Prior art keywords
girder
work
work vehicle
pier
column head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2006214136A
Other languages
English (en)
Other versions
JP4569878B2 (ja
Inventor
Shuhei Ono
秀平 小野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP2006214136A priority Critical patent/JP4569878B2/ja
Publication of JP2008038463A publication Critical patent/JP2008038463A/ja
Application granted granted Critical
Publication of JP4569878B2 publication Critical patent/JP4569878B2/ja
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

【課題】 高橋脚等の橋桁を張り出し架設工法で施工する際に、架設工に先立つ柱頭部の施工において、その施工合理化を図る。
【解決手段】 橋脚柱頭部2aから構築された桁上を、移動作業車20で桁ブロックを構築し、桁ブロックを連結施工して橋桁を架設する際、橋脚2の柱頭部2aを施工する仮設作業床として移動作業車20で用いる作業床21を、ブラケット足場10上に敷設する。そして作業床21面上に仮設作業足場を立設して柱頭部2aを構築する。また作業床21上に移動作業車20による張り出し架設工事の領域を囲む外周足場26を立設し、柱頭部2aの完成後に柱頭部2a上に移動作業車20を組み立てる。移動作業車20に配備された吊り部材22で桁ブロック構築用の型枠25と作業床21とを吊持し、移動作業車20を桁方向に進行させて柱頭部2aに連続する橋桁の桁ブロックの張り出し架設作業を行う。
【選択図】 図5

Description

本発明は橋桁の架設方法に係り、特に高橋脚等の橋桁を張り出し架設工法で施工する際に、架設工に先立つ柱頭部の施工において、その施工合理化を図った橋桁の架設方法に関する。
図7は、山間部の渓谷51に建設される高橋脚橋梁50の一例を示した全体図である。このような橋梁50の架設工事では、両岸の橋台51と中間支持位置の高橋脚52間に橋桁53を架設する工法である、張り出し架設工法(片持ち式架設工法)が採用されることが多い。図8は、図7に示した橋梁50を、張り出し架設工法によって施工している状況を模式的に示した説明図である。図8に示したように、各高橋脚52の柱頭部52aで組み立てられた複数台の移動作業車60を用いて、各橋脚52位置から桁スパンの中間接合位置あるいは斜面に構築された橋台51まで片持ち梁式に橋桁53を連続施工して延長させて橋桁の架設を行うようになっている。
この張り出し架設工法では、移動作業車に吊持された型枠を利用して所定のスパンの桁ブロックが連結構築される。この桁ブロックを構築する作業空間には外周足場が組み立てられ、各桁ブロックでの施工の安全性が確保されている。具体的には、移動作業車の下方に位置する、外周足場で囲まれた作業床上の作業空間において、鉄筋組立、PCケーブル用のシースの配管、型枠組立、コンクリート打設の作業を行い、コンクリート養生期間経過後、型枠解体まで一連の作業が行われる。そして移動作業車を隣接ブロックの施工可能位置まで移動させ、次行程の桁ブロックの施工が行われる。このように繰り返される橋桁ブロックの施工工程では、各工程での作業内容がほぼ定まっているため、各工程での工期短縮は難しいとされていた。この問題を解決するために、特許文献1に開示されたコンクリート橋の架設工法及び架設装置が提案されている。
このコンクリート橋の架設方法では、橋脚頂部まで施工完了したら、この橋脚を構築するために組み立てられていた橋脚の回りの作業足場を利用して、そのまま上方に橋脚の柱頭部を構築することにより、工期短縮を図ることが提案されている。
特開平6−185018号公報。
しかし、上述した特許文献1に開示された架設装置の特徴は、上述したような張り出し桁架設工程における工程短縮を目的とし、移動作業車の進行方向先端側に外型枠を吊持するとともに、内型枠、鉄筋組立を先行して行える作業足場を設けた点にある。このため、柱頭部の構築、柱頭部施工用の支保工の解体工程、移動作業車の組み立て等の一連の工程における工期短縮を実現することは意図していない。この柱頭部の施工では、通常、在来の型枠工法によって行われるため、柱頭部の施工が完了し、型枠、足場それらを支持していたブラケット等の解体工程の完了後、移動作業車の組み立て工程となる。
ところで、従来、柱頭部構築に使用する作業足場と同様の機能を果たす作業床が、桁ブロックの架設工程を通じても移動作業車から吊持する形態で組み込まれ、使用されていた。これらの作業床の共有化を図り、またこの作業床を早期に施工することにより、橋桁施工のための足場組立作業も前倒しに行えようになる。そこで、本発明の目的は上述した従来の技術が有する問題点を解消し、柱頭部の構築工程、移動作業車の組立工程において、仮設作業の資材、機材の共有化、それぞれの組立、解体の時期を調整することで、橋桁架設における工程短縮を図るようにした橋桁の架設方法及び橋桁の架設方法を提供することにある。
上記目的を達成するために、本発明は橋脚柱頭部で組み立てられた移動作業車を、張り出し架設して構築した桁ブロック上を進行させて、前記桁ブロックに連続する桁ブロックを連結施工して橋脚スパン間に橋桁を架設するようにした橋桁の架設方法において、前記橋脚の柱頭部を施工する仮設作業床として、前記移動作業車で用いる作業床をあらかじめ敷設して用い、該作業床面上に仮設作業足場を立設して前記柱頭部を構築するとともに、前記作業床上に前記移動作業車による張り出し架設工事の領域を囲む外周足場を立設し、前記柱頭部の完成後に該柱頭部上に前記移動作業車を組み立て、該移動作業車に配備された吊り部材で桁ブロック構築用の型枠と前記作業床とを吊持し、前記移動作業車を桁方向に進行させて前記柱頭部に連続する橋桁の桁ブロックの張り出し架設作業を開始するようにしたことを特徴とする。
前記作業床上に、前記桁ブロックの底型枠を合わせて載置し、該底型枠と前記作業床とを前記吊り部材で同時に吊持することが好ましい。
前記作業床は、前記橋脚の壁面に固定されたブラケット足場上に前記吊り部材の吊り受け部材を介して敷設され、該吊り受け部材を介して前記吊り部材で吊持することが好ましい。
前記底型枠は、前記作業床上に前記吊り部材の吊り受け部材を介して載置され、該吊り受け部材を介して前記吊り部材で吊持することが好ましい。
本発明によれば、橋脚柱頭部の構築工程と、柱頭部での移動作業車の組立工程とにおいて、移動作業車の資機材を共有し、それらの組立、解体の時期を調整することにより、橋桁の架設工における工程短縮を図ることができるという効果を奏する。
以下、本発明の橋桁の架設方法及び橋桁の架設方法の実施するための最良の形態としての実施例について添付図面を参照して説明する。
図1は、工事対象としての一例としての橋梁(図7)において、公知の型枠工法やスリップフォーム工法で構築された鉄筋コンクリート橋脚2(以下、単に橋脚2と記す。)の頂部(図7中の○印位置)を示した部分拡大図である。この橋脚2の頂部には、橋桁の支点となる柱頭部2a(2点鎖線で表示)が施工される。この橋脚の柱頭部は、橋脚と一体構造をなし、橋桁の連続支点としての役割を果たす。
