EP2840202A1 - Structure de poutre d'échafaudage de travail pour un foyer de chaudière - Google Patents

Structure de poutre d'échafaudage de travail pour un foyer de chaudière Download PDF

Info

Publication number
EP2840202A1
EP2840202A1 EP14181740.3A EP14181740A EP2840202A1 EP 2840202 A1 EP2840202 A1 EP 2840202A1 EP 14181740 A EP14181740 A EP 14181740A EP 2840202 A1 EP2840202 A1 EP 2840202A1
Authority
EP
European Patent Office
Prior art keywords
girder
working scaffold
girder body
flange
beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP14181740.3A
Other languages
German (de)
English (en)
Other versions
EP2840202B1 (fr
Inventor
Yuji Takahashi
Nozomu Nimura
Ryo Moriguchi
Shohei Sato
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of EP2840202A1 publication Critical patent/EP2840202A1/fr
Application granted granted Critical
Publication of EP2840202B1 publication Critical patent/EP2840202B1/fr
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/22Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by roofs or ceilings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • E04G3/246Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the inside contour of a building
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/24Supporting, suspending, or setting arrangements, e.g. heat shielding

Definitions

  • the present invention relates to a working scaffold girder structure in a boiler furnace, a working scaffold girder carriage apparatus, and a method of installing a working scaffold, for temporarily installing a working scaffold for inspection of the boiler furnace.
  • a scaffolding frame is assembled along an inner surface of the furnace wall up to a water tube nose portion or a superheater arranged thereover to allow a scaffolding girder to stretch over the scaffolding frame.
  • scaffolding plates are placed and fixed onto the scaffolding girder to form a working scaffold.
  • An operator performs a work such as inspection or maintenance of a superheater provided in a ceiling of the boiler furnace and removal of clinkers using the working scaffold.
  • a scaffolding girder interposed between a pair of girder insertion frames is inserted from a girder insertion opening, and the scaffolding girder stretches over an upper slope portion of a water tube nose portion while the scaffolding girder maintains a horizontal state using a wire connected between the overlying girder insertion frame and a leading end of the scaffolding girder.
  • a single H-beam is interposed between a pair of C-beams, and an insertion girder is inserted into the furnace through a furnace opening during an operation state. It is possible to perform an inspection work through a short installation process by forming a scaffold in the insertion girder.
  • the scaffolding insertion apparatus has a clamp unit for clamping the scaffolding girder, a feeding unit that feeds the scaffolding girder to the inner space of the boiler, and a travel unit that travels along the outside of the boiler.
  • a side surface of the scaffolding girder is clamped. Therefore, a structure adaptable to the scaffolding girder is limited to a particular type such as an H-beam.
  • a leading end of the girder supported in a cantilever manner droops. Therefore, it is necessary to perform a process of lifting a support stand in the receiving side.
  • the present invention aims to meet the need for a working scaffold girder structure in a boiler furnace, a working scaffold girder carriage apparatus, and a method of installing a working scaffold, by which the working scaffold can be easily installed/removed in/from the boiler furnace.
  • a working scaffold girder structure in a boiler furnace including: a girder body formed by vertically stacking a pair of H-beams such that a flange of one of the H-beams faces a flange of the other H-beam and providing a truss structure between the said flanges; and a stringer having one end supported by a side surface of the girder body and the other end connectable to a side surface of a neighboring girder body, the stringer being foldable or unfoldable in a hinged manner with respect to the one end from the side surface of the girder body in a direction intersecting with a longitudinal direction of the girder body.
  • the girder body may have a guide that protrudes from both principal surfaces of a web plate of the H-beam in parallel with the flanges and extends along a longitudinal direction of the girder body.
  • the girder body may have a suspension accessory provided in a leading end and engaged with a suspension rod of the water tube nose portion.
  • the girder body may have a plurality of individual girders connected in a longitudinal direction, each of the individual girders is formed by vertically stacking a pair of H-beams such that a flange of one of the H-beams faces a flange of the other H-beam and providing a truss structure between the flanges, and the individual girder is formed such that no stringer is provided in any side surface, one or more stringers are provided in any one of the side surfaces, or one or more stringers are provided in each of both the side surfaces.
  • a working scaffold girder carriage apparatus including: a roller guide rail capable of placing and delivering a working scaffold girder structure along a longitudinal direction of a girder body into a boiler furnace from an opening of the boiler furnace, the working scaffold girder structure in the boiler furnace having a girder body formed by vertically stacking a pair of H-beams such that a flange of one of the H-beams faces a flange of the other H-beam and providing a truss structure between the flanges and a stringer having one end supported by a side surface of the girder body and the other end connectable to a side surface of a neighboring girder body, the stringer being foldable or unfoldable in a hinged manner with respect to the one end from the side surface of the girder body in a direction intersecting with a longitudinal direction of the girder body; and a gantry erected from a roller surface of the roller guide rail to a
