EP3941819B1 - A vessel having a mooring system for automatic mooring to a bollard and a method for mooring - Google Patents
A vessel having a mooring system for automatic mooring to a bollard and a method for mooring Download PDFInfo
- Publication number
- EP3941819B1 EP3941819B1 EP20712901.6A EP20712901A EP3941819B1 EP 3941819 B1 EP3941819 B1 EP 3941819B1 EP 20712901 A EP20712901 A EP 20712901A EP 3941819 B1 EP3941819 B1 EP 3941819B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- bollard
- vessel
- mooring
- rope
- mooring line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 21
- 238000004891 communication Methods 0.000 claims description 9
- 230000005540 biological transmission Effects 0.000 claims description 6
- 238000012546 transfer Methods 0.000 claims description 6
- 238000012545 processing Methods 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 230000008878 coupling Effects 0.000 description 8
- 238000010168 coupling process Methods 0.000 description 8
- 238000005859 coupling reaction Methods 0.000 description 8
- 238000001514 detection method Methods 0.000 description 3
- 210000000078 claw Anatomy 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 208000031481 Pathologic Constriction Diseases 0.000 description 1
- 230000003213 activating effect Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000000116 mitigating effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000013519 translation Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/04—Fastening or guiding equipment for chains, ropes, hawsers, or the like
- B63B21/06—Bollards
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/02—Magnetic mooring equipment
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/16—Tying-up; Shifting, towing, or pushing equipment; Anchoring using winches
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/20—Equipment for shipping on coasts, in harbours or on other fixed marine structures, e.g. bollards
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B2021/003—Mooring or anchoring equipment, not otherwise provided for
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/20—Adaptations of chains, ropes, hawsers, or the like, or of parts thereof
- B63B2021/203—Mooring cables or ropes, hawsers, or the like; Adaptations thereof
Definitions
- the present invention relates to a vessel having a mooring system for automatic mooring to one or more bollards in accordance with the preamble of claim 1 and a method for use thereof.
- the vessel's infrastructure such as mooring to quay structures must also be able to allow partial or full autonomous operations.
- WO 2017/167877 A1 discloses a system for automatic mooring of a vessel.
- the vessel comprises two spaced apart winches with mooring lines and a rigid spreader bar connected between the two mooring lines.
- a robotic arm transfers the spreader bar from a position on the vessel to a position behind bollards on the quay.
- JPS6194888 shows another example of an automatic mooring system comprising telescopic arms containing a mooring line with a loop at its end.
- the arm may be placed at the side of the vessel's hull.
- JP S6193392U shows a rotational bollard fixed to a hull on an axle and a second bollard variant which is fixed parallel to a hull.
- JP S574491A shows an automatic mooring method where a bollard is fixed to a hull and a mooring line is fixed to a movable arm located on a quay stricture.
- US 2019/031300 A1 shows a tugboat with a crane am and a bollard located on the deck of the vessel.
- WO 95/18038 A1 shows a vessel with a crane arm occupying a large sace on the deck of the vessel.
- the crane arm is for transferring a mooring loop to an external bollard.
- JP S6018081U shows a unit on a quay structure with a mooring loop on a telescopic arm capable of placing the mooring loop onto a bollard on a vessel floating in water.
- JP S56116586 A shows a crane capable of transferring a mooring loop to a bit on a quay.
- JP S58136585 A multistep cylinder device comprising computer, transmission and receiving system for mooring a ship to a quay bit.
- KR 20130134838 A discloses a mooring robot arm, and more particularly, to a mooring robot arm installed in a marine terminal or the like for delivering a mooring rope.
- the invention concerns a vessel comprising a hull for floating in a body of water and at least one rope-parking bollard, and preferably a plurality of rope-parking bollards, wherein each bollard comprises a bollard column having a proximal longitudinal end and a distal longitudinal end.
- the rope-parking bollard further comprises a bollard head arranged at the distal longitudinal end of the bollard column, wherein the cross-sectional area of the bollard head oriented perpendicular to the longitudinal direction of the bollard column is larger than the corresponding cross sectional area of the bollard column.
- the term 'corresponding cross-sectional area of the bollard column' signifies herein a cross-sectional area oriented parallel to the cross-sectional area of the bollard head.
- the rope-parking bollard is fixed to the vessel's hull at the proximal longitudinal end of the bollard column.
- At least one rope-parking bollard has a bollard head protruding from the hull external side. Further, the longitudinal direction of the bollard column may be perpendicular to the hull side.
- One or more bends may be present on the bollard column along the longitudinal direction between the proximal end and the distal end.
- the proximal longitudinal end of the bollard column fixed into a hull recess formed within the side of the hull.
- the hull recess may have a depth into the side of the hull which is at least 20 % of the length of the bollard column along its longitudinal direction, more preferably a depth of at least 30 %, even more preferably at least 50 %, even more preferably at least 70 %, for example 100 % of the length of the bollard column along its longitudinal direction.
- At least one the rope-parking bollard may further comprise a bollard transmission / communication system comprising a receiver, transmitter and/or a transceiver, thereby allowing wireless communication with a remote-control system.
- a bollard transmission / communication system comprising a receiver, transmitter and/or a transceiver, thereby allowing wireless communication with a remote-control system.
- the bollard may transmit a signal to the remote control system when an attachment system of a vessel's mooring system has established a stable and releasable attachment with the rope-parking bollard and/or has been successfully released from the bollard.
- the vessel may further comprise a mooring line with a mooring line end and an attachment system fixed to the mooring line end, wherein the attachment system is configured to allow releasable attachment to the rope-parking bollard.
- the attachment system may further comprise a mooring loop, wherein the minimum size of the opening of the mooring loop is sufficient to allow the bollard head to enter there through, and a mooring line connector connecting the mooring loop to the mooring line end
- the mooring line may be winched by at least one winch constituting part of the vessel.
- a second mooring line end of the mooring line is in this configuration at least indirectly attached to the winch.
- the vessel may further comprise at least one robotic arm, and preferably a plurality of robotic arms.
- Such a robot arm comprises a robotic arm section, or in case of several arm section an outer robotic arm section, with a gripper assembly at a first longitudinal end.
- the gripper assembly may be configured to releasably grip the mooring line connector to allow transfer of the attachment system from one location to another
- Such a gripper assembly is preferably rotatable / pivotable relative to the robotic arm section.
- a versatile and rotatable / pivotable gripper assembly it may comprise
- At least one, and preferably all, of the rope-parking bollards are placed within a maximum extent of the robotic arm, i.e. the extent corresponding to the configuration where all arm sections of the robotic arm are pivoted relative to each other such that they are aligned along a common longitudinal axis.
- the majority of the rope-parking bollards are within 80 % of the maximum extent.
- the vessel comprises an object sensor system for sensing the position and size of objects within a predetermined distance range, for example objects on quay and/or on deck.
- the object sensor system may for example be placed on the robotic arm and/or on the rope-parking bollard and/or on other locations on the external side of the hull.
- the invention concerns a method performed using a vessel as described above, comprising the following steps:
- step B and step C may be interchanged or performed simultaneously.
- step G and step H may be interchanged or performed simultaneously.
- step E If the external location of step E is the location of a bollard on a quay structure having been previously detected by the object sensing system, the method may further comprise the following steps:
- At least one, preferably all, of the steps can be done remotely by the remote control system.
- At least one, preferably all, of the steps may be activated and controlled based on positional data collected by the object sensing system.
- the method may also be reversed to manoeuvre the attachment system from an external location, for example a quay bollard to a rope-parking bollard.
- At least one of the object sensor system, the attachment system, the winch, the rope-parking bollard and the robotic arm comprise transmitting means allowing wireless communication with a remote data processing apparatus configured to perform the steps A-E, preferably all of the steps A-H
- the invention concerns a data processing apparatus comprising a computer program that, when executed on a processor, is configured to perform the method steps A-E, preferably all steps A-H.
- the manoeuvring of the robotic arm may be achieved by use of one or more telescopic robotic arm sections.
- one or more of the robotic arm sections for example the outermost robotic arm section, may be telescopic in order to achieve additional manoeuvrability.
- Figs. 1-9 show an embodiment of a vessel 100 ( figs. 1 and 2 ) with a mooring system having one or more winches 11 with a winch drum 11a and a winch motor 11b ( figs. 2 and 3 ), mooring lines 10 with a rope eye 22 associated with each winch ( figs. 6-9 ), a plurality of robotic arms 200 fixed to a deck 102 ( figs. 4-7 ) and/or a hull 101 of the vessel 100 and one or more rope-parking bollards 220 associated with one or more of the mooring lines 10 ( figs. 6-9 ).
- the hull 101 of the vessel 100 has a bow part 104 and an aft part 105 ( fig. 2 ).
- the deck structure 103 defined as any physical obstacles arranged onto the vessel's 100 deck 102 that is not directly involved in the mooring operation to a remote structure or the parking of the mooring line's rope eye around a rope-parking bollard, may include both fixed structures such as the deck infrastructure and removable products such as non-mooring related equipment and/or containers.
- a gripper connector 213c at an end 213 of each robotic arm 200 is configured to grab the mooring line 10 near the rope eye 22 at an end 10a of the mooring line 10 without the need of human intervention, and to subsequently transfer the rope eye 22 between the location of the rope-parking bollard 220 and any location within a distance from the rope-parking bollard 220 depending on the maximum extent of the robot arm 200, for example within 30 meters, 25 meters, 20 meters 15 meters, 10 meters or 5 meter
- the mooring line 10 may advantageously be guided during transfer between the rope-parking bollards 220 and the external location, for example via fairleads 106 arranged within the hull 101 or separate mooring line guides 12 arranged on the deck 102 or a combination thereof.
- An example of a mooring line guide 12 may be drums adapted for changing the direction of the mooring line 10 somewhere between the winch 11 and the fairlead 106 (or any other exit structures at the deck's 102 lateral boundaries).
- each rope-parking bollard 220 is at the external side of the hull 101 and adjacent to a fairlead 106, for example within 5 meters from the fairlead.
- the rope-parking bollards may further be evenly distributed along the lateral plane of at least some sections of the hull 101.
- a plurality of rope-parking bollards may be evenly distributed along the bow portion 104 and/or along the aft portion 105.
- each rope-parking bollard 220 comprises a bollard head 221 and a bollard column 222.
- the latter has a bollard column proximal end and a bollard column distal end, where the bollard head 221 is located at the bollard column distal end and the bollard column proximal end is fixed to the hull 101 or the deck 102.
- the protrusion of the rope-parking bollard 220 from the hull 101 or deck 102 may be in any angle relative to the hull/deck surface.
- the bollard column 222 can be straight or have one or more bends / kinks located between the proximal longitudinal end and the distal end.
- the bollard column 222 may initially extend perpendicular to, or at a given first angle between 0° and 90° from, the hull/deck surface 101 and then change direction (bend/kink) along the bollard column's 222 longitudinal angle, i.e. another angle.
- the bollard column 222 is oriented perpendicular to the hull/deck surface without any bends/kinks.
- one or more of the rope-parking bollards 220 may be a placed in a recess 230 in the hull 101 or deck 102, where the proximal longitudinal end of the bollard column 222 is fixed within the recess 230, thereby avoiding, or at least mitigating, any disadvantage related to protruding structures from the hull/deck.
- the opening of the recess 230 is sufficiently large to allow the rope eye 22 to pass around the bollard head 221 during parking of the mooring line 10
- the recess depth into the side of the hull 101 or the deck 102 may be at least 20 % of the length of the bollard column 222 along its longitudinal direction, more preferably at least 30 % of the length, even more preferably at least 50 %, for example between 90 % and 100 %, that is equal or near equal to column's total length.
- the depth of the recess 230 may also have a depth that equals the length of the bollard column 222 and the bollard head 221 along the longitudinal direction of the bollard column 222, thereby reducing significantly undesired interference with external structures such as quay structures 1.
- one or more of the rope-parking bollards 220 may include a signal communication system 223 comprising a receiver and/or a transmitter.
- the signal communication system may include a transceiver, thereby allowing wireless transmission as well as wireless receival.
- the rope-parking bollard 220 may be configured to send a signal to a remotely located control system when the rope eye 22 has established a stable attachment with the rope-parking bollard 220 and/or has been successfully released from the rope-parking bollard 220. If the rope-parking bollard 220 also includes a receiver, the control system may send signals to the rope-parking bollard 220 that may further be communicated to the robotic arm 200 and/or the winch 11 and/or an attachment system 20 including the rope eye 22 at the mooring line 10a during fastening/releasing procedures.
- the rope-parking bollard 220 may be located a distance from a fairlead 106 used to guide the mooring line through the hull 101.
- the rope-parking bollard 220 and the fairlead 106 may further be located at the same or near the same height relative to the hull's 101 waterline as illustrated in fig. 7 or immediately above the fairlead as illustrated in fig. 6 .
- the rope-parking bollard 220 and the fairlead 106 may be located on the same side of the hull 101, but at different deck levels.
- the mooring line 10 further includes an attachment system 20, comprising a mooring loop 22, also denoted a rope eye, attached to the end 10a of the mooring line 10 via a sheave 21 or a mooring line connector 21.
- the gripper connector 213c and the sheave 21 are mutually designed to ensure a stable, releasable coupling.
- One example of such a coupling may be arranging an electromagnet on the gripper connector 213c and a permanent magnet on the mooring line connector 21.
- other fixing means such as hooks may also be envisaged.
- the bollard head 221 is configured such that the bollard head 221 can enter through the mooring loop 22.
- the mooring loop 22 is made elastic, meaning that its initial shape is regained after having been exposed for a load typical for mooring of vessels.
- the mooring loop 22 should regain the initial shape after being exposed for a load of more than 30 kN for at least 1 hour, preferably for a load of more than 50 kN within the same time period.
- Figs. 4 and 5 shows an exemplary embodiment of a robotic arm 200 being fixed on the deck 102 at the right corner of the vessel's aft portion 105.
- the deck structure 103 includes a high number of obstacles, thereby reducing the possible manoeuvrability space of the robotic arm 200 significantly.
- the robotic arm 200 may be equipped with a plurality of robotic arm sections 204,206, 211, where at least some of the sections are movable relative to each other.
- the robotic arm 200 comprises a total of three robotic arm sections 204,206, 211 which are interlinked in the following manner:
- the above-mentioned configuration of the robotic arm 200 is only one of many exemplary configurations that allows high degree of movements despite of relatively complex deck structure 103.
- modifications such as changing the number of robotic arm sections, the direction of axis of rotations, the relative direction of the sections and the section lengths are possible without departing from the stated purpose of the invention.
