JP2017146761A - 需給調整装置 - Google Patents
需給調整装置 Download PDFInfo
- Publication number
- JP2017146761A JP2017146761A JP2016027623A JP2016027623A JP2017146761A JP 2017146761 A JP2017146761 A JP 2017146761A JP 2016027623 A JP2016027623 A JP 2016027623A JP 2016027623 A JP2016027623 A JP 2016027623A JP 2017146761 A JP2017146761 A JP 2017146761A
- Authority
- JP
- Japan
- Prior art keywords
- demand
- market
- profit
- response
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004364 calculation method Methods 0.000 claims abstract description 86
- 230000000694 effects Effects 0.000 claims abstract description 82
- 230000004044 response Effects 0.000 claims abstract description 82
- 238000006467 substitution reaction Methods 0.000 claims abstract description 39
- 230000003466 anti-cipated effect Effects 0.000 abstract 1
- 230000005611 electricity Effects 0.000 description 10
- 238000010586 diagram Methods 0.000 description 7
- 230000006870 function Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- 230000007423 decrease Effects 0.000 description 2
- 238000009472 formulation Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- NAWXUBYGYWOOIX-SFHVURJKSA-N (2s)-2-[[4-[2-(2,4-diaminoquinazolin-6-yl)ethyl]benzoyl]amino]-4-methylidenepentanedioic acid Chemical compound C1=CC2=NC(N)=NC(N)=C2C=C1CCC1=CC=C(C(=O)N[C@@H](CC(=C)C(O)=O)C(O)=O)C=C1 NAWXUBYGYWOOIX-SFHVURJKSA-N 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 238000000611 regression analysis Methods 0.000 description 1
- 230000002194 synthesizing effect Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
【解決手段】デマンドレスポンスの対価としてのインセンティブに対する需要家が実施すると見込まれる需要家調整応答量によって表される需要調整応答特性を設定する需要調整応答特性設定部と、デマンドレスポンスを実施した場合に電力取引市場での価格と比較して利益の改善効果を計算するデマンドレスポンス代替効果計算部と、需要調整応答特性と利益の改善効果に基づいて、デマンドレスポンスを実施することによるインセンティブに対する利益を算出するデマンドレスポンスメリット計算部と、インセンティブに対する利益のうち、最大の利益を与えるインセンティブに基づいて需要家調整指令量を算出するデマンドレスポンス指令量計算部とを備え、需要家調整指令量に基づいて電力の市場売買量を決定する。
【選択図】図3
Description
本発明の特長の1つは、市場価格を考慮した電力の販売を行うことで、エネルギー供給者にとって経済的に最適となるようなDRによる調整電力量および市場販売量の決定を行うことにある。以下、この特長について図1を用いて説明する。
<装置構成>
以下、本発明に係る実施の形態1について、図3〜図8を用いて説明する。図3は、本発明に係る実施の形態1の需給調整装置100の構成を示す機能ブロック図である。
次に、図3を参照しつつ、図5に示すフローチャートを用いて、需給調整装置100の動作フローを説明する。まず、市場情報受信部10において、電力取引市場の情報を受信する(ステップS101)。電力取引市場としては、例えば実需給の1時間前まで取引が可能な1時間前市場が想定される。1時間前市場は2016年以降に開設される予定であり、1時間前市場が、取引の開始時間から終了時間まで連続して取引が行われるザラバ取引である場合、受信する市場情報としては、受け渡し時間ごとに設定される電力売買価格とその数量となるが、市場参加者により受け渡し時刻ごとに電力に様々な価格が設定されて取引されるため、電力売買価格は絶えず変動することとなる。このため、市場情報受信部10は定常的に市場情報を受信するように構成される。