  • an inner side of the gantry may have a first guide roller that extends in parallel with the flange from both principal surfaces of a web plate of any one of the H-beams of the girder body and makes sliding contact with a side surface of a guide extending along a longitudinal direction of the girder body, and a second guide roller that makes sliding contact with a side surface of the other flange of the other H-beam.
  • an upper portion of the gantry may have an upper feeding roller that makes sliding contact with the principal surface of the flange of the one of the H-beams.
  • a method of installing a working scaffold including: forming a plurality of working scaffold girder structures by connecting and inserting, in a longitudinal direction, individual girders formed by vertically stacking a pair of H-beams such that a flange of one of the H-beams faces a flange of the other H-beam and providing a truss structure between the flanges; forming a working passage by connecting a stringer of the individual girder neighboring to an opening side; and expanding and installing a scaffolding plate in the working passage.
  • the guide since the guide is installed in the girder body, it is possible to prevent horizontal sway of an upper portion of the girder body when the girder is fed using the carriage apparatus and straightly deliver the girder body from the opening of the boiler furnace to the inner space of the furnace. Therefore, it is possible to shorten a working time or reduce man power.
  • the girder body is delivered while the flange of the H-beam of the girder body is clamped using the clamp unit, it is possible to deliver the girder body in a cantilever support state even when there is an accessory such as a stringer or unevenness such as a truss structure in a side surface of the girder body.
  • both principal surfaces of the flange of the H-beam of the girder body is clamped using the clamp unit, it is possible to suppress the leading end supported in a cantilever manner from drooping. Furthermore, it is possible to fix the girder body in a temporary installation position.
  • the feeding roller that makes sliding contact with a principal surface of the flange of the H-beam in the upper portion of the girder body is provided, it is possible to prevent drooping of the leading end side of the girder body by suppressing a rise of the cantilever support side of the girder body.
  • the individual girders are connected and inserted in a longitudinal direction, a plurality of working scaffold girder structures are formed, and a working passage is formed by connecting a stringer between the individual girders. Therefore, it is possible to easily expand and install the scaffolding plate from the working passage and reduce an installation work time.
  • FIG. 1 is a side view illustrating a working scaffold girder structure in a boiler furnace and a working scaffold girder carriage apparatus according to this disclosure. It is noted that a stringer is intentionally omitted in FIG. 1 .
  • FIG. 2 is an explanatory diagram illustrating a working scaffold using the working scaffold girder structure in a boiler furnace according to this disclosure.
  • FIG. 3 is an explanatory diagram illustrating a working scaffold girder structure 10d in a boiler furnace according to this disclosure, in which plan views, side views, and rear views of each of individual girders A to E are illustrated.
  • FIG. 4 is an explanatory diagram illustrating a working scaffold girder structure 10b in a boiler furnace according to this disclosure, in which plan views, side views, and rear views of each of individual girders A to E are illustrated.
  • FIG. 5 is an explanatory diagram illustrating a coupling member for coupling the individual girders C and D of the working scaffold girder structure 10b in a boiler furnace according to this disclosure. In addition, in FIG. 5 , the stringer is intentionally omitted.
  • FIG. 6 is an explanatory diagram illustrating operation of the stringer of the individual girder B of the working scaffold girder structure 10b in a boiler furnace according to this disclosure.
  • the working scaffold girder structure 10 includes, as a fundamental configuration, a girder body 20 and a stringer 60 having a truss structure for maintaining a predetermined level of rigidity.
  • the girder body 20 is a long girder extending from an opening 14 of the boiler furnace 12 to a lower side of a water tube nose portion 16 in the furnace.
  • the girder body 20 includes a pair of H-beams and a truss structure 26.
  • the pair of H-beams includes a first H-beam 22 and a second H-beam 24 having the same shape.
  • the truss structure 26 is installed between the pair of H-beams.
  • the first and second H-beams 22 and 24 includes first flanges 22a and 24a, respectively, second flanges 22b and 24b, respectively, and web plates 22c and 24c, respectively, formed therebetween.
  • the girder body 20 is formed by stacking the first and second H-beams 22 and 24 such that the first flanges 22a and 24a of the first and second H-beams 22 and 24 face each other, and a truss structure 26 is provided between the first flanges 22a and 24a.
  • the web plates 22c and 24c are arranged coplanarly, the truss structure 26 is mounted on a top surface of the first flange 22a of the first H-beam 22, and the first flange 24a of the second H-beam 24 is stacked on the top surface of the truss structure 26.
  • the first and second H-beams 22 and 24 are provided with a reinforcing plate 28 that makes contact with the first and second flanges and the web plates in a cross-sectional direction.
  • a plurality of reinforcing plates 28 are provided with an equal interval along a longitudinal direction of the girder body 20.
  • the girder body 20 includes a plurality of split individual girders A to E (in this embodiment, for example, 5 split girders) as illustrated in FIGS. 3 and 4 .
  • the individual girder A in the leading end is first delivered, and then, the individual girders B to E are sequentially coupled in this order.
  • the individual girders B and C are provided with a stringer or stringers 60 described below in any one of or both side surfaces of the web plate.
  • the individual girder D is provided with a pair of stringers 60 in any one of the side surfaces or each of both the side surfaces of the web plate.
  • the stringer of the individual girder D having such a configuration is to form a passage provided in the vicinity of an operator access opening 18 as illustrated in FIG. 2 .
  • a coupling member 30 is used to couple each of the individual girders.
  • the coupling member 30 couples the first H-beams 22 of the individual girders to each other or the second H-beams 24 to each other.
  • the coupling member 30 includes a pair of plate receptacles 32, a girder connecting plate 34, a pair of key-grooved pins 36, and a key plate 38.
  • the plate receptacle 32 includes a pair of plates having a substantially rectangular shape as seen in a plan view and a height substantially equal to a length (height) of the web plate and a pair of pin holes 32a provided in the vicinity of the center thereof, where the key-grooved pin 36 described below can be inserted.
  • the plate receptacle 32 is installed in parallel with the web plate 22c between heads of the first and second flanges 22a and 22b with respect to the web plate 22c.
  • a plate insertion hole 32b where the girder connecting plate 34 described below can be inserted is formed between the plate receptacle 32 and the web plate 22c.
  • the plate receptacle 32 is provided with a mounting hole 32c for fixing the key plate 38 described below.
  • Such a plate receptacle 32 is installed in both ends of the first H-beam 22 of the individual girder.
  • the girder connecting plate 34 includes a pair of substantially rectangular plates having a thickness that can be inserted into the plate insertion hole 32b, a longitudinal length corresponding to the length of a pair of plate receptacles 32 arranged in series, and a height substantially equal to the length of the web plate 22c.
  • the girder connecting plate 34 is provided with four holes 34a in positions matching the pin holes 32a when it is inserted into the plate insertion hole 32b.
  • the key-grooved pin 36 is a pin insertable into the pin hole 32a and the hole 34a and has a head 36a in one end and a key groove 36b in the other end.
  • the key-grooved pin 36 has a length set such that, as it is inserted into the pin hole 32a, and the head 36a abuts on one of plates of the plate receptacle 32, the key groove 36b protrudes from the other plate.
  • the key plate 38 has a pair of hollows 38a fitting into the key groove 36b protruding from the plate of the plate receptacle 32.
  • the key plate 38 has a mounting hole 38b in a position matching the mounting hole 32c of the plate receptacle 32.
  • the girder connecting plate 34 In order to couple the second H-beams 24 to each other, the girder connecting plate 34, a pair of plate receptacles 33, a pair of pins 42, and a pair of pin pressing guides 40 are employed.
  • the girder connecting plate 34 has the same shape as that used to couple the first H-beams 22.
  • the plate receptacle 33 has substantially the same shape as that used to couple the first H-beams 22 and may be applicable to the second H-beam 24. However, the position of the mounting hole 33c is different.
  • the mounting hole 33c of the plate receptacle 33 is provided to interpose the pin hole 33a therebetween.
  • the pin 42 has a diameter insertable into the pin hole 33a and a length matching the thickness of the plate receptacle 33.
  • the diameter of the pin 42 corresponds to a distance between the outer sides of a pair of plates.
  • Such a pin 42 is configured such that its both ends do not protrude from a principal surface of the plate receptacle 33 when it is inserted into the plate receptacle 33.
  • the pin pressing guide 40 blocks the pin hole 33a of the plate receptacle 33 from the outside, protrudes in parallel with the flange of the H-beam from both principal surfaces of the plate receptacle 33, and extends in a longitudinal direction of the girder body 20.
  • the pin pressing guide 40 includes a rectangular plate that covers the pin hole 33a, a protruding plate that protrudes in parallel with the flange of the H-beam from the principal surface of the rectangular plate, that is, perpendicularly to the rectangular plate, and an extension plate that extends along the longitudinal direction of the girder body 20 from the leading edge of the protruding plate, that is, in parallel with the rectangular plate.
  • the pin pressing guide 40 having such a configuration can be formed in series along the longitudinal direction of the girder body 20 together with a guide 50 described below.
  • the pin pressing guide 40 is provided with a mounting hole 40a in a position matching the mounting hole 33c of the plate receptacle 33 so that it can be fixed to the plate receptacle 33 using a fastening element such as a bolt.
  • a guide 50 is installed in both principal surfaces of the web plate 24c of the second H-beam 24.
  • the guide 50 protrudes in parallel with the flanges from both principal surfaces of the web plate 24c of the second H-beam 24 and extends along the longitudinal direction of the girder body 20.
  • the guide 50 is installed in a guide support piece 52 mounted on the reinforcing plate 28.
  • the guide support piece 52 extends in parallel with the flange from the center of the reinforcing plate 28 and protrudes to be separate from the web plate 24c.
  • the guide 50 extends in parallel with the web plate 24c on the end face of the guide support piece 52, that is, along the longitudinal direction of the girder body 20.
  • the guide 50 according to this embodiment protrudes to the outer side than the flange with respect to the web plate 24c.
  • the stringer 60 is a connecting member that connects a plurality of working scaffold girder structures 10 inserted in the same direction from the opening 14 of the boiler furnace 12 to each other in a direction perpendicular to the longitudinal direction.
  • the stringer 60 according to this embodiment has a truss structure 62 similar to that of the girder body 20 and is provided with fastening mounts 63 extending in the longitudinal direction in four corners of the truss structure 62.
  • the fastening mount 63 is provided with a hole 64 where a fastening member such as a bolt or a pin can be inserted.
  • one end side serves as a support portion 66, and the other side serves as a connecting portion 68.
  • the support portion 66 is installed in a pair of upper and lower support pieces 69 extending in a direction perpendicular to the longitudinal direction from the side surface of the girder body 20.
  • the support pieces 69 protrude from both side surfaces with respect to the girder body 20.
  • An interval between a pair of upper and lower support pieces 69 is set to a length substantially equal to the vertical length (height) of the stringer 60.
  • the upper and lower support pieces 69 are provided with holes 69a in positions matching the holes 64 in both ends as seen in a plan view.
  • the left and right protruding lengths of the support pieces 69 with respect to the girder body 20 are set to be substantially equal to or shorter than the protruding length of the guide 50.
  • the support portion 66 is mounted on the support piece 69 using a fastening member such as a bolt.
  • the stringer 60 is formed to be foldable or unfoldable in a hinged manner with respect to such a support portion 66 to a direction intersecting with the longitudinal direction of the girder body 20 from the side surface of the girder body 20.
  • the connecting portion 68 is connectable to the side surface of another neighboring girder body 20.
  • the connecting portion 68 is fixed to the hole 69a of the support piece 69 positioned perpendicularly to the longitudinal direction of the girder body 20 using a fastening member such as a pin in order to connect the girder assemblies 20 to each other.
  • a design of the stringer provided in the working scaffold girder structure 10 may change depending on the configuration of the boiler furnace.
  • the stringer 60 may not be provided in the working scaffold girder structure 10a.
  • the working scaffold girder structure 10b has the stringer 60 on a right side (single side) of the web plate from the opening 14 to the boiler furnace.
  • the working scaffold girder structure 10c has the stringer 60 on a left side (single side) of the web plate from the opening 14 to the boiler furnace.
  • the working scaffold girder structure 10d has the stringers 60 in both sides of the web plate.
  • each stringer 60 is provided in each of both sides with respect to the girder body 20.
  • a pair of stringers 60 are provided in both sides with respect to the girder body 20.
  • the stringer 60 is provided in one side with respect to the girder body 20, and a pin 69b fitting to the hole 69a is provided in the other side.
  • a pair of stringers 60 are provided in one side with respect to the girder body 20.
  • FIGS. 8A to 8C are explanatory diagrams illustrating a suspension accessory and a suspension rod of the working scaffold girder structure in the boiler furnace according to this disclosure.
  • the suspension accessory 70 is provided in the individual girder A positioned in the leading end of the girder body 20.
  • the suspension accessory 70 includes a first hanger 72 and a second hanger 74 coupled to each other using a pin.
  • the first hanger 72 is provided with a hole 73 connectable to the suspension rod 80 of the water tube nose portion described below.
  • the second hanger 74 is a hanger longer than the first hanger 72 and is provided with a long hole 75.
  • the pin provided in the individual girder A is inserted into the long hole 75.
  • the suspension accessory 70 is vertically opened from the top surface provided in the leading end of the individual girder A and is housed in a housing space 76 having a reversed L-shape opened horizontally from the top surface.
  • the pin inserted into the long hole 75 is provided in the vicinity of the curved portion of the housing space 76.
  • the suspension rod 80 is a rod engaged with the suspension accessory 70 of the girder body 20 so that the girder body 20, that is supported in a cantilever manner and droops in its leading end, can be lifted and positioned horizontally.
  • the suspension rod 80 is provided inside the water tube nose portion 16 over the suspension accessory 70.
  • An opening 14a is formed on the lower surface of the water tube nose portion 16 between the suspension rod 80 and the suspension accessory 70.
  • the suspension rod 80 is a rod vertically screwed to a nut 19a of a support beam 19 provided inside the water tube nose portion 16.
  • a lower end of the suspension rod 80 is provided with a hole 80a engaged with the hole 73 of the first hanger 72 by inserting a fastening member. From this opening 14a, it is possible to engage the suspension accessory 70 and the suspension rod 80.
  • the second hanger 74 is housed in the vertical space of the housing space 76 when it is housed as illustrated in FIG. 8A .
  • the first hanger 72 bent perpendicularly to the second hanger 74 is housed in the vertical space.
  • the first hanger 72 rises by pulling up a wire inserted into the hole of the first hanger 72 through the opening 14a of the water tube nose portion 16.
  • the second hanger 74 is lifted by pulling the second hanger 74 in a longitudinal direction.
  • the drooping girder body 20 is lifted to an appropriate position, that is, in a horizontal position by tightening the nut 19a of the support beam 19.
  • FIG. 9 is a perspective view illustrating the working scaffold girder carriage apparatus according to this disclosure.
  • FIG. 10 is a side view illustrating the working scaffold girder carriage apparatus according to this disclosure.
  • FIG. 11 is a plan view illustrating the working scaffold girder carriage apparatus according to this disclosure.
  • FIG. 12 is a view as seen from an arrow direction A-A of FIG. 10 .
  • FIG. 13 is a view as seen from an arrow direction B-B of FIG. 10 .
  • FIG. 14 is a view as seen from an arrow direction C-C of FIG. 10 .
  • the individual girder D in which a pair of stringers are provided in one side
  • the working scaffold girder carriage apparatus 100 includes a roller guide rail 120 that can deliver the girder body 20 along the longitudinal direction of the girder body 20 from the opening 14 of the boiler furnace 12 to the inside of the furnace in order to place the working scaffold girder structure 10, and a gantry 130 erected on a roller surface of the roller guide rail 120 around the girder body 20 in the side where the girder body 20 is placed.
  • a plurality of feeding rollers 122 are straightly arranged between a pair of channels with a predetermined interval.
  • the feeding roller 122 can be freely rotated and does not have a driving source such as a motor.
  • the feeding roller 124 of the opening side has a larger diameter than those of other feeding rollers 122 and has a bearing mechanism.
  • a plurality of feeding rollers 122 and 124 can deliver the girder body 20 along a longitudinal direction while they make contact with a bottom surface of the girder body 20.
  • the gantry 130 is erected vertically from the placement surface of the girder body 20 such that the girder body 20 is surrounded in an arch shape in the opening side of the roller guide raill20.
  • the gantry 130 according to this embodiment includes a first gantry 132 and a second gantry 134.
  • the first gantry 132 is provided in an end of the roller guide rail20 in the opening side.
  • First guide rollers 136 and second guide rollers 138 are installed in the first gantry 132.
  • the first guide rollers 136 are installed to interpose the girder body 20 therebetween in the upper side of the first gantry 132.
  • the first guide rollers 136 are a pair of rollers that make contact with both side surfaces of the guide 50 of the second H-beam 24 of the girder body 20.
  • the second guide rollers 138 are installed to interpose the girder body 20 therebetween in the lower side of the first gantry 132.
  • the second guide rollers 138 are a pair of rollers that make contact with both side surfaces of the second flange 22b of the first H-beam 22 of the girder body 20.
  • the second gantry 134 is provided in the opening side from the center of the roller guide rail 120.
  • An upper feeding roller 140, a delivery unit 150, and a clamp unit 160 are installed in the second gantry 134.
  • the upper feeding roller 140 is a roller that makes contact with the top surface of the second flange 24b of the second H-beam 24 of the girder body 20 in the upper portion of the second gantry 134.
  • the upper feeding roller 140 can be freely rotated and does not have a driving source such as a motor.
  • the upper feeding roller 140 has a diameter larger than those of other feeding rollers 122 and is provided with a bearing mechanism.
  • the delivery unit 150 is a hydraulic cylinder mechanism horizontally expandable to the first gantry 132 side from the upper portion of the second gantry 134.
  • the delivery unit 150 includes a hydraulic cylinder 152 and a piston rod 154, and an end of the hydraulic cylinder 152 is mounted on the upper portion of the second gantry 134.
  • the piston rod 154 is reciprocatable inside the hydraulic cylinder 152, and the clamp unit 160 described below is installed in the leading end of the piston rod 154.
  • the piston rod 154 is stretched or retracted by supplying a hydraulic pressure of a hydraulic source (not illustrated) to the hydraulic cylinder 152, so that the clamp unit 160 can advance or retreat along a longitudinal direction of the girder body 20.
  • FIGS. 15A to 15D are plan views illustrating the clamp unit.
  • FIGS. 16A to 16D are side views illustrating the clamp unit.
  • FIGS. 17A to 17C are views as seen in an arrow direction D-D when the clamp unit 15 is released.
  • FIGS. 18A and 18B are views as seen in an arrow direction D-D when the clamp unit of FIGS. 15A to 15D is clamped, in which the individual girders B, C, or E are clamped.
  • the clamp unit 160 includes a clamp plate 162, a clamp jack 164, a clamp arm 166, and a travel roller 168.
  • the clamp plate 162 is a substantially rectangular plate, as seen in a plan view, arranged in a principal surface (top surface) of one side of the second flange 24b of the second H-beam 24.
  • a pair of clamp jacks 164 and a hydraulic path connected to the clamp jack 164 are installed on the top surface of the clamp plate 162.
  • a pair of notches are provided in the sides of the clamp plate 162 parallel to the longitudinal direction of the girder body 20, and the clamp arm 166 is installed in the notch.
  • the clamp arm 166 has a U-shape as seen in a cross-sectional view. Any one of the opposite sides of the clamp arm 166 is connected to a movable portion of the clamp jack 164, and the other side faces the principal surface (lower surface) of the clamp plate 162 with a predetermined gap.
  • the girder body 20 according to this embodiment is delivered while the second flange 24b of the second H-beam 24 is interposed between the lower surface of the clamp plate and the other side of the clamp arm 166.
  • the (four) travel rollers 168 are installed in each side of the clamp plate 162 in a direction intersecting with the longitudinal direction of the girder body 20.
  • the travel rollers 168 make contact with the top surface of the second flange 24b of the second H-beam 24 to support the clamp unit 160 over the girder body 20.
  • FIGS. 7A to 7F are explanatory diagrams illustrating a feeding operation of the working scaffold girder structure in a boiler furnace according to this disclosure.
  • the individual girder A is placed on the roller guide rail 120 of the working scaffold girder carriage apparatus 100 using a crane.
  • the individual girder A is pushed to the opening 14 side to open a space.
  • the individual girder B is placed on the roller guide rail 120 using a crane.
  • the individual girders A and B are coupled using a coupling member 30.
  • the plate receptacles 32 and 33 and the girder connecting plate 34 are installed in the individual girder A in advance.
  • the plate receptacles 32 and 33 are installed in the individual girder B.
  • the girder connecting plate 34 of the individual girder A is inserted into the plate receptacles 32 and 33 of the individual girder B.
  • a pin 42 is inserted into the pin hole 32a of the plate receptacle 33 in the upper portion of the individual girder B.
  • the pin pressing guide 40 is fixed by blocking the pin hole 32a from the outside of the plate receptacle 33 and inserting a fastening member to the mounting hole 33c.
  • the pin pressing guide 40 can be formed in series along the longitudinal direction of the girder body 20 together with the guide 50.
  • the key-grooved pin 36 is inserted into the pin hole 32a of the plate receptacle 32 in the lower portion of the individual girder B.
  • a hollow of the key plate 38 is fitted to the key groove 36b.
  • the key-grooved pin 36 is fixed by inserting a fastening member into the mounting hole 38b.
  • the coupled individual girders A and B are delivered to the opening 14 side using the delivery unit 150 while the second flange 24b of the second H-beam 24 is clamped using the clamp unit 160, so that the individual girder A is inserted into the furnace from the opening 14.
  • the individual girders C to E are placed on the roller guide rail 120 of the carriage apparatus using a crane.
  • the individual girders C to E are coupled using the coupling member 30 and are delivered to form the girder body 20.
  • the leading end of the individual girder A is positioned under the opening 14a of the water tube nose portion 16.
  • the girder body 20 is supported in a cantilever manner by the working scaffold girder carriage apparatus 100, the leading end side of the girder body 20 droops under its own weight.
  • the opening 14a of the water tube nose portion 16 is opened.
  • a wire is inserted into the hole of the underlying first hanger 72 from the opening 14a and is pulled up to erect the first hanger 72.
  • the second hanger 74 is lifted in a longitudinal direction of the second hanger 74.
  • the first hanger 72 and the suspension rod 80 are engaged with each other using a fastening member while the centers of the holes thereof match each other.
  • the drooping working scaffold girder structure 10 is lifted to an appropriate position, that is, in a horizontal position by tightening the nut 19a of the support beam 19.
  • the leading end side (individual girder A) of the working scaffold girder structure 10 is engaged with the suspension rod 80 of the water tube nose portion 16, and the trailing end side (individual girder E) is clamped by the clamp unit 160, so that the working scaffold girder structure 10 is fixed inside the furnace.
  • FIGS. 19A to 19D and FIGS. 20A to 20C are explanatory diagrams illustrating a method of installing a working scaffold.
  • the working scaffold girder structures 10a and 10b are inserted from the side surface side (one end) of the boiler furnace 12 where the operator access opening 18 is provided ( FIG. 19A ).
  • the stringer 60 of the working scaffold girder structure 10b in the vicinity of the operator access opening 18 is unfolded in a hinged manner to intersect with a longitudinal direction of the girder body 20 and is fixed to the hole 69a of the support piece 69 of the girder body 20 of the neighboring working scaffold girder structure 10a using a fastening member.
  • the scaffolding plates 170 delivered from the operator access opening 18 are placed on the stringer 60 to form an operator access passage.
  • the overhanging beam 172 is arranged to hang over the working scaffold girder structures 10a and 10b and have one end protruding from a wall surface side of the boiler furnace 12.
  • the scaffolding plate 170 delivered from the operator access opening 18 is placed and fixed between the working scaffold girder structures 10a and 10b and between the working scaffold girder structure 10a and the wall surface of the boiler furnace.
  • the working scaffold girder structures 10a and 10c are inserted from the side surface side (the other side) of the boiler furnace 12 where one of the operator access openings 18 is provided, and the stringer 60 of the working scaffold girder structure 10c in the vicinity of the operator access opening 18 is unfolded in a hinged manner in a direction intersecting with a longitudinal direction of the girder body 20 and is fixed by installing a fastening member to the hole 69a of the support piece 69 of the girder body 20 of the neighboring working scaffold girder structure 10a. Then, the scaffolding plates 170 are placed to form the operator access passage.
  • the working scaffold girder structures 10b and 10d are inserted to perform a process of forming the operator access passage.
  • an opening is formed by removing the scaffolding plates 170 in a place, surrounded by the working scaffolds in a frame shape (the place indicated by the cross x in FIG. 20A ), where the suspension scaffold 176 having a frame shape is formed.
  • the suspension scaffold 176 temporarily mounted on a top surface of the working scaffold is inserted downward from the opening.
  • the suspension scaffold 176a arranged under the water pipe nose 16 is first inserted into the lower portion of the working scaffold in the leading end side of the water tube nose portion 16 and is then supported by a suspension scaffold support beam 174 having a frame shape.
  • the suspension scaffold 176a supported by the suspension scaffold support beam 174 is slidingly moved to the individual girder A under the water tube nose portion 16.
  • the suspension scaffolds 176 are connected using the scaffolding plate 170, the suspension scaffolds 176 are formed to surround the working scaffold in a frame shape under the working area of the working scaffold.
  • a veiled area such as a lower surface of the water tube nose portion 16.
  • a stringer foldable or unfoldable in a hinged manner in a side surface of the girder body of the truss structure and connectable to a neighboring girder body Therefore, it is possible to simplify a delivery work of the girder body having a predetermined level of rigidity and easily form a working scaffold girder through a short process.
  • the girder body is delivered while the flange of the H-beam of the girder body is clamped using the clamp unit. Therefore, it is possible to deliver the girder body in a cantilever support state even when there is an accessory such as a stringer or unevenness such as a truss structure in a side surface of the girder body.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Movable Scaffolding (AREA)
  • Bridges Or Land Bridges (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
EP14181740.3A 2013-08-23 2014-08-21 Structure de poutre d'échafaudage de travail pour un foyer de chaudière Not-in-force EP2840202B1 (fr)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013173249A JP6172632B2 (ja) 2013-08-23 2013-08-23 ボイラ火炉内の作業足場用主梁構造、作業足場用主梁搬送装置、及び作業足場の設置方法

Publications (2)

Publication Number Publication Date
EP2840202A1 true EP2840202A1 (fr) 2015-02-25
EP2840202B1 EP2840202B1 (fr) 2016-04-06

Family

ID=51392100

Family Applications (1)

Application Number Title Priority Date Filing Date
EP14181740.3A Not-in-force EP2840202B1 (fr) 2013-08-23 2014-08-21 Structure de poutre d'échafaudage de travail pour un foyer de chaudière

Country Status (4)

Country Link
EP (1) EP2840202B1 (fr)
JP (1) JP6172632B2 (fr)
KR (1) KR101580230B1 (fr)
ZA (1) ZA201406198B (fr)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926915A (zh) * 2016-05-05 2016-09-07 河南省第建筑工程集团有限责任公司 贝雷梁高空长悬挑工作平台的施工方法
WO2017155505A1 (fr) * 2016-03-07 2017-09-14 Safway Services, Llc Support d'extension de plate-forme réglable destiné à des systèmes de plate-forme de travail et procédés correspondants
CN109812002A (zh) * 2019-01-25 2019-05-28 江苏能建机电实业集团有限公司 用于锅炉检修灰口支撑平台及搭建方法
CN115262942A (zh) * 2022-08-25 2022-11-01 中建八局第一建设有限公司 一种高空大堂架空处附着式脚手架支撑机构及施工方法

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6784615B2 (ja) * 2017-03-10 2020-11-11 中電プラント株式会社 安全ネットの展張方法
KR102095125B1 (ko) * 2018-09-20 2020-04-23 한국서부발전 주식회사 보일러 과재열기 튜브의 정비용 플랫폼
JP2021042535A (ja) 2019-09-06 2021-03-18 三菱パワー株式会社 ボイラ火炉内の作業足場設置構造
KR102377444B1 (ko) 2021-03-30 2022-03-22 (주)휴하리 보일러 긴급정비용 추락방지 장치 설치 방법
KR102470512B1 (ko) * 2022-03-23 2022-11-25 (주)해람솔루션 경사면 지지 수평전개 시스템 데크

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH055358A (ja) * 1991-06-26 1993-01-14 Ishikawajima Harima Heavy Ind Co Ltd 足場用梁挿入装置及び該装置による足場用梁架設方法
JPH053481U (ja) 1991-06-26 1993-01-19 石川島播磨重工業株式会社 ボイラ炉内点検用上側足場
GB2268764A (en) * 1992-07-18 1994-01-19 Asw Cubic Structures Limited Roof structure with movable support columns
JP2005264546A (ja) 2004-03-18 2005-09-29 Ishikawajima Harima Heavy Ind Co Ltd 足場用梁挿入装置及び足場用梁挿入方法
US20050217936A1 (en) * 2004-03-31 2005-10-06 Paul Jolicoeur Articulating work platform support system, work platform system, and methods of use thereof
JP2011080668A (ja) 2009-10-06 2011-04-21 Babcock Hitachi Kk ボイラ火炉内作業用足場構造
US8123001B1 (en) * 2008-03-18 2012-02-28 Paul Kristen, Inc. Modular platform/ scaffolding

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0514967Y2 (fr) * 1987-12-25 1993-04-21
JP2527309Y2 (ja) * 1991-08-30 1997-02-26 中部電力株式会社 ワーキングステーション吊り下げ装置
JP3791628B2 (ja) * 1996-04-16 2006-06-28 石川島播磨重工業株式会社 水平梁挿入装置
JP3703096B2 (ja) * 2003-02-19 2005-10-05 日立プラント建設株式会社 構造物の仮設足場及びその構築方法
JP2006348647A (ja) * 2005-06-17 2006-12-28 Oriental Construction Co Ltd 橋桁の押出し工法
KR101220129B1 (ko) * 2011-07-01 2013-01-11 주식회사백상 보일러 연소실 내부 작업 발판 및 설치 방법

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH055358A (ja) * 1991-06-26 1993-01-14 Ishikawajima Harima Heavy Ind Co Ltd 足場用梁挿入装置及び該装置による足場用梁架設方法
JPH053481U (ja) 1991-06-26 1993-01-19 石川島播磨重工業株式会社 ボイラ炉内点検用上側足場
GB2268764A (en) * 1992-07-18 1994-01-19 Asw Cubic Structures Limited Roof structure with movable support columns
JP2005264546A (ja) 2004-03-18 2005-09-29 Ishikawajima Harima Heavy Ind Co Ltd 足場用梁挿入装置及び足場用梁挿入方法
US20050217936A1 (en) * 2004-03-31 2005-10-06 Paul Jolicoeur Articulating work platform support system, work platform system, and methods of use thereof
US8123001B1 (en) * 2008-03-18 2012-02-28 Paul Kristen, Inc. Modular platform/ scaffolding
JP2011080668A (ja) 2009-10-06 2011-04-21 Babcock Hitachi Kk ボイラ火炉内作業用足場構造

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017155505A1 (fr) * 2016-03-07 2017-09-14 Safway Services, Llc Support d'extension de plate-forme réglable destiné à des systèmes de plate-forme de travail et procédés correspondants
CN105926915A (zh) * 2016-05-05 2016-09-07 河南省第建筑工程集团有限责任公司 贝雷梁高空长悬挑工作平台的施工方法
CN105926915B (zh) * 2016-05-05 2018-02-02 河南省第一建筑工程集团有限责任公司 贝雷梁高空长悬挑工作平台的施工方法
CN109812002A (zh) * 2019-01-25 2019-05-28 江苏能建机电实业集团有限公司 用于锅炉检修灰口支撑平台及搭建方法
CN115262942A (zh) * 2022-08-25 2022-11-01 中建八局第一建设有限公司 一种高空大堂架空处附着式脚手架支撑机构及施工方法
CN115262942B (zh) * 2022-08-25 2023-07-11 中建八局第一建设有限公司 一种高空大堂架空处附着式脚手架支撑机构及施工方法

Also Published As

Publication number Publication date
KR20150022717A (ko) 2015-03-04
JP6172632B2 (ja) 2017-08-02
ZA201406198B (en) 2015-12-23
KR101580230B1 (ko) 2015-12-24
EP2840202B1 (fr) 2016-04-06
JP2015040451A (ja) 2015-03-02

Similar Documents

Publication Publication Date Title
EP2840202B1 (fr) Structure de poutre d'échafaudage de travail pour un foyer de chaudière
US11028651B2 (en) Drilling rig
US6260311B1 (en) Concrete form suspension system and method
JP2019031781A (ja) 片持ち張り出し作業車の撤去工法
CN104196222A (zh) 工具式型钢悬挑脚手架的悬挑架
JP2012012835A (ja) 高所作業用作業床の施工方法
CN109138431A (zh) 一种超高层泵管过桥装置及其施工方法
CN108824432A (zh) 水中贝雷梁栈桥钢管桩悬臂式可调定位架
CN218405428U (zh) 一种柱体转运操作装置
CN217579783U (zh) 一种悬索桥钢拉杆锚固系统的安装系统
CN215946614U (zh) 一种爬架用管材提升装置
CN115162171A (zh) 一种悬索桥钢拉杆锚固系统的分段安装方法及安装系统
CN209924462U (zh) 一种钢结构滑移施工有轨式水平载重移运装置
CN112030781B (zh) 钢拱桥拱肋节段的安装方法及安装结构
CN218952028U (zh) 一种超高强混凝土声屏障立柱安装固定装置
KR20220059515A (ko) 보일러 화로 내의 작업 발판 설치 구조
JP5059567B2 (ja) 壁面パネル地組装置及び壁面パネルの地組方法
CN105089271A (zh) 机械式预埋螺栓定位安装组件
CN216305332U (zh) 一种用于建筑施工的导轨立柱
CN217632458U (zh) 隧道初砌台车
CN115676621B (zh) 一种基建用预制件高效安装装置
CN220432074U (zh) 一种异型t梁浇注辅助限位架
CN220847046U (zh) 便于拆卸的贝雷片
CN115288038B (zh) 一种用于铁路箱梁防落梁挡块安装的托架装置及使用方法
CN221545928U (zh) 一种装配式伸缩防护棚

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20140821

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

R17P Request for examination filed (corrected)

Effective date: 20150309

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20151023

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: HITACHI, LTD.

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 788022

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160415

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602014001405

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 788022

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160406

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602014001405

Country of ref document: DE

Representative=s name: BEETZ & PARTNER MBB PATENTANWAELTE, DE

Ref country code: DE

Ref legal event code: R082

Ref document number: 602014001405

Country of ref document: DE

Representative=s name: BEETZ & PARTNER MBB PATENT- UND RECHTSANWAELTE, DE

Ref country code: DE

Ref legal event code: R081

Ref document number: 602014001405

Country of ref document: DE

Owner name: HITACHI PLANT CONSTRUCTION, LTD., JP

Free format text: FORMER OWNER: HITACHI, LTD., TOKYO, JP

REG Reference to a national code

Ref country code: NL

Ref legal event code: PD

Owner name: HITACHI PLANT CONSTRUCTION, LTD.; JP

Free format text: DETAILS ASSIGNMENT: VERANDERING VAN EIGENAAR(S), OVERDRACHT; FORMER OWNER NAME: HITACHI, LTD.

Effective date: 20160906

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160706

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160806

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160707

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160808

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20161110 AND 20161116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602014001405

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

26N No opposition filed

Effective date: 20170110

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20170428

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160831

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160821

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160821

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170831

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20140821

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160831

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160406

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20200825

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20200831

Year of fee payment: 7

Ref country code: GB

Payment date: 20200828

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20200821

Year of fee payment: 7

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602014001405

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20210901

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20210821

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210901

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210821

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210821

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220301