FR2887907A1 - Temporary balustrade for scaffolding of building, has frame made of aluminum, and fixation pins for positioning frame in one vertical plane situated in front of another vertical plane passing through posts during utilization of balustrade - Google Patents

Temporary balustrade for scaffolding of building, has frame made of aluminum, and fixation pins for positioning frame in one vertical plane situated in front of another vertical plane passing through posts during utilization of balustrade Download PDF

Info

Publication number
FR2887907A1
FR2887907A1 FR0506723A FR0506723A FR2887907A1 FR 2887907 A1 FR2887907 A1 FR 2887907A1 FR 0506723 A FR0506723 A FR 0506723A FR 0506723 A FR0506723 A FR 0506723A FR 2887907 A1 FR2887907 A1 FR 2887907A1
Authority
FR
France
Prior art keywords
railing
vertical plane
scaffolding
frame
temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR0506723A
Other languages
French (fr)
Other versions
FR2887907B1 (en
Inventor
Vincent Maisonneuve
Florent Bonnet
Nicolas Chupin
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tubesca Comabi SAS
Original Assignee
COMABI SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by COMABI SA filed Critical COMABI SA
Priority to FR0506723A priority Critical patent/FR2887907B1/en
Publication of FR2887907A1 publication Critical patent/FR2887907A1/en
Application granted granted Critical
Publication of FR2887907B1 publication Critical patent/FR2887907B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/147Railings specially adapted for mounting prior to the mounting of the platform

Abstract

The balustrade (2) has a rectangular frame (3) extending in a vertical plane and whose lower part is provided with coaxial fixation pins (14, 15) staggered on same side with respect to the plane. The fixation pins temporarily connect the balustrade with posts (24) of vertical frames (22) of a scaffolding structure. The fixation pins position the frame in another vertical plane situated in front of a third vertical plane passing through the posts during the utilization of the balustrade.

Description

La présente invention concerne, de façon générale, les échafaudages et,The present invention relates generally to scaffolds and,

plus particulièrement, les dispositifs qui permettent un montage en sécurité des échafaudages, à leurs différents niveaux de planchers.  more particularly, the devices that allow safe mounting of scaffolds at their different levels of floors.

Selon les prescriptions en vigueur, les échafaudages doivent être équipés de garde-corps et de plinthes à chaque niveau de plancher, pour assurer une protection contre les chutes, vis-à-vis du personnel travaillant en hauteur, du moins sur le côté extérieur de l'échafaudage (dans le cas d'un échafaudage installé devant une façade d'immeuble ou autre bâtiment).  According to the regulations in force, the scaffolding must be equipped with guardrails and skirting boards at each floor level, to provide protection against falls, vis-à-vis staff working at height, at least on the outside of scaffolding (in the case of a scaffold installed in front of a building facade or other building).

Les garde-corps d'échafaudage comprennent habituellement une lisse supérieure et une sous-lisse, qui forment la véritable protection contre la chute des opérateurs. Dans les conceptions de garde-corps les plus anciennes, la lisse supérieure et la sous-lisse sont des éléments séparés, fixés séparément à la structure de l'échafaudage. Les garde-corps d'échafaudage de conception plus récente sont monoblocs , c'est-à-dire que la lisse supérieure et la sous-lisse sont reliées rigidement l'une à l'autre de façon permanente, par des montants ou des barreaux verticaux, et le cas échéant par des éléments obliques, soudés d'une part à la lisse supérieure et d'autre part à la sous-lisse.  Scaffolding railings usually include a top rail and a sub-rail, which form the real protection against falling operators. In the older railing designs, the top rail and the sub-rail are separate elements, separately attached to the scaffold structure. The scaffolding railings of more recent design are monoblocs, that is to say that the upper rail and the sub-rail are rigidly connected to one another permanently, by amounts or bars vertical, and if necessary by oblique elements, welded on the one hand to the upper rail and on the other hand to the sub-smooth.

La mise en place des garde-corps, qu'ils soient monoblocs ou composés d'éléments séparés, s'effectue traditionnellement depuis le plancher d'échafaudage devant être protégé, les phases successives de montage d'un échafaudage à partir d'un niveau de plancher terminé étant les suivantes: - mise en place d'un plancher immédiatement supérieur, -accès de l'opérateur au plancher supérieur, - mise en place des garde-corps et plinthes associés au plancher supérieur, - mise en place de cadres verticaux supérieurs préfabriqués ou assemblés, de forme rectangulaire fermée ou en H , au dessus des deux extrémités de ce plancher.  The installation of guardrails, whether monobloc or composed of separate elements, is traditionally carried out from the scaffolding floor to be protected, the successive stages of mounting a scaffolding from a level finished floor being the following: - installation of an immediately higher floor, - access of the operator to the upper floor, - installation of the railings and skirting associated with the upper floor, - installation of vertical frames upper prefabricated or assembled, rectangular closed or H, above the two ends of this floor.

Lors de l'accès de l'opérateur sur le plancher supérieur qui vient d'être mis en place, et pendant la phase de mise en place des garde-corps et des plinthes, l'opérateur n'est pas protégé contre les chutes vers l'extérieur aussi longtemps qu'il n'a pas mis en place et fixé le garde- corps.  When the operator accesses the upper floor that has just been put in place, and during the installation phase of the guardrails and skirting boards, the operator is not protected against falling to outside as long as he has not set up and fixed the guardrail.

Dans le but de pallier les risques de chutes vers l'extérieur au cours du montage d'un échafaudage, il a été déjà proposé diverses solutions.  In order to mitigate the risks of falling outwards during the erection of a scaffold, various solutions have already been proposed.

