JPS5641924A - Construction engineering for continuous underground wall - Google Patents
Construction engineering for continuous underground wallInfo
- Publication number
- JPS5641924A JPS5641924A JP11609379A JP11609379A JPS5641924A JP S5641924 A JPS5641924 A JP S5641924A JP 11609379 A JP11609379 A JP 11609379A JP 11609379 A JP11609379 A JP 11609379A JP S5641924 A JPS5641924 A JP S5641924A
- Authority
- JP
- Japan
- Prior art keywords
- trench
- guide member
- underground wall
- hole
- continuous underground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
PURPOSE: To economically construct the continuous underground wall by driving a guide member in a hole drilled of a diameter smaller than trench width excavated later and excavating a trench with the help of the guide member, with regard to the construction of profound-depth continuous underground wall.
CONSTITUTION: The hole 12 of the minimum diameter which is of smaller diameter than the width of the trench 20 and sufficient to apply watertight process, is drilled at a prearranged interval. Then in each drilled hole, the guide member 14 of H shape cross-section is driven. Next, hardening material having water tight property and easyly excavated later like cement, is filled in each hole. Later, the trench 20 is excavated applying a mud water method between the said guide members 14 under the guidance of the said guide members 14. After this procedure, the slurry inside the said trench is caused to be hardened, thus constructing a continuous underground wall. In this way, it is possible to save steel material as guide member and excavate a trench under the guidance of guide member. Consequently, profound-depth underground wall of high precision can be constructed.
COPYRIGHT: (C)1981,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11609379A JPS5641924A (en) | 1979-09-12 | 1979-09-12 | Construction engineering for continuous underground wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11609379A JPS5641924A (en) | 1979-09-12 | 1979-09-12 | Construction engineering for continuous underground wall |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS5641924A true JPS5641924A (en) | 1981-04-18 |
Family
ID=14678528
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP11609379A Pending JPS5641924A (en) | 1979-09-12 | 1979-09-12 | Construction engineering for continuous underground wall |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5641924A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102747722A (en) * | 2012-07-27 | 2012-10-24 | 天津市勘察院 | Underground continuous wall joint close grouting and covering construction method and expansion rubber plug |
-
1979
- 1979-09-12 JP JP11609379A patent/JPS5641924A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102747722A (en) * | 2012-07-27 | 2012-10-24 | 天津市勘察院 | Underground continuous wall joint close grouting and covering construction method and expansion rubber plug |
CN102747722B (en) * | 2012-07-27 | 2014-10-01 | 天津市勘察院 | Underground continuous wall joint close grouting and covering construction method and expansion rubber plug |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ATE107737T1 (en) | METHOD AND DEVICE FOR MAKING TUNNEL. | |
JPS5641924A (en) | Construction engineering for continuous underground wall | |
GR930300042T1 (en) | Method for guiding a digging tool during the excavation of a trench wall, and digging tool to be used in the method. | |
JPS5549424A (en) | Construction method for underground column row wall | |
JPS5664028A (en) | Sheathing construction work by antecedent support framework | |
JPS5568919A (en) | Construction of underground continuous wall | |
JPS5670322A (en) | Construction of underground wall by column strip | |
JPS57158436A (en) | Method of construction of precast concrete underground room | |
JPS57130622A (en) | Construction of continuous underground wall | |
JPS57143013A (en) | Large scale process for constructing submarine anchor block | |
JPS57155424A (en) | Executing method for underground outer wall | |
JPS5768419A (en) | Executing method for underground continuous wall | |
JPS5516172A (en) | Excavation work method and apparatus for preventing landslide at ditch scooping | |
SU767278A1 (en) | Method of erecting wall in soil | |
JPS5766221A (en) | Construction work of underground continuous wall | |
JPS57108329A (en) | Formation of basement | |
FR2436851A1 (en) | Prefabricated quay or underwater wall - has cast reinforced concrete sections joined by metal rods to obviate piles or caisson | |
JPS5781525A (en) | Construction of underground continuous wall | |
JPS57140421A (en) | Construction of large-diameter in-situ cast pile | |
JPS57100217A (en) | Refilling work for vacant area of concrete pile driven in site | |
JPS5766230A (en) | Drawing work for steel material of landslide protection wall | |
JPS5612423A (en) | Construction of underground continuous wall | |
GB639829A (en) | Improvements in or relating to walls adapted to form watertight structures | |
JPS6410818A (en) | Construction of continuous underground wall | |
JPS55161118A (en) | Pile driving method and pile |