JP2010265727A - Method for demolishing building using floor climbing type tower crane - Google Patents

Method for demolishing building using floor climbing type tower crane Download PDF

Info

Publication number
JP2010265727A
JP2010265727A JP2009120093A JP2009120093A JP2010265727A JP 2010265727 A JP2010265727 A JP 2010265727A JP 2009120093 A JP2009120093 A JP 2009120093A JP 2009120093 A JP2009120093 A JP 2009120093A JP 2010265727 A JP2010265727 A JP 2010265727A
Authority
JP
Japan
Prior art keywords
support
mast
building
floor
tower crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009120093A
Other languages
Japanese (ja)
Inventor
Hironori Arita
浩徳 在田
Original Assignee
Shimizu Corp
清水建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp, 清水建設株式会社 filed Critical Shimizu Corp
Priority to JP2009120093A priority Critical patent/JP2010265727A/en
Publication of JP2010265727A publication Critical patent/JP2010265727A/en
Pending legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To arrange a tower crane inside a building to carry out efficient demolition work, and to reduce a term of work and an expense required for the demolition work. <P>SOLUTION: A crane body 4 is installed on a building roof, and is constituted to form a double layer support system having a lower support mechanism 20 for supporting a lower part 3a of a mast 3 vertically and horizontally to a skeleton of the second support story P2, and an upper support mechanism 10 for supporting the vertical-directional intermediate part of the mast 3 vertically and horizontally to the skeleton of the first support story P1, middle and high stories of the building 2 are demolished while climbing down through the double layer support system, the lower support mechanism 20 and the upper support mechanism 10 are removed, and a self-support system is formed therein to make the mast 3 self-stand on a base frame installed in a foundation story of the building, so as to demolish a lower story of the building, while climbing down. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、フロアクライミング型タワークレーンを用いた建物解体方法に関する。 The present invention relates to a building dismantling method using a floor climbing type tower crane.
従来、鉄骨系の建物を解体する場合、建物を建てる場合と逆の順序で、解体した部材をクレーンで高所から吊り下ろしながら解体を行っている。この場合、建物の周囲の敷地に余裕があり、十分に揚程が確保できる場合には、移動式クレーンを地上に設置して行うことができるが、敷地が狭い場合や建物が高層の場合等においてはタワークレーンを使用している現状がある。つまり、移動式クレーンを採用する場合、クレーン本体のスペースだけでなくジブを倒して組立、解体できる作業スペースが必要であり、市街地のような敷地が狭いところではスペースが確保できないことから、建物高さが低い場合であってもタワークレーンを採用している。 Conventionally, when dismantling a steel-based building, dismantling is performed while suspending the disassembled members from a high place with a crane in the reverse order of constructing the building. In this case, if there is room in the site around the building and a sufficient lift can be secured, a mobile crane can be installed on the ground, but in cases where the site is small or the building is high-rise, etc. Is currently using tower cranes. In other words, when adopting a mobile crane, not only the space of the crane body but also a work space that can be assembled and disassembled by tilting the jib is necessary, and space cannot be secured in a small site such as an urban area. Even if the height is low, a tower crane is used.
ところで、タワークレーンとして、マストを建物内部に設置するフロアクライミングによるものが周知であり、建物の構築高に合わせてマスト下端の支持部を上層へ盛り替えつつクライミングさせていくものがある(例えば、特許文献1参照)。
特許文献1には、基礎階に十字状にビームを配置させたクロスベース(ベース架台)を設置し、そのベース架台にマストを剛接続し、そのマストの上部に昇降装置を上下方向に移動自在に挿通支持させ、この昇降装置の上部に接続された旋回台を介してジブや揚重機構などを備えたクレーン本体が取り付けたタワークレーンにおいて、建物の各階のスラブにベース架台を通過させることが可能な開口部を設け、ベース架台を下方から引き上げて構築した上階部に移設しつつ、クレーン本体をクライミングさせる手順を繰り返しながら建物を構築する方法について記載されている。
By the way, as a tower crane, one by floor climbing in which a mast is installed inside a building is well known, and there is one that climbs while rearranging the support part at the lower end of the mast to the upper layer according to the building height of the building (for example, Patent Document 1).
In Patent Document 1, a cross base (base mount) in which beams are arranged in a cross shape on a base floor is installed, a mast is rigidly connected to the base mount, and a lifting device can be moved vertically on the mast. In a tower crane attached with a crane body equipped with a jib or lifting mechanism through a swivel connected to the upper part of this lifting device, the base frame can be passed through the slab on each floor of the building It describes a method of constructing a building by repeating the procedure of climbing the crane body while providing a possible opening and moving it to the upper floor constructed by pulling up the base stand from below.
特開平11−301973号公報Japanese Patent Laid-Open No. 11-301973
しかしながら、タワークレーンを用いて建物を解体する従来の方法では、以下のような問題があった。
すなわち、タワークレーンを用いて建物を解体する場合には、上述したようにタワークレーンを建物の外部に設置しているのが一般的である。つまり、特許文献1のようにフロアクライミング式のタワークレーンを建物内部に設置する場合、解体開始時にベース架台を最上階に据える必要があり、フロア解体作業によりタワークレーンの設置部が不安定となるおそれがあった。さらに、常にベース架台を設置するフロアを解体フロアよりも下に設ける必要があり、解体の進捗に応じてタワークレーンを下階へクライミングダウンするために、スラブに開口部を先行して設ける必要があった。この先行して設けられる開口部は解体フロアとは異なるフロアとなることから、別途の解体手段が必要になる不具合があった。しかも、先行して設ける開口部よりも上方の開口部には、既にタワークレーン本体が設置されていてその開口部を占有しているため、開口部を先行して設ける際に発生する解体物を上方へ搬出することが困難であった。
このように、建物本体の解体前に、タワークレーンのベース架台が貫通できる開口部を先行して設けると、先行工事に伴って工期が延びるうえ、解体費が増大するという問題があった。
However, the conventional method of demolishing a building using a tower crane has the following problems.
That is, when dismantling a building using a tower crane, the tower crane is generally installed outside the building as described above. That is, when a floor climbing type tower crane is installed inside a building as in Patent Document 1, it is necessary to place the base stand on the top floor at the start of dismantling, and the floor crane dismantling operation makes the tower crane installation part unstable. There was a fear. In addition, it is necessary to always provide the floor on which the base frame is installed below the dismantling floor, and in order to climb the tower crane down to the lower floor as the dismantling progresses, it is necessary to provide an opening in the slab in advance. there were. Since the opening provided in advance is a floor different from the dismantling floor, there is a problem that a separate disassembling means is required. Moreover, since the tower crane main body is already installed and occupies the opening in the opening above the opening provided in advance, the dismantled matter generated when the opening is provided in advance It was difficult to carry it out upward.
Thus, prior to dismantling the building body, if an opening through which the tower base of the tower crane can be penetrated is provided in advance, there is a problem that the construction period is extended along with the preceding construction and the dismantling cost increases.
本発明は、上述する問題点に鑑みてなされたもので、タワークレーンを建物内部に配置して効率よく解体作業が行え、解体作業にかかる工期と費用の低減を図ることができるフロアクライミング型タワークレーンを用いた建物解体方法を提供することを目的とする。   The present invention has been made in view of the above-described problems, and a floor climbing type tower in which a tower crane is arranged inside a building and can be efficiently dismantled, and the work period and cost for dismantling can be reduced. The object is to provide a building dismantling method using a crane.
上記目的を達成するため、本発明に係るフロアクライミング型タワークレーンを用いた建物解体方法では、マストと、マストの上部を挿通支持させた状態でそのマストに沿って上下動自在とされるクレーン本体とを設け、建物内の各階の躯体に形成される開口部にマストを配置させるフロアクライミング型タワークレーンを用いた建物解体方法であって、クレーン本体を建物屋上に設置するとともに、マストの上下方向中間部を第1支持階の躯体に垂直支持および水平支持させた上部支持部と、マストの下部を上部支持部より下方の第2支持階の躯体に水平支持させた下部支持部とを有する二層支持方式を形成する工程と、二層支持方式によりクライミングダウンさせながら建物の解体する工程と、建物の基礎階にベース架台を設置する工程と、下部支持部および上部支持部によるマストに対する支持を解除するとともに、ベース架台にマストを自立させる自立支持方式を形成する工程と、自立支持方式によりクライミングダウンさせながら建物を解体する工程とを有することを特徴としている。 In order to achieve the above object, in the building dismantling method using the floor climbing type tower crane according to the present invention, the crane main body is movable up and down along the mast in a state where the mast and the upper part of the mast are inserted and supported. The building dismantling method using the floor climbing type tower crane in which the mast is arranged in the opening formed in the frame of each floor in the building, and the crane body is installed on the building rooftop and the mast up and down direction An upper support part in which the middle part is vertically supported and horizontally supported by the housing of the first support floor, and a lower support part in which the lower part of the mast is horizontally supported by the housing of the second support floor below the upper support part. A process of forming a layer support system, a process of demolishing a building while climbing down using a two-layer support system, and a process of installing a base frame on the foundation floor And releasing the support to the mast by the lower support part and the upper support part, and forming a self-supporting system in which the mast is self-supporting on the base frame, and dismantling the building while climbing down by the self-supporting system It is characterized by.