以上説明したように、実施の形態1の需給調整装置100では、電力を市場調達または販売した場合の両ケースにおける経済的メリットを比較することで、電力の市場調達だけでなく市場販売も考慮したDR量を決定でき、経済的に最適な電力の市場調達量および販売量を算出できる。
以上説明した本発明に係る実施の形態1の需給調整装置100では、DR指令量の決定および電力取引市場での電力の売買量を決定しようとしている現在の電力取引市場での電力売買価格の情報を取得し、その情報に基づいてDR指令量の決定および電力取引市場での電力の売買量を決定した。しかしながら電力取引市場での電力売買価格は、他の参入者同士の取引により常に変動し、例えば1時間前市場なら実需給の1時間前まで取引可能であるため、どの時点での取引がエネルギー供給者にとって最も経済的であるかが不透明となる可能性がある。
以下、本発明に係る実施の形態2について、図9〜図11を用いて説明する。図9は、本発明に係る実施の形態2の需給調整装置200の構成を示す機能ブロック図である。なお、図9においては、図3に示した実施の形態1の需給調整装置100と同一の構成については同一の符号を付し、重複する説明は省略する。
以上説明したように、実施の形態2の需給調整装置200では、電力取引市場での電力の市場価格予測を実施した上でDR指令量および電力取引市場での電力の売買量を決定するので、エネルギー供給者にとって最も経済的なDR指令量および電力取引市場での電力の売買量を決定できる。
Claims (6)
- 電力の需要家に対価を支払い電力需要を調整するデマンドレスポンスを電力需給の調整に用いる需給調整装置であって、
前記デマンドレスポンスの対価としてのインセンティブに対する前記需要家が実施すると見込まれる需要家調整応答量によって表される需要調整応答特性を設定する需要調整応答特性設定部と、
前記デマンドレスポンスを実施した場合に電力取引市場での価格と比較して利益の改善効果を計算するデマンドレスポンス代替効果計算部と、
前記需要調整応答特性と前記利益の改善効果に基づいて、前記デマンドレスポンスを実施することによる前記インセンティブに対する利益を算出するデマンドレスポンスメリット計算部と、
前記インセンティブに対する前記利益のうち、最大の利益を与える前記インセンティブに基づいて需要家調整指令量を算出するデマンドレスポンス指令量計算部と、を備え、
前記需要家調整指令量に基づいて電力の市場売買量を決定する、需給調整装置。 - 前記デマンドレスポンス代替効果計算部は、
電力の需要予測が、確保済みの電力の供給力を上回る場合に、不足分の電力を前記デマンドレスポンスで代替することにより得られる第1の利益についての単位電力量あたりの値を算出して、調達分の利益改善効果とする調達分のデマンドレスポンス代替効果計算部と、
前記デマンドレスポンスの実施により生まれる電力の余剰供給力を前記電力取引市場で販売することで発生する第2の利益についての単位電力量あたりの値を算出して、販売分の利益改善効果とする販売分デマンドレスポンス代替効果計算部と、を有し、
前記デマンドレスポンスメリット計算部は、
前記需要調整応答特性と前記調達分の利益改善効果とに基づいて、前記インセンティブに対する前記第1の利益を算出する調達分デマンドレスポンスメリット計算部と、
前記需要調整応答特性と前記販売分の利益改善効果とに基づいて、前記インセンティブに対する前記第2の利益を算出する販売分デマンドレスポンスメリット計算部と、を有し、
前記デマンドレスポンス指令量計算部は、
前記インセンティブに対する前記第1および第2の利益を比較し、前記最大の利益を与える前記インセンティブに基づいて前記需要家調整指令量を算出する、請求項1記載の需給調整装置。 - 前記需給調整装置は、
前記電力取引市場における過去の市場価格の情報に基づいて、将来の市場価格を予測する市場情報予測部をさらに備え、
前記デマンドレスポンス代替効果計算部は、
前記将来の市場価格と比較して前記デマンドレスポンスを実施する場合の前記利益の改善効果を計算する、請求項1記載の需給調整装置。 - 前記市場情報予測部は、
前記デマンドレスポンスを実施する日の市場価格変動の実績値と比較して、価格変動が類似している日の前記過去の市場に基づいて前記将来の市場価格を予測する、請求項3記載の需給調整装置。 - 前記市場情報予測部は、
前記デマンドレスポンスを実施する時刻と同時刻における複数の前記過去の市場価格に基づいて、それらの最大値と最小値および価格分布の何れかに基づいて前記将来の市場価格が変動幅を有するものとして予測する、請求項3記載の需給調整装置。 - 前記デマンドレスポンスは、
前記不足分の電力を上回るように前記需要家調整応答量を設定する、請求項2記載の需給調整装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016027623A JP6436924B2 (ja) | 2016-02-17 | 2016-02-17 | 需給調整装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016027623A JP6436924B2 (ja) | 2016-02-17 | 2016-02-17 | 需給調整装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2017146761A true JP2017146761A (ja) | 2017-08-24 |
JP6436924B2 JP6436924B2 (ja) | 2018-12-12 |
Family
ID=59682288
