JPH01162977A - 資源の動的管理方法と装置 - Google Patents

資源の動的管理方法と装置

Info

Publication number
JPH01162977A
JPH01162977A JP63224872A JP22487288A JPH01162977A JP H01162977 A JPH01162977 A JP H01162977A JP 63224872 A JP63224872 A JP 63224872A JP 22487288 A JP22487288 A JP 22487288A JP H01162977 A JPH01162977 A JP H01162977A
Authority
JP
Japan
Prior art keywords
resources
planning
planned
resource
conflict
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP63224872A
Other languages
English (en)
Other versions
JP2634070B2 (ja
Inventor
William R Rassman
ウイリアム アール.ラスマン
Bradley M Berman
ブラツドレイ エム.バーマン
Scott Blau
スコット ブラウ
Andrew Chiang
アンドリユー チアン
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IntelliMED Corp
Original Assignee
IntelliMED Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=22254786&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JPH01162977(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by IntelliMED Corp filed Critical IntelliMED Corp
Publication of JPH01162977A publication Critical patent/JPH01162977A/ja
Application granted granted Critical
Publication of JP2634070B2 publication Critical patent/JP2634070B2/ja
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06314Calendaring for a resource
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16HHEALTHCARE INFORMATICS, i.e. INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR THE HANDLING OR PROCESSING OF MEDICAL OR HEALTHCARE DATA
    • G16H40/00ICT specially adapted for the management or administration of healthcare resources or facilities; ICT specially adapted for the management or operation of medical equipment or devices
    • G16H40/20ICT specially adapted for the management or administration of healthcare resources or facilities; ICT specially adapted for the management or operation of medical equipment or devices for the management or administration of healthcare resources or facilities, e.g. managing hospital staff or surgery rooms

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Tourism & Hospitality (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • Epidemiology (AREA)
  • Primary Health Care (AREA)
  • Medical Informatics (AREA)
  • Public Health (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Accommodation For Nursing Or Treatment Tables (AREA)
  • Debugging And Monitoring (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。

Description

【発明の詳細な説明】 本発明は資源を管理するための方法、より詳細には、情
報を通信するためにコンピュータ システムを使用して
複数の相互依存し相互に関連する資源を未来を展望して
計画し、またリアル タイムにて動的に管理するための
方法及び装置に関する。
さまざまな分野において、プログラムを遂行し、諸活動
を有効及び効率的に計画するために資源の管理が要求さ
れる。例えば、ビルの建設は、一般及び特殊要員、特定
の設備、及び運搬車の使用の計画を必要とする。これに
加えて、これら資源の幾つかが他の現場での他の建設プ
ロジェクトと共有されることが要求される。また、時間
の経過及び事象の進展に伴って、これら資源の使用を通
常当初の計画から外れて再計画することが必要となる。
同様に、病院内での外科手術室の効率的及び効果的な使
用はさまざまな異なる資源の調整を要求し、通常、多く
の異なるソースから派生する情報を集め、これらにアク
セスし、そしてこれらを活用することが要求される。
外科現場あるいは外科病棟内で管理及び調整が必要とさ
れる資源の幾つかには、手術室。
外科医、麻酔医、研修医、看護婦、技術者、特殊装置等
が含まれる。
過去10年間において、データのアクセス及び表示のた
めのコンピュータ及びコンピュータ ディスプレイ シ
ステムの使用が急増している。例えば、合衆国特許第3
,725,650号は産業管理データを視覚的に表わす
ための方法及び装置を開示する。この特許はデータを棒
グラフあるいはパイ グラフにて表わすためのコンピュ
ータ ディスプレイの使用を教示する。このディスプレ
イは過去及びリアル タイム データのためであり、未
来に対する計画は含まない。これに加えて、個々のグラ
フは他の個々のグラフと独立しており、1つのグラフの
変更が他のグラフに影響を与えない。この特許において
は、ここに開示される方法が資源の未来を展望しての利
用あるいは資源の動的管理に使用できることを示唆しな
い。
合衆国特許第4,646,238号は製造プロセスの一
部としての製品のテスト及び等級の計画に対するコンピ
ユータ化されたシステムに関する。この特許は、資源の
利用を未来を展望して計画するためのシステムは開示せ
ず、また資源の実際の利用を監視するための方法も開示
せず、また計画上の衝突が指摘されるようなシステムの
開示も行なわない。
合衆国特許第4−.547,851号はレストランにお
いて顧客の食物の注文を処理し、また顧客への娯楽設備
、例えば、ビデオ ゲームの提供を処理するために使用
される対話型通信システムを開示する。ただし、これは
資源の未来を展望しての利用あるいは動的な計画には関
与しない。
合衆国特許第4,591,983号はFl暦ルッジ シ
ステム(hierarchical knowledg
ssystem)を開示し、相互に関連し相互に依存す
る資源の計画には全く関係ないようにみえる。
合衆国特許第4,336,589号は倉庫内での物品の
流れを監視及び制御するための方法及びシステムを開示
する。これは主に注文並びに注文された物品が倉庫から
取り出され配送のために準備される流れを追跡するため
に設計されている。このシステムが資源の計画、管理あ
るいは監視に使用できるという示唆はない。
コンピュータを採用するプロジェクト プラナ−も周知
である。これらのプロジェクトプラナ−は最も一般的に
はタスクあるいは行動に集魚が置かれる。これらは主に
関連するタスクを逐次計画するために設計される。例え
ば、ある建設プロジェクトが6つの相から構成され、相
2は相1が2/3完了するまで開始できず、相3,4及
び6はそれぞれ前の相の完成を待つことが要求されるが
、相5は相4と同時に開始できるものと想定されると、
プロジェクト プラナ−が最初の段階で計画を設定し、
この計画にずれが発生した場合。
これを反映して調節するために使用される。
しかし、プロジェクト プラナ−はさまざまな活動に使
用される資源を管理する機能は十分に持たず、またこれ
ら資源への他の要求に応答してオペレータに計画された
行動を調節するように喚起する機能も備えない。
時間と伴に変化し、また複数な相互関係をもつ資源の管
理及び利用は、これら資源及びこれら資源が関与するタ
スクあるいは活動の計画に際しての複雑な問題を含む。
これら問題に対する非効率的な特に矛盾をもつ解は製造
現場あるいはビルの建設、その他において非常に高いコ
ストにつく。これら問題に対する不適当な解はこれらが
医療設備及び外科手術の遂行に関与するような場合はこ
れらが生死の問題にかかわるためにさらに重大である。
必要とされるのは使用できる資源の少なくとも幾つかを
明示される資源及びその他の資源と関連する情報のデー
タ ベースと関連して時間の関数として効果的に表示す
ることである。これに加えて、このシステムは、追加の
資源に関する追加の表示を生成するためにアクセスでき
ることが要求される。その最も−m的な形態においては
、このシステムは時間スケールが広く多様な用途を収容
できるように変更できることが要求される。またショー
ト レンジからロング レンジあるいはこの逆に切り換
えたとき表示されたデータの相互関係をゆがめることな
くショート レンジ並びにロングレンジの未来を展望し
ての(及び/あるいは過去の)使用状況が表示できるこ
とが要求される。
これに加えて、幾つかの設定においては、システムは資
源間の相互関係を示し、1つあるいは複数の資源の使用
に変更があった場合、これら変更が他の資源の使用状態
に与える影響並びに同資源の未来の使用計画及びこれら
が関与する活動への影響を明らかにする能力が要求され
る。
本発明は、好ましくは、コンピュータを使用しての複数
の資源を動的に管理するための方法に関する。この方法
は、使用可能な資源に関する情報を含むデータ ベース
を提供すること、及びこれら資源の計画された及び/あ
るいは実際の使用を時間の関数としてグラフィック的に
表示することを含む。さまざまなタイプの゛指標が資源
及び/あるいはこれらの使用に関する情報の視覚及び他
の感覚的な通信を提供するために使用される。″計画指
標(scheduling 1ndicia)”が資源
の(過去及び/あるいは未来の)使用を示すのに用いら
れ、″状態指標(status 1ndicia) ”
が事象の現在の状態を反映するために使用され、そして
1′衝突指標(conflict 1ndicia) 
”がオペレータに計画上の衝突を喚起するために用いら
れる。この好ましい構成の1つにおいては、本発明はデ
ータ ベース内に格納された情報を絶え間なく更新し、
資源の利用が表示されたときこれがデータ ベース内の
最も最新のデータを反映するようにデータ ベースへの
アクセスを考慮する。
別の実施態様においては、本発明の方法及びシステムは
ディスプレイ上に現れている以上の選択された資源に関
する情報が提供できるようにデータ ベースへのアクセ
スを可能にする。また1つあるいは複数の資源の異なる
さまざまな点に関するデータを提供するためにディスプ
レイを選択的に変更するための設備が提供される。
さらに1本発明は衝突が発生した場合の計画の自動修正
並びにこれら修正の自動通信を考慮する。本発明はまた
手順があるマイルストーン ポイントに達したときの関
連する人への自動的な通知及び動作(購入注文の打ち切
り、炉の停止等)及び手順の自動的な開始を考慮する。
本発明はまた責任手段(accountability
■eang)を編入するが、この手段によって資源が正
しく使用されたかあるいは手順が確立された規則に従っ
て遂行されたかが決定される。
これに加えて、記録作成機能がどんな資源がどんな手順
に誰によって何時使用されたかの文書を作成するために
編入される。
勿論1本発明の全ての用途が必ずしも上の機能の全てを
編入する必要はない。幾つかの用途においてはこれら機
能の幾つかのみが使用とされ、他のより複雑なあるいは
自動化された用途においては、本発明によって考慮され
るより多くの機能が使用されると考えて良い。
本発明の説明が図面との関連で以下に与えられる。
本発明による方法は相互に関連し時間とともに変化する
複数の資源を巻き込む複合プロジェクトの動的制御を可
能とする。好ましくは、 この方法は、例えば、パーソ
ナル コンピュータと関連するタイプのディスプレイシ
ステム及びディスプレイを選択的に変化させるためのキ
ーボードを含む。これに加えて、資源に関するデータを
含むデータ ベースが提供される。このデータ ベース
は1つあるいは複数のリアル タイム ソースから更新
でき、これは一方において表示されるデータを更新する
。キーボードはまたデータをデータ ベースに入力する
ため及び未来の計画を立るために使用される。データは
、好ましくは、グラフィック的に時間の関数としてさま
ざまな資源、活動及び事象の間の時間的関係を描写する
ように表示される。
データの入力、修正、処理及びアクセスは周知の方法及
び技術を使用して遂行できる。
同様に、適当なグラフィック表示の生成は周知の技術を
使用して遂行できる。
本発明を使用して効率的に管理できる非常に多くの状況
が存在する。これら状況の一例として、病院の手術現場
での設備及び他の資源の使用の監視及び計画がある。個
々の手術室は1つの資源を代表し、個々の手術室に関す
る情報がデータ ベース内に提供される。
例えば、幾つかの手術室は外来の手術に制限され、幾つ
かは心臓手術のための専用の設計及び設備をもち、幾つ
かは手術の間の掃除に15分しか要さず、他の幾つかは
20分を要したりする。幾つかの専用の設備はある手術
室内でのみに使用が制限され、幾つかの設備は手術間の
長期間の滅菌を要し、幾つかの設備はこれを必要としな
い。また、幾つかの資源は工事、修理あるいは保守活動
のために使用ができない状態のときがある。特定の用途
が(後に説明されるように)規則追従システム(rul
e−based system)を必要とする場合は。
適用される規則が通常データ ベース内に入力される。
好ましくは、これら全ての情報は主あるいは半永久デー
タ ベース内に格納される。
主データ ベースはまたある知られた活動あるいは手術
に関しての標準情報を含む。例えば、これは次のような
情報を含む。つまり、虫垂切除は90分を要するように
計画し、薬物はA、B、C及びDを準備し、この手術に
は手術室X、Y及び2のみが適当であり、この手術の遂
行は医師J、K及びLのみが許されるなどの情報が含ま
れる6 好ましくは、この主データ ベースと統合された補助、
あるいは−時的データ ベースが主データ ベース内の
情報より頻繁に変わる情報を格納するために使用される
。この−時的データ ベースは、例えば、特定の日ある
いは特定の時間における任意の資源の計画された使用に
関する情報を含む。計画を待つタスクあるいは手術もこ
の一時的データ ベースに含められる。これはまた手術
を待つ特定の患者に関する関連する情報(例えば、名前
、医師、遂行されるべき処置、アレルギー等)を含む。
この使用計画が主あるいは二次データ ベース内の情報
と矛盾する場合は、衝突指標がディスプレイに表示され
、あるいは可聴信号が与えられる。例えば、ある手術が
工事中の手術室で行なわれるように計画された場合は、
衝突指標が表示される。同様に、その患者が指定される
薬物に対してアレルギーをもつ場合は、衝突指標によっ
てこのシステムのオペレータに問題が喚起される6個々
の手術室は任意の時間に対して使用が計画され、この個
々の使用は、特定の患者。
設備及び手術、並びにその手術の遂行に関与する主要人
物及び使用されるべき薬物と関連づけられる。
個々の外科医は1つの資源とみなされ、その外科医の前
の仕事が他の手術あるいは緊急時の場合に対する外科医
の利用の決定に重要な要因となる。同様に、患者も1つ
の資源とみなされ、患者の計画された位置及び活動が患
者がすぐ発見できるように表示される。同様に、設備及
び担当医も資源とみなされる。
通常、これら全ての情報が補助データ ベース内に入力
され、ある資源が使用のために計画されるたびに、また
その計画が修正されるたびに、主データ ベースととも
に検索される。
容易に理解できるごとく、特定の手術を完了するために
要求される実際の時間が計画あるいは予期される時間と
異なることは特に珍いことではない。実際の時間が計画
された時間を超える場合は、この情報が別の手配を行う
べきか決定するために簡単に利用できるべきである。例
えば、このずれは手術室のその後の計画された使用に影
響を与える。これに加えて、患者、外科医、主要人物及
び特定の設備の関与の延長はその外科医、主要人物、及
び設備に対して計画された他の外科手術に影響を与える
。これはまたその患者に対して計画された他の治療にも
影響を与える。
ここで用いられる病院設定内での“資源(resorc
e) ”は5部屋、要員、設備等であり得る。他の設定
においては、″資源″は容器、車、監督1作業者のユニ
ット、時間のブロック、ドル、飛行機、搭乗ゲート、パ
イロット等であり°得る。幾つかの資源は再使用が可能
であり、他の資源は枯渇し、さらに幾つかの資源は再生
が可能である6一般に、資源は知られた及び/あるいは
予定された使用機会をもち、1つあるいは複数の他の資
源と時間の関数として、あるいは他の消費、枯渇あるい
は飽和の関数として関連づけられる。当業者においては
、消費、枯渇等は個々が測定の基準として使用できる点
において時間と類似する性格をもつことは容易に理解で
きるものである。例えば、1日の作業日はその間に活動
が計画され、資源が使用される32個の15分の時間の
ブロックから成るものとみなすことができる。同様に、
2000項目の集合は4つの500個のグループから成
るとみなすことができ、さまざまな活動及び資源をこの
4つのグループの個々の消費にあわせて割り当てること
ができる。ここで使用される用語″時間″はその最も広
い意味において理解されるべきであり、地球の回転に基
づく測定値に限定されるものではない。
資源の供給(availability)及び利用は時
間の関数として“計画指標(scheduling 1
n−dicia)”の使用によって表示される。計画さ
れた手順の進行は監視され、゛′状態指#5(Sta−
tue 1ndicia)”の使用によって表示される
資源の矛盾する計画はパ衝突指標(conflicti
ndicia)”の表示によって知らせられる。ここに
説明される複数の任意の指標、つまり、計画、状態ある
いは衝突指標は、色の変化、カラー パー、影、英数文
字等を含むさまざまな方法によって表示できる。これら
指標はまたハイライト、幾何記号、フラッシュ、及び/
あるいはデータの回りの明るくされた枠などの強調の使
用によって表示することもできる。
システムのオペレータは主デイスプレイの目的で幾つか
の資源を選択できるが、同時にシステムは表示された主
資源のみでなく他のディスプレイ上に表示されることも
されないこともあり表示された主資源とともに使用され
る二次資源の使用も監視する。簡単に述べると、オペレ
ータが″手術室″を主資源として表示することを選択す
るものとする。しかし、これら手術室の1つ0は、外科
医S、麻酔医A、心til!/肺マシンH及び心臓モニ
タMを必要とする。資gS、A、H及びMは二次資源と
呼ばれる。手術室0に対して計画された手術が予定より
長引く場合は、主資源、つまり、手術室○に対するだけ
でなく、二次資源、つまり、外科医S、麻酔医A、心臓
/肺マシンH及びモニタMの計画された使用に対する衝
突を表示する。システムは、勿論、これら指標の1つあ
るいは複数を抑止するように構成することもできる。
本発明のシステムの使用において、オペレータは資源の
使用に対する需要あるいは要求に関するさまざまなソー
スからの情報を集める。病院の手術現場の背景において
は、これは外科医からの手術室、M!:tfIa、特定
のスタッフ メンバー、あるいは麻酔医などの他の医師
に対する要求が含まれる。個々の外科医は執行されるべ
き手術、手術の完了に必要な予定時間、患者情報及び他
の関連するデータを同定する。他の情報、例えば、関与
する医師の別の仕事の予定等も供給される。
オペレータはこの情報をデータ ベース内に任意の周知
の方法によって入力し、続いてさまざまな資源の計画を
立てる。任意の資源の使用に見掛は上の不一致あるいは
矛盾が存在するような計画の設定が試みられると、衝突
指標が表示される。衝突指標によって警告されると、オ
ペレータは企てられた計画を改訂するか、あるいはその
衝突が本当のものかあるいは単に見掛けのものであるか
決定する。
本当の衝突と見掛けの衝突の差を説明するために、訓練
を受けた限られた少数の人のみが実施できる新しい手法
を使用する外科医が関与する状況を考える。全体として
の外科的処置の新たなユニークな面は予定される3時間
の外科的処置の30分のみを占めるものとする。遂行さ
れるべき他のステップ、例えば、重大な手術に備えての
患者の切開、心臓/肺マシンに対する患者の安定化、及
び新たな処置が遂行された後の傷口の縫い合せなどは他
の外科医によって遂行できる。ただし、手術室は、通常
、この3時間全体を通じてその主外科医に割り当てられ
るため、その主外科医がこの3時間の任意の部分におい
て他の用事に計画されているとシステムは衝突指標を表
示する。ただし、現実的には、その外科医の個人的な立
ち会いは30分間のみ要求され、従って、その手術室が
彼の名前で使用されている残りの2時間半の間に彼は他
の仕事を遂行することができる。
ある衝突は現実的であり、またある衝突を単に見掛けで
あることを認識し、本発明のシステム及び方法はさまざ
まなタイプの衝突を認識できるようにされる。つまり、
幾つかの衝突は両立しないことを示し、幾つかの衝突は
収容の余地を残すことを示し、ある衝突はこのどちらに
入るかシステムは認識できない。
個々のタイプの衝突はそれ自体のユニークな衝突指標に
よって示される。これらタイプの情報の表示によって、
オペレータは資源を直ちに再計画すべきか、あるいは実
際の衝突が存在するかさらにチエツクすべきかを知るこ
とができる。
関連する情報を集め、通常、必ずしも必要でないが、こ
の情報をデータ バンクにロードした後、オペレータは
表示の目的上、どの資源が″主″資源であり、どれがパ
二次”資源であるかを決定する。この病院設定において
は、オペレータは″手術室″を表示の目的上、主資源で
あると選択する。別の方法として、パ外科医*r、rt
心1m/肺マシン”、C,Tスキャナー″、“′核磁気
イメージヤー″等。
あるいはこれらの組合せを選択することもできる。
説明の都合上、″手術室″が表示の目的上、主資源とし
て選択されるものと仮定する。最初、画面は2つの軸、
つまり、時間(左下)、及び手術室(上側のカラム見出
し)のみを表示する。最初は画面の残りの部分は9通常
空白とされるが、これが必ずしも要求されるわけではな
い。例えば、個々の時間の未定ブロックに対して1画面
が″空き′あるいは他の同等の記号を示すようにするこ
ともできる。
また、゛′修理(repair) ”を特定の手術室が
計画に使用できないことを反映するために使用すること
もできる。“修理″、″工事″、あるいは″休息″など
の記号は必要な情報がデータ ベース内に格納されてい
る限り自動的に表示することができる。
オペレータは次に計画を手術室1に対する11ケースa
bcI+から開始する。オペレータは1例えば、このケ
ースを7:OOa、m。
から開始し、8:45a、mに終了するように計画する
。″ケースabc”に関する情報が既にデータ ベース
内にロードされている場合は、開始時間が選択されると
、データ ベースの自動検索によって、システムが終端
ポイントを計算及び表示する。いずれの場合も、計画指
標が主資源、この場合は、” Rm 1 ”の使用を反
映するように表示される。第1図において、1ケースa
bc″′のラベルをもつ垂直の長方形が計画指標である
。同様に、残りの手術室も計画し、計画指標が表示され
る。
特定の時間において、主資源の1つに対してなにも計画
されてないかぎり、その位置の所の空白画面あるいはパ
空き′″が計画指標を構成する。
主資源の計画において、システムは主並びに二次資源を
巻き込む使用における衝突を監視する。このような衝突
が検出されると、衝突指標が表示される。衝突は主資源
のみ巻き込む場合、例えば、同時に同一の手術室が2つ
の手術に対して計画されるような場合もある。この場合
は、オペレータは画面上で衝突の性質を検出することが
できる。しかし、衝突はその幾つかが画面上に表示され
ない二次資源を巻き込む場合もある。この場合は、オペ
レータは二次資源の間の衝突に注意するように警告され
る。別の方法として、色、影、あるいはシェープ ボジ
ショニング(shapepositioning)を使
用して、衝突指標自体が衝突の原因である二次資源を同
定するようにすることもできる。
画面上の時間の任意のブロックの間に特定の主資源の計
画されたあるいは実際の使用を示す計画指標は1′セル
(cell)’″と呼ばれる。
第1図上の“ケースabc”が手術室1に対して7:0
0から8:45a、m、まで計画されていることを示す
長方形が1つの゛′セル″である。個々のセルにはタイ
トルを与え、これがセルの上、あるいはこの囲いの中に
現れるようにすることもできる。空間が許す場合は、1
つのセルがその中に表示される二次資源に関する幾つか
のデータをもつようにすることもできる。例えば、“ケ
ースabC″を代表するセル内に使用される外科医の名
前あるいは設備のタイプを表示することもできる。
二次資源をセル内に表示することを決定した場合は、こ
の二次資源表示を衝突を示すのに使用することができる
。例えば、医師Sが2つの手術室に同時に計画された場
合は、これらセルの片方あるいは両方の中の二次資源と
しての医師Sの表示がフラッシュするようにされる。こ
のフラッシュは、この実施態様においては、衝突指標を
構成する。
二次資源の表示はまた追加のオプションを提供するため
に使用することもできる。例えば、メニューに進む代わ
りに、単にカーソルを表示された二次資源の1つに移動
すると、システムがその二次資源の計画あるいはその二
次資源に関する他の情報をもつ窓を表示するようにする
設計することもできる。この窓が第9図に示される。
従って、このシステムはメニュー駆動される必要はない
。ショートカット(5hortcut)の使用1例えば
、セル内の二次資源の表示によってメニューの使用を避
けることができる。
ただし、本発明のより複雑な及び/あるいはより高度の
用途においては、このショートカットの使用は全てのメ
ニューの使用を避けるのに十分ではない。
第1図から第3図及び第6図から第8図に図解されるデ
ィスプレイにおいては、Y軸に沿って時間が上から下に
順に示され、X軸に沿って主資源が示される。容易に理
解できるごとく、どの資源をどの軸に沿って示すかは単
に選択と便利さの問題である。同様に、時間間隔もその
用途の要求に合せて選択することができる。さらに、第
4図及び第5図に示されるごとく、これら時間間隔は必
ずしも表示される必要もない。
第1図の説明に移るが、ディスプレイは資源の混合及び
それらの使用状態を時間との関係で示す。これら資源に
は上段に横方向に示されるように頭文字を用いてラベル
が付けられる。 ここで、” Rm” は部屋を表わし
、”Doc”は外科医を表わし、”Mic”は特定のタ
イプの設備、つまり、マイクロスコープを表わし、そし
て”Res”は他の設備を表わす。
時間は第1図の左に、24時間クロックに基づいて、0
7 : 00から開始して示される。
通常は、主資源の全てを、部屋のように、同一タイプの
ディスプレイに示すのが最も便利である。ただし、この
均一性は必須ではない、示されるごとく、第1図のディ
スプレイに対して選択された主資源は3つの異なるタイ
プから成る。最初の3つのカラム、RRI 11゜“R
2°′、及び“Rm ”内の主資源は1つのタイプであ
るが、最後の3つのカラムの主資源は2つの他のタイプ
から成る。カラム4の主資源は外科医であり、カラム5
及び6の主資源は設備である。
第1図において、“R1”は手術室を示す。
午前07:00から″ケースa b c ”がII R
m、 I Tjを08:45まで使用されるように計画
されている。その後、6ケースd e f ”が11 
Rm I IIを9:00から09 : 45まで用い
る。
Rm2は07:00から09:30まテ1ケースg +
1i ”によって用いられる。Rm3は07:OOから
07:15まで11ケ一スk1m”によって使用され、
その後、07 : 45から08 : 30まで“ケー
スm n o”によって用いられる。さらに、″ケース
prs’″によって08:45から09:Ooまテ用イ
ラレ、続いて、″ケースtuv”によって09:15か
ら09:45まで用いられる。
多くの外科医が関与するが、外科医“Doca17の行
動のみが示される。KL D ocat+は7:00か
ら7:15までRm3におり、7:45から8:15ま
で1′ケー:A a b c ”に関与し、そしてRm
4(表示されない)に9二00から9=45までいる。
“Micx”は1′Doca1+によって7二00から
7=15まで使用され、1ケ一スmno”によって7:
45から8:15まで使用され、そして手術室1内で8
:45から9=45まで使用される。また、資源”Re
5y”は″ケースa b c ”のために7=00から
7:15まで使用され(ただし、ケースabcは7:1
5の後の長く続く)、その後、(既に進行中の)パケー
スg h inによって7:30からS:OOまで使用
されるように移動される。資源II Reyy71はそ
の後8:15 から 9:3o まで″ケースd e 
f ”に対して割り当てられるように示される。6ケー
スdef″は9:oOまで開始されないように計画され
ているが、#Res y#1をこのケースのために8:
15がら空けておくことは必ずしも衝突となるわけでは
ない。
ただし、これは価値ある資産のむだにはなる。
特定の用途の要求によっては、”Re5y″のこのよう
な計画は、必要ではないが、衝突指標の表示の引きがね
となるようにすることもできる。
第1図において、1ケースabc″は7:OOから8:
45まで計画される。”Doca”はこのケースに関与
するように計画されるが、7:45から8:15までの
み関与するように計画される。彼はまた”Rm3”  
(”ケースk1m”)に対して7:00がら7:15ま
で計画される。1ケースabcl′がDoc  aのケ
ースの場合は、オペレータが彼をRm3(“ケース k
lm”)に対して7:00から7:15まで計画しよう
と試みると、衝突指標が表示されることとなる。すると
、オペレータはチエツクし、DocaがRm l (”
ケースabc”)に対して7:45から8=15までの
み必要とされることを知り、この衝突指標を無効にする
か抑止する。
第1図内の表示は行動の未来の計画の結果を示し、所定
の時間期間に対して示される。
時間スケールを変更することによって(例えば、15分
の間隔から30分の間隔に変更)、オペレータはさらに
先まで見ることが可能となる。ただし、計画指標のサイ
ズが物理的に縮小される。個々の資源の下のセル間の距
離も縮められ、用途によっては1時間的に隣接するケー
スの分解能が判別不能となる。また、時間スケールのこ
のような圧縮は1個々のセル内に表示される情報、例え
ば、二次資源に関する情報の量を制約する。
時間スケールの圧縮はまた衝突指標をトリガする。例え
ば、第1図のスケールが15分の間隔から1時間の間隔
に変更されると、Rml内の“ケースabc”及び11
ケースdef”を含めて複数のセルの間で衝突指標が表
示されることとなる。個々のセルは時間ブロック8:0
0から9:OOの部分を占めることとなる。
データの通信のための衝突並びに状態指標の使用は、2
次元ディスプレイ上での多次元情報の通信を可能にする
。衝突あるいは状態指標の表示を引き起すような幾つか
のデータは半永久データ ベースから、また幾つかは一
時的なデータ ベースから、そしてまた幾つかは現ある
いはリアル タイム入力から取り出すようにされる。
病院の外科病棟での用途、並びに本発明が適用できる他
の用途においては、内部リアルタイム クロックを含め
ることは多くの点で好都合である。例えば、このクロッ
クはオペレータにその時点においてどの資源が使用中で
またどの資源が空いているかを知らせるのに使用できる
。これはまた現在、特定の資源。
例えば、”Doca”がどこにいるかを知るためにも使
用できる。これに加えて、リアルタイム クロックを含
めると、衝突指標の自動表示が可能となる。
この時間情報があると、状態指標を処置の進行を監視及
び表示するのに使用できる6手術室に患者が入ったこと
を同定ラベルの使用によって知らせることができる。′
ケースabc”は患者が入る前は青にし、患者が手術室
にいる間はオレンジにし、そして患者が出た後は赤にさ
れる。別の方法として、 ラベルをセル内で患者が手術
室に入ったことを示すためにそのすぐ上の位置に移動す
ることもできる(第1B図)、他の状態指標を手術の進
行を監視するために使用することもできる。これを行な
う1つの方法としては、患者が手術室内にいる時間を表
わすセルが外科的処置が終了に向うに従って逐次変化さ
れる。例えば、最初、セルのその時間長に沿っての4分
の1がステップ1が完結したことを示すようにコントラ
スト色あるいは別個のパターンに変更される(第1A図
)、別の方法としては、計画指標セルの第1の4半分を
占拠するカラム内に英数文字1例えば、′ステップ1”
が使用される(第1C図)。患者が入ったことを示すた
めにラベルが使用される場合は、セル内の第1のカラム
をステップ1の完結を示すために用いることもできる(
第1C図)、状態指標はまた時計の顔のような形状をと
り、この部分が外科的処置の進行に従って、あるいは時
間の進行に従って影あるいは色を与えられるようにする
こともできる(IE図)、さらに、これら指標を組み合
せて使用することもできる。
第2のマイルストーン、つまり、意味をもつ段階に到達
すると、第2の状態指標が表示される。−例として、セ
ルの1/4の幅の第2のカラムがコントラスト色に変え
られる(第1D図)、追加の指標、例えば、セル内の追
加のカラムを手術中に他のマイルストーン。
つまり意味をもつ段階を表わすために使用することもで
きる。
本発明による方法は、リアル タイム クロックが編入
された場合、状態指標を自動的に表示するようにできる
。説明のため、1ケースabc” (第1図)が4つの
大きな段階を含むものと仮定する。段V11は20分を
要し、段階2は30分を要し1段階3は40分を要し、
そして段階4は15分を要するものと仮定する。手段、
例えば、信号ボタンが個々の段階が完了したことを示す
ために手術室内に置かれる。ボタンが7:20a、m、
ちょうどあるいはこの前に押された場合は、セル″ケー
スabc”内の垂直の棒の形態をもち、そのセルの1/
4を占める状態指標が出現する(第1A図)、シかし、
信号ボタンが押される前にリアルタイムクロックが7=
21に達した場合は、この状態指標が自動的にフラッシ
ュを開始するようにされ、これが指標ボタンが押される
まで継続するようにされる。
状態指標のこのフラッシングはオペレータに手術が予定
より長側いている事実を喚起する。
この情報が手に入いることにより、状況が重大な局面を
迎える前に再計画の必要性が予測できる。
リアル タイム クロックはまた衝突指標の自動表示に
も使用できる。Rma内の信号ボタンが11Doca″
が彼の仕事を7:45前に完結したことを通知するため
に使用されない場合は、Doc  aがその時点でケー
スabcのためにRmlで仕事をするよう輪計画されて
いるために衝突標識が出現するようにされる。
状態指標は、必ずしも必要ではないが、所定のシーケン
スに従って通信することもできる。幾つかの外科的処置
においては、順番はその処置の幾つかあるいは全ての段
階に対して重要でない場合もある。順番が重要である場
合は、本発明の方法及びシステムはプログラムされたモ
ードにて動作するようにされる。
マイルストーンに到達するたびに、オペレータは単にボ
タンを押す。個々のボタンが押されると、所定のシーケ
ンスの次の段階に到達したことが通知される。
ただし、別の用途においては、手作業モードの方が適当
である場合もある。手作業モードにおいては、オペレー
タはカーソルの移動あるいは他のメカニズムによって、
最初に段階、つまり、マイルストーンを同定し、次にそ
の完結を通知する。従って、手作業モードにおいては、
段階2の前に段階3の完了を通知することもできる。
この2つのモードの混合を用いることもできる。この方
法では1手作業モードでも所定のシーケンスあるいは規
則を確立することができる。例えば、ステップ3がステ
ップ4が開始される前に完結される必要があるが、ステ
ップ1,2及び5はステップ3及び4の時間関係とは無
関係に進行するような場合が存在する。1突指標を用い
て順番上の規則が違反されたことを示すことができる。
理解できるごとく、多くの施設はプログラム モード、
手作業モードあるいは混合モードのいずれかを選択でき
る柔軟性を要求する。
本発明はこの柔軟性を容易に提供できる。
通常、なにがいつ起ったかの記録をとることが重要であ
る。これは1本発明によると、単に個々のマイルストー
ンに到達した時間を記@(例えば、メモリ内あるいは印
字出力上に)することによって達成される。通常、リア
ル タイム記録がリアル タイム クロックを用いてマ
イルストーン信号が送られるたびに行なわれる。ただし
、通常は、同時的な通知は不可能である。例えば、外科
手術中、あるマイルストーンに到達したとき信号ボタン
を押す自由がない場合がある。従って、本発明はある事
象が起った時間を手操作にて入力するための手段も考慮
する。本発明はまた記録された時間がリアル タイムで
あるか手操作にて入力されたものであるかの適当な指標
を通常記録上に使用する。
この記録はまた責任の確認にも使用できる。
この記録からどのような手順が踏まれたか、個々のマイ
ルストーンにいつ到達したか、及びどのような資源が関
与したかを簡単に知ることができる。
このシステムはまた幾つかの動作を自動的に遂行するよ
うに設計することもできる。例えば、ある設備が使用の
前に所定の期間だけウオーミング アップを必要とする
ような場合1本発明の方法においては、システムは外科
的処置の特定のマイルストーンが完結した時点において
装置がオンされるように設計される。同様に、産業設定
の場合は、システムはある所定のマイルストーンに到達
すると購入の注文を自動的にカットしたり、鋳型を開け
たりする。
本発明による方法はまた規則追従システムを考慮し、こ
のシステム内ではあるタイプの衝突指標が検出されると
、幾つかの資源が自動的に再計画される。これを説明す
るために、第1図において、ケースabcの完結とケー
スdefの開始の間に15分が存在しなければならない
ものと仮定する。8:50までにケースabcが終了し
たことを知らせる信号が送られない場合は、ケースde
fを9:15分から開始するように自動的に再計画する
ような規則が確立される。この規則はまた再計画の前に
ケースdefに関与する全ての資源の計画のチエツクを
要求する。
これらケースdefに関連する計画をチエツクした結果
として新たな衝突が検出されない場合は、再計画を実施
され、変更の通知が影響を受けた人に自動的に連絡され
る。これは、例えば、システムがケースdefを遂行す
るように計画された外科医の事務所にtn話を入れるよ
うにすることによって、あるいは音声シンセサイザを用
いて新たな計画を報告させることによって達成される。
ケースdefの再計画が別の衝突を引き起すことが発見
された場合は、システムはこの再計画を行なわず、代わ
りに、単に第1の衝突の通知のみを与えるように設計す
ることもできる。この通知は、視覚的な表示によること
も、特徴ある音色によって伝えることもできる。別の可
能性としては、システムに第2の層の衝突(secon
d tier conflict)に巻き込まれた資源
の再構成を試させ、この第2の計画から衝突が起らない
ときに限って、第1及び第2の層の再計画に進ませるよ
うに設計することができる。衝突が見られる場合は、規
則によって再計画の努力を放棄させる。
本発明はまた状態指標の使用によって予期されなかった
資源の空きを予測することも考慮する1例えば、7:5
0まで終了しないとみられていた1′ケースabc”の
段階2が7:40分になる前に完了したような場合、状
態指標バー(第1A図)が異なるコントラスト色にて表
示される。画面上へのこのカラー パーの出現はオペレ
ータに手術室1(及び他の“ケースabc″″に関与す
る資源)が当初予定されていたより早く空いたことを通
告する。
第2図は第1図が静的な予測情報を反映するのとは対照
的にリアル タイム情報に基づく動的ディスプレイで表
わす、第2図では、時間が’(tn)”及び矢印によっ
て示される。
第2図は“ケースabc″と11ケースdef”の間の
手術室1に対する衝突を示すが、これが衝突指標C−1
によって示される。この衝突は、オペレータが状態指標
に対応して″ケースabc’″の予定完了時間を変更し
た結果として発生するにれはまた。(リアルタイム ク
ロックによって示される)時間が″ケースabc’″が
完結したことを知らせる信号を受信することな(8:4
5分を過ぎた場合にトリガされる。
パケースa bc ITの計画完了時間の変更はまた“
Rm 4 ”に9二〇〇に出頭することが予定されてい
る“Doc  a”の計画にも衝突を起す。衝突指標C
−2がこの衝突を反映する。
理想的には、衝突指標はどの資源が関与しているか無関
係に表示される。例えば、9ケースabc″′の終了が
予定より遅れた場合、手術室1の使用には衝突は発生し
ないが、これがそのケースに関与する麻酔医の計画に衝
突を与える可能性がある。麻酔医の計画がデータ ベー
ス内に置かれている場合は、“ケースabcI+の完了
の再計画に応答してデータ ペースの検索を行なうこと
によってこの麻酔医の“ケースabc”への長がびく関
与は彼の他の仕事との衝突を引き起すことが発見される
可能がある。結果として、さらに別の衝突指標C−3が
表示される。衝突指1RC=3はこれが単に衝突の存在
を反映するのみであり、源を同定しないという点におい
て非限定的である。衝突指標C−1及びC−2は、一方
、衝突の存在を知らせるのみでなく、関与する1つある
いは複数の資源を同定する。
別の方法として、C−3は色、位置、形状等の使用によ
って限定的にすることもできる。
手術室1及び2の下の識別子゛′ケースa dc u及
びケースg)、 i ITはセル内からセルの上に移動
し、これらケースがそれらの対応する手術室内において
現在進行中であることを示すことに注意する。11 D
 oca#+の下の識別子″ケースabc”もセルの上
に移動し、Doca′が現在のケースに関与しているこ
とを反映する。
第2図のRm、1の下には計画した完了時間が4:45
分から9:15分に変更され、30分の遅れ(d)が存
在したことが示される。
Rm、1の下のこのクロスの影は当初9:00から開始
することが計画されたケースdefが9=30まで開始
しないことを示す。
Rm3の下の識別子の位置は、即座に、ケースk1m、
mno及びp r ’sが終了し、ケ−スtuvがまだ
開始されてないことを示す。
ケースmnoは当初は8:15に終了するように計画さ
れたが、実際には8:30まで終了しなかったことがわ
かる。
さらに第2図において、“Doc  a”の下から、彼
のケースabcへの関与が計画したように8:15には
終了せず、現在でも進行中であり、今度は9:15に終
るように計画されていることがわかる。
最後に、当初、おそらくケースdefの前にセットアツ
プ及び調節を行なう目的でRag。
1に8:45に移動されるように計画されたMic、X
がまだ運び込まれておらず、この移動が9=15まで計
画されてないことがわかる。
第3図は主資源が第1図に示される計画との関連で実際
はいかに使用されたかの記録的表示である6第3図にお
いて、08:45に完了することを計画された″ケース
abcI+(″ケースabc”セル内の斜線)が09 
: 05ぐらいまで終了せず、1ケースdef”がその
後直ちに開始されたことがわかる。衝突指標C−4(二
重のクロス斜線)は“ケースdef”が予定の時間に開
始されなかったことを示す。
同様に、衝突指標は17 D Oc、 Hgが彼がケー
スabcのために遅れて9:05までRm4での仕事を
開始しなかったことを示す(C−5)。
第3図の実施態様においては、単一クロス斜線の形式の
指標が予定の計画からの変更が行なわれたことを示すた
めに用いられる。ケースtuvセルの反対方向のクロス
斜線は中止された外科的処置を示す。
第1図も第3図もいずれも現時間の指標を示すものでな
いことに注意する。この2つのタイプの表示が混乱する
ことを避けるため。
通常1片方を他方と区別するためのある記号が用いられ
る。この1つの方法は、未来の表示に対して1つの背景
色を用い、過去の表示に対してコントラストの背景色を
用いる方法である。このコントラスト色の使用はまた別
個の現時間標識を不必要にする。動的ディスプレイ上に
おいては、時間の経過が2つの色の間のインタフェース
 ラインを下方に移動することによって示される。
第2図のディスプレイは時間矢印(t n)を画面の下
方に移動させることによって時間の経過を示し、セルは
固定される。当業者においては容易に理解できるごとく
、セルを移動させ、時間ラインを固定することもできる
このようなディスプレイが第4図の左半分に示される0
時間が経過するに従って、デジタル クロックが変化し
、セルが上に移動する。
第4図はまた本発明によるといかにグラフィック ディ
スプレイがリアル タイム テキスト ディスプレイと
結合され、これによって補足されるかを示す。1つのセ
ルが画面から消えていくと、その資源の現在の使用を示
すテキスト表示が新たな状況を反映するために自動的に
変更される。
第4図は8:05の状況を示す。第5図は11:25の
時点での同一の手術室に対する状況を示す。セル間の時
間の関係が8二05(第4図)と11:25(第5図)
の間で変化していることに注意すべきである。これはこ
の実施態様においてはセル内にマイルストーン マーカ
(M)が埋め込まれているために起こる。セルはこれら
マイルストーン マーカの個々の所でそのマイルストー
ンに実際に到達した事実の指標が受信されるまで停止す
る。
セルは次に上方向への移動を開始する。この実施態様に
おいては、マイルストーン マーカとセルの移動が状態
指標を構成する。
第6図は1987年6月の開始のプロジェクトX及びY
及び資源123,223及び224に対する未来の計画
の画面を示す。プロジェクトXは部分的に重複する2つ
の相をもつ。プロジェクトYは3つの相をもつが、これ
らのいずれも重複しない。資源123、及び223はプ
ロジェクトYの相1及び2において用いられる。資源2
24はプロジェクトXの相1とプロジェクトYの相3の
間に2度使用される。
第7図は1987年6月8日の時点の動的あるいは実際
の出来事を第6図に示される計画との関連で示す。プロ
ジェクトXの相1は計画通りは開始せず、終了が遅れた
。この終了の遅れは、″相1″セル内の矢印tによって
示される。この遅れは資源224がプロジェクトXの相
1とプロジェクトYの相3に同時に使用できないため衝
突を発生させた。この衝突が指@C−6,C−7及びC
−8によって示される。時間は画面の背景色の変化によ
って示される。この2つの色の界面が現時間(1)であ
る。
プロジェクトX及びプロジェクトXにおいて使用される
資源224は第7図において再計画されているが、プロ
ジェクトYの相3及び“Y”の相3内での資源224の
使用はまだ再計画されてない。
プロジェクトXの相1と2の間の幾らかの重複は予想さ
れたが、相1の終了の遅れが結果としてこの重複をあま
りにも大きくし、この結果、相2の開始を遅れさせるこ
とが必要となった。これはプロジェクトXの相2のセル
の影によって示される。
第8図は第1図と関連する幾つかのセルに追加の情報を
含めるように再構成されたディスプレイを示す、前述の
ごとく、本発明の方法及びシステムはメニュー駆動する
ことができる。このメニュー及びサブメニューの性格、
それらがアクセスを許す情報及びこれらが提供する他の
機能は用途によって異なる。幾つかのメニューは単にデ
ータ ベースから情報を呼び出すために用いられる。他
のメニューはディスプレイ フォーマットを変更するた
めに使用される。これらメニューがいかに使用され、ま
たどのようなタイプのメニューが利用できるかは、本発
明が適用される用途及び本発明を使用する者の創造力に
依存する。
ポツプ アップ ウィンドウの従来の使用はそれらがグ
ラフィック ディスプレイに従来置かれる以上の追加の
情報の表示を可能にする。第9図においては、ポツプア
ップウィンドウが特定のケースに関する詳細な情報を調
べるために呼び出されている。
このディスプレイはまた特定の医師あるいは患者の位置
を追跡するためにも用いることができる。病院システム
内のデータ ベースはまた外科手術現場とは関係ない他
の資源の使用状態を表示するのに用いることもできる。
例えば、病院システムは現在及び未来の病室の使用状況
を同定し、個々の位置を簡単に知り、病室の利用状態に
関する時間情報を検索できるように設計することもでき
る6 少なくとも本発明の用途の初期の段階においては、情報
の入力は、通常、キーボード及び/あるいは信号スイッ
チを通じて行なわれるが、本発明はこのようなデバイス
の使用に限定されるものではない。特定の用途により。
電話、無線、マイクロ波、赤外及び信号を伝送するため
の他のデバイス及び方法を使用することができる。動的
計画が様々な位置からの到着及び出発を伴なう現場の要
員に依存するような産業設定においては、電話あるいは
″ビーバー(beeper) ”  を現情報を入力す
るために用いることもできる。同様に、衝突指標あるい
は再計画情報も″ピーバーあるいは他のデバイスを用い
て現場要員に自動的に伝えることができる。
陰極線管が本発明の実施においての使用に対して最も適
当であると思われるが、ここで使用される用語″ディス
プレイ(d i s p l a y ) ”はより一
般的な意味で使用される。ある用途によっては、ハード
 コピー、例えば、用紙への印刷が許容できるディスプ
レイであり得る。同様に、アレイの白熱電球を使用する
こともできる。他の多少複雑なディスプレイを使用する
ことも可能である。
最後に、本発明の上に説明の実施態様は解説のみを意図
するものである。当業者にとっては、特許請求の範囲及
び精神から逸脱することなく他の無数の実施態様が考え
られることは勿論である。
【図面の簡単な説明】
第1図は本発明に従かう計画された資源の未来のディス
プレイを示す図; 第1A図は第1のマイルストーンに到達した後のセルの
1つを示す図; 第1B図は同定ラベルが患者が手術室に入ったことを示
すためにセルの上に移動された第1図のセルの1つを示
す図; 第1C図はマイルストーン1の完了を示すのに異なる手
段が用いられ第1A図と同一の情報を示す図; 第1D図は第2のマイルストーンが経過した後の時点の
第1A図と同一のセルを示す図;第1E図は状態指標を
表示するために丸あるいは時計の顔が使用されるセルを
示す図;第2図は本発明に従って事象の発生に伴って修
正される、第1図の計画を動的ディスプレイとして示す
図; 第3図は終了後の第1図の計画を示すが、これは本発明
に従って生成された過去の記録であり、なにが発生した
かのみでなく、これが実際には計画された使用といかに
異なったかを示す図; 第4図は計画情報をグラフィック的にデイスプレィする
ための計画された資源に関する情報が同時にテキスト形
式にて表示されるような方法を示す図; 第5図は第4図のディスプレイを後の時点で示す図; 第6図は本発明に従っての産業プロジェクトの未来を展
望しての計画のディスプレイを示す図; 第7図は幾つかの発生した事象を反映するように修正さ
れる。第6図の計画の動的ディスプレイを示す図; 第8図は第1図上に出現する幾つかの情報の再構成され
たディスプレイを示す図;そして 第9図はケースkimに関する情報を示するたのオーバ
レイされたポツプ アップ ウィンドウを第1図のディ
スプレイ上にもつディスプレイを示す図である。 [主要部分の符号の説明] マイルストーンマーカ・・・・・・・・・・・・・・・
・M衝突指標・・・・・・・・C−1,C−2,C−3
,C−4,C−5時刻矢印・・・・・・・・・・・・・
・・・・・・・・・・・・[t h]図面の浄i!)(
内容に変更なし) IQ : (X) − 10:15− FIG、1 IQ:+5 − FIG、2 10:15− FIG、3 □ □□   −雫□ □ □―−−□−□ −−一軸
輌 1    神  □←FIG、6 FIG、7 FfG、8 10:0Q FIG、9

