JP7484955B2 - 建設機械 - Google Patents
建設機械 Download PDFInfo
- Publication number
- JP7484955B2 JP7484955B2 JP2022048872A JP2022048872A JP7484955B2 JP 7484955 B2 JP7484955 B2 JP 7484955B2 JP 2022048872 A JP2022048872 A JP 2022048872A JP 2022048872 A JP2022048872 A JP 2022048872A JP 7484955 B2 JP7484955 B2 JP 7484955B2
- Authority
- JP
- Japan
- Prior art keywords
- passage
- construction machine
- handle
- lifting member
- opening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims description 77
- 230000001174 ascending effect Effects 0.000 claims description 3
- 230000002265 prevention Effects 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 description 19
- 238000009434 installation Methods 0.000 description 1
Images
Landscapes
- Component Parts Of Construction Machinery (AREA)
- Control And Safety Of Cranes (AREA)
Description
最初に本発明の実施態様を列記して説明する。
以下、適宜図面を参照しつつ、本発明の実施の形態を詳説する。
図1から図3に示すように、当該建設機械10は、第1通路1と、第1通路1から下方に延びる昇降部材2とを備える。また、当該建設機械10は、第1通路1の下方に配置される第2通路3を備える。図3に示すように、第1通路1には、昇降部材2への連絡用の開口11と、開口11の周縁部に配置されたヒンジ軸12を中心に回転可能で、開口11を閉塞可能な蓋体13とが設けられている。
旋回体30は、上述のようにポスト20に回転可能に支持される旋回フレーム31を有する。旋回フレーム31には、作業部材32、ガード33、キャブ34等が配置されている。作業部材32としては、特に限定されるものではなく、当該建設機械10の用途に応じて選択可能である。ガード33は、エンジン等の部材を内部に収容する構造体であり、その内部空間がエンジンルームを構成している。ガード33は、第1通路1に沿うように設けられており、開口11に隣接する位置を含んで配置されている。キャブ34は、オペレータが搭乗する運転室である。キャブ34は、第1通路1からアクセスできるように設けられており、本実施形態では、旋回フレーム31の右側前方(作業部材32が配置された側を「前」とした場合の右側前方)に配置されている。
第1通路1は、フレーム1aと、このフレーム1aに配置される床部材1bとを含む。第1通路1には、フレーム1aによって画定される隙間として、オペレータ等が通過可能な上述の開口11が設けられている。
蓋体13は、例えば平面視矩形状である。蓋体13は、その外縁に沿って設けられるフレーム13aと、このフレーム13aに配置される床部材13bとを含む。図4及び図5に示すように、蓋体13は、開口11を閉塞する第1位置P1と、開口11に対して上方に回転された第2位置P2とで保持可能に構成されている。
昇降部材2は、第1通路1の開口11に連絡するように設けられている。この構成によると、昇降部材2を第1通路1の直下に配置でき、昇降部材2を第1通路1よりも外側に張り出して設けることを要しない。その結果、建設機械10全体のコンパクト化を図ることができる。また、この構成によると、張り出し部分を補強するための部材を設けなくてもよいので、部品点数を削減できると共に、通路の安全性を確保しやすい。
図3に示すように、第2通路3は、フレーム3aと、このフレーム3aに配置される床部材3bとを含む。第2通路3は、第1通路1に対して、鉛直方向(当該建設機械10を水平面に配置した状態における鉛直方向)に間隔を空けて配置されている。
当該建設機械10は、ポスト20の周面に沿って、第2通路3に連絡可能な第3通路21を有する。第3通路21は、ポストの周面を螺旋状又は部分螺旋状に巻回するように配置されている。第3通路21は、旋回体30を回転させた際に、第2通路3と接触しないように設けられている。
当該建設機械10によると、オペレータ等は、蓋体13を第2位置P2に保持することで昇降部材2によって昇降することができると共に、蓋体13を第1位置P1に保持することで蓋体13を足場としてメンテナンス作業を行うことができる。当該建設機械10は、蓋体13が、第1位置P1における下面側に取っ手15を有しているので、オペレータ等は、取っ手15を把持して蓋体13を第2位置P2に容易に揺動できると共に、この蓋体13を第2位置P2に保持した状態で、取っ手15を昇降部材2用の手摺りとして使用することができる。従って、当該建設機械10は、メンテナンス作業等の安全性を確保しつつ、昇降部材2による昇降を容易かつ確実に行うことができる。
上記実施形態は、本発明の構成を限定するものではない。従って、上記実施形態は、本明細書の記載及び技術常識に基づいて上記実施形態各部の構成要素の省略、置換又は追加が可能であり、それらは全て本発明の範囲に属するものと解釈されるべきである。
1a、3a、13a フレーム
1b、3b、13b 床部材
2 昇降部材
2a 踏み板
3 第2通路
10 建設機械
11 開口
12 ヒンジ軸
13 蓋体
14 柵体
14a 手摺り部
15 取っ手
15a 把持部
15b 接続部
20 ポスト
21 第3通路
30 旋回体
31 旋回フレーム
32 作業部材
33 ガード
34 キャブ
P1 第1位置
P2 第2位置
Claims (8)
- 第1通路と、
上記第1通路から下方に延びる昇降部材と
を備える建設機械であって、
上記第1通路に、上記昇降部材への連絡用の開口と、上記開口の周縁部に配置されたヒンジ軸を中心に回転可能で、上記開口を閉塞可能な蓋体とが設けられており、
上記蓋体が、上記開口を閉塞する第1位置と、上記開口に対して上方に回転された第2位置とで保持可能に構成されており、
上記蓋体が、上記第1位置における下面側に開閉用の取っ手を有しており、
上記取っ手が、上記第2位置で、上記昇降部材用の手摺りとなるように設けられており、
上記第1通路の側部に沿って落下防止用の柵体が配置されており、
上記蓋体が、上記第2位置で上記柵体に固定される建設機械。 - 上記取っ手が、上記第2位置で上記昇降部材の昇降方向に延びる把持部を有する請求項1に記載の建設機械。
- 上記取っ手が、棒部材又はパイプ部材である請求項2に記載の建設機械。
- 上記柵体が、上記蓋体が第2位置に配置された状態で、上記取っ手に連続して配置される手摺り部を有する請求項1から請求項3のいずれか1項に記載の建設機械。
- 上記昇降部材が階段部材である請求項1から請求項4のいずれか1項に記載の建設機械。
- 上下方向に延びるポストと、
上記ポストに回転可能に支持される旋回フレームを有する旋回体と
を備えており、
上記第1通路が上記旋回フレームに配置されている請求項1から請求項5のいずれか1項に記載の建設機械。 - 上記第1通路の下方に配置される第2通路をさらに備えており、
上記昇降部材が、上記第1通路と上記第2通路とを連絡するように設けられている請求項6に記載の建設機械。 - 上記昇降部材及び上記第2通路が、上記第1通路と一体的に旋回するように上記旋回体に配置されている請求項7に記載の建設機械。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2022048872A JP7484955B2 (ja) | 2022-03-24 | 2022-03-24 | 建設機械 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2022048872A JP7484955B2 (ja) | 2022-03-24 | 2022-03-24 | 建設機械 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2023142145A JP2023142145A (ja) | 2023-10-05 |
JP7484955B2 true JP7484955B2 (ja) | 2024-05-16 |
Family
ID=88206565
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2022048872A Active JP7484955B2 (ja) | 2022-03-24 | 2022-03-24 | 建設機械 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7484955B2 (ja) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019123564A (ja) | 2018-01-11 | 2019-07-25 | コベルコ建機株式会社 | 作業機械 |
WO2020156709A1 (en) | 2019-02-01 | 2020-08-06 | Siemens Gamesa Renewable Energy A/S | A wind turbine and a method for transporting cargo inside a wind turbine |
JP2021188395A (ja) | 2020-06-01 | 2021-12-13 | 鹿島建設株式会社 | 養生蓋 |
-
2022
- 2022-03-24 JP JP2022048872A patent/JP7484955B2/ja active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019123564A (ja) | 2018-01-11 | 2019-07-25 | コベルコ建機株式会社 | 作業機械 |
WO2020156709A1 (en) | 2019-02-01 | 2020-08-06 | Siemens Gamesa Renewable Energy A/S | A wind turbine and a method for transporting cargo inside a wind turbine |
JP2021188395A (ja) | 2020-06-01 | 2021-12-13 | 鹿島建設株式会社 | 養生蓋 |
Also Published As
Publication number | Publication date |
---|---|
JP2023142145A (ja) | 2023-10-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4270239B2 (ja) | 建設機械 | |
JP5309976B2 (ja) | 作業機械 | |
AU2013202936B2 (en) | Counterweight system for an industrial machine | |
JP2000247560A5 (ja) | ||
JP4190641B2 (ja) | エレベーター装置 | |
JP7484955B2 (ja) | 建設機械 | |
JP5257117B2 (ja) | 建設機械のステップ構造 | |
JP6649638B2 (ja) | 作業機械 | |
JP2006193260A (ja) | 階段段差解消装置 | |
JP5404660B2 (ja) | 建設機械 | |
JP2843807B2 (ja) | 旋回作業車 | |
JP5054802B2 (ja) | 建設機械 | |
JP5683331B2 (ja) | 建設機械のステップ付きキャブフロントガード | |
JP2018096174A (ja) | 建設機械のヘッドガード | |
JP5841504B2 (ja) | 旋回作業機 | |
JP6286344B2 (ja) | 建設機械 | |
JP6704871B2 (ja) | 建設機械 | |
JP7507711B2 (ja) | アースドリル機 | |
JP4804144B2 (ja) | 工事用エレベーター類のクライミング工法におけるトップシーブ装置 | |
JP3610706B2 (ja) | 建設機械の手すり | |
JP2004238864A (ja) | 建設機械のステップ装置 | |
JP2004238916A (ja) | 土木・建設機械の工具箱兼用ステップ装置 | |
JP2007170018A (ja) | 建設機械のステップ構造 | |
JP7388275B2 (ja) | 建設機械 | |
CA2169017C (en) | Dragline with high headroom between upper and lower structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20230113 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20240125 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20240130 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240319 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20240402 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20240415 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7484955 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |