JP2017223066A - 杭施工管理方法 - Google Patents
杭施工管理方法 Download PDFInfo
- Publication number
- JP2017223066A JP2017223066A JP2016120081A JP2016120081A JP2017223066A JP 2017223066 A JP2017223066 A JP 2017223066A JP 2016120081 A JP2016120081 A JP 2016120081A JP 2016120081 A JP2016120081 A JP 2016120081A JP 2017223066 A JP2017223066 A JP 2017223066A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- hole
- penetration
- excavation
- depth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 86
- 238000009430 construction management Methods 0.000 title claims abstract description 49
- 230000035515 penetration Effects 0.000 claims abstract description 157
- 238000009412 basement excavation Methods 0.000 claims abstract description 103
- 238000012360 testing method Methods 0.000 claims abstract description 96
- 238000010276 construction Methods 0.000 claims abstract description 59
- 230000000149 penetrating effect Effects 0.000 claims abstract description 23
- 230000007246 mechanism Effects 0.000 claims abstract description 15
- 229910000831 Steel Inorganic materials 0.000 claims description 68
- 239000010959 steel Substances 0.000 claims description 68
- 230000003014 reinforcing effect Effects 0.000 claims description 49
- 238000005553 drilling Methods 0.000 claims description 15
- 239000000725 suspension Substances 0.000 claims description 15
- 238000007726 management method Methods 0.000 claims 1
- 230000002787 reinforcement Effects 0.000 abstract description 17
- 230000015572 biosynthetic process Effects 0.000 abstract description 2
- 239000007788 liquid Substances 0.000 description 13
- 230000002093 peripheral effect Effects 0.000 description 13
- 239000000463 material Substances 0.000 description 8
- 230000008569 process Effects 0.000 description 8
- 210000000078 claw Anatomy 0.000 description 6
- 238000013461 design Methods 0.000 description 5
- 238000005259 measurement Methods 0.000 description 5
- 239000004576 sand Substances 0.000 description 5
- 239000002689 soil Substances 0.000 description 5
- 239000002994 raw material Substances 0.000 description 4
- 238000007789 sealing Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 239000004568 cement Substances 0.000 description 3
- 238000007599 discharging Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 239000011440 grout Substances 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 229910000278 bentonite Inorganic materials 0.000 description 2
- 239000000440 bentonite Substances 0.000 description 2
- SVPXDRXYRYOSEX-UHFFFAOYSA-N bentoquatam Chemical compound O.O=[Si]=O.O=[Al]O[Al]=O SVPXDRXYRYOSEX-UHFFFAOYSA-N 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000009429 electrical wiring Methods 0.000 description 2
- 238000000605 extraction Methods 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 229920003002 synthetic resin Polymers 0.000 description 2
