JP4452053B2 - 軸ずれ測定装置 - Google Patents
軸ずれ測定装置 Download PDFInfo
- Publication number
- JP4452053B2 JP4452053B2 JP2003343442A JP2003343442A JP4452053B2 JP 4452053 B2 JP4452053 B2 JP 4452053B2 JP 2003343442 A JP2003343442 A JP 2003343442A JP 2003343442 A JP2003343442 A JP 2003343442A JP 4452053 B2 JP4452053 B2 JP 4452053B2
- Authority
- JP
- Japan
- Prior art keywords
- axis
- shaft
- bearing
- signal
- distance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000005259 measurement Methods 0.000 claims description 51
- 238000006073 displacement reaction Methods 0.000 claims description 24
- 230000008878 coupling Effects 0.000 claims description 7
- 238000010168 coupling process Methods 0.000 claims description 7
- 238000005859 coupling reaction Methods 0.000 claims description 7
- 239000007789 gas Substances 0.000 description 63
- 239000002184 metal Substances 0.000 description 16
- 230000001133 acceleration Effects 0.000 description 13
- 238000010586 diagram Methods 0.000 description 10
- 239000000446 fuel Substances 0.000 description 10
- 230000008859 change Effects 0.000 description 8
- 239000000567 combustion gas Substances 0.000 description 6
- 238000009434 installation Methods 0.000 description 6
- 230000004044 response Effects 0.000 description 6
- 101150093282 SG12 gene Proteins 0.000 description 3
- 238000012790 confirmation Methods 0.000 description 3
- 238000001816 cooling Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 238000007599 discharging Methods 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 241000255777 Lepidoptera Species 0.000 description 1
- 230000004913 activation Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000002791 soaking Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N25/00—Investigating or analyzing materials by the use of thermal means
- G01N25/16—Investigating or analyzing materials by the use of thermal means by investigating thermal coefficient of expansion
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/16—Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
Landscapes
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
- Length Measuring Devices With Unspecified Measuring Means (AREA)
- Control Of Turbines (AREA)
Description
図1のように構成される一軸コンバインドプラントにおいて、軸3a及び軸5aそれぞれの中心位置のずれを測定するための軸ずれ測定装置が、クラッチ7周辺に設置された後述する各種センサと制御装置10内の軸ずれ演算部101(図5)とによって構成される。図2に、クラッチ7周辺に設置される各種センサの設置位置を示す。
Δhi2=h0×τ×(Ti2−To2) …(2)
Δd2=((GC2−GA2)+(GB2−GD2))/(2×21/2) …(4)
ΔS2=(Gu2−Gd2)/ds2 …(6)
−(Δhi2+Δd2)+ΔS2×L2 …(7)
次に、上述のように軸3a,5aの軸ずれを測定する軸ずれ測定装置を備える一軸コンバインドプラントにおける制御装置10の構成の一部について、以下に説明する。図5は、制御装置10の構成の一部を示すブロック図である。
a.目標回転速度がRaより低いとき
信号M2がハイとなるとともに、信号M1,M3〜M6がローとなるため、セレクタS9,S10,S13によって、信号発生器SG13の昇速率R13が選択され、スイッチSW1を介して出力される。
b.目標回転速度がRa以上且つRbより低いとき
b−1.コールドモード
