CN105133854A - 一种竖向构件的置换卸载结构及施工方法 - Google Patents
一种竖向构件的置换卸载结构及施工方法 Download PDFInfo
- Publication number
- CN105133854A CN105133854A CN201510629869.7A CN201510629869A CN105133854A CN 105133854 A CN105133854 A CN 105133854A CN 201510629869 A CN201510629869 A CN 201510629869A CN 105133854 A CN105133854 A CN 105133854A
- Authority
- CN
- China
- Prior art keywords
- unloading
- vertical member
- displacement
- post
- jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本发明公开了一种竖向构件的置换卸载结构及施工方法,包括固定安装在被置换竖向构件上、下两端的支撑构件,在支撑构件之间设置有位于竖向构件两侧的卸载柱,在卸载柱与上端的支撑构件之间设置有卸载千斤顶。本发明的置换卸载结构通过设置两个支撑构件在所需置换构件的上下两侧,然后通过设置卸载柱、卸载千斤顶,以竖向构件为基准,将需要卸除的荷载通过上部支撑构件、卸载千斤顶、卸载柱、下方的支撑构件传递至竖向构件,相对于现有的置换技术而言,占用的空间很少,置换后可以快速恢复原空间,施工周期缩短,费用也大大降低,具有明显的社会效益和经济效益。
Description
技术领域
本发明涉及建筑领域,具体涉及一种竖向构件的置换卸载结构及施工方法。
背景技术
随着建筑行业快速发展,建设工程中结构构件混凝土强度出现问题的情况时有发生,建筑结构的竖向结构构件(柱、剪力墙)混凝土强度一旦出现问题,经济及社会影响巨大。目前,解决此类问题的方法通常有三种:一是对出现问题的构件直接进行加固处理,如增大截面,型钢加固等,采用此类方法会改变原结构应力分布情况,影响建筑空间;二是直接全部拆除后重新浇筑,鉴于混凝土质量问题一般拆模后甚至验收时才发现,往往出现问题的构件上面已经施工若干层,若拆除重建,其经济损失、社会不利影响巨大;三是置换加固,鉴于采用置换加固时的传统支撑方法,如从基础层开始全楼满堂支撑卸载,分段置换,或采用型钢结构整体卸载,其费用高、工期长。
发明内容
本发明的目的是解决现有技术中竖向构件置换方法中存在的改变原结构应力分布情况,影响建筑空间、费用高、工期长的问题,提供一种竖向构件的置换卸载结构及施工方法,达到快速、可靠置换的目的。
本发明的目的通过下述技术方案实现:
一种竖向构件的置换卸载结构,包括固定安装在被置换竖向构件上、下两端的支撑构件,在支撑构件之间设置有位于竖向构件两侧的卸载柱,在卸载柱与上端的支撑构件之间设置有卸载千斤顶。本发明的置换卸载结构通过设置两个支撑构件在所需置换构件的上下两侧,然后通过设置卸载柱、卸载千斤顶,以竖向构件为基准,将需要卸除的荷载通过上部支撑构件、卸载千斤顶、卸载柱、下方的支撑构件传递至下层竖向构件,相对于现有的置换技术而言,占用的空间很少,置换后可以快速恢复原空间,施工周期缩短,费用也大大降低,具有明显的社会效益和经济效益。
所述的支撑构件包括固定设置在竖向构件上的支撑牛腿,支撑牛腿内部设置抗剪钢筋与竖向构件连接。支撑牛腿通过抗剪钢筋与竖向构件浇筑成整体的方式,可以极大提升支撑牛腿的传力效果,同时,将竖向构件需置换段的负荷传递给下层竖向构件。
所述卸载千斤顶的两侧沿水平方向设置有支撑小柱。支撑小柱能增强千斤顶在卸载过程中的稳定性,进一步提高卸压支撑结构的可靠性。
所述卸载千斤顶的两端分别通过钢垫板作用在支撑构件与卸载柱上。通过钢垫板的设置,可以使卸载柱的受力趋于均匀。
在所述的卸载柱与竖向构件之间还设置有隔断构造层。通过设置一个隔断构造层,可以使得卸载柱与竖向构件需置换段之间完全分离,保证卸载完全,避免局部卸载不足造成的影响。
所述隔断构造层的厚度为20~50mm。经过申请人的多次研究和实验,隔断构造宽度设置20~50mm时既可以达到隔断的目的,又保证竖向构件两侧的卸载柱的卸载均匀分布,成本最低。
所述位于竖向构件两侧的卸载柱之间还设置有连接构件。申请人发现卸载柱沿高度方向合适位置设置连接构件,可以保持两侧卸载柱的同步受力和刚度一致,可减少卸载柱的有效高度,减小卸载柱截面尺寸,节约造价。
所述的连接构件之间的间隔为1.5~2.0m。进一步讲,发明人发现,连接构件沿卸载柱高度方向设置的间距在1.5~2.0m之间最为适宜。