- the other end of the outer section 211 may constitute a gripper assembly 213 comprising
- the gripper assembly 213 is generally configured to enable releasable gripping of the sheave 21 arranged between the mooring loop 22 and the end 10a of the mooring line 10. Furthermore, the gripper assembly 213 is, in cooperation with the robotic arm sections, generally configured to manoeuvre the mooring loop 22 around a rope-parking bollard 220 or a mooring structure such as a bollard 2 on a quay 1. Hence, the configuration of the gripper assembly 213 may be modified with respect to inter alia the number of rotary devices, the axes of rotations and the component sizes, without departing from the stated purpose.
- all or some of the rotating means on the robotic arm 200 such as the swivels 203,205,207,210 and/or rotary devices 213a,213b,213c may be configured to allow controllable rotation speed, for example by use of electromotors and/or meshing gears.
- the vessel also comprises an object sensing system 30 configured to detect the surrounding structures.
- an object sensing system 30 configured to detect the surrounding structures.
- a sensor camera 30a constituting a part of the object sensing system 30 is arranged on the mid rotary device 213b, thereby enabling detection of an area in the vicinity of the gripper assembly 213.
- structures such as rope-parking bollards 220 or bollards 2 may be detected and analysed with respect to position and size.
- the object sensing system 30 is configured to detect objects within a maximum allowable distance, for example 100 m, 80 m, 70 m, 50 m, 30 m, 10 m or 5 m.
- the object sensing system 30 may comprise a plurality of sensor components distributed on the vessel 100 to ensure detection and analyses of the surrounding environment and thereby allowing a successful mooring with little or no need of human intervention.
- sensor components may be arranged on each or some of the robotic arm sections, as well as on the gripper assembly 213 or on the rope-parking bollard 220.
- Sensor components on other parts of the vessel 100 such as on winches 11, fairleads 106, mooring line guides 12, deck structure 103, etc, may be envisaged to further aid the positioning of the robotic arm 200 and/or the mooring line 10 and/or the mooring loop 22.
- Fig. 11 shows a sensing area 31 set up by at least part of the object sensing system 30, within which any structure such as rope-parking bollards 220 may be detected and analysed with respect to position and size.
- the different steps to ensure a successful transfer of the attachment system 20 from or to a rope-parking bollard 220 may proceed as follows:
- the arrangement of the mooring loop 22 around the rope-parking bollard 220 may proceed as for the arrangement around the bollard 2 as described above.
- the rope-parking bollard 220 is configured to facilitate attachment of the attachment system 20, when the attachment system 20 is not being used for other purposes, for example mooring the vessel 100 to a bollard 2 on a quay 1.
- the rope-parking 220 bollard thus provides a predetermined location for the attachment system 20, where the attachment system 20 can be retrieved or placed, for example by the robotic arm 200.
- the robotic arm 200 may be guided to the rope-parking bollard 220 automatically by a remote-control unit.
Description
- The present invention relates to a vessel having a mooring system for automatic mooring to one or more bollards in accordance with the preamble of
claim 1 and a method for use thereof. - In the last decade there have been a growing focus in the maritime industry to provide vessels with a high degree of autonomy. An example of an autonomous ship is found disclosed in
WO 2017/129863 A1 . - However, in order to achieve full autonomy within the maritime industry, the vessel's infrastructure such as mooring to quay structures must also be able to allow partial or full autonomous operations.
- Mooring with a high degree of autonomy is known in the art. As an example,
WO 2017/167877 A1 discloses a system for automatic mooring of a vessel. The vessel comprises two spaced apart winches with mooring lines and a rigid spreader bar connected between the two mooring lines. A robotic arm transfers the spreader bar from a position on the vessel to a position behind bollards on the quay. - However, such a known mooring solution requires that a large portion of the deck surface area of the vessel has been liberated in order to avoid interference with the mooring procedure, thereby reducing the maximum deck available for infrastructure, equipment or storage. Moreover, the risk of unintentional loss of mooring to the bollards is considered high, in particular during harsh sea conditions.
-
JPS6194888 -
JP S6193392U -
JP S574491A -
US 2019/031300 A1 shows a tugboat with a crane am and a bollard located on the deck of the vessel. -
WO 95/18038 A1 -
JP S6018081U -
JP S56116586 A -
JP S58136585 A -
KR 20130134838 A - It is thus an object of the present invention to provide a vessel comprising an automatic mooring system that at least mitigate the above mentioned disadvantages of the prior art.
- More particular, it is an object of the present invention to provide a flexible and automatic mooring system that optimize the utilization of the total deck surface area Also, it is an object of the present invention to provide a flexible and automatic mooring system with a high degree of predictability.
- The present invention is set forth and characterized in the independent claims, while the dependent claims describe other characteristics of the invention.
- In a first aspect, the invention concerns a vessel comprising a hull for floating in a body of water and at least one rope-parking bollard, and preferably a plurality of rope-parking bollards, wherein each bollard comprises a bollard column having a proximal longitudinal end and a distal longitudinal end. The rope-parking bollard further comprises a bollard head arranged at the distal longitudinal end of the bollard column, wherein the cross-sectional area of the bollard head oriented perpendicular to the longitudinal direction of the bollard column is larger than the corresponding cross sectional area of the bollard column. The term 'corresponding cross-sectional area of the bollard column' signifies herein a cross-sectional area oriented parallel to the cross-sectional area of the bollard head. The rope-parking bollard is fixed to the vessel's hull at the proximal longitudinal end of the bollard column.
- At least one rope-parking bollard has a bollard head protruding from the hull external side. Further, the longitudinal direction of the bollard column may be perpendicular to the hull side.
- One or more bends may be present on the bollard column along the longitudinal direction between the proximal end and the distal end.
- In one exemplary configuration the proximal longitudinal end of the bollard column fixed into a hull recess formed within the side of the hull. The hull recess may have a depth into the side of the hull which is at least 20 % of the length of the bollard column along its longitudinal direction, more preferably a depth of at least 30 %, even more preferably at least 50 %, even more preferably at least 70 %, for example 100 % of the length of the bollard column along its longitudinal direction.
- At least one the rope-parking bollard may further comprise a bollard transmission / communication system comprising a receiver, transmitter and/or a transceiver, thereby allowing wireless communication with a remote-control system. For example, if the rope-parking bollard comprises a transmitter, the bollard may transmit a signal to the remote control system when an attachment system of a vessel's mooring system has established a stable and releasable attachment with the rope-parking bollard and/or has been successfully released from the bollard.
- The vessel may further comprise a mooring line with a mooring line end and an attachment system fixed to the mooring line end, wherein the attachment system is configured to allow releasable attachment to the rope-parking bollard.
- The attachment system may further comprise a mooring loop, wherein the minimum size of the opening of the mooring loop is sufficient to allow the bollard head to enter there through, and a mooring line connector connecting the mooring loop to the mooring line end
- The mooring line may be winched by at least one winch constituting part of the vessel. A second mooring line end of the mooring line is in this configuration at least indirectly attached to the winch. The vessel may further comprise at least one robotic arm, and preferably a plurality of robotic arms. Such a robot arm comprises a robotic arm section, or in case of several arm section an outer robotic arm section, with a gripper assembly at a first longitudinal end. The gripper assembly may be configured to releasably grip the mooring line connector to allow transfer of the attachment system from one location to another
- Such a gripper assembly is preferably rotatable / pivotable relative to the robotic arm section.
- As an exemplary configuration of a versatile and rotatable / pivotable gripper assembly, it may comprise
- a first, inner rotary device rotatably fixed to the first longitudinal end of the robotic arm section,
- a second, mid rotary device rotatably fixed to the inner rotary device with an axis of rotation different, preferably perpendicular, to the axis of rotation of the inner rotary device and
- an outer gripper connector rotatably fixed to the mid rotary device with an axis of rotation different, preferably perpendicular, to the axis of rotation of the mid rotary device.
- At least one, and preferably all, of the rope-parking bollards are placed within a maximum extent of the robotic arm, i.e. the extent corresponding to the configuration where all arm sections of the robotic arm are pivoted relative to each other such that they are aligned along a common longitudinal axis. In a more preferred embodiment, the majority of the rope-parking bollards are within 80 % of the maximum extent.
- In another exemplary configuration the vessel comprises an object sensor system for sensing the position and size of objects within a predetermined distance range, for example objects on quay and/or on deck.
- The object sensor system may for example be placed on the robotic arm and/or on the rope-parking bollard and/or on other locations on the external side of the hull.
- In a second aspect, the invention concerns a method performed using a vessel as described above, comprising the following steps:
- A. Manoeuvring one or more robot arm sections of the robotic arm by operating at least one swivel located between the deck base and the outermost robotic arm section to a position where the gripper assembly is arranged adjacent to the attachment system, wherein the mooring loop of the attachment system is surrounding the rope-parking bollard. In case of several robot arm sections, each robotic arm section is interlinked end to end with another robot arm section via a dedicated swivel, thereby allowing independent pivoting.
- B. Operating the winch to slacken the tension of the mooring line.
- C. Releasably attaching the gripper assembly to the mooring line connector.
- D. Guiding the mooring loop by operating at least one rotary device of the gripper assembly or at least one swivel or a combination thereof such that the mooring loop is released from the rope-parking bollard.
- E. Guiding the attachment system by operating at least one rotary device of the gripper assembly or at least one swivel or a combination thereof such that the attachment system is guided to the external location, for example the location of a quay bollard detected by the object sensing system.
- Note that step B and step C may be interchanged or performed simultaneously. Further, step G and step H may be interchanged or performed simultaneously.
- If the external location of step E is the location of a bollard on a quay structure having been previously detected by the object sensing system, the method may further comprise the following steps:
- F. Guiding the attachment system by operating at least one rotary device of the gripper assembly or at least one swivel or a combination thereof such that the mooring loop surrounds at least part of the bollard on the quay structure.
- G. Disattaching the gripper assembly from the attachment system.
- H. Operating the winch to tighten the mooring line between the winch and the bollard.
- At least one, preferably all, of the steps can be done remotely by the remote control system.
- Further, at least one, preferably all, of the steps may be activated and controlled based on positional data collected by the object sensing system.
- The method may also be reversed to manoeuvre the attachment system from an external location, for example a quay bollard to a rope-parking bollard.
- In yet another exemplary configuration of the method, at least one of the object sensor system, the attachment system, the winch, the rope-parking bollard and the robotic arm comprise transmitting means allowing wireless communication with a remote data processing apparatus configured to perform the steps A-E, preferably all of the steps A-H
- In a third aspect, the invention concerns a data processing apparatus comprising a computer program that, when executed on a processor, is configured to perform the method steps A-E, preferably all steps A-H.
- In an alternative or additional configuration, the manoeuvring of the robotic arm may be achieved by use of one or more telescopic robotic arm sections. For example, one or more of the robotic arm sections, for example the outermost robotic arm section, may be telescopic in order to achieve additional manoeuvrability.
-
-
Figs. 1 (A) and (B) illustrate a vessel viewed from the side and from the top, respectively, having a plurality of robotic arms forming part of a vessel in accordance with the invention. -
Figs. 2 (A) and (B) illustrate an aft portion and a bow portion, respectively, of the vessel inFigs. 1 , both portions comprising a mooring winch system for winching mooring lines. -
Figs. 3 (A), (B) and (C) illustrates examples of prior art mooring winches that may be used on the vessel. -
Figs. 4 (A) and (B) illustrate a bow portion and an aft portion, respectively, of a vessel in accordance with the invention with a robotic arm arranged in a folded position on a deck of a vessel. -
Figs. 5 (A) ,(B) ,(C) ,(D) ,(E) and(F) illustrate in different perspective views a method in accordance with the invention for attaching a rope eye of the mooring line around a bollard by use of the robotic arm ofFigs. 4 . -
Fig. 6 illustrates a rope-parking bollard on the external surface of a vessel hull located near a mooring line's fairlead, where a rope eye of the mooring line is arranged in a parked position around the bollard. -
Fig. 7 illustrates another rope-parking bollard positioned on the external surface of a vessel hull further away from the fairlead of the mooring line. -
Fig. 8 illustrates a vessel with an upper deck and a lower deck, where a rope-parking bollard is located on the external surface of a vessel hull at the upper deck. -
Figs. 9 (A), (B), (C) and(D) illustrate in different perspective views two alternative methods of placing a rope eye of the mooring line around a rope-parking bollard placed externally on a vessel hull by use of the robotic arm ofFigs. 4 and5 , where -
Figs. 9 (A) and (B) and Figs. 9 (C) and (D) shows placement of the rope eye when approaching the rope-parking bollard from opposite angles. -
Figs. 10 (A), (B) and (C) illustrate in different perspective views a method in accordance with the invention for attaching a rope eye of the mooring line around a bollard on a quay structure by use of a robotic arm. -
Fig. 11 illustrates the detection areas of an object sensing system attached to a robotic arm, where both the sensor system and the robotic arm constitute parts of the vessel in accordance with the invention. -
Fig. 12 illustrates in perspective an attachment system constituting part of a vessel in accordance with the invention, wherein the attachment system comprising an elastic rope eye and a sheave attached behind the splice of the rope eye. -
Fig. 13 illustrates the external surface of a vessel hull constituting part of a vessel in accordance with the invention, with a rope-parking bollard placed within a hull recess. - In the following, specific embodiments of the invention will be described in more detail with reference to the drawings. However, the invention is not limited to the embodiments and illustrations contained herein. It is specifically intended that the invention includes modified forms of the embodiments, including portions of the embodiments and combinations of elements of different embodiments. It should be appreciated that in the development of any actual implementation, as in any engineering or design project, specific decisions must be made to achieve the developer's specific goals, such as compliance with system and/or business-related constraints. Moreover, it should be appreciated that such a development effort might be complex and time consuming, but would nevertheless be a routine undertaking of design, fabrication and manufacture for the skilled person having the benefit of this disclosure.
