JP2015203239A - Vertically movable mobile scaffold for assembling temporary overhead landing bridge - Google Patents

Vertically movable mobile scaffold for assembling temporary overhead landing bridge Download PDF

Info

Publication number
JP2015203239A
JP2015203239A JP2014083324A JP2014083324A JP2015203239A JP 2015203239 A JP2015203239 A JP 2015203239A JP 2014083324 A JP2014083324 A JP 2014083324A JP 2014083324 A JP2014083324 A JP 2014083324A JP 2015203239 A JP2015203239 A JP 2015203239A
Authority
JP
Japan
Prior art keywords
support
scaffold
column
fixed
strut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014083324A
Other languages
Japanese (ja)
Other versions
JP6059176B2 (en
Inventor
野村 裕晧
Yuko Nomura
裕晧 野村
國男 梶
Kunio Kaji
國男 梶
慧太 西尾
Keita Nishio
慧太 西尾
孝彦 樫本
Takahiko Kashimoto
孝彦 樫本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyu Co Ltd
Oak Co Ltd
Taiyu KK
Original Assignee
Taiyu Co Ltd
Oak Co Ltd
Taiyu KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyu Co Ltd, Oak Co Ltd, Taiyu KK filed Critical Taiyu Co Ltd
Priority to JP2014083324A priority Critical patent/JP6059176B2/en
Publication of JP2015203239A publication Critical patent/JP2015203239A/en
Application granted granted Critical
Publication of JP6059176B2 publication Critical patent/JP6059176B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Movable Scaffolding (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a vertically movable scaffold that allows easy installation of a work platform on multiple bearing piles, when assembling a landing bridge for constructing an overpass, etc.SOLUTION: A vertically movable scaffold 1 is used when installing a landing bridge for construction work, and is vertically movable along a bearing pile 70a of the landing bridge. The vertically movable scaffold 1 comprises: a fixing platform 2 having a horizontal column fitting surface and fixed at a reference position of the adjacent bearing piles 70a; an extendable column 4 installed on an upper surface 6 of the fixing platform 2, the column 4 having a bearing support part 3 connectable to a surface of the bearing pile, and extendable by being connected upward; a climbing device 11 installed on each of the adjacent columns 4, the climbing device having a scaffold base 10 and being movable vertically along the column 4; connecting scaffold members 14, 15 for connecting the climbing devices 11, the connecting scaffold members forming an intermediate scaffolding 14 between the scaffold bases 10; and a horizontal beam 4u connecting top ends of the adjacent columns 4 and may be hung from above.

Description

本発明は、例えば高架道路工事用の桟橋組立てに利用する作業用足場ユニットに関する。   The present invention relates to a working scaffold unit used, for example, for assembling a pier for elevated road construction.

地勢的に国土の大半が山岳部又は、平野部であっても地表の起伏が多く存在する傾斜地よりなる日本列島では、高速道路や鉄道等高架橋の築造工事において、施工レベル確保のために「工事用桟橋」の設置が必須とされる場合が多い。高所作業となる工事用桟橋の組立作業のために、支持杭に仮設足場を設置することが必要となる。具体的には、この工事用桟橋の組立ては、従来例としての図11に示すように、工事用桟橋の長手方向及び幅方向の双方向に所定間隔ごとに複数本の支持杭70a,70b,70cを地盤Gに立設し、幅及び長手方向の双方に隣り合う支持杭70a,70bの間に水平継ぎ材71及び斜め継ぎ材72と上部に縦断桁74を懸架することによって支持杭70a,70b同士を連結、補強した後、当該縦断桁74の上に横断桁75及び覆工板73を設置することにより行われる。   In the Japanese archipelago, which consists of sloped land where there is a lot of surface undulations even if the land is mostly mountainous or plain, in order to secure the construction level in the construction of viaducts such as highways and railways, In many cases, it is essential to install a pier. It is necessary to install a temporary scaffolding on the support piles for the assembly work of the construction pier, which is a work at a high place. Specifically, as shown in FIG. 11 as a conventional example, the construction pier is assembled by a plurality of support piles 70a, 70b, at predetermined intervals in both the longitudinal direction and the width direction of the construction pier. 70c is erected on the ground G, and the horizontal pile 71 and the diagonal piece 72 are suspended between the support piles 70a and 70b adjacent in both the width and the longitudinal direction, and the vertical girder 74 is suspended above the support pile 70a, After connecting and reinforcing 70b, the crossing girder 75 and the lining board 73 are installed on the longitudinal girder 74.

ここで、支持杭70a,70b間に配置される水平継ぎ材71及び斜め継ぎ材72は、所定間隔ごとに、支持杭70の異なる複数の高さに設けられるため、1本あたりの支持杭70a,70bに設けられる継ぎ材71,72の設置箇所にそれぞれ作業用の仮設足場が必要となる。このため、図11に示すように、1本の支持杭70a,70bに、作業が必要な箇所にのみ取り付ける複数の仮設足場76を設置することが行われていた。   Here, since the horizontal joint material 71 and the diagonal joint material 72 arranged between the support piles 70a and 70b are provided at a plurality of different heights of the support pile 70 at every predetermined interval, the support pile 70a per one. , 70b, a temporary scaffold for work is required at each of the locations where the joint members 71, 72 are provided. For this reason, as shown in FIG. 11, a plurality of temporary scaffolds 76 attached to only one place where work is required has been installed on one support pile 70a, 70b.

しかし、仮設足場76は、支持杭70a,70bの立設毎に、継ぎ材71,72の設置個数に応じて移設(取付け・取外し)の作業を行う必要があり、時間と費用がかかるという問題がある。また、仮設足場76は、部分的に設置される足場であるため、作業員の移動時や、組立,解体,移設作業時に別の昇降手段が必要となり、安全性の確保が困難であるという問題がある。   However, the temporary scaffold 76 needs to be relocated (attached / removed) according to the number of joint members 71, 72 installed every time the support piles 70a, 70b are erected, which is time consuming and expensive. There is. In addition, since the temporary scaffold 76 is a partially installed scaffold, another lifting means is required when the worker moves, or when assembling, dismantling, and moving work, and it is difficult to ensure safety. There is.

また、別の仮設足場の例としては、図12に示すように、支持杭70a,70bの立設毎に、地上から支持杭70a,70bの作業が必要な高さまで、連続的に構成される枠組み足場77を設置することで行われる。   Moreover, as another example of the temporary scaffold, as shown in FIG. 12, every time the support piles 70a and 70b are erected, the support piles 70a and 70b are continuously configured from the ground to a height at which the work of the support piles 70a and 70b is necessary. This is done by installing a framework scaffold 77.