一种竖向构件的置换施工方法,包括以下步骤:
(a)将竖向构件需置换段的楼面板、楼顶板位于卸载柱位置的混凝土凿除;
(b)在竖向构件上钻孔,放置抗剪钢筋,绑扎支撑牛腿的钢筋,同时将支撑小柱的钢筋预埋固定,浇筑支撑牛腿;
(c)在竖向构件的置换段钻孔,放置连接构件,绑扎卸载柱的钢筋,浇筑卸载柱,卸载柱柱顶预埋钢垫板;
(d)在卸载柱上安装卸载千斤顶,采用卸载千斤顶进行卸载,浇筑支撑小柱混凝土;
(e)凿除竖向构件需置换段的混凝土后重新浇筑,待其混凝土强度达到设计要求后,拆除卸载千斤顶、卸载柱及支撑构件。
本发明的另一个目的是提供一种竖向构件的置换施工方法,通过上述步骤,在较小的空间范围内进行置换,从而减小空间影响,同时采用平截面假设,即重力荷载在置换的过程中按刚度分配;重力荷载在置换过程中不转移,即不考虑空间作用,将需要采用复杂专业程序进行计算的简化为简单的手算,方便技术人员掌握使用,与传统卸载方法相比,在需要置换的构件两侧增设卸载柱,卸载柱通过上下层支撑牛腿连接卸载,直接将竖向构件需置换段架空,从而达到卸载的目的。
在步骤(b)中,还包括将竖向构件与支撑牛腿的接触表面凿毛的步骤。通过将支撑牛腿与原结构表面凿毛,可以增加抗剪能力,提高传力效果。
在步骤(c)之前,在竖向构件需置换段的表面进行隔断构造层的铺设。
本发明与现有技术相比,具有如下的优点和有益效果:
1本发明一种竖向构件的置换卸载结构及施工方法,通过设置卸载柱、卸载千斤顶,以竖向构件为基准,将需要卸除的荷载通过上部支撑构件、卸载千斤顶、卸载柱、下方的支撑构件传递至下层竖向构件,相对于现有的置换技术而言,占用的空间很少,置换后可以快速恢复原空间,施工周期缩短,费用也大大降低,具有明显的社会效益和经济效益;
2本发明一种竖向构件的置换卸载结构及施工方法,采用平截面假设,即重力荷载在置换的过程中按刚度分配;重力荷载在置换过程中不转移,即不考虑空间作用,将需要采用复杂专业程序进行的计算简化为简单的手算,方便技术人员掌握使用,与传统卸载方法相比,在需要置换的构件两侧增设卸载柱,卸载柱通过上下层牛腿连接卸载,直接将需置换层构件架空,从而达到卸载的目的;
3本发明一种竖向构件的置换卸载结构及施工方法,卸载柱沿高度方向合适位置设置连接构件,可减少卸载柱有效高度,减小卸载柱截面尺寸,节约造价,通过调整卸载柱支撑牛腿内抗剪钢筋弯折方向增强卸载作用;在卸载柱与上端连接支撑牛腿之间设置千斤顶,达到卸载的目的;在千斤顶的的两侧沿水平方向设置有支撑小柱,增强千斤顶在卸载过程中的稳定性,进一步提高卸压支撑结构的可靠性。将竖向构件需置换层的楼面板及楼顶板位于卸载柱位置的混凝土凿除,确保卸载完全。
附图说明
此处所说明的附图用来提供对本发明实施例的进一步理解,构成本申请的一部分,并不构成对本发明实施例的限定。在附图中:
图1为本发明结构示意图。
附图中标记及相应的零部件名称:
1-竖向构件,2-支撑牛腿,3-抗剪钢筋,4-楼面板,5-隔断构造层,6-连接构件,7-卸载柱,8-楼顶板,9-钢垫板,10-卸载千斤顶,11-支撑小柱。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚明白,下面结合实施例和附图,对本发明作进一步的详细说明,本发明的示意性实施方式及其说明仅用于解释本发明,并不作为对本发明的限定。
实施例
如图1所示,本发明一种竖向构件的置换卸载结构及施工方法,以某工程的一层结构柱作为竖向构件进行置换为例,按照以下工序进行施工:
(a)将竖向构件1需置换层的楼面板4、楼顶板8位于卸载柱7位置的混凝土凿除,保证卸载柱7与需要置换构件完全脱离;
(b)将支撑牛腿2与竖向构件1接触的表面凿毛,增加抗剪能力储备,在需要置换的竖向构件1上钻孔,放置抗剪钢筋3,下部支撑牛腿2的抗剪钢筋3往下弯折,上部支撑牛腿2的抗剪钢筋3往上弯折,可以有效增加抗剪能力,绑扎支撑牛腿2的钢筋,同时将支撑小柱11的钢筋预埋固定,浇筑支撑牛腿2;
(c)在竖向构件1的表面帖敷塑料泡沫板作为隔断构造层5,隔断构造层5的厚度为20~50mm,在竖向构件1的置换层钻孔,放置连接构件6,连接钢管作为连接构件6,连接钢管沿卸载柱7的高度方向设置,其间距在1.5~2.0m,绑扎卸载柱7的钢筋,浇筑卸载柱7,卸载柱7柱顶预埋钢垫板9;卸载柱7可采用钢筋混凝土柱或钢柱,可以根据不同结构形式、现场情况随机选用:进一步讲,当需置换层承载较大,对卸载柱承载要求较大时,可采用钢筋混凝土柱,当需置换层承载较小,对卸载柱承载要求相对较小时,可采用钢柱;进一步,发明人发现,对一般民用建筑,当需置换层上部楼层≥5层时,采用混凝土柱更为经济,当需置换层上部楼层<5层时,采用钢柱更为经济;发明人发现卸载柱采用二次灌浆料浇筑更为经济合理,进一步讲,二次灌浆料强度可以在24小时内迅速达到较高强度值,节约造价,同时减少泄压千斤顶的全负荷工作状态风险;
(d)设置隔断构造层5,待卸载柱7强度达到设计要求后,在卸载柱7上安装卸载千斤顶10,采用卸载千斤顶10进行卸载;在千斤顶的两侧沿水平方向设置支撑小柱11,增强千斤顶在卸载过程中的稳定性;
(E)凿除竖向构件1需置换层的混凝土后重新浇筑,待其混凝土强度达到设计要求后,拆除卸载千斤顶10及卸载柱7。
以上所述的具体实施方式,对本发明的目的、技术方案和有益效果进行了进一步详细说明,所应理解的是,以上所述仅为本发明的具体实施方式而已,并不用于限定本发明的保护范围,凡在本发明的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (11)
1.一种竖向构件(1)的置换卸载结构,其特征在于:包括固定安装在竖向构件(1)上、下两端的支撑构件,在支撑构件之间设置有位于竖向构件(1)两侧的卸载柱(7),在卸载柱(7)与上端的支撑构件之间设置有卸载千斤顶(10)。
2.根据权利要求1所述的一种竖向构件的置换卸载结构,其特征在于:所述的支撑构件包括固定设置在竖向构件(1)上的支撑牛腿(2),支撑牛腿(2)内部设置抗剪钢筋(3)与竖向构件(1)连接。
3.根据权利要求1所述的一种竖向构件的置换卸载结构,其特征在于:所述卸载千斤顶(10)的两端分别通过钢垫板(9)作用在支撑构件与卸载柱(7)上。
4.根据权利要求1至3中任意一项所述的一种竖向构件的置换卸载结构,其特征在于:在所述的卸载柱(7)与竖向构件(1)需置换段之间还设置有隔断构造层(5)。
5.根据权利要求4所述的一种竖向构件的置换卸载结构,其特征在于:所述隔断构造层(5)的厚度为20~50mm。
6.根据权利要求1所述的一种竖向构件的置换卸载结构,其特征在于:所述卸载千斤顶(10)的两侧沿水平方向设置有支撑小柱(11)。
7.根据权利要求1至3中任意一项所述的一种竖向构件的置换卸载结构,其特征在于:所述位于竖向构件(1)需置换段两侧的卸载柱(7)之间还设置有连接构件(6)。
8.根据权利要求7所述的一种竖向构件的置换卸载结构,其特征在于:所述的连接构件(6)之间的间隔为1.5~2.0m。
9.一种竖向构件的置换施工方法,其特征在于包括以下步骤:
(a)将竖向构件(1)需置换段的楼面板(4)、楼顶板(8)位于卸载柱(7)位置的混凝土凿除;
(b)在竖向构件(1)上钻孔,放置抗剪钢筋(3),绑扎支撑牛腿(2)的钢筋,同时将支撑小柱(11)的钢筋绑扎并预埋固定,浇筑支撑牛腿(2);
(c)在竖向构件(1)需置换段上钻孔,放置连接构件(6),绑扎卸载柱(7)的钢筋,浇筑卸载柱(7),卸载柱(7)柱顶预埋钢垫板(9);
(d)在卸载柱(7)上安装卸载千斤顶(10),采用卸载千斤顶(10)进行卸载,浇筑支撑小柱(11)混凝土;
(e)凿除竖向构件(1)需置换段的混凝土后重新浇筑,待其混凝土强度达到设计要求后,拆除卸载千斤顶(10)及卸载柱(7)。
10.根据权利要求9所述的一种竖向构件的置换施工方法,其特征在:在步骤(b)中,还包括将竖向构件(1)与支撑牛腿(2)的接触表面凿毛的步骤。
11.根据权利要求9所述的一种竖向构件的置换施工方法,其特征在:在步骤(c)之前,在竖向构件(1)需置换段的表面进行隔断构造层(5)的铺设。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510629869.7A CN105133854B (zh) | 2015-09-29 | 2015-09-29 | 一种竖向构件的置换卸载结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510629869.7A CN105133854B (zh) | 2015-09-29 | 2015-09-29 | 一种竖向构件的置换卸载结构及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105133854A true CN105133854A (zh) | 2015-12-09 |
CN105133854B CN105133854B (zh) | 2017-07-04 |
Family
ID=54719399
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510629869.7A Active CN105133854B (zh) | 2015-09-29 | 2015-09-29 | 一种竖向构件的置换卸载结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105133854B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108265998A (zh) * | 2017-12-29 | 2018-07-10 | 浙江省建筑设计研究院 | 一种高层建筑承重构件整层置换方法 |
CN110067260A (zh) * | 2019-04-11 | 2019-07-30 | 牛斌 | 盖挖逆作法车站钢管柱倾斜处理方法 |
CN111101726A (zh) * | 2018-10-26 | 2020-05-05 | 杭州固力建筑工程有限公司 | 一种结构托换技术在加固工程中的应用方法 |
CN110130670B (zh) * | 2019-04-10 | 2021-04-06 | 太原理工大学 | 钢筋混凝土上下牛腿式临时支撑系统及其施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3807142B2 (ja) * | 1999-03-23 | 2006-08-09 | 株式会社竹中工務店 | 既存建物の免震化工事における上部構造の支持方法 |
CN101054855A (zh) * | 2007-05-11 | 2007-10-17 | 李今保 | 计算机应变控制梁柱托换方法 |
CN102505866A (zh) * | 2011-11-18 | 2012-06-20 | 广州华特建筑结构设计事务所 | 一种柱身缺陷混凝土的置换方法 |
CN103758359A (zh) * | 2014-01-17 | 2014-04-30 | 西安建筑科技大学 | 一种安全可靠的托梁换柱施工系统及其施工方法 |
CN203795884U (zh) * | 2014-01-17 | 2014-08-27 | 西安建筑科技大学 | 一种安全可靠的托梁换柱施工系统 |
CN204552141U (zh) * | 2015-04-22 | 2015-08-12 | 福州大学 | 一种用于梁支柱置换施工的支撑结构 |
CN204940908U (zh) * | 2015-09-29 | 2016-01-06 | 四川省建筑科学研究院 | 一种竖向构件的置换卸载结构 |
-
2015
- 2015-09-29 CN CN201510629869.7A patent/CN105133854B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3807142B2 (ja) * | 1999-03-23 | 2006-08-09 | 株式会社竹中工務店 | 既存建物の免震化工事における上部構造の支持方法 |
CN101054855A (zh) * | 2007-05-11 | 2007-10-17 | 李今保 | 计算机应变控制梁柱托换方法 |
CN102505866A (zh) * | 2011-11-18 | 2012-06-20 | 广州华特建筑结构设计事务所 | 一种柱身缺陷混凝土的置换方法 |
CN103758359A (zh) * | 2014-01-17 | 2014-04-30 | 西安建筑科技大学 | 一种安全可靠的托梁换柱施工系统及其施工方法 |
CN203795884U (zh) * | 2014-01-17 | 2014-08-27 | 西安建筑科技大学 | 一种安全可靠的托梁换柱施工系统 |
CN204552141U (zh) * | 2015-04-22 | 2015-08-12 | 福州大学 | 一种用于梁支柱置换施工的支撑结构 |
CN204940908U (zh) * | 2015-09-29 | 2016-01-06 | 四川省建筑科学研究院 | 一种竖向构件的置换卸载结构 |
Non-Patent Citations (2)
Title |
---|
吴志雄: "某高层框剪结构柱头缺陷混凝土置换加固设计与施工", 《第九届全国建筑物鉴定与加固改造学术会议》 * |
费广清: "置换混凝土加固剪力墙在某工程中的应用分析", 《安徽建筑》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108265998A (zh) * | 2017-12-29 | 2018-07-10 | 浙江省建筑设计研究院 | 一种高层建筑承重构件整层置换方法 |
CN111101726A (zh) * | 2018-10-26 | 2020-05-05 | 杭州固力建筑工程有限公司 | 一种结构托换技术在加固工程中的应用方法 |
CN110130670B (zh) * | 2019-04-10 | 2021-04-06 | 太原理工大学 | 钢筋混凝土上下牛腿式临时支撑系统及其施工方法 |
CN110067260A (zh) * | 2019-04-11 | 2019-07-30 | 牛斌 | 盖挖逆作法车站钢管柱倾斜处理方法 |
CN110067260B (zh) * | 2019-04-11 | 2021-04-20 | 北京城建设计发展集团股份有限公司 | 盖挖逆作法车站钢管柱倾斜处理方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105133854B (zh) | 2017-07-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102016195B (zh) | 栅格型托板结构及其建造方法 | |
CN105133854A (zh) | 一种竖向构件的置换卸载结构及施工方法 | |
KR101107300B1 (ko) | 강판전단벽 | |
JP5239190B2 (ja) | 既設rc部材の補強方法及び既設rc部材の補強用パネル | |
KR100903398B1 (ko) | 프리캐스트 섬유보강 와이어매쉬 슬래브 | |
KR102144400B1 (ko) | 프리캐스트 슬래브용 psc거더 및 이를 이용한 교량시공방법 | |
CN204940908U (zh) | 一种竖向构件的置换卸载结构 | |
KR101237000B1 (ko) | 프리캐스트 콘크리트 패널 시공방법 | |
KR102000534B1 (ko) | 거푸집 겸용 고내구성 텍스타일 보강 패널을 이용한 철근콘크리트 구조물 시공방법 | |
CN103603491B (zh) | 一种梁板后浇带模板支撑架的搭设方法 | |
CN103046764B (zh) | 钢筋网细石混凝土加固预应力混凝土空心板的方法 | |
CN102900241A (zh) | 混凝土结构改建中“新梁老柱”的节点一体化施工方法 | |
CN104499608A (zh) | 预应力型钢加固剪力墙的设计与施工方法 | |
KR101098688B1 (ko) | 단면감소 철근을 이용한 보-기둥 접합 부분에서의 내진 성능 향상 구조를 가지는 철근 콘크리트 골조 구조물 | |
KR20140069752A (ko) | 철근매입에 의한 전단벽 등분포보강 및 단부보강 공법 | |
KR101300490B1 (ko) | 이종재료 상부플랜지를 갖는 중공 거더 및 이를 이용한 교량 시공 방법 | |
KR20110019188A (ko) | 슬래브 구축용 결합구조 | |
KR101710943B1 (ko) | 구조물용 피씨 데크 슬래브 및 이의 제조방법 | |
CN210597741U (zh) | 一种剪力墙现浇暗柱钢筋布置 | |
KR101447537B1 (ko) | 연속화모듈을 이용한 프리캐스트 바닥판 연속화 방법 | |
KR101288831B1 (ko) | 소구경말뚝 및 하중전이프레임을 이용한 벽체존치 건축물 리모델링 공법 | |
KR20160000005A (ko) | 철물을 이용한 장스판 콘크리트 바닥 보강 신축이음장치와 보강방법 | |
KR101064752B1 (ko) | 콘크리트 슬래브 타설용 데크 | |
CN105525629A (zh) | 地铁车站施工方法及装置 | |
JP6232190B2 (ja) | 目地構成部材、コンクリート打設方法、コンクリート構造物 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: A section of Chengdu city Jinniu District 610000 North Road No. 55 in Sichuan Province Patentee after: Sichuan Academy of Architectural Sciences Co., Ltd. Address before: A section of Chengdu city Jinniu District 610000 North Road No. 55 in Sichuan Province Patentee before: Research Inst. of Architectonics, Sichuan Prov. |