CN111101726A - 一种结构托换技术在加固工程中的应用方法 - Google Patents
一种结构托换技术在加固工程中的应用方法 Download PDFInfo
- Publication number
- CN111101726A CN111101726A CN201811311753.9A CN201811311753A CN111101726A CN 111101726 A CN111101726 A CN 111101726A CN 201811311753 A CN201811311753 A CN 201811311753A CN 111101726 A CN111101726 A CN 111101726A
- Authority
- CN
- China
- Prior art keywords
- steel
- layers
- column
- underpinning
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G23/0222—Replacing or adding wall ties
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
本发明公开了一种结构托换技术在加固工程中的应用方法,第一步,在N层、N+2层竖向构件上浇注抱柱梁;所述抱柱梁包括上、下抱柱梁或设置钢牛腿;第二步,在浇筑后的抱柱梁或设置好的钢牛腿间设置钢结构支撑,钢结构支撑内外侧通过连接型钢配合安装;第三步,把N+2层及以上结构的原由N+1层竖向构件承担的竖向荷载通过抱柱梁或钢牛腿托换系统传递至N层竖向构件上;第四步,将N+1层竖向构件的混凝土凿除;最后,支模浇筑新的混凝土。本发明的结构托换技术在加固工程中的应用方法,通过采用结构整体托换的方法来置换竖向构件的混凝土,对原构件的加固有效且不留后患;特别适用于因混凝土不合格导致局部构件强度无法达到设计要求的情况。
Description
技术领域
本发明涉及一种采用结构整体托换技术对竖向受力构件的混凝土置换施工技术,具体涉及一种结构托换技术在加固工程中的应用方法。
背景技术
对竖向受力构件的卸载,目前主要采用搭设钢管脚手架支撑的方法;该方法施工工作量大,且受现场场地条件限制,当所卸载的构件轴力较大时,脚手架支撑难以满足卸载的需求。针对竖向受力构件(如结构柱、剪力墙等)的卸载,特别是该构件所传递的轴力较大时,我们采用设置抱柱梁或钢牛腿的钢支撑系统对上部结构整体托换的方法可以有效达到解决问题的目的;现有技术中当竖向受力构件本身承担或传递的荷载很大,如高层结构的底部层数,采用搭设钢管脚手架来对结构柱卸载的方法很难满足需求,特别是脚手架的底部支座,一般楼板承载力无法分担上部十几层的恒载,需从地坪基础上搭起,工作量很大且受现场条件限制。
发明内容
(一)要解决的技术问题
为解决上述问题,本发明提出了一种结构托换技术在加固工程中的应用方法,可对任意楼层的竖向构件进行托换,且施工场地范围影响小,施工操作便利;可有效解决因脚手架等支撑自身变形而导致托换的上部结构沉降变形,防止托换构的上部结构出现变形、产生裂缝。
(二)技术方案
本发明的结构托换技术在加固工程中的应用方法,
第一步,在N层、N+2层竖向构件上浇注抱柱梁;所述抱柱梁包括上、下抱柱梁或设置钢牛腿;
第二步,在浇筑完成后的上下抱柱梁或设置好的上下钢牛腿间设置钢结构支撑,钢结构支撑内外侧通过连接型钢配合安装;
第三步,把N+2层及以上结构的原由N+1层竖向构件承担的竖向荷载通过抱柱梁或钢牛腿托换系统传递至N层竖向构件上;即对N+1层竖向构件进行卸载,使构件处在零应力的状态下。
第四步,将N+1层竖向构件的混凝土凿除;
第五步,支模浇筑新的混凝土。
进一步地,所述的抱柱梁其特征在于:采用灌浆料或早强高标号混凝土浇筑。
进一步地,所述的抱柱梁其特征在于:抱柱梁钢筋主筋采用对穿钢筋将构件两侧同位置抱柱梁对拉连接。
进一步地,所述的钢牛腿其特征在于:采用对穿螺栓将构件两侧同位置钢牛腿对拉连接。
进一步地,所述的在浇筑完成后的上下抱柱梁或设置好的上下钢牛腿间设置钢结构支撑,其特征在于:根据计算上部结构的托换重量来确定选用何种尺寸、型号的型钢,如H型钢、工字钢、方钢、圆钢等。
进一步地,所述的抱柱梁或钢牛腿托换系统中,在上下抱柱梁或钢牛腿之间的钢支撑系统中,增设液压千斤顶主动施加预应力。
进一步地,所述的混凝土强度根据需要选用,振捣密实并养护;待混凝土养护强度达到设计要求,方可拆除托换系统。
(三)有益效果
本发明与现有技术相比较,其具有以下有益效果:
(1)本发明的结构托换技术在加固工程中的应用方法,通过采用结构整体托换的方法来置换竖向构件的混凝土,可对任意楼层的竖向构件进行托换,且施工场地范围影响小,施工操作便利.
