JPS5733614A - Method for sinking installed pile through internal excavation - Google Patents
Method for sinking installed pile through internal excavationInfo
- Publication number
- JPS5733614A JPS5733614A JP10892280A JP10892280A JPS5733614A JP S5733614 A JPS5733614 A JP S5733614A JP 10892280 A JP10892280 A JP 10892280A JP 10892280 A JP10892280 A JP 10892280A JP S5733614 A JPS5733614 A JP S5733614A
- Authority
- JP
- Japan
- Prior art keywords
- rod
- existing pile
- poured
- pile
- hardening material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009412 basement excavation Methods 0.000 title abstract 2
- 239000000463 material Substances 0.000 abstract 3
- 238000002347 injection Methods 0.000 abstract 2
- 239000007924 injection Substances 0.000 abstract 2
- 210000004080 Milk Anatomy 0.000 abstract 1
- 239000004568 cement Substances 0.000 abstract 1
- 239000008267 milk Substances 0.000 abstract 1
- 235000013336 milk Nutrition 0.000 abstract 1
- 239000004570 mortar (masonry) Substances 0.000 abstract 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract 1
Abstract
PURPOSE: To increase a pile-supporting force, by a method wherein, in case an existing pile is sunk through the internal excavation, a hardening material is poured through a pouring pipe positioned along a part in parallel to an outer circumference surface of the existing pile.
CONSTITUTION: An auger 3 is inserted into an inner chamber of an existing pile 1, and the existing pile 1 is sunk as a ground is bored. Mortar, such as cement milk, or other hardening material 4 is poured through a pouring pipe 2. The auger 3 is pulled out, and a pouring pipe rod 5 is inserted. A support ground is previously excavated with a high-pressure injection of water through a nozzle as the rod 5 turns, and the rod 5 is inserted. A hardening material is poured in a high-pressure injection manner as the rod 5 turns, and with this the rod 5 is lifted to form a support layer.
COPYRIGHT: (C)1982,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP55108922A JPS6319645B2 (en) | 1980-08-08 | 1980-08-08 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP55108922A JPS6319645B2 (en) | 1980-08-08 | 1980-08-08 |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS5733614A true JPS5733614A (en) | 1982-02-23 |
JPS6319645B2 JPS6319645B2 (en) | 1988-04-23 |
Family
ID=14497043
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP55108922A Expired JPS6319645B2 (en) | 1980-08-08 | 1980-08-08 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6319645B2 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS595078U (en) * | 1982-06-29 | 1984-01-13 | ||
JPH0274718A (en) * | 1988-09-09 | 1990-03-14 | Maeda Seikan Kk | Excavating burying method for premolded pile and device therefor |
KR100383520B1 (en) * | 2000-12-15 | 2003-05-14 | 전기표 | Grouting continuity injection method and continuity injection vertical divice |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5387505A (en) * | 1977-01-13 | 1978-08-02 | Nippon Kokan Kk | Method of founding pile |
JPS556125A (en) * | 1978-06-27 | 1980-01-17 | Matsushita Electric Ind Co Ltd | Electric heater for hot wind generator |
-
1980
- 1980-08-08 JP JP55108922A patent/JPS6319645B2/ja not_active Expired
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5387505A (en) * | 1977-01-13 | 1978-08-02 | Nippon Kokan Kk | Method of founding pile |
JPS556125A (en) * | 1978-06-27 | 1980-01-17 | Matsushita Electric Ind Co Ltd | Electric heater for hot wind generator |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS595078U (en) * | 1982-06-29 | 1984-01-13 | ||
JPS6312459Y2 (en) * | 1982-06-29 | 1988-04-09 | ||
JPH0274718A (en) * | 1988-09-09 | 1990-03-14 | Maeda Seikan Kk | Excavating burying method for premolded pile and device therefor |
KR100383520B1 (en) * | 2000-12-15 | 2003-05-14 | 전기표 | Grouting continuity injection method and continuity injection vertical divice |
Also Published As
Publication number | Publication date |
---|---|
JPS6319645B2 (en) | 1988-04-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS5985028A (en) | Steel pipe pile and laying work thereof | |
JPS5733614A (en) | Method for sinking installed pile through internal excavation | |
JPS5634823A (en) | Concrete pile injection constructing method | |
JPS56142923A (en) | Construction of foundation pile and case auger used therefor | |
JPS61109822A (en) | Construction work of pile | |
JPS61134425A (en) | Method of forming foundation pile | |
JPS5513338A (en) | Caison sinking method | |
JPS56128808A (en) | Depositing method of concrete in water | |
JPH0464618A (en) | Pit excavation work method | |
JPH01102126A (en) | Underground laying of steel tubular pile | |
JPS6417920A (en) | Construction of precast pile with bag | |
JPH03250114A (en) | Construction method of cast-in-place concrete pile | |
JPS5631941A (en) | Building of underground storage tank | |
JPS56163318A (en) | Settling guider for foundation pile | |
JPH01165821A (en) | Construction work of concrete foundation | |
JPH041319A (en) | Foundation pile driving method in soft ground | |
JPS5545910A (en) | Pile pulling method | |
JPH0238620A (en) | Reinforced cage of cast-in-place concrete pile and execution using same | |
JPS63176519A (en) | Construction of continuous wall under water surface | |
JPS57108311A (en) | Steel sheet pile | |
JPS5664018A (en) | Concrete pile | |
JPS56105016A (en) | Executing method for reinforced foundation pile and reinforcing steel pipe | |
JPS56105023A (en) | Preventing method for frost heaving of pile | |
JPS6340012A (en) | Construction of structure removable structural part | |
JPS63289112A (en) | Cut-off wall in base ground of dam |