本発明では、例えば二層支持方式が採用できないような建物の低層階の解体時においては、ベース架台でマストを支持する自立支持方式を採用し、それ以外の中高層階の解体持には各階のスラブによりマストに対する水平支持、垂直支持を取ることが可能な二層支持方式を採用することができる。この二層支持方式においては、マストにかかるモーメント(水平荷重)を下部支持部と上部支持部の上下2層で受けもつことができ、タワークレーンの自重および吊荷作業時の反力による垂直荷重を上部支持部で受けもち、建物に対して効率よく伝達して支持することができる。すなわち、二層支持方式では、モーメントによる垂直荷重を各支持部の水平支持で吸収してこれを作用させないため、マストにかかる全荷重をそのベース架台にもたせる自立支持方式による場合と比べて、上部支持部で受ける垂直荷重を小さくすることができる。 In the present invention, for example, when demolishing a lower floor of a building where a two-layer support system cannot be adopted, a self-supporting support system that supports a mast with a base frame is adopted, and other middle floors are dismantled with each floor A two-layer support system that can take horizontal support and vertical support for the mast by slabs can be adopted. In this two-layer support system, the moment (horizontal load) applied to the mast can be handled by the upper and lower two layers of the lower support part and the upper support part, and the vertical load due to the weight of the tower crane and the reaction force during lifting work Can be received and supported efficiently by the upper support part. That is, in the two-layer support system, the vertical load due to the moment is absorbed by the horizontal support of each support part and this is not acted on, so compared to the case of the self-supporting support system in which the entire load applied to the mast is also applied to the base frame The vertical load received by the support portion can be reduced.
このように、上部支持部で受ける垂直荷重が小さいのでタワークレーン設置部の直近の躯体の梁に垂直荷重をもたせることが可能であり、従来のようなベース架台のみでタワークレーン全体にかかる荷重を支持する自立型タワークレーンに比べてベース架台を小型化させることができる。しかも、低層階における最終段階での解体工程時に自立支持方式を採用すればよく、その他はベース架台の盛り替えが不要な二層支持方式を採用すればよいことから、開口部の大きさもマストが配置可能な程度の小さいもので済み、例えば既存のエレベータシャフトを利用してタワークレーンを設置することができる。 In this way, since the vertical load received by the upper support part is small, it is possible to give a vertical load to the beam of the nearest frame of the tower crane installation part, and the load applied to the entire tower crane can be applied only with the conventional base frame. The base frame can be reduced in size compared to the supporting self-supporting tower crane. In addition, the self-supporting support method may be adopted at the final stage of the dismantling process on the lower floors, and the other is only required to adopt a two-layer support method that does not require the replacement of the base frame. For example, a tower crane can be installed using an existing elevator shaft.
また、本発明に係るフロアクライミング型タワークレーンを用いた建物解体方法では、マストを設置するための開口部は、建物のエレベータシャフトであることが好ましい。
本発明では、建物解体時に既存のエレベータシャフトを利用してマストを設置することができるので、解体作業に伴ってマストを配置するための開口部を設ける必要がなく、作業効率の向上を図ることができる。
In the building dismantling method using the floor climbing type tower crane according to the present invention, the opening for installing the mast is preferably an elevator shaft of the building.
In the present invention, since the mast can be installed using the existing elevator shaft at the time of building demolition, it is not necessary to provide an opening for arranging the mast in accordance with the demolition work, and work efficiency is improved. Can do.
本発明のフロアクライミング型タワークレーンを用いた建物解体方法によれば、解体最終段階となる低層階を自立支持方式で行い、それより上の解体作業においては各階のスラブよりマストに対する水平支持、垂直支持を取ることが可能な二層支持方式を採用することで、ベース架台の盛り替えが不要なクライミングダウンが行えるため、タワークレーンを建物内部に配置して効率よく解体作業を行うことができる。そのため、従来のように先行して開口部を設ける必要がないことから、解体作業にかかる工期の短縮と、解体費用の低減を図ることができる。 According to the building demolition method using the floor climbing type tower crane of the present invention, the lower floor which is the final stage of demolition is carried out by a self-supporting system, and in the demolition work above it, horizontal support for the mast from the slab on each floor, vertical By adopting a two-layer support system that can be supported, climbing down that does not require replacement of the base frame can be performed, so that a tower crane can be arranged inside the building for efficient dismantling work. Therefore, since it is not necessary to provide an opening in advance as in the conventional case, it is possible to shorten the work period for the dismantling work and reduce the dismantling cost.
本発明の実施の形態によるタワークレーンの全体構成を示す側面図であって、自立支持方式で設置した図である。It is a side view which shows the whole structure of the tower crane by embodiment of this invention, Comprising: It is the figure installed by the self-supporting system. タワークレーンの全体構成を示す側面図であって、二層支持方式で設置した図である。It is a side view which shows the whole tower crane structure, Comprising: It is the figure installed by the two-layer support system. 上部支持機構を示す平面図である。It is a top view which shows an upper support mechanism. 図3に示す上部支持機構の拡大図である。FIG. 4 is an enlarged view of the upper support mechanism shown in FIG. 3. 図3に示すA−A線矢視図である。It is an AA arrow directional view shown in FIG. 上部支持機構の組立分解斜視図である。It is an assembly exploded perspective view of an upper support mechanism. 下部支持機構を示す平面図である。It is a top view which shows a lower support mechanism. 図7に示す下部支持機構の拡大図である。FIG. 8 is an enlarged view of the lower support mechanism shown in FIG. 7. (a)は図7に示すB−B線矢視図、(b)は図7に示すC−C線矢視図である。(A) is a BB line arrow view shown in FIG. 7, (b) is a CC line arrow view shown in FIG. 昇降支持機構の側面図である。It is a side view of a raising / lowering support mechanism. 昇降支持機構の側面図である。It is a side view of a raising / lowering support mechanism. (a)〜(c)はタワークレーンを用いた建物解体手順を説明する図である。(A)-(c) is a figure explaining the building demolition procedure using a tower crane. (a)〜(c)は図10(c)に続く建物解体手順を説明する図である。(A)-(c) is a figure explaining the building demolition procedure following FIG.10 (c). (a)〜(c)は図11(c)に続く建物解体手順を説明する図である。(A)-(c) is a figure explaining the building demolition procedure following FIG.11 (c).
以下、本発明の実施の形態によるフロアクライミング型タワークレーンを用いた建物解体方法について、図1乃至図12に基づいて説明する。 Hereinafter, a building dismantling method using a floor climbing type tower crane according to an embodiment of the present invention will be described with reference to FIGS.
図1に示すように、本実施の形態による建物解体方法に用いられるフロアクライミング型タワークレーン(以下、単に「タワークレーン1」という)は、建物2の構築に使用されるものと同様のもの、すなわち柱と梁の建て方に合わせて施工する積層工法によって構築される建物の内部に設置可能なものが採用されている。 As shown in FIG. 1, the floor climbing type tower crane (hereinafter simply referred to as “tower crane 1”) used in the building dismantling method according to the present embodiment is the same as that used to construct the building 2; That is, what can be installed inside a building constructed by a layered construction method that is constructed in accordance with the way the columns and beams are built is employed.
先ず、タワークレーン1を内部に配置させて解体する建物2について概略説明する。
図1および図2に示すように、本実施の形態による建物は、鉄筋コンクリート造(RC造)をなし、本設梁6(6A、6B)と、本設柱7(7A、7B)と床スラブ8とによって構築されている(図3参照)。そして、各階に構築される床スラブ8には、エレベータシャフト(以下、開口部9という)が設けられており、この開口部9にはタワークレーン1のマスト3が配置されることになる。
First, the outline of the building 2 in which the tower crane 1 is disposed and demolished will be described.
As shown in FIGS. 1 and 2, the building according to the present embodiment is made of reinforced concrete (RC), and includes a main beam 6 (6A, 6B), a main column 7 (7A, 7B), and a floor slab. 8 (see FIG. 3). The floor slab 8 constructed on each floor is provided with an elevator shaft (hereinafter referred to as an opening 9), and the mast 3 of the tower crane 1 is disposed in the opening 9.
次に、建物解体に使用される本実施の形態によるタワークレーン1の詳細な構造について説明する。なお、下記のタワークレーン1の構造説明にあっては、上述したように本タワークレーン1が建物の構築作業と解体作業との両方に共通して使用可能であるので、説明上、構築に係わる記載もあるが、解体においても同様とする。   Next, the detailed structure of the tower crane 1 by this Embodiment used for building demolition is demonstrated. In the description of the structure of the tower crane 1 below, as described above, the tower crane 1 can be used in common for both the building construction work and the dismantling work. Although there is a description, the same applies to dismantling.
図1および図2に示すように、タワークレーン1は、建物2内の上下方向に連続するエレベータシャフト(開口部9)に配置されるマスト3と、このマスト3に対して上下動自在に挿通支持されたクレーン本体4とからなり、建物2の構築初期段階となる低層階構築時と、それ以降の中高層構築時でマスト3に対する支持方式が異なっている。
つまり、図1に示す低層階構築時においては、ビームを平面視略十字状に配したベース架台5を建物2の基礎階の床スラブ、或いは梁上に設置し、このベース架台5にマスト3の下端3aを支持させた自立支持方式となっている。このとき、水平方向にも支持されるようになっている。
