JP2011047111A - 縦坑の内壁面に形成されるコンクリート壁の構築方法 - Google Patents
縦坑の内壁面に形成されるコンクリート壁の構築方法 Download PDFInfo
- Publication number
- JP2011047111A JP2011047111A JP2009193864A JP2009193864A JP2011047111A JP 2011047111 A JP2011047111 A JP 2011047111A JP 2009193864 A JP2009193864 A JP 2009193864A JP 2009193864 A JP2009193864 A JP 2009193864A JP 2011047111 A JP2011047111 A JP 2011047111A
- Authority
- JP
- Japan
- Prior art keywords
- formwork
- concrete wall
- jack
- wall
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000009415 formwork Methods 0.000 claims description 70
- 238000010276 construction Methods 0.000 claims description 9
- 230000003028 elevating effect Effects 0.000 claims description 4
- 238000007711 solidification Methods 0.000 abstract 1
- 230000008023 solidification Effects 0.000 abstract 1
- 230000008707 rearrangement Effects 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
【解決手段】縦坑2の下部のコンクリート壁3に埋設したロッド4を垂直上方へ延伸させ、ロッドを昇降する昇降ジャッキ5に梁部材6を連結し、梁部材に配設される支持部材7に型枠ジャッキ8を固定し、型枠ジャッキの先端に型枠9を結合して、昇降ジャッキと型枠ジャッキとを操作することによって型枠をコンクリート壁の上側にその壁面に沿って配置し、次いで型枠と地盤との隙間にコンクリートを流し込んで、コンクリートを乾燥して固化させることによってコンクリート壁の上側にさらなるコンクリート壁を形成した後、型枠ジャッキを操作して型枠をコンクリート壁から離隔させ、引き続き昇降ジャッキを操作して型枠を上方に移動させ、さらに型枠ジャッキを操作して型枠をコンクリート壁の上側に壁面に沿って配置し、次いで型枠と地盤との隙間にコンクリートを流し込む。
【選択図】図1
Description
そこで円筒形の型枠を予め分割しておき、水平断面において複数個に分離させて使用する技術が実用化されている。しかも型枠をコンクリート壁から離隔させるためにネジ式の離隔具を併用することによって、コンクリート壁を構築した後で型枠を比較的容易に取り出すことができる。この離隔具は、型枠に結合されたネジを作業員が回動させて、コンクリート壁から型枠を離隔させるものである。この技術を活用すれば工期の短縮が期待できる。ただし、作業員の負荷軽減および工期のさらなる短縮の観点から改善の余地が残されている。
昇降ジャッキ5には梁部材6を連結し、その梁部材6に支持部材7を配設する。さらに支持部材7に型枠ジャッキ8を取付けて、型枠ジャッキ8の先端に型枠9を結合する。その結果、昇降ジャッキ5がロッド4を昇降することによって、型枠9を上下方向に移動させることが可能となる。また、型枠ジャッキ8を作動させることによって、型枠9を水平方向に移動させることも可能となる。
図1に示す通り、地盤1と型枠9との間に、コンクリート壁3の上端面を底面とする隙間が構成される。その隙間にコンクリートを流し込んで乾燥させる。コンクリートが固化すると、既存のコンクリート壁3の上側にさらなるコンクリート壁が形成される。
本発明では、ロッド4の本数は縦坑1の直径やコンクリート壁3の厚さに応じて適宜設定すれば良く、6本に限定するものではない。ただし、型枠ジャッキ8を支持する支持部材7,梁部材6,昇降ジャッキ5からなる構造体の安定性を維持するためには、2本以上のロッドを用いて、そのそれぞれに昇降ジャッキ5を取り付けることが好ましい。
以下では図2を参照して型枠9の離隔と再配列について説明する。
コンクリート壁3から型枠9を離隔させる際には、分割した型枠9のうち、等間隔で位置する型枠9を型枠ジャッキ8によって離隔させる。図2には等間隔で位置する4ケ所の型枠9を離隔させた例を示す。そして型枠ジャッキ8をさらに操作して、その型枠9とコンクリート壁3との間隔を拡大する。次に、隣接する型枠9をコンクリート壁3から離隔させるにあたって、既に離隔させた型枠9とコンクリート壁3との中間まで離隔させる。このようにして型枠の分割された部位に応じて型枠ジャッキ8のストロークを変化させることによって、コンクリート壁3から離隔させる際に互いに隣合う型枠の干渉を防止することができる。
以上に説明した通り、本発明によれば、型枠の離隔と再配列を容易に行なうことが可能であるから、作業員の負荷を軽減できるばかりでなく、工期を大幅に短縮できる。
図1に示すように、地盤1に設けられた縦坑2の内壁面下部にコンクリート壁3を形成し、そのコンクリート壁3にロッド4(直径76.3mm)を等間隔で6本埋設した。ロッド4はコンクリート壁3の上端面から垂直上方へ延伸させ、そのロッド4を昇降する昇降ジャッキ5をそれぞれ取付けた。昇降ジャッキ5には梁部材6を連結し、その梁部材6に支持部材7を配設した。さらに支持部材7に型枠ジャッキ8を取付けて、型枠ジャッキ8の先端に型枠9を結合した。
