크게 줄일 수 있게 된다. Furthermore, the permanent bearing disposed on the bottom of the precast receiving beam is sufficient if the gap can withstand the eccentric load due to the live load transmitted from the top plate of the bridge. Therefore, in the related art, since the precast PSC beams arranged in the perpendicular direction of the bridge have to be supported by one bearing, the width of the upper portion of the bridge in the direction of the bridge perpendicular to the bridge should be formed to have a length corresponding to the width of the bridge. Tensile stress is applied to the piers and the foundation by the live and distributed dead loads acting on the bearings at the end of the bridge's axial direction, so that the piers and the foundation are excessively supported to withstand the tensile stresses acting on the piers. There was a side issue that had to be designed. However, in the present invention, the working load and dead load acting on the bottom plate of the bridge are transmitted to the precast PSC beam provided in the axial direction, and this load acts on the precast receiving beam provided in the perpendicular direction of the axial axis. That is, since the load acting on the precast bearing beam is transmitted to the bearing centered on the relative central part of the upper part of the piers, the load transmitted from the bottom plate to the piers via the precast PSC beam and the precast bearing beam is mainly compressed to the piers. Since stress is mainly controlled, the pier can be constructed stably and economically. Therefore, when constructing the bridge according to the sequencing method of the prestressed concrete composite beam bridge according to the present invention, it is possible to remove a portion 20 'of the upper portion of the bridge (coping) extending in the direction perpendicular to the pier, and transfer it to the permanent bearing. Since the applied load is applied around the middle of the upper part of the piers, the moment acting on the piers is minimized, and the tensile stress component is almost eliminated. Therefore, the compression stress in the direction of gravity is mainly applied to the piers, which greatly reduces the size of the piers and foundation structures. It becomes possible.
또한, 본 발명에 따른 공법은 다수의 프리캐스트 PSC빔이 하나의 프리캐스트 받침빔에 의해 지지되므로, 다수의 프리캐스트 PSC빔을 설치하더라도 추가로 소요되는 공종은 거의 없게 된다. 특히, 최근에는 예상치 못하는 기후변화에 따른 강우량의 증가로 인해 하천의 홍수위가 높아짐에 따라, 근접도로 및 교량의 도로계획고(Final Elevation)는 변경하지 않고 교량의 지간(Span)을 넓히고 거더의 높이(H)를 줄이고자 하는 시도가 다방면에서 이루어지고 있는 데, 본 발명에 따른 공법은 PSC 합성빔이 연속화 됨에 따라 교량지간이 넓어지고 보다 낮은 높이(H)의 프리캐스트 PSC빔이 시공이 가능 해지고, 또한 같은 조건의 기존 교량의 프리캐스트 PSC빔의 수보다 다수의 프리캐스트 PSC빔을 설치하는 것이 용이해지므로 보다 더 낮은 거더의 높이(H)의 프리캐스트 PSC빔의 시공이 가능해 지므로, 교량 시공에 소요되는 기간을 지연시키지 않으면서 경제성 있는 낮은 높이의 교량의 연속화를 가능하게 한다. In addition, in the method according to the present invention, since a plurality of precast PSC beams are supported by one precast receiving beam, there is almost no additional work required even if a plurality of precast PSC beams are provided. In particular, as the flood level of rivers increases due to the recent increase in rainfall due to unexpected climate change, the span of bridges and the height of girder are increased without changing the road elevation and the final elevation of bridges. Attempts to reduce (H) have been made in many ways. As the method according to the present invention is continued, as the PSC composite beams are continuous, the bridge span becomes wider, and a lower height (H) precast PSC beam can be constructed. In addition, it becomes easier to install a number of precast PSC beams than the number of precast PSC beams of existing bridges under the same conditions, so that the construction of a precast PSC beam having a lower height (H) of the girder becomes possible. It enables economic continuity of low height bridges without delaying the time required.
한편, 교량의 양 끝단 지지부(통상적으로 '교대'로 불리 우는 지지 부분)와 같이 상기 프리캐스트 PSC빔을 일측에만 거치시키는 프리캐스트 받침빔과, 그 프리캐스트 받침빔과 마주보는 프리캐스트 PSC빔을 고정하기 위하여, 제작장에서 프리캐스트 PSC빔 제작 시 빔 끝단에 돌기부위를 일체로 타설한 후, 일단의 고강도 강봉용 고정너트, 지지판이 상기 프리캐스트 받침빔 내에 미리 매설시켜 고정시킨 상태로, 상기 프리캐스트 PSC빔의 돌기 부위를 관통하도록 설치된 고강도 강봉의 타단에 위치한 고정 너트를 죄는 것에 의하여 상기 강봉을 긴장시켜, 상기 프리캐스트 받침빔과 상기 프리캐스트 PSC빔을 연결시키는 단계를; 추가적으로 포함한다. On the other hand, the precast support beam for mounting the precast PSC beam only on one side, such as the support portion (usually called 'shift') of both ends of the bridge, and the precast PSC beam facing the precast support beam In order to fix, the precast PSC beam is fabricated at the fabrication site, and after the projections are integrally placed on the beam end, one end of the high-strength steel rod fixing nut and support plate are embedded in the precast support beam in advance to fix the precast PSC beam. Tensioning the steel rod by tightening a fixing nut located at the other end of the high-strength steel rod installed to penetrate the protruding portion of the cast PSC beam, thereby connecting the precast receiving beam to the precast PSC beam; Additionally included.
이를 통해, 교량의 중앙 지점에는 1,2차 고강도 강봉을 긴장하는 것에 의해 양측의 프리캐스트 PSC빔을 연결시킴으로써 두 빔은 일체화 되고, 합성빔 내에 설치된 2차 연속 텐던을 긴장함으로써 교량이 연속화 된다. 또한 제작장에서 프리캐스트 PSC빔 제작시 빔 중간의 다이어프램을 일체 타설하여 제작한 후 교상에서 서로 인접한 프리캐스트 PSC빔의 두 다이어프램을 서로 연결 시공함으로써 좌우 각각의 프리캐스트 PSC빔이 일체화된다. 따라서, 각각의 프리캐스트 PSC빔이 개별적으로 하중을 전달하는 것이 아니라, 프리캐스트 받침빔과 각각의 프리캐스트 PSC빔이 구속된 상태의 사각 판상 구조가 되어, 작용하는 하중을 판상으로 전달하게 되므로 보다 안정된 하중 지지 구조를 구현한다.Through this, the two beams are integrated by connecting both precast PSC beams by tensioning the first and second high-strength steel bars at the central point of the bridge, and the bridges are continuous by tensioning the second continuous tendon installed in the composite beam. In addition, when the precast PSC beam is fabricated in the fabrication site, the diaphragm in the middle of the beam is integrally placed, and then the two diaphragms of the adjacent precast PSC beams are connected to each other in a bridge to integrate the precast PSC beams on the left and right. Therefore, each precast PSC beam does not carry loads individually, but instead becomes a rectangular plate structure in which the precast base beam and each precast PSC beam are constrained, thereby transferring the acting load to the plate. Implement a stable load bearing structure.
여기서, 상기 프리캐스트 PSC빔 거치 단계 이전에, 공장에서 제작되어 운반된 프리캐스트 세그먼트 PSC빔들은 현장 근처의 제작장에 설계된 1지간 길이에 대한 필요 수량만큼 종 방향으로 배열한 후 프리캐스트 세그먼트 PSC빔과 빔 사이의 접합 부위를 콘크리트 현장 타설하여 양생함으로써 프리캐스트 PSC빔으로 일체화시고, 또한, 이 지점의 횡 방향으로 다이어프램을 콘크리트 현장타설 제작하여 상기 프리캐스트 PSC빔과 상기 다이어프램을 연결 고정하는 것에 의해 교축 방향으로 연속화된 PSC빔을 형성한다. 그리고, 상기 프리캐스트 PSC빔을 연결 고정시키는 단계이후에, 상기 다이어프램 사이의 간극을 콘크리트로 현장 타설하는 단계를; 더 포함한다. 이를 통해, 프리캐스트 세그먼트 PSC빔을 제작장 대신 공장에서 일괄 제작하여 현장으로 운송하는 것이 가능해지므로, 보다 경제적이고 신속한 시공이 가능해진다. Here, prior to the precast PSC beam mounting step, the precast segment PSC beams manufactured and transported at the factory are arranged in the longitudinal direction by the required quantity for the length of one space designed at the production site near the site, and then the precast segment PSC beams. By injecting and curing the joint site between the beam and the concrete, integrating it into the precast PSC beam, and by manufacturing the diaphragm in the concrete in the transverse direction at this point, and fixing the precast PSC beam and the diaphragm by fixing. A continuous PSC beam is formed in the axial direction. And, after the step of fixing and fixing the precast PSC beam, site-casting the gap between the diaphragms with concrete; It includes more. As a result, the precast segment PSC beam can be manufactured at the factory instead of the production site and transported to the site, thereby enabling more economical and rapid construction.
이 때, 상기 프리캐스트 다이어프램들 사이의 교축직각 방향 간극에 콘크리트를 현장 타설하는 단계와; 상기 프리캐스트 다이어프램들과 상기 프리캐스트 PSC빔들을 교축직각 방향으로 관통하는 텐던을 긴장시키는 단계를; 더 포함하여, 교축직각 방향의 프리캐스트 PSC빔 사이의 간격을 일정하게 유지한다. 여기서, 프리캐스트 다이어프램들은 상기 프리캐스트 PSC빔에 일체로 미리 제작될 수도 있고, 상기 프리캐스트 PSC빔에 독립적으로 고정 설치될 수 있다.At this time, site-casting concrete in a gap between the precast diaphragms in the axially perpendicular gap; Tensioning a tendon penetrating the precast diaphragms and the precast PSC beams in an orthogonal direction; Further, the distance between the precast PSC beams in the orthogonal direction is kept constant. Here, the precast diaphragms may be previously manufactured integrally with the precast PSC beam, or may be fixedly installed independently of the precast PSC beam.
미리 제작된 상기 프리캐스트 PSC빔에는 그 상면에 상기 최종 바닥판의 일부두께로 형성된 부분 바닥판이 상기 프리캐스트 PSC빔과 일체로 형성될 수도 있다. 즉, 프리캐스트 PSC빔을 제작하는 과정 중에 완성된 바닥판의 두께보다 얇은 부분두께인 부분 바닥판을 프리캐스트 PSC빔과 일체로 미리 타설 양생하면, 현장에서 교각에 거치되는 프리캐스트 PSC빔의 상면에 최종 바닥판을 타설하는 공종이 매우 간편해진다. The precast PSC beam may be formed integrally with the precast PSC beam on a top surface thereof, the partial bottom plate having a partial thickness of the final bottom plate. In other words, if the partial bottom plate, which is thinner than the thickness of the completed bottom plate, is pre-cast and cured integrally with the precast PSC beam during the manufacturing process of the precast PSC beam, the upper surface of the precast PSC beam mounted on the piers in the field This makes it very easy to cast the final slab on the floor.
즉, 상기 콘크리트 합성빔의 형성 단계는, 교축직각 방향으로 인접한 프리캐스트 PSC빔의 상기 부분 바닥판의 사이에 콘크리트를 타설하도록 상기 부분 바닥판의 저면을 연결하는 판 형상의 시스템 거푸집을 설치하는 단계와; 상기 부분 바닥판의 상면과 상기 거푸집의 상면에 콘크리트를 타설하여 바닥판을 형성하는 단계에 의해 이루어질 수 있게 된다. That is, the step of forming the concrete composite beam, the step of installing a plate-shaped system formwork connecting the bottom surface of the partial bottom plate so as to cast concrete between the partial bottom plate of the precast PSC beam adjacent in the axially perpendicular direction Wow; By pouring concrete on the upper surface of the partial bottom plate and the upper surface of the formwork can be made by the step of forming a bottom plate.
이와 관련하여, 종래에는 교량의 바닥판을 지지하는 프리캐스트 PSC빔의 개수가 많아 질수록 교량 시공에 소요되는 공기가 연장될 뿐만 아니라 경제성이 크게 악화되는 문제점이 있으므로, 적은 수의 프리캐스트 PSC빔을 적용하기 위하여 크기가 큰 프리캐스트 PSC빔을 적용하여 왔다. 따라서, 부분 바닥판 만큼 중량이 증가한 프리캐스트 PSC빔을 크레인으로 인상하는 데 한계가 있으므로, 전술한 부분 바닥판을 이용한 본 발명에 따른 공법을 적용하기 곤란하였다. 그러나, 본 발명에 따른 공법은 하나의 프리캐스트 받침빔이 교대 상에 거치되므로, 프리캐스트 받침빔에 의해 지지되는 프리캐스트 PSC빔의 교축직각 방향으로의 수가 많아지더라도 시공에 소요되는 시간과 비용은 크게 증가하지 않게 된다. 더욱이, 프리캐스트 PSC빔의 높이(H)가 일정한 지간(Span)길이를 기준으로 종래에는 2m에 달하던 것이, 최근에는 1.1m에까지 작게 되었다는 점을 감안한다면, 앞으로 프리캐스트 PSC빔의 높이(H)가 더욱 더 작아질 것이다. In this regard, in the related art, as the number of precast PSC beams supporting the bottom plate of the bridge increases, the air required for the construction of the bridge is not only extended but also economically deteriorated. In order to apply the large size precast PSC beam has been applied. Therefore, it is difficult to apply the method according to the present invention using the above-described partial bottom plate because there is a limit in pulling the precast PSC beam, whose weight is increased by the partial bottom plate, to the crane. However, in the construction method according to the present invention, since one precast receiving beam is alternately mounted, the time and cost required for the construction even if the number of precast PSC beams supported by the precast receiving beam increases in the direction perpendicular to the axial axis. Does not increase significantly. Furthermore, considering that the height H of the precast PSC beam was 2m, which was conventionally small based on a constant span length, the height H of the precast PSC beam was reduced to 1.1m in the future. Will become even smaller.