As shown in FIG. 1 and FIG. 2, the tower crane 1 is inserted into a mast 3 arranged in an elevator shaft (opening 9) that is continuous in the vertical direction in the building 2, and is movable up and down with respect to the mast 3. The support system for the mast 3 is different between the low-rise floor construction which is the construction initial stage of the building 2 and the subsequent middle-high construction construction.
That is, when the lower floor shown in FIG. 1 is constructed, the base gantry 5 in which the beam is arranged in a substantially cross shape in plan view is installed on the floor slab or beam of the base floor of the building 2, and the mast 3 This is a self-supporting system in which the lower end 3a of the slab is supported. At this time, it is also supported in the horizontal direction.
また、図2に示すように、中高層構築時におけるマスト3に対する支持構造は、上下二層の支持部(上部支持機構10、下部支持機構20)によってマスト3を建物2の躯体に支持させた構造をなし、上部支持機構10(上部支持部)においてマスト3に作用する水平荷重と垂直荷重を支持し、下部支持機構20(下部支持部)においてマスト3に作用する水平荷重のみを支持する二層支持方式となっている。
つまり、本タワークレーン1は、組み立て後、所定階までの躯体を構築した時点でベース架台5をマスト3から切り離し、マスト3を上部支持機構10と下部支持機構20による支持方式へ移行させてフロアクライミングする構造となっている。
そして、詳しくは後述するが、クライミングによってマスト3を盛り替える際には、上部支持機構10の一部に接続可能な昇降支持機構30(図10、図11参照)を用いる構成となっている。
As shown in FIG. 2, the support structure for the mast 3 at the time of construction of the middle and high-rise is a structure in which the mast 3 is supported on the housing of the building 2 by upper and lower two-layer support parts (upper support mechanism 10 and lower support mechanism 20). Two layers that support horizontal load and vertical load acting on the mast 3 in the upper support mechanism 10 (upper support portion) and support only horizontal load acting on the mast 3 in the lower support mechanism 20 (lower support portion). It is a support system.
In other words, the tower crane 1 is separated from the mast 3 at the time when the building up to a predetermined floor is constructed after the assembly, and the mast 3 is shifted to a support system by the upper support mechanism 10 and the lower support mechanism 20 to form a floor. It has a climbing structure.
As will be described in detail later, when the mast 3 is rearranged by climbing, an elevating support mechanism 30 (see FIGS. 10 and 11) that can be connected to a part of the upper support mechanism 10 is used.
図3に示すように、マスト3は、平面視矩形の柱状をなし、所定長さのマストピース(単体のマスト)を上部に順次継ぎ足すことでその高さを延長する周知のものである。
図1および図2に示すように、クレーン本体4は、マスト3に沿って昇降可能に設けられた昇降装置41と、昇降装置41の上部に固定された旋回台42と、旋回台42上に固定されていてジブ等の揚重機械を装備した揚重装置43とから概略構成されている。昇降装置41は、図示しないロックピンの着脱によりマスト3に対して係止可能な上下一対の着脱フレームと、図示しない昇降ジャッキとを備えており、前記一対の着脱フレームをマスト3に対して交互に固定又は開放しつつ、昇降ジャッキを伸縮動作させることにより、クレーン本体4をクライミングさせる構造となっている。
そして、昇降装置41の下側の着脱フレームには構台44が設けられている。この構台44は、マスト3をクレーン本体4に反力を取って上昇させる際に、建物2の躯体(本設梁6など)に固定可能とした構造となっている。
As shown in FIG. 3, the mast 3 has a rectangular columnar shape in plan view, and is a well-known one that extends its height by sequentially adding mast pieces (single masts) of a predetermined length to the upper part.
As shown in FIG. 1 and FIG. 2, the crane body 4 includes an elevating device 41 that can be moved up and down along the mast 3, a swivel base 42 fixed to the upper portion of the elevating device 41, and a swivel base 42. A lifting device 43 which is fixed and equipped with a lifting machine such as a jib is schematically constituted. The elevating device 41 includes a pair of upper and lower detachable frames that can be locked to the mast 3 by attaching and detaching a lock pin (not shown), and an elevating jack (not shown), and the pair of detachable frames are alternately attached to the mast 3. The crane body 4 is climbed by extending and retracting the lifting jack while being fixed to or released from the crane.
A gantry 44 is provided on the detachable frame below the lifting device 41. The gantry 44 has a structure that can be fixed to the housing (the main beam 6 or the like) of the building 2 when the mast 3 is lifted by the reaction force applied to the crane body 4.
次に、マスト3に作用する垂直荷重および水平荷重を支持する上部支持機構10の構成について図面に基づいて説明する。
図3〜図6に示すように、上部支持機構10は、マスト3の上下方向略中間部の所定階(以下、上部支持機構10を設置する階を「第1支持階P1」という)に配置され、建物2の本設梁6、本設柱7、床スラブ8に支持を取り、マスト3に作用する水平荷重と垂直荷重とを支持するものである。
Next, the configuration of the upper support mechanism 10 that supports the vertical load and the horizontal load acting on the mast 3 will be described with reference to the drawings.
As shown in FIGS. 3 to 6, the upper support mechanism 10 is arranged on a predetermined floor (hereinafter, the floor on which the upper support mechanism 10 is installed is referred to as a “first support floor P <b> 1”) at a substantially intermediate portion in the vertical direction of the mast 3. Thus, the main beam 6, the main column 7 and the floor slab 8 of the building 2 are supported, and the horizontal load and the vertical load acting on the mast 3 are supported.
上部支持機構10は、開口部9の外周部に配置されたY軸方向に延びる一対の第1本設梁6A、6Aを橋渡しするようにして固定されてX軸方向に配置される第1受け梁11と、X軸方向に延びる第2本設梁6Bに跨るようにして係合する一対の介挿部材12(12A、12B)と、介挿部材12A、12B上に固定されるとともに長手方向をX軸方向に向けて配置された第2受け梁13と、第1受け梁11および第2受け梁13を架け渡すようにして配置されるとともにマスト3に係止された一対の支持脚14(14A、14B)とを備えて概略構成されている。 The upper support mechanism 10 is fixed so as to bridge a pair of first main beams 6A and 6A that extend in the Y-axis direction and is arranged in the X-axis direction. A pair of insertion members 12 (12A, 12B) engaged with the beam 11 so as to straddle the second permanent beam 6B extending in the X-axis direction, and fixed on the insertion members 12A, 12B and longitudinally And a pair of support legs 14 arranged so as to bridge the first receiving beam 11 and the second receiving beam 13 and locked to the mast 3. (14A, 14B).
第1受け梁11は、長尺鋼材からなり、その両端の脚部11a、11aがそれぞれ第1本設梁6A、6Aの上面6aにアンカーボルト15により固定されている。第1受け梁11の上面11bには、長手方向の所定位置に支持脚14を載置させるための平板状の敷板111が固着されるとともに、支持脚14のX軸方向への移動量を制限するための第1係止板112が設けられている。 The 1st receiving beam 11 consists of long steel materials, and the leg parts 11a and 11a of the both ends are being fixed to the upper surface 6a of 6 A of 1st permanent beams by the anchor bolt 15, respectively. On the upper surface 11 b of the first receiving beam 11, a flat sheet board 111 for mounting the support leg 14 at a predetermined position in the longitudinal direction is fixed, and the amount of movement of the support leg 14 in the X-axis direction is limited. A first locking plate 112 is provided for this purpose.
図6に示すように、各介挿部材12A、12Bは、横材121と、横材121の両端から下方に突出する縦材122、123とにより第2本設梁6Bを跨ぐようにして下向きに開口するコの字状に形成されており、横材121の長手方向中央より上方に向けて所定長さで延びた上端に第2受け梁6Bを固定するための取付部124が設けられている。つまり、介挿部材12が第2本設梁6Bに係合したときに、横材121が第2本設梁6Bの上面6aに載置した状態となり、縦材122、123によってY軸方向(つまり、第2本設梁6Bの材軸方向に直交する水平面内の方向)の移動を規制する構造となっている。介挿部材12は、縦材122、123どうしの間隔が第2本設梁6Bの幅寸法より僅かに大きい寸法で形成され、一方の縦材123と第2本設梁6Bとの間に伸縮ジャッキ16Aが介挿され、その伸縮ジャッキ16Aを伸張させて突っ張った状態とすることで、介挿部材12のY軸方向への移動が規制されている。 As shown in FIG. 6, each of the insertion members 12 </ b> A and 12 </ b> B faces downward with a cross member 121 and vertical members 122 and 123 protruding downward from both ends of the cross member 121 so as to straddle the second main beam 6 </ b> B. A mounting portion 124 for fixing the second receiving beam 6B is provided at the upper end of the cross member 121 that extends upward from the center in the longitudinal direction by a predetermined length. Yes. That is, when the insertion member 12 is engaged with the second permanent beam 6B, the cross member 121 is placed on the upper surface 6a of the second permanent beam 6B, and the longitudinal members 122 and 123 cause the Y-axis direction ( That is, it has a structure that restricts the movement of the second main beam 6B in the horizontal plane perpendicular to the material axis direction. The insertion member 12 is formed such that the distance between the vertical members 122 and 123 is slightly larger than the width of the second beam 6B. The insertion member 12 expands and contracts between the vertical member 123 and the second beam 6B. When the jack 16A is inserted and the telescopic jack 16A is extended and stretched, the movement of the insertion member 12 in the Y-axis direction is restricted.
そして、取付部124には、第2受け梁13を固定するためのボルト穴が所定の位置に設けられている。
また、介挿部材12は、開口部9を形成する躯体の高さ方向の段差に対応するものでもあり、その高さ寸法は、取付部124に取り付けた第2受け梁13の上面13aと、第1受け梁11の上面11bとが同じ高さ位置となるように設定されている。
The mounting portion 124 is provided with a bolt hole for fixing the second receiving beam 13 at a predetermined position.
The insertion member 12 also corresponds to a step in the height direction of the casing that forms the opening 9, and the height dimension thereof is the upper surface 13 a of the second receiving beam 13 attached to the attachment portion 124, and The upper surface 11b of the first receiving beam 11 is set to have the same height position.
第2受け梁13は、第1受け梁11より高さ寸法の小さな長尺鋼材からなり、その長手方向をX軸方向に向けて第2本設梁6B上に係合させた介挿部材12A、12B上に固定され、伸縮ジャッキ16Bによって躯体の本設柱7A、7Bどうし間で突っ張った状態で係止されている。第2受け梁13には、介挿部材12A、12Bの取付部124に対応する位置に下部取付部131が設けられている。この下部取付部131には、介挿部材12の取付部124に固定するための長穴が形成されている。この長穴はY軸方向に長い穴形状をなしており、この長穴の範囲内で第2受け梁13は介挿部材12A、12Bに対してY軸方向への移動が可能となっている。
そして、上部取付部132には、支持脚14に固定するための長穴132aが所定の位置に設けられるとともに、支持脚14のX軸方向及びY軸方向の両方の移動量を制限するための第2係止板133が設けられている。
The second receiving beam 13 is made of a long steel material having a smaller height than the first receiving beam 11, and the insertion member 12A is engaged with the second main beam 6B with its longitudinal direction directed in the X-axis direction. , 12B, and is locked in a state of being stretched between the main pillars 7A, 7B of the housing by the extension jack 16B. The second receiving beam 13 is provided with a lower mounting portion 131 at a position corresponding to the mounting portion 124 of the insertion members 12A and 12B. The lower attachment portion 131 is formed with an elongated hole for fixing to the attachment portion 124 of the insertion member 12. The elongated hole has a shape that is long in the Y-axis direction, and the second receiving beam 13 can move in the Y-axis direction with respect to the insertion members 12A and 12B within the range of the elongated hole. .
The upper mounting portion 132 is provided with a long hole 132a for fixing to the support leg 14 at a predetermined position, and limits the amount of movement of the support leg 14 in both the X-axis direction and the Y-axis direction. A second locking plate 133 is provided.
支持脚14A、14Bは、マスト3水平方向に挟み込むようにして長手方向をY軸方向(第1受け梁11と第2受け梁13とに直交する方向)に向けて配置され、それぞれがマスト側部にボルトなどで固定可能となっており、長手方向の両端の脚部14a、14aがそれぞれ第1受け梁11と第2受け梁13とに載置されている。   The support legs 14A and 14B are arranged with the longitudinal direction thereof oriented in the Y-axis direction (direction orthogonal to the first receiving beam 11 and the second receiving beam 13) so as to be sandwiched in the horizontal direction of the mast 3, each of which is on the mast side The leg portions 14a and 14a at both ends in the longitudinal direction are placed on the first receiving beam 11 and the second receiving beam 13, respectively.
そして、図4に示すように、支持脚14A、14Bは、脚部14a、14aが水平方向(矢印E方向)に折り畳み自在となっており、折り畳まれた状態(図に示す二点差線)でマスト3に固定した支持脚14A、14Bが開口部9内で上下方向に移動可能となっている。つまり、所定階(第1支持階P1)でマスト3を上部支持機構10で支持するときには脚部14a、14aが伸ばされて第1受け梁11上および第2受け梁13上に載置された状態となり、マスト3を盛り替えて上方に移設する際にはすべての脚部14aが折り畳まれた状態となる。 As shown in FIG. 4, the support legs 14A and 14B are such that the leg portions 14a and 14a are foldable in the horizontal direction (arrow E direction), and in the folded state (two-dot line shown in the figure). Support legs 14 </ b> A and 14 </ b> B fixed to the mast 3 can move in the vertical direction within the opening 9. That is, when the mast 3 is supported by the upper support mechanism 10 on the predetermined floor (first support floor P1), the leg portions 14a and 14a are extended and placed on the first receiving beam 11 and the second receiving beam 13. When the mast 3 is rearranged and moved upward, all the leg portions 14a are folded.
次に、マスト3の下部3aで水平荷重を支持する下部支持機構20の構成について図面に基づいて説明する。
図7、図8、および図9(a)、(b)に示すように、下部支持機構20は、マスト3の下部3aを所定階(以下、下部支持機構20を設置する階を「第2支持階P2」という)の躯体の本設梁6および床スラブ8に反力を取って水平支持し、マスト3に作用するモーメント(水平荷重)を受けるためのものである。
すなわち、下部支持機構20は、マスト3の周囲を取り囲むようにして設けられる支持枠体21と、この支持枠体21から水平方向(Y軸方向)に張り出して開口部9の対向する両側に位置する躯体に係止する支持係止部22(22A〜22D)と、支持枠体21の内角部でマスト3の水平力を支持するクサビ材23とを備えて概略構成されている。
Next, the configuration of the lower support mechanism 20 that supports the horizontal load at the lower portion 3a of the mast 3 will be described with reference to the drawings.
As shown in FIGS. 7, 8, 9 (a) and 9 (b), the lower support mechanism 20 is configured so that the lower part 3 a of the mast 3 is placed on a predetermined floor (hereinafter referred to as the second floor where the lower support mechanism 20 is installed). This is for receiving a reaction force on the main beam 6 and the floor slab 8 of the frame of the support floor P2 ”and receiving the moment (horizontal load) acting on the mast 3.
That is, the lower support mechanism 20 is provided on a support frame 21 provided so as to surround the periphery of the mast 3, and is positioned on both sides of the opening 9 that protrude from the support frame 21 in the horizontal direction (Y-axis direction). The support latching part 22 (22A-22D) latched to the housing which carries out, and the wedge material 23 which supports the horizontal force of the mast 3 in the internal corner part of the support frame 21 are comprised roughly.
支持枠体21は、H型鋼などの鋼材から形成され、平面視で略四角形状に枠組みされており、マスト3に対して間隔をもって配置されている。
支持係止部22は、支持枠体21のY軸方向に延びる横材が延長され、そのうち一方が第2本設梁6B上に第1高さ調整ブロック24を介してアンカーボルト(図示省略)で固定され、他方が床スラブ8上に第2高さ調整ブロック25を介してアンカーボルト(図示省略)で固定されている。第1および第2高さ調整部材24、25は、図9(a)に示すように、第2本設梁6Bの上面6aと床スラブ8の上面8aとの高さに段差がある場合において、異なる高さ寸法となる。
The support frame 21 is formed of a steel material such as H-shaped steel, and is framed in a substantially quadrangular shape in plan view, and is disposed at an interval with respect to the mast 3.
The support locking portion 22 is formed by extending a cross member extending in the Y-axis direction of the support frame 21, one of which is an anchor bolt (not shown) via a first height adjustment block 24 on the second main beam 6 </ b> B. The other is fixed on the floor slab 8 with the anchor bolt (not shown) via the second height adjustment block 25. As shown in FIG. 9A, the first and second height adjusting members 24 and 25 are provided with a step difference in height between the upper surface 6a of the second main beam 6B and the upper surface 8a of the floor slab 8. , Different height dimensions.
次に、マスト3の盛り替え時に用いられる昇降支持機構30について説明する。
図10および図11に示すように、昇降支持機構30は、第1支持機構10に設けられる構造であって、図3に示す支持脚14A、14Bの両側の位置で平行に配置されるとともに第1受け梁11および第2受け梁13に取り付けられた一対の第3受け梁31(31A、31B)と、これら第3受け梁31A、31Bに橋渡しするようにして固定される第4受け梁32(32A、32B)と、第4受け梁32A、32Bに橋渡しするようにして固定されるとともにクレーン本体4の下端4aに固定される第5受け梁33(33A、33B)とからなる。
昇降支持機構30によってクレーン本体4が建物2の躯体(本設梁6など)に固定された状態となり、この状態でマスト3の盛り替え時の反力を取ることができ、昇降装置41を駆動させることでマスト3を上昇させる構造となっている。
Next, the elevating support mechanism 30 used when changing the mast 3 will be described.
As shown in FIGS. 10 and 11, the elevating support mechanism 30 has a structure provided in the first support mechanism 10, and is arranged in parallel at positions on both sides of the support legs 14A and 14B shown in FIG. A pair of third receiving beams 31 (31A, 31B) attached to the first receiving beam 11 and the second receiving beam 13, and a fourth receiving beam 32 fixed so as to bridge the third receiving beams 31A, 31B. (32A, 32B) and a fifth receiving beam 33 (33A, 33B) fixed to the fourth receiving beams 32A, 32B and fixed to the lower end 4a of the crane body 4.
The crane body 4 is fixed to the building 2 (main beam 6 or the like) of the building 2 by the lifting support mechanism 30, and in this state, the reaction force can be taken when the mast 3 is replaced, and the lifting device 41 is driven. By doing so, the mast 3 is lifted.
ここで、上述した構成からなるタワークレーン1の作用について、説明しておく。
図1および図2に示すように、本タワークレーン1では、マスト3に作用する水平荷重を上部支持機構10と下部支持機構20の上下2層で受けもたせるとともに、タワークレーン1の自重および吊荷作業時の反力による垂直荷重を上部支持機構10で受けもたせることができる。そして、上部支持機構10および下部支持機構20における水平支持によって、マスト3に生じる曲げモーメントによる垂直荷重を吸収することができるので、上部支持機構10で受ける垂直荷重を小さくすることができ、支持機構10を簡単な、且つ小型化した構造とすること可能となる。
これにより、フロアクライミング時にマスト下端をベース架台で支持する必要がなくなり、フロアクライミングに必要な開口部の面積を小さくすることができる。そのため、本実施の形態のように建物2のエレベータシャフトをマスト3を設置する開口部9として利用することが可能となり、従来のように建物2の居室部に開口部を設けることがなくなることから、仕上げ工事などの建物の作業工程に対する影響を少なくすることができる。
Here, the operation of the tower crane 1 having the above-described configuration will be described.
As shown in FIGS. 1 and 2, in the tower crane 1, horizontal loads acting on the mast 3 are received by the upper and lower layers of the upper support mechanism 10 and the lower support mechanism 20, and the weight and suspended load of the tower crane 1 are also received. The upper support mechanism 10 can receive a vertical load due to a reaction force during work. Since the vertical support by the bending moment generated in the mast 3 can be absorbed by the horizontal support in the upper support mechanism 10 and the lower support mechanism 20, the vertical load received by the upper support mechanism 10 can be reduced, and the support mechanism 10 can be a simple and downsized structure.
