EP2908072B1 - Heat pump-type heating and hot-water supply apparatus - Google Patents

Heat pump-type heating and hot-water supply apparatus Download PDF

Info

Publication number
EP2908072B1
EP2908072B1 EP15153933.5A EP15153933A EP2908072B1 EP 2908072 B1 EP2908072 B1 EP 2908072B1 EP 15153933 A EP15153933 A EP 15153933A EP 2908072 B1 EP2908072 B1 EP 2908072B1
Authority
EP
European Patent Office
Prior art keywords
water
refrigerant
hot
heat exchanger
water supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP15153933.5A
Other languages
German (de)
English (en)
French (fr)
Other versions
EP2908072A1 (en
Inventor
Hiroshi Abiko
Masanori Noguchi
Nobuyuki DOBATA
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu General Ltd
Original Assignee
Fujitsu General Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu General Ltd filed Critical Fujitsu General Ltd
Publication of EP2908072A1 publication Critical patent/EP2908072A1/en
Application granted granted Critical
Publication of EP2908072B1 publication Critical patent/EP2908072B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B30/00Heat pumps
    • F25B30/02Heat pumps of the compression type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B6/00Compression machines, plants or systems, with several condenser circuits
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2339/00Details of evaporators; Details of condensers
    • F25B2339/04Details of condensers
    • F25B2339/047Water-cooled condensers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/06Several compression cycles arranged in parallel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/25Control of valves
    • F25B2600/2507Flow-diverting valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/21Temperatures
    • F25B2700/2115Temperatures of a compressor or the drive means therefor
    • F25B2700/21152Temperatures of a compressor or the drive means therefor at the discharge side of the compressor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/21Temperatures
    • F25B2700/2116Temperatures of a condenser
    • F25B2700/21161Temperatures of a condenser of the fluid heated by the condenser
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/21Temperatures
    • F25B2700/2117Temperatures of an evaporator
    • F25B2700/21174Temperatures of an evaporator of the refrigerant at the inlet of the evaporator

