EP2623898A1 - Heisswasserversorgungssystem - Google Patents

Heisswasserversorgungssystem Download PDF

Info

Publication number
EP2623898A1
EP2623898A1 EP11828854.7A EP11828854A EP2623898A1 EP 2623898 A1 EP2623898 A1 EP 2623898A1 EP 11828854 A EP11828854 A EP 11828854A EP 2623898 A1 EP2623898 A1 EP 2623898A1
Authority
EP
European Patent Office
Prior art keywords
temperature
refrigeration cycle
low
heat exchanger
temperature refrigeration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP11828854.7A
Other languages
English (en)
French (fr)
Other versions
EP2623898A4 (de
Inventor
Takahiro Zushi
Shun Asari
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Carrier Corp
Original Assignee
Toshiba Carrier Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Carrier Corp filed Critical Toshiba Carrier Corp
Publication of EP2623898A1 publication Critical patent/EP2623898A1/de
Publication of EP2623898A4 publication Critical patent/EP2623898A4/de
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D17/00Domestic hot-water supply systems
    • F24D17/02Domestic hot-water supply systems using heat pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1051Arrangement or mounting of control or safety devices for water heating systems for domestic hot water
    • F24D19/1054Arrangement or mounting of control or safety devices for water heating systems for domestic hot water the system uses a heat pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H4/00Fluid heaters characterised by the use of heat pumps
    • F24H4/02Water heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B47/00Arrangements for preventing or removing deposits or corrosion, not provided for in another subclass
    • F25B47/02Defrosting cycles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B47/00Arrangements for preventing or removing deposits or corrosion, not provided for in another subclass
    • F25B47/02Defrosting cycles
    • F25B47/022Defrosting cycles hot gas defrosting
    • F25B47/025Defrosting cycles hot gas defrosting by reversing the cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B7/00Compression machines, plants or systems, with cascade operation, i.e. with two or more circuits, the heat from the condenser of one circuit being absorbed by the evaporator of the next circuit
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/027Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
    • F25B2313/02741Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means using one four-way valve
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2339/00Details of evaporators; Details of condensers
    • F25B2339/04Details of condensers
    • F25B2339/047Water-cooled condensers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/04Refrigeration circuit bypassing means
    • F25B2400/0403Refrigeration circuit bypassing means for the condenser
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/04Refrigeration circuit bypassing means
    • F25B2400/0411Refrigeration circuit bypassing means for the expansion valve or capillary tube
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/25Control of valves
    • F25B2600/2501Bypass valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/25Control of valves
    • F25B2600/2513Expansion valves

Definitions

  • Embodiments described herein relate generally to a hot water supply system that supplies hot water by using a cascade refrigeration cycle.
  • a cascade refrigeration cycle to obtain a high compression ratio by connecting a high-temperature refrigeration cycle and a low-temperature refrigeration cycle via an intermediate heat exchanger and causing the intermediate heat exchanger to exchange heat of a refrigerant circulating through the high-temperature refrigeration cycle and a refrigerant circulating through the low-temperature refrigeration cycle tends to be used more frequently (for example, Jpn. Pat. Appln. KOKAI Publication No. 2000-320914 ).
  • a water heat exchanger is included as a condenser constituting the high-temperature refrigeration cycle and water or hot water is guided thereto via a hot water pipe.
  • the water or hot water is exchanged for high-temperature hot water, which is supplied to the side of use to which the hot water pipe is connected. Therefore, an efficient hot water supply operation can be performed even in a cold district.
  • a four-way valve of the high-temperature refrigeration cycle and a four-way valve of the low-temperature refrigeration cycle are switched in the reverse direction to reverse the circulation direction of the refrigerant.
  • Hot water guided into the water heat exchanger of the high-temperature refrigeration cycle is used as a heat source for defrosting and thus, a high pressure and a discharge temperature during defrosting operation can be maintained. Because a high-temperature gas refrigerant is directly guided into the aero-thermal exchanger of the low-temperature refrigeration cycle, the aero-thermal exchanger can be defrosted efficiently.
  • the four-way valve is expensive and if possible, the cost should be reduced through the reduction of parts costs by removing the four-way valve and pipes connected to the four-way valve.
  • the present embodiment has been made based on the above circumstances and a hot water supply system capable of reducing parts costs and performing an efficient defrosting operation by including the cascade refrigeration cycle and exercising special control for defrosting operation of an evaporator of the low-temperature refrigeration cycle is provided.
  • a hot water supply system of the present invention comprises, a cascade refrigeration cycle constituted of a low-temperature refrigeration cycle communicatively connecting a low-temperature compressor, a four-way valve, an intermediate heat exchanger, a low-temperature expansion device, and an evaporator via a refrigerant pipe and a high-temperature refrigeration cycle communicatively connecting a high-temperature compressor, a water heat exchanger, a high-temperature expansion device, and the intermediate heat exchanger via the refrigerant pipe to cause the intermediate heat exchanger to exchange heat of a refrigerant guided to the low-temperature refrigeration cycle and a refrigerant guided to the high-temperature refrigeration cycle, a hot water pipe communicating with the water heat exchanger in the high-temperature refrigeration cycle to cause circulating water or hot water and the refrigerant guided to the high-temperature refrigeration cycle to exchange heat and to supply the heat to a side of use, a bypass circuit whose one end is connected to the refrigerant pipe between
  • FIG. 1 is a block diagram of a refrigeration cycle of a hot water supply system and shows particularly a refrigeration cycle switchover state during defrosting operation.
  • the hot water supply system is constituted of a high-temperature refrigeration cycle Ra, a hot water pipe H, a low-temperature refrigeration cycle Rb, and a controller (control unit) S.
  • the high-temperature refrigeration cycle Ra will first be described.
  • a discharge portion a of a high-temperature compressor 1, a water heat exchanger 2, a liquid receiver 3, a high-temperature expansion device 4, a heat sink 5a of an intermediate heat exchanger 5, and a gas liquid separation device 6 are connected in succession via a refrigerant pipe P and the gas liquid separation device 6 is communicatively connected to a suction portion b of the high-temperature compressor 1.
  • a refrigerant compressed and discharged by the high-temperature compressor 1 is guided in the sequence of water heat exchanger 2 ⁇ liquid receiver 3 ⁇ high-temperature expansion device 4 ⁇ heat sink 5a of intermediate heat exchanger 5 ⁇ gas liquid separation device 6 ⁇ high-temperature compressor 1.
  • the water heat exchanger 2 acts as a condenser and the heat sink 5a of the intermediate heat exchanger 5 acts as an evaporator.
  • a bypass circuit B is provided in the high-temperature refrigeration cycle Ra.
  • the bypass circuit B is formed of a bypass pipe 9 whose one end is connected to the refrigerant pipe P between the discharge portion a of the high-temperature compressor 1 and the water heat exchanger 2, whose other end is connected to a refrigerant pipe P between the high-temperature expansion device 4 and the heat sink 5a of the intermediate heat exchanger 5, and having a fluid-controlled valve 8 in an intermediate portion.
  • the hot water pipe H has one end portion connected to a hot water return pipe or a return buffer tank and the other end portion connected to a hot water outlet pipe or a supply buffer tank (none of the above is illustrated).
  • the intermediate portion of the hot water pipe H communicates with the water heat exchanger 2 constituting the high-temperature refrigeration cycle Ra so that water or hot water guided into the hot water pipe H and a refrigerant guided into the water heat exchanger 2 can exchange heat.
  • a discharge portion c of a low-temperature compressor 10 and a first port d1 of a four-way valve 11 are connected via the refrigerant pipe P and a radiating portion 5b of the intermediate heat exchanger 5 is connected to a second port d2 of the four-way valve 11 via the refrigerant pipe P.
  • a third port d3 of the four-way valve 11 is connected to two aero-thermal exchanger 12, 12 via the refrigerant pipe P divided into two pipes in an intermediate portion thereof.
  • a fourth port d4 of the four-way valve 11 is connected to a suction portion e of the low-temperature compressor 10 via the refrigerant pipe P through a gas liquid separation device 13.
  • the radiating portion 5b of the intermediate heat exchanger 5 is connected to a liquid receiver 14 via the refrigerant pipe P and the liquid receiver 14 and the two aero-thermal exchangers 12 are connected via the refrigerant pipe P divided into two pipes in an intermediate portion, each of which having a low-temperature expansion device 15.
  • a refrigerant compressed and discharged by the low-temperature compressor 10 is guided in the sequence of four-way valve 11 ⁇ radiating portion 5b of intermediate heat exchanger 5 ⁇ liquid receiver 14 ⁇ two low-temperature expansion devices 15 ⁇ two aero-thermal exchangers 12 ⁇ four-way valve 11 ⁇ liquid separation device 13 ⁇ low-temperature compressor 10.
  • the radiating portion 5b of the intermediate heat exchanger 5 acts as a condenser and the aero-thermal exchanger 12 acts as an evaporator.
  • the four-way valve 11 is switched to the direction shown in FIG. 11 and a refrigerant compressed and discharged by the low-temperature compressor 10 is guided in the sequence of four-way valve 11 ⁇ two aero-thermal exchangers 12 ⁇ two low-temperature expansion devices 15 ⁇ liquid receiver 14 ⁇ radiating portion 5b of intermediate heat exchanger 5 ⁇ four-way valve 11 ⁇ liquid separation device 13 ⁇ low-temperature compressor 10.
  • the aero-thermal exchanger 12 acts as a condenser and the radiating portion of the intermediate heat exchanger 5 acts as an evaporator.
  • the controller S receives a detection signal from temperature sensors provided in the discharge portions a, c and the suction portions b, e of the high-temperature compressor 1 and the low-temperature compressor 10 respectively, pressure sensors provided in the discharge portions a, c and the suction portions b, e, a temperature sensor provided in the water heat exchanger 2, temperature sensors provided in the heat sink 5a and the radiating portion 5b of the intermediate heat exchanger 5, a temperature sensor (none of the sensors is illustrated) provided in the aero-thermal exchanger 12 and the like.
  • controller S performs an operation after receiving an instruction signal from a remote controller (remocon) and compares the operation result with a stored reference value (thermal capability, the temperature of the intermediate heat exchanger 5 and the like) to control the operating frequency of the high-temperature compressor 1 and the low-temperature compressor 10.
  • a remote controller remote controller
  • a stored reference value thermo capability, the temperature of the intermediate heat exchanger 5 and the like
  • the controller S calculates a superheat amount (hereinafter, referred to as an "SH amount") of a heat exchanger from a difference between a refrigerant temperature of the heat exchanger and a refrigerant temperature on the suction side of a compressor to control the throttling amount of the high-temperature expansion device 4 and the low-temperature expansion device 15. Then, the controller S executes control to open or close the fluid-controlled valve 8 of the bypass circuit B.
  • SH amount superheat amount
  • the hot water supply system is configured as described above and the controller S during hot water supply operation controls the high-temperature refrigeration cycle Ra and the low-temperature refrigeration cycle Rb so that the refrigerant is guided and circulated as described above.
  • the refrigerant is compressed by the radiating portion 5b on the side of the low-temperature refrigeration cycle Rb to give off heat of condensation and the refrigerant is evaporated by the heat sink 5a on the side of the high-temperature refrigeration cycle Ra while the heat of condensation being absorbed.
  • the difference of temperature between the evaporating temperature in the aero-thermal exchanger 12 and the condensing temperature in the water heat exchanger 2 increases in the hot water supply system as a whole so that a high compression ratio can be obtained.
  • water heat exchanger 2 executing a condensation function in the high-temperature refrigeration cycle Ra water or hot water guided into the hot water pipe H absorbs high heat of condensation and the temperature thereof rises efficiently.
  • the water or hot water is exchanged for high-temperature hot water in the water heat exchanger 2 and circulated by way of water heat exchanger 2 ⁇ supply buffer tank of hot water ⁇ return buffer-tank on load sidle ⁇ water heat exchanger 2.
  • the aero-thermal exchanger 12 in the low-temperature refrigeration cycle Rb executes an evaporation function and thus, condensed water generated here is frozen to form frost, which adheres to the aero-thermal exchanger 12.
  • the thickness of frost increases with the passage of time, decreasing the heat exchange efficiency by the aero-thermal exchanger 12.
  • the controller S receives not only a detection signal from the temperature sensor attached to the aero-thermal exchanger 12, but also a detection signal from other sensors to determine whether a defrosting operation of the aero-thermal exchanger 12 is needed.
  • the defrosting operation is performed based on the result of the determination and actually, the controller S exercises the control described below immediately before starting a defrosting operation.
  • the controller S exercises throttling control of the high-temperature expansion device 4 provided in the high-temperature refrigeration cycle Ra in the timing immediately before starting a defrosting operation.
  • the flow rate of the refrigerant guided from the high-temperature expansion device 4 into the heat sink 5a of the intermediate heat exchanger 5 decreases in the high-temperature refrigeration cycle Ra.
  • the amount of absorbed heat by the heat sink 5a of the intermediate heat exchanger 5 decreases and the temperatures of the heat sink 5a and the radiating portion 5b rise and also the temperature of the intermediate heat exchanger 5 as a whole rises. At this point, there is no need to change the operating frequency of the high-temperature compressor 1 in the high-temperature refrigeration cycle Ra and the low-temperature compressor 10 in the low-temperature refrigeration cycle Rb.
  • the suction temperature and suction pressure of the high-temperature compressor 1 communicatively connected via the heat sink 5a of the intermediate heat exchanger 5 and the refrigerant pipe P also rise, but the circulating amount of refrigerant in the high-temperature refrigeration cycle Ra decreases and thus, the discharge pressure hardly rises, leading to a lower compression ratio of the high-temperature compressor 1.
  • the suction temperature of the high-temperature compressor 1 rises and a difference from the evaporating temperature of the heat sink 5a of the intermediate heat exchanger executing an evaporation function increases and thus, the so-called SH amount becomes excessive and the discharge temperature of the high-temperature compressor 1 rises.
  • the low-temperature refrigeration cycle Rb with the rise in temperature of the radiating portion 5b of the intermediate heat exchanger, the compression ratio increases and the discharge temperature of the low-temperature compressor 10 rises.
  • the controller S exercises, as described above, throttling control of the high-temperature expansion device 4 of the high-temperature refrigeration cycle Ra in the timing immediately before starting a defrosting operation of the aero-thermal exchanger 12. Therefore, the rise in evaporating temperature of the heat sink 5a of the intermediate heat exchanger 5, the rise in condensing temperature of the radiating portion 5b, and the rise in discharge temperature of the high-temperature compressor 1 and the low-temperature compressor 10 are obtained in a short time without changing the operating frequency of the high-temperature compressor 1 and the low-temperature compressor 10.
  • the temperature of low-pressure piping parts ranging from the high-temperature expansion device 4 to the high-temperature compressor 1 via the intermediate heat exchanger 5 rises and also the temperature of the compressor body of the high-temperature compressor 1 and high-pressure piping parts ranging from the high-temperature compressor 1 to the water heat exchanger 2 rises so that heat can be stored.
  • the temperature of high-pressure piping parts ranging from the high-temperature compressor 1 and the low-temperature compressor 10 to the low-temperature expansion device 15 via the four-way valve 11 and the intermediate heat exchanger 5 rises so that heat can be stored.
  • the controller S controls the start of an actual defrosting operation of the aero-thermal exchanger 12.
  • the fluid-controlled valve 8 of the bypass circuit B is opened and the also the four-way valve 11 of the low-temperature refrigeration cycle Rb is switched to cause the refrigerant to circulate in the direction opposite to the refrigerant circulation direction heretofore.
  • the controller S stops the operation of the low-temperature compressor 10 once (a few tens of seconds to a few minutes) and also exercises necessary control such as opening an equalizing pipe to balance the pressure on the high-pressure side and the low-pressure side in the low-temperature refrigeration cycle Rb. Then, the flow of the refrigerant inside the switching valve is decreased by switching the four-way valve 11 so that switching noise can be inhibited by quieting the collision.
  • the controller S totally closes the high-temperature expansion device 4 while continuing the operation of the high-temperature compressor 1 in the high-temperature refrigeration cycle Ra.
  • the high pressure of the high-temperature refrigeration cycle Ra is maintained and the refrigerant recovered from the heat sink 5a of the intermediate heat exchanger 5 and discharged from the high-temperature compressor 1 stores heat by remaining in the water heat exchanger 2 as a condenser and the liquid receiver 3 as a high-temperature liquid refrigerant.
  • the amount of absorbed heat from the heat sink 5a can be restrained by the refrigerant not being supplied to the intermediate heat exchanger 5 so that a heat storage effect can be maintained.
  • a pump-down (refrigerant recovery) operation is performed in the high-temperature refrigeration cycle Ra and thus, it is desirable to extend the operation duration by reducing the operating frequency of the high-temperature compressor 1 when necessary so that an operation stop should not occur due to a pressure drop of low pressure.
  • the controller S controls the fluid-controlled valve 8 of the bypass circuit B to open while continuing the operation of the high-temperature compressor 1 in the high-temperature refrigeration cycle Ra. Further, the controller S switches the four-way valve 11 in the low-temperature refrigeration cycle Rb and also restarts the operation of the low-temperature compressor 10.
  • a hot gas as a refrigerant gas at high temperature and pressure discharged from the high-temperature compressor 1 is guided to the bypass circuit B and then guided into the heat sink 5a of the intermediate heat exchanger 5 via the fluid-controlled valve 8 to give off high heat.
  • a liquid refrigerant present in the water heat exchanger 2 as a condenser and the liquid receiver 3 is depressed and boiled before being gasified to circulate in the opposite direction in the refrigeration cycle.
  • the gasified refrigerant is guided to the bypass circuit B and then guided into the intermediate heat exchanger 5 via the fluid-controlled valve 8. Accordingly, heat is also absorbed from hot water on the side of use to provide a portion of the heat source needed for defrosting operation.
  • the refrigerant circulates in the direction opposite to the direction during hot water supply operation using the intermediate heat exchanger 5 as a heat source and the refrigerant is condensed in each of the aero-thermal exchangers 12 to give off heat of condensation.
  • frost adhering to the aero-thermal exchanger 12 is gradually melted and drops as drain water. The frost is quickly thinned to expose the surface of the aero-thermal exchanger 12.
  • All stored heat is used to defrost the aero-thermal exchanger 12, further promoting a defrosting operation.
  • the controller S detects that high pressure of the high-temperature refrigeration cycle Ra has dropped to a predetermined pressure or less, the controller S executes control to totally close the fluid-controlled valve 8 of the bypass circuit B and also executes control to open the high-temperature expansion device 4 totally or to an appropriate degree of opening.
  • a discharge gas at low temperature in the high-temperature refrigeration cycle Ra can be warmed by heat of hot water guided into the water heat exchanger 2 so that a heat source of the defrosting operation of the aero-thermal exchanger 12 can be ensured.
  • the temperature drop of hot water guided into the water heat exchanger 2 can be limited to less than 1 degree.
  • high-temperature expansion device 4 is adjusted to an appropriate degree of opening, instead of totally opening the high-temperature expansion device 4, high pressure of the high-temperature refrigeration cycle Ra can be slightly increased and thus, the amount of heat by input of the high-temperature compressor 1 can be ensured and also the supply amount of hot gas to the intermediate heat exchanger 5 can be adjusted.
  • the defrosting operation of the aero-thermal exchanger 12 is performed as described above and thus, the need for the four-way valve in the high-temperature refrigeration cycle Ra can be eliminated and also the need for piping parts to be connected to the four-way valve can be eliminated. Therefore, parts costs can be reduced and improvement in workability and also cost reductions can be achieved due to eliminated piping, contributing to miniaturization of devices from reduced installation space thereof.
  • bypass pipe 9 and the fluid-controlled valve 8 constituting the bypass circuit B are needed as a substitute for eliminating the need for the four-way valve in the high-temperature refrigeration cycle Ra, but both ends of the bypass pipe 9 only need to be connected to an intermediate portion of the refrigerant pipe P constituting the high-temperature refrigeration cycle Ra and the fluid-controlled valve 8 can be installed simply as an on-off valve so that the effect on cost can be reduced to a minimum.
  • the rise in low pressure of the high-temperature refrigeration cycle Ra, the rise in discharge temperature accompanying an increase in SH amount, and further the rise in high pressure and the rise in discharge temperature of the low-temperature refrigeration cycle Rb can be obtained by relatively simple control of only throttling the high-temperature expansion device 4 immediately before a defrosting operation being started.
  • the amount of heat needed for defrosting operation can internally be stored in low-pressure piping parts, the high-temperature compressor 1, and high-pressure piping parts in the high-temperature refrigeration cycle Ra and the low-temperature compressor 10 and high-pressure piping parts in the low-temperature refrigeration cycle Rb so that defrosting efficiency can be improved.
  • the operation of the low-temperature compressor 10 in the low-temperature refrigeration cycle Rb is stopped for a predetermined time to balance the pressure on the high-pressure side and the low-pressure side and then the four-way valve 11 is switched and thus, switching noise can be reduced and quiet operation can be achieved.
  • the fluid-controlled valve 8 of the bypass circuit B is controlled to open and the high-temperature expansion device 4 is controlled to close while the operation of the high-temperature compressor 1 being continued. Therefore, hot water as a heat source for defrosting is hardly used so that the temperature drop of hot water guided into the hot water pipe H can be limited. Thus, the heat storage state can be retained while high pressure of the high-temperature refrigeration cycle Ra being maintained, which is helpful in reducing the defrosting time.
  • the fluid-controlled valve 8 of the bypass circuit B is controlled to close and the high-temperature expansion device 4 is controlled to open totally or to an appropriate degree of opening. Therefore, even if input of the high-temperature compressor 1 and the low-temperature compressor 10 is in a minimum state after internal heat storage being used up, a discharge gas of the high-temperature compressor 1 can be warmed by hot water of the hot water pipe H so that the heat source can be ensured, reducing the risk of incomplete defrosting.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)
EP11828854.7A 2010-09-27 2011-09-20 Heisswasserversorgungssystem Withdrawn EP2623898A4 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2010215911 2010-09-27
PCT/JP2011/071326 WO2012043297A1 (ja) 2010-09-27 2011-09-20 給湯システム

Publications (2)

Publication Number Publication Date
EP2623898A1 true EP2623898A1 (de) 2013-08-07
EP2623898A4 EP2623898A4 (de) 2018-01-17

Family

ID=45892761

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11828854.7A Withdrawn EP2623898A4 (de) 2010-09-27 2011-09-20 Heisswasserversorgungssystem

Country Status (5)

Country Link
EP (1) EP2623898A4 (de)
JP (1) JPWO2012043297A1 (de)
KR (1) KR20130006495A (de)
CN (1) CN102884384A (de)
WO (1) WO2012043297A1 (de)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014083932A1 (ja) * 2012-11-30 2014-06-05 ダイキン工業株式会社 水加熱システム
EP4257891A4 (de) * 2020-12-01 2024-05-01 Daikin Industries, Ltd. Kältekreislaufsystem

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014105891A (ja) * 2012-11-26 2014-06-09 Panasonic Corp 冷凍サイクル装置及びそれを備えた温水生成装置
WO2014175151A1 (ja) * 2013-04-26 2014-10-30 東芝キヤリア株式会社 給湯装置
CN106288476A (zh) * 2016-09-23 2017-01-04 苏州热火能源科技有限公司 一种双温升的复叠式热泵
WO2021065156A1 (ja) * 2019-09-30 2021-04-08 ダイキン工業株式会社 熱源ユニット及び冷凍装置
CN116507865A (zh) * 2020-12-01 2023-07-28 大金工业株式会社 冷冻循环系统
JP7380739B2 (ja) * 2022-03-30 2023-11-15 株式会社富士通ゼネラル ヒートポンプ装置

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60164157A (ja) * 1984-02-07 1985-08-27 Matsushita Electric Ind Co Ltd ヒ−トポンプ給湯機
JPS61101771A (ja) * 1984-10-23 1986-05-20 三菱電機株式会社 ヒ−トポンプ式冷暖房給湯機
JPS61175430A (ja) * 1985-01-31 1986-08-07 Tohoku Electric Power Co Inc 冷凍サイクル
JPS63286676A (ja) * 1987-05-18 1988-11-24 三菱電機株式会社 空気調和装置
JPH01144770U (de) * 1988-03-30 1989-10-04
JP2841708B2 (ja) * 1990-05-17 1998-12-24 ダイキン工業株式会社 冷凍装置
JPH04288463A (ja) * 1991-02-25 1992-10-13 Mitsubishi Electric Corp 空気調和機
JPH06123527A (ja) * 1992-10-12 1994-05-06 Hitachi Ltd 冷凍・冷蔵ユニットの冷凍サイクル
JPH09119754A (ja) * 1995-10-27 1997-05-06 Hitachi Ltd 空気調和機
JP2909963B2 (ja) * 1996-09-24 1999-06-23 ダイキン工業株式会社 空気調和機
JP3531049B2 (ja) * 1997-03-12 2004-05-24 松下電器産業株式会社 冷凍サイクル制御装置
JP2000320914A (ja) 1999-05-14 2000-11-24 Daikin Ind Ltd 冷凍装置
JP4078036B2 (ja) * 2001-02-20 2008-04-23 東芝キヤリア株式会社 ヒートポンプ給湯器
JP4641683B2 (ja) * 2001-09-04 2011-03-02 三洋電機株式会社 冷凍サイクル装置
JP3909311B2 (ja) * 2003-06-24 2007-04-25 日立アプライアンス株式会社 ヒートポンプ給湯機
JP2009109069A (ja) * 2007-10-30 2009-05-21 Panasonic Corp ヒートポンプ給湯機
JP5200996B2 (ja) * 2009-02-24 2013-06-05 ダイキン工業株式会社 ヒートポンプシステム
JP5711448B2 (ja) * 2009-02-24 2015-04-30 ダイキン工業株式会社 ヒートポンプシステム
JP5551882B2 (ja) * 2009-02-24 2014-07-16 ダイキン工業株式会社 ヒートポンプシステム

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2012043297A1 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014083932A1 (ja) * 2012-11-30 2014-06-05 ダイキン工業株式会社 水加熱システム
EP4257891A4 (de) * 2020-12-01 2024-05-01 Daikin Industries, Ltd. Kältekreislaufsystem

Also Published As

Publication number Publication date
KR20130006495A (ko) 2013-01-16
WO2012043297A1 (ja) 2012-04-05
CN102884384A (zh) 2013-01-16
EP2623898A4 (de) 2018-01-17
JPWO2012043297A1 (ja) 2014-02-06

Similar Documents

Publication Publication Date Title
EP2623898A1 (de) Heisswasserversorgungssystem
US9631826B2 (en) Combined air-conditioning and hot-water supply system
JP5575192B2 (ja) 二元冷凍装置
JP5595245B2 (ja) 冷凍装置
JP4069947B2 (ja) 冷凍装置
JP5575191B2 (ja) 二元冷凍装置
JP2008224088A (ja) 給湯器
JP2008096033A (ja) 冷凍装置
JP2009156472A (ja) 空気調和機
WO2017037771A1 (ja) 冷凍サイクル装置
WO2010070932A1 (ja) 冷凍装置
JP2012093054A (ja) 冷凍装置
JP5783783B2 (ja) 熱源側ユニット及び冷凍サイクル装置
JP6052456B2 (ja) 冷凍装置
JP2015064169A (ja) 温水生成装置
JP2008175410A (ja) 熱源側ユニット及び空気調和システム
JP7224480B2 (ja) 室外ユニットおよび冷凍サイクル装置
US20210207834A1 (en) Air-conditioning system
JP2014081180A (ja) ヒートポンプ装置
JPH04251158A (ja) 冷凍装置の運転制御装置
JPH04222353A (ja) 空気調和装置の運転制御装置
JP6048549B1 (ja) 冷凍装置
JP4269476B2 (ja) 冷凍装置
JP2009293887A (ja) 冷凍装置
JP7183381B2 (ja) 冷凍サイクル装置

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20130410

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
RA4 Supplementary search report drawn up and despatched (corrected)

Effective date: 20171219

RIC1 Information provided on ipc code assigned before grant

Ipc: F24D 19/10 20060101ALI20171213BHEP

Ipc: F24H 1/00 20060101ALI20171213BHEP

Ipc: F24D 17/02 20060101ALI20171213BHEP

Ipc: F25B 47/02 20060101AFI20171213BHEP

Ipc: F25B 7/00 20060101ALI20171213BHEP

Ipc: F25B 13/00 20060101ALI20171213BHEP

Ipc: F25B 49/02 20060101ALI20171213BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

18W Application withdrawn

Effective date: 20180503