(2)可有效解决因脚手架等支撑自身变形而导致托换的上部结构沉降变形,防止托换构的上部结构出现变形、产生裂缝。
(3)施工成本降低。
(4)对原构件的加固有效且不留后患;特别适用于因混凝土不合格导致局部构件强度无法达到设计要求的情况。
附图说明
图1是本发明的抱柱梁(钢牛腿)托换系统立面图;
1-上抱柱梁(钢牛腿),2-千斤顶,3-钢结构支撑,4-连接型钢,5-下抱柱梁(钢牛腿),6-拟托换结构柱或剪力墙。
具体实施方式
实施例1:
如图1所示,本发明的结构托换技术在加固工程中的应用方法,首先于拟托换结构柱或剪力墙6的N层、N+2层竖向构件上浇注抱柱梁;所述抱柱梁包括上、下抱柱梁(钢牛腿)1、5,在N层、N+2层抱柱梁(钢牛腿)间设置钢结构支撑3,钢结构支撑3内外侧通过连接型钢4配合安装;把N+2层及以上结构的原由N+1层竖向构件承担的竖向荷载通过抱柱梁(钢牛腿)托换系统传递至N层竖向构件上,即对N+1层竖向构件进行卸载,使构件处在零应力的状态下。然后将N+1层竖向构件的混凝土凿除,最后支模浇筑新的混凝土;混凝土强度根据需要选用,振捣密实并养护;待混凝土养护强度达到设计要求,方可拆除托换系统。
在抱柱梁或钢牛腿托换系统中,为了减少施工时钢结构支撑因上部结构荷载而产生的局部变形,在上、下抱柱梁(钢牛腿)1、5之间的钢支撑系统中,增设液压千斤顶2主动施加预应力,以保证上部结构整体的变形及托换构件的高度等符合设计图纸、施工规范要求。
上面所述的实施例仅仅是对本发明的优选实施方式进行描述,并非对本发明的构思和范围进行限定。在不脱离本发明设计构思的前提下,本领域普通人员对本发明的技术方案做出的各种变型和改进,均应落入到本发明的保护范围,本发明请求保护的技术内容,已经全部记载在权利要求书中。
Claims (7)
1.一种结构托换技术在加固工程中的应用方法,其特征在于:
第一步,在N层、N+2层竖向构件上浇注抱柱梁或设置钢牛腿;
所述抱柱梁包括上、下抱柱梁或设置钢牛腿;
第二步,在浇筑完成后的上下抱柱梁或设置好的上下钢牛腿间设置钢结构支撑,钢结构支撑内外侧通过连接型钢配合安装;
第三步,把N+2层及以上结构的原由N+1层竖向构件承担的竖向荷载通过抱柱梁或钢牛腿托换系统传递至N层竖向构件上;
第四步,将N+1层竖向构件需要置换的混凝土凿除;
第五步,支模浇筑新的混凝土。
2.根据权利要求1所述的抱柱梁其特征在于:采用灌浆料或早强高标号混凝土浇筑。
3.根据权利要求1所述的抱柱梁其特征在于:抱柱梁钢筋主筋采用对穿钢筋将构件两侧同位置抱柱梁对拉连接。
4.根据权利要求1所述的钢牛腿其特征在于:采用对穿螺栓将构件两侧同位置钢牛腿对拉连接。
5.根据权利要求1所述的在浇筑完成后的上下抱柱梁或设置好的上下钢牛腿间设置钢结构支撑,其特征在于:根据计算上部结构的托换重量来确定选用何种尺寸、型号的型钢,如H型钢、工字钢、方钢、圆钢等。
6.根据权利要求1所述的结构托换技术在加固工程中的应用方法,其特征在于:所述的抱柱梁或钢牛腿托换系统中,在上下抱柱梁或钢牛腿之间的钢支撑系统中,增设液压千斤顶主动施加预应力。
7.根据权利要求1所述的结构托换技术在加固工程中的应用方法,其特征在于:所述的混凝土强度根据需要选用,振捣密实并养护;待混凝土养护强度达到设计要求,方可拆除托换系统。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811311753.9A CN111101726A (zh) | 2018-10-26 | 2018-10-26 | 一种结构托换技术在加固工程中的应用方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811311753.9A CN111101726A (zh) | 2018-10-26 | 2018-10-26 | 一种结构托换技术在加固工程中的应用方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111101726A true CN111101726A (zh) | 2020-05-05 |
Family
ID=70419954
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811311753.9A Pending CN111101726A (zh) | 2018-10-26 | 2018-10-26 | 一种结构托换技术在加固工程中的应用方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111101726A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111691697A (zh) * | 2020-06-03 | 2020-09-22 | 南通大学 | 一种开裂剪力墙可靠加固关键施工方法 |
WO2021253986A1 (zh) * | 2020-06-19 | 2021-12-23 | 上海建工四建集团有限公司 | 一种混凝土柱临时托换装置及其使用方法 |
CN113982303A (zh) * | 2021-10-22 | 2022-01-28 | 广东中青建筑科技有限公司 | 一种钢筋混凝土柱的置换方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101550766A (zh) * | 2008-04-03 | 2009-10-07 | 上海市第七建筑有限公司 | 一种用于结构体系转换的隔层置换施工方法 |
JP2011149171A (ja) * | 2010-01-20 | 2011-08-04 | Kyushu Electric Power Co Inc | 塔構造物の主柱材取替装置及び主柱材取替方法 |
CN102505866A (zh) * | 2011-11-18 | 2012-06-20 | 广州华特建筑结构设计事务所 | 一种柱身缺陷混凝土的置换方法 |
CN105133854A (zh) * | 2015-09-29 | 2015-12-09 | 四川省建筑科学研究院 | 一种竖向构件的置换卸载结构及施工方法 |
CN204940908U (zh) * | 2015-09-29 | 2016-01-06 | 四川省建筑科学研究院 | 一种竖向构件的置换卸载结构 |
CN108265998A (zh) * | 2017-12-29 | 2018-07-10 | 浙江省建筑设计研究院 | 一种高层建筑承重构件整层置换方法 |
CN207863507U (zh) * | 2017-12-29 | 2018-09-14 | 浙江省建筑设计研究院 | 一种用于高层建筑楼层的竖向构件置换装置 |
-
2018
- 2018-10-26 CN CN201811311753.9A patent/CN111101726A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101550766A (zh) * | 2008-04-03 | 2009-10-07 | 上海市第七建筑有限公司 | 一种用于结构体系转换的隔层置换施工方法 |
JP2011149171A (ja) * | 2010-01-20 | 2011-08-04 | Kyushu Electric Power Co Inc | 塔構造物の主柱材取替装置及び主柱材取替方法 |
CN102505866A (zh) * | 2011-11-18 | 2012-06-20 | 广州华特建筑结构设计事务所 | 一种柱身缺陷混凝土的置换方法 |
CN105133854A (zh) * | 2015-09-29 | 2015-12-09 | 四川省建筑科学研究院 | 一种竖向构件的置换卸载结构及施工方法 |
CN204940908U (zh) * | 2015-09-29 | 2016-01-06 | 四川省建筑科学研究院 | 一种竖向构件的置换卸载结构 |
CN108265998A (zh) * | 2017-12-29 | 2018-07-10 | 浙江省建筑设计研究院 | 一种高层建筑承重构件整层置换方法 |
CN207863507U (zh) * | 2017-12-29 | 2018-09-14 | 浙江省建筑设计研究院 | 一种用于高层建筑楼层的竖向构件置换装置 |
Non-Patent Citations (2)
Title |
---|
张峰等: "高层建筑墙柱置换设计 ", 《中华建设》 * |
毕江寰: "高层住宅工程七层局部结构托换施工 ", 《天津建设科技》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111691697A (zh) * | 2020-06-03 | 2020-09-22 | 南通大学 | 一种开裂剪力墙可靠加固关键施工方法 |
WO2021253986A1 (zh) * | 2020-06-19 | 2021-12-23 | 上海建工四建集团有限公司 | 一种混凝土柱临时托换装置及其使用方法 |
CN113982303A (zh) * | 2021-10-22 | 2022-01-28 | 广东中青建筑科技有限公司 | 一种钢筋混凝土柱的置换方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6448817B2 (ja) | Pcトラス壁体構造物及びその施工方法 | |
US8261502B2 (en) | Tower foundation system | |
KR100820299B1 (ko) | 가설브래킷 설치구조 및 가설브래킷을 이용한 사장교 주탑pc가로보 설치공법 | |
CN103935911B (zh) | 塔吊附墙支撑结构及其施工方法 | |
JP2007527971A (ja) | タワーの立設方法 | |
CN111101726A (zh) | 一种结构托换技术在加固工程中的应用方法 | |
CN210067002U (zh) | 一种免支撑装配式框架结构体系 | |
CN102021889A (zh) | 一种桥梁架设方法 | |
KR102387052B1 (ko) | 단부보강된 하프 프리캐스트 콘크리트 보의 시공 방법 | |
CN108775084B (zh) | 钢-混凝土组合预制梁和预制柱连接结构和施工方法 | |
CN111663659B (zh) | 错层同步施工方法 | |
KR20120019152A (ko) | 프리스트레스트 프리캐스트 콘크리트 합성보와 이의 제작방법 및 이의 시공방법 | |
KR101335382B1 (ko) | 내부힌지를 활용한 복합트러스 거더교의 시공법 | |
US10829927B2 (en) | Vertical slip form construction system with multi-function platform, and method of constructing a building therewith | |
CN112814163B (zh) | 建筑免模板的施工方法 | |
JP5342312B2 (ja) | プレキャスト部材の架設方法 | |
CN106032705A (zh) | 一种钢筋混凝土楼盖的一体式浇筑成型施工方法 | |
CN216076559U (zh) | 一种装配式自适应竖向变形的混凝土结构体系 | |
CN201024713Y (zh) | 新型建筑物隔震结构 | |
KR102244658B1 (ko) | 기둥 상단부에 드롭판넬이 형성된 무량판 구조의 시공방법 | |
CN210216491U (zh) | 一种易搭建式塔吊基础结构 | |
CN209891158U (zh) | 一种渡槽支撑系统 | |
CN112854603A (zh) | 一种预制混凝土管桩柱与空心楼盖或无梁楼盖的连接结构 | |
CN211313083U (zh) | 一种框架柱 | |
CN219033213U (zh) | 一种预应力混凝土管桩接桩连接装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20200505 |