枠組み足場77は、地上から高さ方向に連続的に構成されており、作業員の移動時や、組立,解体,移設作業時に別の昇降手段を必要としない。しかし、枠組み足場77は、本来、ビル建設等の高さ方向に進行する建設現場で用いられる仮設足場であり、建設物が完成するまで解体の必要がない建設現場での使用に比べ、平面的に進行する工事用ステージの組立においては、支持杭70a,70bの立設毎に、組立、解体作業を必要とし、その上、山岳部又は、傾斜地に枠組み足場の設置場所として平面的スペースを確保する必要があり、これらによる作業工数の増大によって時間と費用がかかることから、当該工事を目的とした仮設足場としては、適しておらず、設備規模が過大で、仮設足場の設置は、非常に煩雑な作業になるという問題があった。   The framework scaffold 77 is continuously configured in the height direction from the ground, and does not require a separate lifting means when the worker moves, or when assembling, dismantling, or moving work. However, the framework scaffold 77 is originally a temporary scaffold used at a construction site that progresses in the height direction, such as building construction, and is more planar than a construction site that does not require dismantling until the construction is completed. When assembling the construction stage, the assembly and dismantling work is required every time the support piles 70a and 70b are erected, and in addition, a planar space is secured as a place for installing the framework scaffolding in mountainous areas or sloped areas. Since it takes time and money due to the increase in work man-hours due to these, it is not suitable as a temporary scaffold for the purpose of the construction, the equipment scale is excessive, and the installation of the temporary scaffold is very There was a problem that it was a complicated task.

このような作業足場の設置及び解体の煩雑性を解消するために、特許文献1(特開平7−259322号公報)や特許文献2(特開2009−121108号公報)などに昇降式作業足場等が知られている。   In order to eliminate the complexity of installing and dismantling such work scaffolds, Patent Document 1 (Japanese Patent Laid-Open No. 7-259322), Patent Document 2 (Japanese Patent Laid-Open No. 2009-121108), etc. It has been known.

特許文献1に記載されている昇降足場は、足場マストに沿って走行台が垂直方向位置を変更可能に構成されているものであって、足場マストが伸張可能に構成されている昇降足場である。   The lifting scaffold described in Patent Literature 1 is a lifting scaffold in which the traveling platform is configured to be able to change the vertical position along the scaffold mast, and the scaffold mast is configured to be extendable. .

また、特許文献2には、足場のコンクリート打設高さに合わせて枠組み足場を設置するという問題を解消するため、昇降足場に搭載された鉄筋を所定の高さに持ち上げた後、ホイストにより吊り下げて鉄筋を高構造物に組み付ける組立て方法が開示されている。   In Patent Document 2, in order to solve the problem of installing a framework scaffold according to the concrete placement height of the scaffold, the rebar mounted on the lifting scaffold is lifted to a predetermined height and then suspended by a hoist. An assembly method for lowering and assembling a reinforcing bar to a high structure is disclosed.

特開平7−259322号公報JP 7-259322 A 特開2009−121108号公報JP 2009-121108 A

しかし、特許文献1の装置は、家屋などの建築物に支持して設けられる昇降足場であって、高架道路工事用の桟橋組立てなど、長手方向に沿って異なる支持杭に順次取りつけるには、組立て及び分解を繰り返し行う必要があることから、取り扱いが煩雑であり、設置及び解体時における安全性の確保が難しいという問題があった。   However, the device of Patent Document 1 is a lifting scaffold provided to support a building such as a house, and is assembled to be attached to different support piles along the longitudinal direction, such as a pier assembly for elevated road construction. In addition, since it is necessary to repeatedly perform disassembly, the handling is complicated, and it is difficult to ensure safety during installation and disassembly.

また、特許文献2の装置は、高構造物の上部に予めホイストを設置し、これによって鉄筋を吊り下げる構造であるため、予め昇降足場が移動するためのマストを設置しておく必要があり、設置位置を異ならせて設置及び解体を繰り返し行う必要がある桟橋組立には不向きであり、安全性の確保が困難であるという問題があった。   In addition, since the device of Patent Document 2 has a structure in which a hoist is previously installed on the upper part of a high structure and thereby hangs a reinforcing bar, it is necessary to previously install a mast for moving the lifting scaffold, There is a problem that it is not suitable for pier assembly that requires repeated installation and dismantling at different installation positions, and it is difficult to ensure safety.

したがって、本発明が解決しようとする技術的課題は、高架道路工事用の桟橋組立てなど、多数の支持杭に作業足場を容易に設置することができる昇降足場を提供することである。   Therefore, the technical problem to be solved by the present invention is to provide an elevating scaffold capable of easily installing work scaffolds on a large number of support piles such as pier assembly for elevated road construction.

本発明は、上記技術的課題を解決するために、以下の構成の昇降足場を提供する。   In order to solve the above technical problem, the present invention provides a lifting scaffold having the following configuration.

本発明の昇降足場は、工事用桟橋の設置工事において用いられ、桟橋の支持杭に沿って昇降可能な昇降足場であって、
前記支持杭の基準位置に固定されて支柱取付部を有する固定架台と、
前記固定架台に前記支持杭に平行に連結され、前記支持杭に連結される支持サポート部を有する、上方に連結することで伸張自在な支柱と、
前記支柱に設けられ、上面に足場台を有する前記支柱を昇降可能なクライミング装置と、
前記支柱に連結され、上方から前記支柱をクライミング装置と供に吊り下げ可能な吊り下げ部材とを有する。
The lifting scaffold of the present invention is used in the construction work of the construction pier, and is a lifting scaffold that can be lifted and lowered along the supporting pile of the pier,
A fixed base fixed to a reference position of the support pile and having a column mounting portion;
A support column connected to the fixed base in parallel to the support pile and having a support support portion connected to the support pile, and a column that can be extended by being connected upward,
A climbing device that is provided on the support and capable of raising and lowering the support having a scaffolding base on the upper surface;
A suspension member connected to the support column and capable of hanging the support column together with the climbing device from above.

前記支柱は、隣り合う前記支持杭にそれぞれ固定された前記固定架台にそれぞれ設けられ、
前記隣り合う支柱にそれぞれ設けられ同期駆動するクライミング装置を連結し、前記それぞれの足場台の間に中間足場を形成する連結足場部材と、
前記隣り合う支柱の上端にそれぞれ設けられ、前記吊り下げ部材を有する上部水平梁を備えることで、2つの支柱を連結して、一対として移動させることができる。
The support columns are respectively provided on the fixed mounts fixed to the adjacent support piles, respectively.
A connecting scaffold member that connects the climbing devices that are provided on the adjacent struts to be driven synchronously and forms an intermediate scaffold between the respective scaffolding bases,
By providing an upper horizontal beam provided at the upper end of the adjacent struts and having the suspension member, the two struts can be connected and moved as a pair.

前記支柱は、所定間隔ごとに前記クライミング装置が係止可能な係合部を備えており、
前記クライミング装置は、前記所定間隔を置いて上下に配置された係止部と、前記上下の係止部との間隔を伸縮させる駆動装置とを備える。
The strut includes an engaging portion that can be locked by the climbing device at predetermined intervals.
The climbing device includes a locking portion disposed above and below the predetermined interval, and a driving device that expands and contracts the interval between the upper and lower locking portions.

前記支柱は、基礎支柱と連結支柱から構成され、前記基礎支柱は、前記固定架台に設置され、前記連結支柱は、上端に連結されることによって、前記支柱全体の長さが伸張可能に構成されている。   The strut is composed of a base strut and a connection strut, the base strut is installed on the fixed base, and the connection strut is connected to an upper end so that the entire length of the strut can be extended. ing.

本発明によれば、固定架台を高さの基準レベルとすることができるため、当該固定架台に支柱を取りつけることで、支柱の支持構造を簡素化することができ、さらに支柱を上下につなげて伸張することで、支柱に対する足場の高さ位置の精度を向上させることができる。また、支柱に対して、昇降するクライミング装置を有するため、作業の安全性を確保することができ、さらに、他の支持杭への移動については、支柱とクライミング装置を一体的に吊り下げて移動させることができるため、設置する支持杭への移設を容易にし、足場解体時の安全性を確保することができる。   According to the present invention, since the fixed mount can be set to a reference level of height, the support structure of the support can be simplified by attaching the support to the fixed mount, and the support can be connected vertically. By extending, it is possible to improve the accuracy of the height position of the scaffold with respect to the support column. In addition, because it has a climbing device that moves up and down with respect to the support column, work safety can be ensured. Further, for movement to other support piles, the support column and climbing device are suspended and moved together. Therefore, the transfer to the support pile to be installed can be facilitated, and the safety when the scaffold is dismantled can be secured.

本発明の第1実施形態にかかる昇降足場の構成を模式的に示す図である。It is a figure which shows typically the structure of the raising / lowering scaffold concerning 1st Embodiment of this invention. 図1の昇降足場の構成を示す部分拡大正面図である。It is a partial expanded front view which shows the structure of the raising / lowering scaffold of FIG. 図1の昇降足場の構成を示す部分拡大側面図である。It is a partial expanded side view which shows the structure of the raising / lowering scaffold of FIG. 図1の昇降足場の構成を示す部分拡大平面図である。It is a partial enlarged plan view which shows the structure of the raising / lowering scaffold of FIG. 図4のA部分の部分拡大図である。It is the elements on larger scale of the A section of FIG. 図1の昇降足場の組立て手順を示す模式図であり、支持杭に固定架台を取りつける状態を示す図である。It is a schematic diagram which shows the assembly procedure of the raising / lowering scaffold of FIG. 1, and is a figure which shows the state which attaches a fixed mount to a support pile. 図1の昇降足場の組立て手順を示す模式図であり、固定架台に基礎支柱及び昇降足場ユニットを取りつける状態を示す図である。It is a schematic diagram which shows the assembly procedure of the raising / lowering scaffold of FIG. 1, and is a figure which shows the state which attaches a base support | pillar and a raising / lowering scaffold unit to a fixed mount. 図1の昇降足場の組立て手順を示す模式図であり、支柱に連結支柱を取りつける状態を示す図である。It is a schematic diagram which shows the assembly procedure of the raising / lowering scaffold of FIG. 1, and is a figure which shows the state which attaches a connection support | pillar to a support | pillar. 図1の昇降足場の組立て手順を示す模式図であり、支柱上限まで昇降足場ユニットが上昇した状態を示す図であり、(a)は正面図、(b)は側面図を示す。It is a schematic diagram which shows the assembly procedure of the raising / lowering scaffold of FIG. 1, and is a figure which shows the state which the raising / lowering scaffold unit raised to the support | pillar upper limit, (a) is a front view, (b) shows a side view. 図1の昇降足場の組立て手順を示す模式図であり、組み上がった昇降足場を支持杭から取り外す状態を示す図である。It is a schematic diagram which shows the assembly procedure of the raising / lowering scaffold of FIG. 1, and is a figure which shows the state which removes the assembled raising / lowering scaffold from a support pile. 従来の工事用桟橋の仮設足場の配置を示す模式図である。It is a schematic diagram which shows arrangement | positioning of the temporary scaffold of the conventional construction jetty. 従来の工事用桟橋の枠組み足場の配置を示す模式図である。It is a schematic diagram which shows arrangement | positioning of the frame scaffold of the conventional construction jetty.

以下、本発明の実施形態に係る昇降足場について、図面を参照しながら説明する。   Hereinafter, a lifting scaffold according to an embodiment of the present invention will be described with reference to the drawings.

図1は、本発明の実施形態に係る昇降足場の構成を示す模式図であり、(a)は幅方向から見た構成、(b)は長手方向から見た構成を示す図である。本実施形態にかかる昇降足場1は、工事用桟橋100の組立てに用いられるものである。工事用桟橋100は、図1(a)及び図1(b)に示す通り、地盤Gにステージの長手方向及び幅方向に複数並べて立設されている支持杭70a,70bを備える。既設の支持杭70bには、図1(b)に示すとおり、水平継ぎ材71及び覆工板73が設けられており、当該覆工板73に、クレーン101などの設備を配置する。昇降足場1は、新設の支持杭70aにこれらの部材を取りつける作業を行うための足場を構成するものである。なお、継ぎ材は、斜め継ぎ材(図11参照)も設けられるが、図1においては記載を省略する。   FIG. 1 is a schematic diagram showing a configuration of a lifting scaffold according to an embodiment of the present invention, where (a) is a configuration viewed from the width direction, and (b) is a configuration viewed from the longitudinal direction. The lifting scaffold 1 according to the present embodiment is used for assembling the construction jetty 100. As shown in FIGS. 1A and 1B, the construction pier 100 includes support piles 70 a and 70 b that are erected on the ground G side by side in the longitudinal direction and the width direction of the stage. As shown in FIG. 1B, the existing support pile 70 b is provided with a horizontal joint material 71 and a lining plate 73, and equipment such as the crane 101 is arranged on the lining plate 73. The elevating scaffold 1 constitutes a scaffold for performing the work of attaching these members to the newly installed support pile 70a. In addition, although the diagonal joining material (refer FIG. 11) is also provided as a joining material, description is abbreviate | omitted in FIG.

昇降足場1は、隣り合う一対の新設の支持杭70aのそれぞれに設けられる固定架台2と、それぞれの固定架台2の上面に設置され、支持杭70aの表面に連結可能な支持サポート部3を有する、上方に連結することで伸張自在な支柱4と、それぞれの支柱に沿って矢印90に示すように上下移動可能に設けられた昇降足場ユニット5とを備える。   The lifting / lowering scaffold 1 includes a fixed mount 2 provided on each of a pair of adjacent support piles 70a, and a support support portion 3 that is installed on the upper surface of each fixed mount 2 and can be connected to the surface of the support pile 70a. The support 4 is extendable by being connected upward, and the lifting and lowering scaffold unit 5 is provided so as to be movable up and down as indicated by an arrow 90 along each support.

図2は、図1の昇降足場の構成を示す部分拡大図である。固定架台2は、図1及び図2に示すように、新設の支持杭70aの下部近傍に固定されており、その上面が支柱取付面6となっている。支柱取付面6は支柱取付の高さ基準となっている。支柱取付面6には、支柱4(基礎支柱4a)を固定するための固定部7が設けられており、基礎支柱4aの下端を挿入して位置決め固定する。   FIG. 2 is a partially enlarged view showing the configuration of the lifting scaffold of FIG. As shown in FIGS. 1 and 2, the fixed mount 2 is fixed in the vicinity of the lower portion of a newly installed support pile 70 a, and the upper surface thereof serves as a column attachment surface 6. The column mounting surface 6 is a height reference for column mounting. The support mounting surface 6 is provided with a fixing portion 7 for fixing the support 4 (base support 4a), and the lower end of the support support 4a is inserted and fixed.

それぞれの固定架台2の間には、架台連結部材2aが設けられており、固定架台2の位置ずれを防止する。   A gantry connecting member 2 a is provided between the fixed gantry 2 to prevent the positional displacement of the fixed gantry 2.

支柱4は、固定架台2に取りつけられる基礎支柱4aと基礎支柱の上方に連結される連結支柱4bとで構成される。基礎支柱4aと連結支柱4bとは、上下両端に互いに連結可能なジョイントを有しており、基礎支柱4aと連結支柱4bの上端は、別の連結支柱4bの下端部分と連結できるように構成されている。連結支柱4bは、基礎支柱4a及び連結支柱4bの上方に設けられているジョイントに、下端のジョイントを連結していくことにより、支柱4が伸張する。なお、本実施形態では、基礎支柱4aと連結支柱4bとは、同じジョイント構成を有する同じ構成のものであるが、基礎支柱4aは、固定架台2との連結を強力にするために連結支柱4bと異なるジョイントを採用してもよい。   The support column 4 includes a foundation support column 4a attached to the fixed mount 2 and a connection support column 4b connected to the upper side of the foundation support column. The foundation support column 4a and the connection support column 4b have joints that can be connected to each other at both upper and lower ends, and the upper ends of the foundation support column 4a and the connection support column 4b are configured to be connected to the lower end portion of another connection support column 4b. ing. The connecting column 4b is extended by connecting the joint at the lower end to the joint provided above the basic column 4a and the connecting column 4b. In this embodiment, the foundation support column 4a and the connection support column 4b are of the same configuration having the same joint configuration, but the foundation support column 4a is connected to the fixed support frame 2 in order to strengthen the connection. Different joints may be used.

基礎支柱4aと連結支柱4bに設けられるジョイントとしては、基礎支柱4aと連結支柱4bを水平方向及び鉛直方向への位置ずれが生じないように、嵌め込み式のものであって、脱落しないように固定することができるものが好適に利用される。   As the joints provided on the foundation struts 4a and the connection struts 4b, the foundation struts 4a and the connection struts 4b are of a fitting type so as not to be displaced in the horizontal direction and the vertical direction, and fixed so as not to fall off. What can be used is preferably used.

支柱4の上端には、上部水平梁4uが設けられ、一対の支柱4を連結する。上部水平梁4uには、クレーン101によって上部水平梁4uに固定された支柱を一体的に吊持する吊り下げワイヤー4wが設けられる。吊り下げワイヤー4wは、本発明の吊り下げ部材に相当する。   An upper horizontal beam 4 u is provided at the upper end of the column 4 to connect the pair of columns 4. The upper horizontal beam 4u is provided with a suspension wire 4w that integrally suspends a column fixed to the upper horizontal beam 4u by the crane 101. The hanging wire 4w corresponds to the hanging member of the present invention.

また、支柱4の支持杭70aとの対向面には、支持サポート部3が設けられており、支持杭70aに設けられたサポート取付部材8に連結することによって、支柱4を支持杭70aにしっかりと固定する(図3参照)。なお、支持サポート部3は、一対の支持杭70aを跨ぐように設けられた水平継ぎ材71に固定してもよい(図4参照)。   Moreover, the support support part 3 is provided in the opposing surface with the support pile 70a of the support | pillar 4, By connecting with the support attachment member 8 provided in the support pile 70a, the support | pillar 4 is firmly fixed to the support pile 70a. (See FIG. 3). In addition, you may fix the support support part 3 to the horizontal joint material 71 provided so that a pair of support pile 70a might be straddled (refer FIG. 4).

基礎支柱4aと連結支柱4bには、図3に示すように、それぞれ同じ長さ寸法に構成されており、長さ寸法の4分の1の位置にそれぞれロックピン挿入孔9が設けられている。ロックピン挿入孔9は、後述するように昇降足場ユニット5のクライミング装置11が昇降動作する場合に、クライミング装置11と支柱4との係止を行うためのものである。基礎支柱4aと連結支柱4bとの長さ寸法の4分の1の位置にそれぞれロックピン挿入孔9が設けられていることにより、上下に連続するロックピン挿入孔9のピッチは、いずれも基礎支柱4aと連結支柱4bとの長さ寸法の半分となり、昇降足場ユニット5のクライミング装置11のピンの間隔をこれに合わせておくことで、支柱とクライミング装置とが確実に係合される。   As shown in FIG. 3, each of the basic support pillar 4a and the connecting support pillar 4b is configured to have the same length dimension, and a lock pin insertion hole 9 is provided at a position of a quarter of the length dimension. . The lock pin insertion hole 9 is for locking the climbing device 11 and the support column 4 when the climbing device 11 of the lifting scaffold unit 5 moves up and down as will be described later. Since the lock pin insertion holes 9 are respectively provided at positions that are a quarter of the lengths of the base columns 4a and the connection columns 4b, the pitches of the lock pin insertion holes 9 that are continuous in the vertical direction are all foundations. The strut 4a and the connecting strut 4b are half the length dimension, and the climbing device 11 of the lifting and lowering scaffolding unit 5 is matched to the pin spacing, so that the strut and the climbing device are reliably engaged.

昇降足場ユニット5は、足場台10と連結されたクライミング装置11とを備えており、クライミング装置11の動作により支柱を上下移動することができる。足場台10は、クライミング装置11の上方部分に位置し、水平に設けられた踏板12及び手摺り13を備え、作業者Mが搭乗して支柱70aに対する作業をするためのものである。左右の支柱4aに設けられる昇降足場ユニット5の足場台10は、互いの対向する側面には手摺り13が設けられておらず、当該位置に後述する中間足場14を連結することによって作業者Mが双方間を移動することができる。   The lifting and lowering scaffolding unit 5 includes a climbing device 11 connected to the scaffolding base 10, and the column can be moved up and down by the operation of the climbing device 11. The scaffold base 10 is located in the upper part of the climbing apparatus 11 and includes a horizontal tread 12 and a handrail 13, and the operator M gets on and works on the column 70 a. The scaffold platform 10 of the lifting scaffold unit 5 provided on the left and right support columns 4a is not provided with handrails 13 on the side surfaces facing each other, and an operator M can be obtained by connecting an intermediate scaffold 14 described later to the position. Can move between the two.

なお、足場台10には、図4に示すように、支持杭70aの全周囲にわたって作業ができるように、支持杭70a周囲を囲うように補助足場10aを取りつけてもよい。   In addition, as shown in FIG. 4, you may attach the auxiliary scaffold 10a to the scaffold base 10 so that the circumference | surroundings of the support pile 70a may be enclosed so that it can work | operate over the circumference | surroundings of the support pile 70a.

中間足場14は、左右の足場台10を連結するものであり、支持杭70a間の離間距離に応じて異なる足場台10との間の間隔が異なっても使用できるように伸縮自在に構成されている。中間足場14は,固定足場15とその両端に設けられた伸縮足場16とを備えており、矢印91に示すように、伸縮足場16の位置を変更することで、中間足場の寸法を調整することができる。   The intermediate scaffold 14 connects the left and right scaffold platforms 10 and is configured to be stretchable so that it can be used even if the distance between the scaffold platforms 10 differs according to the separation distance between the support piles 70a. Yes. The intermediate scaffold 14 includes a fixed scaffold 15 and telescopic scaffolds 16 provided at both ends thereof, and adjusts the dimensions of the intermediate scaffold by changing the position of the telescopic scaffold 16 as indicated by an arrow 91. Can do.

中間足場14は、左右の支柱4にしっかりと固定されている左右のクライミング装置11を連結することで、一対の支柱4を連結することができ、これにより後述する昇降足場1の他の支持杭70aへの移動時に支柱4間のズレなどを防止又は抑制する。   The intermediate scaffold 14 can connect the pair of support pillars 4 by connecting the left and right climbing devices 11 firmly fixed to the left and right support pillars 4, whereby other supporting piles of the lifting scaffold 1 described later. Misalignment between the columns 4 is prevented or suppressed when moving to 70a.

クライミング装置11は、上部フレーム17と下部フレーム18とを備えており、両者がクライミングシリンダー19で接続されている。また、クライミング装置11には、クライミングシリンダー19を油圧動作させるための油圧ユニット20が設けられている。   The climbing device 11 includes an upper frame 17 and a lower frame 18, and both are connected by a climbing cylinder 19. The climbing apparatus 11 is provided with a hydraulic unit 20 for hydraulically operating the climbing cylinder 19.

上部フレーム17と下部フレーム18はその上下方向の離間距離を変更可能に構成されており、当該離間距離の制御はクライミングシリンダー19により行われる。すなわち、クライミングシリンダー19が伸縮することで、上部フレーム17と下部フレーム18との離間距離が変化する。   The upper frame 17 and the lower frame 18 are configured to be able to change the separation distance in the vertical direction, and the separation distance is controlled by the climbing cylinder 19. In other words, the distance between the upper frame 17 and the lower frame 18 changes as the climbing cylinder 19 expands and contracts.

上部フレーム17と下部フレーム18には、それぞれ支柱4のコーナー部分を支持するガイドローラー21が設けられている。ガイドローラー21は、支柱4の長手方向に回転自在に構成され、昇降足場ユニット5を支柱4に沿って移動させると供に支柱4の軸方向に交差する方向へのガタツキを防止する。   The upper frame 17 and the lower frame 18 are each provided with a guide roller 21 that supports the corner portion of the support column 4. The guide roller 21 is configured to be rotatable in the longitudinal direction of the support column 4, and prevents rattling in a direction crossing the axial direction of the support column 4 as the lifting scaffold unit 5 is moved along the support column 4.

また、上部フレーム17と下部フレーム18には、基礎支柱4aと連結支柱4bのロックピン挿入孔9に挿入される上部ロックピン22と下部ロックピン23とがそれぞれ設けられている。上部ロックピン22と下部ロックピン23はそれぞれ進退自在に構成されており、それぞれ、基礎支柱4aと連結支柱4bのロックピン挿入孔9に挿入されることで、昇降足場ユニット5を支柱4に固定する。上部ロックピン22と下部ロックピン23との距離は、上部フレーム17と下部フレーム18が近接位置にあるときはロックピン挿入孔9のピッチと同じであり、上部フレーム17と下部フレーム18が最大離間したときはロックピン挿入孔9のピッチの2倍になるようになっている。   Further, the upper frame 17 and the lower frame 18 are respectively provided with an upper lock pin 22 and a lower lock pin 23 that are inserted into the lock pin insertion holes 9 of the foundation column 4a and the connection column 4b. The upper lock pin 22 and the lower lock pin 23 are configured to be freely movable back and forth, and are fixed to the support column 4 by being inserted into the lock pin insertion holes 9 of the foundation support column 4a and the connecting support column 4b, respectively. To do. The distance between the upper lock pin 22 and the lower lock pin 23 is the same as the pitch of the lock pin insertion holes 9 when the upper frame 17 and the lower frame 18 are close to each other. In this case, the pitch of the lock pin insertion holes 9 is doubled.

昇降足場ユニット5は、左右のクライミング装置11が、下記に示すように、上部フレーム17と下部フレーム18及びクライミングシリンダー19が同期して動作することによって支柱4を上下移動する。昇降足場ユニット5を上昇させる場合は、下部フレーム18が支柱4に固定された状態で、クライミングシリンダー19を伸張させ、その後、上部フレーム17を支柱4に固定する。次いで、下部フレーム18の固定を解除し、クライミングシリンダー19を縮小させる。   As shown below, the lifting and lowering scaffold unit 5 moves the column 4 up and down by the upper frame 17, the lower frame 18, and the climbing cylinder 19 operating synchronously as shown below. When the lifting scaffold unit 5 is raised, the climbing cylinder 19 is extended with the lower frame 18 fixed to the support column 4, and then the upper frame 17 is fixed to the support column 4. Next, the lower frame 18 is released and the climbing cylinder 19 is reduced.

一方、昇降足場ユニット5を下降させる場合は、上部フレーム17が支柱4に固定された状態で、クライミングシリンダー19を伸張させ、その後、下部フレーム18を支柱4に固定する。次いで、上部フレーム18の固定を解除し、クライミングシリンダー19を縮小させる。   On the other hand, when lowering the lifting scaffold unit 5, the climbing cylinder 19 is extended with the upper frame 17 fixed to the support column 4, and then the lower frame 18 is fixed to the support column 4. Next, the upper frame 18 is released and the climbing cylinder 19 is reduced.

このように、左右のクライミング装置11を同期して動作させることで、昇降足場ユニット5の支柱4における位置を自由に変更することができる。なお、それぞれのクライミング装置11を駆動させるための電源Vは、例えば図1に示すように地面G上に配置し、ケーブルでクライミング装置11に給電するようにしてもよい。   Thus, by operating the left and right climbing apparatuses 11 in synchronization, the position of the lifting and lowering scaffold unit 5 on the column 4 can be freely changed. In addition, the power supply V for driving each climbing apparatus 11 may be arrange | positioned on the ground G, for example, as shown in FIG. 1, and may be made to supply electric power to the climbing apparatus 11 with a cable.

次に,本実施形態にかかる昇降足場1の組立て手順について説明する。まず、地面Gに所定間隔に立設された支持杭70aの所定高さに固定架台2を取りつけるための位置決めを行なう。この位置決めには、固定架台2の据え付け基準となるものであり、例えば、地面から所定の高さとなるように工事の目的などに応じて適宜決定される。また、測定された据え付け基準位置には、位置決めのための目印を支持杭70a表面に溶接などで取りつけるようにしてもよい。当該目印は、固定架台2が支柱に対する位置ずれを防止するためのストッパーとして使用することもできる。   Next, the assembly procedure of the lifting scaffold 1 according to the present embodiment will be described. First, positioning for attaching the fixed mount 2 to a predetermined height of the support pile 70a erected on the ground G at a predetermined interval is performed. This positioning serves as a reference for installation of the fixed mount 2 and is appropriately determined according to the purpose of the construction so as to be a predetermined height from the ground. Moreover, you may make it attach the mark for positioning to the surface of the support pile 70a by welding etc. to the measured installation reference position. The mark can also be used as a stopper for preventing the fixed gantry 2 from being displaced with respect to the column.

次に、図6に示すように、決定された据え付け基準位置に固定架台2を取りつける。固定架台2は、上記のように、支柱取付面6が据え付け基準位置となるように支持杭70aに取りつけられ、当該支柱取付面6に設けられた固定部7に基礎支柱4aを固定することによって、基礎支柱4aに設けられている昇降足場ユニット5の固定位置を所望の位置とすることができる。   Next, as shown in FIG. 6, the fixed base 2 is attached to the determined installation reference position. As described above, the fixed mount 2 is attached to the support pile 70a so that the support mounting surface 6 becomes the installation reference position, and the base support 4a is fixed to the fixing portion 7 provided on the support mounting surface 6. And the fixed position of the raising / lowering scaffold unit 5 provided in the foundation support | pillar 4a can be made into a desired position.

次に、図7に示すように、クレーン101から吊り下げて基礎支柱4a及びクライミング装置11を一体的に吊り下げて、矢印92に示すように、固定架台2に連結する。このとき、クライミング装置11は基礎支柱4aに固定されており、両者を一体的に吊り下げられ、固定架台2に連結される。左右のクライミング装置11を固定した後、中間足場14をクレーン101で吊り下げて矢印93に示すように、足場台10の間に配置連結する。また、基礎支柱4aの支持サポート部3を支持杭70aに連結し、支柱4を支持杭70aに固定する。   Next, as shown in FIG. 7, the foundation column 4 a and the climbing device 11 are suspended integrally from the crane 101 and connected to the fixed base 2 as indicated by an arrow 92. At this time, the climbing device 11 is fixed to the foundation column 4 a, and both are integrally suspended and connected to the fixed mount 2. After fixing the left and right climbing apparatuses 11, the intermediate scaffold 14 is suspended by the crane 101 and arranged and connected between the scaffolding platforms 10 as indicated by arrows 93. Moreover, the support support part 3 of the foundation support | pillar 4a is connected to the support pile 70a, and the support | pillar 4 is fixed to the support pile 70a.

次いで、図8に示すように、支柱4の上端に連結支柱4bを取りつける。連結支柱4bは、上部水平梁4uに固定された状態でクレーン101に吊り下げられ、矢印94に示すように支柱4の上端に取りつけられる。延長部分の連結支柱4bについては、クライミング装置11を上昇させながら、支持サポート部3を支持杭70aに連結し、延長部分の支柱4を支持杭70aに固定する。   Next, as shown in FIG. 8, the connecting column 4 b is attached to the upper end of the column 4. The connecting column 4 b is suspended from the crane 101 while being fixed to the upper horizontal beam 4 u, and is attached to the upper end of the column 4 as indicated by an arrow 94. About the connection pillar 4b of the extension part, while raising the climbing apparatus 11, the support support part 3 is connected to the support pile 70a, and the support pillar 70a of the extension part is fixed to the support pile 70a.

