JP2011149171A - 塔構造物の主柱材取替装置及び主柱材取替方法 - Google Patents
塔構造物の主柱材取替装置及び主柱材取替方法 Download PDFInfo
- Publication number
- JP2011149171A JP2011149171A JP2010010115A JP2010010115A JP2011149171A JP 2011149171 A JP2011149171 A JP 2011149171A JP 2010010115 A JP2010010115 A JP 2010010115A JP 2010010115 A JP2010010115 A JP 2010010115A JP 2011149171 A JP2011149171 A JP 2011149171A
- Authority
- JP
- Japan
- Prior art keywords
- main
- main pillar
- main column
- support member
- pillar material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000463 material Substances 0.000 title claims abstract description 342
- 238000000034 method Methods 0.000 title abstract description 24
- 229910000831 Steel Inorganic materials 0.000 description 90
- 239000010959 steel Substances 0.000 description 90
- 230000005540 biological transmission Effects 0.000 description 25
- 238000009434 installation Methods 0.000 description 7
- 239000002184 metal Substances 0.000 description 7
- 229910052751 metal Inorganic materials 0.000 description 7
- 230000002093 peripheral effect Effects 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 238000003780 insertion Methods 0.000 description 5
- 230000037431 insertion Effects 0.000 description 5
- 230000035882 stress Effects 0.000 description 5
- 238000010276 construction Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 229910019142 PO4 Inorganic materials 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000000470 constituent Substances 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000004615 ingredient Substances 0.000 description 1
- NBIIXXVUZAFLBC-UHFFFAOYSA-K phosphate Chemical compound [O-]P([O-])([O-])=O NBIIXXVUZAFLBC-UHFFFAOYSA-K 0.000 description 1
- 239000010452 phosphate Substances 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
【解決手段】主柱材取替装置1は、取替対象の主柱材P2の上側に連なる上側主柱材P3に固定される上側固定具2と、主柱材P2の上側に連なる下側主柱材P1に固定される下側固定具3を備える。上側固定具2と下側固定具3との間に、支持部材4とネジ調整部8とジャッキ9の列を幅方向の両端に2列配置する。上側及び下側固定具2,3を、互いに密着したライナー6L,6Rと主柱材P1,P3をクランプ7で押圧して、主柱材P1,P3に固定する。クランプ7は、ライナー6L,6Rと主柱材P1,P3との接触面を中心軸が交差すると共に、先端部に円錐突起73dが形成された押圧ボルト72を有する。
【選択図】図1
Description
上記固定具は、
固定具本体に連結され、上記主柱材の表面に接する摩擦部材と、
上記主柱材と摩擦部材との接触面に中心軸が交差する状態で、上記主柱材及び摩擦部材の少なくとも一方に接触して押圧力を作用させる少なくとも1つの押圧ボルトを有し、上記主柱材と摩擦部材とを押圧して挟持する押圧具と