Thereby, it is not necessary to support the lower end of the mast with the base frame during floor climbing, and the area of the opening necessary for floor climbing can be reduced. Therefore, the elevator shaft of the building 2 can be used as the opening 9 for installing the mast 3 as in the present embodiment, and no opening is provided in the living room of the building 2 as in the prior art. The influence on the building work process such as finishing work can be reduced.
次に、上述したタワークレーン1を用いた建物の解体手順について図面に基づいて説明する。なお、図12〜図14では、上部支持機構10や下部支持機構20等、見易くするために簡略化している。   Next, the building dismantling procedure using the tower crane 1 described above will be described based on the drawings. In FIGS. 12 to 14, the upper support mechanism 10, the lower support mechanism 20, and the like are simplified for easy viewing.
図12〜図14に示すように、本タワークレーン1を用いた建物解体方法は、クレーン本体4を建物屋上に設置するとともに、マスト3の下部3aを第2支持階P2の床コンクリート6に水平支持させた下部支持機構20と、マスト3の上下方向中間部を第1支持階P1の床コンクリート6に水平支持させた上部支持機構10とを有する二層支持方式(図1参照)を形成し、二層支持方式によりクライミングダウンさせながら建物2の中高層階を解体し、下部支持機構20を撤去移設し、また上部支持機構10をマスト3と一体で移設するとともに、建物2の基礎階F0に設置したベース架台5上にマスト3を自立させた自立支持方式(図1参照)を形成してクライミングダウンさせながら建物の低層階を解体するものである。以下、さらに詳細に説明する。 As shown in FIGS. 12-14, the building dismantling method using this tower crane 1 installs the crane main body 4 on a building rooftop, and horizontally arrange | positions the lower part 3a of the mast 3 on the floor concrete 6 of the 2nd support floor P2. A two-layer support system (see FIG. 1) having a lower support mechanism 20 that is supported and an upper support mechanism 10 that horizontally supports the vertical middle portion of the mast 3 on the floor concrete 6 of the first support floor P1 is formed. The middle and upper floors of the building 2 are dismantled while climbing down by the two-layer support method, the lower support mechanism 20 is removed and moved, and the upper support mechanism 10 is moved together with the mast 3 and is moved to the base floor F0 of the building 2 A self-supporting system (see FIG. 1) in which the mast 3 is self-supporting is formed on the installed base gantry 5 and the lower floors of the building are dismantled while climbing down. This will be described in more detail below.
図12(a)に示すように、先ずステップS1において、建物2の屋上階RFにジブクレーンJを設置するとともに、開口部9上に設けられているエレベータ機械室91を解体、撤去し、開口部9の上部に開口9cを設ける。ここで、ジブクレーンJは、図12(a)〜(c)においてジブクレーンJに繋がるワイヤ及びフックのみが示されている。
次いで、ジブクレーンJを利用して、開口部9下のエレベータ運器や開口部9内の機器等の機材92を解体し、屋上階RFの開口9cより搬出する。そして、図12(b)に示すステップS2において、ジブクレーンJで開口部9の開口9cからベース架台5を分割投入し、1階(基礎階F0)にベース架台5をアンカーなどによって固定する。
As shown in FIG. 12A, first, in step S1, the jib crane J is installed on the roof floor RF of the building 2, and the elevator machine room 91 provided on the opening 9 is dismantled and removed, and the opening is opened. An opening 9 c is provided at the top of 9. Here, as for the jib crane J, only the wire and hook connected to the jib crane J are shown in FIGS.
Next, using the jib crane J, the equipment 92 such as an elevator transporter under the opening 9 and equipment in the opening 9 is dismantled and carried out from the opening 9c of the rooftop RF. Then, in step S2 shown in FIG. 12 (b), the base mount 5 is divided and inserted from the opening 9c of the opening 9 with the jib crane J, and the base mount 5 is fixed to the first floor (base floor F0) with an anchor or the like.
次に、図12(c)に示すように、ステップS3では、ジブクレーンJにて二層支持方式でのタワークレーン1(マスト3、クレーン本体4、上部支持機構10、下部支持機構20)を組み立て、その後、設置したタワークレーン1を用いてジブクレーンJを解体する。
具体的には、図7〜図9に示すように、所定本数(図12(c)では7本)のマストピースを連結させたマスト3の下部3aにおいて、下部支持機構20で躯体に水平支持を取る。
Next, as shown in FIG. 12 (c), in step S 3, the tower crane 1 (mast 3, crane body 4, upper support mechanism 10, lower support mechanism 20) is assembled with the jib crane J in a two-layer support system. Then, the jib crane J is disassembled using the installed tower crane 1.
Specifically, as shown in FIGS. 7 to 9, the lower support mechanism 20 horizontally supports the frame at the lower part 3 a of the mast 3 to which a predetermined number (seven in FIG. 12C) of mast pieces are connected. I take the.
さらに、図3〜図6に示すように、マスト中間部において、上部支持機構10の第1受け梁11を床スラブ8に固定し、第2本設梁6Bに一対の介挿部材12A、12Bを介して第2受け梁13を設け、さらに第1受け梁11と第2受け梁13とを橋渡しするようにして支持脚14A、14Bを設け、さらに支持脚14A、14Bとマスト3とを固定して、マスト3に作用する水平荷重と垂直荷重とを支持する。   Further, as shown in FIGS. 3 to 6, the first receiving beam 11 of the upper support mechanism 10 is fixed to the floor slab 8 at the middle portion of the mast, and a pair of insertion members 12 </ b> A and 12 </ b> B are attached to the second main beam 6 </ b> B. The second receiving beam 13 is provided via the support legs, and the support legs 14A and 14B are provided so as to bridge the first receiving beam 11 and the second receiving beam 13, and the support legs 14A and 14B and the mast 3 are fixed. Thus, the horizontal load and the vertical load acting on the mast 3 are supported.
これにより、図12(c)に示すマスト下端3aに設けた下端支持部20と、マスト中間部に設けた上部支持機構10によってマスト3に作用するモーメント(水平荷重)を受けもつとともに、上部支持機構10でマスト3にかかるタワークレーン1全体の垂直荷重を受けもつ二層支持構造のタワークレーン1を設置することができる。なお、このときクレーン本体4は、最上階RFに昇降支持機構30を設置させた状態とする。 Thus, the lower end support portion 20 provided at the mast lower end 3a shown in FIG. 12 (c) and the upper support mechanism 10 provided at the mast intermediate portion are responsible for the moment (horizontal load) acting on the mast 3, and the upper support It is possible to install the tower crane 1 having a two-layer support structure that takes the vertical load of the entire tower crane 1 applied to the mast 3 by the mechanism 10. At this time, the crane body 4 is in a state where the lifting support mechanism 30 is installed on the top floor RF.
次に、図13(a)〜(c)に示すように、ステップS4において、二層支持方式によってタワークレーン1を設置可能な建物高さまでをクライミングダウンさせながら、建物2を解体する。具体的には、図13(a)において、昇降支持機構30を建物の最上階RFから切り離した状態とし、クレーン本体4をマスト3のみで支持する。その後、クレーン本体4で上部支持機構10より上方の階高の建物2を解体する。さらに、図13(b)、(c)に示すように、クレーン本体4をクライミングダウンさせながら、建物2を解体する(ステップS5、S6)。   Next, as shown to Fig.13 (a)-(c), in step S4, the building 2 is demolished, climbing down to the building height which can install the tower crane 1 by a two-layer support system. Specifically, in FIG. 13A, the lifting support mechanism 30 is separated from the top floor RF of the building, and the crane body 4 is supported only by the mast 3. Then, the building 2 with a higher floor above the upper support mechanism 10 is dismantled with the crane body 4. Further, as shown in FIGS. 13B and 13C, the building 2 is dismantled while the crane body 4 is climbed down (steps S5 and S6).
つまり、図1に示すように、クレーン本体4を盛り替える際には、ロックピン(図示省略)をマスト3から引き抜き、図示しない伸縮ジャッキを伸長して下部フレームを下降させ、その位置で下部フレームのロックピンをマスト3に差し込んで固定する。そして、上部フレームのロックピンをマスト3から引き抜いて、伸縮ジャッキを収縮して上部フレームを下降させ、上部フレームのロックピンをマスト3に差し込んで固定する。これにより、伸縮ジャッキによる1ストローク分下降するための盛り替えが完了する。このような盛り替え作業を繰り返すことで、図13(a)〜(c)に示すように順次クライミングダウンを行いながら、建物2の解体を行うことができる。 That is, as shown in FIG. 1, when the crane body 4 is refilled, the lock pin (not shown) is pulled out from the mast 3, the extension jack (not shown) is extended to lower the lower frame, and the lower frame is moved to that position. Insert the lock pin into the mast 3 and fix it. Then, the lock pin of the upper frame is pulled out from the mast 3, the extension jack is contracted to lower the upper frame, and the lock pin of the upper frame is inserted into the mast 3 and fixed. Thereby, the reordering for lowering by one stroke by the extension jack is completed. By repeating such rearrangement work, the building 2 can be dismantled while climbing down sequentially as shown in FIGS.
また、図13(b)、(c)に示すステップS5、S6において、上部支持機構10と下部支持機構20との移設は、昇降支持機構30(クレーン本体4)を解体中の最上階の躯体(すなわち、上部支持機構10)に固定し、続いて下部支持機構20のマスト3に対する水平支持を解除し、下降したマスト3の下部3aへ移設して、その位置でマスト3を水平支持する。また、上部支持機構10は、図4に示す第1受け梁11の第1係止板112、及び第2受け梁13の第2係止板133を取り外し、図3に示す支持脚14をマスト3と一体でそれより下方の所定階へ移設し、その第1支持階P1において水平支持及び垂直支持を行う。   Further, in steps S5 and S6 shown in FIGS. 13B and 13C, the upper support mechanism 10 and the lower support mechanism 20 are moved to the uppermost frame where the lifting support mechanism 30 (crane body 4) is being disassembled. (That is, the upper support mechanism 10), the horizontal support of the lower support mechanism 20 with respect to the mast 3 is subsequently released, the lower support 3 is moved to the lower part 3a of the lowered mast 3, and the mast 3 is horizontally supported at that position. Further, the upper support mechanism 10 removes the first locking plate 112 of the first receiving beam 11 and the second locking plate 133 of the second receiving beam 13 shown in FIG. 3 is moved to a predetermined floor below it, and horizontal support and vertical support are performed on the first support floor P1.