Definitions

  • the present invention relates to a heat pump-type heating and hot-water supply apparatus that exchanges heat between refrigerant and water.
  • a heat pump-type heating and hot-water supply apparatus which uses hot water generated by heat exchange between refrigerant and water for heating and hot-water supply.
  • Such heat pump-type heating and hot-water supply apparatuses include one having a plurality of heat pump circuits and a hot-water supply circuit (see, for example, JP-A-2005-337626 ).
  • the heat pump circuit includes a compressor, a water/refrigerant heat exchanger that exchanges heat between refrigerant and water, an expansion valve, a heat source side heat exchanger, and a refrigerant pipe that connects them sequentially.
  • the hot-water supply circuit supplies, by a circulation pump, hot water heated by the water/refrigerant heat exchangers to a heating load such as a floor heating panel or bathroom heating apparatus, or a hot-water supply load such as a water storage tank.
  • At least one of the plurality of heat pump circuits supplies the hot water to the hot-water supply load. Furthermore, a heat pump circuit other than the above heat pump circuit supplies the hot water to the heating load. In the heat pump-type heating and hot-water supply apparatus, the hot-water supply load and the heating load can be operated simultaneously.
  • the heat load of the hot-water supply load is generally larger than the heat load of the heating operation. This is because the hot water supply temperature of the hot-water supply load is higher than the set temperature of the heating load (a room temperature being a target temperature of a room where the heating load is installed).
  • the temperature of the hot water flowing out of the water/refrigerant heat exchanger of the heat pump circuit that supplies the hot water to the hot-water supply load (hereinafter described as the going temperature) is higher than the going temperature at the water/refrigerant heat exchanger of the heat pump circuit that supplies the hot water to the heating load.
  • the temperature of the refrigerant flowing out of the water/refrigerant heat exchanger of the heat pump circuit that supplies the hot water to the hot-water supply load may be higher than the going temperature at the water/refrigerant heat exchanger of the heat pump circuit that supplies the hot water to the heating load.
  • the refrigerant flowing out of the water/refrigerant heat exchanger of the heat pump circuit that supplies the hot water to the hot-water supply load goes through the heat source side heat exchanger, and is simply suctioned again by the compressor. Hence, it cannot be said that the heat of the refrigerant flowing out of the hot-water supply load can be effectively used.
  • An object of the present invention is to provide a heat pump-type heating and hot-water supply apparatus that effectively uses the heat of refrigerant flowing out of a hot-water supply load to improve the operating efficiency.
  • a heat pump-type heating and hot-water supply apparatus includes: a first heat pump circuit including a first compressor, a first water/refrigerant heat exchanger, first flow rate adjustment means, a first heat source side heat exchanger, and a first refrigerant pipe connecting them sequentially; a second heat pump circuit including a second compressor, a second water/refrigerant heat exchanger, second flow rate adjustment means, a second heat source side heat exchanger, and a second refrigerant pipe connecting them sequentially; a heating hot-water circuit including a heating load, a circulation pump, the first water/refrigerant heat exchanger, the second water/refrigerant heat exchanger, and a hot water pipe connecting them sequentially; a hot-water supply refrigerant circuit including a hot-water supply load, an outgoing refrigerant pipe through which refrigerant flowing from the second compressor to the hot-water supply load flows, and a return refrigerant pipe through which
  • the heat pump-type heating and hot-water supply apparatus of the present invention when the heating load and the hot-water supply load are operated simultaneously, heat is exchanged between the refrigerant flowing out of the hot-water supply load and flowing through the return refrigerant pipe and the water circulating through the heating hot-water circuit. Consequently, the operating efficiency of the heat pump-type heating and hot-water supply apparatus upon the simultaneous operation of the heating load and the hot-water supply load can be improved.
  • the heat pump-type heating and hot-water supply apparatus includes an indoor unit being a heating load and a water storage tank being a hot-water supply load, which are of the present invention.
  • the hot water that has exchanged heat with refrigerant in a water/refrigerant heat exchanger is circulated to the indoor unit to heat a room.
  • refrigerant is circulated to a heat exchange unit installed inside the water storage tank to heat the water stored in the water storage tank.
  • Fig. 1 illustrates a configuration of a heat pump-type heating and hot-water supply apparatus 100 according to an embodiment.
  • the heat pump-type heating and hot-water supply apparatus 100 includes a first heat pump circuit 10a, a second heat pump circuit 10b, a heating hot-water circuit 30, and a hot-water supply refrigerant circuit 40.
  • Each of the first heat pump circuit 10a and the second heat pump circuit 10b can be operated independently.
  • the second heat pump circuit 10b operates as a heat pump circuit for supplying hot water.
  • the first heat pump circuit 10a includes a compressor (first compressor) 1a, a water/refrigerant heat exchanger (first water/refrigerant heat exchanger) 2a, an expansion valve (first flow rate adjustment means) 3a, a heat source side heat exchanger (first heat source side heat exchanger) 4a, an accumulator 5a, and a refrigerant pipe (first refrigerant pipe) 11a that connects them sequentially.
  • the compressor 1a is a variable capacity compressor. In other words, the operating capacity of the compressor 1a is variable by an unillustrated motor, whose speed is controlled by an inverter, driving the compressor 1a.
  • the water/refrigerant heat exchanger 2a includes a refrigerant side flow passage 2aa connected to the refrigerant pipe 11a, and a water side flow passage 2ab connected to a hot water pipe 31 of the heating hot-water circuit 30 described below.
  • the water/refrigerant heat exchanger 2a exchanges heat between the refrigerant flowing through the refrigerant side flow passage 2aa and the water flowing through the water side flow passage 2ab.
  • the expansion valve 3a is an electronic expansion valve. The opening degree of the expansion valve 3a is adjusted to adjust the amount of refrigerant flowing into the heat source side heat exchanger 4a.
  • the heat source side heat exchanger 4a exchanges heat between the refrigerant and the air flowing into the heat source side heat exchanger 4a by the rotation of an outdoor fan 6a placed in the vicinity of the heat source side heat exchanger 4a.
  • the accumulator 5a separates the refrigerant having flowed from the heat source side heat exchanger 4a into liquid refrigerant and gas refrigerant, and causes the compressor 1a to suction only the gas refrigerant.
  • the first heat pump circuit 10a includes a discharge temperature sensor 51a, a refrigerant temperature sensor 52a, a heat exchange temperature sensor 53a, and an outside temperature sensor 54a.
  • the discharge temperature sensor 51a is provided to the refrigerant pipe 11a in the vicinity of a refrigerant discharge side of the compressor 1a, and detects the temperature of the refrigerant discharged from the compressor 1a.
  • the refrigerant temperature sensor 52a is provided to the refrigerant pipe 11a between the water/refrigerant heat exchanger 2a and the expansion valve 3a, and detects the temperature of the refrigerant flowing out of the water/refrigerant heat exchanger 2a.
  • the heat exchange temperature sensor 53a is provided to the refrigerant pipe 11a between the expansion valve 3a and the heat source side heat exchanger 4a, and detects the temperature of the refrigerant flowing into the heat source side heat exchanger 4a.
  • the outside temperature sensor 54a is placed in the vicinity of the heat source side heat exchanger 4a, and detects the outside temperature being the outdoor temperature.
  • the second heat pump circuit 10b includes a compressor (second compressor) 1b, a first three-way valve (first flow passage switching means) 7, a water/refrigerant heat exchanger (second water/refrigerant heat exchanger) 2b, a second three-way valve (second flow passage switching means) 8, an expansion valve (second flow rate adjustment means) 3b, a heat source side heat exchanger (second heat source side heat exchanger) 4b, an accumulator 5b, and a refrigerant pipe (second refrigerant pipe) 11b that connects them sequentially.
  • the compressor 1b is a variable capacity compressor. In other words, the operating capacity of the compressor 1b is variable by an unillustrated motor, whose speed is controlled by an inverter, driving the compressor 1b.
  • the water/refrigerant heat exchanger 2b includes a refrigerant side flow passage 2ba connected to the refrigerant pipe 11b, and a water side flow passage 2bb connected to a hot water pipe 31 of the heating hot-water circuit 30 described below.
  • the water/refrigerant heat exchanger 2b exchanges heat between the refrigerant flowing through the refrigerant side flow passage 2ba and the water flowing through the water side flow passage 2bb.
  • the expansion valve 3b is an electronic expansion valve. The opening degree of the expansion valve 3b is adjusted to adjust the amount of refrigerant flowing into the heat source side heat exchanger 4b.
  • the heat source side heat exchanger 4b exchanges heat between the refrigerant and the air flowing into the heat source side heat exchanger 4b by the rotation of an outdoor fan 6b placed in the vicinity of the heat source side heat exchanger 4b.
  • the accumulator 5b separates the refrigerant having flowed from the heat source side heat exchanger 4b into liquid refrigerant and gas refrigerant, and causes the compressor 1b to suction only the gas refrigerant.
  • the first three-way valve 7 includes three ports: a port a, a port b, and a port c.
  • the port a is connected by the refrigerant pipe 11b to a refrigerant discharge side of the compressor 1b.
  • the port b is connected by the refrigerant pipe 11b to one end of the refrigerant side flow passage 2ba of the water/refrigerant heat exchanger 2b.
  • the port c is connected to one end of an outgoing refrigerant pipe 41 described below. Therefore, the first three-way valve 7 is configured to flow the refrigerant discharged from the compressor 1b to the outgoing refrigerant pipe 41 or the water/refrigerant heat exchanger 2b.
  • the port c is closed (the closed port c is filled in with black in Fig. 1 ), and the port a communicates with the port b.
  • the second three-way valve 8 includes three ports: a port d, a port e, and a port f.
  • the port d is connected by the refrigerant pipe 11b to the other end of the refrigerant side flow passage 2ba of the water/refrigerant heat exchanger 2b.
  • the port e is connected by the refrigerant pipe 11b to the expansion valve 3b.
  • the port f is connected to one end of a return refrigerant pipe 42 described below. Therefore, the second three-way valve 8 is configured to switch the refrigerant to flow into the expansion valve 3b between the refrigerant from the water/refrigerant heat exchanger 2b and the refrigerant from the return refrigerant pipe 42.
  • the port f is closed (the closed port f is filled in with black in Fig. 1 ), and the port d communicates with the port e.
  • the second heat pump circuit 10b includes a discharge temperature sensor 51b, a refrigerant temperature sensor 52b, a heat exchange temperature sensor 53b, and an outside temperature sensor 54b.
  • the discharge temperature sensor 51b is provided to the refrigerant pipe 11b in the vicinity of a refrigerant discharge port of the compressor 1b, and detects the temperature of the refrigerant discharged from the compressor 1b.
  • the refrigerant temperature sensor 52b is provided to the refrigerant pipe 11b between the water/refrigerant heat exchanger 2b and the expansion valve 3b, and detects the temperature of the refrigerant flowing out of the water/refrigerant heat exchanger 2b.
  • the heat exchange temperature sensor 53b is provided to the refrigerant pipe 11b between the expansion valve 3b and the heat source side heat exchanger 4b, and detects the temperature of the refrigerant flowing into the heat source side heat exchanger 4b.
  • the outside temperature sensor 54b is placed in the vicinity of the heat source side heat exchanger 4b, and detects the outside temperature being the outdoor temperature.
  • the heating hot-water circuit 30 includes an indoor unit 21 being a heating load, a circulation pump 22, the water/refrigerant heat exchanger 2a, a third three-way valve (third flow passage switching means) 9, the water/refrigerant heat exchanger 2b, an auxiliary water/refrigerant heat exchanger (third water/refrigerant heat exchanger) 23, and the hot water pipe 31 that connects them sequentially.
  • the indoor unit 21 is a floor heating panel or radiator.
  • the hot water flowing through the indoor unit 21 heats the air of a room where the indoor unit 21 is installed, and accordingly the room is heated.
  • the circulation pump 22 is a variable capacity pump. The circulation pump 22 is driven to circulate the hot water in the heating hot-water circuit 30.
  • the water/refrigerant heat exchangers 2a and 2b are placed between the circulation pump 22 and the auxiliary water/refrigerant heat exchanger 23.
  • the water side flow passage 2ab of the water/refrigerant heat exchanger 2a and the water side flow passage 2bb of the water/refrigerant heat exchanger 2b are respectively connected to the hot water pipe 31.
  • the auxiliary water/refrigerant heat exchanger 23 includes a water side flow passage 23a connected to the hot water pipe 31, and a refrigerant side flow passage 23b connected to the return refrigerant pipe 42 of the hot-water supply refrigerant circuit 40 described below.
  • the auxiliary water/refrigerant heat exchanger 23 exchanges heat between the refrigerant flowing through the refrigerant side flow passage 23b (the return refrigerant pipe 42) and the water flowing through the water side flow passage 23a (the hot water pipe 31).
  • the third three-way valve 9 includes three ports: a port g, a port h, and a port j.
  • the port g is connected by the hot water pipe 31 to the water side flow passage 2ab of the water/refrigerant heat exchanger 2a.
  • the port h is connected by the hot water pipe 31 to the water side flow passage 2bb of the water/refrigerant heat exchanger 2b.
  • the port j is connected to one end of a bypass pipe 32 that bypasses the water/refrigerant heat exchanger 2b.
  • the other end of the bypass pipe 32 is connected to the hot water pipe 31 between the water/refrigerant heat exchanger 2b and the auxiliary water/refrigerant heat exchanger 23.
  • the port j is closed (the closed port j is filled in with black in Fig. 1 ), and the port g communicates with the port h.
  • the third three-way valve 9 is configured to switch an outlet for water from the water/refrigerant heat exchanger 2a between the water/refrigerant heat exchanger 2b and the auxiliary water/refrigerant heat exchanger 23.
  • the third three-way valve 9 sets the outlet for the water from the water/refrigerant heat exchanger 2a to the water/refrigerant heat exchanger 2b.
  • the third three-way valve 9 sets the outlet for the water from the water/refrigerant heat exchanger 2a to the auxiliary water/refrigerant heat exchanger 23.
  • the heating hot-water circuit 30 includes a first going temperature sensor 55, a second going temperature sensor 56, and a third going temperature sensor 57.
  • the first going temperature sensor 55 is provided to the hot water pipe 31 in the vicinity of the water/refrigerant heat exchanger 2a on the third three-way valve 9 side.
  • the first going temperature sensor 55 detects a first going temperature being the temperature of the water flowing out of the water/refrigerant heat exchanger 2a.
  • the second going temperature sensor 56 is provided to the hot water pipe 31 in the vicinity of the water/refrigerant heat exchanger 2b on the auxiliary water/refrigerant heat exchanger 23 side.
  • the second going temperature sensor 56 detects a second going temperature being the temperature of the water flowing out of the water/refrigerant heat exchanger 2b.
  • the third going temperature sensor 57 is provided to the hot water pipe 31 in the vicinity of the auxiliary water/refrigerant heat exchanger 23 on the indoor unit 21 side.
  • the third going temperature sensor 57 detects a third going temperature being the temperature of the water flowing out of the auxiliary water/refrigerant heat exchanger 23.
  • the hot-water supply refrigerant circuit 40 includes the first three-way valve 7, the water storage tank 24 being the hot-water supply load, the auxiliary water/refrigerant heat exchanger 23, the second three-way valve 8, and the outgoing refrigerant pipe 41 and the return refrigerant pipe 42 that connect them.
  • the water storage tank 24 includes a heat exchange unit 25, a water inlet 26, a hot-water outlet 27, and a water storage sensor 58.
  • the heat exchange unit 25 is formed into a spiral shape and is placed in a lower part of the water storage tank 24.
  • a lower end of the heat exchange unit 25 is connected to the other end of the outgoing refrigerant pipe 41. Moreover, the one end of the outgoing refrigerant pipe 41 is connected to the port c of the first three-way valve 7 as described above. Therefore, the refrigerant flowing from the compressor 1b to the water storage tank 24 (the heat exchange unit 25) flows through the outgoing refrigerant pipe 41.
  • an upper end of the heat exchange unit 25 is connected to the other end of the return refrigerant pipe 42.
  • the one end of the return refrigerant pipe 42 is connected to the port f of the second three-way valve 8 as described above. Therefore, the refrigerant flowing from the water storage tank 24 to the expansion valve 3b flows through the return refrigerant pipe 42.
  • the water inlet 26 is provided at the bottom of the water storage tank 24.
  • the water inlet 26 is directly coupled to an unillustrated water pipe. Water is supplied into the water storage tank 24 from the water pipe via the water inlet 26.
  • the hot-water outlet 27 is provided at the top of the water storage tank 24.
  • the hot-water outlet 27 is connected to a hot water pipe connected to an unillustrated bathtub, wash basin faucet, or the like.
  • the hot water stored in the water storage tank 24 is supplied from the hot-water outlet 27 to the bathtub, wash basin faucet, or the like.
  • the water storage sensor 58 detects the temperature of the hot water stored in the water storage tank 24.
  • the refrigerant side flow passage 23b of the auxiliary water/refrigerant heat exchanger 23 is connected to the return refrigerant pipe 42.
  • the auxiliary water/refrigerant heat exchanger 23 exchanges heat between the refrigerant flowing through the refrigerant side flow passage 23b and the water flowing through the water side flow passage 23a.
  • the port c is closed and the port a communicates with the port b in the first three-way valve 7 of the second heat pump circuit 10b.
  • the port f is closed and the port d communicates with the port e in the second three-way valve 8 of the second heat pump circuit 10b.
  • the port j is closed and the port g communicates with the port h in the third three-way valve 9 of the heating hot-water circuit 30.
  • the compressor 1a of the first heat pump circuit 10a, the compressor 1b of the second heat pump circuit 10b, and the circulation pump 22 of the heating hot-water circuit 30 are driven.
  • a set temperature Ti of the heating operation of the indoor unit 21, which is set by a user is assumed to be 24°C as an example. Furthermore, a target hot water temperature Tt being a target value of the temperature of the hot water flowing into the indoor unit 21 for achieving the set temperature Ti is assumed to be 40°C.
  • the refrigerant compressed and discharged from the compressor 1a (1b) flows into the refrigerant side flow passage 2aa (2ba) of the water/refrigerant heat exchanger 2a (2b).
  • the refrigerant having flowed into the refrigerant side flow passage 2aa (2ba) of the water/refrigerant heat exchanger 2a (2b) is condensed by the heat exchange with the water flowing through the water side flow passage 2ab (2bb) of the water/refrigerant heat exchanger 2a (2b), and flows out of the water/refrigerant heat exchanger 2a (2b).
  • the refrigerant having flowed out of the water/refrigerant heat exchanger 2a (2b) is decompressed upon passage through the expansion valve 3a (3b) and flows into the heat source side heat exchanger 4a (4b).
  • the refrigerant having flowed into the heat source side heat exchanger 4a (4b) evaporates by the heat exchange with the air flowing into the heat source side heat exchanger 4a (4b) by the rotation of the outdoor fan 6a (6b), and flows out of the heat source side heat exchanger 4a (4b).
  • the refrigerant having flowed out of the heat source side heat exchanger 4a (4b) is then suctioned by the compressor 1a (1b) via the accumulator 5a (5b), and compressed again.
  • the water having flowed into the water side flow passage 2ab of the water/refrigerant heat exchanger 2a by the drive of the circulation pump 22 is heated by the heat exchange with the refrigerant flowing through the refrigerant side flow passage 2aa of the water/refrigerant heat exchanger 2a, and becomes a hot water at a first predetermined temperature T1 (for example, 30°C) that is lower than the target hot water temperature Tt.
  • T1 for example, 30°C
  • the hot water flows out of the water/refrigerant heat exchanger 2a.
  • the hot water having flowed out of the water/refrigerant heat exchanger 2a flows into the water side flow passage 2bb of the water/refrigerant heat exchanger 2b via the third three-way valve 9.
  • T2 the target hot water temperature Tt: 40°C
  • the hot water flows out of the water/refrigerant heat exchanger 2b.
  • the hot water having flowed out of the water/refrigerant heat exchanger 2b flows into the indoor unit 21 via the auxiliary water/refrigerant heat exchanger 23.
  • the heat of the hot water having flowed into the indoor unit 21 is dissipated to heat the room where the indoor unit 21 is installed.
  • the speed of the compressor 1a, the opening degree of the expansion valve 3a, and the speed of the outdoor fan 6a are respectively controlled in such a manner that the temperature of the water flowing out of the water/refrigerant heat exchanger 2a reaches the above-mentioned first predetermined temperature T1, in other words, that the hot water temperature detected by the first going temperature sensor 55 reaches the first predetermined temperature T1.
  • the speed of the compressor 1b, the opening degree of the expansion valve 3b, and the speed of the outdoor fan 6b are respectively controlled in such a manner that the temperature of the water flowing out of the water/refrigerant heat exchanger 2b reaches the above-mentioned second predetermined temperature T2, in other words, that the hot water temperature detected by the second going temperature sensor 56 reaches the second predetermined temperature T2.
  • the first heat pump circuit 10a and the second heat pump circuit 10b are operated to increase the temperature of the hot water flowing into the indoor unit 21 to the target hot water temperature Tt. Therefore, an optimum load can be shared by the first heat pump circuit 10a and the second heat pump circuit 10b compared to a case of operating the first heat pump circuit 10a or the second heat pump circuit 10b to increase the temperature of the hot water flowing into the indoor unit 21 to the target hot water temperature Tt.
  • the first heat pump circuit 10a increases the temperature of water to the first predetermined temperature T1.
  • the second heat pump circuit 10b increases the temperature of the hot water heated by the first heat pump circuit 10a to the second predetermined temperature T2.
  • the port b is closed and the port a communicates with the port c in the first three-way valve 7 of the second heat pump circuit 10b.
  • the port d is closed and the port e communicates with the port f in the second three-way valve 8 of the second heat pump circuit 10b.
  • the port h is closed and the port g communicates with the port j in the third three-way valve 9 of the heating hot-water circuit 30.
  • the compressor 1a of the first heat pump circuit 10a, the compressor 1b of the second heat pump circuit 10b, and the circulation pump 22 of the heating hot-water circuit 30 are driven.
  • a set temperature Ti of the heating operation of the indoor unit 21, which is set by a user is assumed to be 24°C as an example.
  • a target hot water temperature Tt being a target value of the temperature of the hot water flowing into the indoor unit 21 for achieving the set temperature Ti is assumed to be 40°C.
  • a water heating temperature Tb being a target temperature upon heating the water stored in the water storage tank 24 is assumed to be 60°C.
  • the flow of the refrigerant in the first heat pump circuit 10a is the same as the above-mentioned case where the heating operation is performed. Accordingly, its description is omitted.
  • the refrigerant compressed and discharged from the compressor 1b flows from the refrigerant pipe 11b through the outgoing refrigerant pipe 41 via the first three-way valve 7, and flows into the heat exchange unit 25 of the water storage tank 24.
  • the refrigerant having flowed into the heat exchange unit 25 exchanges heat with the water stored in the water storage tank 24, and flows out of the heat exchange unit 25.
  • the refrigerant having flowed out of the heat exchange unit 25 flows through the return refrigerant pipe 42, flows into the refrigerant side flow passage 23b of the auxiliary water/refrigerant heat exchanger 23, is condensed by the heat exchange with the water flowing through the water side flow passage 23a of the auxiliary water/refrigerant heat exchanger 23, and flows out of the auxiliary water/refrigerant heat exchanger 23.
  • the refrigerant having flowed out of the auxiliary water/refrigerant heat exchanger 23 flows through the return refrigerant pipe 42 and flows into the refrigerant pipe 11b via the second three-way valve 8.
  • the refrigerant having flowed into the refrigerant pipe 11b is decompressed upon passage through the expansion valve 3b, and flows into the heat source side heat exchanger 4b.
  • the refrigerant having flowed into the heat source side heat exchanger 4b evaporates by the heat exchange with the air flowing into the heat source side heat exchanger 4b by the rotation of the outdoor fan 6b, and flows out of the heat source side heat exchanger 4b.
  • the refrigerant having flowed out of the heat source side heat exchanger 4b is then suctioned by the compressor 1b via the accumulator 5b, and compressed again.
  • the water having flowed into the water side flow passage 2ab of the water/refrigerant heat exchanger 2a by the drive of the circulation pump 22 is heated by the heat exchange with the refrigerant flowing through the refrigerant side flow passage 2aa of the water/refrigerant heat exchanger 2a, and becomes the hot water at the first predetermined temperature T1 (for example, 30°C) that is lower than the target hot water temperature Tt.
  • T1 for example, 30°C
  • the hot water having flowed out of the water/refrigerant heat exchanger 2a flows from the hot water pipe 31 into the bypass pipe 32 via the third three-way valve 9, and flows back into the hot water pipe 31 from the bypass pipe 32.
  • the hot water having flowed out of the water/refrigerant heat exchanger 2a flows in such a manner as to bypass the water/refrigerant heat exchanger 2b.
  • the hot water flows out of the auxiliary water/refrigerant heat exchanger 23.
  • the hot water having flowed out of the auxiliary water/refrigerant heat exchanger 23 flows into the indoor unit 21.
  • the heat of the hot water having flowed into the indoor unit 21 is dissipated to heat the room where the indoor unit 21 is installed.
  • the speed of the compressor 1a, the opening degree of the expansion valve 3a, and the speed of the outdoor fan 6a are respectively controlled in such a manner that the temperature of the water flowing out of the water/refrigerant heat exchanger 2a reaches the above-mentioned first predetermined temperature T1, in other words, that the hot water temperature detected by the first going temperature sensor 55 reaches the first predetermined temperature T1.
  • the speed of the compressor 1b, the opening degree of the expansion valve 3b, and the speed of the outdoor fan 6b are respectively controlled in such a manner that the temperature of the hot water stored in the water storage tank 24 (in other words, the temperature of the hot water detected by the water storage sensor 58) reaches the above-mentioned water heating temperature Tb.
  • the temperature of the refrigerant flowing out of the heat exchange unit 25 becomes higher than the target hot water temperature Tt.
  • the temperature of the refrigerant flowing out of the heat exchange unit 25 is also approximately 55°C. Accordingly, the refrigerant flowing out of the heat exchange unit 25 can heat the hot water flowing out of the water/refrigerant heat exchanger 2a.
  • 10°C which is a difference in temperature from the target hot water temperature Tt, can be compensated by the heating with the refrigerant flowing out of the heat exchange unit 25 in the auxiliary water/refrigerant heat exchanger 23.
  • the amount of the heat exchange between the refrigerant and the water in the heat exchange unit 25 may be increased due to reasons such as a large difference between the temperature of the hot water stored in the water storage tank 24 and the water heating temperature Tb.
  • the temperature of the refrigerant flowing out of the heat exchange unit 25 is decreased so that the amount of the heat exchange between the refrigerant and the water in the auxiliary water/refrigerant heat exchanger 23 is decreased. Therefore, in this case, it may become difficult to heat the hot water flowing out of the auxiliary water/refrigerant heat exchanger 23 to the target hot water temperature Tt.
  • the speed of the compressor 1a, the opening degree of the expansion valve 3a, and the speed of the outdoor fan 6a are controlled in such a manner as to increase the temperature of the hot water flowing out of the water/refrigerant heat exchanger 2a by the difference between the temperature of the hot water flowing out of the auxiliary water/refrigerant heat exchanger 23 (the temperature being detected by the third going temperature sensor 57) and the target hot water temperature Tt.
  • the first heat pump circuit 10a is operated to heat the hot water flowing into the indoor unit 21.
  • the second heat pump circuit 10b is operated to circulate the refrigerant through the heat exchange unit 25 of the water storage tank 24 and heat the water stored in the water storage tank 24 to the water heating temperature Tb.
  • the auxiliary water/refrigerant heat exchanger 23 heat is exchanged between the refrigerant having flowed out of the heat exchange unit 25 and the hot water having flowed out of the water/refrigerant heat exchanger 2a. Consequently, the temperature of the hot water flowing into the indoor unit 21 is increased to the target hot water temperature Tt.
  • the refrigerant having flowed out of the heat exchange unit 25 does not simply flow into the heat source side heat exchanger 4b and evaporate, but flows into the auxiliary water/refrigerant heat exchanger 23 before flowing into the heat source side heat exchanger 4b. Heat is then exchanged in the auxiliary water/refrigerant heat exchanger 23 between the refrigerant and the hot water flowing out of the water/refrigerant heat exchanger 2a and flowing into the indoor unit 21.
  • the capacity of the first heat pump circuit 10a to be exerted can be reduced. Accordingly, the operating efficiency of the heat pump-type heating and hot-water supply apparatus 100 improves.
  • a heat pump-type heating and hot-water supply apparatus 200 in the embodiment is the same of the heat pump-type heating and hot-water supply apparatus 100 of the first embodiment in terms of including the first heat pump circuit 10a, the second heat pump circuit 10b, the indoor unit 21, and the water storage tank 24, and being able to perform only the heating operation and to simultaneously perform the heating operation and the water heating operation.
  • the heat pump-type heating and hot-water supply apparatus 200 does not include the second three-way valve 8, the third three-way valve 9, the bypass pipe 32, and the auxiliary water/refrigerant heat exchanger 23, which are included in the heat pump-type heating and hot-water supply apparatus 100.
  • the connection point of the return refrigerant pipe 42 on the second heat pump circuit 10b side is changed to the refrigerant pipe 11b between (the port b of) the first three-way valve 7 and (the refrigerant side flow passage 2ba of) the water/refrigerant heat exchanger 2b.
  • an electromagnetic on-off valve (opening/closing means) 60 is provided to the return refrigerant pipe 42 of the hot-water supply refrigerant circuit 40.
  • the electromagnetic on-off valve 60 controls the flow of the refrigerant from the return refrigerant pipe 42 to the water/refrigerant heat exchanger 2b. As described below, the electromagnetic on-off valve 60 shuts off the flow of the refrigerant from the return refrigerant pipe 42 to the water/refrigerant heat exchanger 2b when the heating operation by the indoor unit 21 is performed while the hot-water supply operation by the water storage tank 24 is stopped. On the other hand, the electromagnetic on-off valve 60 flows the refrigerant from the return refrigerant pipe 42 to the water/refrigerant heat exchanger 2b when the heating operation by the indoor unit 21 and the hot-water supply operation by the water storage tank 24 are performed.
  • arrows represent refrigerant and hot water flow directions in the circuits.
  • the closed port of the first three-way valve 7 is filled in with black.
  • the closed electromagnetic on-off valve 60 is filled in with black, the open electromagnetic on-off valve 60 is hollow.
  • a case where only the heating operation is being performed (the heating operation is being performed and the hot-water supply operation is not being performed) in the heat pump-type heating and hot-water supply apparatus 200 is described with reference to Fig. 3 .
  • the port c is closed and the port a communicates with the port b in the first three-way valve 7 of the second heat pump circuit 10b.
  • the electromagnetic on-off valve 60 is closed.
  • the compressor 1a of the first heat pump circuit 10a, the compressor 1b of the second heat pump circuit 10b, and the circulation pump 22 of the heating hot-water circuit 30 are driven.
  • a set temperature Ti of the heating operation of the indoor unit 21, which is set by a user is assumed to be 24°C as an example, as in the case described in the first embodiment. Furthermore, a target hot water temperature Tt being a target value of the temperature of the hot water flowing into the indoor unit 21 for achieving the set temperature Ti is assumed to be 40°C.
  • the water having flowed into the water side flow passage 2ab of the water/refrigerant heat exchanger 2a by the drive of the circulation pump 22 is heated by the heat exchange with the refrigerant flowing through the refrigerant side flow passage 2aa of the water/refrigerant heat exchanger 2a, and becomes a hot water at a first predetermined temperature T1 (for example, 30°C) that is lower than the target hot water temperature Tt.
  • T1 for example, 30°C
  • T2 the target hot water temperature Tt: 40°C
  • the hot water flows out of the water/refrigerant heat exchanger 2b.
  • the hot water having flowed out of the water/refrigerant heat exchanger 2b flows into the indoor unit 21.
  • the heat of the hot water having flowed into the indoor unit 21 is dissipated to heat the room where the indoor unit 21 is installed.
  • the speed of the compressor 1a, the opening degree of the expansion valve 3a, and the speed of the outdoor fan 6a are respectively controlled in such a manner that the temperature of the water flowing out of the water/refrigerant heat exchanger 2a reaches the above-mentioned first predetermined temperature T1, in other words, that the hot water temperature detected by the first going temperature sensor 55 reaches the first predetermined temperature T1.
  • the speed of the compressor 1b, the opening degree of the expansion valve 3b, and the speed of the outdoor fan 6b are respectively controlled in such a manner that the temperature of the water flowing out of the water/refrigerant heat exchanger 2b reaches the above-mentioned second predetermined temperature T2, in other words, that the hot water temperature detected by the second going temperature sensor 56 reaches the second predetermined temperature T2.
  • the first heat pump circuit 10a and the second heat pump circuit 10b are operated to increase the temperature of the hot water flowing into the indoor unit 21 to the target hot water temperature Tt. Therefore, an optimum load can be shared by the first heat pump circuit 10a and the second heat pump circuit 10b compared to a case of operating the first heat pump circuit 10a or the second heat pump circuit 10b to increase the temperature of the hot water flowing into the indoor unit 21 to the target hot water temperature Tt.
  • the first heat pump circuit 10a increases the temperature of water to the first predetermined temperature T1.
  • the second heat pump circuit 10b increases the temperature of the hot water heated by the first heat pump circuit 10a to the second predetermined temperature T2.
  • the port b is closed and the port a communicates with the port c in the first three-way valve 7 of the second heat pump circuit 10b.
  • the electromagnetic on-off valve 60 is opened.
  • the compressor 1a of the first heat pump circuit 10a, the compressor 1b of the second heat pump circuit 10b, and the circulation pump 22 of the heating hot-water circuit 30 are driven.
  • a set temperature Ti of the heating operation of the indoor unit 21, which is set by a user is assumed to be 24°C as an example, as in the case described in the first embodiment.
  • a target hot water temperature Tt being a target value of the temperature of the hot water flowing into the indoor unit 21 for achieving the set temperature Ti is assumed to be 40°C.
  • a water heating temperature Tb being a target temperature upon heating the water stored in the water storage tank 24 is assumed to be 60°C.
  • the flow of the refrigerant in the first heat pump circuit 10a is the same as the above-mentioned case where the heating operation is performed. Accordingly, its description is omitted.
  • the refrigerant compressed and discharged from the compressor 1b flows from the refrigerant pipe 11b through the outgoing refrigerant pipe 41 via the first three-way valve 7, and flows into the heat exchange unit 25 of the water storage tank 24.
  • the refrigerant having flowed into the heat exchange unit 25 exchanges heat with the water stored in the water storage tank 24, and flows out of the heat exchange unit 25.
  • the refrigerant having flowed out of the heat exchange unit 25 flows through the return refrigerant pipe 42, passes through the opened electromagnetic on-off valve 60, and flows into the refrigerant pipe 11b.
  • the refrigerant having flowed into the refrigerant pipe 11b flows into the refrigerant side flow passage 2ba of the water/refrigerant heat exchanger 2b.
  • the refrigerant is condensed by the heat exchange with the water flowing through the water side flow passage 2bb of the water/refrigerant heat exchanger 2b, and flows out of the water/refrigerant heat exchanger 2b.
  • the refrigerant having flowed out of the water/refrigerant heat exchanger 2b is decompressed upon passage through the expansion valve 3b, and flows into the heat source side heat exchanger 4b.
  • the refrigerant having flowed into the heat source side heat exchanger 4b evaporates by the heat exchange with the air flowing into the heat source side heat exchanger 4b by the rotation of the outdoor fan 6b, and flows out of the heat source side heat exchanger 4b.
  • the refrigerant having flowed out of the heat source side heat exchanger 4b is then suctioned by the compressor 1b via the accumulator 5b, and compressed again.
  • the water having flowed into the water side flow passage 2ab of the water/refrigerant heat exchanger 2a by the drive of the circulation pump 22 is heated by the heat exchange with the refrigerant flowing through the refrigerant side flow passage 2aa of the water/refrigerant heat exchanger 2a, and becomes the hot water at the first predetermined temperature T1 (for example, 30°C) that is lower than the target hot water temperature Tt.
  • T1 for example, 30°C
  • the hot water flows out of the water/refrigerant heat exchanger 2b.
  • the hot water having flowed out of the water/refrigerant heat exchanger 2b flows into the indoor unit 21.
  • the heat of the hot water flowing into the indoor unit 21 is dissipated to heat the room where the indoor unit 21 is installed.
  • the speed of the compressor 1a, the opening degree of the expansion valve 3a, and the speed of the outdoor fan 6a are respectively controlled in such a manner that the temperature of the water flowing out of the water/refrigerant heat exchanger 2a reaches the above-mentioned first predetermined temperature T1, in other words, that the hot water temperature detected by the first going temperature sensor 55 reaches the first predetermined temperature T1.
  • the speed of the compressor 1b, the opening degree of the expansion valve 3b, and the speed of the outdoor fan 6b are respectively controlled in such a manner that the temperature of the hot water stored in the water storage tank 24 (in other words, the temperature of the hot water detected by the water storage sensor 58) reaches the above-mentioned water heating temperature Tb.
  • the temperature of the refrigerant flowing out of the heat exchange unit 25 becomes higher than the target hot water temperature Tt.
  • the temperature of the refrigerant flowing out of the heat exchange unit 25 is also approximately 55°C. Accordingly, the refrigerant flowing out of the heat exchange unit 25 can heat the hot water flowing out of the water/refrigerant heat exchanger 2a.
  • 10°C which is a difference in temperature from the target hot water temperature Tt, can be compensated by the heating with the refrigerant flowing out of the heat exchange unit 25 in the water/refrigerant heat exchanger 2b.
  • the amount of the heat exchange between the refrigerant and the water in the heat exchange unit 25 may be increased due to reasons such as a large difference between the temperature of the hot water stored in the water storage tank 24 and the water heating temperature Tb.
  • the temperature of the refrigerant flowing out of the heat exchange unit 25 is decreased so that the amount of the heat exchange between the refrigerant and the water in the water/refrigerant heat exchanger 2b is decreased. Therefore, in this case, it may become difficult to heat the hot water flowing out of the water/refrigerant heat exchanger 2b to the target hot water temperature Tt.
  • the speed of the compressor 1a, the opening degree of the expansion valve 3a, and the speed of the outdoor fan 6a are controlled in such a manner as to increase the temperature of the hot water flowing out of the water/refrigerant heat exchanger 2a by the difference between the temperature of the hot water flowing out of the water/refrigerant heat exchanger 2b (the temperature being detected by the second going temperature sensor 56) and the target hot water temperature Tt.
  • the first heat pump circuit 10a is operated to heat the hot water flowing into the indoor unit 21.
  • the second heat pump circuit 10b is operated to circulate the refrigerant through the heat exchange unit 25 of the water storage tank 24 and heat the water stored in the water storage tank 24 to the water heating temperature Tb.
  • the water/refrigerant heat exchanger 2b heat is exchanged between the refrigerant having flowed out of the heat exchange unit 25 and the hot water having flowed out of the water/refrigerant heat exchanger 2a. Consequently, the temperature of the hot water flowing into the indoor unit 21 is increased to the target hot water temperature Tt.
  • the refrigerant having flowed out of the heat exchange unit 25 does not simply flow into the heat source side heat exchanger 4b and evaporate, but flows into the water/refrigerant heat exchanger 2b before flowing into the heat source side heat exchanger 4b. Heat is then exchanged in the water/refrigerant heat exchanger 2b between the refrigerant and the hot water flowing out of the water/refrigerant heat exchanger 2a and flowing into the indoor unit 21. Hence, there is no need to increase the temperature of the hot water flowing out of the water/refrigerant heat exchanger 2a to the target hot water temperature Tt. Therefore, the capacity of the first heat pump circuit 10a to be exerted can be reduced. Accordingly, the operating efficiency of the heat pump-type heating and hot-water supply apparatus 200 improves.
  • the heat pump-type heating and hot-water supply apparatus of the present invention when the heating load and the hot-water supply load are operated simultaneously, heat is exchanged between the refrigerant flowing out of the hot-water supply load and flowing through the return refrigerant pipe and the water circulating through the heating hot-water circuit. Consequently, the operating efficiency of the heat pump-type heating and hot-water supply apparatus upon the simultaneous operation of the heating load and the hot-water supply load can be improved.
  • the heat pump-type heating and hot-water supply apparatus including two heat pump circuits are described as an example.
  • the heat pump-type heating and hot-water supply apparatus of the present invention may include three or more heat pump circuits instead. If three or more heat pump circuits are included, for example, they may be configured in such a manner that, when the heat load of the heating load is larger than the heat load of the hot-water supply load, the number of heat pump circuits for heating (the first heat pump circuits) is set to be more than one while the number of heat pump circuits for hot-water supply (the second heat pump circuits) is set to be one.
  • the number of heat pump circuits for heating (the first heat pump circuits) is set to be one while the number of heat pump circuits for hot-water supply (the second heat pump circuits) is set to be more than one.
  • the heat pump-type heating and hot-water supply apparatus may be the following first to third heat pump-type heating and hot-water supply apparatuses.
  • the first heat pump-type heating and hot-water supply apparatus is a heat pump-type heating and hot-water supply apparatus including a plurality of heat pump circuits, a heating hot-water circuit, and a hot-water supply refrigerant circuit, in which each of the plurality of heat pump circuits is configured by sequentially connecting a compressor, a water/refrigerant heat exchanger, flow rate adjustment means, and a heat source side heat exchanger by a refrigerant pipe, the heating hot-water circuit is configured by sequentially connecting a heating load, a circulation pump, a plurality of the water/refrigerant heat exchangers, an auxiliary water/refrigerant heat exchanger by a hot-water supply pipe, in the hot-water supply refrigerant circuit, a hot-water supply load and the auxiliary water/refrigerant heat
  • the heat pump circuit for hot-water supply includes first flow passage switching means and second flow passage switching means, each of the first flow passage switching means and the second flow passage switching means includes at least three connection ports: a first connection port, a second connection port, and a third connection port, the first connection port of the first flow passage switching means is connected by the refrigerant pipe to a refrigerant discharge side of the compressor, the second connection port is connected by the refrigerant pipe to a refrigerant inflow side of the water/refrigerant heat exchanger, the third connection port is connected to one end of the outgoing refrigerant pipe, the first connection port of the second flow passage switching means is connected by the refrigerant pipe to a refrigerant outflow side of the water/refrigerant heat exchanger, the second connection port is connected by the refrigerant pipe to a refrigerant inflow side of the flow rate adjustment means, the
  • the return refrigerant pipe when the water/refrigerant heat exchanger in the heat pump circuit for hot-water supply also acts as the auxiliary water/refrigerant heat exchanger, one end of the return refrigerant pipe is connected between the first flow passage switching means and the water/refrigerant heat exchanger, the return refrigerant pipe includes opening/closing means that can shut off the flow of the refrigerant in the return refrigerant pipe, and the opening/closing means is closed when only the heating operation by the heating load is performed, and is open when the heating operation by the heating load and the hot-water supply operation by the hot-water supply load are simultaneously performed.
EP15153933.5A 2014-02-17 2015-02-05 Heat pump-type heating and hot-water supply apparatus Not-in-force EP2908072B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014027783A JP6123697B2 (ja) 2014-02-17 2014-02-17 ヒートポンプ式暖房給湯装置

Publications (2)

Publication Number Publication Date
EP2908072A1 EP2908072A1 (en) 2015-08-19
EP2908072B1 true EP2908072B1 (en) 2018-10-03

Family

ID=52473744

Family Applications (1)

Application Number Title Priority Date Filing Date
EP15153933.5A Not-in-force EP2908072B1 (en) 2014-02-17 2015-02-05 Heat pump-type heating and hot-water supply apparatus

Country Status (3)

Country Link
EP (1) EP2908072B1 (ja)
JP (1) JP6123697B2 (ja)
ES (1) ES2704696T3 (ja)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6102793B2 (ja) * 2014-02-26 2017-03-29 株式会社富士通ゼネラル ヒートポンプ式暖房給湯装置
ITUB20155000A1 (it) * 2015-10-30 2017-04-30 Edilvi Sistema di gestione impianto fotovoltaico - pompa di calore - accumulo termico
CN112817347B (zh) * 2020-12-25 2022-05-24 北京京仪自动化装备技术股份有限公司 一种快速升降温系统及其控制方法
CN113586183A (zh) * 2021-07-22 2021-11-02 上海交通大学 发电机组与聚合热泵结合的能量回收装置及工作方法
CN113739463B (zh) * 2021-08-19 2022-09-27 珠海格力电器股份有限公司 冷机机组控制方法、装置及制冷设备

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4033788B2 (ja) * 2003-02-25 2008-01-16 三洋電機株式会社 ヒートポンプ装置
JP4058696B2 (ja) 2004-05-28 2008-03-12 日立アプライアンス株式会社 ヒートポンプ給湯システム
JP2006090574A (ja) * 2004-09-21 2006-04-06 Hitachi Home & Life Solutions Inc ヒートポンプ式給湯暖房システム
US20090120117A1 (en) * 2007-11-13 2009-05-14 Dover Systems, Inc. Refrigeration system
JP2009264714A (ja) * 2008-04-30 2009-11-12 Panasonic Corp ヒートポンプ温水システム
JP5806940B2 (ja) * 2009-12-28 2015-11-10 ダイキン工業株式会社 ヒートポンプシステム
JP5330988B2 (ja) * 2009-12-29 2013-10-30 日立アプライアンス株式会社 ヒートポンプ給湯機
JP2012159229A (ja) * 2011-01-31 2012-08-23 Toshiba Carrier Corp 冷凍機および冷凍装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
ES2704696T3 (es) 2019-03-19
JP6123697B2 (ja) 2017-05-10
JP2015152263A (ja) 2015-08-24
EP2908072A1 (en) 2015-08-19

Similar Documents

Publication Publication Date Title
EP2908072B1 (en) Heat pump-type heating and hot-water supply apparatus
EP2833072B1 (en) Heating and hot water supply system
WO2014136384A1 (ja) 暖房給湯装置
JP6354627B2 (ja) ヒートポンプ給湯暖房システム
JP2004218912A (ja) ヒートポンプ式給湯暖房装置
JP6645593B2 (ja) 熱媒体循環システム
JP2008267658A (ja) ヒートポンプ式給湯機
JP2011169584A (ja) ヒートポンプ給湯機
WO2018087867A1 (ja) 熱媒体循環システム
JP3869801B2 (ja) ヒートポンプ式給湯暖房装置
JP2013217575A (ja) ヒートポンプ給湯機
JP5160141B2 (ja) 給湯システム
JP2017198414A (ja) 給湯空調システム
KR101604418B1 (ko) 급탕 기능을 구비하는 히트펌프식 냉난방 시스템
JP2015092125A (ja) 貯湯式給湯装置
JP6210019B2 (ja) 貯湯式給湯機
JP6823713B2 (ja) 温水暖房装置および温水暖房方法
JP6834494B2 (ja) 貯湯式給湯機
JP6102793B2 (ja) ヒートポンプ式暖房給湯装置
WO2017163305A1 (ja) 熱媒体循環システム
JP2015169373A (ja) ヒートポンプサイクル装置
JP5741256B2 (ja) 貯湯式給湯機
JP5835140B2 (ja) 貯湯式給湯機
JP2017172881A (ja) ヒートポンプ式暖房装置
KR101875226B1 (ko) 히트펌프 연동 온수 순환 시스템 및 그 제어 방법

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

17P Request for examination filed

Effective date: 20151001

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RIC1 Information provided on ipc code assigned before grant

Ipc: F25B 49/02 20060101ALI20180319BHEP

Ipc: F25B 6/00 20060101AFI20180319BHEP

Ipc: F25B 30/02 20060101ALI20180319BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20180503

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1049035

Country of ref document: AT

Kind code of ref document: T

Effective date: 20181015

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Ref country code: DE

Ref legal event code: R096

Ref document number: 602015017342

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20181003

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1049035

Country of ref document: AT

Kind code of ref document: T

Effective date: 20181003

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2704696

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20190319

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190103

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190203

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190103

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190203

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190104

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602015017342

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

26N No opposition filed

Effective date: 20190704

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190205

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20190228

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190228

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190205

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20200128

Year of fee payment: 6

Ref country code: DE

Payment date: 20200121

Year of fee payment: 6

Ref country code: GB

Payment date: 20200129

Year of fee payment: 6

Ref country code: ES

Payment date: 20200302

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190205

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20200113

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20150205

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602015017342

Country of ref document: DE

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20210205

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210205

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210228

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210901

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210205

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20220504

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181003

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210206