JPS56163318A - Settling guider for foundation pile - Google Patents
Settling guider for foundation pileInfo
- Publication number
- JPS56163318A JPS56163318A JP6485880A JP6485880A JPS56163318A JP S56163318 A JPS56163318 A JP S56163318A JP 6485880 A JP6485880 A JP 6485880A JP 6485880 A JP6485880 A JP 6485880A JP S56163318 A JPS56163318 A JP S56163318A
- Authority
- JP
- Japan
- Prior art keywords
- guide cylinder
- pile
- auger
- cement milk
- guider
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
PURPOSE: To exactly excavate a pit for pile, make uniform the reinforcing layer round the pile, and increase the bearing force of the pile by inserting a pile guide cylinder by which the insertion of the pile is vertically guided into an auger guide cylinder, while an excavating auger is vertically guided and held by said auger guide cylinder.
CONSTITUTION: An auger guide cylinder 6 is penerated into the ground where a pile is to be settled and a guard 5 is projected slightly from the ground's surface. Then, an auger 7 is inserted into a guide cylinder 3 and turned, while a pit 1 is excavated while injecting an excavating liquid 12 from the tip of the auger 7. After the excavation, cement milk 14 is injected from the auger 7 while the auger 7 is pulled up, and then a pile guide cylinder 8 is inserted into the guide cylinder 3 of the auger guide cylinder 6, a pile 2 is inserted along the pile guide cylinder 8 and settled to a given depth, the cement milk 14 is hardened to some extent and then a pile guide cylinder 11 and auger guide cylinder 6 are pulled up. Afterwards, the spaces thus formed are filled with cement milk.
COPYRIGHT: (C)1981,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6485880A JPS56163318A (en) | 1980-05-16 | 1980-05-16 | Settling guider for foundation pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6485880A JPS56163318A (en) | 1980-05-16 | 1980-05-16 | Settling guider for foundation pile |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS56163318A true JPS56163318A (en) | 1981-12-15 |
Family
ID=13270289
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP6485880A Pending JPS56163318A (en) | 1980-05-16 | 1980-05-16 | Settling guider for foundation pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS56163318A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60186348U (en) * | 1984-05-17 | 1985-12-10 | 前田製管株式会社 | Pile misalignment prevention device |
JP2009108482A (en) * | 2007-10-26 | 2009-05-21 | Marui Kiso:Kk | Ground stabilization method for extraction of existing pile |
KR100939535B1 (en) * | 2009-03-24 | 2010-02-03 | 이규철 | Guide for execution of underground diaphragm wall |
-
1980
- 1980-05-16 JP JP6485880A patent/JPS56163318A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60186348U (en) * | 1984-05-17 | 1985-12-10 | 前田製管株式会社 | Pile misalignment prevention device |
JP2009108482A (en) * | 2007-10-26 | 2009-05-21 | Marui Kiso:Kk | Ground stabilization method for extraction of existing pile |
KR100939535B1 (en) * | 2009-03-24 | 2010-02-03 | 이규철 | Guide for execution of underground diaphragm wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS56163318A (en) | Settling guider for foundation pile | |
JPS56142923A (en) | Construction of foundation pile and case auger used therefor | |
JPS55142835A (en) | Earth retaining method | |
JPS5634823A (en) | Concrete pile injection constructing method | |
JPS57108328A (en) | Formation of basement | |
JPS5771923A (en) | Construction work of continuous underground wall | |
JPS55116923A (en) | Method for construction of pile foundation | |
JPS5545910A (en) | Pile pulling method | |
JPS5513338A (en) | Caison sinking method | |
JPS5781525A (en) | Construction of underground continuous wall | |
JPS57108329A (en) | Formation of basement | |
JPS5766223A (en) | Deformation reduction work for landslide protection wall | |
JPS57108313A (en) | Construction work and device for cut-off wall of in-site driven pile row and head of earth auger therefor | |
JPS57112513A (en) | Construction of foundation pile for ground improvement | |
JPS5792218A (en) | Laying work of ready-made pile | |
JPS5664018A (en) | Concrete pile | |
JPS57108326A (en) | Construction of pile foundation with underground wall | |
JPS5670322A (en) | Construction of underground wall by column strip | |
JPS5733614A (en) | Method for sinking installed pile through internal excavation | |
JPS5721622A (en) | Construction of large-diameter pile in site | |
JPS5748018A (en) | Constructing method for pile foundation with underground wall | |
JPS57108321A (en) | Construction of foundation for building and structure | |
JPS6417920A (en) | Construction of precast pile with bag | |
JPS57146833A (en) | Pressure-driving work of knotted pile | |
JPS55136322A (en) | Expansion piling method |