次に、所定の高さまで建物を解体したら、工事の進捗に合わせた適宜なタイミングで、図14(a)に示すようにマスト3の支持形態を二層支持方式から自立支持方式へ切り替える(ステップS7)。つまり、ステップS7では、クレーン本体4をマスト3に沿って下降させ、昇降支持機構30を所定階(解体中の最上階)の躯体に固定してから、上部支持機構10と下部支持機構20とのマスト3に対する支持を解除し、マスト3を下降させて予め基礎階F0に設けておいたベース架台5上にマスト3を自立した状態で略鉛直方向に立設する。次いで、上部支持機構10と下部支持機構20とを適宜な段階で撤去することで、マスト3に対する自立支持方式となる。   Next, when the building is demolished to a predetermined height, the support form of the mast 3 is switched from the two-layer support system to the self-supporting support system as shown in FIG. S7). In other words, in step S7, the crane body 4 is lowered along the mast 3 and the lifting support mechanism 30 is fixed to the frame of the predetermined floor (the uppermost floor during dismantling), and then the upper support mechanism 10 and the lower support mechanism 20 The mast 3 is released from the support, and the mast 3 is lowered, and the mast 3 is erected in a substantially vertical direction on the base frame 5 previously provided on the base floor F0. Next, by removing the upper support mechanism 10 and the lower support mechanism 20 at an appropriate stage, a self-supporting system for the mast 3 is obtained.
タワークレーン1が自立支持方式で設置された後、図14(b)に示すように、クレーン本体4で基礎階F0より上階の建物2(低層階)を解体する(ステップS8)。
そして、ステップS6においてタワークレーン1を使用した解体作業のすべてが完了したら、図14(c)に示すようにステップS9でタワークレーン1を解体して撤去する。このとき、図示しない別のクレーンを使用してクレーン本体4を下降させながら、マスト3をクレーン本体4の上方から1本ずつ抜き取るようにする。
After the tower crane 1 is installed in a self-supporting manner, the building 2 (lower floor) above the base floor F0 is dismantled with the crane body 4 as shown in FIG. 14 (b) (step S8).
When all the dismantling work using the tower crane 1 is completed in step S6, the tower crane 1 is disassembled and removed in step S9 as shown in FIG. 14 (c). At this time, the mast 3 is pulled out from above the crane body 4 one by one while lowering the crane body 4 using another crane (not shown).
このように、本タワークレーン1を用いた建物解体方法において、二層支持方式が採用できないような建物の低層階の解体時においては、ベース架台5でマスト3を支持する自立支持方式を採用し、それ以外の中高層階の解体持には各階の床コンクリート6によりマスト3に対する水平支持、垂直支持を取ることが可能な二層支持方式を採用することができる。この二層支持方式においては、上述したようにマスト3にかかるモーメント(水平荷重)を下部支持機構20と上部支持機構10の上下2段で受けもつことができ、タワークレーン1の自重および吊荷作業時の反力による垂直荷重を上部支持機構10で受けもち、建物に対して効率よく伝達して支持することができる。すなわち、二層支持方式では、マスト3にかかる全荷重をそのベース架台5にもたせる自立支持方式による場合と比べて、モーメントによる垂直荷重を各支持部の水平支持で吸収して作用させないため、上部支持機構10で受ける垂直荷重を小さくすることができる。 Thus, in the building dismantling method using the tower crane 1, the self-supporting supporting method in which the mast 3 is supported by the base gantry 5 is adopted at the time of dismantling the lower floor of the building where the two-layer supporting method cannot be adopted. For other middle and high-rise floor dismantling, a two-layer support system that can take horizontal support and vertical support for the mast 3 by the floor concrete 6 on each floor can be adopted. In this two-layer support system, as described above, the moment (horizontal load) applied to the mast 3 can be handled by the upper and lower stages of the lower support mechanism 20 and the upper support mechanism 10. The upper support mechanism 10 receives a vertical load due to a reaction force during work, and can efficiently transmit and support the building. That is, in the two-layer support method, the vertical load due to the moment is absorbed by the horizontal support of each support part and does not act as compared with the case of the self-supporting support method in which the total load applied to the mast 3 is also given to the base frame 5. The vertical load received by the support mechanism 10 can be reduced.
そして、上部支持機構10で受ける垂直荷重が小さいのでタワークレーン設置部の直近の躯体の梁に垂直荷重をもたせることが可能であり、従来のようなベース架台のみでタワークレーン全体にかかる荷重を支持する自立型タワークレーンに比べてベース架台5を小型化させることができる。しかも、低層階における最終段階での解体工程時に自立支持方式を採用すればよく、その他はベース架台5の盛り替えが不要な二層支持方式を採用すればよいことから、開口部の大きさもマスト3が配置可能な程度と小さいもので済み、本実施の形態のように既存の開口部9を利用してタワークレーン1を設置することができる。そのため、解体作業に伴ってマスト3を配置するための開口部を設ける必要がなく、作業効率の向上を図ることができる。 Further, since the vertical load received by the upper support mechanism 10 is small, it is possible to give a vertical load to the beam of the nearest frame of the tower crane installation part, and the load applied to the entire tower crane is supported only by the conventional base frame. Compared to the self-supporting tower crane, the base mount 5 can be downsized. Moreover, the self-supporting support method may be adopted at the final stage of the dismantling process on the lower floors, and the other is only required to adopt a two-layer support method that does not require the replacement of the base gantry 5, so the size of the opening is also mast. The tower crane 1 can be installed using the existing opening 9 as in the present embodiment. Therefore, it is not necessary to provide an opening for arranging the mast 3 along with the dismantling work, and the work efficiency can be improved.
上述のように本実施の形態によるフロアクライミング型タワークレーンを用いた建物解体方法では、解体最終段階となる低層階を自立支持方式で行い、それより上の解体作業においては各階の躯体よりマスト3に対する水平支持、垂直支持を取ることが可能な二層支持方式を採用することで、ベース架台5の盛り替えが不要なクライミングダウンが行えるため、タワークレーン1を建物内部に配置して効率よく解体作業を行うことができる。そのため、従来のように先行して開口部を設ける必要がないことから、解体作業にかかる工期の短縮と、解体費用の低減を図ることができる。 As described above, in the building dismantling method using the floor climbing type tower crane according to the present embodiment, the lower floor which is the final stage of dismantling is performed by the self-supporting method, and in the dismantling work above that, the mast 3 By adopting a two-layer support system that can take horizontal support and vertical support to the base, climbing down that does not require replacement of the base gantry 5 is possible, so the tower crane 1 can be placed inside the building and disassembled efficiently Work can be done. Therefore, since it is not necessary to provide an opening in advance as in the conventional case, it is possible to shorten the work period for the dismantling work and reduce the dismantling cost.
以上、本発明によるフロアクライミング型タワークレーンを用いた建物解体方法の実施の形態について説明したが、本発明は上記の実施の形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。
例えば、本実施の形態では建物の解体時においてタワークレーン1を設置する前にベース架台5を開口部9の下の基礎階F0に設置しているが、このタイミングでベース架台5を設置することに限定されることはない。例えば、タワークレーン1の設置後であって、二層支持方式から自立支持方式に切り替える時点などに、ベース架台5を基礎階F0に設置可能の場合には、そのときにベース架台5を設置するようにしてもよい。また、ベース架台5を分割せずに所定箇所に搬送できる場合には、建物外で組み立ててそのまま所定位置に搬入するようにしてもかまわない。
As mentioned above, although embodiment of the building demolition method using the floor climbing type tower crane by this invention was described, this invention is not limited to said embodiment, It changes suitably in the range which does not deviate from the meaning. Is possible.
For example, in this embodiment, the base frame 5 is installed on the base floor F0 below the opening 9 before the tower crane 1 is installed at the time of building dismantling, but the base frame 5 is installed at this timing. It is not limited to. For example, if the base mount 5 can be installed on the base floor F0 after the tower crane 1 is installed and when the two-layer support system is switched to the self-supporting system, the base mount 5 is installed at that time. You may do it. In addition, when the base gantry 5 can be transported to a predetermined location without being divided, it may be assembled outside the building and carried directly to the predetermined position.
さらに、本実施の形態では、二層支持方式から自立支持方式への切り替え時のタイミングは、建物の構造、解体手順等の条件に応じて任意に設定することができる。また、二層支持方式における下部支持機構20と上部支持機構10の位置においても同様にとくに限定されることはなく、解体手順に応じて適宜移設すればよい。
さらにまた、下部支持機構20と上部支持機構10の支持構造は、本実施の形態に限定されることはない。
Furthermore, in this Embodiment, the timing at the time of the switch from a two-layer support system to a self-supporting support system can be arbitrarily set according to conditions, such as a structure of a building and a demolition procedure. Similarly, the positions of the lower support mechanism 20 and the upper support mechanism 10 in the two-layer support method are not particularly limited, and may be appropriately moved according to the dismantling procedure.
Furthermore, the support structure of the lower support mechanism 20 and the upper support mechanism 10 is not limited to the present embodiment.
1 タワークレーン(フロアクライミング型タワークレーン)
2 建物
3 マスト
3a 下部
4 クレーン本体
5 ベース架台
6、6A、6B 本設梁
7、7A、7B 本設柱
8 床スラブ
9 開口部
10 上部支持機構
11 第1受け梁
13 第2受け梁
14、14A、14B 支持脚
20 下部支持機構
21 支持枠体
30 昇降支持機構
41 昇降装置
F0 基礎階
P1 第1支持階
P2 第2支持階
RF 最上階
1 Tower crane (floor climbing type tower crane)
2 Building 3 Mast 3a Lower part 4 Crane body 5 Base mount 6, 6A, 6B Main beam 7, 7A, 7B Main column 8 Floor slab 9 Opening 10 Upper support mechanism 11 First receiving beam 13 Second receiving beam 14, 14A, 14B Support leg 20 Lower support mechanism 21 Support frame 30 Lift support mechanism 41 Lift device F0 Base floor P1 First support floor P2 Second support floor RF Top floor