この動作を繰り返し行い、支柱4を所望の高さまで伸張させた後、昇降足場ユニット5を任意の高さに移動させて作業を行う。図9は、昇降足場ユニット5を上昇させながら所定の位置に水平継ぎ材71を取りつける作業を行い、昇降足場ユニット5を最上位置まで移動した状態を示している。   This operation is repeated, and after the column 4 is extended to a desired height, the lifting and lowering scaffold unit 5 is moved to an arbitrary height to perform the work. FIG. 9 shows a state where the lifting scaffold unit 5 is moved to the uppermost position by performing the work of attaching the horizontal joint material 71 to a predetermined position while raising the lifting scaffold unit 5.

当該支持杭70aについての作業が終了すると、昇降足場ユニットを当該支持杭70aから取り外し、別の支持杭に移動させる。この場合は、上記のように支柱4の上端を上部水平梁4uに固定してクレーン101で吊り下げた状態で、昇降足場ユニット5を最下位置まで下降させながら、支持サポート部3を支持杭70aから取り外す(図10参照)。このとき、支柱の上端は、上部水平梁4uで連結され、下端は昇降足場ユニット5で連結されているため、支柱4の歪みや位置ずれなどを防止することができ、当該状態で、次の支持杭70aまで、吊り下げた状態で移動させることができる。   When the work on the support pile 70a is finished, the lifting scaffold unit is removed from the support pile 70a and moved to another support pile. In this case, with the upper end of the support column 4 fixed to the upper horizontal beam 4u and suspended by the crane 101 as described above, the support support part 3 is supported by the support pile while the lifting scaffold unit 5 is lowered to the lowest position. Remove from 70a (see FIG. 10). At this time, since the upper end of the support column is connected by the upper horizontal beam 4u and the lower end is connected by the lifting / lowering scaffold unit 5, it is possible to prevent the support column 4 from being distorted or misaligned. The support pile 70a can be moved in a suspended state.

以上説明したように、本実施形態にかかる昇降足場1によれば、新設又は既設の支持杭の水準位置に取りつけた固定架台の上に支柱を積み上げていくことで支柱を伸張させることができ、また、支柱に取りつけたピン挿入孔によって、昇降足場ユニット5を特定の位置に固定することができるため、作業足場ユニットの高さ位置を精度よく決定することができる。また、一対の支柱の上端及び下端を固定することによって、歪みを発生させることなく全体として取り外し及び設置場所の変更を行うことができるため、昇降足場1の施工及び取り外しの手間を容易にし、安全性を確保することができる。   As described above, according to the lifting scaffold 1 according to the present embodiment, the column can be extended by stacking the column on the fixed base attached to the level position of the newly installed or existing support pile, In addition, since the lifting scaffold unit 5 can be fixed at a specific position by the pin insertion hole attached to the support column, the height position of the work scaffold unit can be determined with high accuracy. In addition, by fixing the upper and lower ends of the pair of struts, it is possible to remove and change the installation location as a whole without causing distortion, making it easy to construct and remove the lifting scaffold 1 and safety Sex can be secured.

なお、本発明は上記実施形態に限定されるものではなく、その他種々の態様で実施可能である。例えば、クライミング装置11の構成は、本実施形態に限定されるものではなく、例えば、ラックピニオンなどを用いた昇降機構を用いてもよい。   In addition, this invention is not limited to the said embodiment, It can implement in another various aspect. For example, the configuration of the climbing device 11 is not limited to the present embodiment, and for example, an elevating mechanism using a rack and pinion may be used.

1 昇降足場
2 固定架台
2a 架台連結部材
3 支持サポート部
4 支柱
4a 基礎支柱
4b 連結支柱
4u 上部水平梁
5 昇降足場ユニット
6 固定架台上面
7 固定部
8 サポート取付部材
9 ロックピン挿入孔
10 足場台
11 クライミング装置
12 踏板
13 手摺り
14 中間足場
15 固定足場
16 伸縮足場
17 上部フレーム
18 下部フレーム
19 クライミングシリンダー
20 油圧ユニット
21 ガイドローラー
22 上部ロックピン
23 下部ロックピン
70a,70b 支持杭
71 水平継ぎ材
72 斜め継ぎ材
73 覆工板
101 クレーン
DESCRIPTION OF SYMBOLS 1 Lifting scaffold 2 Fixed mount frame 2a Mount connection member 3 Support support part 4 Support | pillar 4a Foundation support column 4b Connection support column 4u Upper horizontal beam 5 Lifting scaffold unit 6 Fixed mount upper surface 7 Fixed part 8 Support attachment member 9 Lock pin insertion hole 10 Scaffold base 11 Climbing device 12 Tread 13 Handrail 14 Intermediate scaffold 15 Fixed scaffold 16 Telescopic scaffold 17 Upper frame 18 Lower frame 19 Climbing cylinder 20 Hydraulic unit 21 Guide roller 22 Upper lock pin 23 Lower lock pin 70a, 70b Support pile 71 Horizontal joint 72 Inclined Jointing material 73 Lining board 101 Crane

Claims (4)

工事用桟橋の設置工事において用いられ、桟橋の支持杭に沿って昇降可能な昇降足場であって、
前記支持杭の基準位置に固定されて支柱取付部を有する固定架台と、
前記固定架台に前記支持杭に平行に連結され、前記支持杭に連結される支持サポート部を有する、上方に連結することで伸張自在な支柱と、
前記支柱に設けられ、上面に足場台を有する前記支柱を昇降可能なクライミング装置と、
前記支柱に連結され、上方から前記支柱をクライミング装置と供に吊り下げ可能な吊り下げ部材とを有することを特徴とする、昇降足場。
It is used in the construction work of the construction pier, and is a lifting scaffold that can be raised and lowered along the support pile of the pier,
A fixed base fixed to a reference position of the support pile and having a column mounting portion;
A support column connected to the fixed base in parallel to the support pile and having a support support portion connected to the support pile, and a column that can be extended by being connected upward,
A climbing device that is provided on the support and capable of raising and lowering the support having a scaffolding base on the upper surface;
An elevating scaffold comprising a suspension member coupled to the support column and capable of hanging the support column from above with a climbing device.
前記支柱は、隣り合う前記支持杭にそれぞれ固定された前記固定架台にそれぞれ設けられ、
前記隣り合う支柱にそれぞれ設けられ同期駆動するクライミング装置を連結し、前記それぞれの足場台の間に中間足場を形成する連結足場部材と、
前記隣り合う支柱の上端にそれぞれ設けられ、前記吊り下げ部材を有する上部水平梁を備えることを特徴とする、請求項1に記載の昇降足場。
The support columns are respectively provided on the fixed mounts fixed to the adjacent support piles, respectively.
A connecting scaffold member that connects the climbing devices that are provided on the adjacent struts to be driven synchronously and forms an intermediate scaffold between the respective scaffolding bases,
The lifting scaffold according to claim 1, further comprising an upper horizontal beam provided at each of upper ends of the adjacent columns and having the suspension member.
前記支柱は、所定間隔ごとに前記クライミング装置が係止可能な係合部を備えており、
前記クライミング装置は、前記所定間隔を置いて上下に配置された係止部と、前記上下の係止部との間隔を伸縮させる駆動装置とを備える、ことを特徴とする、請求項1又は2に記載の昇降足場。
The strut includes an engaging portion that can be locked by the climbing device at predetermined intervals.
The said climbing apparatus is provided with the latching | locking part arrange | positioned up and down at the said predetermined space | interval, and the drive device which expands / contracts the space | interval of the said upper and lower latching | locking part, It is characterized by the above-mentioned. Lifting scaffold as described in.
前記支柱は、基礎支柱と連結支柱から構成され、前記基礎支柱は、前記固定架台に設置され、前記連結支柱は、上端に連結されることによって、前記支柱全体の長さが伸張可能に構成されていることを特徴とする、請求項1から3のいずれか1つに記載の昇降足場。   The strut is composed of a base strut and a connection strut, the base strut is installed on the fixed base, and the connection strut is connected to an upper end so that the entire length of the strut can be extended. The lifting scaffold according to any one of claims 1 to 3, characterized in that
JP2014083324A 2014-04-15 2014-04-15 Mobile lifting scaffold for assembling temporary elevated jetty Active JP6059176B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014083324A JP6059176B2 (en) 2014-04-15 2014-04-15 Mobile lifting scaffold for assembling temporary elevated jetty

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014083324A JP6059176B2 (en) 2014-04-15 2014-04-15 Mobile lifting scaffold for assembling temporary elevated jetty

Publications (2)

Publication Number Publication Date
JP2015203239A true JP2015203239A (en) 2015-11-16
JP6059176B2 JP6059176B2 (en) 2017-01-11

Family

ID=54596864

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014083324A Active JP6059176B2 (en) 2014-04-15 2014-04-15 Mobile lifting scaffold for assembling temporary elevated jetty

Country Status (1)

Country Link
JP (1) JP6059176B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642049A (en) * 2017-08-23 2018-01-30 柳州欧维姆机械股份有限公司 A kind of device and its installation method changed for main rope of suspension bridge cord clip
CN111502215A (en) * 2020-05-26 2020-08-07 中铁十六局集团城市建设发展有限公司 Movable scaffold
CN115142662A (en) * 2022-08-17 2022-10-04 中建七局第二建筑有限公司 Installation and construction method of attached lifting scaffold

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4969529U (en) * 1972-09-28 1974-06-17
JPS60154433U (en) * 1984-03-26 1985-10-15 日立造船株式会社 Work scaffolding for elevating offshore work platform
JP2010007365A (en) * 2008-06-27 2010-01-14 Taisei Corp Form timbering apparatus and form apparatus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4969529U (en) * 1972-09-28 1974-06-17
JPS60154433U (en) * 1984-03-26 1985-10-15 日立造船株式会社 Work scaffolding for elevating offshore work platform
JP2010007365A (en) * 2008-06-27 2010-01-14 Taisei Corp Form timbering apparatus and form apparatus

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642049A (en) * 2017-08-23 2018-01-30 柳州欧维姆机械股份有限公司 A kind of device and its installation method changed for main rope of suspension bridge cord clip
CN111502215A (en) * 2020-05-26 2020-08-07 中铁十六局集团城市建设发展有限公司 Movable scaffold
CN115142662A (en) * 2022-08-17 2022-10-04 中建七局第二建筑有限公司 Installation and construction method of attached lifting scaffold
CN115142662B (en) * 2022-08-17 2023-08-11 中建七局第二建筑有限公司 Installation construction method of attached lifting scaffold

Also Published As

Publication number Publication date
JP6059176B2 (en) 2017-01-11

Similar Documents

Publication Publication Date Title
JP4563413B2 (en) Bridge girder construction method
JP5394334B2 (en) Construction method of work floor for work at height
KR102115380B1 (en) Hydraulic slipform safety locking device and virtical structure and slab construction method using the same
KR101922324B1 (en) Ceiling lift up construction method
JP2010265727A (en) Method for demolishing building using floor climbing type tower crane
JP6503716B2 (en) Demolition system and demolition method
JP2009091123A (en) Crane for steel tower
JP2009132474A (en) Mounting device of climbing frame
JP6893188B2 (en) Demolition system and demolition method of existing structures
JP6059176B2 (en) Mobile lifting scaffold for assembling temporary elevated jetty
JP6508958B2 (en) Demolition system and demolition method
JP2007291719A (en) Method and equipment for erecting heavy load
US20130263549A1 (en) Safety screen system for steel erection work
JP2010133084A (en) Method of constructing hollow high structure
JP5421143B2 (en) Overhead crane installation equipment
JP3179138U (en) Scaffolding support for leg head construction
JP6508959B2 (en) Demolition system and demolition method
JP2021042632A (en) Cantilever device for bridge construction and method for erecting and demolishing bridge
KR102089758B1 (en) Formwork structure supported by column unit
JP7136309B2 (en) Superstructure material transportation equipment and superstructure material transportation method
CN215564411U (en) Sliding construction device for high-rise cylindrical building
JP6449637B2 (en) Building construction method
JP5437876B2 (en) Method of dismantling and removing support members in the construction process of RC RC ramen structure viaduct
JP2006104832A (en) Construction method of structure, structure and elevator
JP2780571B2 (en) Reinforcing cage construction equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20151224

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161124

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20161206

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20161208

R150 Certificate of patent or registration of utility model

Ref document number: 6059176

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250