Une solution particulière consiste en des garde-corps conçus de telle manière que leur mise en place puisse s'effectuer depuis le plancher inférieur (par rapport au plancher dit supérieur à protéger par le gardecorps considéré). Ainsi, après avoir mis en place le plancher supérieur, l'opérateur pourra accéder à ce plancher supérieur et y prendre place, en se trouvant immédiatement protégé contre les chutes par le garde-corps déjà mis en place auparavant depuis le plancher inférieur. L'opérateur pourra alors mettre en place les cadres verticaux, puis fixer sur ces cadres un nouveau garde-corps destiné au niveau de plancher suivant, et ainsi de suite, ceci permettant en principe un montage en toute sécurité de l'échafaudage, quelle que soit sa hauteur.  A particular solution consists of guardrails designed in such a way that their implementation can be carried out from the lower floor (relative to the said upper floor to be protected by the gardparorps considered). Thus, after setting up the upper floor, the operator can access the upper floor and take place there, being immediately protected against falls by the guardrail already set up previously from the lower floor. The operator can then set up the vertical frames, then fix on these frames a new railing for the next floor level, and so on, this allowing in principle a safe assembly of the scaffolding, whatever its height.

Toutefois, la conception de garde-corps pouvant être mis en place depuis un plancher inférieur conduit à des réalisations de garde-corps complexes, lourdes et encombrantes, donc difficiles à manipuler, à stocker et à transporter, et relativement coûteuses, d'autant plus que tous les gardecorps d'un échafaudage doivent être réalisés selon la même conception, puisqu'il s'agit de garde-corps dits permanents , en ce sens qu'ils restent incorporés à la structure d'échafaudage dès son montage, et jusqu'à son démontage final.  However, the design of railing that can be set up from a lower floor leads to complex, heavy and cumbersome railings, so difficult to handle, store and transport, and relatively expensive, especially that all scaffoldingbodies must be made according to the same design, since they are so-called permanent guardrails, in the sense that they remain embedded in the scaffolding structure as soon as it is erected, and until to its final disassembly.

Pour le montage en sécurité des échafaudages, une autre solution également connue consiste en des garde-corps spéciaux dits provisoires ou mobiles , en raison de leur intervention temporaire. En effet, la spécificité de ces garde-corps réside dans le fait qu'ils sont mis en place pour protéger l'opérateur au niveau du plancher supérieur, pendant que l'opérateur met en place les garde-corps ordinaires de ce niveau de plancher supérieur qu'il s'agisse de garde-corps monoblocs ou de lisses individuelles. Ensuite, le garde-corps provisoire peut être retiré, puis réutilisé pour le montage en sécurité du niveau de plancher suivant, et ainsi de suite...  Another solution also known for the secure mounting of scaffolds is the provision of special temporary or mobile guardrails, due to their temporary intervention. Indeed, the specificity of these railings lies in the fact that they are set up to protect the operator at the level of the upper floor, while the operator sets up the ordinary guardrails of this floor level superior whether it is monobloc railings or individual smooth. Then, the temporary railing can be removed and reused for safe mounting of the next floor level, and so on ...

Comme on le comprend, un tel système est avantageux, en ce sens qu'il permet de conserver pour tous les niveaux de planchers des garde-corps permanents de structure ordinaire, qui sont simples et légers et peu encombrants, et qu'il ne nécessite qu'un nombre limité de garde-corps spéciaux, réutilisables successivement à chaque niveau de plancher, pour assurer un montage de l'échafaudage en toute sécurité.  As can be understood, such a system is advantageous in that it makes it possible to keep, for all levels of floors, permanent guardrails of ordinary structure, which are simple and light and compact, and that it does not require only a limited number of special guardrails, reusable successively at each floor level, to secure the scaffold assembly.

La présente invention est relative à ce type de garde-corps dit provisoire, et elle a pour but de perfectionner un tel garde garde-corps, de manière à faciliter sa préhension et sa manutention, tout en conservant une structure simple et légère, et ceci sans modifier la structure de l'échafaudage.  The present invention relates to this type of railing said temporary, and it aims to perfect such railing guard, so as to facilitate its grip and handling, while maintaining a simple and lightweight structure, and this without changing the structure of the scaffolding.

A cet effet, l'invention a essentiellement pour objet un garde-corps provisoire pour le montage en sécurité des échafaudages, ce garde-corps étant prévu pour être mis en place temporairement à un niveau de plancher d'un échafaudage, pendant la mise en place du ou des garde-corps ordinaires de ce niveau de plancher, ledit garde-corps provisoire étant constitué par un cadre de contour globalement rectangulaire, s'étendant dans un plan vertical, dont la partie inférieure est munie à ses extrémités de moyens de fixation décalés d'un même côté par rapport au plan du cadre et prévus pour la liaison temporaire du garde-corps provisoire avec des montants des cadres verticaux de la structure de l'échafaudage, ces moyens étant conçus pour, lors de l'utilisation du garde- corps provisoire, le positionner dans un plan vertical situé en avant d'un plan vertical passant par les montants des cadres verticaux de la structure de l'échafaudage.  For this purpose, the subject of the invention is essentially a temporary railing for the secure mounting of scaffolding, this railing being intended to be placed temporarily at a floor level of a scaffolding, during the implementation of place of the ordinary railing or rails of this floor level, said temporary railing consisting of a generally rectangular outline frame, extending in a vertical plane, whose lower part is provided at its ends with fixing means staggered on the same side relative to the plane of the frame and provided for the temporary connection of the temporary railing with uprights of the vertical frames of the structure of the scaffolding, these means being designed for, when using the guard - Provisional body, position it in a vertical plane located in front of a vertical plane passing through the uprights of the vertical frames of the structure of the scaffolding.

Dans une forme de réalisation préférée de ce garde-corps provisoire, les moyens de fixation comprennent, à chaque extrémité du garde- corps dans la partie inférieure de celui-ci, deux doigts de fixation coaxiaux, superposés, dont l'axe commun est parallèle au plan du cadre et décalé par rapport au plan de celui-ci, les deux doigts de fixation étant prévus pour être introduits dans deux douilles superposées de montants des cadres verticaux de la structure de l'échafaudage.  In a preferred embodiment of this temporary railing, the fixing means comprise, at each end of the guardrail in the lower part thereof, two superimposed coaxial fixing fingers whose common axis is parallel. to the plane of the frame and offset from the plane thereof, the two fastening fingers being provided to be introduced into two superimposed sleeves uprights of the vertical frames of the structure of the scaffolding.

Ainsi, le garde-corps provisoire, objet de la présente invention, comporte un système de fixation, notamment au moyen de doigts engagés dans les douilles habituelles des cadres verticaux de l'échafaudage, système de fixation qui est conçu de façon à déporter vers l'extérieur le cadre de ce garde-corps, par rapport au plan vertical passant par les montants extérieurs des cadres entre lesquels est fixé le garde-corps provisoire. Ce plan vertical reste donc bien dégagé, et c'est dans ce plan vertical que seront fixés les garde-corps permanents de l'échafaudage, en bénéficiant alors de la protection assurée par le garde- corps provisoire. Les garde-corps permanents, que ceux-ci soient en éléments séparés ou "monoblocs", n'ont pas à être modifiés, et ainsi le garde-corps provisoire, objet de l'invention, reste compatible avec des échafaudages existants, y compris leurs garde-corps permanents, échafaudages qui peuvent constituer un stock important chez un utilisateur.  Thus, the temporary railing, object of the present invention, comprises a fastening system, in particular by means of fingers engaged in the usual sockets of the vertical frames of the scaffolding, fastening system which is designed to deport to the outside the frame of this railing, in relation to the vertical plane passing through the outer amounts of the frames between which is fixed the temporary railing. This vertical plane remains clear, and it is in this vertical plane that will be fixed permanent guardrails of the scaffolding, while enjoying the protection provided by the temporary guardrail. The permanent guardrails, whether they are in separate elements or "monoblocs", do not have to be modified, and thus the provisional railing, object of the invention, remains compatible with existing scaffolds, including their permanent railing, scaffolding that can constitute a large stock in a user.

Le garde-corps provisoire possède une structure monobloc, résultant de l'assemblage d'éléments horizontaux et verticaux, qui forment au moins une lisse supérieure, une sous-lisse et deux montants terminaux pourvus des moyens de fixation, tels que doigts de fixation, les montants terminaux s'étendant au-dessous de la sous-lisse. Avantageusement, lesdits montants terminaux font partie respectivement de deux parties rectangulaires, qui s'étendent au-dessous de la sous-lisse et qui constituent, notamment par leurs traverses inférieures, respectivement deux poignées de préhension. Ces dernières permettent une préhension du garde-corps provisoire par le bas, par un ou deux opérateurs, pour hisser ce garde-corps provisoire au niveau du plancher supérieur, depuis un niveau de plancher inférieur (ou depuis le sol s'il s'agit, au début du montage de l'échafaudage, de protéger le premier niveau de plancher).  The provisional railing has a one-piece structure, resulting from the assembly of horizontal and vertical elements, which form at least one upper rail, one sub-rail and two end posts provided with fixing means, such as fixing fingers, the end uprights extending below the sub-smooth. Advantageously, said end uprights are respectively part of two rectangular parts, which extend below the sub-smooth and which constitute, in particular by their lower cross members, respectively two gripping handles. The latter allow a gripping of the temporary railing from below, by one or two operators, to hoist this temporary railing at the upper floor, from a lower floor level (or from the ground if it is at the beginning of the erection of the scaffolding, to protect the first floor level).

Pour obtenir le décalage désiré, les deux doigts de fixation, prévus à chaque extrémité du garde-corps provisoire, sont reliés aux montants terminaux correspondants de ce garde-corps par des pattes de liaison obliques, c'est-à-dire qui s'étendent dans des plans verticaux formant un angle aigu par rapport au plan vertical du cadre du garde-corps provisoire.  To obtain the desired offset, the two fastening fingers, provided at each end of the temporary guardrail, are connected to the corresponding end posts of this railing by oblique connecting lugs, that is to say which s' extend in vertical planes forming an acute angle to the vertical plane of the frame of the temporary railing.

Le garde-corps provisoire, objet de l'invention, est de préférence réalisé essentiellement en aluminium, notamment en ce qui concerne son cadre, pour obtenir une construction légère, laquelle facilite ses manutentions notamment par un opérateur unique. En effet, les manutentions du garde-corps provisoire s'opèrent nécessairement à l'extérieur du volume de l'échafaudage, en porte-à-faux, ce qui sollicite fortement le corps de l'opérateur.  The temporary railing, which is the subject of the invention, is preferably made essentially of aluminum, especially as regards its frame, to obtain a light construction, which facilitates its handling particularly by a single operator. In fact, the handling of the temporary railing necessarily takes place outside the volume of the scaffold, cantilever, which strongly solicits the body of the operator.

De toute façon, l'invention sera mieux comprise à l'aide de la description qui suit, en référence au dessin schématique annexé représentant, à titre d'exemple, une forme d'exécution de ce garde-corps provisoire, et illustrant son utilisation lors du montage d'un échafaudage: Figure 1 est une vue de face d'un garde-corps provisoire conforme à la présente invention; Figure 2 est une vue de dessous du garde-corps de la figure 1; Figure 3 est une vue à échelle agrandie du détail A de la figure 1; 35 Figure 4 est une vue à échelle agrandie du détail B de la figure 1; Figure 5 est une vue en perspective, illustrant l'utilisation du garde-corps provisoire selon les figures 1 à 4, au cours du montage d'un échafaudage; Figure 6 représente, à échelle agrandie, un détail (partie gauche) 5 de la figure 5.  In any case, the invention will be better understood with the aid of the description which follows, with reference to the appended schematic drawing showing, by way of example, an embodiment of this temporary railing, and illustrating its use. when mounting a scaffold: Figure 1 is a front view of a temporary railing according to the present invention; Figure 2 is a bottom view of the guardrail of Figure 1; Figure 3 is an enlarged view of detail A of Figure 1; Figure 4 is an enlarged view of detail B of Figure 1; Figure 5 is a perspective view, illustrating the use of the temporary railing according to Figures 1 to 4, during the assembly of a scaffold; Figure 6 shows, on an enlarged scale, a detail (left part) of Figure 5.

Le garde-corps provisoire, objet de la présente invention, est désigné par la référence générale 2 et il se trouve représenté seul sur les figures 1 à 4. Pour situer ses diverses parties, ce garde-corps 2 est supposé placé dans un plan vertical, comme s'il se trouvait en position d'utilisation.  The temporary railing, object of the present invention, is designated by the general reference 2 and it is shown alone in Figures 1 to 4. To locate its various parts, this railing 2 is assumed placed in a vertical plane , as if in the use position.

La partie principale du garde-corps 2 est constituée par un cadre 3, de contour sensiblement rectangulaire, résultant de l'assemblage d'éléments horizontaux et verticaux, avantageusement constitués par des profilés en aluminium.  The main part of the railing 2 is constituted by a frame 3, of substantially rectangular contour, resulting from the assembly of horizontal and vertical elements, advantageously constituted by aluminum profiles.

Le cadre 3 comprend notamment une lisse supérieure 4 et une sous-lisse 5, dont les extrémités sont raccordées à des montants terminaux opposés 6 et 7, lesquels s'étendent au-dessous de la sous-lisse 5. La lisse supérieure 4 est encore reliée ici à la sous lisse 5 par un barreau de renfort intermédiaire 8, situé à mi-longueur du garde-corps 2.  The frame 3 comprises in particular an upper rail 4 and a sub-rail 5, whose ends are connected to opposite end posts 6 and 7, which extend below the sub-rail 5. The upper rail 4 is still connected here to the sub-smooth 5 by an intermediate reinforcing bar 8, located halfway length of the railing 2.

Les montants terminaux 6 et 7 font partie respectivement de deux parties rectangulaires 9 et 10, symétriques l'une de l'autre, qui s'étendent audessous de la sous-lisse 5. Les traverses inférieures respectives 11 et 12 des deux parties rectangulaires 9 et 10 constituent des poignées de préhension du garde-corps 2. Ces deux traverses 11 et 12 peuvent être raccordés l'une à l'autre par une partie intermédiaire 13, en formant dans ce cas une barre inférieure unique reliant les extrémités inférieures des deux montants terminaux 6 et 7.  The end uprights 6 and 7 are respectively part of two rectangular parts 9 and 10, symmetrical to each other, which extend below the sub-smooth 5. The respective lower crosspieces 11 and 12 of the two rectangular portions 9 These two crosspieces 11 and 12 can be connected to each other by an intermediate portion 13, forming in this case a single lower bar connecting the lower ends of the two. terminal amounts 6 and 7.

Les traverses supérieures des deux parties rectangulaires 9 et 10, qui se confondent avec les tronçons terminaux de la sous-lisse 5, constituent deux autres poignées de préhension du garde-corps 2.  The upper crosspieces of the two rectangular parts 9 and 10, which merge with the end sections of the sub-rail 5, constitute two other handles of the railing 2.

L'ensemble des éléments horizontaux et verticaux précédemment décrits, qui constituent le cadre 3, s'étend dans un plan vertical P voir figure 2.  The set of horizontal and vertical elements previously described, which constitute the frame 3, extends in a vertical plane P see FIG.

En se référant à la vue de détail de la figure 3, le montant terminal 6 du cadre 3 porte, dans sa partie inférieure, deux doigts de fixation 14 et 15 coaxiaux, superposés, dirigés l'un et l'autre vers le bas. Le doigt de fixation 14 supérieur est relié au montant terminal 6 par une patte de liaison 16, orientée obliquement, c'est-à-dire une patte qui s'étend dans un plan vertical formant un angle aigu a par rapport au plan vertical P du cadre 3. De manière similaire, le doigt de fixation 15 inférieur est relié au montant terminal 6 par une patte de liaison 17 qui est orientée obliquement. Les deux doigts de fixation 14 et 15 se trouvent ainsi décalés, du même côté, par rapport au plan P du cadre 3.  Referring to the detail view of Figure 3, the end post 6 of the frame 3 carries, in its lower part, two fixing fingers 14 and 15 coaxial, superimposed, directed one and the other downwards. The upper fixing pin 14 is connected to the end upright 6 by a connecting lug 16, oriented obliquely, that is to say a lug which extends in a vertical plane forming an acute angle with respect to the vertical plane P 3. Similarly, the lower fixing finger is connected to the end post 6 by a connecting lug 17 which is oriented obliquely. The two fixing fingers 14 and 15 are thus offset, on the same side, relative to the plane P of the frame 3.

En se référant à l'autre vue de détail de la figure 4, le montant terminal 7 du cadre 3 opposé au montant terminal 6, porte également dans sa partie inférieure deux doigts des fixation 18 et 19 coaxiaux, superposés, dirigés l'un et l'autre vers le bas. Les deux doigts de fixation 18 et 19 sont relié au montant terminal 7 par des pattes de liaison respectives 20 et 21, orientées obliquement. Ces deux doigts de fixation 18 et 19 se trouvent ainsi décalés, par rapport au plan P du cadre 3, du même côté que les deux premiers doigts de fixation 14 et 15.  Referring to the other detail view of FIG. 4, the end upright 7 of the frame 3 opposite to the end upright 6, also carries in its lower part two fingers of the coaxial fasteners 18 and 19, superimposed, directed one and the other down. The two fixing fingers 18 and 19 are connected to the end upright 7 by respective connecting lugs 20 and 21, oriented obliquely. These two fixing fingers 18 and 19 are thus offset, with respect to the plane P of the frame 3, on the same side as the two first fixing fingers 14 and 15.

Les figures 5 et 16 illustrent l'utilisation de garde-corps provisoires 2 tels que celui précédemment décrit, au cours du montage d'un échafaudage. A cet effet, la figure 5 montre quelques travées d'un échafaudage en cours de montage. La structure de cet échafaudage comprend notamment des cadres verticaux 22, en particulier en forme de H , qui sont superposés et reposent sur le sol des pieds 23. De manière connue, les montants 24 des cadres verticaux 22 comportent, à différents niveaux, des douilles 25 d'axe vertical, permettant l'assemblage de composants de l'échafaudage, tels que des tubes horizontaux 26 et des diagonales 27.  Figures 5 and 16 illustrate the use of provisional guardrails 2 such as that described above, during the assembly of a scaffold. For this purpose, Figure 5 shows some bays of a scaffolding during assembly. The structure of this scaffold comprises in particular vertical frames 22, in particular H-shaped, which are superimposed and rest on the floor of the feet 23. In known manner, the uprights 24 of the vertical frames 22 comprise, at different levels, bushings 25 of vertical axis, allowing the assembly of components of the scaffold, such as horizontal tubes 26 and diagonals 27.

Les cadres verticaux 22 supportent des éléments de plancher 28 de l'échafaudage, chaque élément de plancher 28 étant muni, à ses extrémités, de crochets 29 permettant sa fixation sur les traverses horizontales 30 des cadres verticaux 22. Certains éléments de plancher 28 sont pourvus d'une trappe d'accès 31, autorisant un accès depuis le sol (ou depuis un niveau inférieur) par une échelle 32.  The vertical frames 22 support floor elements 28 of the scaffolding, each floor member 28 being provided at its ends with hooks 29 for attachment to the horizontal crosspieces 30 of the vertical frames 22. Some floor elements 28 are provided. an access hatch 31, allowing access from the ground (or from a lower level) by a ladder 32.

Dans l'exemple illustré par la figure 5, les éléments de plancher 28 déjà mis en place forment un premier niveau de plancher, déjà complètement installé, et un deuxième niveau de plancher en cours d'installation. Le premier niveau de plancher se trouve déjà sécurisé par des garde-corps permanents, résultant de lisses supérieures 33 et de sous-lisses 34 montées horizontalement entre les cadres verticaux 22, en utilisant les douilles 25. En supposant qu'il s'agisse ici d'un échafaudage installé devant une façade, les garde-corps constitués des lisses 33 et sous-lisse 34 sont au moins présents sur le côté extérieur de l'échafaudage, pour assurer un protection contre les chutes vis-à-vis du personnel travaillant sur les éléments de plancher 28.  In the example illustrated in Figure 5, the floor elements 28 already in place form a first floor level, already completely installed, and a second floor level being installed. The first floor level is already secured by permanent railings, resulting from upper rails 33 and sub-rails 34 mounted horizontally between the vertical frames 22, using the sockets 25. Assuming that it is here a scaffolding installed in front of a facade, the railings consisting of smooth 33 and sub-smooth 34 are at least present on the outer side of the scaffold, to provide protection against falls vis-à-vis staff working on floor elements 28.

Les garde-corps provisoires 2 sont prévus pour être mis en place, depuis un niveau de plancher inférieur (ici le premier niveau de plancher), en regard d'un niveau de plancher supérieur (ici le deuxième niveau de plancher), afin de protéger l'opérateur 35 pendant que celui-ci met en place les garde-corps permanents du niveau de plancher supérieur.  The temporary guardrails 2 are intended to be put in place, from a lower floor level (here the first floor level), facing a higher floor level (here the second floor level), in order to protect the operator 35 while it sets up the permanent guardrails of the upper floor level.

L'opérateur 35 posté au niveau de plancher inférieur saisit un gardecorps provisoire 2 par ses deux parties rectangulaires 9 et 10, par exemple par les traverses inférieures 11 et 12, et il lève le garde-corps provisoire 2, avant de l'abaisser selon les flèches F, de sorte que, comme le montre plus particulièrement la figure 6: - les deux doigts de fixation 14 et 15 s'engagent respectivement dans deux douilles 25 superposées d'un cadre vertical 22 situé en extrémité 15 d'une travée; - les deux autres doigts de fixation 18 et 19 s'engagent respectivement dans deux douilles 25 superposées d'un cadre vertical 22 situé à l'extrémité opposée de la même travée.  The operator 35 posted at the lower floor level grasps a provisional guard 2 by its two rectangular portions 9 and 10, for example by the lower sleepers 11 and 12, and he lifts the provisional guardrail 2, before lowering it according to the arrows F, so that, as shown more particularly in Figure 6: - the two fixing fingers 14 and 15 respectively engage in two sockets 25 superimposed a vertical frame 22 at the end 15 of a span; the two other fixing fingers 18 and 19 respectively engage in two superimposed sockets 25 of a vertical frame 22 situated at the opposite end of the same span.

Le cadre 3 du garde-corps provisoire 2 se trouve ainsi positionné (comme pour les deux autres garde-corps 2 visibles au centre et à droite sur la figure 5) dans un plan vertical, situé en avant du plan vertical passant par les montants 24 extérieurs des cadres verticaux 22, ce décalage résultant de la disposition oblique des pattes de liaison respectives 16, 17, 20, 21 des différents doigts de fixation 14, 15, 18, 19.  The frame 3 of the temporary railing 2 is thus positioned (as for the other two guardrails 2 visible in the center and on the right in FIG. 5) in a vertical plane, situated in front of the vertical plane passing through the uprights 24. the vertical frames 22, this offset resulting from the oblique arrangement of the respective connecting lugs 16, 17, 20, 21 of the different fastening fingers 14, 15, 18, 19.

Ce décalage du cadre 3 du garde-corps provisoire 2 permet la mise en place, au niveau de plancher supérieur, des garde-corps permanents (lisses supérieures 33 et sous-lisses 34). Après mise en place des garde- corps permanents sur tout le niveau de plancher supérieur, la structure de l'échafaudage est prolongée vers le haut, et les garde-corps provisoires 2 sont dégagés des douilles 25 par une traction vers le haut, chaque garde-corps 2 pouvant être saisi par sa sous-lisse 5 par l'opérateur qui a pris place sur le niveau de plancher supérieur. Les garde-corps provisoires 2 peuvent alors être réutilisés de la même manière, en étant emboîtés sur des douilles 25, pour la protection temporaire du niveau de plancher suivant (ici le troisième niveau de plancher), et ainsi de suite, quel que soit le nombre total de niveaux de plancher de l'échafaudage.  This offset of the frame 3 of the temporary guardrail 2 allows the establishment, at the upper floor level, permanent guardrails (upper smooth 33 and sub-smooth 34). After placing permanent guardrails on the entire upper floor level, the structure of the scaffolding is extended upwards, and the temporary guardrails 2 are released from the bushes 25 by pulling up, each guard -body 2 can be grasped by its sub-smooth 5 by the operator who took place on the upper floor level. The temporary guardrails 2 can then be reused in the same way, being nested on sockets 25, for the temporary protection of the next floor level (here the third floor level), and so on, whatever the total number of floor levels of the scaffold.

Comme il va de soi, l'invention ne se limite pas à la seule forme d'exécution de ce garde-corps provisoire qui a été décrite ci-dessus, à titre d'exemple; elle en embrasse au contraire, toutes les variantes de réalisation et d'application respectant le principe. C'est ainsi, notamment, que l'on ne s'éloignerait pas du cadre de l'invention: - en modifiant les formes de détail du garde-corps provisoire, par exemple la disposition et le nombre des éléments horizontaux et verticaux de son cadre; - en appliquant l'invention non seulement à des échafaudages dont la structure comprend des cadres verticaux préfabriqués ou assemblés en forme de H , mais aussi à des échafaudages avec cadres verticaux fermés, préfabriqués ou assemblés, de forme générale rectangulaire, autrement dit des cadres à deux montants reliés entre eux par une traverse supérieure et par une traverse inférieure; - en utilisant le garde-corps provisoire, objet de l'invention, non seulement sur un côté (extérieur) de l'échafaudage, mais encore sur ses deux côtés, dans les cas où une protection similaire est souhaitée ou nécessaire sur les deux côtés; - en utilisant ce garde-corps provisoire non seulement pour le montage en sécurité de garde-corps permanents constitués par une lisse supérieure et une sous-lisse séparées, mais aussi pour le montage en sécurité de garde-corps permanents de type monobloc .  It goes without saying that the invention is not limited to the sole embodiment of this provisional railing which has been described above, for example; it embraces the contrary, all variants of implementation and application respecting the principle. It is thus, in particular, that one would not move away from the scope of the invention: - by modifying the forms of detail of the provisional railing, for example the arrangement and the number of the horizontal and vertical elements of its frame; - by applying the invention not only to scaffolds whose structure comprises prefabricated or assembled H-shaped vertical frames, but also to scaffolds with closed, prefabricated or assembled vertical frames of generally rectangular shape, in other words frames two amounts interconnected by an upper cross and a lower cross; - using the temporary railing, object of the invention, not only on one (outside) side of the scaffold, but on both sides, in cases where similar protection is desired or necessary on both sides ; - by using this temporary railing not only for the secure mounting of permanent railings consisting of a separate upper rail and sub-rail, but also for the secure mounting of permanent monoblock guardrails.

Claims (6)

REVENDICATIONS 1. Garde-corps provisoire pour le montage en sécurité des échafaudages, ce garde-corps (2) étant prévu pur être mis en place temporairement à un niveau de plancher d'un échafaudage, pendant la mise en place du ou des garde-corps ordinaires (33, 34) de ce niveau de plancher, caractérisé en ce qu'il est constitué par un cadre (3) de contour sensiblement rectangulaire, s'étendant dans un plan vertical (P), dont la partie inférieure est munie à ses extrémités de moyens de fixation (14, 15;18, 19) décalés d'un même côté par rapport au plan (P) du cadre (3) et prévus pour la liaison temporaire du garde-corps provisoire (2) avec des montants (24) des cadres verticaux (22) de l'échafaudage, ces moyens de fixation (14, 15; 18, 19) étant conçus pour, lors de l'utilisation du garde-corps provisoire (2), le positionner dans un plan vertical situé en avant d'un plan vertical passant par les montants (24) des cadres verticaux (22) de la structure de l'échafaudage.  1. Provisional railing for the secure mounting of scaffolding, this railing (2) being intended to be placed temporarily at a floor level of a scaffold, during the establishment of the railing or rails common (33, 34) of this floor level, characterized in that it consists of a frame (3) of substantially rectangular contour, extending in a vertical plane (P), the lower portion is provided with its ends of fastening means (14, 15; 18, 19) staggered on the same side with respect to the plane (P) of the frame (3) and provided for the temporary connection of the temporary guardrail (2) with uprights ( 24) vertical frames (22) of the scaffolding, these fastening means (14, 15; 18, 19) being adapted to position it in a vertical plane when using the provisional guardrail (2) located in front of a vertical plane passing through the uprights (24) of the vertical frames (22) of the structure of the scaffolding. 2. Garde-corps provisoire selon la revendication 1, caractérisé en ce que les moyens de fixation comprennent, à chaque extrémité du garde-corps (2) dans la partie inférieure de celui-ci, deux doigts de fixation coaxiaux, superposés (14, 15; 18, 19), dont l'axe commun est parallèle au plan (P) du cadre (3), les deux doigts de fixation (14, 15; 18, 19) étant prévus pour être introduites dans deux douilles (25) superposées de montants (24) de cadres verticaux (22) de la structure de l'échafaudage.  2. Provisional railing according to claim 1, characterized in that the fastening means comprise, at each end of the railing (2) in the lower part thereof, two superposed coaxial fastening fingers (14, 15, 18, 19), whose common axis is parallel to the plane (P) of the frame (3), the two fixing fingers (14, 15; 18, 19) being intended to be introduced into two sockets (25). superposed uprights (24) of vertical frames (22) of the structure of the scaffolding. 3. Garde-corps provisoire selon la revendication 1 ou 2, caractérisé en ce qu'il possède une structure monobloc, résultant de l'assemblage d'éléments horizontaux et verticaux, qui forment au moins une lisse supérieure (4), une sous-lisse (5) et deux montants terminaux (6, 7) pourvus des moyens de fixation, tels que doigts de fixation (14, 15; 18, 19), les montant terminaux (6, 7) s'étendant au-dessous de la sous-lisse (5).  3. Provisional railing according to claim 1 or 2, characterized in that it has a one-piece structure, resulting from the assembly of horizontal and vertical elements, which form at least one upper rail (4), a sub-base smooth (5) and two end posts (6, 7) provided with fixing means, such as fixing fingers (14, 15; 18, 19), the end posts (6, 7) extending below the sub-smooth (5). 4. Garde-corps provisoire selon revendication 3, caractérisé en ce que les montants terminaux (6, 7) font partie respectivement de deux parties rectangulaires (9, 10), qui s'étendent au-dessous de la sous-lisse (5) et qui constituent, notamment par leurs traverses inférieures (11, 12), respectivement deux poignées de préhension.  4. Temporary guardrail according to claim 3, characterized in that the end posts (6, 7) are respectively part of two rectangular parts (9, 10), which extend below the sub-rail (5). and which constitute, in particular by their lower rails (11, 12), respectively two gripping handles. 5. Garde-corps provisoire selon l'ensemble des revendications 2 et 3, caractérisé en ce que les deux doigts de fixation (14, 15; 18, 19), prévus à chaque extrémité du garde-corps provisoire (2), sont reliés aux montants terminaux (6, 7) correspondants de ce garde-corps par des pattes de liaison (16, 17; 20, 21), obliques, c'est-à-dire qui s'étendent dans des plans verticaux formant un angle aigu (a) par rapport au plan vertical (P) du cadre (3) du garde-corps provisoire (2).  5. Provisional guardrail according to the set of claims 2 and 3, characterized in that the two fastening fingers (14, 15; 18, 19) provided at each end of the provisional railing (2), are connected to the corresponding end posts (6, 7) of this railing by connecting lugs (16, 17; 20, 21), oblique, that is to say which extend in vertical planes forming an acute angle (a) in relation to the vertical plane (P) of the frame (3) of the temporary guardrail (2). 6. Garde-corps provisoire selon l'une quelconque des revendications 1 à 5, caractérisé en ce qu'il est réalisé essentiellement en aluminium, notamment en ce qui concerne son cadre (3).  6. Provisional guardrail according to any one of claims 1 to 5, characterized in that it is made essentially of aluminum, particularly with regard to its frame (3).
FR0506723A 2005-06-30 2005-06-30 PROVISIONAL GUARD FOR THE SAFETY ASSEMBLY OF SCAFFOLDS Expired - Fee Related FR2887907B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR0506723A FR2887907B1 (en) 2005-06-30 2005-06-30 PROVISIONAL GUARD FOR THE SAFETY ASSEMBLY OF SCAFFOLDS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR0506723A FR2887907B1 (en) 2005-06-30 2005-06-30 PROVISIONAL GUARD FOR THE SAFETY ASSEMBLY OF SCAFFOLDS

Publications (2)

Publication Number Publication Date
FR2887907A1 true FR2887907A1 (en) 2007-01-05
FR2887907B1 FR2887907B1 (en) 2009-01-16

Family

ID=36072162

Family Applications (1)

Application Number Title Priority Date Filing Date
FR0506723A Expired - Fee Related FR2887907B1 (en) 2005-06-30 2005-06-30 PROVISIONAL GUARD FOR THE SAFETY ASSEMBLY OF SCAFFOLDS

Country Status (1)

Country Link
FR (1) FR2887907B1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010007001A1 (en) * 2008-07-18 2010-01-21 Product Solutions Catalysis Ltd Scaffolding
GB2471214A (en) * 2009-06-18 2010-12-22 Product Solutions Catalysis Ltd Scaffolding side frame
FR2949490A1 (en) * 2009-09-01 2011-03-04 Comabi Balustrade for use on facade scaffold in building, has fixation units oriented obliquely inward with respect to plane of balustrade in order to place balustrade, in mounted position, at outside of plane of posts of structure of scaffold
FR2949489A1 (en) * 2009-09-01 2011-03-04 Comabi SCAFFOLDING STRUCTURE, IN PARTICULAR FACADE SCAFFOLDING
FR2974832A1 (en) * 2011-05-06 2012-11-09 Sas Sodimat Tubular metal structure for constructing temporary scaffolding in building site, has vertical posts connected together by multiple connectors, where connectors are used to assemble railing frames following single non-derogable procedure
ITBA20110027A1 (en) * 2011-05-31 2012-12-01 Gianfranco Giordano PERFECT FALL STRUCTURAL PARAPET
EP2527563A3 (en) * 2011-05-25 2014-01-15 Harsco Infrastructure B.V. Scaffolding and guard rail for use therein
DE102015206276A1 (en) * 2015-04-08 2016-10-13 Peri Gmbh Scaffolding and scaffolding with such a framework part

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2429884A1 (en) * 1978-06-28 1980-01-25 Socform Sarl Sectional roller mounted working platform - has rectangular space frame form with ends formed by one piece ladder frames supporting deck
FR2706929A1 (en) * 1993-06-25 1994-12-30 Bancilhon Claude Highly safe, quick-to-assemble and quick-to-dismantle scaffolding
FR2740514A1 (en) * 1995-10-27 1997-04-30 Mills Gravity retaining gravity hook for quick mounting and demounting of frames or posts fitted to tubular structures
EP1262612A2 (en) * 2001-05-31 2002-12-04 Stanford Scaffolding Limited Temporary guard rail
DE102004012007A1 (en) * 2003-03-13 2004-09-23 Müller & Baum GmbH & Co.KG Parapet for protection of building frame has support strips for cross bars pivoted to building frame uprights
US20050061582A1 (en) * 2004-12-10 2005-03-24 Karanouh Rached Movable and repositionable safety guard rails for scaffolding

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2429884A1 (en) * 1978-06-28 1980-01-25 Socform Sarl Sectional roller mounted working platform - has rectangular space frame form with ends formed by one piece ladder frames supporting deck
FR2706929A1 (en) * 1993-06-25 1994-12-30 Bancilhon Claude Highly safe, quick-to-assemble and quick-to-dismantle scaffolding
FR2740514A1 (en) * 1995-10-27 1997-04-30 Mills Gravity retaining gravity hook for quick mounting and demounting of frames or posts fitted to tubular structures
EP1262612A2 (en) * 2001-05-31 2002-12-04 Stanford Scaffolding Limited Temporary guard rail
DE102004012007A1 (en) * 2003-03-13 2004-09-23 Müller & Baum GmbH & Co.KG Parapet for protection of building frame has support strips for cross bars pivoted to building frame uprights
US20050061582A1 (en) * 2004-12-10 2005-03-24 Karanouh Rached Movable and repositionable safety guard rails for scaffolding

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010007001A1 (en) * 2008-07-18 2010-01-21 Product Solutions Catalysis Ltd Scaffolding
GB2474194A (en) * 2008-07-18 2011-04-06 Product Solutions Catalysis Ltd Scaffolding
GB2474194B (en) * 2008-07-18 2012-12-05 Product Solutions Catalysis Ltd Scaffolding
GB2471214A (en) * 2009-06-18 2010-12-22 Product Solutions Catalysis Ltd Scaffolding side frame
GB2471214B (en) * 2009-06-18 2012-12-12 Product Solutions Catalysis Ltd Scaffolding
FR2949490A1 (en) * 2009-09-01 2011-03-04 Comabi Balustrade for use on facade scaffold in building, has fixation units oriented obliquely inward with respect to plane of balustrade in order to place balustrade, in mounted position, at outside of plane of posts of structure of scaffold
FR2949489A1 (en) * 2009-09-01 2011-03-04 Comabi SCAFFOLDING STRUCTURE, IN PARTICULAR FACADE SCAFFOLDING
EP2299027A1 (en) * 2009-09-01 2011-03-23 Comabi Scaffolding structure, in particular for façade scaffolding
FR2974832A1 (en) * 2011-05-06 2012-11-09 Sas Sodimat Tubular metal structure for constructing temporary scaffolding in building site, has vertical posts connected together by multiple connectors, where connectors are used to assemble railing frames following single non-derogable procedure
EP2527563A3 (en) * 2011-05-25 2014-01-15 Harsco Infrastructure B.V. Scaffolding and guard rail for use therein
ITBA20110027A1 (en) * 2011-05-31 2012-12-01 Gianfranco Giordano PERFECT FALL STRUCTURAL PARAPET
DE102015206276A1 (en) * 2015-04-08 2016-10-13 Peri Gmbh Scaffolding and scaffolding with such a framework part

Also Published As

Publication number Publication date
FR2887907B1 (en) 2009-01-16

Similar Documents

Publication Publication Date Title
FR2887907A1 (en) Temporary balustrade for scaffolding of building, has frame made of aluminum, and fixation pins for positioning frame in one vertical plane situated in front of another vertical plane passing through posts during utilization of balustrade
FR3058432A1 (en) IMPROVEMENT TO SHOOTING TOWERS.
FR3050749A1 (en) MODULE FOR REALIZING A ROTARY SITE STAIRCASE, ASSEMBLY COMPRISING AT LEAST ONE SUCH MODULE AND SITE STAIRCASE COMPRISING AT LEAST ONE SUCH ASSEMBLY
FR2887574A1 (en) Balustrade for scaffolding of building, has articulated fixation finger cooperating with bush of vertical frame to permit pivoting of balustrade around horizontal axis while placing balustrade
EP0046099B1 (en) Bracket scaffold and safety apparatus containing this bracket scaffold
FR2908804A1 (en) Fixed or rolling scaffolding guardrail, has operating handle articulated towards end of guardrail opposite to hook, where horizontal distance provided between inner edge of hooks is greater than distance between exterior of rod and post
EP2180117B1 (en) Safety guard rails for scaffolding, installation method and scaffolding obtained
WO2000014373A1 (en) Portable support structure useful as ladder or stepladder
FR3124813A1 (en) Scaffolding tower and scaffolding and use of tower and scaffolding
FR2905967A1 (en) Scaffolding system for carrying out work e.g. painting exterior facade of building, has horizontal guide rail module forming guide rail, and scaffolding rigidly installed on guide rail to permit access to work location
EP2085537B1 (en) Method of securely installing and removing a rolling scaffold, secure guardrails used and scaffold obtained
FR2510164A1 (en) Building construction staging for foldable brackets - has two part strut with joint sleeve taking diagonal brace
EP2706166B1 (en) Modular strutting tower for civil engineering and construction
FR2949490A1 (en) Balustrade for use on facade scaffold in building, has fixation units oriented obliquely inward with respect to plane of balustrade in order to place balustrade, in mounted position, at outside of plane of posts of structure of scaffold
EP1067253B1 (en) Scaffold-frame and scaffold composed of such frames
WO2014064341A1 (en) One-piece railing for a shoring tower, and shoring tower comprising same
FR3109596A1 (en) Method of erecting a temporary shoring tower
WO2023281211A1 (en) Scaffolding tower and scaffold and use of the tower and scaffold
EP3619379A1 (en) Set of structural elements intended for forming a multi-storey above-ground car park, and corresponding multi-storey above-ground car park
FR2925089A1 (en) METHOD FOR ASSEMBLING AND SECURING A ROLLING SCAFFOLD AND SMOOTH SAFETY ASSEMBLY USED
FR3124814A1 (en) Scaffolding and use of scaffolding
EP2299027B1 (en) Scaffolding structure, in particular for façade scaffolding
FR2944305A1 (en) Balustrade for e.g. light tower hoist type scaffold, has inverted lower hook placed at lower part of panel, where inverted hook is positioned to be locked by cross-pieces that are fixed to nodes of posts at level of floor
FR2995333A1 (en) Modular strutting tower for supporting formwork of e.g. flagstones, of e.g. building, has tenon and opening that are encased by swiveling movement of frames relative to each other, where movement is included in safety perimeter
FR3079863A1 (en) MONTABLE SCAFFOLDING BODY FROM A LOWER LEVEL USING A PERCH

Legal Events

Date Code Title Description
CD Change of name or company name

Owner name: TUBESCA-COMABI, FR

Effective date: 20140207

PLFP Fee payment

Year of fee payment: 12

PLFP Fee payment

Year of fee payment: 13

PLFP Fee payment

Year of fee payment: 14

PLFP Fee payment

Year of fee payment: 15

PLFP Fee payment

Year of fee payment: 16

PLFP Fee payment

Year of fee payment: 17

PLFP Fee payment

Year of fee payment: 18

ST Notification of lapse

Effective date: 20240205