その隙間にコンクリートを流し込んだ後、乾燥させた。コンクリートが固化すると、型枠ジャッキ8を作動させて型枠9をコンクリート壁から離隔させた。型枠9は水平断面において12個に分割されており、図2に示すように、まず等間隔で位置する4ケ所の型枠9を離隔させた。その型枠ジャッキ8のストロークは200mmとした。次に、隣接する4ケ所の型枠9をコンクリート壁3から離隔させた。型枠ジャッキ8のストロークは100mmとした。引き続き、残る4ケ所の型枠9をストローク50mmでコンクリート壁3から離隔させた。
以上の手順を繰り返すことによって、既存のコンクリート壁3の上側にさらなるコンクリート壁を形成していき、地盤1に設けられた縦坑2の内壁面にコンクリート壁3を構築した。
このようにして、地盤1に設けられた縦坑2の全高にわたって内壁面にコンクリート壁3を短期間で構築することができた。
2 縦坑
3 コンクリート壁
4 ロッド
5 昇降ジャッキ
6 梁部材
7 支持部材
8 型枠ジャッキ
9 型枠
Claims (3)
- 地盤中に設けられる縦坑の内壁面に形成されるコンクリート壁の構築方法において、前記縦坑の下部に形成されたコンクリート壁に埋設したロッドを前記コンクリート壁の上端面から垂直上方へ延伸させ、前記ロッドを昇降する昇降ジャッキに梁部材を連結し、前記梁部材に配設される支持部材に型枠ジャッキを固定し、前記型枠ジャッキの先端に型枠を結合して、前記昇降ジャッキと前記型枠ジャッキとを操作することによって前記型枠を前記コンクリート壁の上側にその壁面に沿って配置し、次いで前記型枠と前記地盤との隙間にコンクリートを流し込んで、前記コンクリートを乾燥して固化させることによって前記コンクリート壁の上側にさらなるコンクリート壁を形成した後、前記型枠ジャッキを操作して前記型枠を前記コンクリート壁から離隔させ、引き続き前記昇降ジャッキを操作して前記型枠を上方に移動させ、さらに前記型枠ジャッキを操作して前記型枠を前記コンクリート壁の上側に前記壁面に沿って配置し、次いで前記型枠と前記地盤との隙間にコンクリートを流し込むことを特徴とする縦坑の内壁面を形成するコンクリート壁の構築方法。
- 前記型枠が、水平断面において複数個に分割されてなることを特徴とする請求項1に記載の縦坑の内壁面を形成するコンクリート壁の構築方法。
- 前記型枠の分割された部位に応じて、結合された型枠ジャッキのストロークを変化させることによって、互いに隣合う型枠の干渉を防止することを特徴とする請求項2に記載の縦坑の内壁面を形成するコンクリート壁の構築方法。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2009193864A JP2011047111A (ja) | 2009-08-25 | 2009-08-25 | 縦坑の内壁面に形成されるコンクリート壁の構築方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2009193864A JP2011047111A (ja) | 2009-08-25 | 2009-08-25 | 縦坑の内壁面に形成されるコンクリート壁の構築方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JP2011047111A true JP2011047111A (ja) | 2011-03-10 |
Family
ID=43833705
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2009193864A Pending JP2011047111A (ja) | 2009-08-25 | 2009-08-25 | 縦坑の内壁面に形成されるコンクリート壁の構築方法 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2011047111A (ja) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102305076A (zh) * | 2011-08-11 | 2012-01-04 | 中十冶集团有限公司 | 液压迈步式竖井模板支护装置 |
| CN102352758A (zh) * | 2011-09-22 | 2012-02-15 | 河北省第四建筑工程公司 | 一种汽车平硐斜溜井施工方法 |
| CN106884659A (zh) * | 2016-12-20 | 2017-06-23 | 内蒙古伊泰广联煤化有限责任公司 | 冻结井筒混凝土内外层井壁蒸汽养护工艺 |
| CN106958447A (zh) * | 2016-12-20 | 2017-07-18 | 内蒙古伊泰广联煤化有限责任公司 | 一种对冻结井筒混凝土内外层井壁进行蒸汽养护的装置 |
| CN109339795A (zh) * | 2018-11-19 | 2019-02-15 | 中国葛洲坝集团三峡建设工程有限公司 | 一种竖井顶板混凝土施工装置及方法 |
| KR102213656B1 (ko) * | 2020-11-27 | 2021-02-08 | 주식회사 네오시티 | 가변슬립폼 및 이를 이용한 변단면 수직구 시공방법 |
| CN113089492A (zh) * | 2021-04-15 | 2021-07-09 | 合肥万众交通工程有限公司 | 一种应用于公路施工的桥梁模板 |
| CN116044408A (zh) * | 2023-01-10 | 2023-05-02 | 中国水利水电第四工程局有限公司 | 一种深竖井液压调平内爬式滑升模板装置 |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS4521074Y1 (ja) * | 1966-11-07 | 1970-08-22 | ||
| JPS5655662A (en) * | 1979-10-12 | 1981-05-16 | Kajima Corp | Wall body construction method and apparatus |
| JPH08105240A (ja) * | 1994-10-03 | 1996-04-23 | Taisei Corp | 塔状コンクリート構造物の型枠骨組及び構築工法 |
-
2009
- 2009-08-25 JP JP2009193864A patent/JP2011047111A/ja active Pending
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS4521074Y1 (ja) * | 1966-11-07 | 1970-08-22 | ||
| JPS5655662A (en) * | 1979-10-12 | 1981-05-16 | Kajima Corp | Wall body construction method and apparatus |
| JPH08105240A (ja) * | 1994-10-03 | 1996-04-23 | Taisei Corp | 塔状コンクリート構造物の型枠骨組及び構築工法 |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102305076A (zh) * | 2011-08-11 | 2012-01-04 | 中十冶集团有限公司 | 液压迈步式竖井模板支护装置 |
| CN102352758A (zh) * | 2011-09-22 | 2012-02-15 | 河北省第四建筑工程公司 | 一种汽车平硐斜溜井施工方法 |
| CN106884659A (zh) * | 2016-12-20 | 2017-06-23 | 内蒙古伊泰广联煤化有限责任公司 | 冻结井筒混凝土内外层井壁蒸汽养护工艺 |
| CN106958447A (zh) * | 2016-12-20 | 2017-07-18 | 内蒙古伊泰广联煤化有限责任公司 | 一种对冻结井筒混凝土内外层井壁进行蒸汽养护的装置 |
| CN106958447B (zh) * | 2016-12-20 | 2020-05-01 | 内蒙古伊泰广联煤化有限责任公司 | 一种对冻结井筒混凝土内外层井壁进行蒸汽养护的装置 |
| CN109339795A (zh) * | 2018-11-19 | 2019-02-15 | 中国葛洲坝集团三峡建设工程有限公司 | 一种竖井顶板混凝土施工装置及方法 |
| KR102213656B1 (ko) * | 2020-11-27 | 2021-02-08 | 주식회사 네오시티 | 가변슬립폼 및 이를 이용한 변단면 수직구 시공방법 |
| CN113089492A (zh) * | 2021-04-15 | 2021-07-09 | 合肥万众交通工程有限公司 | 一种应用于公路施工的桥梁模板 |
| CN116044408A (zh) * | 2023-01-10 | 2023-05-02 | 中国水利水电第四工程局有限公司 | 一种深竖井液压调平内爬式滑升模板装置 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104109999B (zh) | 桥塔横梁的施工方法 | |
| KR100968068B1 (ko) | 다중 수평구조부재 형성방법 | |
| WO2020052637A1 (zh) | 一种利用高强混凝土柱与钢滑道交替顶升增层建筑物的装置及其施工方法 | |
| CN204151823U (zh) | 盖挖逆作结构板下顺筑侧墙单侧悬臂液压模板台车 | |
| CN103806654A (zh) | 用于电梯井筒模的液压支撑系统及其运行方法 | |
| CN108412204A (zh) | 现场建筑屋3d打印机的机架结构 | |
| CN102425140B (zh) | 一种用于高空封拱的施工方法 | |
| CN202850498U (zh) | 用于电梯井筒模的液压支撑系统 | |
| JP6966853B2 (ja) | 傾斜面のコンクリート打設方法、及び、移動式型枠装置 | |
| CN113846575B (zh) | 一种挂篮悬臂施工内模自动化操作方法 | |
| CN106555474B (zh) | 凹字型建筑物模板组施工方法 | |
| JP6029066B2 (ja) | 多層建築物の解体工法 | |
| CN115110765A (zh) | 一种变形缝处剪力墙施工方法及装置 | |
| JP2010255374A (ja) | 超高層建物の解体方法 | |
| CN206477589U (zh) | 一种现场3d建筑打印机的机架结构 | |
| CN104912322A (zh) | 塑料模板早拆支撑体系及其施工方法 | |
| CN106555472B (zh) | 凹字型楼层成型装置的胶覆式缩放结构 | |
| CN205088949U (zh) | 凹字型楼层成型装置的外墙模具组设构造 | |
| CN205222349U (zh) | 分段提升式施工电梯机构 | |
| CN219862422U (zh) | 梁段浇筑模板装置 | |
| CN110821207A (zh) | 一种小型已有构筑物整体提升方法 | |
| CN106555479B (zh) | 凹字型楼层成型装置的吊装设备 | |
| CN104164974A (zh) | 建筑物浇筑方法及其使用的浇筑模具系统 | |
| CN205153561U (zh) | 凹字型楼层成型装置的吊装设备 | |
| CN209469442U (zh) | 一种立模脱模系统以及具有该系统的水沟电缆槽台车 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20110511 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20121009 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20121016 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20121113 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20130709 |
|
| RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20130717 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20140311 |