JPS5549424A - Construction method for underground column row wall - Google Patents

Construction method for underground column row wall

Info

Publication number
JPS5549424A
JPS5549424A JP11772079A JP11772079A JPS5549424A JP S5549424 A JPS5549424 A JP S5549424A JP 11772079 A JP11772079 A JP 11772079A JP 11772079 A JP11772079 A JP 11772079A JP S5549424 A JPS5549424 A JP S5549424A
Authority
JP
Japan
Prior art keywords
guide pipe
pile
fitted
connection member
soil cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11772079A
Other languages
Japanese (ja)
Other versions
JPS583091B2 (en
Inventor
Shinhachiro Ueda
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nitto Kogyo Co Ltd
Original Assignee
Nitto Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nitto Kogyo Co Ltd filed Critical Nitto Kogyo Co Ltd
Priority to JP11772079A priority Critical patent/JPS583091B2/en
Publication of JPS5549424A publication Critical patent/JPS5549424A/en
Publication of JPS583091B2 publication Critical patent/JPS583091B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE: To ensure that collapse of the walls of holes can be prevented by soil cement, that piles can be inserted in holes of predetermined depth assuredly, and that a continuous column row wall can be constructed efficiently by surrounding the whole peripheral surface of each pile with hardened soil cement.
CONSTITUTION: A connection member 3 for holding and fitting to a guide pipe 2 is integrally fitted to the outside peripheral surface of a pile main body 1. Using piles 10 fitted with a cover 4 at the lower end of the guide pipe 2, the connection member 3 of a next pile 10 is fitted to the guide pipe 2 of a pile 10 precedingly inserted in a hole 13. Next, with a pile 10 inserted in the adjacent hole 13, a self- hardening fluid 15 such as cement mortar and gypsum solution is fed under pressure into the guide pipe 2 from its top end, to open the cover 4 at the bottom end by the pressure, and the fluid 15 is fitted in the gap between the guide pipe 2 and the connection member 3 to replace soil cement 12.
COPYRIGHT: (C)1980,JPO&Japio
JP11772079A 1979-09-13 1979-09-13 Construction method for underground column walls Expired JPS583091B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11772079A JPS583091B2 (en) 1979-09-13 1979-09-13 Construction method for underground column walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11772079A JPS583091B2 (en) 1979-09-13 1979-09-13 Construction method for underground column walls

Publications (2)

Publication Number Publication Date
JPS5549424A true JPS5549424A (en) 1980-04-09
JPS583091B2 JPS583091B2 (en) 1983-01-19

Family

ID=14718617

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11772079A Expired JPS583091B2 (en) 1979-09-13 1979-09-13 Construction method for underground column walls

Country Status (1)

Country Link
JP (1) JPS583091B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1984003315A1 (en) * 1983-02-22 1984-08-30 Finic Bv Environmental cut-off for deep excavations
DE3416568A1 (en) * 1983-05-10 1984-11-15 Schlegel Corp., Rochester, N.Y. MEMBRANE BLOCK AGAINST UNDERGROUND FLUID FLOWS AND SECTION THEREFOR
JPS61196016A (en) * 1985-02-27 1986-08-30 Toa Harbor Works Co Ltd Joining method for cut-off sheet
US4671705A (en) * 1984-10-06 1987-06-09 Ed. Zublin Aktiengesellschaft Plug connection for planar barrier webs
US4741644A (en) * 1985-04-11 1988-05-03 Finic, B.V. Environmental cut-off and drain
US4990210A (en) * 1984-08-22 1991-02-05 Ed. Zublin Aktiengesellschaft Apparatus for introducing and joining diaphragms in slotted walls
JP2014051843A (en) * 2012-09-09 2014-03-20 Yokoyama Kiso Koji:Kk Steel pipe sheet pile installation method and steel pipe sheet pile joint
CN108193673A (en) * 2018-01-03 2018-06-22 上海建工集团股份有限公司 A kind of steel pipe pile enclosure structure and its construction method that reciprocal slip casting can be achieved

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1984003315A1 (en) * 1983-02-22 1984-08-30 Finic Bv Environmental cut-off for deep excavations
DE3416568A1 (en) * 1983-05-10 1984-11-15 Schlegel Corp., Rochester, N.Y. MEMBRANE BLOCK AGAINST UNDERGROUND FLUID FLOWS AND SECTION THEREFOR
US4519729A (en) * 1983-05-10 1985-05-28 Schlegel Corporation Segmented membrane barrier
US4990210A (en) * 1984-08-22 1991-02-05 Ed. Zublin Aktiengesellschaft Apparatus for introducing and joining diaphragms in slotted walls
US4671705A (en) * 1984-10-06 1987-06-09 Ed. Zublin Aktiengesellschaft Plug connection for planar barrier webs
JPS61196016A (en) * 1985-02-27 1986-08-30 Toa Harbor Works Co Ltd Joining method for cut-off sheet
JPH045092B2 (en) * 1985-02-27 1992-01-30
US4741644A (en) * 1985-04-11 1988-05-03 Finic, B.V. Environmental cut-off and drain
JP2014051843A (en) * 2012-09-09 2014-03-20 Yokoyama Kiso Koji:Kk Steel pipe sheet pile installation method and steel pipe sheet pile joint
CN108193673A (en) * 2018-01-03 2018-06-22 上海建工集团股份有限公司 A kind of steel pipe pile enclosure structure and its construction method that reciprocal slip casting can be achieved

Also Published As

Publication number Publication date
JPS583091B2 (en) 1983-01-19

Similar Documents

Publication Publication Date Title
ES453146A1 (en) Process for providing a foundation pile for alternating compressive and tractive stresses and a pile thus provided
JPS5549424A (en) Construction method for underground column row wall
JPS5552424A (en) Method of installing underground continuous wall constructing standard pile
JPS5771923A (en) Construction work of continuous underground wall
JPS56131711A (en) Water shielding plate for constructing cut-off wall
JPS5670322A (en) Construction of underground wall by column strip
JPS55165314A (en) Method and device for chemical grouting for improvement of ground
JPS5664028A (en) Sheathing construction work by antecedent support framework
JPS5568919A (en) Construction of underground continuous wall
JPS5748018A (en) Constructing method for pile foundation with underground wall
JPS5631924A (en) Constructing method for water stop wall
JPS573915A (en) Method and apparatus for construction of reaction resistor body underground
JPS5733614A (en) Method for sinking installed pile through internal excavation
JPS5595711A (en) Forming process for underground hardened matter
JPS5792217A (en) Preventing device for settling of reinforced concrete pile cast in site
JPS56135624A (en) Construction of continuous underground wall
JPS55116922A (en) Jointing method of continuous underground wall
JPS5523238A (en) Method and mold for casting concrete at groove communicating lower half portions of two sewage pipes jointly laid in ground with space therebetween
JPS5631941A (en) Building of underground storage tank
JPS56125539A (en) Laying of deep tank for water treatment
JPS57143013A (en) Large scale process for constructing submarine anchor block
JPS5641924A (en) Construction engineering for continuous underground wall
JPS56142921A (en) Construction work of foundation of structure
JPS5781525A (en) Construction of underground continuous wall
JPS576019A (en) Installating method for foundation pile