- 239000000057 synthetic resin Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 239000010720 hydraulic oil Substances 0.000 description 1
- 230000001939 inductive effect Effects 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 238000010297 mechanical methods and process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
Images
Abstract
Description
縦筒状のケーシング(外側ケーシング)3内に、該ケーシング3の下端から下方突出する貫入軸4を一体化したノッキングブロック51と、該ノッキングブロック51を自由落下によって打撃するドライブハンマー52と、落下後のドライブハンマー52を吊り上げて所定高さで下放する吊上げ機構8とを備えてなる貫入試験機M1〜M3を用い、
杭孔H1内に配置させた貫入試験機M1〜M3の貫入軸4を孔底Hb1に着底させ、該貫入軸4が孔底Hb1から所定深さまで貫入するのに要する打撃回数から孔底Hb1の支持強度を判定し、その支持強度が所定値に満たない場合に、該杭孔Hを更に深く再掘削して、再掘削後の孔底Hb2の支持強度を貫入試験機M1〜M3によって同様にして判定し、該支持強度が所定値以上に達した場合に、元の杭長さに対して再掘削による深度増加分の長さを継ぎ足し調整した杭を該杭孔H2に建て込むことを特徴としている。
B2 拡底バケット(掘削先部材)
C 生コンクリート
F 鉄筋籠
F1 鉄筋籠本体
F2 籠延長部
F20 鉄筋籠部材
FC 継ぎ足し連結した鉄筋籠
G 地盤
H1,H2 杭孔
Hb1,Hb2 孔底
M1〜M3 貫入試験機
P 既製杭
P1 杭本体
P2 短尺杭部材
P2A〜P2C 鋼管杭
PA 継ぎ足し連結した既製杭
PB 場所打ち杭
Rh 先端ロッド部材(掘削先部材)
r1 主筋
r1a 主筋張出部
W ワイヤ
3 外側ケーシング(ケーシング)
4 貫入軸
51 ノッキングブロック
52 ドライブハンマー
8 吊上げ機構
この際、再掘削の掘削深さを一律とし、且つ、その掘削深さに対応する長さの同じ杭の複数本を予め用意しているため、再掘削が必要になった時に迅速に対応できる。
Claims (8)
- 地盤に設定深度の杭孔を形成後、該杭孔内への杭の建て込み前に、
縦筒状のケーシング内に、該ケーシングの下端から下方突出する貫入軸を一体化したノッキングブロックと、該ノッキングブロックを自由落下によって打撃するドライブハンマーと、落下後のドライブハンマーを吊り上げて所定高さで下放する吊上げ機構とを備えてなる貫入試験機を用い、
杭孔内に配置させた貫入試験機の前記貫入軸を孔底に着底させ、該貫入軸が孔底から所定深さまで貫入するのに要する打撃回数から孔底の支持強度を判定し、その支持強度が所定値に満たない場合に、該杭孔を更に深く再掘削して、再掘削後の孔底の支持強度を前記貫入試験機によって同様にして判定し、
該支持強度が所定値以上に達した場合に、元の杭長さに対して再掘削による深度増加分の長さを継ぎ足し調整した杭を該杭孔に建て込むことを特徴とする杭施工管理方法。 - 建て込む杭が既製杭であり、前記設定深度の杭孔に対応する長さの杭本体に、前記再掘削による深度増加分に対応する短尺杭部材を継ぎ足し連結し、この連結した杭を再掘削後の杭孔に建て込むことを特徴とする請求項1に記載の杭施工管理方法。
- 前記杭本体がコンクリート杭であり、その下端に前記短尺杭部材としての鋼管杭を継ぎ足し連結する請求項2に記載の杭施工管理方法。
- 建て込む杭が鉄筋籠を利用する場所打ち杭であり、前記設定深度の杭孔に対応する長さの鉄筋籠本体に、前記再掘削による深度増加分に対応する長さの籠延長部を継ぎ足し構築し、この延長した鉄筋籠を再掘削後の杭孔に挿入し、生コンクリートを打設して場所打ち杭とすることを特徴とする請求項1に記載の杭施工管理方法。
- 前記籠延長部が一端側に主筋張出部を有する短尺の鉄筋籠部材からなり、この鉄筋籠部材の各主筋張出部を鉄筋籠本体の主筋下部に重ねて繋ぎ止める請求項4に記載の杭施工管理方法。
- 前記貫入試験機が吊下げ式であり、該貫入試験機をクレーンのワイヤで吊下げて杭孔に出入させる請求項1〜5のいずれかに記載の杭施工管理方法。
- 前記貫入試験機が掘削ロッド連結式であり、杭孔を掘削後の掘削先部材に代えて該貫入試験機を連結して杭孔に出入させる請求項1〜5のいずれかに記載の杭施工管理方法。
- 前記貫入試験機が掘削部材の中空ロッド内蔵型であり、掘削後の杭孔内に該掘削部材を挿入した状態で該貫入試験機を作動させて貫入試験を行う請求項1〜5のいずれかに記載の杭施工管理方法。
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016120081A JP6329590B2 (ja) | 2016-06-16 | 2016-06-16 | 杭施工管理方法 |
EP16878210.0A EP3263773B1 (en) | 2015-12-25 | 2016-11-16 | Piling construction management method |
PCT/JP2016/083919 WO2017110314A1 (ja) | 2015-12-25 | 2016-11-16 | 杭施工管理方法 |
SG11201708196PA SG11201708196PA (en) | 2015-12-25 | 2016-11-16 | Piling construction management method |
US15/715,782 US10557241B2 (en) | 2015-12-25 | 2017-09-26 | Piling construction management method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016120081A JP6329590B2 (ja) | 2016-06-16 | 2016-06-16 | 杭施工管理方法 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2018024377A Division JP6588585B2 (ja) | 2018-02-14 | 2018-02-14 | 杭施工管理方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2017223066A true JP2017223066A (ja) | 2017-12-21 |