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2016027623A Active JP6436924B2 (ja) | 2016-02-17 | 2016-02-17 | 需給調整装置 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6436924B2 (ja) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108429265A (zh) * | 2018-02-12 | 2018-08-21 | 中国电力科学研究院有限公司 | 一种需求响应调控方法及装置 |
JP2020170363A (ja) * | 2019-04-03 | 2020-10-15 | 東京瓦斯株式会社 | 需要調整システム、需要調整方法及びプログラム |
CN112163687A (zh) * | 2020-06-28 | 2021-01-01 | 国家电网公司西北分部 | 一种基于负荷聚合商的用户侧两阶段调峰响应方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001086645A (ja) * | 1999-09-17 | 2001-03-30 | Mitsubishi Electric Corp | 発電設備の最適運転計画算出方法およびその装置 |
JP2004112868A (ja) * | 2002-09-13 | 2004-04-08 | Toshiba Corp | 電力管理システムおよび電力管理方法 |
JP4574985B2 (ja) * | 2001-09-28 | 2010-11-04 | 三菱電機株式会社 | 電力供給計画立案支援方法 |
US20110208637A1 (en) * | 2010-02-25 | 2011-08-25 | Yoshihiro Wakita | Power trade server, green market management server, trading management method, and green trading management method |
JP2014164729A (ja) * | 2013-02-27 | 2014-09-08 | Hitachi Ltd | 電力補給調整装置及び電力補給調整方法 |
JP2015126693A (ja) * | 2013-12-27 | 2015-07-06 | 三菱電機株式会社 | 需要調整策定装置及び端末装置 |
JP2015163861A (ja) * | 2014-02-28 | 2015-09-10 | 中国電力株式会社 | 気温予測システム、気温予測方法 |
JP2016012273A (ja) * | 2014-06-30 | 2016-01-21 | 富士電機株式会社 | 電力消費量誘導装置、電力消費量誘導装置の制御方法及びプログラム |
-
2016
- 2016-02-17 JP JP2016027623A patent/JP6436924B2/ja active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001086645A (ja) * | 1999-09-17 | 2001-03-30 | Mitsubishi Electric Corp | 発電設備の最適運転計画算出方法およびその装置 |
JP4574985B2 (ja) * | 2001-09-28 | 2010-11-04 | 三菱電機株式会社 | 電力供給計画立案支援方法 |
JP2004112868A (ja) * | 2002-09-13 | 2004-04-08 | Toshiba Corp | 電力管理システムおよび電力管理方法 |
US20110208637A1 (en) * | 2010-02-25 | 2011-08-25 | Yoshihiro Wakita | Power trade server, green market management server, trading management method, and green trading management method |
JP2011175556A (ja) * | 2010-02-25 | 2011-09-08 | Sony Corp | 電力取引サーバ、グリーン市場管理サーバ、取引管理方法、及びグリーン取引管理方法 |
JP2014164729A (ja) * | 2013-02-27 | 2014-09-08 | Hitachi Ltd | 電力補給調整装置及び電力補給調整方法 |
JP2015126693A (ja) * | 2013-12-27 | 2015-07-06 | 三菱電機株式会社 | 需要調整策定装置及び端末装置 |
JP2015163861A (ja) * | 2014-02-28 | 2015-09-10 | 中国電力株式会社 | 気温予測システム、気温予測方法 |
JP2016012273A (ja) * | 2014-06-30 | 2016-01-21 | 富士電機株式会社 | 電力消費量誘導装置、電力消費量誘導装置の制御方法及びプログラム |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108429265A (zh) * | 2018-02-12 | 2018-08-21 | 中国电力科学研究院有限公司 | 一种需求响应调控方法及装置 |
CN108429265B (zh) * | 2018-02-12 | 2021-02-02 | 中国电力科学研究院有限公司 | 一种需求响应调控方法及装置 |
JP2020170363A (ja) * | 2019-04-03 | 2020-10-15 | 東京瓦斯株式会社 | 需要調整システム、需要調整方法及びプログラム |
