JPS55142835A - Earth retaining method - Google Patents

Earth retaining method

Info

Publication number
JPS55142835A
JPS55142835A JP5111679A JP5111679A JPS55142835A JP S55142835 A JPS55142835 A JP S55142835A JP 5111679 A JP5111679 A JP 5111679A JP 5111679 A JP5111679 A JP 5111679A JP S55142835 A JPS55142835 A JP S55142835A
Authority
JP
Japan
Prior art keywords
screw
casing
digging
buried
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5111679A
Other languages
Japanese (ja)
Inventor
Toshio Enoki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP5111679A priority Critical patent/JPS55142835A/en
Publication of JPS55142835A publication Critical patent/JPS55142835A/en
Pending legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE: To make the execution of works correct and speedy and raise the vertical accuracy by performing excavation, moving a casing slidably by using connecting ears of steel-pipe piles being buried as guides.
CONSTITUTION: Two lines of guide walls 12 are laid on the surface of ground and between the lines a casing 7 and an auger screw 6 are built vertically, thereby digging being performed. When the digging is performed, a cement milk is injected from the tip of the screw 6 and when the digging is made down to a fixed depth, the casing 7 and the screw 6 is pulled up and a hole D is formed. Before the collapse of the wall of the hole D and the hardening of soil cement begin, a steel-pipe pile B is inserted. After the 1st pile B being inserted and buried, a guide member 9 provided on the casing 7 is fitted in an engaged with the connecting ear B and the digging is conducted by driving the auger screw 6. At this time, the cement milk is injected from the tip of the screw 6. Into a hole 10 left after the casing 7 and the screw 6 being pulled out, the 2nd steel-pipe pile B is inserted by using the connecting ear b as a guide. Similar works being repeated in this way, piles are buried so as to form a continuous line of poles, i.e. an earth retaining wall.
COPYRIGHT: (C)1980,JPO&Japio
JP5111679A 1979-04-24 1979-04-24 Earth retaining method Pending JPS55142835A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5111679A JPS55142835A (en) 1979-04-24 1979-04-24 Earth retaining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5111679A JPS55142835A (en) 1979-04-24 1979-04-24 Earth retaining method

Publications (1)

Publication Number Publication Date
JPS55142835A true JPS55142835A (en) 1980-11-07

Family

ID=12877827

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5111679A Pending JPS55142835A (en) 1979-04-24 1979-04-24 Earth retaining method

Country Status (1)

Country Link
JP (1) JPS55142835A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60219321A (en) * 1984-04-16 1985-11-02 Shiroyama Hideji Pile driving method
JPS61250229A (en) * 1985-04-30 1986-11-07 Mitsuo Sugaya Method and apparatus for penetration of steel sheet pile
JPS63181813A (en) * 1987-01-22 1988-07-27 Takechi Koumushiyo:Kk Construction of steel tubular sheet pile
JPH06272256A (en) * 1993-03-18 1994-09-27 Nitto Kogyo Kk Excavator
KR100850028B1 (en) 2007-05-02 2008-08-04 이재석 Construction method using concrete mould for concrete piles cast in position
WO2019187438A1 (en) * 2018-03-27 2019-10-03 有限会社村上工業 Sheet pile construction method, sheet pile construction device, and holding tool

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60219321A (en) * 1984-04-16 1985-11-02 Shiroyama Hideji Pile driving method
JPS61250229A (en) * 1985-04-30 1986-11-07 Mitsuo Sugaya Method and apparatus for penetration of steel sheet pile
JPS63181813A (en) * 1987-01-22 1988-07-27 Takechi Koumushiyo:Kk Construction of steel tubular sheet pile
JPH06272256A (en) * 1993-03-18 1994-09-27 Nitto Kogyo Kk Excavator
KR100850028B1 (en) 2007-05-02 2008-08-04 이재석 Construction method using concrete mould for concrete piles cast in position
WO2019187438A1 (en) * 2018-03-27 2019-10-03 有限会社村上工業 Sheet pile construction method, sheet pile construction device, and holding tool

Similar Documents

Publication Publication Date Title
JPS55142835A (en) Earth retaining method
JPS56142923A (en) Construction of foundation pile and case auger used therefor
JPS5513338A (en) Caison sinking method
JPS5646031A (en) Constructing method for pile foundation footing with erected trunk
JPS5781525A (en) Construction of underground continuous wall
JPS57108313A (en) Construction work and device for cut-off wall of in-site driven pile row and head of earth auger therefor
JPS5771923A (en) Construction work of continuous underground wall
JPS5516172A (en) Excavation work method and apparatus for preventing landslide at ditch scooping
JPS56163318A (en) Settling guider for foundation pile
JPS5545910A (en) Pile pulling method
JPS55155823A (en) Burying method for pile
JPS55165317A (en) Burying method for steel-pipe sheet pile
JPS57108326A (en) Construction of pile foundation with underground wall
JPS5748018A (en) Constructing method for pile foundation with underground wall
JPS55136326A (en) Stabilizing method and device for foundation pile
JPS601451B2 (en) Water stop mountain stop wall construction method using Benoto pile excavator
JPS573912A (en) Method and apparatus for improving soft ground by grout with telescoping stirring shaft
JPS55161115A (en) Constructing method for underground column-row wall with cast-in-place pile
JPS5670322A (en) Construction of underground wall by column strip
JPS5585731A (en) Method and apparatus for burying pile
JPS5532809A (en) Pile foundation practice
JPS5542990A (en) Burying process for preformed pile
JPS56122433A (en) Laying work of pipe
JPS5664018A (en) Concrete pile
JPS554410A (en) Earth retaining method