JP6329590B2 JP6329590B2 (ja) | 2018-05-23 |
Family
ID=60687929
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2016120081A Active JP6329590B2 (ja) | 2015-12-25 | 2016-06-16 | 杭施工管理方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6329590B2 (ja) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019214911A (ja) * | 2018-06-14 | 2019-12-19 | 善一郎 藤本 | 供回り防止翼の取り付け構造 |
JP2020056220A (ja) * | 2018-10-02 | 2020-04-09 | 株式会社奥村組 | 杭孔形成装置 |
CN113481962A (zh) * | 2021-08-13 | 2021-10-08 | 湖北波森特岩土工程有限公司 | 一种自动化施工深层强夯复合地基的方法 |
CN114108607A (zh) * | 2021-11-10 | 2022-03-01 | 中国一冶集团有限公司 | 一种穿越溶洞的灌注桩施工方法 |
CN114960648A (zh) * | 2022-06-14 | 2022-08-30 | 重庆建工集团股份有限公司 | 一种混凝土桩头线割装置 |
CN117071556A (zh) * | 2023-10-13 | 2023-11-17 | 兴化市杰俊机械有限公司 | 一种海洋打桩船 |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5748019A (en) * | 1980-09-01 | 1982-03-19 | Takechi Koumushiyo:Kk | Pile including steel pipe pile |
JPS60190823U (ja) * | 1982-11-12 | 1985-12-18 | 佛原 学 | 鋼管杭とコンクリート杭の合成杭 |
JPH06287944A (ja) * | 1993-04-05 | 1994-10-11 | Kawasaki Steel Corp | 回転貫入杭 |
JPH11200364A (ja) * | 1998-01-12 | 1999-07-27 | Azuma Kogyo Kk | モルタル深礎杭用型枠パネルおよび型枠 |
JP2002317594A (ja) * | 2001-02-16 | 2002-10-31 | Mitani Sekisan Co Ltd | 杭穴掘削方法及び基礎杭の施工方法並びに杭穴壁の練付け装置 |
JP2003232033A (ja) * | 2002-02-06 | 2003-08-19 | Taisei Corp | 基礎杭構造 |
JP2005097879A (ja) * | 2003-09-22 | 2005-04-14 | Ohbayashi Corp | 鉄筋籠およびその立て込み方法 |
JP2007285064A (ja) * | 2006-04-19 | 2007-11-01 | Mitani Sekisan Co Ltd | 基礎杭の構築方法 |
JP2009057693A (ja) * | 2007-08-29 | 2009-03-19 | Kubota Corp | 鋳造杭 |
JP2010242499A (ja) * | 2010-06-28 | 2010-10-28 | Sumitomo Metal Ind Ltd | 基礎杭構造およびsc杭 |
JP2013112953A (ja) * | 2011-11-28 | 2013-06-10 | Jfe Steel Corp | 鋼管杭の接続構造 |
JP2013122121A (ja) * | 2011-12-09 | 2013-06-20 | Senshu Iwatani:Kk | 鉄筋籠の建て込み方法、該方法に用いる浮力付与装置、及び浮力体離脱装置 |
JP5918435B1 (ja) * | 2015-12-25 | 2016-05-18 | 株式会社オーク | 杭施工管理方法 |
JP5932178B1 (ja) * | 2016-03-10 | 2016-06-08 | 株式会社オーク | 杭孔掘削装置及び杭施工管理方法 |
-
2016
- 2016-06-16 JP JP2016120081A patent/JP6329590B2/ja active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5748019A (en) * | 1980-09-01 | 1982-03-19 | Takechi Koumushiyo:Kk | Pile including steel pipe pile |
JPS60190823U (ja) * | 1982-11-12 | 1985-12-18 | 佛原 学 | 鋼管杭とコンクリート杭の合成杭 |
JPH06287944A (ja) * | 1993-04-05 | 1994-10-11 | Kawasaki Steel Corp | 回転貫入杭 |
JPH11200364A (ja) * | 1998-01-12 | 1999-07-27 | Azuma Kogyo Kk | モルタル深礎杭用型枠パネルおよび型枠 |
JP2002317594A (ja) * | 2001-02-16 | 2002-10-31 | Mitani Sekisan Co Ltd | 杭穴掘削方法及び基礎杭の施工方法並びに杭穴壁の練付け装置 |
JP2003232033A (ja) * | 2002-02-06 | 2003-08-19 | Taisei Corp | 基礎杭構造 |
JP2005097879A (ja) * | 2003-09-22 | 2005-04-14 | Ohbayashi Corp | 鉄筋籠およびその立て込み方法 |
JP2007285064A (ja) * | 2006-04-19 | 2007-11-01 | Mitani Sekisan Co Ltd | 基礎杭の構築方法 |
JP2009057693A (ja) * | 2007-08-29 | 2009-03-19 | Kubota Corp | 鋳造杭 |
JP2010242499A (ja) * | 2010-06-28 | 2010-10-28 | Sumitomo Metal Ind Ltd | 基礎杭構造およびsc杭 |
JP2013112953A (ja) * | 2011-11-28 | 2013-06-10 | Jfe Steel Corp | 鋼管杭の接続構造 |
JP2013122121A (ja) * | 2011-12-09 | 2013-06-20 | Senshu Iwatani:Kk | 鉄筋籠の建て込み方法、該方法に用いる浮力付与装置、及び浮力体離脱装置 |
JP5918435B1 (ja) * | 2015-12-25 | 2016-05-18 | 株式会社オーク | 杭施工管理方法 |
JP5932178B1 (ja) * | 2016-03-10 | 2016-06-08 | 株式会社オーク | 杭孔掘削装置及び杭施工管理方法 |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019214911A (ja) * | 2018-06-14 | 2019-12-19 | 善一郎 藤本 | 供回り防止翼の取り付け構造 |
JP2020056220A (ja) * | 2018-10-02 | 2020-04-09 | 株式会社奥村組 | 杭孔形成装置 |
JP7190692B2 (ja) | 2018-10-02 | 2022-12-16 | 株式会社奥村組 | 杭孔形成装置 |
CN113481962A (zh) * | 2021-08-13 | 2021-10-08 | 湖北波森特岩土工程有限公司 | 一种自动化施工深层强夯复合地基的方法 |
CN114108607A (zh) * | 2021-11-10 | 2022-03-01 | 中国一冶集团有限公司 | 一种穿越溶洞的灌注桩施工方法 |
CN114108607B (zh) * | 2021-11-10 | 2023-07-18 | 中国一冶集团有限公司 | 一种穿越溶洞的灌注桩施工方法 |
CN114960648A (zh) * | 2022-06-14 | 2022-08-30 | 重庆建工集团股份有限公司 | 一种混凝土桩头线割装置 |
CN114960648B (zh) * | 2022-06-14 | 2023-11-14 | 重庆建工集团股份有限公司 | 一种混凝土桩头线割装置 |
CN117071556A (zh) * | 2023-10-13 | 2023-11-17 | 兴化市杰俊机械有限公司 | 一种海洋打桩船 |
CN117071556B (zh) * | 2023-10-13 | 2024-02-09 | 兴化市杰俊机械有限公司 | 一种海洋打桩船 |
Also Published As
Publication number | Publication date |
---|---|
JP6329590B2 (ja) | 2018-05-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6329590B2 (ja) | 杭施工管理方法 | |
JP5932178B1 (ja) | 杭孔掘削装置及び杭施工管理方法 | |
WO2017110314A1 (ja) | 杭施工管理方法 | |
JP5994035B1 (ja) | 杭孔用貫入試験装置及び杭施工管理方法 | |
JP5972494B1 (ja) | 掘削ロッド連結用貫入試験機及び杭施工管理方法 | |
JP2006241919A (ja) | 杭施工機および杭施工方法 | |
JP2020070687A (ja) | 鋼管杭の施工方法 | |
JP6242466B1 (ja) | 杭孔用貫入試験機 | |
WO2006041051A1 (ja) | マイクロパイルおよびその構築方法 | |
JP5918435B1 (ja) | 杭施工管理方法 | |
US20090285637A1 (en) | Pile mandrel with extendable reaming members | |
JP2013002039A (ja) | 削孔用エアハンマー装置 | |
JP6588585B2 (ja) | 杭施工管理方法 | |
KR102053231B1 (ko) | 기존 기성 말뚝을 이용한 기초 보강 방법 | |
KR102178354B1 (ko) | 파일 인발장치 | |
JP6758629B2 (ja) | 既設杭把持装置 | |
CN110273413A (zh) | 一种预制桩的高效施工方法 | |
JP6754662B2 (ja) | 動的荷重試験装置、及びこれを用いた場所打ちコンクリート杭の掘削先端地盤の支持力確認方法 | |
JP6047257B1 (ja) | 杭孔用貫入試験機及び杭施工管理方法 | |
JP3827309B2 (ja) | 埋め込み杭工法用補助装置及び埋め込み杭工法 | |
CN108086309B (zh) | 一种迷你桩钢筋笼安装方法 | |
JP3293796B2 (ja) | 杭打ち装置 | |
JP6636362B2 (ja) | バケットと接続用ケーシングとの接続構造及び掘削穴埋め戻し工法 | |
EP3351688A1 (en) | Apparatus and method for stabilizing a foundation of a building | |
JP6677564B2 (ja) | 鉄筋籠及び鉄筋籠の接続方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20161221 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180214 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180420 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6329590 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |