JPS5781525A JP15798880A JP15798880A JPS5781525A JP S5781525 A JPS5781525 A JP S5781525A JP 15798880 A JP15798880 A JP 15798880A JP 15798880 A JP15798880 A JP 15798880A JP S5781525 A JPS5781525 A JP S5781525A
Authority
JP
Japan
Prior art keywords
pile
auger
erected
attachment
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15798880A
Other languages
Japanese (ja)
Inventor
Haruki Takei
Original Assignee
Tokyo Kozai Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Kozai Kk filed Critical Tokyo Kozai Kk
Priority to JP15798880A priority Critical patent/JPS5781525A/en
Publication of JPS5781525A publication Critical patent/JPS5781525A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE: To construct an underground continuous wall having a high water shielding capability by a method in which a PC pile with attachments is erected in a pit excavated by auger, and PC piles are orderly erected while excavating pits under the guidance of the attachments.
CONSTITUTION: In the first place, a pit A of a circular section is formed underground by means of an auger, during which excavation is made while injecting cement milk, etc., from the tip of the auger. Then, a PC pile 2 of a rectangular cross section is erected to form a pile row in the excavated pit A. In this case, an attachment 5 is beforehand attached to one connecting face of the PC pile 2. Then, by the same way, excavation is made under the guidance of the attachment 5 of the PC pile 2. After the completion of excavation and the injection of cement milk, the auger and the attachment 5 are drawn out. Then, the next PC pile 2 with an attachment 5 is erected and connected. The operations are orderly repeated to construct an underground continuous wall.
COPYRIGHT: (C)1982,JPO&Japio
JP15798880A 1980-11-10 1980-11-10 Construction of underground continuous wall Pending JPS5781525A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15798880A JPS5781525A (en) 1980-11-10 1980-11-10 Construction of underground continuous wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15798880A JPS5781525A (en) 1980-11-10 1980-11-10 Construction of underground continuous wall

Publications (1)

Publication Number Publication Date
JPS5781525A true JPS5781525A (en) 1982-05-21

Family

ID=15661781

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15798880A Pending JPS5781525A (en) 1980-11-10 1980-11-10 Construction of underground continuous wall

Country Status (1)

Country Link
JP (1) JPS5781525A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0813478A (en) * 1994-07-04 1996-01-16 Sato Kigyo:Kk Construction method for steel pipe post row wall
KR100499338B1 (en) * 2002-07-03 2005-07-04 (주)세일엔지니어링 Conduit using phc pile
KR100501046B1 (en) * 2002-07-19 2005-07-18 주식회사 우일 이알에스 Reinforced concrete structure for building retaining wall and method for constructing retaining wall using the same

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4858608A (en) * 1971-11-19 1973-08-17

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4858608A (en) * 1971-11-19 1973-08-17

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0813478A (en) * 1994-07-04 1996-01-16 Sato Kigyo:Kk Construction method for steel pipe post row wall
KR100499338B1 (en) * 2002-07-03 2005-07-04 (주)세일엔지니어링 Conduit using phc pile
KR100501046B1 (en) * 2002-07-19 2005-07-18 주식회사 우일 이알에스 Reinforced concrete structure for building retaining wall and method for constructing retaining wall using the same

Similar Documents

Publication Publication Date Title
JPH03122316A (en) Ground improvement method and device therefor
DE2926155A1 (en) CONNECTING A COMPONENT TO SURROUNDING SOIL OR ROCK AND METHOD FOR PRODUCING THIS CONNECTION
DE2737646A1 (en) Tunnel construction for high water content strata - uses concrete walls and low grade concrete pilings which are drilled out to allow water flow after completion
DE3228198A1 (en) Method of improving the keying of a reinforced-concrete root pile which forms a root pile wall preferably with other root piles of the same type
JPH02240321A (en) Device for forming cast-in-situ pile
JPS615125A (en) Foundation of building
JPS63280121A (en) Ground anchor
JPS59195925A (en) Construction of on-site concrete pile
JPS55155815A (en) Method and device for chemical grouting
JPH02120421A (en) Floating prevention method for underground construction
JPH0424398A (en) Construction of underground space with arched member
JPS6272810A (en) Ground improvement work
JPH04155018A (en) Construction of foundation for building
JPH0280710A (en) Preparing cast-in-place concrete pile
JP4295880B2 (en) Construction method of impermeable walls
JPS63110319A (en) Stabilization work of banking
JPS5631928A (en) Constructing method for soil pile
SU705056A1 (en) Method of providing an antiseepage member of an earth-filled dam
JPS5858327A (en) Driving of underground pile
JPS56119030A (en) Performance of work for placing an embedded pile and device for carrying out the said performance
JPS5869923A (en) Construction of underground continuous wall with drain layer
SU639993A1 (en) Casing pile
JPS5530039A (en) Method for constructing underground structures
JPS61216923A (en) Construction of in-situ concrete pile
JPS62268423A (en) Construction work of underground pile used in common for earth anchor