以下、この柱頭部2aの構築手順について、図2〜図4を参照して説明する。
柱頭部2aの施工に先立ち、図2に示したように、橋脚2上部のコンクリート側壁面の所定高さにブラケット足場10を取り付ける。このブラケット足場10は、コンクリート側壁面に沿って所定間隔をあけてアンカー(図示せず)固定された立て材11と、各立て材11の上端部から側方に向けて水平配置された受け梁12と、受け梁12を支持する方杖13とから構成されている。
さらにブラケット足場10上には、後の張り出し架設工法で使用される移動作業車20(図5参照)の作業床21を敷設する(図3)。この作業床21は、格子状に組まれた根太材(図示せず)を介してブラケット足場10上に敷設されており、これにより橋脚2の周囲に平面視してロ字形をなす所定面積の作業スペースが確保される。また作業床21は、後に移動作業車20の吊り部材22で吊持される際の吊り受け部材23を台座としてブラケット足場10上に載置されている。このため、後に移動作業車20に組み込まれる際に、吊り受け部材23を吊り部材22の所定レベル(高さ)の吊り点位置に固定することで、容易に移動作業車20の作業床21として組み直して使用することができる。
また、作業床21上には、図3右半図に示したように、桁ブロック5の底型枠25を構成する型枠部材があらかじめ載置されている。この場合にも、作業床21の場合と同様に、吊り部材22で一括して移動作業車20から吊持可能な吊り受け部材24を台座として使用することが好ましい。作業床21、底型枠25の支持点が吊り受け部材23,24のみでは足りない場合には適宜、ブラケット足場10上および作業床21上に支持点(図示せず)を追加することが好ましい。
次いで、図4に示したように、作業床21上で柱頭部2aの構築を行う。作業足場としての作業床21は橋脚2の外周寸法に合わせて組み立てられおり、この作業足場を利用して、まず柱頭部2aの鉄筋組立、型枠組立等を行う。型枠組立完了後、柱頭部2aのコンクリート打設作業までの施工期間に並行して、図4左半図に示したように、張り出し架設用の外周足場26を作業床21上に組み立てる。この外周足場26は、公知の枠組足場を、架設中の桁ブロック5全体が覆える程度の範囲で組み立て、その外周全面に安全ネットを張設したもので、張り出し架設時の桁ブロック5の施工空間全体を覆う安全設備として機能する。また柱頭部2aの構築時の作業員の安全設備としての役割も果たす。
柱頭部2aのコンクリート養生期間経過後、あるいはコンクリートが所定強度に達した段階で、柱頭部上で移動作業車20の組み立てを行う。移動作業車20は、図5に示したように、走行機構あるいは横引き可能な可動支持体を備えた公知の鉄骨トラス構造フレームからなり、2台が柱頭部2aから両方向の桁方向に向けて橋脚中心線に関して対称形をなして組み立てられる。それぞれの移動作業車20の上弦トラスに直交して組み込まれ、両端が橋桁幅より外方まで延在した吊り桁(図示せず)から複数本の吊り部材22が吊持されている。この吊り部材22によって、上述した作業床21と、桁ブロック5の複数の型枠の全荷重とが、所定の吊り点位置で支持される。作業床21は常に水平保持されて吊持されるが、底型枠25の吊り点は、桁ブロックの桁高が張り出し架設の進行に伴い低くなるため、その桁高に合わせて吊り部材22の所定高さに固定できるように調整することができる。
図6に示したように、完成した桁ブロック5上で移動作業車20を走行させ、完成した桁ブロック5の先端位置ま移動させ、次工程の桁ブロック5の施工が行われる。なお、移動作業車20および移動作業車20に吊持された作業足場、外周足場26が橋脚を離れた段階で、橋脚のコンクリート壁にアンカー固定されていたブラケット足場10を撤去することができる。
その後、公知の張り出し架設工法の手順に基づき、順次桁ブロック5を連続施工し、橋脚間のスパン中間位置で、両側から張り出し架設された桁ブロック5を連結して1スパンの施工を行い、あるいは端部スパンでは橋台位置までの架設工を行う。
このように、移動作業車20の作業床21を柱頭部2aの施工のための作業床21として兼用し、移動作業車20の組み立て時に移動作業車20の一部の設備として転用した点、柱頭部2aの構築時に作業床21上に張り出し架設用の外周足場26を組み立て、その後張り出し架設開始後に橋脚2に取り付けたブラケット足場10を解体、撤去することができる。このように従来、柱頭部2aの施工段階、移動作業車20の組み立て段階で、工程上のクリティカルパスとなっていた上述の作業を、主作業の進行に並行して行えるため、張り出し架設工程が開始できるまでの工程を大幅に短縮できるようになった。
柱頭部施工前の状態を示した橋脚頂部の拡大図。 ブラケット足場が設けられた状態を示した橋脚頂部の拡大図。 ブラケット足場上に移動作業車の作業床を敷設した状態を示した橋脚頂部の拡大図。 柱頭部構築時の並行作業として張り出し架設用の外周足場を組み立てた状態を示した橋脚頂部の拡大図。 柱頭部の上部に移動作業車を組み立て、張り出し架設のための型枠設置状態を示した橋脚頭部の拡大図。 移動作業車による張り出し架設状況を示した橋脚頭部の拡大図。 高橋脚の橋梁全形を示した説明図。 図7に示した橋梁の施工状態を示した説明図。
符号の説明
2 橋脚
2a 柱頭部
5 桁ブロック
10 ブラケット足場
20 移動作業車
21 作業床
22 吊り部材
23 吊り受け部材
25 底型枠
26 外周足場

Claims (4)

  1. 橋脚柱頭部で組み立てられた移動作業車を、張り出し架設して構築した桁ブロック上を進行させて、前記桁ブロックに連続する桁ブロックを連結施工して橋脚スパン間に橋桁を架設するようにした橋桁の架設方法において、
    前記橋脚の柱頭部を施工する仮設作業床として、前記移動作業車で用いる作業床をあらかじめ敷設して用い、該作業床面上に仮設作業足場を立設して前記柱頭部を構築するとともに、前記作業床上に前記移動作業車による張り出し架設工事の領域を囲む外周足場を立設し、前記柱頭部の完成後に該柱頭部上に前記移動作業車を組み立て、該移動作業車に配備された吊り部材で桁ブロック構築用の型枠と前記作業床とを吊持し、前記移動作業車を桁方向に進行させて前記柱頭部に連続する橋桁の桁ブロックの張り出し架設作業を開始するようにしたことを特徴とする橋桁の架設方法。
  2. 前記作業床上に、前記桁ブロックの底型枠を合わせて載置し、該底型枠と前記作業床とを前記吊り部材で同時に吊持するようにしたことを特徴とする請求項1に記載の橋桁の架設方法。
  3. 前記作業床は、前記橋脚の壁面に固定されたブラケット足場上に前記吊り部材の吊り受け部材を介して敷設され、該吊り受け部材を介して前記吊り部材で吊持されることを特徴とする請求項1に記載の橋桁の架設方法。
  4. 前記底型枠は、前記作業床上に前記吊り部材の吊り受け部材を介して載置され、該吊り受け部材を介して前記吊り部材で吊持されることを特徴とする請求項2に記載の橋桁の架設方法。
JP2006214136A 2006-08-07 2006-08-07 橋桁の架設方法 Active JP4569878B2 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006214136A JP4569878B2 (ja) 2006-08-07 2006-08-07 橋桁の架設方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006214136A JP4569878B2 (ja) 2006-08-07 2006-08-07 橋桁の架設方法

Publications (2)

Publication Number Publication Date
JP2008038463A true JP2008038463A (ja) 2008-02-21
JP4569878B2 JP4569878B2 (ja) 2010-10-27

Family

ID=39173813

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006214136A Active JP4569878B2 (ja) 2006-08-07 2006-08-07 橋桁の架設方法

Country Status (1)

Country Link
JP (1) JP4569878B2 (ja)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761034A (zh) * 2010-03-25 2010-06-30 中国建筑第六工程局有限公司 一种悬灌连续梁边墩直线段的施工方法
CN101831872A (zh) * 2010-05-12 2010-09-15 重庆城建控股(集团)有限责任公司 一种前后支点组合式挂篮
CN102535339A (zh) * 2011-12-07 2012-07-04 中铁十九局集团第七工程有限公司 薄壁空心高墩悬臂灌注连续梁牛腿托架及其搭建方法
CN102691266A (zh) * 2012-06-03 2012-09-26 中交第四公路工程局有限公司 桥梁边跨现浇段超高组合支架施工方法
CN102704409A (zh) * 2012-06-28 2012-10-03 中铁十三局集团第一工程有限公司 三角托架
CN103374885A (zh) * 2012-04-13 2013-10-30 中铁十局集团第五工程有限公司 一种穿孔对拉铰支座型托架
CN103452049A (zh) * 2013-09-15 2013-12-18 中铁一局集团有限公司 桥墩顶现浇混凝土施工用牛腿支架
CN103498425A (zh) * 2013-09-25 2014-01-08 中铁五局集团第一工程有限责任公司 一种全拆装组合式多功能托架支承结构及其施工方法
CN103696373A (zh) * 2013-11-01 2014-04-02 中铁十七局集团第二工程有限公司 一种可调式三角托架的施工方法
CN103866696A (zh) * 2014-03-26 2014-06-18 中铁二十四局集团安徽工程有限公司 一种矮塔斜拉桥长悬臂零号节段现浇支架
CN103952982A (zh) * 2014-05-13 2014-07-30 中交二航局第三工程有限公司 桥梁箱梁挂篮锚地拉杆式千斤顶预压装置及预压方法
CN104532758A (zh) * 2014-12-25 2015-04-22 浙江诚邦园林股份有限公司 一种预应力砼悬浇连续梁零号块施工支架
CN104727231A (zh) * 2015-04-03 2015-06-24 中铁第五勘察设计院集团有限公司 悬臂灌注法施工连续梁及连续刚构桥几何参数结构
CN104894980A (zh) * 2015-04-09 2015-09-09 中铁第五勘察设计院集团有限公司 一种装配式倾角可调自落架墩旁托架及其施工方法
CN105951610A (zh) * 2016-05-13 2016-09-21 中铁十七局集团第二工程有限公司 一种辅助悬臂梁施工的支架结构及施工方法
CN106522107A (zh) * 2016-12-23 2017-03-22 中国水利水电第五工程局有限公司 一种可变弧桥梁落地支架装置
CN109098098A (zh) * 2018-10-23 2018-12-28 中交第公路工程局有限公司 吊挂式系梁施工装置及吊挂式系梁施工方法
CN109356039A (zh) * 2018-12-06 2019-02-19 广东腾盛模架科技有限公司 一种安全施工装配式盖梁作业平台
CN109610323A (zh) * 2018-12-07 2019-04-12 江西集银科技有限公司 一种桥梁悬臂施工挂篮设备悬吊系统
CN111287095A (zh) * 2020-04-03 2020-06-16 中国铁建大桥工程局集团有限公司 下拖特大桥主梁专项施工工法

