JPS5748019A - Pile including steel pipe pile - Google Patents

Pile including steel pipe pile

Info

Publication number
JPS5748019A
JPS5748019A JP12147880A JP12147880A JPS5748019A JP S5748019 A JPS5748019 A JP S5748019A JP 12147880 A JP12147880 A JP 12147880A JP 12147880 A JP12147880 A JP 12147880A JP S5748019 A JPS5748019 A JP S5748019A
Authority
JP
Japan
Prior art keywords
pile
steel pipe
tip part
driven
occasion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP12147880A
Other languages
Japanese (ja)
Other versions
JPH0125848B2 (en
Inventor
Kingo Asayama
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takechi Koumusho KK
Original Assignee
Takechi Koumusho KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takechi Koumusho KK filed Critical Takechi Koumusho KK
Priority to JP12147880A priority Critical patent/JPS5748019A/en
Publication of JPS5748019A publication Critical patent/JPS5748019A/en
Publication of JPH0125848B2 publication Critical patent/JPH0125848B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE: To increase the sticking force of mortar and the like to a pile wall and thereby to increase the supporting force of the pile, by providing projections for bearing pressure on the inside and outside peripheries of the tip part of the pile respectively on the occasion when the steel pipe pile is driven by a method free from vibrations and noises.
CONSTITUTION: Ring-shaped projections 12 and 13 are provided on the inside and outside peripheral surfaces of the tip part 11 of a hollow pipe 10 including the steel pipe pile, the tip part 11 of which is formed of a steel pipe at least. Moreover, as occasion calls, the needed places of the projections 12 and 13 are provided with escapes cuts 14 and 15 through which muddy water, cement milk and the like escape when the pile is driven. On the occasion when the hollow pile 10 thus prepared is driven by the method free from vibrations and noises, cement milk or the like for consolidation of foundation is injected into the tip part 11 of the pile 10 and is cured and enlarged to form a mortar bulb part (a) whereby the supporting force of the tip of the pile is obtd.
COPYRIGHT: (C)1982,JPO&Japio
JP12147880A 1980-09-01 1980-09-01 Pile including steel pipe pile Granted JPS5748019A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12147880A JPS5748019A (en) 1980-09-01 1980-09-01 Pile including steel pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12147880A JPS5748019A (en) 1980-09-01 1980-09-01 Pile including steel pipe pile

Publications (2)

Publication Number Publication Date
JPS5748019A true JPS5748019A (en) 1982-03-19
JPH0125848B2 JPH0125848B2 (en) 1989-05-19

Family

ID=14812140

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12147880A Granted JPS5748019A (en) 1980-09-01 1980-09-01 Pile including steel pipe pile

Country Status (1)

Country Link
JP (1) JPS5748019A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5810936U (en) * 1981-07-13 1983-01-24 川崎製鉄株式会社 steel pipe pile
JP2006207320A (en) * 2005-01-31 2006-08-10 Nippon Steel Corp Structure of steel pipe pile end for pile installation by inner excavation
JP2008255694A (en) * 2007-04-06 2008-10-23 Nippon Steel Corp Excavator for pile construction and construction method of pile
WO2017110314A1 (en) * 2015-12-25 2017-06-29 株式会社オーク Piling construction management method
JP2017223066A (en) * 2016-06-16 2017-12-21 株式会社オーク Pile construction management method
JP2020026708A (en) * 2018-08-17 2020-02-20 株式会社横山基礎工事 Steel pipe for inner excavation pile construction method

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4724878B2 (en) * 1999-08-31 2011-07-13 三谷セキサン株式会社 Foundation pile structure
JP4724873B2 (en) * 1999-08-31 2011-07-13 三谷セキサン株式会社 Ready-made pile
JP4817156B2 (en) * 1999-08-31 2011-11-16 三谷セキサン株式会社 Ready-made pile
JP4724879B2 (en) * 1999-08-31 2011-07-13 三谷セキサン株式会社 Foundation pile structure
JP2007032044A (en) * 2005-07-26 2007-02-08 Sumitomo Metal Ind Ltd Supporting structure of foundation pile and steel pipe pile

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4877608A (en) * 1972-01-20 1973-10-18
JPS5370506A (en) * 1976-12-06 1978-06-23 Sumitomo Const Method of making base pile
JPS5376505A (en) * 1976-12-17 1978-07-07 Kawasaki Steel Co Method of treating placed tip of steel pipe for pile

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4877608A (en) * 1972-01-20 1973-10-18
JPS5370506A (en) * 1976-12-06 1978-06-23 Sumitomo Const Method of making base pile
JPS5376505A (en) * 1976-12-17 1978-07-07 Kawasaki Steel Co Method of treating placed tip of steel pipe for pile

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5810936U (en) * 1981-07-13 1983-01-24 川崎製鉄株式会社 steel pipe pile
JP2006207320A (en) * 2005-01-31 2006-08-10 Nippon Steel Corp Structure of steel pipe pile end for pile installation by inner excavation
JP4608327B2 (en) * 2005-01-31 2011-01-12 新日本製鐵株式会社 The tip structure of a steel pipe pile used in the medium digging method.
JP2008255694A (en) * 2007-04-06 2008-10-23 Nippon Steel Corp Excavator for pile construction and construction method of pile
WO2017110314A1 (en) * 2015-12-25 2017-06-29 株式会社オーク Piling construction management method
US10557241B2 (en) 2015-12-25 2020-02-11 Oak Co., Ltd. Piling construction management method
JP2017223066A (en) * 2016-06-16 2017-12-21 株式会社オーク Pile construction management method
JP2020026708A (en) * 2018-08-17 2020-02-20 株式会社横山基礎工事 Steel pipe for inner excavation pile construction method

Also Published As

Publication number Publication date
JPH0125848B2 (en) 1989-05-19

Similar Documents

Publication Publication Date Title
JPS5748019A (en) Pile including steel pipe pile
JPS559953A (en) Method and apparatus for installing steel pipe pile
JPS55114717A (en) Combination method of support and foundation
JPS5736214A (en) Reinforcing construction work of lock bolt for soft ground
JPS55119822A (en) Method for reinforcing bearing capacity of concrete pile and reinforcing member thereof
JPS53140798A (en) Precast concrete block and method of building structure thereby
JPS5789020A (en) Construction work of ready-made pile
JPS54128815A (en) Lining tank
JPS573915A (en) Method and apparatus for construction of reaction resistor body underground
JPS55161117A (en) Constructing method for underground continuous wall by precast concrete member
JPS56163316A (en) Execution of pile in soft ground
JPS5530040A (en) Working for foundation pile
JPS579916A (en) Foundation structure for building
JPS53104063A (en) Hydraulic coupler
JPS52100037A (en) Daft tube manhole passage of hydraulic machinery
JPS5659920A (en) Pile-driving method and device thereof
JPS5719422A (en) Fixing method of net in process covering slope with net
JPS5733614A (en) Method for sinking installed pile through internal excavation
JPS5496642A (en) Grouting device for hydraulic machinery
JPS5532812A (en) Huge pole foundation practice
JPS5768420A (en) Executing method for foundation pile
JPS51128019A (en) Reinforced concrete pipe
JPS5634814A (en) Constructing method of rubber dam
JPS55132808A (en) Constructing method for rubber dam
JPS56119029A (en) Building-in method for main pile of soil concrete pile in bulge retaining wall