EP2342856B1 - Device for connection between prefabricated beams and columns - Google Patents
Device for connection between prefabricated beams and columns Download PDFInfo
- Publication number
- EP2342856B1 EP2342856B1 EP09736581.1A EP09736581A EP2342856B1 EP 2342856 B1 EP2342856 B1 EP 2342856B1 EP 09736581 A EP09736581 A EP 09736581A EP 2342856 B1 EP2342856 B1 EP 2342856B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- beams
- connection
- opening
- column
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
Definitions
- the present invention relates to a device for connection between prefabricated beams and columns.
- the column is constituted by a plurality of reinforced-concrete segments which are mutually spaced longitudinally and are mutually connected, at their respective ends, by rebars that protrude from such reinforced-concrete segments.
- the ends of the beams are engaged by resting on the faces that are directed upward of the segments that constitute the column, and any space left free between the segments is filled with a concrete casting, so as to complete the joining of the beams to the column.
- US 6,058,669 discloses a rigid connection between the reinforcement of the beams and the rebars that protrude from the segments of the columns, so as to provide, in the nodes of the structure, hyperstatic couplings which are particularly useful if the building is designed to withstand seismic actions.
- Another known solution uses a continuous column which has, at the portion between stories, through openings in which connecting elements that protrude from the ends of the beams are designed to be accommodated.
- JP 2002 294858 A discloses a concrete column member having a plurality of beam members connected thereto in a manner as defined in the pre-characterizing portion of the appended claim 1.
- GB 2 027 785 A discloses a connection between a pillar and beams of prefabricated concrete, comprising a pillar having a through-passing aperture at a connection point, and beams provided with metal bolts which are longitudinally dispaceably mounted in metal tubes and which extend into the aperture and are supported therein, after which the aperture is filled out with concrete. Above the beams there is provided a cover coating of cast concrete provided with reinforcment members.
- the aim of the present invention is to provide a device for connection between prefabricated beams and columns that is capable of eliminating or at least reducing drastically the drawbacks noted above.
- an object of the invention is to provide a device for connection between prefabricated beams and columns that is reliable in use and extremely flexible. Another object is to provide a device for connection between prefabricated beams and columns that allows to reduce significantly the installation times of columns and beams.
- Another object of the invention is to provide a device for connection between prefabricated beams and columns in which the joint between the columns and the beams ensures higher resistance to any seismic actions.
- Another object of the invention is to provide a device for connection between prefabricated beams and columns that is capable of ensuring easy and practical transport of the various structural components and in particular of the beams and of the columns.
- the present invention relates to a device, generally designated by the reference numeral 1, for connection between a column 2 and beams 3 which are prefabricated.
- connection device 1 comprises, along the extension 100 of the column 2, at least one pair of resting portions, in particular a pair of resting ledges 4a, which are arranged on opposite sides with respect to the direction of longitudinal extension 100 of the column and are designed to be engaged, by resting and at least during installation, by an end portion 5 of a respective beam 3.
- the through opening 6 is designed to accommodate means 7 for connection between the column 2 and the beams 3 which are arranged on opposite sides with respect to the through opening 6.
- the through opening 6 is extended over a greater height than the height of the beams 3.
- connection means 7 comprise a completion casting 8, which passes at least partially through the through opening 6 and is designed to connect stably each beam 3 to the column 2 and accordingly the beams 3 arranged on opposite sides with respect to the through opening 6.
- connection device 1 further has a connecting body 9, which is arranged above a surface 8a that is directed upward of the completion casting 8 and passes at least partially through the through opening 6 in order to mutually connect the surfaces 3 a that are directed upward of the beams 3.
- the connecting body 9 is designed to pass through the portion of the through opening 6 that lies above and higher than the upper surface 3a of the beam 3 and accordingly above the completion casting 8, which as shown has its upper surface at the same height as the upper surface 3 a of the beams 3.
- connection means 7 comprise a connecting reinforcement frame 10 between the beam reinforcement frames 11 of each beam 3 that is arranged on opposite sides with respect to the through opening 6.
- the connecting reinforcement frame 10 can be constituted for example by a plurality of connecting bars 12 and is designed to cross the respective through opening 6 and to be embedded in the completion castings 8.
- the connecting body 9 is adapted to provide a so-called structural screed, the functionality of which will be described in greater detail hereinafter.
- At least one auxiliary reinforcement body 13 is inserted in the thickness of the connecting body 9 forming the structural screed and runs substantially parallel to the main longitudinal direction 101 of the beams 3.
- each pair of resting ledges 4a and 4b is arranged on opposite sides with respect to a respective through opening 6.
- connection device 1 from having only two resting ledges 4a and accordingly a single through opening 6 formed along the extension of the column 2.
- the beams 3 have, at their end portion 5 designed to rest against the respective ledge 4a, 4b, a longitudinally extended recess 14 in which the concavity is directed upward.
- the recess 14 has a transverse dimension that substantially corresponds to the transverse dimension of the through opening 6, and is designed, during the production of the connection device 1, to be filled at least partially by the completion casting 8.
- the beam reinforcement frame 11 comprises at least one bar which has a respective threaded end portion 11 a, which is associated stably with a sleeve 15 which is threaded internally and can be engaged by a respective end portion 12a of a respective connecting bar 12, which forms at least part of the connecting reinforcement frame 10.
- the internally threaded sleeve 15 is embedded at least partially in the beam 3.
- the through opening or openings 6 are provided by a tubular box 16, which is embedded within the column and optionally connected stably to a reinforcement frame 17 of the column.
- the auxiliary reinforcement 13 arranged inside the connecting body 9 is, in particular, for connection between brackets 18 that protrude from the upper surface 3a of the beams 3 arranged on opposite sides with respect to the through opening 6.
- the method for installing the connection device 1 according to the present invention is as follows.
- the column 2 which has, along its own longitudinal extension, the through opening or openings 6 and the resting ledges 4a (and optionally 4b) arranged below the respective through openings 6, is prepared vertically.
- the connecting reinforcement frame 10 is arranged so as to at least partially cross in a longitudinal direction the through opening 6.
- the threaded end portions 12a of the respective connecting bars 12 that provide the connecting reinforcement frame 10 are screwed into respective sleeves 15 embedded at least partially in the beam 3.
- the completion casting 8 completely fills the recesses 14 and accordingly its surface directed upward is arranged at the same height as the upper surface 3a of the beams 3.
- a free region accordingly remains between the upper surface of the completion casting 8 that passes through the through opening 6 and the top of the through opening 6, and the connecting body 9 arranges itself inside such free region.
- the auxiliary reinforcement frame 13 is arranged above the upper surface of the completion casting 8 and so as to pass through such free region.
- the auxiliary reinforcement 13 is coupled to the brackets 18 that protrude from the upper surfaces 3a of the beams 3.
- connection body which in practice provides a structural screed which is arranged above the beams 3 and cooperates with the connection device 1 allows, for an equal height of the beams 3, to have a larger portion of continuity between the beams and the columns, with an evident advantage in terms of structural and anti-seismic performance.
- UHTC Ultra-High Performance Concrete
- This material has two main characteristics that are particularly important in the specific application: first of all, its behavior is ductile and it withstands large deformations prior to failure, differently from traditional concrete, which has a fragile behavior and fails with small deformations.
- the column remains monolithic and the hinges form at the ends of the beams and therefore outside the cross-section of the column.
- the materials used, as well as the dimensions, may be any according to requirements.
- tubular boxes 16 and the reinforcement frames in general by using high-performance steels, such as for example the steel known commercially by the acronym HPS (High Performance Steel).
- HPS High Performance Steel
Description
- The present invention relates to a device for connection between prefabricated beams and columns.
- Today, multi-story columns which have casting discontinuities at the portions between stories are used to provide the joints between columns and beams in prefabrication in the construction sector.
- In solutions of this type, the column is constituted by a plurality of reinforced-concrete segments which are mutually spaced longitudinally and are mutually connected, at their respective ends, by rebars that protrude from such reinforced-concrete segments.
- During assembly, the ends of the beams, also generally made of reinforced concrete, are engaged by resting on the faces that are directed upward of the segments that constitute the column, and any space left free between the segments is filled with a concrete casting, so as to complete the joining of the beams to the column.
-
US 6,058,669 discloses a rigid connection between the reinforcement of the beams and the rebars that protrude from the segments of the columns, so as to provide, in the nodes of the structure, hyperstatic couplings which are particularly useful if the building is designed to withstand seismic actions. - Although it is valid in principle, the solution outlined above has a criticality caused by the fact that in the points of discontinuity of the column there is a flexural deformability that makes it difficult to transport and install.
- Another known solution uses a continuous column which has, at the portion between stories, through openings in which connecting elements that protrude from the ends of the beams are designed to be accommodated.
- Although this solution makes the transport of the columns and their installation less problematic, it has the drawback of requiring that during production the beams are provided with such connecting elements, which are generally constituted by metallic inserts which are partially embedded in the casting.
- In order to solve the drawbacks noted above, this same Applicant filed, on 6 December 2005, Italian patent application No.
VR2005A000154 -
JP 2002 294858 A claim 1. -
GB 2 027 785 A - The aim of the present invention is to provide a device for connection between prefabricated beams and columns that is capable of eliminating or at least reducing drastically the drawbacks noted above.
- Within this aim, an object of the invention is to provide a device for connection between prefabricated beams and columns that is reliable in use and extremely flexible.
Another object is to provide a device for connection between prefabricated beams and columns that allows to reduce significantly the installation times of columns and beams. - Another object of the invention is to provide a device for connection between prefabricated beams and columns in which the joint between the columns and the beams ensures higher resistance to any seismic actions.
- Another object of the invention is to provide a device for connection between prefabricated beams and columns that is capable of ensuring easy and practical transport of the various structural components and in particular of the beams and of the columns.
- In accordance with the invention, there is provided a device connecting prefabricated beams and columns as defined in the appended claims.
- Further characteristics and advantages of the invention will become better apparent from the following detailed description of some preferred but not exclusive embodiments of a device for connection between prefabricated beams and columns according to the present invention, illustrated by way of non-limiting example in the accompanying drawings, wherein:
-
Figure 1 is an exploded perspective view of a multi-story column associated with a plurality of beams; -
Figure 2 is a sectional view, taken along a substantially vertical plane of arrangement, of a device for connection between columns and beams according to the invention; -
Figure 3 is an enlarged-scale view of a detail of the cross-section ofFigure 2 related to the region of connection between the beam and the completion casting; -
Figure 4 is a sectional view, taken along a substantially horizontal plane of arrangement, of a device for connection between columns and beams according to the invention; -
Figure 5 is an enlarged-scale view of a detail of the cross-section ofFigure 4 related to the region of connection between the beam and the completion casting; -
Figure 6 is a view, partially in phantom lines, of a column along a plane that is substantially perpendicular to the plane of arrangement of the cross-section shown inFigure 2 , in which, for the sake of greater clarity, the beam and the completion casting have been omitted; -
Figure 7 is a perspective view of the longitudinal end of a beam. - In the exemplary embodiments that follow, individual characteristics, given in relation to specific examples, may actually be interchanged with other different characteristics that exist in other exemplary embodiments.
- Moreover, it is noted that anything found to be already known during the patenting process is understood not to be claimed and to be the subject of a disclaimer.
- With reference to the figures, the present invention relates to a device, generally designated by the
reference numeral 1, for connection between acolumn 2 andbeams 3 which are prefabricated. - The
connection device 1 comprises, along theextension 100 of thecolumn 2, at least one pair of resting portions, in particular a pair of restingledges 4a, which are arranged on opposite sides with respect to the direction oflongitudinal extension 100 of the column and are designed to be engaged, by resting and at least during installation, by anend portion 5 of arespective beam 3. - At a region of the
column 2 that is formed above the pair or pairs of restingledges opening 6, which runs substantially parallel to thelongitudinal extension 101 of thebeams 3. - The through
opening 6 is designed to accommodatemeans 7 for connection between thecolumn 2 and thebeams 3 which are arranged on opposite sides with respect to the through opening 6. - According to a particularly important aspect of the present invention, the through opening 6 is extended over a greater height than the height of the
beams 3. - In greater detail, the connection means 7 comprise a
completion casting 8, which passes at least partially through the through opening 6 and is designed to connect stably eachbeam 3 to thecolumn 2 and accordingly thebeams 3 arranged on opposite sides with respect to the through opening 6. - The
connection device 1 further has a connectingbody 9, which is arranged above a surface 8a that is directed upward of thecompletion casting 8 and passes at least partially through the through opening 6 in order to mutually connect thesurfaces 3 a that are directed upward of thebeams 3. - In particular, the
connecting body 9 is designed to pass through the portion of the through opening 6 that lies above and higher than theupper surface 3a of thebeam 3 and accordingly above thecompletion casting 8, which as shown has its upper surface at the same height as theupper surface 3 a of thebeams 3. - Advantageously, the connection means 7 comprise a connecting
reinforcement frame 10 between thebeam reinforcement frames 11 of eachbeam 3 that is arranged on opposite sides with respect to the through opening 6. - The connecting
reinforcement frame 10 can be constituted for example by a plurality of connectingbars 12 and is designed to cross the respective through opening 6 and to be embedded in thecompletion castings 8. - Conveniently, the connecting
body 9 is adapted to provide a so-called structural screed, the functionality of which will be described in greater detail hereinafter. - In greater detail and with particular reference to the embodiment shown in
Figures 2 and 3 , at least oneauxiliary reinforcement body 13 is inserted in the thickness of the connectingbody 9 forming the structural screed and runs substantially parallel to the mainlongitudinal direction 101 of thebeams 3. - As shown in the exploded perspective view of
Figure 1 , it is possible to form, along theextension 100 of thecolumn 2, two pairs of restingledges longitudinal extension 100 of thecolumn 2 and are designed to be engaged by resting by anend portion 5 of arespective beam 3. - It appears evident that in this case each pair of resting
ledges - However, nothing prevents, as is further evident from the description, the
connection device 1 from having only two restingledges 4a and accordingly a single throughopening 6 formed along the extension of thecolumn 2. - Conveniently, the
beams 3 have, at theirend portion 5 designed to rest against therespective ledge recess 14 in which the concavity is directed upward. - In particular, the
recess 14 has a transverse dimension that substantially corresponds to the transverse dimension of the throughopening 6, and is designed, during the production of theconnection device 1, to be filled at least partially by thecompletion casting 8. - According to a further important aspect of the present invention, the
beam reinforcement frame 11 comprises at least one bar which has a respective threadedend portion 11 a, which is associated stably with asleeve 15 which is threaded internally and can be engaged by arespective end portion 12a of a respective connectingbar 12, which forms at least part of the connectingreinforcement frame 10. - The internally threaded
sleeve 15 is embedded at least partially in thebeam 3. - Advantageously, the through opening or
openings 6 are provided by atubular box 16, which is embedded within the column and optionally connected stably to areinforcement frame 17 of the column. - The
auxiliary reinforcement 13 arranged inside the connectingbody 9 is, in particular, for connection between brackets 18 that protrude from theupper surface 3a of thebeams 3 arranged on opposite sides with respect to the through opening 6. - The method for installing the
connection device 1 according to the present invention is as follows. - The
column 2, which has, along its own longitudinal extension, the through opening oropenings 6 and the restingledges 4a (and optionally 4b) arranged below the respective throughopenings 6, is prepared vertically. - Then the
end portions 5 of thebeams 3 are rested on the respective restingledges - The connecting
reinforcement frame 10 is arranged so as to at least partially cross in a longitudinal direction the through opening 6. - With particular reference to the illustrated embodiment, the threaded
end portions 12a of the respective connectingbars 12 that provide the connectingreinforcement frame 10 are screwed intorespective sleeves 15 embedded at least partially in thebeam 3. - This operation is evidently very easy with respect to a connection by welding, which in the specific case might entail, if not performed according to best practice, the risk of compromising the static strength of the
device 1 for connection between thebeams 3 and thecolumn 2. - At this point, the
recesses 14 and the lower volume of the throughopening 6 are filled with thecompletion casting 8, embedding within thecompletion casting 8 the connectingreinforcement frame 10. - Advantageously, the
completion casting 8 completely fills therecesses 14 and accordingly its surface directed upward is arranged at the same height as theupper surface 3a of thebeams 3. - A free region accordingly remains between the upper surface of the
completion casting 8 that passes through the through opening 6 and the top of the through opening 6, and theconnecting body 9 arranges itself inside such free region. - In particular, for the provision of the connecting
body 9, theauxiliary reinforcement frame 13 is arranged above the upper surface of the completion casting 8 and so as to pass through such free region. - Conveniently, the
auxiliary reinforcement 13 is coupled to the brackets 18 that protrude from theupper surfaces 3a of thebeams 3. - The presence of the connecting body, which in practice provides a structural screed which is arranged above the
beams 3 and cooperates with theconnection device 1 allows, for an equal height of thebeams 3, to have a larger portion of continuity between the beams and the columns, with an evident advantage in terms of structural and anti-seismic performance. - It has been found that it is particularly advantageous to use, as a material for providing the completion casting 8, a material known by the acronym UHTC (Ultra-High Performance Concrete), such as the one marketed by Lafarge S.A. under the trademark DUCTAL.
- This material has two main characteristics that are particularly important in the specific application: first of all, its behavior is ductile and it withstands large deformations prior to failure, differently from traditional concrete, which has a fragile behavior and fails with small deformations.
- Moreover, differently from traditional concrete, it also withstands significant traction stresses.
- All the characteristics of the invention indicated above as advantageous, convenient or the like may also be omitted or be replaced with equivalents.
- The invention thus conceived is susceptible of numerous modifications and variations, all of which are within the scope of the appended claims.
- In practice it has been found that the invention has achieved the intended aim and objects in all of its embodiments.
- In particular, it has been found experimentally that the device for connection between columns and beams according to the invention remains intact up to high load values, being truly ductile.
- Moreover, even after intense stresses, the column remains monolithic and the hinges form at the ends of the beams and therefore outside the cross-section of the column.
- In practice, the materials used, as well as the dimensions, may be any according to requirements.
- In particular, it has been found that it is particularly advantageous to provide the
tubular boxes 16 and the reinforcement frames in general by using high-performance steels, such as for example the steel known commercially by the acronym HPS (High Performance Steel). - Where technical features mentioned in any claim are followed by reference signs, those reference signs have been included for the sole purpose of increasing the intelligibility of the claims and accordingly such reference signs do not have any limiting effect on the interpretation of each element identified by way of example by such reference signs.
Claims (8)
- A device (1) for connection between prefabricated beams and columns comprising, a column (2) and prefabricated beams (3), and along the extension of said column (2), at least one pair of resting portions (4a, 4b), which are arranged on opposite sides with respect to the direction of longitudinal extension (100) of said column and are engaged, by resting, by an end portion (5) of a respective beam (3), at a region of said column (2) formed above said at least one pair of resting portions (4a, 4b) there being at least one through opening (6), which runs substantially parallel to the longitudinal extension (101) of said beams (3) and accommodates means (7) for connection between said column (2) and said beams (3), said opening (6) extending over a greater height than the height of said beams (3), said connection means (7) comprising a completion casting (8) which passes at least partially through said through opening (6), and a reinforcement frame (10) passing through said through opening (6) and being embedded in said completion casting (8), characterized in that said completion casting (8) having an upper surface at the same height as the upper surface (3a) of said beams (3) such that a free region remains between the upper surface of the completion casting (8) that passes through the through opening (6) and the top of the through opening (6), and a connecting body (9) being provided which is arranged inside said free region above the surface that is directed upward of said completion casting (8) and which passes at least partially through said through opening (6) and mutually connects the upward-facing surfaces (3a) of said beams (3), and said reinforcement frame (10) being connected between reinforcement frames (11) of the beams that are arranged on opposite sides with respect to said at least one through opening (6).
- The device for connection between prefabricated beams and columns according to claim 1, characterized in that said connecting body (9) is adapted to provide a structural screed.
- The device for connection between prefabricated beams and columns according to claim 2, characterized in that it comprises, within the thickness of said connecting body (9) that forms said structural screed, at least one auxiliary reinforcement frame body (13) that runs substantially parallel to the main longitudinal direction (101) of said beams (3).
- The device for connection between prefabricated beams and columns according to claim 1, characterized in that it comprises, along the extension of said column (2), two pairs of resting portions (4a, 4b) which are arranged on opposite sides with respect to the direction of longitudinal extension (100) of said column (2) and are designed to be engaged by resting by an end portion (5) of a respective beam (3).
- The device for connection between prefabricated beams and columns according to claim 4, characterized in that said beams (3) have, at their end portion (5) designed to rest against the respective resting portions (4a, 4b), a longitudinally elongated recess (14) in which the concavity is directed upward, its transverse dimension corresponding substantially to the transverse dimension of said through opening (6), said recess (14) being designed to be at least partially filled by said completion casting (8).
- The device for connection between prefabricated beams and columns according to claim 1, characterized in that said reinforcement frame (11) of the beam (3) comprises at least one bar which has a respective threaded end portion (11a) which is stably associated with an internally threaded sleeve (15) which can be engaged by a respective end portion (12a) of a respective connecting bar (12) which forms at least part of said connecting reinforcement frame (10), said threaded sleeve (15) being at least partially embedded within said beam (3).
- The device for connection between prefabricated beams and columns according to claim 1, characterized in that said at least one through opening (6) is provided by a tubular box (16), which is embedded within said column (2) and is connected stably to a reinforcement frame (17) of the column.
- The device for connection between prefabricated beams and columns according to claim 3, characterized in that said auxiliary reinforcement frame (13) provides a connection between brackets (18) that protrude from the upper surface (3a) of the beams (3) arranged on opposite sides with respect to said through opening (6).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ITVR2008A000109A IT1391215B1 (en) | 2008-09-30 | 2008-09-30 | CONNECTION DEVICE BETWEEN PILLARS AND PREFABRICATED BEAMS |
PCT/EP2009/062678 WO2010037775A2 (en) | 2008-09-30 | 2009-09-30 | Device for connection between prefabricated beams and columns |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2342856A2 EP2342856A2 (en) | 2011-07-13 |
EP2342856B1 true EP2342856B1 (en) | 2015-04-15 |
Family
ID=41147249
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP09736581.1A Not-in-force EP2342856B1 (en) | 2008-09-30 | 2009-09-30 | Device for connection between prefabricated beams and columns |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP2342856B1 (en) |
IT (1) | IT1391215B1 (en) |
WO (1) | WO2010037775A2 (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ITVR20130022A1 (en) * | 2013-01-29 | 2014-07-30 | Eiseko Engineering | CONSTRUCTION SYSTEM IN THE BUILDING SECTOR |
EP2951364B1 (en) * | 2013-01-29 | 2018-03-14 | Building Service di Cenzon Francesco e Pomini Giorgio S.n.c. | Building system for the construction industry |
JP6195463B2 (en) * | 2013-04-02 | 2017-09-13 | 株式会社竹中工務店 | building |
JP6367582B2 (en) * | 2014-03-18 | 2018-08-01 | 大成建設株式会社 | Construction method of frame structure |
JP6876384B2 (en) * | 2016-06-13 | 2021-05-26 | 株式会社竹中工務店 | Beam-column joint structure |
JP6833263B2 (en) * | 2016-06-28 | 2021-02-24 | 西松建設株式会社 | Column-beam joint structure and manufacturing method of joint members |
WO2019114912A1 (en) * | 2017-12-14 | 2019-06-20 | Mellah Djaffar Riadh | New method for constructing heavy precast buildings from earthquake-resistant concrete |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2349009A1 (en) * | 1976-04-20 | 1977-11-18 | Ccl Systems Ltd | Joining of concrete blocks - by casting second block round reinforcing wire protruding from metal sleeve in first block |
CH631777A5 (en) * | 1978-08-14 | 1982-08-31 | Rejop Nv | CONNECTION STRUCTURE BETWEEN PREFABRICATED CONCRETE PILLARS AND BEAM. |
FR2438719A1 (en) * | 1978-10-10 | 1980-05-09 | Klein Bernard | Concrete beam and column structure for building - uses post-inserted ties through heads of columns and beam end to give live load continuity |
FR2466576A1 (en) * | 1979-10-03 | 1981-04-10 | Saret | Beam to column joint concrete frame - uses steel column sleeve for welded beam end bracket and sleeve grooves form shear key in site concrete |
FR2491977A1 (en) * | 1980-10-15 | 1982-04-16 | Saret | Joint connection for building frame in reinforced concrete - has open reinforcement column cage retaining angled beams with connecting bars |
IT1135451B (en) * | 1981-02-13 | 1986-08-20 | Nievo Soncini | CONSTRUCTION SYSTEM, WITH PREFABRICATED ELEMENTS, FOR BUILDING STRUCTURES |
JP2002294858A (en) * | 2001-03-29 | 2002-10-09 | Ohbayashi Corp | Halfprecast concrete column member and halfprecast concrete beam member and construction method of reinforced concrete column-beam frame using these members |
-
2008
- 2008-09-30 IT ITVR2008A000109A patent/IT1391215B1/en active
-
2009
- 2009-09-30 EP EP09736581.1A patent/EP2342856B1/en not_active Not-in-force
- 2009-09-30 WO PCT/EP2009/062678 patent/WO2010037775A2/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
ITVR20080109A1 (en) | 2010-04-01 |
IT1391215B1 (en) | 2011-11-18 |
WO2010037775A2 (en) | 2010-04-08 |
EP2342856A2 (en) | 2011-07-13 |
WO2010037775A3 (en) | 2010-10-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2342856B1 (en) | Device for connection between prefabricated beams and columns | |
KR0171608B1 (en) | A fire-resistant prefabricated steel beam | |
KR102011412B1 (en) | Joint for Precast Beam and Columns | |
KR101228593B1 (en) | Composite girder using inner molding member and bridge construction method therwith | |
KR101663132B1 (en) | Self-supporting type column structure | |
KR20100115400A (en) | Steel-concrete composite crossbeam having t-shaped beam and construction methods using the same | |
KR101962853B1 (en) | Joint for Precast Beam and Columns | |
KR100646661B1 (en) | Hybrid beam for slim-floor and slim-floor structure using the same | |
KR101868677B1 (en) | Connection unit for coupling main steel girder and ancillary steel girder and, connection methods using the same | |
KR20090068536A (en) | Concrete-composite crossbeam and construction methods of slab structure using the same | |
KR100761785B1 (en) | Mold-concrete composite crossbeam | |
KR101791248B1 (en) | Seismic retrofit structure for reinforcing wall of mansonry | |
KR101705002B1 (en) | Prefabricated double composite plate girder bridge and its construction method | |
KR100992495B1 (en) | Bridge having integrated coping and girder | |
JP2008266910A (en) | Projection structure of anchorage or deviator of tendon, and construction method therefor | |
KR101013009B1 (en) | Apparatus having a girder connection anchor plate and the continuous construction method for a psc girder bridge by using the same apparatus | |
KR101124820B1 (en) | Combination Structure | |
KR101834423B1 (en) | Precast concrete beam with variable cross section | |
KR100768081B1 (en) | Columnless structure of apartment buildings | |
KR20130063358A (en) | Hollow girder having upper flange of different materials, and method for constructing bridge using for the same | |
JP6978901B2 (en) | Joining structure and joining method of precast concrete beam members | |
KR20100045740A (en) | Support assembly for precast half depth cantilever deck, constructing method of such cantilever deck, bridge using such assembly and constructing method for such bridge | |
KR102033052B1 (en) | Method for constructing truss bridge support with infilled tube using src girder | |
KR101765389B1 (en) | Light weight precast beam with void implementing archi mechanism | |
KR101109244B1 (en) | Structural Wall having Fiber Concrete Reinforcing Part for Plastic Hinge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20110422 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA RS |
|
DAX | Request for extension of the european patent (deleted) | ||
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: POINT S.R.L. |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Ref document number: 602009030664 Country of ref document: DE Free format text: PREVIOUS MAIN CLASS: H04L0001180000 Ipc: E04B0001210000 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04B 1/21 20060101AFI20141007BHEP |
|
INTG | Intention to grant announced |
Effective date: 20141023 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 722077 Country of ref document: AT Kind code of ref document: T Effective date: 20150515 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602009030664 Country of ref document: DE Effective date: 20150528 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20150415 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 722077 Country of ref document: AT Kind code of ref document: T Effective date: 20150415 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150817 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150715 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150716 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150815 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602009030664 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150415 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 |
|
26N | No opposition filed |
Effective date: 20160118 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602009030664 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 Ref country code: LU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150930 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20150930 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150930 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150930 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150930 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150930 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160401 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20090930 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20210726 Year of fee payment: 13 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220930 |