-
Figs. 1-9 show an embodiment of a vessel 100 (figs. 1 and2 ) with a mooring system having one ormore winches 11 with awinch drum 11a and awinch motor 11b (figs. 2 and3 ),mooring lines 10 with arope eye 22 associated with each winch (figs. 6-9 ), a plurality ofrobotic arms 200 fixed to a deck 102 (figs. 4-7 ) and/or ahull 101 of thevessel 100 and one or more rope-parking bollards 220 associated with one or more of the mooring lines 10 (figs. 6-9 ). - The
hull 101 of thevessel 100 has abow part 104 and an aft part 105 (fig. 2 ). Thedeck structure 103, defined as any physical obstacles arranged onto the vessel's 100deck 102 that is not directly involved in the mooring operation to a remote structure or the parking of the mooring line's rope eye around a rope-parking bollard, may include both fixed structures such as the deck infrastructure and removable products such as non-mooring related equipment and/or containers. - A
gripper connector 213c at anend 213 of eachrobotic arm 200 is configured to grab themooring line 10 near therope eye 22 at anend 10a of themooring line 10 without the need of human intervention, and to subsequently transfer therope eye 22 between the location of the rope-parking bollard 220 and any location within a distance from the rope-parking bollard 220 depending on the maximum extent of therobot arm 200, for example within 30 meters, 25 meters, 20 meters 15 meters, 10 meters or 5 meter - The
mooring line 10 may advantageously be guided during transfer between the rope-parking bollards 220 and the external location, for example viafairleads 106 arranged within thehull 101 or separate mooring line guides 12 arranged on thedeck 102 or a combination thereof. An example of amooring line guide 12 may be drums adapted for changing the direction of themooring line 10 somewhere between thewinch 11 and the fairlead 106 (or any other exit structures at the deck's 102 lateral boundaries). - The location of each rope-
parking bollard 220 is at the external side of thehull 101 and adjacent to afairlead 106, for example within 5 meters from the fairlead. - The rope-parking bollards may further be evenly distributed along the lateral plane of at least some sections of the
hull 101. For example, a plurality of rope-parking bollards may be evenly distributed along thebow portion 104 and/or along theaft portion 105. - As best illustrated in
Figs. 8 and9 , each rope-parking bollard 220 comprises abollard head 221 and abollard column 222. The latter has a bollard column proximal end and a bollard column distal end, where thebollard head 221 is located at the bollard column distal end and the bollard column proximal end is fixed to thehull 101 or thedeck 102. - The protrusion of the rope-
parking bollard 220 from thehull 101 ordeck 102 may be in any angle relative to the hull/deck surface. - Furthermore, the
bollard column 222 can be straight or have one or more bends / kinks located between the proximal longitudinal end and the distal end. - For example, the
bollard column 222 may initially extend perpendicular to, or at a given first angle between 0° and 90° from, the hull/deck surface 101 and then change direction (bend/kink) along the bollard column's 222 longitudinal angle, i.e. another angle. In a specific exemplary configuration, thebollard column 222 can extend perpendicular from the hull/deck surface (first angle = 90°) a distance corresponding to half the length of thebollard column 22 and then bend 90°, thus extending to thebollard head 221 in a direction parallel along the hull/deck surface. - In the most preferred configuration, the
bollard column 222 is oriented perpendicular to the hull/deck surface without any bends/kinks. - In an alternative configuration, one or more of the rope-
parking bollards 220 may be a placed in arecess 230 in thehull 101 ordeck 102, where the proximal longitudinal end of thebollard column 222 is fixed within therecess 230, thereby avoiding, or at least mitigating, any disadvantage related to protruding structures from the hull/deck. The opening of therecess 230 is sufficiently large to allow therope eye 22 to pass around thebollard head 221 during parking of themooring line 10 - The recess depth into the side of the
hull 101 or thedeck 102 may be at least 20 % of the length of thebollard column 222 along its longitudinal direction, more preferably at least 30 % of the length, even more preferably at least 50 %, for example between 90 % and 100 %, that is equal or near equal to column's total length. The depth of therecess 230 may also have a depth that equals the length of thebollard column 222 and thebollard head 221 along the longitudinal direction of thebollard column 222, thereby reducing significantly undesired interference with external structures such asquay structures 1. - In particular for self-driving / at least partly autonomous vehicles, one or more of the rope-
parking bollards 220 may include a signal communication system 223 comprising a receiver and/or a transmitter. For example, the signal communication system may include a transceiver, thereby allowing wireless transmission as well as wireless receival. - If the rope-
parking bollard 220 comprises a signal communication system 223 with a transmitter, the rope-parking bollard 220 may be configured to send a signal to a remotely located control system when therope eye 22 has established a stable attachment with the rope-parking bollard 220 and/or has been successfully released from the rope-parking bollard 220. If the rope-parking bollard 220 also includes a receiver, the control system may send signals to the rope-parking bollard 220 that may further be communicated to therobotic arm 200 and/or thewinch 11 and/or anattachment system 20 including therope eye 22 at themooring line 10a during fastening/releasing procedures. - As best illustrated by
fig. 6-8 , the rope-parking bollard 220 may be located a distance from afairlead 106 used to guide the mooring line through thehull 101. The rope-parking bollard 220 and thefairlead 106 may further be located at the same or near the same height relative to the hull's 101 waterline as illustrated infig. 7 or immediately above the fairlead as illustrated infig. 6 . - If the
vessel 100 comprises a plurality of vertically arrangeddecks 102 as illustrated infig. 7 , the rope-parking bollard 220 and thefairlead 106 may be located on the same side of thehull 101, but at different deck levels. - As best illustrated in
figs. 6-10 and12 , themooring line 10 further includes anattachment system 20, comprising amooring loop 22, also denoted a rope eye, attached to theend 10a of themooring line 10 via asheave 21 or amooring line connector 21. Thegripper connector 213c and thesheave 21 are mutually designed to ensure a stable, releasable coupling. One example of such a coupling may be arranging an electromagnet on thegripper connector 213c and a permanent magnet on themooring line connector 21. However, other fixing means such as hooks may also be envisaged. - A skilled person will understand that the particular configuration of the
sheave 21 and thegripper connector 213c for aiding the coupling and the guiding process may vary while still achieving the purpose of stable and easy alignable coupling. - To facilitate automatic surrounding or entanglement of the
mooring loop 22 around the rope-parking bollard 220, thebollard head 221 is configured such that thebollard head 221 can enter through themooring loop 22. Themooring loop 22 is made elastic, meaning that its initial shape is regained after having been exposed for a load typical for mooring of vessels. For example, themooring loop 22 should regain the initial shape after being exposed for a load of more than 30 kN for at least 1 hour, preferably for a load of more than 50 kN within the same time period. -
Figs. 4 and5 shows an exemplary embodiment of arobotic arm 200 being fixed on thedeck 102 at the right corner of the vessel'saft portion 105. As is apparent fromfig. 4A , thedeck structure 103 includes a high number of obstacles, thereby reducing the possible manoeuvrability space of therobotic arm 200 significantly. - To ensure a high positional degree of freedom, the
robotic arm 200 may be equipped with a plurality of robotic arm sections 204,206, 211, where at least some of the sections are movable relative to each other. - In one particular embodiment shown in the figures the
robotic arm 200 comprises a total of three robotic arm sections 204,206, 211 which are interlinked in the following manner: - a
deck base 201 in the form of a cylinder is fixed to the vessel'sdeck 102, - a
robotic arm base 202 in the form of a fork is rotatably fixed to thedeck base 102 via adeck swivel 203 such that the rotational axis of therobotic arm base 202 is perpendicular to the deck floor at and in the vicinity of thedeck base 201, - an end of the inner
robotic arm section 204 is pivotably fixed to therobotic arm base 202 via a roboticarm base swivel 205 such that the rotation axis of thesection 204 is parallel to the deck floor at and in the vicinity of thedeck base 201, - an end of the second
robotic arm section 206 is rotatably fixed to the other end of the innerrobotic arm section 204 via athird swivel 207 such that both the longitudinal direction and the rotational axis of thesection 206 are aligned with the longitudinal direction of theinner section 204, - an end of the outer
robotic arm section 211 is rotatably fixed to the other end of thesecond section 206 via afourth swivel 210 such that the longitudinal direction of theouter section 211 is aligned, but oppositely directed, to thesecond section 206, and the rotational axis of theouter section 211 is parallel to the rotational axis of thesecond section 206. - Note that the above-mentioned configuration of the
robotic arm 200 is only one of many exemplary configurations that allows high degree of movements despite of relativelycomplex deck structure 103. A skilled person understands that modifications such as changing the number of robotic arm sections, the direction of axis of rotations, the relative direction of the sections and the section lengths are possible without departing from the stated purpose of the invention. - As best shown in
fig. 4B and9 , the other end of theouter section 211 may constitute agripper assembly 213 comprising - an
inner rotary device 213a having an axis of rotation aligned along the longitudinal direction of theouter section 211, - a
mid-rotary device 213b having an axis of rotation perpendicular to the axis of rotation of theinner rotary device 213a and - a
gripper connector 213c comprising an outer rotary device having an axis of rotation perpendicular to the axes of rotation of both the inner and themid rotary devices - As mentioned above, the
gripper assembly 213 is generally configured to enable releasable gripping of thesheave 21 arranged between themooring loop 22 and theend 10a of themooring line 10. Furthermore, thegripper assembly 213 is, in cooperation with the robotic arm sections, generally configured to manoeuvre themooring loop 22 around a rope-parking bollard 220 or a mooring structure such as abollard 2 on aquay 1. Hence, the configuration of thegripper assembly 213 may be modified with respect to inter alia the number of rotary devices, the axes of rotations and the component sizes, without departing from the stated purpose. - Moreover, all or some of the rotating means on the
robotic arm 200 such as the swivels 203,205,207,210 and/orrotary devices - The vessel also comprises an
object sensing system 30 configured to detect the surrounding structures. In the embodiment shown infig. 10a and 10b , asensor camera 30a constituting a part of theobject sensing system 30 is arranged on the midrotary device 213b, thereby enabling detection of an area in the vicinity of thegripper assembly 213. Hence, structures such as rope-parking bollards 220 orbollards 2 may be detected and analysed with respect to position and size. - The
object sensing system 30 is configured to detect objects within a maximum allowable distance, for example 100 m, 80 m, 70 m, 50 m, 30 m, 10 m or 5 m. - In general, the
object sensing system 30 may comprise a plurality of sensor components distributed on thevessel 100 to ensure detection and analyses of the surrounding environment and thereby allowing a successful mooring with little or no need of human intervention. For example, such sensor components may be arranged on each or some of the robotic arm sections, as well as on thegripper assembly 213 or on the rope-parking bollard 220. Sensor components on other parts of thevessel 100 such as onwinches 11,fairleads 106, mooring line guides 12,deck structure 103, etc, may be envisaged to further aid the positioning of therobotic arm 200 and/or themooring line 10 and/or themooring loop 22. -
Fig. 11 shows asensing area 31 set up by at least part of theobject sensing system 30, within which any structure such as rope-parking bollards 220 may be detected and analysed with respect to position and size. - With reference to
fig. 4 B andfigs. 5-10 , the different steps to ensure a successful transfer of theattachment system 20 from or to a rope-parking bollard 220, may proceed as follows: - The swivels 203,205,207,210, of the
robotic arm 200 is operated to approach the rope-parking bollard 22 and theattachment system 20 comprising thesheave 21 and therope eye 22 surrounding the rope-parking bollard 220. - The
gripper assembly 213 at the end of theouter section 211 is arranged adjacent to thesheave 21 between themooring loop 22 and themooring line end 10a. - The
object sensing system 30 is used to detecte.g. deck structures 103 not pre-registered in the robotic arm's database and/or to verify correct entry in such database, thereby allowing therobotic arm 200 to make necessary movements to avoid undesired impacts. Theobject sensing system 30 may also be used to locate the exact location of operational structures such as thesheave 21. - If needed, one or more of the
rotary devices sheave 21 to ensure that thegripper connector 213c is close enough, and in a favourable orientation, to allow releasable coupling with thesheave 21. - The releasable coupling is established, for example by activating an electromagnet or operating a claw.
- The swivels 203,205,207,210, of the
robotic arm 200 is operated to transport themooring loop 22, thesheave 21 and themooring line end 10a to a position adjacent abollard 2 on the quay 1 (seefig. 5 C andD ). As forstep 1, theobject sensing system 30 may be used to detect the position and the size of thebollard 2 to enable mooring, and/or to detect the positions and sizes other type of obstacles in order for therobotic arm 200 to make necessary adjustments to avoid undesired impacts. - One or more of the
rotary devices rope eye 22 around the bollard 2 (seefig. 5 C-F ,fig 9 A-D andfig. 10 A-C ). For example, the mutual operation of the swivels 203,205,207,210, and therotary devices rope eye 22 until the opening is facing the side of the bollard 2 (seefig. 5 D andfig. 9 A) , then guidemooring loop 22 around thebollard 2 by translational and/or rotational movement towards thebollard 2. In an alternative procedure, themooring loop 22 may be positioned directly above thebollard 2 with its opening facing down towards the top of the bollard 2 (seefig. 10 A-C ), followed by a substantially translation movement of themooring loop 22 downwards. - The coupling between the
gripper connector 213c and thesheave 21 is released, for example by sending a signal to the electromagnet or by opening the claw. - The swivels 203,205,207,210, is operated to move the
robotic arm 200 back to its parked position on thedeck 102 or at thehull 101, that is with themooring loop 22 arranged around the rope-parking bollard 220 (seefig. 4 ). - The arrangement of the
mooring loop 22 around the rope-parking bollard 220 may proceed as for the arrangement around thebollard 2 as described above. - It is understood by the person skilled in the art, that the rope-
parking bollard 220 is configured to facilitate attachment of theattachment system 20, when theattachment system 20 is not being used for other purposes, for example mooring thevessel 100 to abollard 2 on aquay 1. The rope-parking 220 bollard thus provides a predetermined location for theattachment system 20, where theattachment system 20 can be retrieved or placed, for example by therobotic arm 200. Therobotic arm 200 may be guided to the rope-parking bollard 220 automatically by a remote-control unit. - It is appreciated that certain features of the invention, which, for clarity, have been described above in the context of separate embodiments, may also be provided in combination in a single embodiment. Conversely, various features of the invention, which, for brevity, have been described in the context of a single embodiment, may also be provided separately or in any suitable sub-combination.
List of reference numerals / letters: 1 Quay / quay structure 2 Bollard on quay structure 10 Mooring line 10a Mooring line end 11 Winch for mooring line 11a Drum 11b Winch motor 12 Mooring line guide 20 Attachment system at mooring line end 21 Mooring line connector / mooring line magnet / sheave / rope eye connector 21a Guiding structure of mooring line connector 22 Mooring loop / rope eye 30 Object sensor system for detecting and analysing surrounding structure. 30a Sensor camera 31 Sensing area of the object sensing system 100 Vessel 101 Hull 102 Deck 103 Deck structure / underlying structure 104 Bow part of vessel 105 Aft part of vessel 106 Chock / fairlead 200 Robotic arm / manipulator arm 201 Deck base 202 Fork shaped structure / fork / robotic arm base 203 First swivel between deck base and fork base, deck swivel 204 First robotic arm section / inner robotic arm section 205 Second swivel between fork base and first robotic arm section / robotic arm base swivel 206 Second robotic arm section rotationally arranged relative to first robotic arm 207 Third swivel between first robotic arm section and second robotic arm section 210 Fourth swivel between second robotic arm section and outer robotic arm section 211 Outer robotic arm section rotationally arranged relative to the second robotic arm section 213 Robotic arm end / gripper assembly 213a First rotary device with an axis of rotation along the longitudinal direction of the outer robotic arm section / inner rotary device 213b Second rotary device with an axis of rotation perpendicular to the axis of rotation of the first rotary device 213c Gripper connector having a third rotary device with an axis of rotation perpendicular to the axes of rotation of the first and second rotary device for releasable coupling to mooring connector / gripper magnet 213c1 Guiding structure of gripper connector 213c2 Connector coil in gripper electromagnet 220 Bollard /parking bollard/ rope-parking bollard placed on ship hull 221 Bollard head placed on ship hull 222 Bollard column placed on ship hull 222a Bollard column proximal end 222b Bollard column distal end 223 Signal communication system on parking bollard 230 Hull recess
Claims (19)
- A vessel (100) comprising:- a hull (101) for floating in a body of water,- a rope-parking bollard (220) comprising
a bollard column (222) having a proximal longitudinal end and a distal longitudinal end,∘ a bollard head (221) arranged at the distal longitudinal end of the bollard column (222), and∘ a transmission system (223) comprising at least one of a receiver, a transmitter and a transceiver for allowing wireless communication with a remote-control system,∘ wherein the cross-sectional area of the bollard head (221) oriented perpendicular to the longitudinal direction of the bollard column (222) is larger than the corresponding cross-sectional area of the bollard column (222),∘ wherein the rope-parking bollard (220) is fixed to the hull (101) at the proximal longitudinal end of the bollard column (222), and- a mooring system for automatic mooring to one or more bollards (2) on a quay structure (1),wherein at least a bollard head (221) of the rope-parking bollard (220) protrudes from an external side of the hull (101). - The vessel (100) according to claim 1,
characterized in that the longitudinal direction of the bollard column (222) is perpendicular to the side of the hull (101). - The vessel (100) according to claim 1 or 2,
characterized in that the proximal longitudinal end of the bollard column (222) is fixed into a hull recess (230) formed within the side of the hull (101). - The vessel (100) according to claim 3,
characterized in that the hull recess (230) has a depth into the side of the hull (101) which is at least 20 % of the length of the bollard column (222) along its longitudinal direction - The vessel (100) according to any of the preceding claims,
characterized in that the vessel (100) further comprises plurality of rope-parking bollards (220). - The vessel (100) according to any of the preceding claims,
characterized in that the vessel (100) further comprisesa mooring line (10) having a mooring line end (10a),an attachment system (20) fixed to the mooring line end (10a) for allowing releasable attachment to the rope-parking bollard (220). - The vessel (100) according to any of the preceding claims,
characterized in that the vessel (100) further comprisesa mooring line (10) having a mooring line end (10a),an attachment system (20) fixed to the mooring line end (10a) for allowing releasable attachment to the rope-parking bollard (220),wherein the rope-parking bollard (220) further comprises
a bollard transmission system (223) comprising a transmitter, wherein the bollard transmission system (223) is configured to transmit a signal to a remote-control system when the attachment system (20) has established a releasable attachment to the rope-parking bollard (220). - The vessel (100) according to any of the preceding claims,
characterized in that the vessel (100) further comprises- a mooring line (10) comprising a mooring line end (10a) and- an attachment system (20) for retrievable attachment to a rope-parking bollard (220), the attachment system (20) comprising- a mooring loop (22), wherein the minimum size of the opening of the mooring loop (22) is sufficient to allow the bollard head (221) to enter there through, and- a mooring line connector (21) connecting the mooring loop (22) to the mooring line end (10a). - The vessel (100) according to claim 8,
characterized in that the vessel (100) further comprises- a winch (11) for winching the mooring line (10), wherein a second mooring line end of the mooring line (10) is at least indirectly attached to the winch (11), and- a robotic arm (200) comprising an outer robotic arm section (211) with a gripper assembly (213) at a first longitudinal end, wherein the gripper assembly (213) is configured to releasably grip the mooring line connector (21) to allow transfer of the attachment system (20) from one location to another. - The vessel (100) according to claim 9,
characterized in that the gripper assembly (213) is rotatable relative to the outer robotic arm section (211). - The vessel (100) according to claim 9 or 10,
characterized in that the gripper assembly (213) comprises- a first rotary device (213a) rotatably fixed to the first longitudinal end of the outer robotic arm section (211) and- a second rotary device (213b) rotatably fixed to the first rotary device (213a) with an axis of rotation different to the axis of rotation of the first rotary device (213a). - The vessel (100) according to claim 11,
characterized in that the gripper assembly (213) further comprises- a gripper connector (213c) rotatably fixed to the second rotary device (213b) with an axis of rotation different to the axis of rotation of the second rotary device (213b). - The vessel (100) according any of the claims 9 to 12,
characterized in that the vessel (100) comprises a plurality of robotic arms (200). - The vessel (100) according to any of the claims 9-13,
characterized in that the vessel (100) further comprises a plurality of rope-parking bollards (220) and that at least one of the rope-parking bollards (220) are placed within the maximum extent of the robotic arm (200). - The vessel (100) according to any of the preceding claims,
characterized in that the vessel (100) further comprises an object sensor system (30) for sensing the position and size of objects within a predetermined distance range. - A method for automatically transferring a mooring line (10) from a vessel (100) to an external location, wherein the vessel (100) is in accordance with any of the preceding claims 1-15 and further comprises- an object sensor system (30) for sensing the position and size of objects located within a maximum allowable distance from the object sensor system (30), and wherein the mooring system comprises- a mooring line (10) comprising a first mooring line end (10a) and a second mooring line end,- an attachment system (20) for retrievable attachment to the rope-parking bollard (220), the attachment system (20) comprising a mooring loop (22) having an opening with a size sufficient to allow the rope-parking bollard (220) to enter there through and a mooring line connector (21) connecting the mooring loop (22) and the first mooring line end (10a),- a winch (11) for winching the mooring line (10), wherein the second mooring line end is at least indirectly attached to the winch (11), and- a robotic arm (200) comprisinga deck base (201) rotatably fixed at least indirectly to a deck (101) of the vessel (100) andan outer robotic arm section (211) having a first longitudinal end rotatably fixed to a gripper assembly (213) and a second longitudinal end rotatably fixed at least indirectly to the deck base (201),wherein the method comprises the following steps:A. manoeuvring the outer robotic arm section (211) by operating at least one swivel (203,205,207,210,) located between the deck base (201) and the outer robotic arm section (211) to a position where the gripper assembly (213) is arranged adjacent to the attachment system (20), wherein the mooring loop (22) of the attachment system (20) is surrounding the rope-parking bollard (220)B. operating the winch (11) to slacken the tension of the mooring line (10),C. releasably attaching the gripper assembly (213) to the mooring line connector (21),D. guiding the mooring loop (22) by operating at least one rotary device (213a,213b,213c) of the gripper assembly (213) or at least one swivel (203,205,207,210,) or a combination thereof such that the mooring loop (22) is released from the rope-parking bollard (220) andE. guiding the attachment system (20) by operating at least one rotary device (213a,213b,213c) of the gripper assembly (13) or at least one swivel (203,205,207,210,) or a combination thereof such that the attachment system (20) is guided to the external location.
- The method according to claim 16, wherein the external location is the location of a bollard (2) on a quay structure (1) having been previously detected by the object sensor system (30) and
wherein the method further comprises the following steps:F. guiding the attachment system (20) by operating at least one rotary device (213a, 213b, 213c) of the gripper assembly (13) or at least one swivel (203, 205, 207, 210,) or a combination thereof such that the mooring loop (22) surrounds at least part of the bollard (2) on the quay structure (1),G. disattaching the gripper assembly (213) from the attachment system (20), andH. operating the winch (11) to tighten the mooring line (10) between the winch (11) and the bollard (2). - The method according to any one of the claims 16 to 17, characterized in that at least one of the object sensor system (30), the attachment system (20), the winch (11), the rope-parking bollard (220) and the robotic arm (200) comprise transmitting means allowing wireless communication with a remote data processing apparatus configured to perform the steps A-E.
- A data processing apparatus comprising a processor configured to perform the method according to the steps A-E of any of claims 17 to 18.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NO20190367A NO345183B1 (en) | 2019-03-18 | 2019-03-18 | A vessel having a mooring system for automatic mooring to a bollard and a method for mooring |
PCT/EP2020/057259 WO2020187900A1 (en) | 2019-03-18 | 2020-03-17 | A vessel having a mooring system for automatic mooring to a bollard and a method for mooring |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3941819A1 EP3941819A1 (en) | 2022-01-26 |
EP3941819B1 true EP3941819B1 (en) | 2023-03-15 |
Family
ID=69903138
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP20712901.6A Active EP3941819B1 (en) | 2019-03-18 | 2020-03-17 | A vessel having a mooring system for automatic mooring to a bollard and a method for mooring |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP3941819B1 (en) |
DK (1) | DK3941819T3 (en) |
FI (1) | FI3941819T3 (en) |
NO (1) | NO345183B1 (en) |
PL (1) | PL3941819T3 (en) |
WO (1) | WO2020187900A1 (en) |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB122357A (en) * | 1918-06-15 | 1919-01-23 | Andrew Simpson | Improvements in and relating to Bollards or Mooring Bitts. |
GB327939A (en) * | 1929-09-10 | 1930-04-17 | Clement Henry Stevens | Improvements in and relating to the construction of bollards |
JPS56116586A (en) * | 1980-02-20 | 1981-09-12 | Mitsubishi Heavy Ind Ltd | Mooring equipment |
JPS5942133B2 (en) * | 1980-06-06 | 1984-10-12 | 日立造船株式会社 | Automatic mooring method for ships |
JPS58136585A (en) * | 1982-02-10 | 1983-08-13 | Hitachi Zosen Corp | Ship mooring method |
JPS58119490U (en) * | 1982-02-10 | 1983-08-15 | 日立造船株式会社 | Mooring device |
JPS59221613A (en) * | 1983-05-31 | 1984-12-13 | Mitsubishi Heavy Ind Ltd | Measuring device of ship position |
JPS6018081U (en) * | 1983-07-16 | 1985-02-07 | 三菱重工業株式会社 | automatic mooring device |
US4729332A (en) * | 1983-12-21 | 1988-03-08 | Nippon Kokan Kabushiki Kaisha | Mooring apparatus |
JPS60244693A (en) * | 1984-05-17 | 1985-12-04 | Nippon Kokan Kk <Nkk> | Mooring method for ice water sailing ship |
JPH0324471Y2 (en) * | 1984-11-24 | 1991-05-28 | ||
NL9302289A (en) * | 1993-12-31 | 1995-07-17 | Sven Olaf Aarts | Method for manipulating a connecting element in shipping. |
DE602007001263D1 (en) * | 2006-06-22 | 2009-07-23 | Food & Food Di Morelli Stefano | Automatic mooring system |
DE202009009334U1 (en) * | 2009-07-07 | 2009-09-17 | Carl Cloos Schweißtechnik GmbH | Seven-axis articulated robot |
KR20130134838A (en) * | 2012-05-31 | 2013-12-10 | 한국과학기술원 | Robot arm apparatus for mooring |
CN105346676A (en) * | 2015-09-23 | 2016-02-24 | 江苏神力集团船舶设备有限责任公司 | Mooring bollard with spherical head |
FI130355B (en) | 2016-01-29 | 2023-07-17 | Rolls Royce Oy Ab | Autonomous operation of a vessel |
DK201670186A1 (en) * | 2016-03-31 | 2017-10-16 | A P Møller - Mærsk As | A method and system for operating one or more tugboats |
DK179138B1 (en) * | 2016-03-31 | 2017-11-27 | A P Møller - Mærsk As | A boat with a mooring system and a method for automatically mooring a boat |
-
2019
- 2019-03-18 NO NO20190367A patent/NO345183B1/en unknown
-
2020
- 2020-03-17 FI FIEP20712901.6T patent/FI3941819T3/en active
- 2020-03-17 EP EP20712901.6A patent/EP3941819B1/en active Active
- 2020-03-17 DK DK20712901.6T patent/DK3941819T3/en active
- 2020-03-17 WO PCT/EP2020/057259 patent/WO2020187900A1/en active Search and Examination
- 2020-03-17 PL PL20712901.6T patent/PL3941819T3/en unknown
Also Published As
Publication number | Publication date |
---|---|
WO2020187900A1 (en) | 2020-09-24 |
FI3941819T3 (en) | 2023-06-12 |
NO20190367A1 (en) | 2020-09-21 |
NO345183B1 (en) | 2020-10-26 |
EP3941819A1 (en) | 2022-01-26 |
PL3941819T3 (en) | 2023-07-31 |
DK3941819T3 (en) | 2023-06-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11845521B2 (en) | Marine structure comprising a launch and recovery system | |
EP3321162B1 (en) | Unmanned vessel having coupling apparatus and recovery method therefor | |
WO2017167877A1 (en) | A boat with a mooring system and a method for automatically mooring a boat | |
US11279446B2 (en) | Disconnectable tower yoke mooring system and methods for using same | |
KR102333334B1 (en) | Coupling systems for the transport of hydrocarbons in the high seas | |
EP3941818B1 (en) | A mooring structure for automatic mooring of a vessel to a quay and a method for mooring | |
KR101722249B1 (en) | Apparatus for connecting floating structure | |
EP3941819B1 (en) | A vessel having a mooring system for automatic mooring to a bollard and a method for mooring | |
US11267532B2 (en) | Disconnectable tower yoke mooring system and methods for using same | |
EP3740423B1 (en) | A vessel with a semi automatic or automatic mooring system and method | |
EP3697680B1 (en) | Pull-in buoy | |
EP3622123A1 (en) | Floating pipeline with coupling assembly | |
WO2022105974A1 (en) | Line handling device and vessel comprising the line handling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20211013 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20221014 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602020008887 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1553871 Country of ref document: AT Kind code of ref document: T Effective date: 20230415 |
|
RAP4 | Party data changed (patent owner data changed or rights of a patent transferred) |
Owner name: MACGREGOR NORWAY AS |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20230615 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230522 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20230315 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230315 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230615 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230315 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230315 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230315 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20230331 Year of fee payment: 4 Ref country code: FR Payment date: 20230608 Year of fee payment: 4 Ref country code: DK Payment date: 20230615 Year of fee payment: 4 Ref country code: DE Payment date: 20230612 Year of fee payment: 4 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1553871 Country of ref document: AT Kind code of ref document: T Effective date: 20230315 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230315 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230616 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20230612 Year of fee payment: 4 Ref country code: FI Payment date: 20230612 Year of fee payment: 4 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230315 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230315 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230717 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230315 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230315 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230315 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230315 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230315 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230715 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20230612 Year of fee payment: 4 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20230331 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602020008887 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230317 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230315 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230315 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230315 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230331 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230317 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230331 |
|
26N | No opposition filed |
Effective date: 20231218 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230331 |