Claims (2)

  1. マストと、該マストの上部を挿通支持させた状態でそのマストに沿って上下動自在とされるクレーン本体とを設け、建物内の各階の躯体に形成される開口部に前記マストを配置させるフロアクライミング型タワークレーンを用いた建物解体方法であって、
    前記クレーン本体を建物屋上に設置するとともに、前記マストの上下方向中間部を第1支持階の躯体に垂直支持および水平支持させた上部支持部と、前記マストの下部を前記上部支持部より下方の第2支持階の躯体に水平支持させた下部支持部とを有する二層支持方式を形成する工程と、
    前記二層支持方式によりクライミングダウンさせながら前記建物の解体する工程と、
    前記建物の基礎階にベース架台を設置する工程と、
    前記下部支持部および上部支持部による前記マストに対する支持を解除するとともに、前記ベース架台に前記マストを自立させる自立支持方式を形成する工程と、
    前記自立支持方式によりクライミングダウンさせながら前記建物を解体する工程と、
    を有することを特徴とするフロアクライミング型タワークレーンを用いた建物解体方法。
    A floor provided with a mast and a crane main body that is movable up and down along the mast with the upper portion of the mast inserted and supported, and the mast is disposed in an opening formed in a frame of each floor in the building A building demolition method using a climbing type tower crane,
    The crane body is installed on the roof of the building, and an upper support part in which a vertical middle part of the mast is vertically supported and horizontally supported by a frame of a first support floor, and a lower part of the mast is below the upper support part. Forming a two-layer support system having a lower support part horizontally supported by a housing of the second support floor;
    Dismantling the building while climbing down by the two-layer support method;
    Installing a base mount on the basement floor of the building;
    Releasing the support to the mast by the lower support part and the upper support part, and forming a self-supporting system that makes the mast stand on the base frame;
    Dismantling the building while climbing down by the self-supporting method;
    A building dismantling method using a floor-climbing tower crane characterized by comprising:
  2. 前記マストを設置するための開口部は、前記建物のエレベータシャフトであることを特徴とする請求項1に記載のフロアクライミング型タワークレーンを用いた建物解体方法。 The building dismantling method using a floor climbing type tower crane according to claim 1, wherein the opening for installing the mast is an elevator shaft of the building.
JP2009120093A 2009-05-18 2009-05-18 Method for demolishing building using floor climbing type tower crane Pending JP2010265727A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009120093A JP2010265727A (en) 2009-05-18 2009-05-18 Method for demolishing building using floor climbing type tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009120093A JP2010265727A (en) 2009-05-18 2009-05-18 Method for demolishing building using floor climbing type tower crane

Publications (1)

Publication Number Publication Date
JP2010265727A true JP2010265727A (en) 2010-11-25

Family

ID=43362920

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009120093A Pending JP2010265727A (en) 2009-05-18 2009-05-18 Method for demolishing building using floor climbing type tower crane

Country Status (1)

Country Link
JP (1) JP2010265727A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012122200A (en) * 2010-12-06 2012-06-28 Taisei Corp Temporary roof support structure
JP2013104173A (en) * 2011-11-10 2013-05-30 Shimizu Corp Temporary curing body
CN103243932A (en) * 2012-02-03 2013-08-14 上海庞源机械租赁股份有限公司 Structure for detaching inner climbing tower crane through roof crane and construction method thereof
CN103922232A (en) * 2014-04-14 2014-07-16 南通庞源机械工程有限公司 Self-elevating tower crane descending process
JP2016137955A (en) * 2015-01-26 2016-08-04 株式会社北川鉄工所 Climbing Crane
CN105858501A (en) * 2016-06-12 2016-08-17 上海市机械施工集团有限公司 Self-attaching tower crane provided with foundation underpinning device and construction method thereof
JP2017082557A (en) * 2015-10-30 2017-05-18 清水建設株式会社 Horizontal jib crane and construction method using the same
WO2018196451A1 (en) * 2017-04-28 2018-11-01 中国建筑股份有限公司 Non-closed tower crane climbing frame device
CN109704210A (en) * 2019-01-22 2019-05-03 中建四局第五建筑工程有限公司 A kind of high-altitude tower crane large arm fracture dip method for dismounting

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012122200A (en) * 2010-12-06 2012-06-28 Taisei Corp Temporary roof support structure
JP2013104173A (en) * 2011-11-10 2013-05-30 Shimizu Corp Temporary curing body
CN103243932A (en) * 2012-02-03 2013-08-14 上海庞源机械租赁股份有限公司 Structure for detaching inner climbing tower crane through roof crane and construction method thereof
CN103922232A (en) * 2014-04-14 2014-07-16 南通庞源机械工程有限公司 Self-elevating tower crane descending process
JP2016137955A (en) * 2015-01-26 2016-08-04 株式会社北川鉄工所 Climbing Crane
JP2017082557A (en) * 2015-10-30 2017-05-18 清水建設株式会社 Horizontal jib crane and construction method using the same
CN105858501A (en) * 2016-06-12 2016-08-17 上海市机械施工集团有限公司 Self-attaching tower crane provided with foundation underpinning device and construction method thereof
CN105858501B (en) * 2016-06-12 2017-11-24 上海市机械施工集团有限公司 Itself tower crane of attachment with foundation underpinning device and its construction method
WO2018196451A1 (en) * 2017-04-28 2018-11-01 中国建筑股份有限公司 Non-closed tower crane climbing frame device
CN109704210A (en) * 2019-01-22 2019-05-03 中建四局第五建筑工程有限公司 A kind of high-altitude tower crane large arm fracture dip method for dismounting

Similar Documents

Publication Publication Date Title
JP2010265727A (en) Method for demolishing building using floor climbing type tower crane
JP5914203B2 (en) Disassembly method, disassembly assistance device
JP6503716B2 (en) Demolition system and demolition method
JP5365854B2 (en) Tower crane support structure and climbing method
JP2009184756A (en) Tower crane support structure and building method thereof
JP2009073599A (en) Supporting structure of tower crane and climbing method
JP6474151B2 (en) Dismantling system and dismantling method
JP2010255374A (en) Demolition method for skyscraper building
JP2001010780A (en) Climbing tower crane and its climbing method
JP5003253B2 (en) RC beam construction method
JP5825864B2 (en) Tower crane mast support structure and tower crane support method
JP5558757B2 (en) Climbing crane refilling mechanism and floor climbing method
JP2006009421A (en) Construction method for building by use of tower crane
JP2016017291A (en) Demolition method and demolition system
JP2004316255A (en) Variable floor height type storied structure, construction method of variable floor height type storied structure, and floor height changing method for variable floor height type storied structure
US20130263549A1 (en) Safety screen system for steel erection work
JP2006307506A (en) Scaffolding
JP2021116153A (en) Supporting platform for tower crane and climbing method using the same
JP2009299346A (en) Construction method of building
JP6967383B2 (en) How to dismantle an existing structure
JP2018150144A (en) Construction method of building
JP3368483B2 (en) Bridge pier construction method
JP2008214932A (en) Construction method for building
RU46027U1 (en) CONSOLE-CROSSING FORESTS
JP2008215013A (en) Building construction method