信号M2,M5がハイとなるとともに、信号M1,M3,M4,M6がローとなるため、セレクタS1,S2,S9,S10,S13によって、信号発生器SG1の昇速率R1が選択され、スイッチSW1を介して出力される。
b−2.ウォームモード
信号M2,M3,M5がハイとなるとともに、信号M1,M4,M6がローとなるため、セレクタS1,S2,S9,S10,S13によって、信号発生器SG2の昇速率R2が選択され、スイッチSW1を介して出力される。
b−3.ホットモード
信号M2,M4,M5がハイとなるとともに、信号M1,M3,M6がローとなるため、セレクタS2,S9,S10,S13によって、信号発生器SG3の昇速率R3が選択され、スイッチSW1を介して出力される。
c.目標回転速度がRb以上のとき
c−1.コールドモード
信号M2,M5,M6がハイとなるとともに、信号M1,M3,M4がローとなるため、セレクタS3,S4,S10,S13によって、信号発生器SG4の昇速率R4が選択され、スイッチSW1を介して出力される。
c−2.ウォームモード
信号M2,M3,M5,M6がハイとなるとともに、信号M1,M4がローとなるため、セレクタS3,S4,S10,S13によって、信号発生器SG5の昇速率R5が選択され、スイッチSW1を介して出力される。
c−3.ホットモード
信号M2,M4〜M6がハイとなるとともに、信号M1,M3がローとなるため、セレクタS4,S10,S13によって、信号発生器SG6の昇速率R6が選択され、スイッチSW1を介して出力される。
a.目標回転速度がRaより低いとき
信号M1がハイとなるとともに、信号M2〜M6がローとなるため、セレクタS11〜S13によって、信号発生器SG14の昇速率R14が選択され、スイッチSW1を介して出力される。
b.目標回転速度がRa以上且つRbより低いとき
b−1.コールドモード
信号M1,M5がハイとなるとともに、信号M2〜M4,M6がローとなるため、セレクタS5,S6,S11〜S13によって、信号発生器SG7の昇速率R7が選択され、スイッチSW1を介して出力される。
b−2.ウォームモード
信号M1,M3,M5がハイとなるとともに、信号M2,M4,M6がローとなるため、セレクタS5,S6,S11〜S13によって、信号発生器SG8の昇速率R8が選択され、スイッチSW1を介して出力される。
b−3.ホットモード
信号M1,M4,M5がハイとなるとともに、信号M2,M3,M6がローとなるため、セレクタS6,S11〜S13によって、信号発生器SG9の昇速率R9が選択され、スイッチSW1を介して出力される。
c.目標回転速度がRb以上のとき
c−1.コールドモード
信号M1,M5,M6がハイとなるとともに、信号M2,M3,M4がローとなるため、セレクタS7,S8,S12,S13によって、信号発生器SG10の昇速率R10が選択され、スイッチSW1を介して出力される。
c−2.ウォームモード
信号M1,M3,M5,M6がハイとなるとともに、信号M2,M4がローとなるため、セレクタS7,S8,S12,S13によって、信号発生器SG11の昇速率R11が選択され、スイッチSW1を介して出力される。
c−3.ホットモード
信号M1,M4〜M6がハイとなるとともに、信号M2,M3がローとなるため、セレクタS8,S12,S13によって、信号発生器SG12の昇速率R12が選択され、スイッチSW1を介して出力される。
a.コールドモード
信号M2がハイとなるとともに、信号M1,M3,M4がローとなるため、セレクタS21,S22,S25によって、信号発生器SG21のヒートソーク時間T1が選択され、スイッチSW2を介して出力される。
b.ウォームモード
信号M2,M3がハイとなるとともに、信号M1,M4がローとなるため、セレクタS21,S22,S25によって、信号発生器SG22のヒートソーク時間T2が選択され、スイッチSW2を介して出力される。
c.ホットモード
信号M2,M4がハイとなるとともに、信号M1,M3がローとなるため、セレクタS22,S25によって、信号発生器SG23のヒートソーク時間T3が選択され、スイッチSW2を介して出力される。
a.コールドモード
信号M1がハイとなるとともに、信号M2〜M4がローとなるため、セレクタS23,S24,S25によって、信号発生器SG24のヒートソーク時間T4が選択され、スイッチSW2を介して出力される。
b.ウォームモード
信号M1,M3がハイとなるとともに、信号M2,M4がローとなるため、セレクタS23,S24,S25によって、信号発生器SG25のヒートソーク時間T5が選択され、スイッチSW2を介して出力される。
c.ホットモード
信号M1,M4がハイとなるとともに、信号M2,M3がローとなるため、セレクタS24,S25によって、信号発生器SG26のヒートソーク時間T6が選択され、スイッチSW2を介して出力される。
次に、図1に示す一軸コンバインドプラントの起動時の動作について、以下に説明する。図9は、一軸コンバインドプラントの起動時におけるプラント全体及びガスタービン3及び蒸気タービン5それぞれの負荷の値の変遷を表すタイミングチャートである。尚、図9において、実線がプラント全体の負荷を、一点鎖線がガスタービン3の負荷を、点線が蒸気タービン5の負荷を、それぞれ表す。
2 燃焼器
3 ガスタービン
4 HRSG
5 蒸気タービン
6 発電機
7 クラッチ
8 復水器
9 煙突
10 制御装置
Claims (1)
- 第1回転体〔3〕の第1軸〔3a〕が挿入される第1軸受〔71〕の周方向の複数点に設けられた複数の第1径方向ギャップ計測センサ〔53A〜D〕と、
第2回転体〔5〕の第2軸〔5a〕が挿入される第2軸受〔73〕の周方向の複数点に設けられた複数の第2径方向ギャップ計測センサ〔54A〜D〕と、
前記第1径方向ギャップ計測センサ〔53A〜D〕で測定された前記第1軸受の周方向の複数点から前記第1軸までの距離より前記第1軸受の中心からの前記第1軸の軸心のずれ〔Δd1〕を求めるとともに、前記第2径方向ギャップ計測センサ〔54A〜D〕で測定された前記第2軸受の周方向の複数点から前記第2軸までの距離より前記第2軸受の中心からの前記第2軸の軸心のずれ〔Δd2〕を求め、前記第1及び第2軸の軸心のずれに基づいて前記第1及び第2軸の偏心軸ずれ量〔Δd1−Δd2〕を求める軸ずれ演算部〔101〕と、
を備え、
前記第1径方向ギャップ計測センサ〔53A〜D〕が、前記第1軸受〔71〕の軸方向に垂直な断面における水平面に対して垂直な直線に対して線対称となるとともに、前記第1軸受の中心に対して点対称となるように配置され、
前記第2径方向ギャップ計測センサ〔54A〜D〕が、前記第2軸受〔73〕の軸方向に垂直な断面における水平面に対して垂直な直線に対して線対称となるとともに、前記第2軸受の中心に対して点対称となるように配置され、
点対称となる2つの前記第1径方向ギャップ計測センサ〔53A〜D〕毎に、測定された前記第1軸〔3a〕との距離の差を求めた後、当該点対称となる2つの前記第1径方向ギャップ計測センサ毎に求められた前記第1軸との距離の差の平均を、前記第1軸受の中心からの前記第1軸の軸心のずれ〔Δd1〕とし、
点対称となる2つの前記第2径方向ギャップ計測センサ〔54A〜D〕毎に、測定された前記第2軸〔5a〕との距離の差を求めた後、当該点対称となる2つの前記第2径方向ギャップ計測センサ毎に求められた前記第2軸との距離の差の平均を、前記第2軸受の中心からの前記第2軸の軸心のずれ〔Δd2〕とし、
当該第1及び第2軸それぞれの軸心のずれの差を、前記第1及び第2軸の偏心軸ずれ量〔Δd1−Δd2〕とし、
更に、
前記第1軸〔3a〕の上側の第1定点〔u〕との距離を測定する第1軸方向ギャップ計測センサ〔55u〕と、
前記第1定点と同一面において前記第1軸の下側となる第2定点〔d〕との距離を測定する第2軸方向ギャップ計測センサ〔55d〕と、
前記第2軸の上側の第3定点〔u〕との距離を測定する第3軸方向ギャップ計測センサ〔56u〕と、
前記第3定点と同一面において前記第2軸の下側となる第4定点〔d〕との距離を測定する第4軸方向ギャップ計測センサ〔56d〕と、
を備え、
前記軸ずれ演算部において、前記第1及び第2軸方向ギャップ計測センサそれぞれで測定され前記第1及び第2定点との距離より前記第1軸の傾き〔ΔS1〕を求めるとともに、前記第3及び第4軸方向ギャップ計測センサそれぞれで測定された前記第3及び第4定点との距離より前記第2軸の傾き〔ΔS2〕を求め、前記第1及び第2軸の傾きに基づいて前記第1及び第2軸の傾き軸ずれ量〔ΔS1×L1+ΔS2×L2〕を求め、
前記第1及び第2軸方向ギャップ計測センサ〔55u、55d〕間の距離をd1とし、
前記第1及び第2軸方向ギャップ計測センサにより測定された前記第1及び第2定点〔u、d〕それぞれへの距離をdu1,dd1とし、
前記第1軸が支持されている支持点から前記第1及び第2軸が結合される結合点までの距離をD1とし、
前記第3及び第4軸方向ギャップ計測センサ〔56u、56d〕間の距離をd2とし、
前記第3及び第4軸方向ギャップ計測センサにより測定された前記第3及び第4定点〔u、d〕それぞれへの距離をdu2,dd2とし、
前記第2軸が支持されている支持点から前記第1及び第2軸が結合される結合点までの距離をD2としたとき、
D1×(du1−dd1)/d1+D2×(du2−dd2)/d2となる値に基づいて、前記第1及び第2軸の傾き軸ずれ量〔ΔS1×L1+ΔS2×L2〕を求め、
更に、
前記第1軸〔3a〕が挿入される第1軸受〔71〕を支持する第1軸受支持台〔72〕の温度を測定する第1温度センサ〔51〕と、
前記第2軸〔5a〕が挿入される第2軸受〔73〕を支持する第2軸受支持台〔74〕の温度を測定する第2温度センサ〔52〕と、
を備え、
前記軸ずれ演算部〔101〕において、前記第1温度センサで測定された温度より前記第1軸受支持台の伸び量〔Δhi1〕を求めるとともに、前記第2温度センサで測定された温度より前記第2軸受支持台の伸び量〔Δhi2〕を求め、前記第1及び第2軸受支持台の伸び量に基づいて前記第1及び第2軸の支持台軸ずれ量〔Δhi1−Δhi2〕を求め、
前記第1及び第2軸受支持台〔72、74〕の垂直変位量〔Δhi1、Δhi2〕の差を、前記第1及び第2軸〔3a、5a〕の総軸ずれ量〔d 0 〕の一部とし、
前記第1及び第2軸の総軸ずれ量は、前記第1回転体となるガスタービンと、前記第2回転体となる蒸気タービンと、これらの結合及び切り離しを行うクラッチとを制御する制御部へ供給されており、該制御部により、
起動時において、前記第1軸と前記第2軸とを前記クラッチで切り離した状態として、前記ガスタービンを起動させた後に前記蒸気タービンを起動させたとき、前記第1及び第2軸の軸ずれ量に基づいて、前記蒸気タービンのヒートソーク時間を設定し、
前記第1及び第2軸の軸ずれ量が大きいほど、前記蒸気タービンのヒートソーク時間の値を長くすることを特徴とする軸ずれ測定装置。
Priority Applications (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003343442A JP4452053B2 (ja) | 2003-10-01 | 2003-10-01 | 軸ずれ測定装置 |
| US10/942,133 US7175342B2 (en) | 2003-10-01 | 2004-09-16 | Shaft-misalignment-measuring device, a shaft-misalignment-measuring method, a single-shaft combined plant using the shaft-misalignment-measuring device and a start-up method of the single-shaft combined plant |
| CNB2004100119816A CN100402804C (zh) | 2003-10-01 | 2004-09-27 | 轴心差测量装置和方法 |
| CNA2008101082465A CN101298978A (zh) | 2003-10-01 | 2004-09-27 | 轴心差测量装置和方法 |
| DE102004047939A DE102004047939B4 (de) | 2003-10-01 | 2004-10-01 | Wellenfehlausrichtungs-Messvorrichtung, Wellenfehlausrichtungs-Messverfahren, kombinierte Anlage mit Einzelwelle mit Wellenfehlausrichtungs-Messvorrichtung und Anfahrverfahren der kombinierte Anlage mit Einzelwelle |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003343442A JP4452053B2 (ja) | 2003-10-01 | 2003-10-01 | 軸ずれ測定装置 |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2009272640A Division JP5123920B2 (ja) | 2009-11-30 | 2009-11-30 | 一軸コンバインドプラント及びこの一軸コンバインドプラントの起動方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2005106738A JP2005106738A (ja) | 2005-04-21 |
| JP4452053B2 true JP4452053B2 (ja) | 2010-04-21 |
Family
ID=34386279
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2003343442A Expired - Lifetime JP4452053B2 (ja) | 2003-10-01 | 2003-10-01 | 軸ずれ測定装置 |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US7175342B2 (ja) |
| JP (1) | JP4452053B2 (ja) |
| CN (2) | CN101298978A (ja) |
| DE (1) | DE102004047939B4 (ja) |
Families Citing this family (34)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7765082B2 (en) * | 2000-09-11 | 2010-07-27 | Axiam, Incorporated | System for optimal alignment of a shaft of a gas turbine |
| US8220245B1 (en) * | 2005-08-03 | 2012-07-17 | Candent Technologies, Inc. | Multi spool gas turbine system |
| EP1911939A1 (de) * | 2006-10-09 | 2008-04-16 | Siemens Aktiengesellschaft | Zielwinkelgeregelter Einkuppelvorgang |
| US20090193784A1 (en) * | 2008-01-31 | 2009-08-06 | General Electric Company | Power generating turbine systems |
| US20090193785A1 (en) * | 2008-01-31 | 2009-08-06 | General Electric Company | Power generating turbine systems |
| US20090193782A1 (en) * | 2008-01-31 | 2009-08-06 | General Electric Company | Power generating turbine systems |
| DE102008010916A1 (de) * | 2008-02-25 | 2009-08-27 | Prüftechnik Dieter Busch AG | Verfahren und Vorrichtung zur Ermittlung einer Ausrichtung von zwei drehbar gelagerten Maschinenteilen, einer Ausrichtung von zwei hohlzylinderförmigen Maschinenteilen oder zur Prüfung einer Komponente auf Geradheit entlang einer Längsseite |
| JP5185677B2 (ja) * | 2008-03-31 | 2013-04-17 | 三菱重工業株式会社 | 自動調芯嵌合クラッチを用いた駆動力伝達機構における軸ズレ量検知方法 |
| US20100170347A1 (en) * | 2009-01-07 | 2010-07-08 | General Electric Company | Method and apparatus for continuous machinery alignment measurement |
| US9157723B2 (en) | 2009-01-30 | 2015-10-13 | Axiam, Inc. | Absolute diameter measurement arm |
| US8219353B2 (en) * | 2009-01-30 | 2012-07-10 | Axiam, Inc. | Absolute diameter measurement arm |
| JP4897018B2 (ja) * | 2009-08-19 | 2012-03-14 | 三菱重工コンプレッサ株式会社 | 機械ユニットの配置システム |
| US8578772B2 (en) * | 2010-01-28 | 2013-11-12 | Pruftechnik Dieter Busch Ag | Device and method for monitoring of rotating machine elements |
| US20120109569A1 (en) * | 2010-10-27 | 2012-05-03 | General Electric Company | Diagnosis of bearing thermal anomalies in an electrical machine |
| US8904658B2 (en) * | 2011-11-08 | 2014-12-09 | Prüftechnik Ag | Method for determining the orientation of two shafts connected via two universal joints and a third shaft in the plane of the three shafts |
| US8689455B2 (en) * | 2012-02-29 | 2014-04-08 | Solar Turbines Inc. | Shaft alignment tool |
| JP5947144B2 (ja) * | 2012-08-08 | 2016-07-06 | 東海旅客鉄道株式会社 | 電機子軸の支持構造の破損検出装置 |
| TWI467125B (zh) | 2012-09-24 | 2015-01-01 | Ind Tech Res Inst | 量測系統與量測方法 |
| DE102012023201A1 (de) * | 2012-11-28 | 2014-05-28 | Prüftechnik Dieter Busch AG | Kupplungsvorrichtung und Verfahren zum Bestimmen der Fehlausrichtung von zwei Wellen |
| KR200479612Y1 (ko) | 2013-11-29 | 2016-02-17 | 한전케이피에스 주식회사 | 가스터빈 연소실에 부착된 연소기와 가스터빈 연소실 정렬을 위한 거리측정시스템 |
| JP6239392B2 (ja) * | 2014-01-24 | 2017-11-29 | 三菱重工業株式会社 | 回転軸系のアライメント調整方法およびアライメント計測装置 |
| EP2910742A1 (de) * | 2014-02-20 | 2015-08-26 | Siemens Aktiengesellschaft | Verfahren zum Kuppeln einer Dampfturbine und einer Gasturbine mit einem gewünschten Differenzwinkel |
| GB2524582B (en) | 2014-03-28 | 2016-07-20 | Mitsubishi Hitachi Power Sys | Combined cycle gas turbine plant |
| KR20170018883A (ko) * | 2014-06-10 | 2017-02-20 | 제네럴 일렉트릭 컴퍼니 | 가스 터빈 시스템 및 방법 |
| CN104655079B (zh) * | 2015-02-13 | 2016-08-24 | 广东联兴建设有限公司 | 具有散热功能的电力行业汽轮机主轴轴承的检测装置及检测方法 |
| JP6578136B2 (ja) | 2015-05-29 | 2019-09-18 | 三菱日立パワーシステムズ株式会社 | コンバインドサイクルプラント、その制御装置及び起動方法 |
| CN106884889A (zh) * | 2017-03-13 | 2017-06-23 | 钟浪雅 | 一种可精确瞄准嵌合的牙嵌离合器 |
| CN108425707B (zh) * | 2017-07-14 | 2019-12-31 | 上海电气电站设备有限公司 | 一种联合循环汽轮机快速启动预暖系统及其暖机方法 |
| KR102367225B1 (ko) * | 2017-10-12 | 2022-02-25 | 엘지전자 주식회사 | 갭 센서 유닛 및 이를 포함하는 압축기 |
| JP7361594B2 (ja) * | 2019-12-19 | 2023-10-16 | キヤノン株式会社 | 識別装置、処理装置、処理方法、およびプログラム |
| CN115030782B (zh) * | 2022-06-13 | 2023-06-02 | 江苏万恒铸业有限公司 | 一种用于汽轮机汽缸的智能载荷测量装置 |
| CN115289154A (zh) * | 2022-08-03 | 2022-11-04 | 国家电投集团河南电力有限公司 | 一种监测离合器啮合状态的方法、装置以及介质 |
| US12188366B2 (en) * | 2022-08-31 | 2025-01-07 | General Electric Company | Alignment tool |
| JP7830291B2 (ja) * | 2022-11-02 | 2026-03-16 | 株式会社東芝 | 振動低減型クラッチ結合制御方法および振動低減型クラッチ結合制御装置 |
Family Cites Families (22)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3783522A (en) * | 1972-04-04 | 1974-01-08 | V Dodd | Method and apparatus for shaft alignment |
| US4033042A (en) * | 1974-10-10 | 1977-07-05 | Bently Nevada Corporation | Shaft alignment apparatus and method |
| US4148013A (en) * | 1975-12-19 | 1979-04-03 | The Indikon Company, Inc. | Rotating shaft alignment monitor |
| US4441028A (en) * | 1977-06-16 | 1984-04-03 | Lundberg Robert M | Apparatus and method for multiplying the output of a generating unit |
| US4161068A (en) * | 1977-11-30 | 1979-07-17 | Mcmaster Thomas M | Apparatus and method for aligning shafts |
| US4538455A (en) * | 1984-04-27 | 1985-09-03 | General Electric Company | Method and apparatus for axially aligning the coupled shafts of a steam turbine |
| US4586264A (en) * | 1984-12-31 | 1986-05-06 | Industrial Maintenance Systems, Inc. | Methods for measuring alignment of coupled shafts |
| US5004084A (en) | 1989-05-24 | 1991-04-02 | Sundstrand Corporation | Closed loop control of a hydraulically controlled clutch |
| US5077905A (en) * | 1990-06-04 | 1992-01-07 | Murray Jr Malcolm G | Laser alignment mount assembly and method |
| US5263261A (en) * | 1992-06-03 | 1993-11-23 | Computational Systems, Incorporated | Shaft alignment data acquisition |
| US5222306A (en) * | 1992-08-28 | 1993-06-29 | Westinghouse Electric Corp. | Apparatus for centering and the axial and parallel alignment of shafts |
| US5514952A (en) * | 1993-06-30 | 1996-05-07 | Simmonds Precision Products Inc. | Monitoring apparatus for rotating equipment dynamics for slow checking of alignment using plural angled elements |
| DE4426354C2 (de) | 1994-07-25 | 2003-03-06 | Alstom | Kombianlage |
| US5920999A (en) * | 1996-07-02 | 1999-07-13 | Hutter; Edward F. | Segmented mechanical shafting alignment tool and method |
| JPH10169407A (ja) | 1996-12-11 | 1998-06-23 | Toshiba Eng Co Ltd | 蒸気タービンのロータ位置検出装置 |
| JPH10184317A (ja) | 1996-12-26 | 1998-07-14 | Fuji Electric Co Ltd | 一軸型コンバインドサイクルプラント |
| US5896672A (en) * | 1997-06-27 | 1999-04-27 | Harris; G. Danny | Precision shaft alignment system |
| US6035629A (en) | 1997-08-08 | 2000-03-14 | Hamilton Sunstrand Corporation | System for controlling acceleration of a load coupled to a gas turbine engine |
| JP3413068B2 (ja) * | 1997-08-19 | 2003-06-03 | オークマ株式会社 | 工作機械の熱変位推定方法 |
| JP3772019B2 (ja) * | 1998-04-21 | 2006-05-10 | 株式会社東芝 | 蒸気タービン |
| DE19829178B4 (de) | 1998-06-30 | 2008-09-18 | Alstom | Verfahren sowie Vorrichtung zur Leistungsermittlung sowie zur Leistungsregelung bei einer Anlage, insbesondere einer kombinierten Gas- und Dampfturbinenanlage |
| JP2003013709A (ja) * | 2001-06-28 | 2003-01-15 | Mitsubishi Heavy Ind Ltd | クラッチ嵌合検出装置及びこれを備えた一軸コンバインドプラント |
-
2003
- 2003-10-01 JP JP2003343442A patent/JP4452053B2/ja not_active Expired - Lifetime
-
2004
- 2004-09-16 US US10/942,133 patent/US7175342B2/en not_active Expired - Lifetime
- 2004-09-27 CN CNA2008101082465A patent/CN101298978A/zh active Pending
- 2004-09-27 CN CNB2004100119816A patent/CN100402804C/zh not_active Expired - Lifetime
- 2004-10-01 DE DE102004047939A patent/DE102004047939B4/de not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| CN100402804C (zh) | 2008-07-16 |
| CN1603578A (zh) | 2005-04-06 |
| JP2005106738A (ja) | 2005-04-21 |
| US20050074049A1 (en) | 2005-04-07 |
| US7175342B2 (en) | 2007-02-13 |
| DE102004047939A1 (de) | 2005-04-28 |
| CN101298978A (zh) | 2008-11-05 |
| DE102004047939B4 (de) | 2006-12-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4452053B2 (ja) | 軸ずれ測定装置 | |
| US8472033B2 (en) | Method of detecting amount of axis displacement in power transmission device using automatic self-aligning engagement clutch | |
| JP5123920B2 (ja) | 一軸コンバインドプラント及びこの一軸コンバインドプラントの起動方法 | |
| JP3716244B2 (ja) | クラッチを備えた一軸コンバインドプラントの運転制御装置及び運転制御方法。 | |
| CN108350805B (zh) | 用于使陆基或海基多转子燃气涡轮运行的系统、方法和计算机程序 | |
| JP3930462B2 (ja) | 一軸コンバインドサイクル発電設備及びその運転方法 | |
| US6274945B1 (en) | Combustion control method and system | |
| US20100031667A1 (en) | Method for operating a power plant | |
| US10428695B2 (en) | Combined cycle plant, device for controlling said plant, and method for starting up said plant | |
| WO2002088531A1 (en) | Method of operating a gas turbine | |
| BR102013007109A2 (pt) | Partida de turbina a gás com conversor de frequência | |
| TWI654366B (zh) | Factory control unit, factory control method, and power plant | |
| JP2018003824A (ja) | プラント制御装置、プラント制御方法、および発電プラント | |
| JP2013040567A (ja) | 発電プラント及びその改造方法 | |
| JP2003083003A (ja) | ガスタービン及びガスタービン複合発電プラントの運転方法 | |
| RU2006593C1 (ru) | Способ регулирования радиального зазора между концами лопаток ротора и корпусом турбомашины газотурбинного двигателя | |
| WO2021033930A1 (ko) | 자가 가동형 소각로 시스템 | |
| KR101944285B1 (ko) | 플랜트 제어 장치, 플랜트 제어 방법, 및 발전 플랜트 | |
| KR102056918B1 (ko) | 가스터빈의 블레이드 간극 측정 및 보정 시스템과 이를 이용한 블레이드 간극 측정 및 보정 방법 | |
| EP3396135B1 (en) | Control apparatus and method of gas turbine system | |
| JP6795419B2 (ja) | 湿分利用ガスタービン | |
| JP2005146870A (ja) | 蒸気タービン船の主タービン増速方法と増速装置 | |
| JP7051487B2 (ja) | 同期電動機の制御装置及び同期発電機の制御装置 | |
| JP5222008B2 (ja) | 一軸コンバインドプラントの再起動方法及び再起動装置 | |
| JP5357741B2 (ja) | 蒸気タービンおよび蒸気タービンの運転方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060911 |
|
| RD01 | Notification of change of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7421 Effective date: 20071010 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080711 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080722 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080922 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20090929 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20091130 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20091201 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20100112 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20100129 |
|
| R151 | Written notification of patent or utility model registration |
Ref document number: 4452053 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130205 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140205 Year of fee payment: 4 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313111 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| EXPY | Cancellation because of completion of term |