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101391637B1 (ko) * 2012-03-21 2014-05-07 원대연 강재트러스를 이용한 복합트러스 거더의 제작공법
CN103306206B (zh) * 2013-06-13 2015-09-16 浙江金筑交通建设有限公司 一种采用薄壁空心高墩钢筋支模架安装钢筋的施工方法
CN103882813B (zh) * 2014-04-10 2016-02-03 中铁二局工程有限公司 用于桥墩与横系梁同步施工的牛腿托架平台及其搭建方法
CN108797380B (zh) * 2018-06-05 2020-04-24 中铁十二局集团有限公司 悬灌连续梁托架悬吊施工装置及施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06235208A (ja) * 1992-04-07 1994-08-23 Kawada Kensetsu Kk 高架構造物における上部工の構築方法
JPH11131421A (ja) * 1997-10-29 1999-05-18 Taisei Corp Pc片持架設橋の柱頭部の構築方法
JP2004218316A (ja) * 2003-01-16 2004-08-05 Ps Mitsubishi Construction Co Ltd 柱頭部の構築方法及び架設作業車
JP2005171521A (ja) * 2003-12-08 2005-06-30 Ps Mitsubishi Construction Co Ltd 柱頭部の施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06235208A (ja) * 1992-04-07 1994-08-23 Kawada Kensetsu Kk 高架構造物における上部工の構築方法
JPH11131421A (ja) * 1997-10-29 1999-05-18 Taisei Corp Pc片持架設橋の柱頭部の構築方法
JP2004218316A (ja) * 2003-01-16 2004-08-05 Ps Mitsubishi Construction Co Ltd 柱頭部の構築方法及び架設作業車
JP2005171521A (ja) * 2003-12-08 2005-06-30 Ps Mitsubishi Construction Co Ltd 柱頭部の施工方法

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761034B (zh) * 2010-03-25 2013-05-08 中国建筑第六工程局有限公司 一种悬灌连续梁边墩直线段的施工方法
CN101761034A (zh) * 2010-03-25 2010-06-30 中国建筑第六工程局有限公司 一种悬灌连续梁边墩直线段的施工方法
CN101831872A (zh) * 2010-05-12 2010-09-15 重庆城建控股(集团)有限责任公司 一种前后支点组合式挂篮
CN101831872B (zh) * 2010-05-12 2011-07-06 重庆城建控股(集团)有限责任公司 一种前后支点组合式挂篮
CN102535339A (zh) * 2011-12-07 2012-07-04 中铁十九局集团第七工程有限公司 薄壁空心高墩悬臂灌注连续梁牛腿托架及其搭建方法
CN103374885A (zh) * 2012-04-13 2013-10-30 中铁十局集团第五工程有限公司 一种穿孔对拉铰支座型托架
CN102691266B (zh) * 2012-06-03 2014-04-16 中交第四公路工程局有限公司 桥梁边跨现浇段超高组合支架施工方法
CN102691266A (zh) * 2012-06-03 2012-09-26 中交第四公路工程局有限公司 桥梁边跨现浇段超高组合支架施工方法
CN102704409A (zh) * 2012-06-28 2012-10-03 中铁十三局集团第一工程有限公司 三角托架
CN103452049A (zh) * 2013-09-15 2013-12-18 中铁一局集团有限公司 桥墩顶现浇混凝土施工用牛腿支架
CN103452049B (zh) * 2013-09-15 2015-08-19 中铁一局集团有限公司 桥墩顶现浇混凝土施工用牛腿支架
CN103498425A (zh) * 2013-09-25 2014-01-08 中铁五局集团第一工程有限责任公司 一种全拆装组合式多功能托架支承结构及其施工方法
CN103498425B (zh) * 2013-09-25 2015-08-05 中铁五局集团第一工程有限责任公司 一种全拆装组合式多功能托架支承结构及其施工方法
CN103696373A (zh) * 2013-11-01 2014-04-02 中铁十七局集团第二工程有限公司 一种可调式三角托架的施工方法
CN103866696A (zh) * 2014-03-26 2014-06-18 中铁二十四局集团安徽工程有限公司 一种矮塔斜拉桥长悬臂零号节段现浇支架
CN103952982A (zh) * 2014-05-13 2014-07-30 中交二航局第三工程有限公司 桥梁箱梁挂篮锚地拉杆式千斤顶预压装置及预压方法
CN103952982B (zh) * 2014-05-13 2015-12-02 中交二航局第三工程有限公司 桥梁箱梁挂篮锚地拉杆式千斤顶预压装置及预压方法
CN104532758A (zh) * 2014-12-25 2015-04-22 浙江诚邦园林股份有限公司 一种预应力砼悬浇连续梁零号块施工支架
CN104727231A (zh) * 2015-04-03 2015-06-24 中铁第五勘察设计院集团有限公司 悬臂灌注法施工连续梁及连续刚构桥几何参数结构
CN104894980A (zh) * 2015-04-09 2015-09-09 中铁第五勘察设计院集团有限公司 一种装配式倾角可调自落架墩旁托架及其施工方法
CN104894980B (zh) * 2015-04-09 2017-03-08 中铁第五勘察设计院集团有限公司 一种装配式倾角可调自落架墩旁托架及其施工方法
CN105951610A (zh) * 2016-05-13 2016-09-21 中铁十七局集团第二工程有限公司 一种辅助悬臂梁施工的支架结构及施工方法
CN106522107A (zh) * 2016-12-23 2017-03-22 中国水利水电第五工程局有限公司 一种可变弧桥梁落地支架装置
CN106522107B (zh) * 2016-12-23 2018-07-20 中国水利水电第五工程局有限公司 一种可变弧桥梁落地支架装置
CN109098098A (zh) * 2018-10-23 2018-12-28 中交第公路工程局有限公司 吊挂式系梁施工装置及吊挂式系梁施工方法
CN109098098B (zh) * 2018-10-23 2024-04-02 中交一公局集团有限公司 吊挂式系梁施工装置及吊挂式系梁施工方法
CN109356039A (zh) * 2018-12-06 2019-02-19 广东腾盛模架科技有限公司 一种安全施工装配式盖梁作业平台
CN109610323A (zh) * 2018-12-07 2019-04-12 江西集银科技有限公司 一种桥梁悬臂施工挂篮设备悬吊系统
CN111287095A (zh) * 2020-04-03 2020-06-16 中国铁建大桥工程局集团有限公司 下拖特大桥主梁专项施工工法

Also Published As

Publication number Publication date
JP4569878B2 (ja) 2010-10-27

Similar Documents

Publication Publication Date Title
JP4569878B2 (ja) 橋桁の架設方法
KR100667921B1 (ko) 프리캐스트콘크리트 가로보를 이용한 케이블교량의 주탑시공방법
CN106760529B (zh) 屋盖钢桁架滑移拼装施工平台及安装方法
CN108589535B (zh) 一种钢筋混凝土箱型拱桥施工方法
KR20070010449A (ko) 아치교의 시공 방법
JPH11181725A (ja) コンクリート製主塔の水平梁の施工法
KR101889064B1 (ko) 장대교량의 주탑 시공방법
JP2019078090A (ja) 張出架設作業車及び施工方法
CN108316150B (zh) 斜拉桥主塔及钢锚梁的施工系统和施工方法
JP2639361B2 (ja) 鋼管・コンクリート複合構造橋脚の施工方法
JP4104910B2 (ja) コンクリートアーチ橋のアーチリブ架設方法
JP6509096B2 (ja) 張出架設方法
JPH0643686B2 (ja) プレキャスト部材によるアーチ橋の架設法
JP5693869B2 (ja) 橋桁の架設方法
JP6889010B2 (ja) 橋梁の施工方法
JP2017096057A (ja) 橋梁の施工方法
JPH0633627B2 (ja) 既存施設上の新築構法
JP2004156388A (ja) アーチ構造物の構築方法、ドーム構造物およびその構築方法
JP2008208594A (ja) 片持架設工法における橋脚上部の施工方法
JP5925231B2 (ja) 建物の構築方法と新設建物の地下躯体
JP5506057B2 (ja) 建物の構築方法
JP2000104220A (ja) 複合トラス橋の架設方法
JP2008255636A (ja) Rc大梁の施工方法
KR20060008453A (ko) 교량 시공방법
JP4298628B2 (ja) 鋼管柱接合部エレメントを用いた高架橋の梁部の施工法

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20081119

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20100216

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20100304

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100316

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100514

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100615

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100729

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130820

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4569878

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140820

Year of fee payment: 4