Claims (1)

  1. 【特許請求の範囲】 1、メモリをもつコンピュータを使用し て複数の関連する資源の利用を未来を展望して計画する
    ための方法において、該方法が:該資源の少なくとも幾
    つかに関する情報の データベースを作成するステップ; 該資源の幾つかを主資源と同定し、他の幾 つかを二次資源と同定するステップ; 該資源の少なくともいくつかの間の一時的 な関連を確立するステップ; 該主資源の少なくとも幾つか及び該二次資 源の少なくとも幾つかの未来を展望しての利用を計画す
    るステップ; 該資源の1つの該計画的な利用が同一ある いは別の資源の利用計画と相反しないか決定するステッ
    プ;及び 衝突指標を用いて該相反する利用計画の存 在を知らせるステップを含むことを特徴とする方法。 2、メモリをもつコンピュータを使用し て複数の関連する資源の利用を未来を展望して計画する
    方法において、該方法が; 該資源の少なくとも幾つかに関する情報の データベースを作成するステップ; 該データベース内に該資源の少なくとも 幾つかの許される及び許されない使用データを含めるス
    テップ; 該資源の少なくとも幾つかの使用を未来を 展望して計画するステップ; 該計画された利用のいずれかが許されない 使用を構成するか決定するためにデータベ ースを検索するステップ;及び 衝突指標を用いて該許されない使用計画を 伝えるステップを含むことを特徴とする方法。 3、請求項1ないし2記載の方法におい て、該衝突指標の少なくとも幾つかの通知が音響を介し
    て行なわれることを特徴とする 4、請求項1ないし2記載の方法におい て、該衝突指標の少なくとも幾つかの通信が光、無線あ
    るいは他の電磁放射を使用して行なわれることを特徴と
    する方法。 5、請求項1記載の方法において、光学 ディスプレイがさらに含まれ、該衝突指標の少なくとも
    1つの通信が該指標を該ディスプレイ上に出現されるこ
    とによって達成されることを特徴とする方法。 6、請求項2記載の方法において、光学 ディスプレイがさらに含まれ、該衝突指標の少なくとも
    1つの通信が該指標を該ディスプレイ上に出現されるこ
    とによって達成されることを特徴とする方法。 7、請求項6記載の方法において、該未 来の計画された利用が該ディスプレイ上に計画指標の形
    式で反映されることを特徴とする方法。 8、請求項7記載の方法において、該資 源の第1の計画された利用の後の時点において該資源の
    少なくとも1つの実際の利用を表わす情報を得るステッ
    プ;及び 該実際の利用情報をこの情報を該ディスプ レイ上に状態指標として出現させることによって伝える
    ステップがさらに含まれることを特徴とする方法。 9、請求項8記載の方法において、該実 際の利用が任意の資源の事前に計画された利用と一致し
    ないか決定するステップ;及び 該一致しない事前に計画された利用の少な くとも1つを再計画するステップがさらに含まれること
    を特徴とする方法。 10、請求項8記載の方法において、該実 際の利用を記録するステップがさらに含まれることを特
    徴とする方法。 11、請求項1記載の方法において、該資 源の第1の計画された使用の後の時点において該資源の
    少なくとも1つの実際の利用を表わす情報を得るステッ
    プ; 該実際の使用が該データベース内に格納 された時間的関係のいずれかあるいは任意の情報と矛盾
    しないか決定するステップ;及び衝突指標によってこの
    ような矛盾する利用 計画の存在を通知するステップがさらに含まれることを
    特徴とする方法。 12、少なくとも幾つかが互いに関連する 複数の資源の利用を未来を展望して計画するためのシス
    テムにおいて、該システムが; メモリをもつコンピュータ; 該メモリ内に格納された該資源の少なくと も幾つかに関する情報を含むデータベース;セットの主
    資源及びセットの二次資源; 該主資源の少なくとも幾つかの利用を時間 の関数として未来を展望して計画するための計画作成手
    段; 該計画された利用の少なくとも1つを少な くとも1つの別の計画された使用とあるいは該データベ
    ース内に格納された情報と比較 することによって相反を検出するための手段;及び 衝突指標を使用して該検出された相反の存 在を通知するための手段を含むことを特徴とする装置。 13、請求項12記載の装置において、光 学的に認識できるディスプレイがさらに含まれることを
    特徴とする装置。 14、請求項13記載の装置において、該 計画情報の少なくとも幾つかが計画指標によって該ディ
    スプレイ上に出現するように設計されることを特徴とす
    る装置。 15、請求項14記載の装置において、該 衝突指標の少なくとも幾つかが該ディスプレイ上に出現
    するように設計されることを特徴とする装置。 16、請求項15記載の装置において、該 計画指標が時間の関数としての該主資源の少なくとも幾
    つかの計画された利用を反映することを特徴とする装置
    。 17、請求項16記載の装置において、該 計画指標の少なくとも幾つかが該二次資源の少なくとも
    幾つかの利用に関する情報を組み込むことを特徴とする
    装置。 18、少なくとも幾つかが互いに関連する 複数の資源の利用を未来を展望して計画し、定期的に監
    視及び管理するための装置において、該装置が: メモリをもつコンピュータ; 該メモリ内に格納された該資源の少なくと も幾つかに関する情報を含むデータベース;セットの主
    資源及びセットの二次資源; 該主資源の少なくとも幾つかの利用を時間 の関数として未来を展望して計画するための計画作成手
    段; 該未来を展望して計画された利用の少なく とも幾つかを計画指標を使用して通知するための手段; 該計画された利用の少なくとも1つを少な くとも1つの他の計画された利用あるいは該データベー
    ス内に格納された情報と比較し て相反が存在しないか決定するための手段;衝突指標を
    使用して検出された相反の存在 を通知するための手段; 資源の第1の計画された使用の後に該主資 源の少なくとも1つの実際の利用に関する情報を集める
    ための手段;及び 該計画された利用の少なくとも1つを該実 際の利用と該未来を展望しての計画された利用との間の
    差を反映するように修正するための手段を含むことを特
    徴とする。 19、請求項18記載の装置において、該 主資源の少なくとも1つの利用の実際の状態を該主資源
    の少なくとも1つの当初の計画された利用の後の時点に
    おいて入力するための手段がさらに含まれることを特徴
    とする装置。 20、請求項19記載の装置において、該 主資源の少なくとも1つの実際の利用に関する情報をこ
    れの第1の未来を展望しての計画された利用の後の時点
    において集めるための手段及び該実際の利用に関する情
    報を状態指標を使用して通信するための手段がさらに含
    まれることを特徴とする装置。 21、請求項20記載の装置において、該 主資源の少なくとも1つの該実際の利用を該資源の未来
    を展望しての計画された使用と比較するための手段及び
    該比較の結果を状態指標を使用して通信するための手段
    がさらに含まれることを特徴とする装置。 22、請求項18記載の装置において、該 実際の利用情報を集めるための手段がリアルタイムクロ
    ック手段を含むことを特徴とす る装置。 23、請求項19記載の装置において、該 資源の実際の利用状態を入力するための手段がリアルタ
    イムクロック手段を含むこと を特徴とする装置。 24、請求項20記載の装置において、該 資源の実際の利用に関する情報を集めるための手段がリ
    アルタイムクロック手段を含 むことを特徴とする装置。 25、請求項18記載の装置において、修 正に起因する相反する利用を検出し、該検出された修正
    に起因する相反を衝突指標を用いて通信するための手段
    がさらに含まれることを特徴とする装置。 26、請求項18記載の装置において、該 計画指標あるいは該衝突指標の少なくとも1つを表示す
    るための光学ディスプレイ手段がさらに含まれることを
    特徴とする装置。 27、請求項20記載の装置において、該 計画指標、該衝突指標あるいは該状態指標の少なくとも
    1つを表示するための光学ディスプレイ手段がさらに含
    まれることを特徴とする装置。 28、請求項25記載の装置において、該 計画指標、該衝突指標あるいは該状態指標の少なくとも
    1つを表示するための光学ディスプレイ手段がさらに含
    まれることを特徴とする装置。 29、請求項18記載の装置において、該 修正手段が少なくとも1つの修正に起因する相反の検出
    に応答して該計画された利用の少なくとも1つを自動的
    に変更するための手段を含むことを特徴とする装置。 30、請求項14記載の装置において、該 計画指標の少なくとも幾つかがグラフィック表示の形式
    で出現することを特徴とする装置。 31、請求項15記載の装置において、該 計画指標及び衝突指標の少なくとも幾つかがグラフィッ
    ク表示の形式にて出現することを特徴とする装置。 32、請求項28記載の装置において、該 計画指標、衝突指標及び状態指標の少なくとも幾つかが
    グラフィック表示の形式にて出現することを特徴とする
    装置。 33、請求項30ないし32記載の装置に おいて、該グラフィック表示が該主資源あるいは二次資
    源の少なくとも幾つかの利用に関する情報のテキスト表
    示と同時に出現するように設計されることを特徴とする
    装置。 34、請求項13記載の装置において、該 データベース内に格納された該資源の少な くとも1つに関する情報がアクセスでき該ディスプレイ
    上に出現するように設計されることを特徴とする装置。 35、請求項19記載の装置において、該 実際の利用状態のデータの入力の時間を記録するための
    手段がさらに含まれることを特徴とする装置。 36、請求項19記載の装置において、該 実際の利用状態の時間を記録するための手段がさらに含
    まれることを特徴とする装置。
JP22487288A 1987-09-10 1988-09-09 資源の動的管理方法と装置 Expired - Lifetime JP2634070B2 (ja)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US96,027 1987-09-10
US096,027 1987-09-10
US07/096,027 US4937743A (en) 1987-09-10 1987-09-10 Method and system for scheduling, monitoring and dynamically managing resources

Publications (2)

Publication Number Publication Date
JPH01162977A true JPH01162977A (ja) 1989-06-27
JP2634070B2 JP2634070B2 (ja) 1997-07-23

Family

ID=22254786

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22487288A Expired - Lifetime JP2634070B2 (ja) 1987-09-10 1988-09-09 資源の動的管理方法と装置

Country Status (6)

Country Link
US (1) US4937743A (ja)
EP (1) EP0306965A3 (ja)
JP (1) JP2634070B2 (ja)
AU (1) AU622371B2 (ja)
CA (1) CA1294054C (ja)
IL (1) IL87663A (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04119461A (ja) * 1990-09-10 1992-04-20 Fujitsu Ltd 知識ベースシステムにおけるスケジューリング方法
JPH0757006A (ja) * 1993-08-17 1995-03-03 Nec Corp リソース管理装置

Families Citing this family (340)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5230066A (en) * 1986-09-19 1993-07-20 Mitsubishi Denki Kabushiki Kaisha Microcomputer
US5133075A (en) * 1988-12-19 1992-07-21 Hewlett-Packard Company Method of monitoring changes in attribute values of object in an object-oriented database
US5208904A (en) * 1989-03-07 1993-05-04 Brother Kogyo Kabushiki Kaisha Data processing apparatus and method for preparing data representative of supplemental figure attached to basic figure reproduced on output medium
US5117353A (en) * 1989-05-05 1992-05-26 Staff-Plus, Inc. System for use in a temporary help business
US5164897A (en) * 1989-06-21 1992-11-17 Techpower, Inc. Automated method for selecting personnel matched to job criteria
DE3925168A1 (de) * 1989-07-28 1991-01-31 Udo Quilitz Verfahren zur zuordnung von datensaetzen zu zeitwerten einer zeitlichen reihenfolge
US5233533A (en) * 1989-12-19 1993-08-03 Symmetrix, Inc. Scheduling method and apparatus
US5253340A (en) * 1990-01-19 1993-10-12 Canon Kabushiki Kaisha Data processing apparatus having a graphics device with priority scheduling of drawing requests
US5226120A (en) * 1990-05-21 1993-07-06 Synoptics Communications, Inc. Apparatus and method of monitoring the status of a local area network
US5295065A (en) * 1990-06-01 1994-03-15 Motorola, Inc. Resource-lot association coordinator
US5208765A (en) * 1990-07-20 1993-05-04 Advanced Micro Devices, Inc. Computer-based method and system for product development
JP2732711B2 (ja) * 1990-12-20 1998-03-30 株式会社日立製作所 多次元情報表示方法および装置
US5237497B1 (en) * 1991-03-22 1998-05-26 Numetrix Lab Ltd Method and system for planning and dynamically managing flow processes
JPH0816877B2 (ja) * 1991-06-10 1996-02-21 インターナショナル・ビジネス・マシーンズ・コーポレイション データ処理システム用資源データの実時間捕獲及び減縮方法及びシステム
JPH0774984B2 (ja) * 1991-06-10 1995-08-09 インターナショナル・ビジネス・マシーンズ・コーポレイション システム資源利用率測定方法とデータ処理システム
US5278751A (en) * 1991-08-30 1994-01-11 International Business Machines Corporation Dynamic manufacturing process control
JPH05225206A (ja) * 1991-10-29 1993-09-03 Internatl Business Mach Corp <Ibm> プロジェクト予定表と資源企画カレンダとの統合方法及び装置
US5365360A (en) * 1991-11-15 1994-11-15 International Business Machines Corporation Method and apparatus for presenting information contained within a data icon by assigning attributes to various dimensions of the data icon
US5644692A (en) * 1991-12-06 1997-07-01 Lucent Technologies Inc. Information display apparatus and methods
CA2082848C (en) * 1991-12-06 2000-12-19 Stephen G. Eick Apparatus for selective simultaneous display of information about a plurality of events
JPH05165842A (ja) * 1991-12-13 1993-07-02 Toyota Central Res & Dev Lab Inc 工程時間の見積り装置
JPH0683404A (ja) * 1992-01-20 1994-03-25 Internatl Business Mach Corp <Ibm> スケジュール表示のカストマイズ装置および方法
JPH0756652B2 (ja) * 1992-03-24 1995-06-14 インターナショナル・ビジネス・マシーンズ・コーポレイション 動画像のフレーム列の検索
US5247438A (en) * 1992-03-30 1993-09-21 Infoassist, Inc. Personal time management system and method
US5659693A (en) * 1992-08-27 1997-08-19 Starfish Software, Inc. User interface with individually configurable panel interface for use in a computer system
US5483468A (en) * 1992-10-23 1996-01-09 International Business Machines Corporation System and method for concurrent recording and displaying of system performance data
US5432932A (en) * 1992-10-23 1995-07-11 International Business Machines Corporation System and method for dynamically controlling remote processes from a performance monitor
US5553235A (en) * 1992-10-23 1996-09-03 International Business Machines Corporation System and method for maintaining performance data in a data processing system
US5506955A (en) * 1992-10-23 1996-04-09 International Business Machines Corporation System and method for monitoring and optimizing performance in a data processing system
US5487144A (en) * 1992-12-01 1996-01-23 Yokogawa Electric Corporation Scheduling system
US5659768A (en) * 1993-01-06 1997-08-19 Forbes; Kenneth S. System and method for the time representation of tasks
US5615138A (en) * 1993-04-08 1997-03-25 Honda Giken Kogyo Kabushiki Kaisha Method for establishing the working mantime in the production line
JPH06342357A (ja) * 1993-06-01 1994-12-13 Mitsubishi Electric Corp ユーザインタフェース方式
JPH0756754A (ja) * 1993-08-03 1995-03-03 Internatl Business Mach Corp <Ibm> マルチメディア・グループ資源割当て装置及び方法
IL106792A (en) * 1993-08-24 1998-02-08 Scitex Corp Ltd System for planning and making illustrations
DE4329886B4 (de) * 1993-09-06 2012-05-03 Heidelberger Druckmaschinen Ag Ablaufsteuerungssystem für Druckereien
US5467268A (en) * 1994-02-25 1995-11-14 Minnesota Mining And Manufacturing Company Method for resource assignment and scheduling
US5623404A (en) * 1994-03-18 1997-04-22 Minnesota Mining And Manufacturing Company System and method for producing schedules of resource requests having uncertain durations
IL112660A (en) * 1994-03-31 1998-01-04 Minnesota Mining & Mfg System integrating active and simulated decision- making processes
EP0754333A4 (en) * 1994-04-04 2001-07-18 Alive Inc GRAPHIC VIEW OF CALCULATION RESULTS
US5590269A (en) * 1994-04-22 1996-12-31 Minnesota Mining & Manufacturing Company Resource assignment system providing mixed-initiative user interface updates
US7039595B1 (en) 1998-10-21 2006-05-02 Infor International Limited System and method for throughput measurement
US5787000A (en) * 1994-05-27 1998-07-28 Lilly Software Associates, Inc. Method and apparatus for scheduling work orders in a manufacturing process
US6801820B1 (en) 1994-05-27 2004-10-05 Lilly Software Associates, Inc. Method and apparatus for scheduling work orders in a manufacturing process
US7647241B1 (en) 1994-05-27 2010-01-12 Infor Global Solutions (Veenendaal) B.V Computer program product for determining and reducing customer service impact
CA2130065C (en) * 1994-08-12 1999-03-02 Michael Joel Cincinatus Utilizing pseudotables as a method and mechanism for providing database monitor information
KR960008583A (ko) * 1994-08-26 1996-03-22 윌리암 티. 엘리스 데이타 프로세싱 시스템 및 데이타 프로세싱 시스템 관리 방법
US7092894B1 (en) * 1994-09-01 2006-08-15 Harris Corporation Cost reactive scheduler and method
US20040172175A1 (en) * 2003-02-27 2004-09-02 Julich Paul M. System and method for dispatching by exception
US7539624B2 (en) * 1994-09-01 2009-05-26 Harris Corporation Automatic train control system and method
US5623413A (en) * 1994-09-01 1997-04-22 Harris Corporation Scheduling system and method
US5668944A (en) * 1994-09-06 1997-09-16 International Business Machines Corporation Method and system for providing performance diagnosis of a computer system
US5797002A (en) 1994-09-20 1998-08-18 Papyrus Technology Corp. Two-way wireless system for financial industry transactions
US7373322B1 (en) 1994-09-20 2008-05-13 Papyrus Technology Corporation Two-way wireless communication system for financial industry transactions
US5774877A (en) * 1994-09-20 1998-06-30 Papyrus Technology Corp. Two-way wireless system for financial industry transactions
US6768981B2 (en) 1994-09-20 2004-07-27 Papyrus Corporation Method for executing a cross-trade in a two-way wireless system
US6023679A (en) * 1994-10-04 2000-02-08 Amadeus Global Travel Distribution Llc Pre- and post-ticketed travel reservation information management system
US5842173A (en) * 1994-10-14 1998-11-24 Strum; David P. Computer-based surgical services management system
US5596502A (en) * 1994-11-14 1997-01-21 Sunoptech, Ltd. Computer system including means for decision support scheduling
US5761684A (en) * 1995-05-30 1998-06-02 International Business Machines Corporation Method and reusable object for scheduling script execution in a compound document
US5634100A (en) * 1995-08-07 1997-05-27 Apple Computer, Inc. System and method for event parameter interdependence and adjustment with pen input
US5644721A (en) * 1995-08-30 1997-07-01 System One Information Management, L.L.C. Multiple currency travel reservation information management system and method
US5765140A (en) * 1995-11-17 1998-06-09 Mci Corporation Dynamic project management system
WO1997025682A1 (en) * 1996-01-05 1997-07-17 Hirsch John D System and method for optimal operating room scheduling and booking
US5835898A (en) * 1996-02-29 1998-11-10 Dcd Corporation Visual schedule management system for a manufacturing facility
US5781737A (en) * 1996-04-30 1998-07-14 International Business Machines Corporation System for processing requests for notice of events
US5970463A (en) * 1996-05-01 1999-10-19 Practice Patterns Science, Inc. Medical claims integration and data analysis system
US5918207A (en) * 1996-05-01 1999-06-29 Electronic Data Systems Corporation Process and system for predictive resource planning
US6049774A (en) * 1996-07-08 2000-04-11 At&T Corp. Machine, method and medium for dynamic optimization for resource allocation
US5923552A (en) * 1996-12-31 1999-07-13 Buildnet, Inc. Systems and methods for facilitating the exchange of information between separate business entities
US5831534A (en) * 1997-01-09 1998-11-03 Mooney; John M. Patient detection system
US6571215B1 (en) * 1997-01-21 2003-05-27 Microsoft Corporation System and method for generating a schedule based on resource assignments
US6609100B2 (en) * 1997-03-07 2003-08-19 Lockhead Martin Corporation Program planning management system
US5978768A (en) * 1997-05-08 1999-11-02 Mcgovern; Robert J. Computerized job search system and method for posting and searching job openings via a computer network
US6032123A (en) * 1997-05-12 2000-02-29 Jameson; Joel Method and apparatus for allocating, costing, and pricing organizational resources
US6064974A (en) * 1997-05-30 2000-05-16 Novell, Inc. Method and system for monitoring the status of a limited resource
US6169534B1 (en) 1997-06-26 2001-01-02 Upshot.Com Graphical user interface for customer information management
US6035278A (en) * 1997-07-08 2000-03-07 Netscape Communications Corporation Method and system for schedule and task management
US6073110A (en) * 1997-07-22 2000-06-06 Siemens Building Technologies, Inc. Activity based equipment scheduling method and system
US6990458B2 (en) * 1997-08-28 2006-01-24 Csg Systems, Inc. System and method for computer-aided technician dispatch and communication
WO1999018530A1 (en) * 1997-10-06 1999-04-15 Nexprise, Inc. Trackpoint-based computer-implemented systems and methods for facilitating collaborative project development and communication
WO1999031615A1 (en) * 1997-12-16 1999-06-24 Schlumberger Technology Corporation A method and system of simulating and optimizing land seismic operations
US6965867B1 (en) 1998-04-29 2005-11-15 Joel Jameson Methods and apparatus for allocating, costing, and pricing organizational resources
US6282546B1 (en) * 1998-06-30 2001-08-28 Cisco Technology, Inc. System and method for real-time insertion of data into a multi-dimensional database for network intrusion detection and vulnerability assessment
US6157915A (en) * 1998-08-07 2000-12-05 International Business Machines Corporation Method and apparatus for collaboratively managing supply chains
JP2002523842A (ja) * 1998-08-27 2002-07-30 アップショット・コーポレーション ネットワークベースのセールス・フォース管理のための方法および装置
US6149440A (en) * 1998-09-18 2000-11-21 Wyngate, Inc. Methods and apparatus for authenticating informed consent
US6171112B1 (en) 1998-09-18 2001-01-09 Wyngate, Inc. Methods and apparatus for authenticating informed consent
US6336101B1 (en) * 1998-09-24 2002-01-01 International Business Machines Corporation Tracking of computer components allocated during configuration of computer systems and networks by a simplified user friendly configuration process
US6298334B1 (en) 1998-10-15 2001-10-02 Netdecide Corporation Object-based numeric-analysis engine
US7505827B1 (en) * 1998-11-06 2009-03-17 Honeywell International Inc. Automated finite capacity scheduler
US6275812B1 (en) * 1998-12-08 2001-08-14 Lucent Technologies, Inc. Intelligent system for dynamic resource management
AU776929B2 (en) * 1998-12-21 2004-09-23 Frontline Technologies Group Llc System and method for performing substitute fulfillment information compilation and notification
US6334133B1 (en) * 1998-12-21 2001-12-25 Frontline Data, Inc. System and method for performing substitute fulfillment
JP3327235B2 (ja) * 1998-12-22 2002-09-24 トヨタ自動車株式会社 受注品納期管理システム
US6614450B1 (en) * 1999-03-03 2003-09-02 Gateway, Inc. Information display system for scheduling the utilization of a facility
US6408218B1 (en) 1999-03-18 2002-06-18 Textron Systems Corporation Shop floor control system
US6806891B1 (en) 1999-05-07 2004-10-19 The Foxboro Company Method and apparatus for automated management and display of booking status
US6625636B1 (en) * 1999-05-13 2003-09-23 International Business Machines Corporation Job protection within a distributed processing system having subsystem downtime
US6389454B1 (en) 1999-05-13 2002-05-14 Medical Specialty Software Multi-facility appointment scheduling system
US8121874B1 (en) * 1999-05-27 2012-02-21 Accenture Global Services Limited Phase delivery of components of a system required for implementation technology
US7945468B1 (en) 1999-08-20 2011-05-17 Frontline Technologies, Inc. Notification of employees via pass code accessed web pages
US6662230B1 (en) 1999-10-20 2003-12-09 International Business Machines Corporation System and method for dynamically limiting robot access to server data
US6876991B1 (en) 1999-11-08 2005-04-05 Collaborative Decision Platforms, Llc. System, method and computer program product for a collaborative decision platform
US8788308B1 (en) * 2004-03-29 2014-07-22 West Corporation Employee scheduling and schedule modification method and apparatus
US6798413B1 (en) * 1999-12-03 2004-09-28 Dcs, Inc. Workflow management system
US6968314B1 (en) 1999-12-22 2005-11-22 International Business Machines Corporation Enhanced security features for an automated order fulfillment system
US20020029272A1 (en) * 2000-02-11 2002-03-07 Scott Weller Method and system for assigning and distributing work over a computer network
US20040260601A1 (en) * 2000-03-13 2004-12-23 Victor Brief System and method for internet based procurement of goods and services
AU2001248164A1 (en) * 2000-03-31 2001-10-15 Mdsi Mobile Data Solutions, Inc. Enterprise scheduling system for scheduling mobile service representatives
US20030196312A1 (en) * 2000-04-06 2003-10-23 Ford Motor Company Method for manufacturing an item
US10115076B2 (en) * 2000-04-21 2018-10-30 Goalassist Corporation System and method employing capacity/demand management for human-factor resources
US7457765B2 (en) * 2000-06-02 2008-11-25 Drason Consulting Services, Llc Method and system for scheduling employees in a patient care environment
US7587329B2 (en) * 2000-06-02 2009-09-08 Drason Consulting Services, Llc Method and system for optimizing employee scheduling in a patient care environment
AU7409401A (en) * 2000-06-13 2001-12-24 Jurgen Axt Method for apportioning industrial or technological resources in technical systems
WO2002003225A2 (en) * 2000-06-15 2002-01-10 Xis Incorporated Method and system for product lifecycle management
US7236976B2 (en) * 2000-06-19 2007-06-26 Aramark Corporation System and method for scheduling events and associated products and services
US6751630B1 (en) * 2000-07-20 2004-06-15 Ge Medical Technology Services, Inc. Integrated multiple biomedical information sources
US7174303B2 (en) * 2000-07-31 2007-02-06 Uappoint, Inc Customer driven, sponsor controlled network-based graphical scheduling system and method
US8180661B2 (en) * 2000-08-23 2012-05-15 Landport Systems, Inc. System and method for managing property
US20020129139A1 (en) * 2000-09-05 2002-09-12 Subramanyan Ramesh System and method for facilitating the activities of remote workers
US6742028B1 (en) 2000-09-15 2004-05-25 Frank Wang Content management and sharing
US8050944B2 (en) * 2000-09-20 2011-11-01 Epic Systems Corporation Intelligent patient visit information management and navigation system
US7249145B1 (en) 2000-10-13 2007-07-24 General Electric Company Methods and apparatus for selecting candidates to interview
WO2002035393A1 (en) * 2000-10-27 2002-05-02 Manugistics, Inc. System and methods for sharing and viewing supply chain information
WO2002035438A1 (en) * 2000-10-27 2002-05-02 Manugistics, Inc. System and method of monitoring supply chain parameters
US7668761B2 (en) * 2000-10-27 2010-02-23 Jda Software Group System and method for ensuring order fulfillment
TW581955B (en) * 2000-10-27 2004-04-01 Manugistics Inc Supply chain demand forecasting and planning
US6962531B2 (en) * 2000-11-03 2005-11-08 Harrah's Operating Company, Inc. Automated service scheduling system
US7765121B2 (en) * 2000-11-03 2010-07-27 Harrah's Operating Company, Inc. Automated service scheduling system based on customer value
US20020055918A1 (en) * 2000-11-08 2002-05-09 Patrick Hlathein Operating room resource management system incorporating an interactive, visual method for coordinating multiple, interdependent
US7139720B1 (en) * 2000-11-14 2006-11-21 Xerox Corporation Project planning system and method for accommodating AD HOC requests within a fixed core development cycle
US20020120472A1 (en) * 2000-12-22 2002-08-29 Dvorak Carl D. System and method for integration of health care records
US6983423B2 (en) * 2000-12-22 2006-01-03 Epic Systems Corporation Electronic system for collecting and communicating clinical order information in an acute care setting
US6901407B2 (en) * 2001-01-12 2005-05-31 Rick D. Curns System and method for updating project management scheduling charts
US6818006B2 (en) * 2001-04-03 2004-11-16 Medtronic Vascular, Inc. Temporary intraluminal filter guidewire
US6584400B2 (en) 2001-04-09 2003-06-24 Louis J C Beardsworth Schedule activated management system for optimizing aircraft arrivals at congested airports
JP2002312473A (ja) * 2001-04-11 2002-10-25 Matsushita Electric Ind Co Ltd 健康診断システム
US6959405B2 (en) * 2001-04-18 2005-10-25 Blue Pumpkin Software, Inc. Method and system for concurrent error identification in resource scheduling
US20020156670A1 (en) * 2001-04-23 2002-10-24 Newman Frederic M. Method of managing workers at a well site
US20020153134A1 (en) * 2001-04-23 2002-10-24 Newman Frederic M. Method of managing work orders at a well site
US6947161B2 (en) 2001-05-16 2005-09-20 Hewlett-Packard Development Company, L.P. Systems and methods for automatic status tracking of automatically ordered replaceable components for printing devices
US20020178043A1 (en) * 2001-05-25 2002-11-28 Searles J. Brian Method and system for monitoring employee availability
US20020188490A1 (en) * 2001-06-12 2002-12-12 Kruse Patricia S. Meeting scheduling/meeting room reservation linkage method
US7415393B1 (en) 2001-06-14 2008-08-19 Massachusetts Institute Of Technology Reliability buffering technique applied to a project planning model
US7349863B1 (en) 2001-06-14 2008-03-25 Massachusetts Institute Of Technology Dynamic planning method and system
US7027051B2 (en) * 2001-06-29 2006-04-11 International Business Machines Corporation Graphical user interface for visualization of sampled data compared to entitled or reference levels
US20010051892A1 (en) * 2001-07-26 2001-12-13 David Brown Method for scheduling appointments
CA2455494A1 (en) * 2001-09-13 2003-03-20 British Telecommunications Public Limited Company Resource management method and apparatus
WO2003025703A2 (en) * 2001-09-17 2003-03-27 Duke University Methods of providing medical information and related systems and computer program products
US10346767B2 (en) * 2001-10-31 2019-07-09 Goalassist Corporation System and method employing capacity/demand management in prepared food service industry
US6785881B1 (en) * 2001-11-19 2004-08-31 Cypress Semiconductor Corporation Data driven method and system for monitoring hardware resource usage for programming an electronic device
US20030154110A1 (en) * 2001-11-20 2003-08-14 Ervin Walter Method and apparatus for wireless access to a health care information system
US20030130872A1 (en) * 2001-11-27 2003-07-10 Carl Dvorak Methods and apparatus for managing and using inpatient healthcare information
US20030120582A1 (en) * 2001-12-21 2003-06-26 Oncall Solutions, Inc. Call schedule auctioning method and apparatus
CA2368523A1 (en) * 2002-01-18 2003-07-18 Genus Resource Management Technologies Inc. Method and system for integrated natural resource management
US20030139952A1 (en) * 2002-01-24 2003-07-24 Ford Global Technologies, Inc. Complexity management and production optimization system
US20030220815A1 (en) * 2002-03-25 2003-11-27 Cathy Chang System and method of automatically determining and displaying tasks to healthcare providers in a care-giving setting
US20030216945A1 (en) * 2002-03-25 2003-11-20 Dvorak Carl D. Method for analyzing orders and automatically reacting to them with appropriate responses
US20030200168A1 (en) * 2002-04-10 2003-10-23 Cullen Andrew A. Computer system and method for facilitating and managing the project bid and requisition process
US20030212604A1 (en) * 2002-05-09 2003-11-13 Cullen Andrew A. System and method for enabling and maintaining vendor qualification
US7558745B2 (en) * 2002-09-30 2009-07-07 Volt Information Sciences, Inc. Method of and system for enabling and managing sub-contracting entities
US7925568B2 (en) 2002-04-10 2011-04-12 Volt Information Sciences, Inc. Computer system and method for producing analytical data related to the project bid and requisition process
US7698146B2 (en) * 2002-04-24 2010-04-13 Volt Information Sciences Inc. System and method for collecting and providing resource rate information using resource profiling
US20030204434A1 (en) * 2002-04-29 2003-10-30 Linton Jonathan Daniel Forecast of amount in the face of uncertainty
US20030220816A1 (en) * 2002-04-30 2003-11-27 Andy Giesler System and method for managing interactions between machine-generated and user-defined patient lists
US20030220821A1 (en) * 2002-04-30 2003-11-27 Ervin Walter System and method for managing and reconciling asynchronous patient data
US20030220817A1 (en) * 2002-05-15 2003-11-27 Steve Larsen System and method of formulating appropriate subsets of information from a patient's computer-based medical record for release to various requesting entities
US20040010465A1 (en) * 2002-05-20 2004-01-15 Cliff Michalski Method and apparatus for exception based payment posting
US20040010422A1 (en) * 2002-05-20 2004-01-15 Cliff Michalski Method and apparatus for batch-processed invoicing
US20040002884A1 (en) * 2002-06-28 2004-01-01 Lenio Allan J. Method for facilitating product launches through an integrated communication process
US7983923B1 (en) 2002-07-10 2011-07-19 Sap Ag Collaborative management of delivery schedules
US7979294B2 (en) * 2002-07-31 2011-07-12 Epic Systems Corporation System and method for providing decision support to appointment schedulers in a healthcare setting
AU2002328597A1 (en) * 2002-08-08 2004-02-25 Hiroshi Egawa Method for setting reservation for examination of patient in medical organization, reservation setting system, computer program, and recording medium
US7814055B2 (en) * 2002-08-28 2010-10-12 Apple Inc. Method of managing a calendar and a computer system for implementing that method
WO2004027672A1 (en) * 2002-09-09 2004-04-01 Apple Computer, Inc. A computer program comprising a plurality of calendars
EP1546846A2 (en) * 2002-09-09 2005-06-29 Apple Computer, Inc. A method of managing a calendar and a computer system for implementing that method
US20040172520A1 (en) * 2002-09-19 2004-09-02 Michael Smit Methods and apparatus for visually creating complex expressions that inform a rules-based system of clinical decision support
JP3976659B2 (ja) * 2002-10-09 2007-09-19 富士通株式会社 コンピュータによる業務管理方法
US10714213B2 (en) 2002-10-29 2020-07-14 Practice Velocity, LLC Method and system for automated medical records processing with patient tracking
US7840434B2 (en) * 2002-10-29 2010-11-23 At&T Intellectual Property I, L. P. Methods and systems for assigning multiple tasks
US11361853B2 (en) 2002-10-29 2022-06-14 Practice Velocity, LLC Method and system for automated medical records processing with telemedicine
US9842188B2 (en) 2002-10-29 2017-12-12 Practice Velocity, LLC Method and system for automated medical records processing with cloud computing
US8606594B2 (en) 2002-10-29 2013-12-10 Practice Velocity, LLC Method and system for automated medical records processing
US7953625B2 (en) * 2002-10-29 2011-05-31 Sap Aktiengesellschaft Available resource presentation
US7624027B1 (en) 2002-10-29 2009-11-24 Practice Velocity, LLC Method and system for automated medical records processing
EP1565109A1 (en) * 2002-11-25 2005-08-24 Fonar Corporation Method, apparatus, and facility for mri dual scanning
US7236227B2 (en) 2002-12-04 2007-06-26 Eastman Kodak Company System for management of both pre-show and feature presentation content within a theatre
US20040111307A1 (en) * 2002-12-04 2004-06-10 International Business Machines Corporation Electronic calendar management of privately owned resources
US6812994B2 (en) * 2002-12-04 2004-11-02 Eastman Kodak Company Streamlined methods and systems for scheduling and handling digital cinema content in a multi-theatre environment
US7034916B2 (en) 2002-12-04 2006-04-25 Eastman Kodak Company Scheduling between digital projection and film projection corresponding to a predetermined condition
US20040133889A1 (en) * 2002-12-12 2004-07-08 Renzo Colle Scheduling tasks across multiple locations
US20040117046A1 (en) * 2002-12-12 2004-06-17 Renzo Colle User interface for scheduling tasks
US20040122711A1 (en) * 2002-12-20 2004-06-24 Mediware Information Systems Inc. System and method for the optimization of the delivery of hospital services
US7937193B2 (en) 2003-02-27 2011-05-03 General Electric Company Method and apparatus for coordinating railway line of road and yard planners
US7725249B2 (en) * 2003-02-27 2010-05-25 General Electric Company Method and apparatus for congestion management
US7797087B2 (en) 2003-02-27 2010-09-14 General Electric Company Method and apparatus for selectively disabling train location reports
US20060212187A1 (en) * 2003-02-27 2006-09-21 Wills Mitchell S Scheduler and method for managing unpredictable local trains
US20060212188A1 (en) * 2003-02-27 2006-09-21 Joel Kickbusch Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics
US20050154634A1 (en) * 2003-03-08 2005-07-14 Robert Konop Human factors scheduling safety system
EP1614067A2 (de) * 2003-04-09 2006-01-11 Siemens Aktiengesellschaft Verfahren und system zur versorgung von mehreren service-dienstleistern mit technischen servicegeräten
US8292172B2 (en) * 2003-07-29 2012-10-23 General Electric Company Enhanced recordation device for rail car inspections
US8494945B2 (en) 2003-08-18 2013-07-23 Gilbert Leistner Methods for creating a group practice
CA2535835A1 (en) * 2003-08-18 2005-03-03 Gilbert Leistner System and method for identification of quasi-fungible goods and services, and financial instruments based thereon
US20070106532A1 (en) * 2003-09-12 2007-05-10 Agfa-Gevaert Planning of simultaneous examinations for a single patient within one time slot
EP1550969A3 (en) * 2003-12-11 2005-08-31 International Business Machines Corporation Method and system for dynamically and automatically set-up offerings for IT-services
US20050228707A1 (en) * 2003-12-23 2005-10-13 Robert Hendrickson Method for real-time allocation of customer service resources and opportunities for optimizing business and financial benefit
US20050154600A1 (en) * 2004-01-08 2005-07-14 American International Group, Inc. Extended work program
US7848946B2 (en) 2004-01-12 2010-12-07 Jda Software Group, Inc. Sales history decomposition
US20070150327A1 (en) * 2004-01-21 2007-06-28 Rncc Global Projects Project management method and system
US8275865B2 (en) * 2004-02-05 2012-09-25 International Business Machines Corporation Methods, systems and computer program products for selecting among alert conditions for resource management systems
US20050182582A1 (en) * 2004-02-12 2005-08-18 International Business Machines Corporation Adaptive resource monitoring and controls for a computing system
USD801981S1 (en) 2004-02-19 2017-11-07 Johnson Controls Technology Company Display screen with graphical user interface
US8340981B1 (en) 2004-03-02 2012-12-25 Cave Consulting Group, Inc. Method, system, and computer program product for physician efficiency measurement and patient health risk stratification utilizing variable windows for episode creation
WO2005084402A2 (en) * 2004-03-02 2005-09-15 Volt Information Sciences Inc. Method of and system for consultant re-seller business information transfer
US7739126B1 (en) 2004-03-02 2010-06-15 Cave Consulting Group Method, system, and computer program product for physician efficiency measurement and patient health risk stratification
US20050222884A1 (en) * 2004-03-31 2005-10-06 Ralf Ehret Capacity planning of resources
US20050228710A1 (en) * 2004-04-09 2005-10-13 Sam Richards Asset scheduling management in media production
US7809682B2 (en) * 2004-05-24 2010-10-05 Apple Inc. Data synchronization between multiple devices
US7877356B1 (en) 2004-05-24 2011-01-25 Apple Inc. Retaining intermediate states of shared groups of objects and notification of changes to shared groups of objects
US7383291B2 (en) * 2004-05-24 2008-06-03 Apple Inc. Method for sharing groups of objects
US7814231B2 (en) * 2004-05-24 2010-10-12 Apple Inc. Method of synchronizing between three or more devices
US7991637B1 (en) 2004-05-24 2011-08-02 Apple Inc. Freeform communication in calendaring system
US7908047B2 (en) * 2004-06-29 2011-03-15 General Electric Company Method and apparatus for run-time incorporation of domain data configuration changes
US20080288379A1 (en) * 2004-06-29 2008-11-20 Allin Patrick J Construction payment management system and method with automated electronic document generation features
EP1769452A4 (en) 2004-06-29 2008-07-02 Textura Corp CONSTRUCTION PAYMENT MANAGEMENT SYSTEM AND METHOD
US7925584B2 (en) * 2004-06-29 2011-04-12 Textura Corporation Construction payment management system and method with document tracking features
US9460441B2 (en) 2004-06-29 2016-10-04 Textura Corporation Construction payment management system and method with document exchange features
US8561076B1 (en) 2004-06-30 2013-10-15 Emc Corporation Prioritization and queuing of media requests
US20060015386A1 (en) * 2004-07-19 2006-01-19 Moore Dennis B Avoiding conflicting requests for resources or meetings
US8286125B2 (en) * 2004-08-13 2012-10-09 Cypress Semiconductor Corporation Model for a hardware device-independent method of defining embedded firmware for programmable systems
US7970639B2 (en) * 2004-08-20 2011-06-28 Mark A Vucina Project management systems and methods
US20060041461A1 (en) * 2004-08-20 2006-02-23 Mark Vucina Project management device and method
US7735091B2 (en) * 2004-08-23 2010-06-08 At&T Intellectual Property I, L.P. Methods, systems and computer program products for providing application services to a user
US8725547B2 (en) * 2004-08-24 2014-05-13 Epic Systems Corporation Utilization indicating schedule scanner
US20060053034A1 (en) * 2004-09-08 2006-03-09 Epic Systems Corporation System and method for providing a real-time status for managing encounters in health care settings
US7693735B2 (en) * 2004-11-23 2010-04-06 Etadirect Holdings, Inc. Dynamic schedule mediation
US20060122865A1 (en) * 2004-11-24 2006-06-08 Erik Preiss Procedural medicine workflow management
US20060143060A1 (en) * 2004-12-28 2006-06-29 General Electric Company Integrated scheduling system for health care providers
US8024355B2 (en) * 2004-12-29 2011-09-20 Sap Ag Dynamic capacity demand profile construction with a persisted capacity demand profile and a collision buffer
US7443303B2 (en) * 2005-01-10 2008-10-28 Hill-Rom Services, Inc. System and method for managing workflow
US7844480B2 (en) * 2005-01-27 2010-11-30 International Business Machines Corporation Method and system for planning and managing multiple projects on demand with critical chain and replenishment
US20060177041A1 (en) * 2005-02-04 2006-08-10 Michael Warner Method and system to project staffing needs using predictive modeling
EP1913534A4 (en) * 2005-02-11 2010-07-07 Volt Inf Sciences Inc PROJECT WORK CHANGING IN A PLAN / AREA MANAGEMENT AND BUSINESS INFORMATION SYNERGY SYSTEM AND METHOD
WO2006094885A1 (en) 2005-03-04 2006-09-14 Quadrat Method for processing a linked list of time segments
WO2006094882A1 (en) * 2005-03-04 2006-09-14 Quadrat Method and user interface for managing and displaying solutions for multiple resources in an appointment scheduling system.
BRPI0608008A2 (pt) * 2005-03-14 2009-11-03 Gen Electric sistema e método para o planejamento de pátio ferroviário
US20060218027A1 (en) * 2005-03-22 2006-09-28 Carrion Veronica L System and method for single user interface window event scheduling
WO2006121972A2 (en) * 2005-05-06 2006-11-16 Stereoraxis, Inc. Preoperative and intra-operative imaging-based procedure workflow with complexity scoring
EP1888292A4 (en) * 2005-05-25 2010-08-25 Romeena Pty Ltd As Trustee For TRACKING AN INSTRUMENT
CN101263521A (zh) * 2005-08-01 2008-09-10 伏特资讯科学公司 外包式服务水平协议供应管理系统及方法
US10157355B2 (en) 2005-11-15 2018-12-18 General Electric Company Method to view schedule interdependencies and provide proactive clinical process decision support in day view form
US20070143169A1 (en) * 2005-12-21 2007-06-21 Grant Chad W Real-time workload information scheduling and tracking system and related methods
US20070162315A1 (en) * 2006-01-06 2007-07-12 Microsoft Corporation Space reservation system
US8090725B1 (en) 2006-01-13 2012-01-03 CareerBuilder, LLC Method and system for matching data sets of non-standard formats
US8103679B1 (en) 2006-01-13 2012-01-24 CareerBuilder, LLC Method and system for matching data sets of non-standard formats
US8375026B1 (en) 2006-01-13 2013-02-12 CareerBuilder, LLC Method and system for matching data sets of non-standard formats
US20070168304A1 (en) * 2006-01-18 2007-07-19 Hletko Paul M Method of financing mobile assets
US7474980B2 (en) * 2006-01-24 2009-01-06 The United States Of America As Represented By The Secretary Of The Army Automated tool for monitoring archaeological sites (ATMAS™)
KR100678126B1 (ko) * 2006-03-24 2007-02-02 삼성전자주식회사 이동 통신 단말기에서의 중복 일정 관리 방법
US7603212B2 (en) * 2006-03-30 2009-10-13 Honeywell International, Inc. Real time planning and scheduling for a team of unmanned vehicles
US7710999B2 (en) * 2006-04-27 2010-05-04 Alcatel Lucent Policy calendar
US20070260497A1 (en) * 2006-05-02 2007-11-08 Wolfgang Daum Method of planning train movement using a front end cost function
US7797088B2 (en) * 2006-05-02 2010-09-14 General Electric Company Method and apparatus for planning linked train movements
US8498762B2 (en) * 2006-05-02 2013-07-30 General Electric Company Method of planning the movement of trains using route protection
US7734383B2 (en) * 2006-05-02 2010-06-08 General Electric Company Method and apparatus for planning the movement of trains using dynamic analysis
US20070276716A1 (en) * 2006-05-25 2007-11-29 Akihiro Kosugi Method For Retrieval of Available Intervals
US7680750B2 (en) * 2006-06-29 2010-03-16 General Electric Company Method of planning train movement using a three step optimization engine
US8082071B2 (en) * 2006-09-11 2011-12-20 General Electric Company System and method of multi-generation positive train control system
WO2008048591A2 (en) * 2006-10-18 2008-04-24 Mediviz Systems, Inc. Medical decision support system and method
US20080109267A1 (en) * 2006-11-02 2008-05-08 International Business Machines Corporation Online startup of an innovation project
US8433461B2 (en) * 2006-11-02 2013-04-30 General Electric Company Method of planning the movement of trains using pre-allocation of resources
US20080115077A1 (en) * 2006-11-09 2008-05-15 International Business Machines Corporation Persistent status indicator for calendar
CN1968147B (zh) * 2006-11-27 2010-04-14 华为技术有限公司 业务处理方法、网络设备及业务处理系统
US8306883B2 (en) * 2007-04-30 2012-11-06 Textura Corporation Construction payment management systems and methods with specified billing features
US8522258B1 (en) 2007-06-15 2013-08-27 At&T Mobility Ii Llc Event handling system
US8571905B2 (en) 2007-07-16 2013-10-29 IT Casino Solutions, LLC Casino operations management system
US8239232B2 (en) 2007-07-17 2012-08-07 At&T Intellectual Property I, L.P. Methods, systems, and computer-readable media for providing commitments information relative to a turf
US20090024435A1 (en) * 2007-07-17 2009-01-22 Robert Ingman Methods, Systems, and Computer-Readable Media for Providing Notification of a Last Job Dispatch
US8341547B2 (en) * 2007-07-17 2012-12-25 At&T Intellectual Property I, L.P. Methods, systems, and computer-readable media for providing contact information at turf level
US8249905B2 (en) 2007-07-17 2012-08-21 At&T Intellectual Property I, Lp Methods, systems, and computer-readable media for providing future job information
US8069072B2 (en) * 2007-07-17 2011-11-29 At&T Intellectual Property I, Lp Methods, systems, and computer-readable media for providing an indication of hightime
US8352302B2 (en) 2007-07-17 2013-01-08 At&T Intellectual Property I, L.P. Methods, systems, and computer-readable media for determining a plurality of turfs from where to reallocate a workforce to a given turf
US8380744B2 (en) 2007-07-17 2013-02-19 At&T Intellectual Property I, L.P. Methods, systems, and computer-readable media for generating a report indicating job availability
US8060401B2 (en) 2007-07-17 2011-11-15 At&T Intellectual Property I, Lp Methods, systems, and computer-readable media for providing an indication of a schedule conflict
US20090024438A1 (en) * 2007-07-17 2009-01-22 Robert Ingman Methods, Systems, and Computer-Readable Media for Providing Workforce To Load Information
WO2009012454A1 (en) * 2007-07-18 2009-01-22 Chevron U.S.A. Inc. Systems and methods for increasing safety and efficiency in oil field operations
US20090023431A1 (en) * 2007-07-19 2009-01-22 Hewlett-Packard Development Company, L.P. Systems and Methods for Communicating with a Network Switch
US20090177535A1 (en) * 2007-09-18 2009-07-09 Pmp Corporation System and method for monitoring and executing substitute fulfillment
US20090125368A1 (en) * 2007-10-16 2009-05-14 Vujicic Jovo John System and Method for Scheduling Work Orders
EP2060986B1 (en) 2007-11-13 2019-01-02 Karl Storz SE & Co. KG System and method for management of processes in a hospital and/or in an operating room
US8180657B2 (en) * 2007-12-31 2012-05-15 International Business Machines Corporation System and method for event slot negotiation
US8140366B2 (en) * 2008-01-04 2012-03-20 Frontline Technologies, Inc. Method, system and program product for filling job orders
US20090187563A1 (en) * 2008-01-22 2009-07-23 Geospot, Inc. Methods for Generating and Indicating a Time Relevant Status for an Operating Entity
JP5044820B2 (ja) * 2008-01-24 2012-10-10 インターナショナル・ビジネス・マシーンズ・コーポレーション 工程管理を行うシステム、工程管理方法およびプログラム
US20090204460A1 (en) * 2008-02-13 2009-08-13 International Business Machines Corporation Method and System For Workforce Optimization
US20090204461A1 (en) * 2008-02-13 2009-08-13 International Business Machines Corporation Method and system for workforce optimization
US8352296B2 (en) * 2008-04-18 2013-01-08 Microsoft Corporation Managing real time meeting room status
US8635126B2 (en) 2010-11-17 2014-01-21 It Casino Solutions Llc Casino operations management system
US8301464B1 (en) 2008-07-18 2012-10-30 Cave Consulting Group, Inc. Method and system for producing statistical analysis of medical care information
US11244416B2 (en) 2008-07-18 2022-02-08 Cave Consulting Group, Inc. System, method, and graphical user interface for identifying medical care providers outside a process-of-care standard
US8010382B2 (en) 2008-09-16 2011-08-30 General Electric Company Systems and methods for self-updating intelligent procedure duration estimation for patient scheduling
US20100088140A1 (en) * 2008-10-06 2010-04-08 Lahav Gil Automated systems and methods for time management
WO2010066023A1 (en) * 2008-12-12 2010-06-17 Smart Technologies Ulc System for supporting coordination of resources for events in an organization
US20100179854A1 (en) * 2009-01-15 2010-07-15 Shafer Steven L Scheduling System and Method
US9483807B2 (en) * 2009-03-26 2016-11-01 Laguna Mena Inc Hospital communication system
EP2256679A1 (en) * 2009-05-29 2010-12-01 Siemens Aktiengesellschaft Customizable scheduling tool, manufacturing executing system comprising said tool and method of using said tool
WO2011014442A1 (en) * 2009-07-27 2011-02-03 Nextgen Healthcare Information Systems, Inc. Systematic rule-based workflow tasking and event scheduling
WO2011013227A1 (ja) * 2009-07-30 2011-02-03 株式会社日立製作所 人員配置システム及びサーバ
AU2010282417A1 (en) * 2009-08-12 2012-03-08 Volt Information Sciences, Inc System and method for productizing human capital labor employment positions/jobs
US8260648B2 (en) * 2009-09-09 2012-09-04 King Fahd University Of Petroleum And Minerals Process scheduling optimization method
US20130103444A1 (en) * 2011-10-21 2013-04-25 Epic Systems Corporation Group scheduling and assignment of resources
US20130290008A1 (en) * 2012-04-27 2013-10-31 Oracle International Corporation Staff assignment for clinical trials
US9021376B2 (en) * 2012-07-02 2015-04-28 International Business Machines Corporation Task timer
US20140108023A1 (en) * 2012-10-12 2014-04-17 Harold Arkoff Operating room management system with mobile app
US9268604B1 (en) * 2012-12-11 2016-02-23 The Boeing Company Automated allocation of vehicle systems for different specified vehicle testing tasks
US20140288941A1 (en) * 2013-03-25 2014-09-25 Arizona S-Corp. Case scheduling, logistics management and associated data management
US20150006341A1 (en) * 2013-06-27 2015-01-01 Metratech Corp. Billing transaction scheduling
US10241654B2 (en) * 2013-12-20 2019-03-26 Dassault Systemes Americas Corp. Computer method and apparatus for automated scheduling
US10037821B2 (en) * 2013-12-27 2018-07-31 General Electric Company System for integrated protocol and decision support
CA2846592C (en) * 2014-03-14 2023-01-03 Mxi Technologies Ltd. Resource planning method and system
US10055703B2 (en) * 2015-01-13 2018-08-21 Accenture Global Services Limited Factory management system
US10204320B2 (en) * 2015-04-30 2019-02-12 Teletracking Technologies, Inc. Integrated system for producing procedural data change sets communicated to client devices
US11037673B2 (en) 2015-09-04 2021-06-15 Materials Management Microsystems, Inc. Systems and methods for tracking surgical inventory and sterilization
US20170083842A1 (en) * 2015-09-21 2017-03-23 International Business Machines Corporation Risk evaluation in parallelizing projects
US11188878B2 (en) * 2015-09-22 2021-11-30 International Business Machines Corporation Meeting room reservation system
US11022421B2 (en) 2016-01-20 2021-06-01 Lucent Medical Systems, Inc. Low-frequency electromagnetic tracking
US20190156293A1 (en) * 2017-11-17 2019-05-23 Qualcomm Incorporated User location and activity based smart reminders
US11055647B2 (en) * 2018-03-22 2021-07-06 Microsoft Technology Licensing, Llc Resource conflict detection and communication
US10192410B1 (en) * 2018-04-06 2019-01-29 Seeca Medical, Inc. System for providing notification of a status of a patient examination and related methods
EP3772029A1 (en) 2019-07-31 2021-02-03 Ciaomanager Srl Method and apparatus for assigning rooms to reservations in hotels
US11056232B2 (en) 2019-08-18 2021-07-06 Medigate tech Ltd. Medication usage auditing based on analysis of infusion pump network traffic
US10600512B1 (en) 2019-08-18 2020-03-24 Medigate tech Ltd. Network-based calculation of prevalence of repeated medical imaging
US10825566B1 (en) 2019-08-18 2020-11-03 Medigate tech Ltd. Ensuring availability of medical devices to receive maintenance
US10658079B1 (en) 2019-08-18 2020-05-19 Medigate tech Ltd. Crowd-based recommendations of a version of firmware for medical devices
US12062434B2 (en) * 2020-04-10 2024-08-13 GE Precision Healthcare LLC Systems and methods for resource availability management
CN111522849A (zh) * 2020-04-22 2020-08-11 深圳市春蚕智能信息技术有限公司 数据库动态访问方法、服务器及存储介质
EP4232979A4 (en) * 2020-10-26 2024-10-16 Showrunnr Inc SYSTEM FOR SYNCHRONIZING ENTERTAINMENT PRODUCTION RESOURCE SUPPLY WITH PRODUCTION PROJECT PLANNING
US20220406447A1 (en) * 2021-06-22 2022-12-22 Olympus Corporation Surgical support system, surgical support method, and information storage medium
US20230098876A1 (en) * 2021-09-24 2023-03-30 Cerner Innovation, Inc. Generation of utilization models to improve surgical block utilization

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59214964A (ja) * 1983-05-20 1984-12-04 Hitachi Ltd 対話型スケジユ−リング方式
JPS6123003A (ja) * 1984-07-09 1986-01-31 Hitachi Ltd スケジユ−ル作成方法

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT286004B (de) * 1969-09-15 1970-11-25 Franz Dr Gelder Verfahren und Einrichtung zur optischen Darstellung betriebswirtschaftlicher Größen
US4019027A (en) * 1975-05-09 1977-04-19 Kelley William L Apparatus and method for schedule monitoring and control
US4336589A (en) * 1980-04-07 1982-06-22 Rapistan Division, Lear Siegler, Inc. Warehousing monitor and control system
US4547851A (en) * 1983-03-14 1985-10-15 Kurland Lawrence G Integrated interactive restaurant communication method for food and entertainment processing
US4700318A (en) * 1983-12-09 1987-10-13 Stuart Ockman Project construction with depiction means and methods
US4591983A (en) * 1984-07-09 1986-05-27 Teknowledge, Inc. Hierarchical knowledge system
US4646238A (en) * 1984-10-26 1987-02-24 Analog Devices, Inc. Material requirements planning system and procedures for use in process industries
US4744028A (en) * 1985-04-19 1988-05-10 American Telephone And Telegraph Company, At&T Bell Laboratories Methods and apparatus for efficient resource allocation
US4835683A (en) * 1986-05-23 1989-05-30 Active English Information Systems, Inc. Expert information system and method for decision record generation
EP0329911B1 (en) * 1988-02-08 1995-03-22 International Business Machines Corporation Method for scheduling meetings

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59214964A (ja) * 1983-05-20 1984-12-04 Hitachi Ltd 対話型スケジユ−リング方式
JPS6123003A (ja) * 1984-07-09 1986-01-31 Hitachi Ltd スケジユ−ル作成方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04119461A (ja) * 1990-09-10 1992-04-20 Fujitsu Ltd 知識ベースシステムにおけるスケジューリング方法
JPH0757006A (ja) * 1993-08-17 1995-03-03 Nec Corp リソース管理装置

Also Published As

Publication number Publication date
IL87663A (en) 1992-06-21
IL87663A0 (en) 1989-02-28
CA1294054C (en) 1992-01-07
US4937743A (en) 1990-06-26
AU622371B2 (en) 1992-04-02
JP2634070B2 (ja) 1997-07-23
EP0306965A3 (en) 1991-07-10
AU2206088A (en) 1989-03-23
EP0306965A2 (en) 1989-03-15

Similar Documents

Publication Publication Date Title
JPH01162977A (ja) 資源の動的管理方法と装置
US20220319683A1 (en) System and method for clinical workforce management interface
Robinson Design for unanticipated use.....
Plaisant et al. LifeLines: visualizing personal histories
US6854088B2 (en) Graphical user interface for project data
US20190354905A1 (en) Graphical User Interface for a Restaurant Management System
KR100573753B1 (ko) 의료 스케줄 및/또는 기록 지원 시스템 및 그 시스템에의해 판독 가능한 프로그램 저장 장치
US20060053034A1 (en) System and method for providing a real-time status for managing encounters in health care settings
US20060004605A1 (en) System and method for a comprehensive interactive graphical representation of a health care facility for managing patient care and health care facility resources
US12068071B2 (en) System and method of dynamically generating work assignments
US20200380451A1 (en) Method and system for scheduling shifts and employee leave management
US5247284A (en) Graphical method of inputing time values
GB2337677A (en) A method and system for displaying and editing a resource schedule
US20230090000A1 (en) Operating room management system with mobile app
JP3717425B2 (ja) 医療項目確認支援システム及び方法、並びにコンピュータプログラム
JP2018088238A (ja) サービス支援装置、サービス支援方法及びプログラム
CN105242899A (zh) 在用于查房的便携式监护仪中显示信息的方法及装置
US20140278521A1 (en) Location limited check-in kiosk method and apparatus
US20060015383A1 (en) Generic contextual floor plans
JP4891678B2 (ja) 電子カルテシステム及びその電子カルテサーバの表示方法
WO2017196947A1 (en) Personalized user interfaces presenting care tasks
JP2006133830A (ja) スケジュール管理方法、スケジュール管理プログラム、並びにそのプログラムを記録したコンピュータ読み取り可能な記録媒体
JP5095006B1 (ja) 医療施設空ベット管理装置およびその方法
EP1628211B1 (en) Method for providing a user interface
CN115512825A (zh) 外科支援系统、外科支援方法和信息存储介质