JP7274331B2 (ja) | 2019-04-03 | 2023-05-16 | 東京瓦斯株式会社 | 需要調整システム、需要調整方法及びプログラム |
JP7470833B2 (ja) | 2019-04-03 | 2024-04-18 | 東京瓦斯株式会社 | 需要調整システム、需要調整方法及びプログラム |
JP7470832B2 (ja) | 2019-04-03 | 2024-04-18 | 東京瓦斯株式会社 | 需要調整システム、需要調整方法及びプログラム |
CN112163687A (zh) * | 2020-06-28 | 2021-01-01 | 国家电网公司西北分部 | 一种基于负荷聚合商的用户侧两阶段调峰响应方法 |
CN112163687B (zh) * | 2020-06-28 | 2024-03-22 | 国家电网有限公司西北分部 | 一种基于负荷聚合商的用户侧两阶段调峰响应方法 |
Also Published As
Publication number | Publication date |
---|---|
JP6436924B2 (ja) | 2018-12-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Rashidizadeh-Kermani et al. | Stochastic programming model for scheduling demand response aggregators considering uncertain market prices and demands | |
WO2018174030A1 (ja) | 取引計画装置および取引計画方法 | |
KR102094137B1 (ko) | 전력거래 중계방법 | |
JP4734059B2 (ja) | 電力取引入札支援システムと方法、およびプログラム | |
JP2019082935A (ja) | 管理装置および管理方法 | |
JP6763193B2 (ja) | 需給計画装置、需給計画方法及びプログラム | |
Mahmoudi et al. | Employing demand response in energy procurement plans of electricity retailers | |
JP2019046281A (ja) | 電力価格予測システム | |
Priyan et al. | Trade credit financing in the vendor–buyer inventory system with ordering cost reduction, transportation cost and backorder price discount when the received quantity is uncertain | |
Charwand et al. | Exploring the trade-off between competing objectives for electricity energy retailers through a novel multi-objective framework | |
JP6436924B2 (ja) | 需給調整装置 | |
JP2005339527A (ja) | 電力市場における入札支援システム | |
JP2022065567A (ja) | 電力取引システム、電力取引方法および電力取引プログラム | |
JP2018102076A (ja) | 需給管理装置、需給管理方法及び需給管理プログラム | |
JP5835675B2 (ja) | 小口電力の集約売買支援システムおよび小口電力の集約売買支援方法 | |
KR102589568B1 (ko) | P2p 전력 거래 자동 중개 장치 및 방법 | |
JP7154244B2 (ja) | 電力需給計画作成装置及び電力需給計画作成方法 | |
JP7323673B2 (ja) | 管理装置および管理方法 | |
Li et al. | Risk-constrained generation asset arbitrage in power systems | |
JP2006285351A (ja) | 電力取引支援システムとその方法、およびプログラム | |
JP2020042738A (ja) | 情報処理装置、情報処理方法及びプログラム | |
JP2007280204A (ja) | 電力取引支援システムと方法、およびプログラム | |
JP3982761B2 (ja) | 電力取引決定方法、その装置およびそのプログラム | |
JP7403264B2 (ja) | エネルギー管理システム、統括管理装置およびエネルギー管理方法 | |
JP4400324B2 (ja) | 電力取引決定装置,電力取引方法回答システム,プログラム及び記憶媒体 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20170928 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20180921 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20181016 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20181113 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6436924 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |