Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LAYER GUIDO
Original Assignee
LAYER GUIDO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LAYER GUIDOfiledCriticalLAYER GUIDO
Publication of FR2456189A1publicationCriticalpatent/FR2456189A1/en
E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
E04F11/18—Balustrades; Handrails
E04F11/181—Balustrades
E04F11/1817—Connections therefor
E—FIXED CONSTRUCTIONS
E04—BUILDING
E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
E04F11/18—Balustrades; Handrails
E04F11/181—Balustrades
E04F11/1836—Handrails of balustrades; Connections between handrail members
E04F11/1838—Laterally displaced handrail
Abstract
Plate (B) is joined to tube (T) by passing a rod (1) through holes (h) in them. The rod is threaded over the whole of its length. Spacing wedges (2) with interior threads (6), are of much larger outside dia. than the rod, giving it greater flexural strength. Spacers of different thickness are provided, so that a combination can be used to exactly match, the distance between (B) and (T). The fixing is completed by end caps (3) which have interior threaded recesses (8). Rubber washers ensure that the caps are not accidently unthreaded.
FR7920154A1979-05-081979-08-07Tie rod and clamp for building construction - has rod passing through tube with spacing wedges retained by threads
WithdrawnFR2456189A1
(en)