상기 프리캐스트 PSC빔에 프리스트레스를 도입하는 단계는 상기 프리캐스트 PSC빔에 내설된 2차 연속 텐던을 긴장시키는 것에 의해 이루어지되, 상기 프리캐스트 PSC빔에 인가된 인장 응력이 부족한 경우에는 교각 위의 프리캐스트 받침빔을 중심으로 연결된 상기 프리캐스트 PSC빔 끝단의 보강 헌치에 설치된 2차 고강도 강봉 또는 상기 2차 연속 텐던으로 재긴장(Restressing)을 하고; 상기 프리캐스트 PSC빔에 인가된 인장 응력이 과도한 경우에는 인가된 프리스트레스를 제거하는 긴장력 감소작업(Detention)을 행하는 것에 의해 이루어진다. The step of introducing prestress into the precast PSC beam is accomplished by tensioning the secondary continuous tendon imparted to the precast PSC beam, and in the event that the tensile stress applied to the precast PSC beam is insufficient Restressing with secondary high strength steel rods or secondary continuous tendons installed at the reinforcement haunches of the precast PSC beam ends connected about a cast support beam; When the tensile stress applied to the precast PSC beam is excessive, a tension reduction operation for removing the applied prestress is performed.
한편, 한강과 같이 그 폭이 1km 이상 되는 넓은 강에 교량을 시공함에 있어서, 교량 전체를 하나의 연속화된 교량으로 시공하는 것은 온도변화 및 지진하중 등으로 인하여 교량에 작용하는 응력이 과도해지므로 바람직하지 않다. 따라서, 프리캐스트 PSC빔을 연속화 함에 있어서도 수개로 한정되는 것이 바람직하다. 이에 따라, 교량의 양단에 위치한 교각(즉, '교대')이 아니더라도, 교량의 중간 지점에 PSC 합성빔의 연속화를 차단시키는 것이 필요하다. 이를 위하여, 상기 프리캐스트 PSC빔 거치 단계는, 상기 프리캐스트 PSC빔을 한쪽에만 거치시키는 한 쌍의 프리캐스트 받침빔이 서로 반대 방향을 향하도록 하나의 교각 상에 나란히 배열시킨 상태에서, 상기 프리캐스트 PSC빔을 상기 프리캐스트 받침빔에 지지되도록 거치하는 것을 포함한다.On the other hand, in the construction of a bridge over a wide river with a width of more than 1 km, such as the Han River, the construction of the entire bridge as one continuous bridge is preferable because the stress acting on the bridge due to temperature changes and earthquake loads is excessive. Not. Therefore, it is preferable to limit the number to several even in sequencing the precast PSC beam. Accordingly, it is necessary to block the sequencing of the PSC composite beam at the midpoint of the bridge, even if it is not the bridge (i.e., 'alternation') located at both ends of the bridge. To this end, the precast PSC beam mounting step, the precast PSC beam in a state in which a pair of precast receiving beams mounted only on one side arranged side by side on one pier so as to face in opposite directions to each other, the precast And mounting a PSC beam to be supported by the precast receiving beam.
한편, 본 발명은, 교각 상부의 영구베어링에 지지되도록 미리 제작된 프리캐스트 받침빔을 거치시키는 프리캐스트 받침빔 거치 단계와; 미리 제작된 프리캐스트 프리캐스트 변단면 PSC빔의 일단이 상기 프리캐스트 받침빔에 지지되고 타단이 임시교각에 지지되도록 거치시킨 후, 상기 프리캐스트 받침빔과 상기 프리캐스트 변단면 PSC빔을 연결하여 일체로 결합시키는 프리캐스트 프리캐스트 변단면 PSC빔의 설치 단계와; 미리 공장에서 제작되어 현장으로 운반된 각각의 프리캐스트 세그먼트 PSC빔과 빔의 접합 부위를 콘크리트 현장 타설하여 서로 연결시켜 제작 완성된 프리캐스트 PSC빔에 1차 텐던을 긴장시킨 후, 상기 프리캐스트 변단면 PSC빔에 양단이 지지되도록 상기 프리캐스트 받침빔의 교축직각 방향으로 다수 거치시키는 프리캐스트 PSC빔 거치 단계와; 상기 프리캐스트 받침빔과 상기 프리캐스트 프리캐스트 변단면 PSC빔 사이의 간극과 상기 프리캐스트 프리캐스트 변단면 PSC빔과 상기 프리캐스트 PSC빔 사이의 간극을 충진하는 충진 단계와; 상기 프리캐스트 받침빔과 이와 교축 방향으로 인접한 상기 프리캐스트 프리캐스트 변단면 PSC빔을 연결 고정시키는 프리캐스트 PSC빔 연결고정 단계와; 상기 프리캐스트 프리캐스트 변단면 PSC빔과 상기 프리캐스트 PSC빔의 상면에 바닥판을 형성하여 콘크리트 합성빔을 형성하는 합성빔 형성 단계와; 2차 연속 텐던을 긴장하여 상기 프리캐스트 PSC빔에 프리스트레스를 도입하는 단계를; 포함하여 구성된 것을 특징으로 하는 프리스트레스트 콘크리트 합성빔 교량의 연속화 공법을 제공한다.On the other hand, the present invention, the precast receiving beam mounting step for mounting a precast receiving beam pre-fabricated to be supported by a permanent bearing on the pier; One end of a precast precast precast side face PSC beam is supported by the precast base beam and the other end is supported by a temporary pier, and then the precast base beam and the precast side face PSC beam are connected together. Installing a precast precast cross-section PSC beam to be coupled to each other; The precast segment is tensioned to the precast PSC beam by connecting each precast segment PSC beam and the joint portion of the beam to the site in advance. A precast PSC beam mounting step of mounting a plurality of precast receiving beams in a axially orthogonal direction so that both ends thereof are supported by the PSC beams; Filling a gap between the precast receiving beam and the precast precast cross section PSC beam and a gap between the precast precast cross section PSC beam and the precast PSC beam; A precast PSC beam connection fixing step of connecting and fixing the precast receiving beam and the precast precast side face PSC beam adjacent in the axial direction thereof; A composite beam forming step of forming a concrete composite beam by forming a bottom plate on an upper surface of the precast precast cross-sectional PSC beam and the precast PSC beam; Tensioning a second consecutive tendon to introduce prestress into the precast PSC beam; It provides a continuous method of prestressed concrete composite beam bridge, characterized in that configured to include.
이는, 연속교량에서 지간(Span)이 길어질수록 교각 부위에서 작용하는 부 모멘트가 매우 커지게 되므로 교각 부위의 프리캐스트 PSC빔의 단면이 크게 증대되어야 하는 데, 이 경우에는 프리캐스트 PSC빔을 현장에서 인상하는 것이 불가능하고, 또한 기존의 재래적인 콘크리트 장경간 교량 가설방법 중에 하나인 교각과 교각 사이에 동바리 및 거푸집을 설치한 후 콘크리트를 현장 타설하여 시공하는 박스 거더 형식의 가설 방법은 제작 공종이 복잡하고 공사기간이 오래 걸리며 또한 제작비용이 크게 증가하는 문제점이 있어, 공사 기간을 줄이고 원활하게 시공하여 보다 경제적인 교량 건설을 하기 위한 것이다. 즉, 교량의 지간(span)이 약 45m 이상이 되는 경우에, 프리캐스트 PSC빔의 단면 변화가 큰 교각 주변의 구조물을 변단면 형상을 갖도록 프리캐스트 프리캐스트 변단면 PSC빔을 제작하여 교각 상의 프리캐스트 받침빔에 고정 거치시키고, 프리캐스트 받침빔에 고정 거치된 프리캐스트 프리캐스트 변단면 PSC빔에 단면 변화가 없거나 매우 작은 프리캐스트 PSC빔을 거치시켜 설치하는 것을 통해, 교각 주위의 프리캐스트 PSC빔의 단면을 크게 함과 동시에 프리캐스트 받침빔을 중심으로 교량을 연속화시킬 수 있을 뿐만 아니라 교량의 제작 공종과 시간이 현격히 줄어들게 되는 효과를 얻게 된다. This means that the longer the span, the longer the moment is acting on the bridge area in the continuous bridge, so that the cross-section of the precast PSC beam in the bridge area should be greatly increased. It is impossible to raise, and the box girder-type construction method that installs concrete after installing bridges and formwork between the piers and the piers, which is one of the existing conventional methods for constructing long span bridges, is complicated to manufacture. In addition, there is a problem that the construction period takes a long time and the production cost is greatly increased, so that the construction period can be shortened and smoothly constructed to construct a more economic bridge. That is, when the span of the bridge is about 45m or more, the precast precast cross-section PSC beam is manufactured to have the cross-sectional shape of the structure around the bridge where the cross-sectional change of the precast PSC beam is large, and the pre-pier on the bridge Precast PSC beams around piers by fixed mounting on cast bearing beams and mounting of precast precast sectional PSC beams fixed on precast bearing beams with no cross-sectional changes or very small precast PSC beams. In addition to increasing the cross-section of the bridge, the bridges can be continually centered around the precast beam, and the construction work and time of the bridges can be significantly reduced.
이를 통해, 현장에서는 제작장에서 미리 제작된 프리캐스트 프리캐스트 변단면 PSC빔을 교각 상부의 프리캐스트 받침빔에 크레인으로 인상하여 거치시키고 일체로 결합 시킨 후 , 마찬가지로, 미리 제작된 프리캐스트 PSC빔을 프리캐스트 변단면 PSC빔에 거치시킨 후, 내설된 2차 연속 텐던을 긴장하여 프리캐스트 PSC빔에 프리스트레스를 도입하여 연속화 시키는 것을 통해 장지간 교량을 보다 간단한 공종으로 보다 짧은 공사 기간 내에 제작하는 것이 가능해진다. Through this, in the field, the precast precast sectional PSC beam prefabricated at the production site is lifted by a crane to the precast bearing beam on the upper part of the pier and mounted together, and then, the prefabricated precast PSC beam is similarly manufactured. After mounting on the precast edge PSC beam, it is possible to fabricate the bridge between long and short spans in a shorter construction period by applying prestress to the precast PSC beam and tensioning the secondary continuous tendons in the precast section. Become.
이 때, 상기 프리캐스트 받침빔에 프리캐스트 프리캐스트 변단면 PSC빔을 거치 시 사용되는 임시 교각은 프리캐스트 받침빔을 중심으로 교축 방향으로 서로 인접한 2개의 프리캐스트 변단면 PSC빔에 내설된 1차 연결용 직선 텐던을 긴장하여 프리스트레스를 도입한 후 프리캐스트 받침빔과 프리캐스트 변단면 PSC빔이 서로 일체로 결합시킨 상태에서는 어느 때라도 임시 교각을 제거할 수 있다.At this time, the temporary piers used when the precast precast edge cross-section PSC beam is placed on the precast base beam are primarily formed by two precast edge cross-section PSC beams adjacent to each other in the axial direction with respect to the precast base beam. After the pre-stress is introduced by tensioning the straight line tendon for connection, the temporary pier can be removed at any time in the state where the precast base beam and the precast side face PSC beam are integrally coupled to each other.
그리고, 상기 프리캐스트 PSC빔으로부터 프리캐스트 콘크리트 다이어프램이 교축직각 방향으로 돌출 형성된다. 따라서, 상기 프리캐스트 다이어프램들 사이의 교축직각 방향 간극에 콘크리트를 현장 타설하고, 상기 프리캐스트 다이어프램들과 상기 프리캐스트 PSC빔들을 교축직각 방향으로 관통하는 텐던을 긴장시키는 것에 의하여, 교축직각 방향의 프리캐스트 PSC빔 사이의 간격을 일정하게 유지할 수 있고, 교축직각 방향의 각각의 프리캐스트 PSC빔이 개별적으로 하중을 전달하는 것이 아니라 교축직각 방향의 프리캐스트 PSC빔들 상호간에 서로 구속된 사각 판상 구조가 되어 작용하는 하중을 판상으로 전달하게 되므로 보다 안정된 하중 지지 구조를 구현한다. 여기서, 판상 하중 전달 구조를 구현하기 위하여, 상기 다이어프램은 프리캐스트 PSC빔의 중간부 지점에 형성되는 것이 바람직하며 교량의 조건에 따라 그 위치 및 수량은 변경이 가능하다. 그리고, 프리캐스트 다이어프램들은 상기 프리캐스트 PSC빔에 일체로 미리 제작될 수도 있고, 상기 프리캐스트 PSC빔에 독립적으로 고정 설치될 수 있다.Then, the precast concrete diaphragm protrudes from the precast PSC beam in the axial direction perpendicular to the axial direction. Therefore, by placing concrete in the axial perpendicular direction gap between the precast diaphragms and tensioning the tendon penetrating the precast diaphragms and the precast PSC beams in the axial direction, the pre-axial direction The spacing between the cast PSC beams can be kept constant, and the respective precast PSC beams in the crosswise direction do not carry loads individually, but instead become a rectangular plate structure constrained to each other between the precast PSC beams in the crosswise direction. Since the acting load is transmitted to the plate, a more stable load supporting structure is realized. Here, in order to implement the plate-shaped load transfer structure, the diaphragm is preferably formed at the middle point of the precast PSC beam, and its position and quantity can be changed according to the conditions of the bridge. The precast diaphragms may be previously manufactured integrally with the precast PSC beam, and may be fixedly installed independently of the precast PSC beam.
마찬가지로, 상기 프리캐스트 PSC빔은 그 상면에는 상기 바닥판의 일부 두께로 형성된 부분 바닥판이 함께 일체로 미리 제작된 프리캐스트 부분 합성빔으로 형성되고, 상기 콘크리트 합성빔의 형성 단계는, 프리캐스트 PSC빔들의 상기 부분 바닥판들의 사이에 콘크리트를 타설하도록 상기 부분 바닥판의 저면을 연결하는 판형 상의 시스템 거푸집을 설치하는 단계와; 상기 부분 바닥판의 상면과 상기 거푸집의 상면에 콘크리트를 타설하여 바닥판을 형성하는 단계를; 포함하여 이루어질 수 있다. 이를 통해, 바닥판을 시공하는 공종이 훨씬 단순화되고 신속하게 이루어진다.Similarly, the precast PSC beam is formed of a precast partial composite beam having a partial bottom plate formed with a partial thickness of the bottom plate on the upper surface of the precast PSC beam, and the forming step of the concrete composite beam is a precast PSC beam. Installing a plate-shaped system formwork connecting the bottom of the partial bottom plate to pour concrete between the partial bottom plates of the floor; Placing concrete on an upper surface of the partial bottom plate and an upper surface of the formwork to form a bottom plate; It can be made, including. This makes the construction of the floorboard much simpler and faster.
그리고, 상기 프리캐스트 PSC빔 거치 단계는, 상기 프리캐스트 PSC빔을 한쪽에만 거치시키는 한 쌍의 프리캐스트 받침빔이 서로 반대 방향을 향하도록 하나의 교각 상에 나란히 배열시킨 상태에서, 상기 프리캐스트 PSC빔을 상기 프리캐스트 받침빔에 지지되도록 거치하는 것을 포함한다. 이는, 교량 전체를 하나의 연속화된 교량으로 시공하는 것은 교량에 작용하는 온도변화 혹은 지진 등에 의한 응력변화가 증가하여 교량 구조물에 많은 악 영향이 발생하는 문제점을 해결하면서 긴 길이의 교량을 제작할 수 있도록 하기 위함이다. In the precast PSC beam mounting step, the precast PSC beams are arranged side by side on one pier so that a pair of precast receiving beams for mounting the precast PSC beams on only one side thereof face in opposite directions to each other. Mounting the beam to be supported by the precast receiving beam. This means that the construction of the entire bridge as a single continuous bridge can produce a long length bridge while solving the problem that the stress change due to the temperature change or the earthquake acting on the bridge increases and thus many adverse effects occur on the bridge structure. To do this.
한편, 상기 프리캐스트 PSC빔 거치 단계 이전에, 공장에서 제작되어 운반된 프리캐스트 세그먼트 PSC빔들은 현장 근처의 제작장에 설계된 1지간 길이에 대한 필요 수량만큼 종 방향으로 배열한 후 프리캐스트 세그먼트 PSC빔과 빔 사이의 접합 부위를 콘크리트 현장 타설하여 양생함으로써 프리캐스트 PSC빔으로 일체화시고, 또한, 이 지점의 횡 방향으로 다이어프램을 콘크리트 현장타설 제작하여 상기 프리캐스트 PSC빔과 상기 다이어프램을 연결 고정하는 것에 의해 교축 방향으로 연속화된 PSC빔을 형성하는 공정이 추가적으로 포함될 수 있다. 이 때에는, 상기 프리캐스트 PSC빔을 연결 고정시키는 단계이후에, 상기 다이어프램 사이의 간극을 콘크리트로 현장 타설하는 단계를; 더 포함한다. 이를 통해, 프리캐스트 세그먼트 PSC빔을 제작장 대신 공장에서 일괄 제작하여 현장으로 운송하는 것이 가능해지므로, 보다 경제적이고 신속한 시공이 가능해진다. On the other hand, before the precast PSC beam mounting step, the precast segment PSC beams manufactured and transported at the factory are arranged in the longitudinal direction by the required quantity for the length of one space designed at the production site near the site, and then the precast segment PSC beams. By injecting and curing the joint site between the beam and the concrete, integrating it into the precast PSC beam, and by manufacturing the diaphragm in the concrete in the transverse direction at this point, and fixing the precast PSC beam and the diaphragm by fixing. A process of forming the PSC beam continuous in the axial direction may be additionally included. In this case, after the step of fixing the precast PSC beam, the step of in-site casting the gap between the diaphragm in concrete; It includes more. As a result, the precast segment PSC beam can be manufactured at the factory instead of the production site and transported to the site, thereby enabling more economical and rapid construction.
한편, 발명의 다른 분야에 따르면, 본 발명은, 교각 상부의 영구베어링에 지지되도록 거치된 프리캐스트 받침대와; 상기 프리캐스트 받침대에 양단이 지지되어 거치되도록 교축직각 방향으로 다수 배열된 프리캐스트 PSC빔과; 상기 프리캐스트 받침대와 상기 프리캐스트 PSC빔의 사이에 충진된 충진재와; 상기 프리캐스트 PSC빔과 상기 프리캐스트 받침대에 매설되거나 관통하도록 형성되어 상기 프리캐스트 PSC빔과 상기 프리캐스트 받침대를 연결 고정하는 것과 상기 프리캐스트 PSC빔에 프리스트레스를 도입하는 것 중 어느 하나 이상을 수행하는 긴장 수단과; 상기 프리캐스트 PSC빔의 상면에 콘크리트 타설 양생된 바닥판을; 포함하여 구성된 것을 특징으로 하는 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조를 제공한다.On the other hand, according to another field of the invention, the present invention, the precast pedestal mounted so as to be supported by the permanent bearing of the pier; Precast PSC beams are arranged in a plurality of pre-axial direction so that both ends are supported and mounted on the precast pedestal; A filler filled between the precast pedestal and the precast PSC beam; Is formed to be embedded in or through the precast PSC beam and the precast pedestal to perform any one or more of connecting and fixing the precast PSC beam and the precast pedestal and introducing prestress to the precast PSC beam Tension means; A concrete slab cured bottom plate on the top surface of the precast PSC beam; It provides a continuous structure of the prestressed concrete composite beam bridge, characterized in that configured to include.
이를 통해, 상기 프리캐스트 받침대의 양측에 교축 방향으로 각각 인접한 2개의 프리캐스트 PSC빔을 거치시키고 이들을 상호 연결한 1,2차 고강도 강봉으로 긴장하여 서로 연결시키고, 프리캐스트 PSC빔에 설치된 2차 연속 텐던을 긴장하여 프리스트레스를 도입함으로써 연속화 되므로, 그 공종이 단순해지고 시공 기간을 크게 단축시킬 수 있다.Through this, two precast PSC beams adjacent to each other in the axial direction are mounted on both sides of the precast pedestal and are connected to each other by tensioning them with the first and second high-strength steel rods connected to each other, and the second continuous installed in the precast PSC beam. Since the tendons are tensioned and introduced by prestressing, the work can be simplified and construction time can be greatly shortened.
여기서, 상기 프리캐스트 PSC빔을 양측에 거치시키는 상기 프리캐스트 받침대는 상기 교각 상부에 교축직각 방향을 따라 하나의 빔 형태로 놓여지는 프리캐스트 받침빔으로 형성된다. Here, the precast pedestal for mounting the precast PSC beam on both sides is formed of a precast receiving beam which is placed in the form of a beam along the direction perpendicular to the bridge pier.
또한, 상기 영구베어링은 상기 교각 중앙부를 중심으로 프리캐스트 받침대를 지지하도록 대칭으로 배열되며, 최외각에 위치한 상기 베어링 간의 거리는 상기 교량의 폭의 2/3 이하로 형성된다. 즉, 상기 프리캐스트 받침빔은 상기 베어링에 의해 양단이 자유단이 되도록 거치되며, 이를 통해, 교량 상부구조물로부터 교각에 전달되는 응력 성분 중 모멘트에 의한 인장응력 성분이 최소화되고, 압축응력이 주로 작용하게 되므로, 교각을 보다 경제적으로 날씬하게 설계하는 것이 가능해진다.In addition, the permanent bearing is arranged symmetrically to support the precast pedestal around the center of the pier, the distance between the bearing located at the outermost is formed to less than 2/3 of the width of the bridge. In other words, the precast receiving beam is mounted so that both ends are free ends by the bearing, thereby minimizing the tensile stress component due to the moment of the stress components transmitted from the bridge superstructure to the bridge, and compressive stress mainly As a result, the pier can be designed more economically and slimmer.
이 때, 상기 프리캐스트 받침대에는 상기 프리캐스트 PSC빔을 지지하면서 거치하도록 상기 프리캐스트 PSC빔과 인접한 면에 거치돌기가 돌출 형성되고; 상기 프리캐스트 PSC빔에는 상기 거치돌기를 수용하도록 거치홈이 요입 형성되어, 상기 프리캐스트 받침대에 상기 프리캐스트 PSC빔을 거치하는 것을 용이하게 한다.At this time, the precast pedestal is provided with a protrusion projecting on the surface adjacent to the precast PSC beam so as to support while holding the precast PSC beam; The precast PSC beam has a recessed groove formed to receive the mounting protrusion, thereby facilitating the precast PSC beam to the precast pedestal.
또 한편, 본 발명은, 교각 상부의 베어링에 지지되도록 거치된 프리캐스트 받침대와; 상기 교각 중 교축 방향으로 양쪽에 프리캐스트 PSC빔이 거치되는 교각에 거치되는 상기 프리캐스트 받침대에 교축방향으로 일단이 고정 지지되어 거치되는 프리캐스트 프리캐스트 변단면 PSC빔과; 상기 프리캐스트 변단면 PSC빔의 타단에 양단이 지지되어 거치되거나, 상기 프리캐스트 변단면 PSC빔의 타단과 상기 교각 중 교축 방향으로 한쪽에 프리캐스트 PSC빔이 거치되는 교각(즉, 일반적으로 ‘교대’라고 불리는 부분)의 상부에 거치된 상기 프리캐스트 받침대에 양단이 지지되어 거치되는 프리캐스트 PSC빔과; 상기 프리캐스트 받침대와 상기 프리캐스트 변단면 PSC빔 사이의 간극과, 상기 프리캐스트 변단면 PSC빔과 상기 프리캐스트 PSC빔의 사이의 간극에 충진된 충진재와; 상기 프리캐스트 PSC빔, 상기 프리캐스트 프리캐스트 변단면 PSC빔, 상기 프리캐스트 받침대 중 어느 2개 이상을 함께 연결하도록, 이들 중 어느 하나 이상에 매설되거나 이들 중 어느 하나 이상을 관통하도록 형성되어, 이들을 연결 고정하고 동시에 선택적으로 상기 프리캐스트 PSC빔에 프리스트레스를 도입하는 긴장 수단과; 상기 프리캐스트 PSC빔의 상면에 콘크리트 타설 양생된 바닥판을; 포함하여 구성된 것을 특징으로 하는 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조를 제공한다. On the other hand, the present invention, the precast pedestal mounted so as to be supported by the bearing of the upper piers; A precast precast edge section PSC beam having one end fixedly supported in the axial direction by the precast pedestal mounted on the pier where the precast PSC beams are mounted on both sides in the axial direction of the pier; Both ends are supported and mounted on the other end of the precast edge PSC beam, or a bridge in which a precast PSC beam is mounted on one side in the axial direction of the other end of the precast edge PSC beam (ie, in general, the 'shift' A precast PSC beam supported at both ends by the precast pedestal mounted on an upper portion of the part; A filler filled in a gap between the precast pedestal and the precast edge face PSC beam, and a gap between the precast edge face PSC beam and the precast PSC beam; The precast PSC beam, the precast precast cross-section PSC beam, and the two or more of the precast pedestals are buried in one or more of them or formed to penetrate any one or more of these, Tension means for securing a connection and simultaneously introducing prestress to the precast PSC beam; A concrete slab cured bottom plate on the top surface of the precast PSC beam; It provides a continuous structure of the prestressed concrete composite beam bridge, characterized in that configured to include.
즉, 프리캐스트 프리캐스트 변단면 PSC빔을 받침대에 고정 거치시키는 것에 의하여, 장지간 교량에 대해서도 신속하고 간단한 공종으로 교량을 제작하여 연속화 시키는 것이 가능해진다. That is, by fixedly mounting the precast precast side face PSC beam to the pedestal, it becomes possible to manufacture and continue the bridge with a quick and simple work even for the long-term bridge.
이 때, 상기 긴장 수단은 상기 프리캐스트 PSC빔, 프리캐스트 프리캐스트 변단면 PSC빔, 상기 프리캐스트 받침대에 동시에 관통하는 연속 텐던을 포함하여, 상기 연속 텐던을 긴장시키는 것에 의해 상기 프리캐스트 PSC빔, 프리캐스트 프리캐스트 변단면 PSC빔, 상기 프리캐스트 받침대를 일체화시킴과 동시에 연속화시키는 것이 가능해진다. 아울러, 상기 긴장 수단은 프리캐스트 프리캐스트 변단면 PSC빔과 상기 프리캐스트 받침대를 상호 연결 고정하는 1차 연결용 직선 텐던을 포함한다. 이를 통해, 프리캐스트 프리캐스트 변단면 PSC빔과 상기 프리캐스트 받침대를 상호 고정시키는 것이 가능해져, 임시 교각를 제거하는 것이 가능해진다. 이와 관련하여, 상기 긴장 수단은 상기 프리캐스트 PSC빔, 프리캐스트 프리캐스트 변단면 PSC빔, 상기 프리캐스트 받침대 중 2개만을 선택적으로 연결 고정하는 용도와 프리스트레스를 인가하는 용도 중 어느 하나 이상의 용도로 사용될 수도 있고, 상기 프리캐스트 PSC빔, 프리캐스트 프리캐스트 변단면 PSC빔, 상기 프리캐스트 받침대 모두를 연결하는 연속 텐던의 형태로 이들을 연결 고정하고 동시에 프리스트레스를 인가하는 용도로 사용될 수도 있다.At this time, the tensioning means includes the precast PSC beam, the precast precast side face PSC beam, and a continuous tendon penetrating the precast pedestal at the same time, thereby tensioning the continuous tendon by the precast PSC beam, The precast precast cross section PSC beam and the precast pedestal can be integrated and continuous. In addition, the tensioning means includes a linear tendon for primary connection which interconnects and secures the precast precast cross section PSC beam and the precast pedestal. This makes it possible to fix the precast precast side face PSC beam and the precast pedestal to each other, thereby eliminating the temporary piers. In this regard, the tension means may be used for any one or more of the use of selectively connecting and fixing only two of the precast PSC beam, the precast precast cross-section PSC beam, and the precast pedestal, and applying prestress. The precast PSC beam, the precast precast side face PSC beam, and the continuous tendon connecting the precast pedestals may be used to connect and fix them and simultaneously apply prestress.
그리고, 상기 프리캐스트 받침대는 상기 교각의 교축직각 방향을 따라 하나의 빔 형태로 놓여지는 프리캐스트 받침빔으로 형성되고, 상기 프리캐스트 프리캐스트 변단면 PSC빔은 다수로 상기 하나의 프리캐스트 받침대에 상기 교각의 교축직각 방향을 따라 고정 지지되도록 거치된다. 그리고, 상기 프리캐스트 받침빔은 상기 베어링이 양단부에 위치하지 않음으로써 양단이 자유단이 되도록 거치된다. 이를 통해, 교각 상에 받침대를 설치하는 공종이 간편해지며, 받침대를 통해 교각에 전달되는 하중은 교각에 압축 응력이 주로 작용하게 된다. The precast pedestal is formed of a precast receiving beam placed in a single beam shape along the axial direction of the pier. The precast pedestal PSC beam has a plurality of precast pedestals. It is mounted so as to be fixedly supported along the direction of the pier perpendicular to the pier. The precast receiving beam is mounted so that both ends thereof become free ends because the bearing is not positioned at both ends. Through this, the work to install the pedestal on the pier is easy, and the load transmitted to the pier through the pedestal is mainly the compressive stress acting on the pier.
상기 프리캐스트 프리캐스트 변단면 PSC빔과 상기 프리캐스트 PSC빔의 거치를 보다 용이하게 하기 위하여, 상기 프리캐스트 받침대에는 상기 프리캐스트 프리캐스트 변단면 PSC빔의 일단이 고정 지지되어 거치되도록 상기 프리캐스트 프리캐스트 변단면 PSC빔과 인접한 면에 제1거치돌기가 돌출 형성되고, 상기 프리캐스트 프리캐스트 변단면 PSC빔에는 상기 제1거치돌기를 수용하도록 제1거치홈이 요입 형성되며; 상기 프리캐스트 프리캐스트 변단면 PSC빔의 타단에는 상기 프리캐스트 PSC빔을 지지하면서 거치하도록 상기 프리캐스트 PSC빔과 인접한 면에 제2거치돌기가 돌출 형성되고, 상기 프리캐스트 PSC빔에는 상기 제2거치돌기를 수용하도록 제2거치홈이 요입 형성된다.In order to facilitate mounting of the precast precast cross-section PSC beam and the precast PSC beam, one end of the precast precast cross-section PSC beam is fixedly supported and mounted on the precast pedestal. A first roughening protrusion protrudes from a surface adjacent to the cast edge face PSC beam, and a first groove is recessed in the precast precast edge face PSC beam to accommodate the first roughness protrusion; On the other end of the precast precast side face PSC beam, a second projection is formed on a surface adjacent to the precast PSC beam so as to support and support the precast PSC beam, and the second roughness is formed on the precast PSC beam. A second groove is recessed to accommodate the protrusion.
상기 교각으로부터 돌출되는 상기 프리캐스트 변단면 PSC빔의 길이(X)는 교각 사이의 지간(L)의 L/6 내지 L/4로 형성되며, 보다 바람직하게는 약 L/5로 형성된다. 이는, 지간이 L인 양단 지지된 연속구조에 있어서, 정,부 모멘트가 교차되는 즉 굽힘 모멘트가 0이 되는 위치는 단부로부터의 L/5만큼 이격된 위치이므로, 굽힘 모멘트가 0이 되는 주변 위치에서 프리캐스트 프리캐스트 변단면 PSC빔과 프리캐스트 PSC빔이 서로 연결되도록 함으로써, 연결 부위가 파손되는 것을 최소화할 수 있다.The length X of the precast cross section PSC beam protruding from the piers is formed from L / 6 to L / 4 of the span L between piers, more preferably about L / 5. This is a peripheral position where the bending moment becomes zero since the position at which the positive and negative moments intersect, i.e., the bending moment becomes zero is spaced apart by L / 5 from the end, in the continuous structure supported at both ends. In the precast precast cross-section PSC beam and the precast PSC beam to be connected to each other, it is possible to minimize the damage to the connection site.
한편, 본 발명은, 교각 상부의 영구베어링에 지지되도록 거치된 프리캐스트 받침대와; 상기 프리캐스트 받침대에 양단이 지지되어 거치되되, 2개 이상의 프리캐스트 세그먼트 PSC빔과 빔 사이의 접합 부위를 콘크리트 현장 타설하여 연결시키고, 이 지점의 횡 방향으로 다이어프램을 콘크리트 현장타설 제작하여 서로 일체화 시켜 형성된 프리캐스트 PSC빔과; 상기 다이어프램의 교축직각 방향의 간극을 채운 콘크리트와; 상기 프리캐스트 받침대와 상기 프리캐스트 PSC빔의 사이에 충진된 충진재와; 상기 프리캐스트 PSC빔의 사이에 놓여진 상기 프리캐스트 받침대에 매설되거나 관통하도록 형성되어 상기 프리캐스트 PSC빔과 상기 프리캐스트 받침대를 연결 고정하는 것과 상기 프리캐스트 PSC빔에 프리스트레스를 도입하는 것 중 어느 하나 이상을 수행하는 긴장 수단과; 상기 프리캐스트 PSC빔의 상면에 콘크리트 타설 양생된 바닥판을; 포함하여 구성된 것을 특징으로 하는 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조를 제공한다.On the other hand, the present invention, the precast pedestal is mounted so as to be supported by the permanent bearing of the pier; Both ends are supported and mounted on the precast pedestal, and the joint sites between two or more precast segment PSC beams are cast in the concrete site, and the diaphragm is cast in the transverse direction at this point to be integrated with each other. A formed precast PSC beam; Concrete filling the gap in the axial direction perpendicular to the diaphragm; A filler filled between the precast pedestal and the precast PSC beam; At least one of being embedded or penetrated in the precast pedestal placed between the precast PSC beams to connect and fix the precast PSC beam and the precast pedestal, and to introduce prestress into the precast PSC beam. Tension means for carrying out; A concrete slab cured bottom plate on the top surface of the precast PSC beam; It provides a continuous structure of the prestressed concrete composite beam bridge, characterized in that configured to include.
여기서, 상기 프리캐스트 PSC빔을 양측에 거치시키는 상기 프리캐스트 받침대는 상기 교각의 교축직각 방향을 따라 하나의 빔 형태로 놓여지는 프리캐스트 받침빔으로 형성되고, 상기 프리캐스트 PSC빔은 상기 프리캐스트 받침빔에 대하여 교축직각 방향으로 다수 배열된다. 또한, 상기 프리캐스트 받침빔은 상기 베어링이 양단부에 위치하지 않음으로써 양단이 자유단이 되도록 거치된다. Here, the precast pedestal for mounting the precast PSC beam on both sides is formed of a precast receiving beam placed in the form of a beam along the axial direction of the pier, the precast PSC beam is the precast receiving Multiple arrangements are made in the direction perpendicular to the beam. In addition, the precast receiving beam is mounted so that both ends are free ends because the bearing is not positioned at both ends.
마찬가지로, 이 때, 상기 긴장 수단은 2개 이상의 프리캐스트 PSC빔과 상기 프리캐스트 받침대를 동시에 관통하는 2차 연속 텐던을 포함하여, 상기 연속 텐던을 긴장시키는 것에 의해 상기 프리캐스트 PSC빔과 상기 프리캐스트 받침대를 일체화시킴과 동시에 연속화 시키는 것이 가능해진다. 아울러, 상기 긴장 수단은 한쪽에만 프리캐스트 PSC빔이 거치되는 교각 상의 받침대와 프리캐스트 PSC빔만을 상호 연결 고정하는 고장력 강봉도 포함한다. Likewise, the tensioning means in this case comprise at least two precast PSC beams and a second continuous tendon which simultaneously passes through the precast pedestal, thereby tensioning the pretend PSC beam and the precast by tensioning the continuous tendons. It is possible to integrate the pedestal and to make it continuous. In addition, the tensioning means also includes a pedestal on the pier on which only one precast PSC beam is mounted and a high-strength rod for interconnecting and fixing only the precast PSC beam.
또한, 본 발명은, 교각 상부의 베어링에 지지되도록 거치된 프리캐스트 받침대와; 상기 교각 중 교축 방향으로 양쪽에 프리캐스트 PSC빔이 거치되는 교각에 거치되는 상기 프리캐스트 받침대에 교축방향으로 일단이 고정 지지되어 거치되는 프리캐스트 프리캐스트 변단면 PSC빔과; 상기 프리캐스트 변단면 PSC빔의 타단에 양단이 지지되어 거치되거나, 상기 프리캐스트 변단면 PSC빔의 타단과 상기 교각 중 교축 방향으로 한쪽에 프리캐스트 PSC빔이 거치되는 교각의 상부에 거치된 상기 프리캐스트 받침대에 양단이 지지되어 거치되되, 2개 이상의 프리캐스트 세그먼트 PSC빔과 빔 사이의 접합 부위를 콘크리트 현장 타설하여 연결시키고, 상기 접합 부위의 횡 방향으로 다이어프램을 콘크리트 현장타설 제작하여 서로 일체화 시켜 연속화되도록 형성된 프리캐스트 PSC빔과; 상기 다이어프램의 교축직각 방향의 간극을 채운 콘크리트와; 상기 프리캐스트 받침대와 상기 프리캐스트 변단면 PSC빔 사이의 간극과, 상기 프리캐스트 변단면 PSC빔과 상기 프리캐스트 PSC빔의 사이의 간극에 충진된 충진재와; 상기 프리캐스트 프리캐스트 변단면 PSC빔과 상기 프리캐스트 받침대를 연결 고정하는 고정 수단과; 상기 프리캐스트 PSC빔, 상기 프리캐스트 프리캐스트 변단면 PSC빔과, 상기 프리캐스트 받침대를 관통하여 형성되어 상기 프리캐스트 PSC빔에 프리스트레스를 도입하는 긴장 수단과; 상기 프리캐스트 PSC빔의 상면에 콘크리트 타설 양생된 바닥판을; 포함하여 구성된 것을 특징으로 하는 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조를 또한 제공한다.The present invention also includes a precast pedestal mounted so as to be supported by a bearing on an upper portion of the piers; A precast precast edge section PSC beam having one end fixedly supported in the axial direction by the precast pedestal mounted on the pier where the precast PSC beams are mounted on both sides in the axial direction of the pier; Both ends are supported and mounted on the other end of the precast edge-side PSC beam, or the pre-mounted on the top of the bridge where the precast PSC beam is mounted on one side in the axial direction of the other end of the precast edge-side PSC beam. Both ends are supported and mounted on the cast pedestal, but the joint site between two or more precast segment PSC beams and the beam is cast in the concrete site, and the diaphragm is cast in the transverse direction of the joint site and the concrete is integrated to be integrated. A precast PSC beam so formed; Concrete filling the gap in the axial direction perpendicular to the diaphragm; A filler filled in a gap between the precast pedestal and the precast edge face PSC beam, and a gap between the precast edge face PSC beam and the precast PSC beam; Fixing means for connecting and fixing the precast precast side face PSC beam and the precast pedestal; Tension means formed through the precast PSC beam, the precast precast cross-section PSC beam, and the precast pedestal to introduce prestress into the precast PSC beam; A concrete slab cured bottom plate on the top surface of the precast PSC beam; Also provided is a continuous structure of prestressed concrete composite beam bridge, characterized in that configured to include.
이하, 첨부 도면을 참조하여 본 발명의 실시예에 관하여 상세히 설명한다. Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
다만, 본 발명을 설명함에 있어서, 공지된 기능 혹은 구성에 대한 구체적인 설명은 본 발명의 요지를 명료하게 하기 위하여 생략하기로 한다. However, in describing the present invention, a detailed description of known functions or configurations will be omitted to clarify the gist of the present invention.
도1 내지 도10은 본 발명의 제1실시예에 따른 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조에 관한 것으로, 도1은 본 발명의 제1실시예에 따른 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조를 도시한 평면도, 도2는 도1의 측면도, 도3은 도1의 절단선 Ⅲ-Ⅲ에 따른 단면도, 도4는 도1의 'A'부분의 상세 구조를 도시한 사시도, 도5는 도4의 프리캐스트 받침빔의 형상을 도시한 정면도, 도6은 도1의 'B'부분의 상세 구조를 도시한 사시도, 도7은 도6의 죔기구의 구성을 도시한 사시도, 도8은 도2의 프리스트레스트 콘트리트 합성빔에 내설된 2차 연속 텐던이 표시된 합성빔의 구성을 도시한 측면도, 도9는 도2의 프리캐스트 PSC빔에 1차 텐던이 표시되는 형상을 도시한 사시도, 도10은 도1의 프리캐스트 PSC빔으로부터 교축직각 방향으로 돌출된 다이어프램을 상호 일체화시킨 형상을 도시한 도면이다.1 to 10 illustrate a continuity structure of a prestressed concrete composite beam bridge according to a first embodiment of the present invention, and FIG. 1 illustrates a continuity structure of a prestressed concrete composite beam bridge according to a first embodiment of the present invention. FIG. 2 is a side view of FIG. 1, FIG. 3 is a sectional view taken along line III-III of FIG. 1, FIG. 4 is a perspective view showing the detailed structure of part 'A' of FIG. 1, and FIG. 5 is FIG. Fig. 6 is a perspective view showing the detailed structure of part 'B' of Fig. 1, Fig. 7 is a perspective view showing the structure of the clamping mechanism of Fig. 6, and Fig. 8 Fig. 9 is a side view showing the configuration of a composite beam in which a secondary continuous tendon embedded in the prestressed concrete composite beam of Fig. 2 is shown; Fig. 9 is a perspective view showing a shape in which primary tendon is displayed on the precast PSC beam of Fig. 2; Is a diaphragm projecting from the precast PSC beam of FIG. A diagram showing a cross-shape which integrally.
도면에 도시된 바와 같이, 본 발명의 제1실시예에 따른 프리스트레스트 콘크리트 합성빔의 연속화된 교량(100)은, 교량의 중간 지점에 세워진 교각(20)의 교축직각 방향을 따라 영구베어링(111)에 의해 지지되도록 거치된 프리캐스트 중간 프리캐스트 받침빔(110)과, 교량의 양 끝단 지점에 세워진 교각(20)의 교축직각 방향을 따라 영구 베어링(121)에 지지되도록 거치된 프리캐스트 단부 프리캐스트 받침빔(120)과, 중간 프리캐스트 받침빔(110)이나 단부 프리캐스트 받침빔(120)에 의하여 양단이 지지되도록 거치되는 프리캐스트 PSC빔(130)과, 프리캐스트 받침빔(110,120)과 프리캐스트 PSC빔(130) 사이에 채워지는 충진재인 모르타르(140)와, 단부 프리캐스트 받침빔(120)과 마주보는 프리캐스트 PSC빔(130)의 빔 중앙에 프리캐스트 PSC빔(130)의 교축직각 방향으로 돌출 형성된 콘크리트 다이어프램(150)과, 단부 프리캐스트 받침빔(120)과 프리캐스트 PSC빔(130)의 끝단이 서로 밀착되어 일체로 거동되도록 고정하는 죔 기구(160)와, 콘크리트 다이어프램(150)들 사이의 교축직각 방향의 간극에 현장 타설되는 현장타설 콘크리트(152)로 구성된다.As shown in the figure, the
상기 프리캐스트 중간 프리캐스트 받침빔(110)은 콘크리트와 철근구조물로서 공장이나 교량가설현장에 인접한 제작장에서 미리 제작하여 연속화 교량의 중간 지점인 교각(20)의 영구베어링(111) 상에 교축직각 방향으로 놓여지며, 프리캐스트 PSC빔(130)을 간편하게 거치시키도록 양측 하부에 측 방향으로 거치돌기(110a)가 돌출 형성된다. 그리고, 중간 프리캐스트 받침빔(110)은 양단이 자유단이 되도록 중앙부에 2개 내지 3개 정도의 영구베어링(111)으로 지지되는데, 도5에 도시된 바와 같이, 그 길이 방향을 따라 중간 프리캐스트 받침빔 보강텐던(112)이 설치되어 정착구(112a)에서 긴장시키는 것에 의하여 프리캐스트 받침빔에 프리스트레스를 도입한다. The precast intermediate
상기 프리캐스트 단부 프리캐스트 받침빔(120)은 콘크리트와 철근구조물로서 공장이나 제작장에서 미리 제작하여 연속화 교량의 단부 지점에 교각(10) 상부의 영구베어링(121)에 교축직각 방향으로 놓여지며, 교축 방향으로 배열되는 프리캐스트 PSC빔(130)을 간편하게 거치시키도록 프리캐스트 PSC빔(130)을 향하는 일측 하부에 측 방향으로 거치돌기(120a)가 돌출 형성된다. 단부 프리캐스트 받침빔(120)도 중간 프리캐스트 받침빔(110)과 마찬가지로 그 중앙부에 2개 내지 3개 정도의 영구베어링(121)으로 지지되는데, 그 길이 방향을 따라 텐던(112)이 설치되어, 양단의 정착구(112a)를 긴장하여 단부 프리캐스트 받침빔에 프리스트레스를 도입한다.The precast end precast receiving
상기 프리캐스트 PSC빔(130)은 콘크리트와 철근구조물로서 공장이나 제작장에서 미리 제작된 것으로, 교각에 거치된 프리캐스트 PSC빔 자중에 의해 발생되는 빔 중앙 하단부의 인장응력에 의해 콘크리트가 손상되는 것을 방지하기 위하여 빔에 설치된 1차 텐던(132,132a,132b)을 긴장하여 프리스트레스를 도입한다. 또한, 도4 및 도9에 도시된 바와 같이, 중간 프리캐스트 받침빔(110)과 프리캐스트 PSC빔(130)의 연결은 프리캐스트 PSC빔에 형성된 연결돌기(130b)의 1차 고강도 강봉(162)으로, 보강 헌치(130c) 내에 설치된 2차 고강도 강봉(161)으로 긴장함으로써 연결되며, 중간 프리캐스트 받침빔(110)과 프리캐스트 PSC빔에 미리 매설된 쉬스관(134)을 서로 연결시키고, 도6에 도시된 바와 같이, 양측의 프리캐스트 PSC빔(130) 끝단 상면에 형성된 콘크리트 블럭(131c)의 정착구(131a)를 통하여 쉬즈관에 강연선을 삽입하고 이 2차 연속 텐던(131)을 긴장하여 프리캐스트 PSC빔(130)의 중간 하단에 발생하는 인장응력과 교량의 중간 지점부인 교각 주변의 바닥판에 발생하는 인장응력을 상쇄시킴으로써 프리캐스트 PSC빔 교량(100)의 연속화가 가능해진다. 또한 과다 사용하중 작용 시 연속교로 인해서 추가 발생 할 수 있는 교각 주의의 부 모멘트에 의한 인장응력을 보강 헌치(130c)에 매설되어 있는 2차 고강도 강봉(161)을 재긴장(Retension)하여 추가 프리스트레스를 도입시킴으로서 사용 구조물을 유지관리 한다. The
여기서, 프리캐스트 PSC빔(130)의 양단 하부에는 거치돌기(120a)를 수용하는 거치홈(130a)이 형성되어, 교각(10,20)상단에 프리캐스트 받침빔(110,120)이 거치된 상태에서 크레인으로 프리캐스트 PSC빔(130)을 그 사이에 올려두는 것에 의하여, 프리캐스트 받침빔(110,120)에 양단 지지되도록 거치된다. Here, mounting grooves (130a) for receiving the mounting projections (120a) is formed at both ends of the
그리고, 프리캐스트 PSC빔(130)은 중앙부의 단면 형상은 ‘I'자로 형성되지만, 단부에는 프리캐스트 받침빔(110,120)에 거치되어 1,2차 강봉(160,161)으로 고정할 수 있는 강도를 확보하고, 텐던의 인장력에 견딜수 있도록 보다 큰 단면으로 형성된다. In addition, the
상기 충진재(140)는 프리캐스트로 제작된 프리캐스트 PSC빔(130)과 프리캐스트 받침빔(110,120) 사이에 발생되는 간극을 모르타르 등으로 매우기 위한 것이다. The
상기 도10에서의 프리캐스트 중간 다이어프램(150)은 프리캐스트 PSC빔(130) 제작 시 교축직각 방향으로 돌출되도록 프리캐스트 PSC빔(130)과 일체로 타설되어 형성되며, 교축 방향으로 거치된 프리캐스트 PSC빔(130)에 연결된 프리캐스트 중간 다이어프램(150)들 사이의 교축직각 방향 간극은 현장타설 콘크리트(152)로 타설, 양생한 후 교축직각 방향 다이어프램 보강 텐던(151)을 긴장함으로써 프리스트레스를 도입하여 각각의 프리캐스트 PSC빔(130)을 교축직각 방향으로 일체화 시킨다.The precast
상기 죔기구(160)는, 도6,도7에 도시된 바와 같이, 단부 프리캐스트 받침빔(120)과 프리캐스트 PSC빔(130) 사이를 고정시킬 수 있는 소정의 인장강도를 가진 1차 고강도 강봉(162)과, 강봉(162)의 일단에 고정되어 단부 프리캐스트 받침빔(120)에 매설되어 있는 고정너트(162b)와 지지판(163) 강봉 삽입용 쉬즈관(162c), 프리캐스트 PSC빔 끝단에 설치된 연결돌기(130b)를 관통하여 외부로 노출된 강봉(162)에 체결된 인장너트(162a)로 구성된다. 1차 고강도 강봉(162)의 일단이 단부 프리캐스트 받침빔(120)에 매설되어 있는 고정너트(162b)에 체결되어 일체로 거동하고, 외부로 노출된 인장너트(162a)를 긴장하고 조임으로써 단부 프리캐스트 받침빔(120)과 프리캐스트 PSC빔(130)이 서로 밀착하도록 연결 고정시킬 수 있게 된다. As shown in FIGS. 6 and 7, the
이하, 본 발명의 제1실시예에 따른 PSC 합성빔 교량(100)의 연속화 공법을 상술한다.Hereinafter, the sequencing method of the PSC
단계 1 : 도2 및 도3에 도시된 바와 같이, 교각(10,20) 상부에 영구베어링(111,121)을 거치시킨 후, 미리 제작된 프리캐스트 받침빔(110,120)을 교각(10,20)의 교축직각 방향으로 배열되도록 영구베어링(111,121) 상에 거치시킨다. 이에 따라, 도3의 점선으로 표시된 바와 같이, 하나의 베어링(111')이 하나의 프리캐스트 PSC빔(130)을 지지함에 따라 교각(20')의 상부가 벌어지게 형성(20':점선으로 표시된 부분)될 수밖에 없는 한계를 가진 종래 구조와 달리, 본 발명에 따른 구조에서는 바닥판으로부터 전달되는 활하중 등에 의해 전복되지 않을 만큼만 영구베어링(111)이 교각(20)의 중심부에서 대칭으로 이격되게 거치됨에 따라, 교각(20)에 작용하는 모멘트에 의한 인장응력이 최소화되고, 교각(20)에는 압축응력이 주로 작용하므로, 교각(20)기둥 및 기초구조물의 크기와 지지 단면을 작게 설계하는 것이 가능해진다. Step 1 : As shown in Figs. 2 and 3, after the permanent bearings (111, 121) are mounted on the pier (10, 20), the precast bearing beam (110, 120) prepared in advance to the pier (10, 20) It is mounted on the permanent bearings (111, 121) to be arranged in the direction perpendicular to the axial axis. Accordingly, as indicated by a dotted line in FIG. 3, as one
단계 2 : 교각(10,20)상부에 교축직각 방향으로 놓여진 프리캐스트 받침빔(110,120)의 텐던(112,112a)을 긴장시켜, 프리캐스트 받침빔(110,120)이 지지 능력을 갖도록 한다. Step 2 :
단계 3 : 미리 제작된 프리캐스트 PSC빔(130)의 자중에 의한 인장응력에 따른 손상을 방지하기 위하여, 프리캐스트 PSC빔(130)의 1차 텐던(132)을 긴장시킨 상태로, 도2에 도시된 바와 같이, 프리캐스트 받침빔(110,120)의 하측에 돌출 형성된 거치돌기(110a,120a)가 거치홈(130a)에 수용되도록 프리캐스트 PSC빔(130)을 크레인으로 인상하여 프리캐스트 받침빔(110,120)에 지지되도록 거치시킨다. Step 3 : In order to prevent damage due to tensile stress due to the self-weight of the
단계 4 : 프리캐스트로 제작된 프리캐스트 PSC빔(130)과 프리캐스트 받침빔(110)의 사이에는 소정의 간극이 발생되므로, 그 간극을 충진재인 모르타르(140)로 매꾼다. Step 4 : Since a predetermined gap is generated between the
단계 5 : 교축 방향으로 인접하게 배열된 2개의 프리캐스트 PSC빔(130) 사이에 위치한 프리캐스트 중간 프리캐스트 받침빔(110)과의 연결은, 도4에 도시된 바와 같이, 프리캐스트 PSC빔에 형성된 연결돌기(130b)의 1차 고강도 강봉(162)으로, 보강 헌치(130c) 내에 설치된 2차 고강도 강봉(161)으로 긴장시킴으로써 연결되며, 프리캐스트 PSC빔에 설치된 2차 연속 텐던(131)을 긴장시켜 프리스트레스를 도입함으로써 연속화 시킨다. Step 5 : The connection with the precast intermediate
이와 같은 간단한 공정을 통해, 프리캐스트 PSC빔의 연속화를 위하여 별도의 철근으로 구조적 연결하는 종래의 공정과, 프리캐스트 PSC빔의 사이에 콘크리트를 현장 타설하는 종래 공정을 대체할 수 있게 된다. Through such a simple process, it is possible to replace the conventional process of structurally connecting with a separate rebar for the continuation of the precast PSC beam, and the conventional process of placing concrete between the precast PSC beam in the field.
단계 6 : 프리캐스트 PSC빔(130)과 단부 프리캐스트 받침빔(120)이 맞닿는 위치에서는, 도6에 도시된 바와 같이, 단부 프리캐스트 받침빔(120)에 매설되는 고정너트(162b)에 프리캐스트 PSC빔 끝단에 설치된 연결돌기(130b)에서 1차 고강도 강봉(162)을 삽입하고 체결한 후 긴장하여 단부 프리캐스트 받침빔과 프리캐스트 PSC빔이 서로 밀착되어 일체로 거동하도록 한다. 이에 따라, 교량(100) 단부에서도 프리캐스트 PSC빔(130)이 단부 프리캐스트 받침빔(120)에 의해 구속되므로, 교량(100)의 구조물은 교량에 작용되는 활하중 및 사하중에 대하여 안정된 사각 판상 구조 거동을 하게 된다. Step 6 : At the position where the
단계 7 : 도10에 도시된 바와 같이, 프리캐스트 PSC빔(130)의 양측 또는 일측에 교축직각 방향으로 돌출 형성된 프리캐스트 다이어프램(150)의 사이를 콘크리트(152)로 현장 타설하고, 프리캐스트 다이어프램(150)의 교축직각 방향으로 매설된 쉬스관 내의 텐던(151)을 긴장시켜, 각각의 프리캐스트 빔(130)의 교축직각 방향에 대하여 구속시킨다. Step 7 : As shown in FIG. 10, between the
단계 8 : 프리캐스트 PSC빔(130)의 상면에 바닥판을 타설할 동바리 및 거푸 집을 설치하고, 콘크리트를 타설 양생하여 바닥판을 형성한다. Step 8 : Install the bottom of the
단계 9: 도6에 도시된 바와 같이, 프리캐스트 PSC빔(130)의 끝단 상면의 콘크리트 블럭(131c)에 설치된 2차 연속 텐던용 정착구(131a)에 필요한 양의 강연선을 삽입하고 이를 긴장하여 소정 량의 프리스트레스를 도입한다. Step 9 : As shown in FIG. 6, the required amount of stranded wire is inserted into the secondary continuous
단계 10 : 최종 완성 단계에서 발생 예상되는 교각 주변의 부 모멘트에 의한 인장응력에 대하여, 작용한 긴장력의 크기에 따라 각 교각부 측의 프리캐스트 PSC빔 끝단에 형성된 보강헌치(130c) 내의 2차 인장 강봉(161) 또는 2차 연속 텐던(131)의 일부를 재긴장(Retension)하거나, 2차 인장 강봉(161) 또는 2차 연속 텐던용 정착구(131a)를 이용하여 도입된 프리스트레스의 긴장력을 감소시키는 작업(Detension)을 행한다. Step 10 : Secondary tension in the
이하, 도11 내지 도14를 참조하여 본 발명의 제2실시예를 상술한다. 다만, 본 발명의 제2실시예를 설명함에 있어서, 전술한 제1실시예와 중복되는 동일 또는 유사한 구성에 대해서는 동일 또는 유사한 도면 부호로 표시하고, 이에 대한 구체적인 설명은 본 실시예의 요지를 흩뜨리지 않도록 하기 위하여 생략하기로 한다. Hereinafter, a second embodiment of the present invention will be described in detail with reference to FIGS. However, in describing the second embodiment of the present invention, the same or similar components that overlap with the above-described first embodiment are denoted by the same or similar reference numerals, and detailed description thereof will not distract from the gist of the present embodiment. It will be omitted to avoid.
도11 내지 도14는 본 발명의 제2실시예에 따른 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조에 관한 것으로, 도11은 도1에 적용 가능한 부분 바닥판이 일체로 제작된 PSC 부분 합성빔의 형상을 도시한 사시도, 도12는 도11의 PSC 부분 합성빔이 적용된 경우 도1의 ‘A'부분의 상세 구조를 도시한 사시도, 도13은 도11의 PSC 부분 합성빔이 적용된 경우 도1의 ‘B'부분의 상세 구조를 도시한 사시도, 도14은 도11의 PSC 부분 합성빔을 이용하여 교량의 최종 바닥판을 형성하기 위한 구성을 도시한 도면이다.11 to 14 illustrate a continuity structure of a prestressed concrete composite beam bridge according to a second embodiment of the present invention. FIG. 11 illustrates a shape of a PSC partial composite beam in which a partial bottom plate applicable to FIG. 1 is integrally manufactured. 12 is a perspective view showing the detailed structure of the 'A' part of Figure 1 when the PSC partial composite beam of Figure 11 is applied, Figure 13 is a 'B' of Figure 1 when the PSC partial composite beam of Figure 11 is applied 14 is a perspective view showing the detailed structure of the portion, and FIG. 14 is a diagram showing the configuration for forming the final bottom plate of the bridge using the PSC partial composite beam of FIG.
도11 내지 도14에 도시된 바와 같이, 본 발명의 제2실시예에 따른 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조는 프리캐스트 PSC빔(130)의 상면에 타설되어 양생될 바닥판(도14의 점선으로 표시된 부분)의 일부 두께를 갖는 부분 바닥판(171)으로 제작장에서 미리 프리캐스트 PSC빔(130)과 일체로 그 상면에 형성된다는 점에서 전술한 제1실시예(100)의 구성과 상이하다.11 to 14, the continuity structure of the prestressed concrete composite beam bridge according to the second embodiment of the present invention is the bottom plate to be cast and cured on the upper surface of the precast PSC beam (130) The structure of the
이와 같이, 본 발명의 제2실시예는 부분 바닥판(171)이 프리캐스트 PSC빔(130)과 일체로 제작장에서 미리 일체로 형성됨으로써 최종 바닥판(172)의 시공이 매우 간단해지는 장점을 갖는다. 즉, 도14에 도시된 바와 같이, 부분 바닥판(171)과 일체로 타설된 프리캐스트 PSC빔(130)을 프리캐스트 받침빔(110,210)에 교축직각 방향 및 교축 방향으로 연결한 후 최종 바닥판(172)을 콘크리트 타설하여 양생하는 데, 이 때, 부분 바닥판(171) 상면에 콘크리트 스페이서(183)를 관통하여 설치된 훰타이 강봉(181)에 체결된 강재 빔(182)과 판 형상거푸집(180)을 사용한 시스템 거푸집을 이용하여 바닥판 콘크리트 타설하므로, 거푸집의 설치가 매우 간단해지고 최종 바닥판(172)의 높이를 쉽게 맞출 수 있다. 여기서, 스페이서(183)의 높이는 미리 정해진 최종 바닥판(172)의 높이와 일치한다. 다시 말하면, 본 발명의 제2실시예는 PSC빔과 PSC빔 사이의 허공에 동바리를 설치하는 기존의 공법에 비하여, 보다 간단한 공정으로 신속하고 저렴한 비용으로 시공을 가능하게 한다. As such, the second embodiment of the present invention has the advantage that the construction of the
따라서, 전술한 제1실시예(100)의 공법과 대비하여 볼 때, 제2실시예의 공법은 제1실시예(100)의 단계 1 내지 단계 7은 유사하지만, 단계 8 이후의 공정은 아 래의 단계를 따르게 된다.Therefore, in contrast to the process of the
단계 8 : 도13에 도시된 바와 같이, 제작장에서 프리캐스트 PSC빔(130)제작 시 빔과 일체로 시공된 완성 바닥판의 두께보다 얇은 부분두께의 부분 바닥판(171) 양측 끝단 상면의 콘크리트 블럭(131c)에 설치된 2차 연속 텐던용 정착구(131a)에 필요량의 강연선을 삽입하고 이를 긴장하여 소정 량의 프리스트레스를 도입한다. Step 8 : As shown in Figure 13, when manufacturing the
단계 9 : 프리캐스트 PSC빔(130)과 일체된 부분 바닥판의 상면과 측면을 타설할 시스템 거푸집을 설치하고, 콘크리트를 타설 양생하여 최종 바닥판을 형성한다. Step 9 : Install the system formwork for placing the top and side surfaces of the partial bottom plate integrated with the
단계 10 : 최종 완성 단계에서 발생 예상되는 교각 주변의 부 모멘트에 의한 인장응력에 대하여, 작용한 긴장력의 크기에 따라 각 교각부 측의 프리캐스트 PSC빔 끝단에 형성된 보강 헌치(130c) 내의 2차 인장 강봉(161) 또는 2차 연속 텐던(131)의 일부를 재긴장(Retension)하거나, 2차 인장 강봉(161)을 또는 2차 연속 텐던용 정착구(131a)를 이용하여 도입된 프리스트레스의 긴장력을 감소시키는 작업(Detension)을 행한다. Step 10 : Secondary tension in the reinforcement haun (130c) formed at the end of the precast PSC beam on each side of the pier according to the amount of tension applied to the tensile stress due to the minor moment around the pier expected to occur in the final completion stage. Retension a portion of the
이하, 도15 및 도16을 참조하여 본 발명의 제3실시예(200)를 상술한다. 다만, 본 발명의 제3실시예를 설명함에 있어서, 전술한 제1, 2실시예와 중복되는 동일 또는 유사한 구성에 대해서는 동일 또는 유사한 도면 부호로 표시하고, 이에 대한 구체적인 설명은 본 실시예의 요지를 흩뜨리지 않도록 하기 위하여 생략하기로 한다. 15 and 16, a
도15 및 도16은 본 발명의 제3실시예에 따른 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조에 관한 것으로, 도15는 본 발명의 제2실시예에 따른 프리스 트레스트 콘크리트 합성빔 교량의 연속화 구조를 도시한 평면도, 도16은 도15의 측면도이다.15 and 16 illustrate a continuity structure of the prestressed concrete composite beam bridge according to the third embodiment of the present invention, and FIG. 15 illustrates a continuity structure of the prestressed concrete composite beam bridge according to the second embodiment of the present invention. 16 is a side view of FIG. 15.
도면에 도시된 바와 같이, 본 발명의 제3실시예에 따른 프리스트레스트 콘크리트 합성빔의 연속화된 교량(200)은, 교량의 중간 지점에 세워진 교각(30)에 2개의 단부 프리캐스트 받침빔(120)이 서로 반대 방향을 향하도록 배열되는 것이 포함된다는 점에서 전술한 제1, 2실시예의 구성을 확장한 것이다. As shown in the figure, the
보다 구체적으로는, 도14 및 도15의 도면 부호 30으로 표시된 교각 상에는 2개의 단부 프리캐스트 받침빔(220)이 서로 다른 방향으로 배열된다. 이는 교량의 길이가 긴 경우에 바람직 한데, 교량 전체를 하나의 연속화된 교량으로 시공하는 것은 교량에 작용하는 온도변화 혹은 지진 등에 의한 응력변화가 증가하여 교량 구조물에 많은 악 영향이 발생하기 때문이다. 이와 같은 구조를 통해, 교량의 길이가 수km 내지 수십km에 달하더라도, 구분된 연속화 교량을 통해 다수의 사각 판상 구조로 이루어진 교량을 구성할 수 있게 된다. More specifically, two end
이와 같은 제3실시예의 구성(300)은 제1, 2실시예의 구성에 대하여 모두 적용할 수 있음은 본 발명이 속하는 기술 분야의 당업자에게 자명하다. It is apparent to those skilled in the art that the
이하, 도17 내지 도22를 참조하여 본 발명의 제4실시예(300)를 상술한다. 다만, 본 발명의 제4실시예를 설명함에 있어서, 전술한 제1실시예 내지 제3실시예와 중복되는 동일 또는 유사한 구성에 대해서는 동일 또는 유사한 도면 부호로 표시하고, 이에 대한 구체적인 설명은 본 실시예의 요지를 흩뜨리지 않도록 하기 위하여 생략하기로 한다. Hereinafter, a
도17 내지 도22는 본 발명의 제4실시예에 따른 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조에 관한 것으로, 도17은 본 발명의 제4실시예에 따른 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조의 평면도, 도18은 도17의 측면도, 도19는 도17의 'E'부분의 상세 구조를 도시한 사시도, 도20은 도17의 'D'부분의 상세 구조를 도시한 사시도, 도21은 도17의 프리캐스트 PSC빔의 구성을 도시한 사시도, 도22는 도17의 프리캐스트 PSC빔의 측면도이다.17 to 22 illustrate a continuity structure of a prestressed concrete composite beam bridge according to a fourth embodiment of the present invention, and FIG. 17 illustrates a continuity structure of a prestressed concrete composite beam bridge according to a fourth embodiment of the present invention. 18 is a side view of FIG. 17, FIG. 19 is a perspective view showing the detailed structure of the portion 'E' of FIG. 17, FIG. 20 is a perspective view showing the detailed structure of the 'D' portion of FIG. 17 is a perspective view showing the structure of the precast PSC beam of FIG. 17, and FIG. 22 is a side view of the precast PSC beam of FIG.
도면에 도시된 바와 같이, 본 발명의 제4실시예에 따른 프리스트레스트 콘크리트 합성빔의 연속화된 교량(300)은, 교량의 중간 지점에 세워진 교각(20)의 교축직 각 방향을 따라 영구베어링(311)에 의해 지지되도록 거치된 프리캐스트 중간 프리캐스트 받침빔(310)과, 교량의 양 끝단 지점에 세워진 교각(10)의 교축직각 방향을 따라 영구 베어링(321)에 지지되도록 거치된 프리캐스트 단부 프리캐스트 받침빔(320)과, 프리캐스트 중간 프리캐스트 받침빔(310)에 고정 지지되어 거치되는 프리캐스트 프리캐스트 변단면 PSC빔(335)과, 프리캐스트 프리캐스트 변단면 PSC빔(335)이나 단부 프리캐스트 받침빔(320)에 의하여 양단이 지지되도록 거치되고 높이(H')와 단면이 지간에 따라 거의 일정한 프리캐스트 PSC빔(330)과, 프리캐스트 받침빔(310,320)과 프리캐스트 PSC빔(330) 사이에 채워지는 충진재인 모르타르(340)를 포함한다. As shown in the figure, the
즉, 본 발명의 제4실시예는 중간 프리캐스트 받침빔(310)과 프리캐스트 PSC빔(330)의 사이에 프리캐스트 변단면 PSC빔(335)이 게재된다는 점에서 전술한 다른 실시예들과 차별된다. 이는, 교량 지간(L)의 길이가 작은 경우(예컨대, 지간 길이가 25m 내지 45m)의 연속교량에는 프리캐스트 PSC빔의 높이(H')가 일정하여도 지점부와 지간 중간부에 작용하는 굽힘 모멘트에 의한 응력을 견딜 수 있으나, 교량 지간(L)의 길이가 긴 경우(예컨대, 지간 길이가 45m 이상)의 연속교량에서는 교각 부위에서 상부구조물에 발생하는 부 모멘트는 증가하고 지간 중간에서의 정 모멘트는 상대적으로 감소하는데 이 모멘트에 의한 각각의 응력을 억제하기 위하여 교각 주변의 빔의 높이(H)는 지간 중앙에서의 프리캐스트 PSC빔의 높이(H')에 비하여 커져야 경제적이고 안정된 단면이 된다. That is, the fourth embodiment of the present invention is different from the other embodiments described above in that the precast
종래에는 이와 같은 장지간 교량을 제작하는 경우에, 교각과 교각의 사이에 거치되는 변단면을 포함한 프리캐스트 PSC빔을 하나로 제작하면 그 중량이 매우 커서 하나로 제작된 프리캐스트 PSC빔을 크레인으로 인상하는 것이 불가능하며, 기존의 재래적인 장지간의 콘크리트 교량가설 방법 중 교각과 교각 사이에 동바리 및 거푸집을 설치한 후 콘크리트를 현장 타설하여 시공하는 박스 거더 형식의 가설 방법은 제작 공종이 복잡하고 공사기간이 오래 걸리며 또한 제작비용이 크게 증가하는 문제점을 내포하고 있었지만, 이를 개선하고 보다 경제적이고 효율적인 교량을 건설하기 위한 대체 방법으로 본 발명의 제4실시예를 제시한 것이다. Conventionally, when manufacturing such long-long bridges, if one precast PSC beam including a cross section mounted between the bridge and the bridge is fabricated as one, the weight of the precast PSC beam is increased so that the single precast PSC beam is lifted by a crane. It is impossible to use the box girder type construction method that installs concrete and installs concrete after installing bridges and formwork between the bridge piers and the bridges. Although it had a problem that the manufacturing cost is greatly increased, but the fourth embodiment of the present invention is proposed as an alternative method to improve this and to build a more economical and efficient bridge.
따라서, 상기 프리캐스트 프리캐스트 변단면 PSC빔(335)은 도18에 도시된 높이(H)에 비하여, 프리캐스트 PSC빔(330)의 높이(H')에 비하여 훨씬 높게 형성된다. 아울러, 양단지지 형태의 교량 구조에서 굽힘 모멘트가 0이 되는 지점은 교각으로부터 지간(L)의 약 1/5되는 지점이므로, 프리캐스트 프리캐스트 변단면 PSC빔(335)의 길이(X)는 교각으로부터 L/6 내지 4/L인 것이 바람직하며, 약 L/5의 길이로 설계되는 것이 유리하다. Therefore, the precast precast cross
또한, 본 발명의 제4실시예는, 상기 프리캐스트 PSC빔(330)이 2개 이상의 프리캐스트 세그먼트 PSC빔(330')이 결합되어 이루어진다는 점에 있어서도 전술한 실시예와 차별된다. 이를 통해, 프리캐스트 세그먼트 PSC빔(330')은 제작장이 아닌 공장에서 제작하여 현장으로 이송해오는 것이 가능해지므로, 보다 신속하고 저렴하게 교량을 제작할 수 있는 장점을 갖는다. In addition, the fourth embodiment of the present invention differs from the above-described embodiment in that the
여기서, 현장과 인접한 제작장에서 종 방향으로 배열된 각각의 프리캐스트 세그먼트 PSC빔(330')과 빔이 서로 인접하는 부위에 콘크리트 현장 타설(399)하여 연결하고 또한 이 지점의 횡 방향으로 이들을 구속하는 다이어프램(350)을 콘크리트 타설하여 제작한다. 그리고, 다이어프램(350)을 중심으로 교축 방향으로 인접한 각각의 프리캐스트 세그먼트 PSC빔(330')은 내설된 텐던 삽입용 쉬즈관에 강연선을 필요량 삽입하고 1차 텐던(332)을 긴장하여 프리스트레스 프리캐스트 PSC빔에 프리스트레스를 도입시킴으로서 서로 일체화되고 연속 프리캐스트 PSC빔(330) 구조물이 된다. 그리고, 각각의 다이어프램(350)사이의 교축직각 방향으로의 간극에는 콘크리트로 현장타설(352)된 후, 다이어프램 보강 텐던(351)을 긴장하여 교축직각 방향으로의 프리스트레스를 도입시킨다. Here, each of the precast segment PSC beams 330 'arranged in the longitudinal direction at the fabrication site adjacent to the site and the concrete site-pouring 399 are connected to the areas adjacent to each other and constrained in the transverse direction of this point. The concrete is made by pouring the
또한, 부분 바닥판(371)은 프리캐스트 세그먼트 PSC빔(330')의 상면에 공장에서 미리 결합 형성되어 교량 공사 현장으로 운송된다. 그러나, 본 발명은 이에 한정되지 않으며, 부분 바닥판(371)이 공장에서 제작될 당시부터 프리캐스트 세그먼트 PSC빔(330’)에 형성되지 않고 제1실시예의 공법에 따라 현장에서 바닥판의 전부를 시공하는 것을 포함한다. In addition, the
이하에서는, 도면에 도시된 바와 같이, 부분 바닥판(371)이 미리 형성된 프리캐스트 PSC빔(330)이 적용된 것에 대하여 상술하기로 한다.Hereinafter, as shown in the drawing, the
이하, 본 발명의 제4실시예에 따른 합성빔 교량의 연속화 공법을 상술한다.Hereinafter, the sequencing method of the composite beam bridge according to the fourth embodiment of the present invention will be described in detail.
단계 1 : 도17 및 도18에 도시된 바와 같이, 교각(10,20) 상부에 영구베어링(311,321)을 거치시킨 후, 미리 제작된 프리캐스트 받침빔(310,320)을 교각(10,20)의 교축직각 방향으로 배열되도록 영구베어링(311,321) 상에 거치시킨다. Step 1 : As shown in Figs. 17 and 18, after the permanent bearings (311, 321) are mounted on the pier (10, 20), the precast bearing beam (310, 320) of the pre-fabrication of the pier (10, 20) It is mounted on the permanent bearings (311, 321) to be arranged in the direction perpendicular to the axial axis.
단계 2 : 미리 공장이나 제작장에서 제작된 프리캐스트 프리캐스트 변단면 PSC빔(335)을 중간 프리캐스트 받침빔(310)의 제1거치돌기(310a)에 거치되도록, 교각(20)으로부터 소정 거리 이격된 위치에 설치한 임시교각(390) 상의 임시받침(391) 위에 부분 바닥판(371)과 일체로 제작된 프리캐스트 변단면 PSC빔(335)을 교축 방향으로 설치한다. Step 2 : A predetermined distance from the
단계 3 : 도20에 도시된 바와 같이, 프리캐스트 받침빔(310)과 프리캐스트 변단면 PSC빔(335)에 내설된 강연선 삽입용 쉬즈관(336c)을 일체시키고 빔 사이의 공극을 모르타르(340)로 충진 시킨다. Step 3 : As shown in Fig. 20, the
단계 4 : 프리캐스트 받침빔(310)을 중심으로 프리캐스트 변단면 PSC빔과 프리캐스트 받침빔(310) 사이에 설치된 1차 연결용 직선 텐던용 쉬즈관(336c) 내에 강연선(336)을 삽입하고 이를 긴장하여 프리스트레스를 도입하여 서로를 연결하여 일체화 하고, 또한 프리캐스트 변단면 PSC빔에 압축력을 도입함으로써 임시교각(390)을 제거 할 수 있다. Step 4 : Inserting the
단계 5 : 공장에서 운반 가능하도록 제작된 프리캐스트 세그먼트 PSC빔(330')을 현장 근처의 제작장에서 설계된 1지간 길이에 대한 필요 수량만큼 종 방향으로 배열한 후 프리캐스트 세그먼트 PSC빔들 사이의 접합 부위(399)를 콘크리트 로 현장 타설하여 서로 연결시키고, 또한, 이 지점의 횡 방향으로 이들을 구속하기 위한 다이어프램(350)을 콘크리트 타설하여 프리캐스트 PSC빔들로부터 교축직각 방향으로 돌출되도록 제작한다. 이 때, 프리캐스트 세그먼트 PSC빔(330')은 그 상면에 부분 바닥판(371)이 공장에서 일체로 형성된 합성빔의 상태로 현장으로 운반된다. 여기서, 다이어프램(350)은 접합 부위(399)를 포함하도록 형성되는 것이 콘크리트의 현장 타설 공정이 용이해지므로 바람직하지만, 다이어프램(350)이 접합 부위(399)와 별개로 형성될 수도 있다. Step 5 : Arranging the precast segment PSC beam 330 'made to be transportable in the factory in the longitudinal direction by the required quantity for the length of the one section designed at the manufacturing site near the site, and then joining the sites between the precast segment PSC beams. (399) is cast in the field and connected to each other, and also the concrete to the diaphragm (350) for restraining them in the transverse direction of this point is manufactured to protrude in the axial direction perpendicular to the precast PSC beams. At this time, the precast segment PSC beam 330 'is transported to the site in the state of a composite beam in which a
그리고 나서, 프리캐스트 균일 단면 PSC빔(330)에 1차 텐던(332,332a)을 긴장하여 프리스트레스를 도입한 후, 프리캐스트 균일 단면 부분 프리캐스트 PSC빔(330)을 교각을 중심으로 양측에 기 설치된 프리캐스트 변단면 PSC빔(335)의 거치돌기(335a)에 프리캐스트 PSC빔(330)의 거치홈(330a)이 끼워지도록 설치한다. 여기서, 프리캐스트 균일 단면 PSC빔(330)은 반드시 전체에 걸쳐 균일한 높이(H')를 갖는 것에 국한될 필요가 없으며, 프리캐스트 변단면 PSC빔(335)에 비하여 단면의 변화 정도가 미미한 정도를 포함한다. Then, pretension is introduced by tensioning the
단계 6 : 프리캐스트 변단면 PSC빔(335)의 거치돌기(335a)와 균일 단면 프리캐스트 PSC빔(330)의 거치 홈(330a)이 일치가 되도록 배열한 후 두 빔 사이의 공극을 모르타르(340)로 충진한다. 이 때, 배열의 편의를 위하여, 프리캐스트 변단면 PSC빔(335)의 거치 돌기(335a)의 상면에는 균일 단면 프리캐스트 PSC빔(330)의 거치홈(330a)의 저면에 형성된 홈(미도시)이 끼워지는 돌기가 형성된다. Step 6 : After arranging the mounting
단계 7 : 프리캐스트 변단면 PSC빔(335)의 거치돌기(335a)에 매입된 고강도 강봉용 고정너트(362b)에 균일 단면 프리캐스트 PSC빔(330)을 수직으로 관통하여 체결된 고강도 강봉(362)을 긴장함으로써 두 빔을 일체화시키고 각 빔에 내설된 2차 연속 텐던(331)을 긴장하여 프리스트레스를 도입함으로서 교량을 연속화 한다. Step 7 : the high
단계 8 : 프리캐스트 변단면 PSC빔(335) 균일 단면 프리캐스트 PSC빔(330)의 연결 부위의 교축직각 방향으로 설치된 각각의 프리캐스트 PSC빔의 다이어프램(354)을 현장 타설하고, 다이어프램에 내설된 교축직각 방향 텐던(351)을 긴장하여 각각의 빔(330)을 교축직각 방향으로 구속 시킨다. 또한, 프리캐스트 세그먼트 PSC빔(330')의 접합 부위에 교축직각방향으로 돌출 형성된 다이어프램(350) 사이의 간극(352)을 콘크리트로 현장타설하여 채우고, 다이어프램(399)의 돌출 방향인 교축 직각 방향의 텐던을 긴장시킨다. Step 8 : Precast
단계 9 : 전술한 제3실시예와 마찬가지로, 제작장에서 프리캐스트 PSC빔(330)제작 시 빔과 일체로 시공된 완성 바닥판의 두께보다 얇은 부분두께의 부분 바닥판(371) 양측 끝단 상면의 콘크리트 블록(131c)에 설치된 2차 연속 텐던용 정착구(131a)에 필요량의 강연선을 삽입하고 이를 긴장하여 소정 량의 프리스트레스를 도입한다. Step 9 : As in the above-described third embodiment, when fabricating the
단계 10 : 프리캐스트 PSC빔과 일체된 부분 바닥판(371)의 상면과 측면을 타설할 시스템 거푸집을 설치하고, 콘크리트를 타설 양생하여 최종 바닥판을 형성한다. Step 10 : Install a system formwork to cast the top and side surfaces of the
단계 11 : 최종 완성 단계에서 발생 예상되는 교각 주변의 부 모멘트에 의한 인장 응력에 대하여, 작용한 긴장력의 크기에 따라 각 교각부 측의 프리캐스트 PSC빔(330) 끝단에 형성된 보강 헌치 내의 2차 인장 강봉(361) 또는 2차 연속 텐던(361)의 일부를 재긴장(Retension)하거나, 2차 인장 강봉(361) 또는 2차 연속 텐던용 정착구(131a)를 이용하여 도입된 프리스트레스의 긴장력을 감소시키는 작업(Detension)을 행한다. Step 11 : Secondary tension in the reinforcing haunches formed at the ends of the precast PSC beams 330 on the side of each pier according to the amount of tension applied against the tensile stress due to minor moments around the pier expected to occur in the final completion stage. Retension a portion of the steel rod 361 or the secondary continuous tendon 361, or reduce the tension of the prestress introduced by using the secondary tensile steel rod 361 or the secondary continuous
이상에서는 본 발명의 바람직한 실시예를 예시적으로 설명하였으나, 본 발명의 범위는 이와 같은 특정 실시예에만 한정되는 것은 아니며, 특허청구 범위에 기재된 범주 내에서 적절하게 변경 가능한 것이다. 다시 말하면, 전술한 실시예들 가운데 프리캐스트 받침빔(130)을 교각(10,20) 상에 거치시키는 구성에 프리캐스트 변단면 PSC빔(335)을 거치시키는 구성과, 프리캐스트 받침빔(130)을 교각(10,20) 상에 거치시키는 구성에 2개 이상의 프리캐스트 세그먼트 PSC빔(330')으로 프리캐스트 PSC빔(330)을 형성하는 구성은 하나의 실시예를 통해 설명되었지만, 이들이 별개로 구성되는 것도 역시 본 발명의 범주에 속한다. In the above, the preferred embodiments of the present invention have been described by way of example, but the scope of the present invention is not limited to these specific embodiments, and may be appropriately changed within the scope described in the claims. In other words, among the above-described embodiments, the structure for mounting the
이 뿐만 아니라, 프리캐스트 PSC빔(330)의 상면에 미리 부분 바닥판(371)을 타설하는 구성과, 교축직각 방향으로 다이어프램(150, 350)를 형성하여 이들을 연속화시킨 판상 구조로 만드는 구성도 역시 독립적으로 구현될 수 있는 것이다.Not only this, but also the structure in which the
본 발명은 미리 프리캐스트로 제작된 하나의 프리캐스트 받침빔을 교각 상부(코핑)의 영구베어링에 교축직각 방향으로 거치시킨 상태에서, 바닥판의 일부 두께와 함께 미리 타설한 프리캐스트 PSC 부분 합성빔을 크레인으로 인상하여 교각 위의 프리캐스트 받침빔에 단순히 거치시킨 후, 교축 방향으로 서로 인접한 프리캐스트 PSC 부분 합성빔을 프리캐스트 받침빔을 중심으로 상호 연결한 1,2차 고강도 강봉으로 연결시키고 프리캐스트 PSC빔 내에 설치된 2차 연속 텐던을 PSC 부분 합성빔 끝단 상면에서 긴장하여 프리스트레스를 도입한 후 나머지 최종 바닥판을 타설함으로서, 교각에 지지되는 다수의 단순보 형태의 교량을 연속화 시킬 수 있으므로, 짧은 공사 기간 내에 시공을 할 수 있을 뿐만 아니라 그 공종이 단순해지는 프리스트레스트 콘크리트 합성빔 교량의 연속화 구조 및 그 공법을 제공한다.The present invention is a precast PSC partial composite beam pre-poured together with a part thickness of the bottom plate in a state in which a precast receiving beam made of precast is mounted in a direction perpendicular to the axial direction on a permanent bearing of a pier top (coping). And then simply mount it on the precast receiving beam on the pier, then connect the precast PSC partial composite beams adjacent to each other in the axial direction with the 1st and 2nd high strength steel bars interconnected around the precast receiving beam. The second continuous tendon installed in the cast PSC beam is tensioned on the upper surface of the PSC partial composite beam and prestress is introduced, and then the remaining final bottom plate is poured, so that a plurality of simple beam-shaped bridges supported by the pier can be continued. Prestressed concrete that not only can be constructed within the construction period, but also the work is simplified It provides a structure and method of sequencing seongbim bridges.
그리고, 본 발명은, 교량의 연속화를 위하여 임시받침을 사용하지 않고 프리캐스트 받침빔을 지지하는 영구베어링을 한번만 설치하므로 시공이 매우 간단해지는 장점을 갖는다.In addition, the present invention has a merit that the construction is very simple since only one permanent bearing supporting the precast bearing beam is installed without using the temporary bearing for continuity of the bridge.
또한, 본 발명은 교축 방향으로 각각 인접한 2개의 프리캐스트 PSC빔을 프리캐스트 받침빔에 상호 연결한 1,2차 고강도 강봉으로 프리캐스트 PSC빔을 긴장하여 서로 연결시키고, 프리캐스트 PSC빔에 설치된 2차 연속 텐던을 긴장하여 프리스트레스를 도입함으로써 연속화 되므로, 인접한 프리캐스트 PSC빔을 철근으로 연결하는 공종을 제거할 수 있는 유리한 효과를 갖는다.In addition, the present invention is to connect the two precast PSC beams adjacent to each other in the axial direction by the first and second high-strength steel rods interconnected to the precast receiving beams to tension the precast PSC beams to each other, and to install the two precast PSC beams. Since it is continuous by introducing prestress by tensioning the next continuous tendon, it has an advantageous effect of eliminating the work connecting the adjacent precast PSC beams with reinforcing bars.
그리고, 본 발명은, 공장이나 제작장에서 프리캐스트로 제작된 프리캐스트 받침빔을 적용함에 따라 현장에서 콘크리트를 타설, 양생하지 않으므로, 연속화에 필요한 공종이 보다 단순해지고 시공 기간을 크게 단축시킬 수 있다. In addition, since the present invention does not cast and cure concrete in the field by applying a precast receiving beam manufactured by precast in a factory or a manufacturing site, a work required for sequencing can be simplified and construction time can be greatly shortened. .
더욱이, 본 발명은, 하나의 프리캐스트 받침빔이 2개 내지 3개 정도의 소량의 영구베어링에 지지되도록 교각 위에 교축직각 방향으로 거치되므로, 보다 적은 수의 베어링만을 필요로 하게 되고, 베어링 설치에 소요되는 작업을 제거할 수 있는 장점을 갖는다.Furthermore, the present invention requires only a few bearings, since one precast bearing beam is mounted in the axial direction perpendicular to the pier so as to be supported by a small amount of two to three permanent bearings. It has the advantage of eliminating the work required.
또한, 본 발명은, 프리캐스트 받침빔이 교각 상부(코핑)의 중간에서 양쪽 대칭으로 일정한 거리만을 두고 이격 배치된 영구베어링에 의해 지지되므로, 바닥판에 작용하는 사용하중이나 사하중은 프리캐스트 PSC 합성빔을 거쳐 프리캐스트 받 침빔에 작용되며, 이 하중은 교각 상부의 영구베어링을 통해 교각에 전달되는데, 이는 주로 교각기둥에 압축응력이 주로 작용하게 되므로, 기존 PSC 합성빔용 교각에 작용하는 인장 응력 성분을 제거할 수 있는 장점을 갖는다. 이에 따라, 교량의 교축직각 방향으로 연장되는 교각 상부(코핑) 부위 일부를 제거할 수 있으며, 보다 경제적인 교각기둥 및 기초구조물을 구현할 수 있게 된다.In addition, in the present invention, since the precast receiving beam is supported by permanent bearings spaced at a predetermined distance from both sides of the pier in the middle of the pier (coping), the use load or dead load acting on the bottom plate is precast PSC composite. It acts on the precast bearing beam through the beam, and this load is transmitted to the pier through permanent bearings at the top of the pier. This is mainly due to the compressive stress acting on the pier columns, and thus the tensile stress component acting on the pier for conventional PSC composite beams. Has the advantage of being able to remove. Accordingly, it is possible to remove a portion of the upper portion of the bridge (coping) extending in the direction perpendicular to the bridge axial direction, it is possible to implement a more economic pier pillars and foundation structures.
Claims (26)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060105586A KR100785634B1 (en) | 2006-10-30 | 2006-10-30 | Continuation structure of prestressed concrete composite beam bridge and method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060105586A KR100785634B1 (en) | 2006-10-30 | 2006-10-30 | Continuation structure of prestressed concrete composite beam bridge and method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100785634B1 true KR100785634B1 (en) | 2007-12-12 |
Family
ID=39141025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020060105586A KR100785634B1 (en) | 2006-10-30 | 2006-10-30 | Continuation structure of prestressed concrete composite beam bridge and method thereof |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100785634B1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101156013B1 (en) * | 2011-06-21 | 2012-06-18 | (주)삼현피에프 | Method of constructing bride deck using precast concrete deck and bridge superstructure thereof |
KR101203980B1 (en) | 2010-09-30 | 2012-11-22 | 주식회사 아앤시티 | upper structure of bridge |
KR101324982B1 (en) | 2012-04-02 | 2013-11-05 | 한국건설기술연구원 | Walking bridge construction method using psc girder with connecting anchor block |
KR20140111476A (en) | 2013-03-11 | 2014-09-19 | 주식회사 동성엔지니어링 | Bridge construction method for forming continuous point part of pier using copping for connecting girder |
CN109811660A (en) * | 2019-03-14 | 2019-05-28 | 中铁十六局集团第三工程有限公司 | A kind of anti-unstability device of Reinforced Concrete Bridge Members tensioning |
CN111979902A (en) * | 2020-08-28 | 2020-11-24 | 同济大学建筑设计研究院(集团)有限公司 | Bridge structure connecting joint and construction method |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000064222A (en) | 1998-08-13 | 2000-02-29 | Kurosawa Construction Co Ltd | Elevated bridge |
KR20010068055A (en) * | 2001-04-18 | 2001-07-13 | 김형열 | PSC Girder having Anchoring Sleeves and Strengthening Method |
KR200263292Y1 (en) | 2001-10-09 | 2002-02-04 | (주)신성엔지니어링 | Precast concrete block for cross beam of PSC(prestressed concrete) beam bridge |
KR20040052837A (en) * | 2004-05-10 | 2004-06-23 | 연정흠 | Precast Cross Beam Reinforced with Connection Steel Box |
KR20040054639A (en) * | 2004-05-31 | 2004-06-25 | 연정흠 | External Prestressing Method of PS Concrete Composite Girder Bridge by Anchoring and Holding Tendon on Precast Cross-Beam |
KR20040081836A (en) * | 2003-03-17 | 2004-09-23 | 김근택 | Making method and making mold thereof of a bridge making place for ilm pc-box-girder |
KR20050018358A (en) * | 2003-08-12 | 2005-02-23 | 남기태 | Structure of continuous PSC beam with connection member and steel cross beam and bridge construction method using the same |
KR20050095049A (en) * | 2004-03-24 | 2005-09-29 | 김정민 | Continuous bridge construction method using a psc girder |
KR20070024413A (en) * | 2005-08-26 | 2007-03-02 | 주식회사 장헌산업 | Construction method of psc girder bridge using retensionable and detensionable anchorage with unbonded tendon |
-
2006
- 2006-10-30 KR KR1020060105586A patent/KR100785634B1/en active IP Right Grant
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000064222A (en) | 1998-08-13 | 2000-02-29 | Kurosawa Construction Co Ltd | Elevated bridge |
KR20010068055A (en) * | 2001-04-18 | 2001-07-13 | 김형열 | PSC Girder having Anchoring Sleeves and Strengthening Method |
KR200263292Y1 (en) | 2001-10-09 | 2002-02-04 | (주)신성엔지니어링 | Precast concrete block for cross beam of PSC(prestressed concrete) beam bridge |
KR20040081836A (en) * | 2003-03-17 | 2004-09-23 | 김근택 | Making method and making mold thereof of a bridge making place for ilm pc-box-girder |
KR20050018358A (en) * | 2003-08-12 | 2005-02-23 | 남기태 | Structure of continuous PSC beam with connection member and steel cross beam and bridge construction method using the same |
KR20050095049A (en) * | 2004-03-24 | 2005-09-29 | 김정민 | Continuous bridge construction method using a psc girder |
KR20040052837A (en) * | 2004-05-10 | 2004-06-23 | 연정흠 | Precast Cross Beam Reinforced with Connection Steel Box |
KR20040054639A (en) * | 2004-05-31 | 2004-06-25 | 연정흠 | External Prestressing Method of PS Concrete Composite Girder Bridge by Anchoring and Holding Tendon on Precast Cross-Beam |
KR20070024413A (en) * | 2005-08-26 | 2007-03-02 | 주식회사 장헌산업 | Construction method of psc girder bridge using retensionable and detensionable anchorage with unbonded tendon |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101203980B1 (en) | 2010-09-30 | 2012-11-22 | 주식회사 아앤시티 | upper structure of bridge |
US8910336B2 (en) | 2010-09-30 | 2014-12-16 | Supportec Co., Ltd. | Upper structure for bridge |
KR101156013B1 (en) * | 2011-06-21 | 2012-06-18 | (주)삼현피에프 | Method of constructing bride deck using precast concrete deck and bridge superstructure thereof |
KR101324982B1 (en) | 2012-04-02 | 2013-11-05 | 한국건설기술연구원 | Walking bridge construction method using psc girder with connecting anchor block |
KR20140111476A (en) | 2013-03-11 | 2014-09-19 | 주식회사 동성엔지니어링 | Bridge construction method for forming continuous point part of pier using copping for connecting girder |
CN109811660A (en) * | 2019-03-14 | 2019-05-28 | 中铁十六局集团第三工程有限公司 | A kind of anti-unstability device of Reinforced Concrete Bridge Members tensioning |
CN109811660B (en) * | 2019-03-14 | 2024-06-11 | 中铁十六局集团第三工程有限公司 | Device for preventing instability of tensioning of reinforced concrete bridge member |
CN111979902A (en) * | 2020-08-28 | 2020-11-24 | 同济大学建筑设计研究院(集团)有限公司 | Bridge structure connecting joint and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101177342B1 (en) | Precast end segmet girder for continuous bridge, girder making method and bridge construction method using the same | |
KR101012759B1 (en) | Box Girder Having Hybrid Cantilever and Bridge Using Such Box Girder | |
KR100349864B1 (en) | The Structural Continuity Method for Prestreseed Concrete Bridge of Composite I-Beam | |
KR101693256B1 (en) | Construction method of prefabricated psc bridge | |
KR101283535B1 (en) | Fully-precast prestressed concrete girder bridges and construction method of such bridges | |
KR100991869B1 (en) | Single and continuous prestressed concrete girder bridge and the construction method | |
KR100785634B1 (en) | Continuation structure of prestressed concrete composite beam bridge and method thereof | |
KR20040098995A (en) | Construction Method for PSC Girder Bridges | |
KR100988074B1 (en) | Girder bridge connected to abutment and the construction method thereof | |
JP3844743B2 (en) | Box girder bridge structure and its construction method | |
KR101196874B1 (en) | Girder making methos for precast end seggement using end mold and girder therewith | |
KR100936944B1 (en) | Continuity Girder, Continuity Structure of Girder and Construction Method of the Same | |
KR100823448B1 (en) | The improved seismic resistant continuation structure of prestressed concrete composite beam bridge and method thereof | |
KR100952623B1 (en) | Bridge having deck slab concrete structure on plural beams, constructing method thereof and precast partial-depth deck slab concrete structure used in constructing same | |
KR101131969B1 (en) | Continuous Construction Method for Composite Bridge using Prestressed I-Type Girder | |
KR101705002B1 (en) | Prefabricated double composite plate girder bridge and its construction method | |
JP3635004B2 (en) | Bridge cantilever construction method | |
KR20130090709A (en) | Construction method for corrugated steel plate web-psc composite beam | |
KR20080111686A (en) | Bridge using phc girder and slab-phc complex girder | |
KR100349865B1 (en) | The Continuity Method for Prestreseed Concrete Bridge of Composite U-Type Girder | |
KR100583671B1 (en) | Prestressed concrete beam manufactured by installing steel anchorage devices to various positions and reinforcing member to the upper and lower flanges, and construction method of bridge using the concrete beam | |
KR101038714B1 (en) | Bridge and its construction method using tide arch hybrid girders having precast slabs | |
KR101067717B1 (en) | Process for producing prestressed concrete girder and concrete girder structure | |
KR20060017949A (en) | Field-fabricated prestressing steel-composed girder and construction method of continuous bridge using the girder | |
KR100724739B1 (en) | Construction method of PSC Girder bridge using Retensionable and Detensionable anchorage with unbonded tendon |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
N231 | Notification of change of applicant | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20121204 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20131204 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20141205 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20151207 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20161206 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20171206 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20181206 Year of fee payment: 12 |