を有することを特徴としている。
上記固定具、ジャッキ及び支持部材のうちのいずれか2つの間に、ネジの螺合位置に応じて長さが調節可能なネジ調整部を備える。
上記2つの固定具の間にジャッキが介在されて設置される支持部材と、
上記取替対象の主柱材を有する主柱に隣接する隣接主柱と、上記支持部材との間に設置される仮副材と、
上記仮副材の一端を、上記隣接主柱に、この隣接主柱の長さ方向における固定位置を調節可能に固定する第1の仮副材固定具と、
上記仮副材の他端を、上記支持部材に、この支持部材の長さ方向における固定位置を調節可能に固定する第2の仮副材固定具と
を備えることを特徴としている。
上記仮副材の一端を、上記隣接主柱に、この隣接主柱の長さ方向における固定位置を調節可能に固定する第1の仮副材固定具と、
上記仮副材の他端を、上記支持部材に、この支持部材の長さ方向における固定位置を調節可能に固定する第2の仮副材固定具と
を備える。
上記2つの固定具の各々について、上記主柱材と摩擦部材とを押圧具で挟み、この押圧具に設置されて上記主柱材と摩擦部材との接触面に中心軸が交差する押圧ボルトを、上記主柱材及び摩擦部材の少なくとも一方に接触させて押圧力を作用させて、主柱材に固定具を固定する工程と、
上記2つの固定具の間に、ジャッキを介在させて支持部材を設置する工程と、
上記ジャッキを伸張させて、上記取替対象の主柱材の荷重を支持部材に移す工程と、
上記取替対象の主柱材を撤去し、新たな主柱材を取り付ける工程と
を備えることを特徴としている。
上記2つの固定具の間に、ジャッキを介在させて支持部材を設置する工程と、
上記取替対象の主柱材を有する主柱に隣接する隣接主柱に第1の仮副材固定具を固定すると共に、上記支持部材に第2の仮副材固定具を固定して、上記隣接主柱と上記支持部材との間に仮副材を設置する工程と、
上記ジャッキを伸張させて、上記取替対象の主柱材の荷重を支持部材に移す工程と、
上記取替対象の主柱材を撤去し、新たな主柱材を取り付ける工程と
を備えることを特徴としている。
2 上側固定具
3 下側固定具
4 支持部材
6 ライナー
7 クランプ
8 ネジ調整部
9 ジャッキ
P 主柱
P1 下側主柱材
P2 取替対象の主柱材
P3 上側主柱材
Claims (8)
- 取替対象の主柱材の両端に連なる2つの主柱材に各々固定される2つの固定具と、これら2つの固定具の間にジャッキが介在されて設置される支持部材とを備えた主柱材取替装置において、
上記固定具は、
固定具本体に連結され、上記主柱材の表面に接する摩擦部材と、
上記主柱材と摩擦部材との接触面に中心軸が交差する状態で、上記主柱材及び摩擦部材の少なくとも一方に接触して押圧力を作用させる少なくとも1つの押圧ボルトを有し、上記主柱材と摩擦部材とを押圧して挟持する押圧具と
を有することを特徴とする塔構造物の主柱材取替装置。 - 請求項1に記載の塔構造物の主柱材取替装置において、
上記固定具が有する押圧具の押圧ボルトは、先端部に、上記主柱材又は摩擦部材に押圧力を作用させるに伴って上記主柱材又は摩擦部材の表面部分に塑性変形を生じさせる突起が設けられていることを特徴とする塔構造物の主柱材取替装置。 - 請求項1に記載の塔構造物の主柱材取替装置において、
上記支持部材は、使用する種類及び個数によって全体の長さが調整可能な1つ又は複数の単位部材で形成され、
上記固定具、ジャッキ及び支持部材のうちのいずれか2つの間に、ネジの螺合位置に応じて長さが調節可能なネジ調整部を備えることを特徴とする塔構造物の主柱材取替装置。 - 取替対象の主柱材の両端に連なる2つの主柱材に各々固定される2つの固定具と、
上記2つの固定具の間にジャッキが介在されて設置される支持部材と、
上記取替対象の主柱材を有する主柱に隣接する隣接主柱と、上記支持部材との間に設置される仮副材と、
上記仮副材の一端を、上記隣接主柱に、この隣接主柱の長さ方向における固定位置を調節可能に固定する第1の仮副材固定具と、
上記仮副材の他端を、上記支持部材に、この支持部材の長さ方向における固定位置を調節可能に固定する第2の仮副材固定具と
を備えることを特徴とする塔構造物の主柱材取替装置。 - 請求項1乃至3のいずれか1つに記載の塔構造物の主柱材取替装置において、
上記取替対象の主柱材を有する主柱に隣接する隣接主柱と、上記支持部材との間に設置される仮副材と、
上記仮副材の一端を、上記隣接主柱に、この隣接主柱の長さ方向における固定位置を調節可能に固定する第1の仮副材固定具と、
上記仮副材の他端を、上記支持部材に、この支持部材の長さ方向における固定位置を調節可能に固定する第2の仮副材固定具と
を備えることを特徴とする塔構造物の主柱材取替装置。 - 請求項4又は5に記載の塔構造物の主柱材取替装置において、
上記仮副材は、ボルトで連結される2つの部材で形成され、これら2つの部材は、長さ方向に等間隔をおいて形成された複数のボルト孔を各々有し、各部材のボルト孔の間隔が、部材の間で異なる値に設定されていることを特徴とする塔構造物の主柱材取替装置。 - 取替対象の主柱材の両端に連なる2つの主柱材に、これらの主柱材の表面に摩擦部材が接するように2つの固定具を各々配置する工程と、
上記2つの固定具の各々について、上記主柱材と摩擦部材とを押圧具で挟み、この押圧具に設置されて上記主柱材と摩擦部材との接触面に中心軸が交差する押圧ボルトを、上記主柱材及び摩擦部材の少なくとも一方に接触させて押圧力を作用させて、主柱材に固定具を固定する工程と、
上記2つの固定具の間に、ジャッキを介在させて支持部材を設置する工程と、
上記ジャッキを伸張させて、上記取替対象の主柱材の荷重を支持部材に移す工程と、
上記取替対象の主柱材を撤去し、新たな主柱材を取り付ける工程と
を備えることを特徴とする塔構造物の主柱材取替方法。 - 取替対象の主柱材の両端に連なる2つの主柱材に、2つの固定具を各々固定する工程と、
上記2つの固定具の間に、ジャッキを介在させて支持部材を設置する工程と、
上記取替対象の主柱材を有する主柱に隣接する隣接主柱に第1の仮副材固定具を固定すると共に、上記支持部材に第2の仮副材固定具を固定して、上記隣接主柱と上記支持部材との間に仮副材を設置する工程と、
上記ジャッキを伸張させて、上記取替対象の主柱材の荷重を支持部材に移す工程と、
上記取替対象の主柱材を撤去し、新たな主柱材を取り付ける工程と
を備えることを特徴とする塔構造物の主柱材取替方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2010010115A JP5431181B2 (ja) | 2010-01-20 | 2010-01-20 | 塔構造物の主柱材取替装置及び主柱材取替方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2010010115A JP5431181B2 (ja) | 2010-01-20 | 2010-01-20 | 塔構造物の主柱材取替装置及び主柱材取替方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2011149171A true JP2011149171A (ja) | 2011-08-04 |
JP5431181B2 JP5431181B2 (ja) | 2014-03-05 |
Family
ID=44536390
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2010010115A Active JP5431181B2 (ja) | 2010-01-20 | 2010-01-20 | 塔構造物の主柱材取替装置及び主柱材取替方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5431181B2 (ja) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015229917A (ja) * | 2014-06-03 | 2015-12-21 | 株式会社デンロコーポレーション | 山形鋼鉄塔の主柱材取替装置および主柱材取替方法 |
CN106958380A (zh) * | 2016-01-12 | 2017-07-18 | 浙江宁远塔桅制造有限公司 | 一种非单管通信铁塔主材更换的设备及方法 |
JP2019106805A (ja) * | 2017-12-13 | 2019-06-27 | 中国電力株式会社 | 取り替え方法 |
JP2019120032A (ja) * | 2017-12-28 | 2019-07-22 | 中国電力株式会社 | 補強治具 |
CN111101726A (zh) * | 2018-10-26 | 2020-05-05 | 杭州固力建筑工程有限公司 | 一种结构托换技术在加固工程中的应用方法 |
WO2021253986A1 (zh) * | 2020-06-19 | 2021-12-23 | 上海建工四建集团有限公司 | 一种混凝土柱临时托换装置及其使用方法 |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5948632B1 (ja) * | 2015-06-04 | 2016-07-06 | 東京電力ホールディングス株式会社 | 山形鋼鉄塔の主柱材取替え工法 |
JP6959055B2 (ja) * | 2017-07-18 | 2021-11-02 | 東京電力ホールディングス株式会社 | 主柱材交換方法 |
CN110130670B (zh) * | 2019-04-10 | 2021-04-06 | 太原理工大学 | 钢筋混凝土上下牛腿式临时支撑系统及其施工方法 |
-
2010
- 2010-01-20 JP JP2010010115A patent/JP5431181B2/ja active Active
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015229917A (ja) * | 2014-06-03 | 2015-12-21 | 株式会社デンロコーポレーション | 山形鋼鉄塔の主柱材取替装置および主柱材取替方法 |
CN106958380A (zh) * | 2016-01-12 | 2017-07-18 | 浙江宁远塔桅制造有限公司 | 一种非单管通信铁塔主材更换的设备及方法 |
CN106958380B (zh) * | 2016-01-12 | 2020-12-11 | 浙江宁远塔桅制造有限公司 | 一种非单管通信铁塔主材更换的方法 |
JP2019106805A (ja) * | 2017-12-13 | 2019-06-27 | 中国電力株式会社 | 取り替え方法 |
JP6992468B2 (ja) | 2017-12-13 | 2022-01-13 | 中国電力株式会社 | 取り替え方法 |
JP2019120032A (ja) * | 2017-12-28 | 2019-07-22 | 中国電力株式会社 | 補強治具 |
JP7017080B2 (ja) | 2017-12-28 | 2022-02-08 | 中国電力株式会社 | 補強治具 |
CN111101726A (zh) * | 2018-10-26 | 2020-05-05 | 杭州固力建筑工程有限公司 | 一种结构托换技术在加固工程中的应用方法 |
WO2021253986A1 (zh) * | 2020-06-19 | 2021-12-23 | 上海建工四建集团有限公司 | 一种混凝土柱临时托换装置及其使用方法 |
Also Published As
Publication number | Publication date |
---|---|
JP5431181B2 (ja) | 2014-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5431181B2 (ja) | 塔構造物の主柱材取替装置及び主柱材取替方法 | |
CN104759824A (zh) | 一种船用t型结构无码装配工装 | |
DK177198B1 (en) | METHOD AND APPARATUS FOR CORRECTING OVALITY IN WIND TURBINE TOWERS | |
KR20150003675U (ko) | 배관용 지그 | |
KR101399964B1 (ko) | 배관 얼라인 장치 | |
JP2018204379A (ja) | 鋼材の接合構造 | |
KR200470714Y1 (ko) | 송전탑의 용접부위 보강장치 | |
JP6250745B1 (ja) | パイプ用孔あけ装置 | |
KR101268840B1 (ko) | 관체 연결 장치 | |
JP7013352B2 (ja) | 仮設橋の施工方法 | |
CA2955592A1 (en) | Removable axle assembly | |
JP2010120076A (ja) | 配管の位置合わせ装置、配管の溶接方法、及び配管部材の製造方法 | |
JP5695307B2 (ja) | 小口径鋼管杭の接合構造および小口径鋼管杭の施工方法 | |
WO2009125559A1 (ja) | 分割型継手のパイプ接続強度増強構造 | |
EP3021028B1 (en) | Pipe clamp assembly with stiffening element | |
CN211950515U (zh) | 一种隧道二衬钢筋定位卡具 | |
JP7352225B2 (ja) | コンクリート打設用圧送管固定金具 | |
JP2006046007A (ja) | 継手用部材 | |
JP6481924B2 (ja) | 山形鋼鉄塔の主柱材取替装置および主柱材取替方法 | |
US9981687B2 (en) | Axle assembly | |
RU140080U1 (ru) | Центратор труб наружный | |
JP5522460B2 (ja) | 鋼管鉄塔の主柱材取替装置に用いる締付具 | |
CN219945084U (zh) | 钢箱梁节段拼接对缝调整装置 | |
CN219966939U (zh) | 一种用于三通管道安装更换的辅助装置 | |
CN219486588U (zh) | 一种用于pe对接错边调节夹具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20121217 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20131121 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20131203 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20131204 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 5431181 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313115 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |