EP1978207A2 - Pare-feu sur des constructions - Google Patents
Pare-feu sur des constructions Download PDFInfo
- Publication number
- EP1978207A2 EP1978207A2 EP20080005234 EP08005234A EP1978207A2 EP 1978207 A2 EP1978207 A2 EP 1978207A2 EP 20080005234 EP20080005234 EP 20080005234 EP 08005234 A EP08005234 A EP 08005234A EP 1978207 A2 EP1978207 A2 EP 1978207A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- shotcrete
- fire protection
- protection according
- layer
- fire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 239000011378 shotcrete Substances 0.000 claims abstract description 145
- 239000004567 concrete Substances 0.000 claims abstract description 73
- 239000002245 particle Substances 0.000 claims abstract description 38
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 23
- 239000002984 plastic foam Substances 0.000 claims abstract description 10
- 238000010276 construction Methods 0.000 claims description 37
- 229920003023 plastic Polymers 0.000 claims description 29
- 239000004033 plastic Substances 0.000 claims description 29
- 239000000835 fiber Substances 0.000 claims description 27
- 230000002787 reinforcement Effects 0.000 claims description 16
- 239000000853 adhesive Substances 0.000 claims description 15
- 230000001070 adhesive effect Effects 0.000 claims description 15
- 239000006260 foam Substances 0.000 claims description 13
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- -1 polypropylene Polymers 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 9
- 239000003063 flame retardant Substances 0.000 claims description 8
- 229910052500 inorganic mineral Inorganic materials 0.000 claims description 8
- 239000011707 mineral Substances 0.000 claims description 8
- RNFJDJUURJAICM-UHFFFAOYSA-N 2,2,4,4,6,6-hexaphenoxy-1,3,5-triaza-2$l^{5},4$l^{5},6$l^{5}-triphosphacyclohexa-1,3,5-triene Chemical compound N=1P(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP=1(OC=1C=CC=CC=1)OC1=CC=CC=C1 RNFJDJUURJAICM-UHFFFAOYSA-N 0.000 claims description 6
- 239000003365 glass fiber Substances 0.000 claims description 6
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 239000004744 fabric Substances 0.000 claims description 5
- 230000014759 maintenance of location Effects 0.000 claims description 5
- 239000004743 Polypropylene Substances 0.000 claims description 4
- 239000002318 adhesion promoter Substances 0.000 claims description 4
- 238000009435 building construction Methods 0.000 claims description 4
- 229920001155 polypropylene Polymers 0.000 claims description 4
- 239000007767 bonding agent Substances 0.000 claims description 3
- 230000003749 cleanliness Effects 0.000 claims description 3
- 239000003973 paint Substances 0.000 claims description 3
- 239000012744 reinforcing agent Substances 0.000 claims description 3
- 239000012779 reinforcing material Substances 0.000 claims description 3
- 239000003513 alkali Substances 0.000 claims description 2
- 239000004753 textile Substances 0.000 claims description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 claims 1
- 229910052799 carbon Inorganic materials 0.000 claims 1
- 239000011521 glass Substances 0.000 claims 1
- 239000011435 rock Substances 0.000 abstract description 10
- 238000007789 sealing Methods 0.000 abstract description 8
- 239000011888 foil Substances 0.000 abstract description 7
- 239000004794 expanded polystyrene Substances 0.000 abstract 1
- 239000010410 layer Substances 0.000 description 112
- 239000000463 material Substances 0.000 description 24
- 238000009413 insulation Methods 0.000 description 16
- 239000004698 Polyethylene Substances 0.000 description 12
- 229920000573 polyethylene Polymers 0.000 description 12
- 238000010438 heat treatment Methods 0.000 description 9
- 239000004568 cement Substances 0.000 description 8
- 230000006378 damage Effects 0.000 description 7
- 239000004566 building material Substances 0.000 description 6
- 125000006850 spacer group Chemical group 0.000 description 6
- 230000008901 benefit Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 5
- 230000006835 compression Effects 0.000 description 4
- 238000007906 compression Methods 0.000 description 4
- 239000011148 porous material Substances 0.000 description 4
- 230000001681 protective effect Effects 0.000 description 4
- 239000004793 Polystyrene Substances 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 3
- 239000011230 binding agent Substances 0.000 description 3
- 210000000078 claw Anatomy 0.000 description 3
- 239000011248 coating agent Substances 0.000 description 3
- 238000000576 coating method Methods 0.000 description 3
- 230000002349 favourable effect Effects 0.000 description 3
- 230000009970 fire resistant effect Effects 0.000 description 3
- 238000007689 inspection Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 239000012528 membrane Substances 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 239000005060 rubber Substances 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 238000005507 spraying Methods 0.000 description 3
- 230000005641 tunneling Effects 0.000 description 3
- 229920000049 Carbon (fiber) Polymers 0.000 description 2
- 229910000746 Structural steel Inorganic materials 0.000 description 2
- 239000000654 additive Substances 0.000 description 2
- 239000012615 aggregate Substances 0.000 description 2
- 239000004917 carbon fiber Substances 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 229920002223 polystyrene Polymers 0.000 description 2
- 230000037452 priming Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 239000000779 smoke Substances 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 238000004901 spalling Methods 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 238000004381 surface treatment Methods 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 238000010257 thawing Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 238000009736 wetting Methods 0.000 description 2
- 239000004677 Nylon Substances 0.000 description 1
- 239000004952 Polyamide Substances 0.000 description 1
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 239000011358 absorbing material Substances 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 238000004026 adhesive bonding Methods 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 239000011324 bead Substances 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 239000010962 carbon steel Substances 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 230000001010 compromised effect Effects 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 239000000470 constituent Substances 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000013016 damping Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000001704 evaporation Methods 0.000 description 1
- 229920006248 expandable polystyrene Polymers 0.000 description 1
- 238000005187 foaming Methods 0.000 description 1
- 238000013012 foaming technology Methods 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 230000003116 impacting effect Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 239000011229 interlayer Substances 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000002372 labelling Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000008267 milk Substances 0.000 description 1
- 210000004080 milk Anatomy 0.000 description 1
- 235000013336 milk Nutrition 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 238000004806 packaging method and process Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 229920002647 polyamide Polymers 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 229920001296 polysiloxane Polymers 0.000 description 1
- 229920006327 polystyrene foam Polymers 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 239000011819 refractory material Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 239000004094 surface-active agent Substances 0.000 description 1
- 229920002994 synthetic fiber Polymers 0.000 description 1
- 239000012209 synthetic fiber Substances 0.000 description 1
- 238000009827 uniform distribution Methods 0.000 description 1
- 238000003911 water pollution Methods 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
Definitions
- the invention relates to the fire protection of buildings, especially in underground spaces such as tunnels and tunnels.
- Fire protection means all measures that prevent the spread of fire and smoke.
- the structural measures in buildings are very diverse and include in particular the building materials and components, regulated in DIN 4102 and ENV 1992-1-2.
- the invention will be discussed in the application to tunnels.
- fire protection has gained considerable importance in recent years due to various fire cases.
- more and more computational evidence is required, cf. for example ENNV 1992-1-2.
- the fire resistance / fire resistance of a component is of crucial importance. It is measured by the duration that a component retains its function in case of fire.
- the building materials are divided into non-combustible building materials and combustible building materials.
- Usual fire resistance skis are: F0 (in case of fire functional for less than 30 minutes, F30 fire-retardant (at least 30 minutes in case of fire), highly fire resistant (at least 60 minutes in case of fire, F90 fire-resistant (at least 90 minutes in case of fire), F120 highly resistant to fire (in case of fire at least 120 minutes functional), F180 fire-resistant (in case of fire for at least 180 minutes)
- F0 in case of fire functional for less than 30 minutes
- F30 fire-retardant at least 30 minutes in case of fire
- highly fire resistant at least 60 minutes in case of fire
- F90 fire-resistant at least 90 minutes in case of fire
- F120 highly resistant to fire in case of fire at least 120 minutes functional
- F180 fire-resistant in case of fire for at least 180 minutes
- the fire situation in all countries subject to the approval requirement for the use of combustible building materials involves a fire load with a temperature between 1000 and 1200 degrees Celsius.
- Another problem is leaking mountain water. In winter, the water freezes. There is a danger of falling ice masses. This danger is usually met with a film seal. Depending on the thickness of the film is also spoken by webs. In part, there is also the name membrane.
- the foil seal dissipates the water. At the same time a freezing of the water is prevented with a thermal insulation.
- the thermal insulation can be made of polyethylene foam.
- the thermal insulation can be arranged inside the tunnel in front of the film seal. Depending on the nature of the thermal insulation may be connected to the film seal or at the same time form the seal.
- the thermal insulation as well as the film seal can be welded or glued to the joints. Preferably, an overlap of the film edges or the edges of the thermal insulation takes place.
- a compound of the film edges or the edges of the insulation with a strip of material by welding or gluing is provided. As far as is spoken in the further of a film seal and / or thermal insulation, includes the above possibilities.
- the film seal is composed of film webs.
- the film webs are usually laid overlapping on the mountain outbreak, so that the film edges can then be welded together.
- a double seam is produced during welding.
- the gap can be pressurized with air pressure. When the gap is closed, a sufficient sealing effect can be assumed if the pressure drop in the intermediate space does not exceed certain limits over a certain period of time.
- the attachment of the film is done in different ways. With low strength requirements has in the past enforced a film attachment with a trained as a rondelle fastener made of plastic.
- the rondelle is nailed or shot to the mountains or to a first shotcrete layer applied.
- shooting the roundels are not hit with a hammer or the like in the mountains, but driven by a blasting cartridge in the mountains or in the first applied shotcrete layer.
- the known roundels are for example in the DE-3244000C1 . DE4100902A1 . DE19519595A1 . DE8632994.4U1 . DE8701969.8U1 . DE20217044U1 shown and described.
- the known roundels have been welded to the film.
- Rondelles with a predetermined breaking point were considered to be particularly favorable.
- the rondels should break at a load on the film at the predetermined breaking point.
- the strength of the predetermined breaking point is significantly lower than the film strength. This will cause the rondelle to break first if excessive tension is applied to the foil. That is, the film seal will remain intact upon excessive pull in the film while the disk ruptures.
- plastic rondels are only suitable if low forces arise during the attachment of the films and subsequent application of shotcrete.
- the known roundels have a diameter of about 150 mm and a thickness of 3 to 4 millimeters. Such rondels have great strength.
- the known anchors have diameters of 12 or 14 or 16 or 20mm. They are preferably made of stainless steel and are profiled on the mountain side to develop a high tensile strength in the mountains. For the anchor corresponding holes are introduced into the mountains. Subsequently, the anchors are fixed with a mounting cement or other suitable mounting means in the holes. Such anchors can absorb much larger forces in contrast to the known nail construction. The loads are directed to the mountains. With the anchors, it is therefore possible to build a tunnel that can withstand the stresses of passing trains and passing vehicles. At the free end of the anchor are usually provided with a thread, preferably according to the diameter with metric thread M12 or M14 or M16 or M20. At the threaded end, the steel rondelles are held between two screws. The screws allow adjustment of the rondels on the anchor.
- the anchors are usually so long that they protrude beyond the steel rondels out into the tunnel. This serves to attach a wire grid as a retention during injection of the concrete and to stiffen the tunnel lining by connecting to the mountains.
- the wire mesh also serves to reinforce the shotcrete layer.
- a spacer for the wire mesh can be mounted on the anchor.
- Known spacers are star-shaped provided with rods to support the wire mesh as large as possible.
- the film is then clamped between the steel rondels.
- the mountain water runs along the anchors.
- the anchors and the rondelles are subject to corresponding water pollution.
- the invention has recognized that the water penetrates through the screw thread of Rondellen and anchor. The water then also passes through the opening formed in the film. There are leaks. Even a dropwise leakage leads to significant amounts of water in a corresponding time. The water can escape at the inside of the tunnel.
- the invading water freezes. It forms icicles, which fall at the latest in thawing thawing and form a bad risk of accidents. In addition, the ice can cause significant destruction of the tunnel.
- the construction described above with a distance from the mountain excavation tunnel construction is a variant.
- tunnel construction which rests directly on the mountain eruption.
- This variant is particularly advantageous in unstable mountains, because it supports the mountains directly, so that the mountain outbreak only withstand static forces, while a distanced tunnel construction is additionally burdened by the dynamic forces of erupting rock.
- the tunnel construction supporting the mountain provides that a shotcrete layer is first applied to the rock outcrop.
- This layer has the task to seal the surface of the mountain eruption, in order to prevent a so-called leafing of the mountain layers.
- a shotcrete layer holder for a plastic seal are attached.
- a load-bearing concrete layer is built up on the plastic seal.
- This concrete layer is either cast or shotcrete.
- the shotcrete is handled in the same way as in the above-described spaced tunnel construction. This includes mesh and other measures to facilitate the shotcrete build-up at the seal.
- a lightweight concrete is applied to the seal as shotcrete layer.
- the lightweight concrete has after the older proposal supplements of plastic foam particles, preferably wholly or partly made of polystyrene, which carries the short name EPS. There are also other plastics come for foam particles into consideration.
- Such lightweight concrete is described for example in WO2004 / 101460A1 . WO 00/06515 . US 5618344A . US 4547223A . EP 725043A . WO 9.4 / (05896 . EP 295628B1 . FR 2499453 . EP 449360A1 . DE19831295A1 . DE 2127421 . EP 1590308A1 . EP 1122223A1 . DD297386A5 . DE 19529695A1 . DE 4406866A1 ,
- the lightweight concrete has processing advantages in tunnel construction. As the name says, the lightweight concrete is comparatively light compared to normal concrete. The lightweight concrete is easier to build up as a layer than normal concrete, Due to the lower weight of light concrete slides / flows not so easy down. Lightweight concrete also has heat-insulating properties.
- a plastic foam in particular a polyethylene (PE) foam is used in addition to the thermal insulation, as described above.
- PE foam finds a hold on the same anchors as the membrane.
- the lightweight concrete when the lightweight concrete is applied with a so-called rebound grid or rebound mesh or the like, which facilitates the construction of a concrete layer and unfurls a reinforcing effect in the concrete layer, the load capacity of lightweight concrete is low. Therefore, a concrete layer is required on the inside if the tunnel construction must have a proper load capacity. This applies in particular to the distance tunneling of railway tunnels or road tunnels.
- the structure of the shotcrete construction is facilitated by the priming of the film seal and aids such as rebound mesh / grids, but also by claw mats.
- the inventive use of a primer makes in addition to the surface design described above, a contribution to the connection of shotcrete to the film seal and the claw mat.
- the primer can be made with the same cement or adhesive or binder that is also used for the shotcrete, but without the benefits provided in the shotcrete.
- Cement / adhesive / binder are preferably used in powder form. They are either mixed on the foil surface with water and sprayed or sprayed together with the powdered cement / adhesive / binder before application.
- a special primer in the form of a plastic adhesive with mineral admixture proportion is used.
- the plastic adhesive has a special adhesive effect on the plastic of the film seal and the plastic of the claw mat as well other aids.
- the mineral mixture proportions of the adhesive improve the adhesion of the shotcrete.
- the jetting of the primer leads to a thin layer wetting of the film surface and the aids.
- the layer thickness of the wetting is adjusted so that the primer does not run down by its own weight.
- the order quantity is reduced until no run-down is observed.
- the primer application can be varied by changing other parameters. The other parameters are the speed and movement of the application nozzle. By movement of the application nozzle, the movement of the nozzle relative to the film seal is meant. Repeated spraying of the film seal at the same place can reduce the order by reducing the repetition of spraying.
- water-absorbing materials are incorporated into the primer.
- the shotcrete can be applied in a layer or layer or in several layers or layers on the film seal. It is advantageous to apply the shotcrete layer in layers and starting from below. This is achieved by a reciprocating movement of the sprayed concrete application tool.
- shotcrete or concrete and additives and aggregates and reinforcing inserts and as tools optionally materials and devices are used, as described for example in the following publications: DE69910173T2 . DE69801995T2 . DE69721121T2 . DE69718705T2 . DE69701890T2 . DE69700205T2 . DE69418316T2 . DE69407418T2 . DE69403183T2 . DE69122267T2 .
- the shotcrete is optionally conveyed dry to the spray nozzle where it is mixed with the necessary amount of water.
- the shotcrete is adjusted so that it develops sufficient early strength after impact in a short time.
- To adjust the shotcrete accelerator can be used, which accelerate the setting of the shotcrete. Water-absorbing constituents in the shotcrete and / or in the primer also contribute to the formation of the early strength.
- the tunnel construction is built at the inspection distance from the rock outbreak. This makes it possible to check the condition of the rock outcrop. For example, it can lead to rockfall, which destroys the foil seal and thus creates a leak. Furthermore, larger rockfalls usually announce themselves earlier by smaller rockfalls. For larger rockfalls, there is a risk of burglary in the tunnel. Inevitably, the tunnel users are also endangered. As a result, regular inspections of the rock excavation and refractory constructions are appropriate. The inspection requires at least partially a walkability of the cavity between the shotcrete construction and the mountain outbreak. The walkability begins at a distance of about 0.4 m between the rock outcrop and the shotcrete expansion. The accessibility is the more comfortable, the greater the distance. Preferably, the distance is limited to 1m for economic reasons.
- the film described above is provided on the mountain side with a protective fleece to prevent damage to the film during installation or damage caused by falling stones.
- Fire protection is preferably applied refractory material. Fireproof plates are popular. The fire protection at the tunnel is very expensive. The invention therefore has the task of reducing the cost of fire protection in the tunnel.
- this is achieved in that inside tunnel lightweight concrete is used as fire protection, which consists of concrete and plastic foam particles, being used as plastic polyethylene or polystyrene application.
- fire protection which consists of concrete and plastic foam particles, being used as plastic polyethylene or polystyrene application.
- such lightweight concrete behaves very advantageous under fire load. There is no chipping. This is attributed to evaporating water readily causing the plastic foam particles to collapse. In the resulting cavities of the steam can escape.
- the investigations of the fire protection of the invention have shown that even a 60mm thick layer of concrete according to the invention easily holds a fire load of 1000 to 1200 degrees Celsius for 90 minutes and more.
- the thickness is at least 60mm. The thicker the layer, the longer the service life in the event of fire. In time, the tunnel can be cleared.
- the relatively poor thermal conductivity of the lightweight concrete comes into play. This means that the fire load is only carried slowly into the interior of the lightweight concrete. In the above fire test, the temperature remained so low that a lying behind the fire protection of the invention thermal insulation of polyethylene (PE) as well as the film seal is not compromised.
- PE polyethylene
- EPS is widely used in the packaging industry.
- the production of lightweight concrete has become one of EPS's applications.
- EPS is considered unsuitable for fire safety in this document.
- the justification becomes clear from the assessment of other building material with trapped pores. It is assumed that excessive pressure build-up of steam in the pores and this leads to the risk described above.
- the lightweight concrete used as fire protection in the tunnel has a thickness of 10 to 250 mm, preferably a thickness of 40 to 150 mm, more preferably 50 to 130mm.
- the density of shotcrete depends on the amount of EPS particles in the shotcrete.
- the proportion of EPS particles is so large; that results in a density of the applied shotcrete of 300 to 2000 kg per cubic meter.
- the density is 350 to 1200 kg per cubic meter, more preferably 400 to 1100 kg per cubic meter.
- Conventional shotcrete has a density of about 2500 kg per cubic meter
- the size or diameter of the EPS particles is preferably between 0.5 and 7 mm, more preferably between 1 and 6 mm.
- the density of the EPS particles is preferably between 10 and 50 kg per cubic meter, more preferably between 20 and 40 kg per cubic meter.
- the EPS particles tend to segregate in the shotcrete.
- the surface treatment preferably consists of the application of an adhesion promoter.
- the order of the bonding agent can be done in one or more steps.
- the use of surfactants as adhesion promoters is known. Because of the details is on the DE 4428200 A1 Referenced.
- the particles are first wholly or partially coated with an adhesive which is wholly or partially a plastic adhesive, and the EPS particles are then brought into contact with fine-grained mineral material.
- an adhesive which is wholly or partially a plastic adhesive
- the EPS particles are then brought into contact with fine-grained mineral material.
- the EPS particles experience a weighting due to the mineral coating, which considerably simplifies the transport of the EPS particles.
- the mineral coating counteracts the risk of fire during transport and storage of EPS particles until they are processed in shotcrete.
- the admixture of the EPS particles is controlled, so that an integral shotcrete is created.
- a first layer of shotcrete is first applied to an area of the circumference of the tunnel before one or more further layers of shotcrete are applied to the same area.
- the shotcrete technique is to be seen, in which the tunnel peripheral surface is provided with a single shotcrete layer.
- integral shotcrete is based on the integral foam of the plastic foam technology. The integral foam has less foaming on the outer surfaces than in the middle.
- At least two shotcrete layers are preferably provided for the integral technique according to the invention.
- Particular advantages have three layers, of which the mountain side position and the tunnel inside position by the Interlayer are spaced and have a higher strength, so that the expansion formed by the shotcrete is given a high load capacity.
- the thermal insulation of the shotcrete according to the invention should be taken into account in the heat calculation for a tunnel. It leads to a reduction in the thickness of otherwise provided thermal insulation and can make an otherwise provided heat insulation unnecessary.
- the edge region / layer of the shotcrete layer designed with greater strength has optionally a thickness of 5 to 30 mm, preferably a thickness of up to 25 mm, from a shotcrete layer total thickness of 50 mm and more.
- the thickness of the edge region designed with greater strength is preferably dependent on the total thickness of the shotcrete layer.
- reinforcing agents in the edge region or the mountain side and / or tunnel inner side layer influence the thickness thereof. With built-in grids care must be taken to ensure sufficient material coverage of the grid.
- the integral shotcrete according to the invention also comprises layers / layers which are applied at intervals.
- the integral shotcrete according to the invention also comprises layers / layers of different concretes.
- the integral shotcrete according to the invention also comprises differently applied layers and / or differently treated layers.
- the strength of the shotcrete can be increased at desired tunnel surfaces, especially in the edge areas / outdoor areas in addition to the fact that the shotcrete is provided with a reinforcement.
- a reinforcement is provided at least to the interior of the tunnel.
- the reinforcement may consist of plastic fibers and / or glass fiber and / or carbon fibers and / or steel.
- plastic can for example Find polypropylene application.
- the synthetic fibers should reduce or prevent shrinkage cracks in a fiber concrete.
- plastic with high flash point is used.
- the plastic fibers can also be added to the shotcrete for fire protection. It is also possible to equip individual shotcrete layers with plastic fibers instead of the plastic particles. Preferably, the addition of fibers only takes place to increase the strength in the edge region. At least one amount of fiber of 1 kg per cubic meter shotcrete is preferably added to the shotcrete according to the invention in the intended area, preferably at least a fiber amount of 1.5 kg per cubic meter shotcrete.
- the glass fibers used are preferably alkali-resistant fibers which do not react with the alkalis of the concrete.
- Steel fibers can be used in many different ways: stainless, as structural steel, with hooks and without hooks, in various shapes.
- Fibers instead of fibers, threads and cords or even metallic wires can be used. It is the same as for the fibers. Reinforcement wires are offered extensively with properties according to DIN 488 with minimum diameters of a few millimeters.
- mixtures of different fibers come into consideration; both of fibers of different dimensions as well as different other form as well as of different material.
- different mixtures of threads, cords and wires into consideration.
- threads, cords and wires can be mixed with fibers.
- foam particles are provided in each case in the region of the shotcrete, in which without the foam particles there is a risk of spalling of concrete parts.
- the spalling is due to released water and water vapor.
- the vapor is to escape into the cavities, which arise by collapse / collapse of the foam particles under fire load.
- the tissues may also be made of metal.
- mesh mats or the like made of plastic or glass fibers / threads or carbon fibers / threads are preferably mats with a basis weight of 10 to 500; preferably 50 to 200, more preferably 80 to 150 grams per square meter provided.
- the basis weight is usually used for the labeling of textiles.
- the grid mats made of steel are usually offered as mats according to DIN 488 with minimum wire thickness of a few millimeters, profiled and unprofiled.
- the reinforcing mats and reinforcing mesh must be placed at a sufficient distance from the edge / outer surface of the shotcrete to cover with concrete. The dimension depends on both the concrete and the reinforcing material.
- the reinforcement mats and fabrics also come in combination with fibers and / or cords and / or threads and / or wires.
- a reinforcement in shotcrete layers of different density is provided.
- the outer skin has a favorable effect on an accident in the tunnel, because the vehicles are steered more in the direction of travel.
- an otherwise yielding core ensures an advantageous damping effect for impacting vehicles in the event of an accident.
- the high-strength skin has in relation to the core at least twice, preferably at least four times and most preferably at least eight times strength.
- the reinforcement of the shotcrete layer brings about an advantageous resistance to vibration loading from passing vehicles.
- the fire protection according to the invention can also be applied if the tunnel lining with the foil seal and the thermal insulation is held by fasteners described above, which are held by nails and other fastening means on a mountain-side shotcrete layer.
- fastening means are provided for the reinforcement according to the invention as well as for a desired retention of the applied shotcrete.
- the fasteners can be formed by a bolt hook and eyelets.
- the bolts, hooks and eyes are provided with a flange or a rondel and this flange in turn can be welded or glued to the film.
- Welds or splices are preferably selected as the film surfaces which are opposite to the fasteners described above on the films. There, the load from the tunnel extension can be forwarded particularly favorable over the fasteners in the mountains.
- the fire protection of the invention can also be used in building construction.
- the fire protection according to the invention can be struts, columns, beams, purlins and other supporting parts coated so that a fire, the statics of the building is not affected at least until the building is vacated by people.
- Fire protection in building construction should withstand at least a fire load of 1000 degrees Celsius for 30 minutes, preferably withstand at least 60 minutes so that trapped persons can escape.
- the visible side is regularly on the shotcrete. It is advantageous if the visible side is provided with a clean layer. This may be a stain-resistant and preferably cleanable paint or plates or sheets or webs or other. The layer of cleanliness is chosen so that it does not pose a fire hazard.
- Fig. 1 shows a mountain outbreak 1 in stable mountains.
- the mountain outbreak 1 is used to make a tunnel.
- a shotcrete construction is provided in the mountain outbreak.
- the shotcrete construction consists roughly of a film layer 4 and a shotcrete layer 3.
- the film layer 4 is composed of individual webs, which are laid overlapping and are welded together at the overlapping edges. In this case, two adjacent welds are provided at a distance from each other. The cavity between the welds is pressurized with compressed air to check the tightness of the welds.
- an armature 5 is shown schematically.
- the armature 5 is connected to the protruding end of the mountains with a rondellenartigen fastener 14.
- the film layer 4 is applied.
- a fastener 15 At the film layer side, which is opposite to the fastener 14 is a fastener 15.
- the fasteners 14 and 15 clamp the film layer 4 between them.
- the fasteners carry a spacer 13 for a wire mesh 12.
- the wire mesh 12 has two purposes. It serves to build up the shotcrete layer 3 by preventing the concrete layer rebounding from falling off of the foil layer.
- the wire mesh 12 forms a reinforcement for the shotcrete layer.
- the anchors After solidification of the shotcrete construction, the anchors form a solid composite of the expansion with the mountains.
- a shotcrete layer 17 made of lightweight concrete is shown innein rubber on the shotcrete construction.
- This layer 17 has a thickness of 40mm.
- the lightweight concrete consists of conventional shotcrete and a surcharge of EPS.
- the surcharge is in the exemplary embodiment 10Vol%, based on the total volume of lightweight concrete.
- the EPS has a particle size of 4 to 6mm.
- Fig. 3 shows further details of the expansion.
- the mountain-side fastener hereinafter referred to as the outside fastener, designated 9.
- the fastener 9 has a round and curved shape, such as a dome in the embodiment.
- a threaded tube 8 is welded, opposite (inside) a threaded rod 10 is welded.
- an extension rod 7 is provided between the armature 5 and the fastener 9, an extension rod 7 is provided.
- the extension rod is necessary because the anchor sits in a mountain ridge and the distance to the fastener 9 must be bridged.
- the threaded tube 8 forms on the fastener 9 a nozzle, the threaded rod 10 a mandrel.
- the extension rod 7 is screwed into the neck of the Bestigers 9.
- the extension rod 7 is connected at the opposite end via a threaded sleeve 6 with the anchor 5. For this purpose, corresponding threads are provided on the anchor end and in the sleeve and on the extension
- the 4 and 5 show another embodiment of fasteners according to the invention.
- the outside fastener is called 20, the inside fastener 21.
- a nozzle 22 is welded.
- the nozzle 22 is not simply placed on the closed bottom of the fastener, but by a central opening in the Bottom of the fastener 20 performed so that the nozzle 22 protrudes inside a piece.
- the degree of projection is precisely matched to the nature of two seals 27 and 28, which the in Fig. 4 include film layer designated 26 between them.
- the measure determines the possible compression of the seals 27 and 28 during the clamping of the film layer 26.
- the seals 27 and 28 and the film layer 26 have openings sufficient to be pushed over a protruding as a mandrel threaded rod 23 and the protruding pipe 22.
- the nozzle 22 is provided at each end with a blind hole. Both blind holes are separated by a material wall.
- the threaded rod 23 sits as a mandrel.
- outside blind hole sits in the installation situation of the anchor. The described material wall prevents leakage through the thread.
- the seals 27 and 28 are in the embodiment of polyethylene foam with a density of 30 kg per cubic meter, in other embodiments of 18 to 40 kg per cubic meter.
- the purpose of the seals is to compensate for unevenness in the surfaces of the fasteners and the film and imbalances between the fasteners.
- the thickness of the seals is 5mm, in other embodiments 3 to 10 mm. By tightening the two fasteners experienced the seals a strong compression, so that the density of the seals comes close to the density of non-foamed polyethylene.
- the thickness of the seal is reduced by bracing the two fasteners to at least 50%, preferably to at least 70% and even more preferably to at least 90%.
- the reduction refers to the foam volume. In this consideration, the volume of unfoamed film remains the same plastic and the same basis weight unconsidered. That is, the initial dimension relevant to the thickness reduction is reduced by the thickness of the unfoamed film.
- the seals are self-adhesive on both sides.
- the adhesive surfaces are covered by silicone-coated paper before assembly.
- the paper is first peeled off the contact surface with the fastener 20. Thereafter, the seal 28 can be positioned and pressed on the fastener 20. Subsequently, the paper is withdrawn from the contact surface of the seal 28 with the film layer 26 and pressed the film layer against the seal. This results in a provisional stop of the film seal 26.
- the paper is withdrawn from the contact surface of the seal 27 with the film layer 26 and the seal 27 is positioned and pressed against the film layer 26.
- the fastener 21 has an opening that is slightly larger than the diameter of the threaded rod 23 but at the same time significantly less than the diameter of the nozzle 22.
- Fig. 5 After pushing the inner fastener results in the Fig. 5 illustrated situation.
- the seals have the shapes and thicknesses designated 27 'and 28'.
- the fasteners 20 and 21 are compressed so far that the seals develop a desired pressure against the film layer on the one hand and against the contact surfaces with the fasteners on the other. This pressure also causes a clamping of the film layer. Together with the adhesive connection results in a very advantageous holding the film layer.
- Fig. 6 shows a further embodiment for the fastener.
- the fasteners are designated 30 and 31.
- the two fasteners 30 and 31 enclose a film layer 32 between them.
- the outside fastener 31 is provided with a pot-like recess.
- the inside fastener 30 is like a lid in the pot-like fastener 31, so that between the curved edges a desired clamping takes place. In this case, inclined surfaces act like wedges against each other, so that with little force over appropriate ways a strong clamping, even a large-scale clamping can be achieved.
- the fastener 31 is also provided with a curved edge 33.
- Fig. 8 shows a possible honeycomb 43 for the in Fig. 2 illustrated wire mesh.
- Fig. 7 shows a spacer 40 for the positioning of the wire mesh.
- the spacer 40 is pressed with another nut against the nut 25.
- the spacer 40 has various arms to which the wire mesh 43 can be hooked.
- Fig. 9 shows a conventional outside fastener 40 with a central continuous thread and with an adapter 42.
- the adapter 42 has a mandrel 41 with an external thread. Opposite the mandrel 41, the adapter 42 has an outer diameter which corresponds to the diameter of the integrally formed neck 44 on the fastener 40.
- the adapter 42 is screwed with its mandrel 41 in the fastener 40, that the adapter 42 closes against the nozzle 44 and the two contact surfaces are stretched against each other. Both contact surfaces are processed so that leakage is excluded.
- the seal is additionally secured by a sealing ring 45.
- the adapter 42 has a threaded hole formed as a blind hole 43, with which a screw on the anchor is possible.
- Fig. 10 also shows a conventional outside fastener 50 with a central continuous thread.
- This fastener is combined with a mandrel 51 having a collar 52 and a part 53. With the part 53, the mandrel has been screwed from the inside through the fastener and screwed into a threaded sleeve 54 described above for extension operations.
- the collar 52 is closing against the fastener 50 and the threaded sleeve 54 is closing against the stub 57 of the fastener.
- the contact surfaces are the same as after Fig. 9 processed.
- a seal 56 is provided between the collar 52 and the fastener 50.
- the embodiment according to Fig. 11 differs from the embodiment according to Fig. 4 in that, instead of the connecting piece 22, a connecting piece 61 with a continuous threaded bore is provided.
- the nozzle 61 is seated like the nozzle 22 on the designated anchor end 71.
- the threaded rod 60 is like the threaded rod 23 in the socket 61.
- a plug 62 made of plastic, nylon in the embodiment, in other embodiments of polyamide. The plug 62 undergoes a compression between the armature end 63 and the threaded rod 60, so that the plastic deforms sealingly into the threads.
- Fig. 12 shows a further embodiment with a nozzle 70 with an anchor end 71 and a threaded rod 72.
- a plug 62 a plurality of plugs 73 and 74 are provided.
- the plug 73 has a basic length or standard length
- the plug 74 has a significantly smaller special length or adjustment length.
- the plugs 74 serve to adapt to greater distances of the anchor end 71 from the center of the tunnel. The larger distance, however, is not so great that an extension rod is economical, as in Fig. 3 is shown.
- Fig. 13 shows an embodiment with a nozzle 80, which differs from the nozzle 61 in that inside a groove 82 has been incorporated.
- the groove 82 has a depth which is greater than the thread depth of the thread. As a result, the surface is smooth in the groove bottom and can cause the threads no leakage.
- annular grooves are incorporated in the groove bottom. Upon compression of the plug, the plug deforms into the groove 82 and into the grooves 83.
- the groove 82 and the grooves are easy to turn.
- FIGS. 14 and 15 show a shotcrete construction for a tunnel in stable mountains.
- the mountains are designated 101.
- threaded rods 102 have been introduced as an anchor.
- 101 holes have been drilled into the mountains and the anchors have been glued in the mountains.
- the anchors are placed at a distance of 1.2m in such a way that a large number of uniform attachment points are created at the circumference of the rock outcrop, and all points lie on the corner points of equal squares with an edge length of 1.2 m.
- a sealing washer 103 On each threaded rod 102, a sealing washer 103 has then been screwed. Then a waterproofing membrane has been laid. The laying is done in such a way that the film has been placed on the protruding anchor. The anchors 102 penetrate the film. The resulting holes are closed by means of further sealing discs 105. The sealing discs 103 and 105 clamp the film 104 between them and moreover close tightly with the anchors 102.
- Fig. 18 is a suitable film for the shotcrete construction shown.
- the film 110 has a thickness of 2 mm and is sprinkled with strands of material, the strands of material 111 have a thread-like structure with a thickness or diameter of 0.1 to 0.3 mm and a length of 5 to 50 mm.
- the material strands 112 have a thickness of 1 to 2 mm and a length of 10 to 30 mm.
- the different material strands are applied in the exemplary embodiment in separate application operations in order to heat the material strands with a larger diameter differently than the material strands with a smaller diameter.
- the strands of material are applied in a common application process.
- the material strands are superimposed on each other, so that in part there is a hollow layer of the material strands. In this situation arise with the material strands 112 surveys up to a height of 3mm.
- the film surface is uncovered.
- the material spread has a basis weight of 250 grams per square meter. It may also occur in other embodiments, larger or smaller basis weights. Lower basis weights may occur in particular if the film surface is additionally profiled. Thus, basis weights of, for example, 20 grams per square meter are possible. Larger basis weights are appropriate if, depending on the type of shotcrete contract difficulties are to be overcome.
- the different strands of material are sprinkled in the embodiment after heating on the surface of the previously superficially heated film 10.
- the superficial heating of the strands of material has taken place up to the molten liquid.
- the heating is carried out by radiation by the material strands are removed by means of a rotary valve from a reservoir and fall through a heating channel down to the slow slow down past slide.
- the heating channel has in the exemplary embodiment a plurality of electrically operated heating wires and a temperature control. As a result, the temperature of the heating channel can be increased until the falling material strands have the correct surface temperature.
- first a fast-binding cement milk is sprayed thinly onto the film.
- the dried cement slurry forms an advantageous primer for a subsequent application of shotcrete.
- the shotcrete is applied in layers, starting at the tunnel sole.
- the resulting shotcrete layer is designated 106.
- the tunnel runs horizontally, so that the shotcrete is laid in horizontal layers, which are laid überpetit from bottom to top of the film.
- the layers have a width which corresponds to the desired shotcrete layer thickness. In other embodiments, a smaller width of the layers is provided, so that first a first shotcrete layer is applied to the film, which completely covers the film side. Thereafter, another shotcrete layer is applied, which completely covers the previously discussed shotcrete layer. This is repeated until the desired thickness of the shotcrete layer is reached.
- the anchors After creating the shotcrete layer, the anchors still protrude from the concrete layer.
- Another shotcrete layer 109 has been applied to the shotcrete layer 106.
- the further shotcrete layer 109 is made of lightweight concrete and serves as in the exemplary embodiment Fig. 1 and 2 as fire protection.
- the further shotcrete layer 109 adheres to the shotcrete layer 106.
- the protruding from the shotcrete layer 106 ends of the anchor should cause an additional connection with another shotcrete layer 109.
- Fig. 16 shows a shotcrete construction for another tunnel in stable mountains 115.
- To the shotcrete removal includes a film 117 as in the expansion after Fig. 14, 15 and 18 and a shotcrete layer 116.
- the anchors are made very short and attached to the protruding anchor ends so-called rondels.
- the rondels are plastic discs, with where the film 117 is welded in the embodiment. In other embodiments, a bonding takes place. In this construction no perforation of the film takes place.
- the anchor ends are so short that the rondelles have contact with the mountain outbreak as far as possible. This is achieved in the embodiment in that the rondels are already mounted on the anchors when the anchors are placed in the holes.
- the anchors are then pushed into the boreholes until the rondels abut the rock outcrop.
- a mounting mortar / cement which encloses the anchors and sets after hardening in the wells.
- the contact between the mountain eruption and the expansion also has the great advantage that erupting stones invest only slightly in the expansion, while falling down at a spaced expansion and meet with considerable momentum on the expansion.
- Such contact can also be with the anchors and fasteners of the previous embodiments, in which the mountain-side fastener is mounted on its anchor, that he has contact with the mountain outbreak.
- Fig. 16 also shows another shotcrete layer 121 on the inside of the expansion. It is a fire protection as in the previous embodiments.
- Fig. 17 shows yet another embodiment of an expansion, in which also a contact between expansion and mountain outbreak is made.
- a shotcrete layer 119 to Sealing / consolidation applied to the mountain eruption.
- a nonwoven layer 120 is applied to the shotcrete layer 119.
- the nailing is easy as long as the shotcrete layer is not yet cured. But even then a nailing with appropriately hardened and stable nails is possible.
- the rondels can also shoot.
- a film 117a is welded, as in the embodiment according to Fig. 16 explained.
- the same shotcrete layer 116a is as in FIG Fig. 16 intended.
- Fig. 19 shows a tunnel construction with a film seal 151 of PE with a thickness of 1.5 mm, a 35 mm thick PE foam layer 152 as a thermal insulation, a 60 mm thick EPS shotcrete layer 154 and a cleanliness layer 153 in the form of a flame-retardant paint.
- the shotcrete layer has a density of 900 kg per cubic meter.
- the shotcrete layer is fiber-reinforced in the area 155.
- the reinforcement is glass fibers in an amount of 2 kg per cubic meter shotcrete.
- the expansion is held by schematically illustrated anchor 150.
- Fig. 20 shows a tunnel construction with a film seal 141 made of PE with a thickness of 1.5 mm, a 70 mm thick EPS shotcrete layer with a density as in the embodiment according to Fig. 19 and with a reinforcement of structural steel mesh 144. This expansion is also held with anchors 140 shown schematically. On the inside of the tunnel of the shotcrete layer 142, a clean layer 143 is provided.
- the fire protection layer according to the invention behaves as follows:
- the fire load is in Fig. 21 shown.
- the fire load has been measured at 8 points, which have heated uniformly within a few minutes to 1100 degrees Celsius.
- the curve is labeled 160.
- the Fig. 22 shows the temperature at 6 measuring points within the shotcrete layer Fig. 20 ,
- the measuring points are arranged at different distances from the burning area.
- the most remote from the fire surface measuring point shows over a period of 2 hours no significant increase in temperature. This is designated 161.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
- Building Environments (AREA)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102007016199 | 2007-04-02 | ||
DE102008009058 | 2008-02-13 | ||
DE102008012084A DE102008012084A1 (de) | 2007-04-02 | 2008-02-29 | Brandschutz an Bauwerken |
Publications (1)
Publication Number | Publication Date |
---|---|
EP1978207A2 true EP1978207A2 (fr) | 2008-10-08 |
Family
ID=39561952
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP20080005234 Withdrawn EP1978207A2 (fr) | 2007-04-02 | 2008-03-20 | Pare-feu sur des constructions |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP1978207A2 (fr) |
DE (1) | DE102008012084A1 (fr) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ITMI20090943A1 (it) * | 2009-05-28 | 2010-11-29 | Elas Geotecnica Srl | Metodo e apparecchiatura per rivestire una parete di una galleria |
CN102418535A (zh) * | 2011-10-09 | 2012-04-18 | 陕西彬长胡家河矿业有限公司 | 一种地下工程揭露冻结管的封堵及注浆方法 |
CN102518470A (zh) * | 2011-12-27 | 2012-06-27 | 陕西彬长矿业集团有限公司 | 环形截水巷处理冻结管防治水方法 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102018112613A1 (de) * | 2018-05-25 | 2019-11-28 | Solexperts Ag | Verfahren und Vorrichtung zum Ausbau von Hohlräumen unter Tage |
Citations (57)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2127421A1 (en) | 1971-06-03 | 1972-12-14 | Beth, Franz, 6520 Worms; Heckendorf, Siegfried, 6841 Rosengarten | Concrete mouldings - contg prefoamed polystyrene beads by mixing preformed beads with cement and additives, treating with st |
FR2499453A1 (fr) | 1981-02-11 | 1982-08-13 | Mathis Systemtechnik Gmbh | Procede et dispositif pour la preparation de mortiers de grosse et de petite maconnerie |
US4547223A (en) | 1981-03-02 | 1985-10-15 | Nihon Cement Co., Ltd. | Cement-shrinkage-reducing agent and cement composition |
DE8632994U1 (de) | 1986-12-09 | 1987-02-05 | Niederberg-Chemie GmbH, 4133 Neukirchen-Vluyn | Rondelle |
DE8701969U1 (de) | 1986-12-09 | 1987-04-02 | Niederberg-Chemie GmbH, 4133 Neukirchen-Vluyn | Rondelle |
DE3244000C2 (fr) | 1982-11-27 | 1989-06-29 | Niederberg-Chemie Gmbh, 4133 Neukirchen-Vluyn, De | |
DE3838630A1 (de) | 1988-11-15 | 1990-05-17 | Niederberg Chemie | Frostsicherung im tunnel |
DE4100902A1 (de) | 1990-02-26 | 1991-08-29 | Huels Troisdorf | Verfahren zum befestigen von folien oder bahnen zu abdichtungszwecken an einem untergrund |
EP0449360A1 (fr) | 1990-03-29 | 1991-10-02 | Sofitech N.V. | Ciment léger pour applications à haute pression |
DD297386A5 (de) | 1989-10-07 | 1992-01-09 | Lorenz Kesting,De | Polystyrolbeton fuer betonfertigteile |
DE4220274A1 (de) | 1992-06-20 | 1993-12-23 | Hans Jaklin | Gegen Abplatzungen bei Brandbeanspruchung beständiger Beton oder Mörtel |
WO1994005896A1 (fr) | 1992-09-04 | 1994-03-17 | Basf Corporation | Ameliorations apportees aux compositions additives pour les formulations d'obturation de puits de petrole |
DE69006589T2 (de) | 1990-01-03 | 1994-06-23 | Strong Systems Inc | Verfahren zum Sanieren von Schächten durch Auskleiden. |
DE69010067T2 (de) | 1989-04-28 | 1994-10-13 | Trevi Spa | Verfahren und Gerät zum Herstellen von Tunneln. |
EP0295628B1 (fr) | 1987-06-17 | 1995-09-06 | Aqualon Company | Dérivés de 3-alcoxy-2-hydroxypropylcellulose et leur utilisation dans les matériaux de construction |
DE4406866A1 (de) | 1994-03-02 | 1996-02-01 | Hildegard Moedinger | Verfahren zur Herstellung von Granulaten mit porösem Kern und Gefüge unter Verwendung von Abfallstoffen |
DE4428200A1 (de) | 1994-08-09 | 1996-02-15 | Thermozell Entwicklungs Und Ve | Polystyrolgranulat, Verfahren zu seiner Herstellung, sowie Verwendung des Polystyrolgranulats |
EP0725043A2 (fr) | 1995-01-31 | 1996-08-07 | Sandoz Ltd. | Agent dispersant pour ciment |
DE69118723T2 (de) | 1990-01-26 | 1996-11-28 | Blue Circle Ind Plc | Zementzusammensetzung und die Herstellung von Beton daraus |
DE19519595A1 (de) | 1995-05-29 | 1996-12-05 | Niedlich Thorsten | Verfahren zur Befestigung von Bahnen oder Platten für Abdichtungs- und Schutzzwecke an einem Untergrund im Ingenieur-, Tief-Wasser- und Tunnelbau |
DE19529695A1 (de) | 1995-08-11 | 1997-02-13 | Hildegard Moedinger | Verfahren zur Herstellung von Granulaten mit porösem Kern und Gefüge unter Verwendung von versprödeten weichen Abfallstoffen |
DE69122267T2 (de) | 1991-01-08 | 1997-03-06 | Sandoz Ltd | Verfahren zum beimischen von zuschlagstoffen in eine versprühte betonmasse und wirkstoff zur anwendung des verfahrens |
US5618344A (en) | 1995-03-06 | 1997-04-08 | W. R. Grace & Co.-Conn. | Cement composition |
DE19652811A1 (de) | 1995-12-27 | 1997-07-03 | Sandoz Ag | Verfahren und Einrichtung zum Beschichten von Tunnelinnenwänden mit Spritzbeton |
DE29710362U1 (de) | 1997-06-13 | 1997-08-14 | Ed. Züblin AG, 70567 Stuttgart | Vorrichtung zum Betonieren von bewehrten Decken, speziell Gewölben von Tunneln |
DE69403183T2 (de) | 1993-12-06 | 1997-10-09 | Sika Ag | Verfahren zur Abbindungs- und Erhärtungsbeschleunigung einem eines hydraulische Bindemittel enthaltenden Material, Abbindungs- und Erhärtungsbeschleuniger und Verwendung einer Zusammensetzung zur Abbindungs- und Erhärtungsbeschleunigung |
DE29718950U1 (de) | 1997-10-24 | 1998-01-02 | Eber, Friedhelm, 45701 Herten | Spritzdüse zum Ausblasen von fertigen Gemischen, wie Spritzbeton, Spritzmörtel, Schaumbeton, Schaummörtel o.dgl. |
DE19650330A1 (de) | 1996-08-16 | 1998-02-19 | Johannes Junior | Verfahren und Vorrichtung im Tunnelbau |
DE69407418T2 (de) | 1993-07-29 | 1998-05-14 | Lafarge Sa | ERSTARRUNGS- UND HäRTUNGSBESCHLEUNIGER FüR SILIKATISCHE HYDRAULISCHE BINDEMITTEL |
DE29812769U1 (de) | 1998-07-17 | 1998-11-12 | Hanisch, Wolfgang, 02826 Görlitz | Anhängefahrzeug, insbesondere an Personenkraftwagen, für Werbung und Information |
DE19819660A1 (de) | 1997-05-27 | 1998-12-03 | Walter Prof Dr Lukas | Spritzdüse und Verfahren zum Trockenspritzen von Spritzbeton |
DE19754446A1 (de) | 1997-12-08 | 1999-06-10 | Dyckerhoff Ag | Spritzbindemittel und dessen Verwendung |
DE19746958C1 (de) | 1997-10-24 | 1999-06-17 | Friedhelm Eber | Vorrichtung zur Herstellung eines Feststoff-Luft-Flüssigkeitsgemisches, insbesondere zur Herstellung von Spritzmörtel oder dergleichen |
DE69418316T2 (de) | 1993-02-25 | 1999-09-30 | Svensk Glasatervinning Ab | Verfahren zur herstellung von beton |
DE69700205T2 (de) | 1996-07-17 | 1999-09-30 | Italcementi Spa | Schnellhärtender Zement, der Klinker auf der Basis von mit Kalk gemischtem Kalziumfluoraluminat enthält |
DE19819148C1 (de) | 1998-04-24 | 1999-12-16 | Mannesmann Ag | Faser zur Verstärkung gießbarer aushärtender Werkstoffe sowie Verfahren und Vorrichtung zu deren Herstellung |
DE19831295A1 (de) | 1998-07-13 | 2000-01-20 | Hubert Koertge | Leichtbeton für Fertighauselemente und Verfahren zu seiner Herstellung |
WO2000006515A1 (fr) | 1998-07-29 | 2000-02-10 | Holderbank Financiere Glarus Ag | Additif pour compenser le retrait du mortier ou du beton |
DE29818934U1 (de) | 1998-10-23 | 2000-02-24 | Tepe Maschinen Anlagen Und Ind | Vorrichtung zur Herstellung gebrauchsfertiger Mischungen aus Schüttgut |
DE19851913A1 (de) | 1998-11-11 | 2000-05-25 | Rombold & Gfroehrer Gmbh & Co | Verfahren und Vorrichtung zum Herstellen eines Spritzbetons oder Spritzmörtels |
DE19854476A1 (de) | 1998-11-25 | 2000-05-31 | Dyckerhoff Ag | Hydraulische Bindemittelzusammensetzung sowie deren Verwendung |
DE29824278U1 (de) | 1997-12-08 | 2000-09-21 | Dyckerhoff Ag | Spritzbindemittel |
DE69701890T2 (de) | 1996-09-19 | 2000-10-05 | Eka Chemicals Ab Bohus | Verfahren zur herstellung einer abbindenden zusammensetzung |
EP1122223A1 (fr) | 2000-02-01 | 2001-08-08 | Roger Lieber | Composition à base de ciment destinée à la construction, en particulier destinéee à la réalisation de chapes |
DE19838710C2 (de) | 1998-08-26 | 2002-03-21 | Spritzbeton Stuttgart Gmbh & C | Verfahren zur Herstellung spritzfertigen Spritzbetons |
DE19733029C2 (de) | 1997-07-31 | 2002-03-28 | Ludwig Pfeiffer | Verfahren zur Sanierung einer Rohrleitung, insbesondere für den Tiefbau |
DE69801995T2 (de) | 1997-04-30 | 2002-04-04 | Ineos Silicas Ltd | Wässrige silikatlösung und füllstoff enthaltende suspensionen mit hoher lagerstabilität |
DE20217044U1 (de) | 2002-11-05 | 2003-06-26 | Mohr Peter | Schutzschicht aus zweilagigem Vlies mit innenliegenden Schweißflächen |
DE60001390T2 (de) | 1999-03-02 | 2003-12-11 | Italcementi Spa | Schnellhärtender zement enthaltend kalk und aluminate |
DE69721121T2 (de) | 1996-05-13 | 2003-12-24 | Denki Kagaku Kogyo Kk | Beschleunigungsmittel, Sprühmaterial und Verfahren das dieses Material verwendet |
DE69718705T2 (de) | 1996-06-14 | 2004-03-25 | Mbt Holding Ag | Zusatz für Spritzbeton |
DE69910173T2 (de) | 1998-01-14 | 2004-06-17 | SI Corp. | Fasern mit verbesserter sinusform, damit bewehrter beton und entsprechendes verfahren |
DE60010252T2 (de) | 2000-08-08 | 2004-08-26 | Denki Kagaku Kogyo K.K. | Beschleunigungsmittel, Spritzmaterial und seine Verwendung in einem Spritzverfahren |
DE29825081U1 (de) | 1998-11-25 | 2004-09-09 | Dyckerhoff Ag | Schnellsterstarrende hydraulische Bindemittelzusammensetzung |
WO2004101460A1 (fr) | 2003-05-19 | 2004-11-25 | Epscement Ab | Traitement de particules de plastique expanse pour du beton leger |
DE10341299A1 (de) | 2003-09-04 | 2005-03-31 | Fagerdala Deutschland Gmbh | Leichtbeton mit flammhemmenden Eigenschaften |
EP1590308A1 (fr) | 2003-01-24 | 2005-11-02 | Halliburton Energy Services, Inc. | Compositions de ciment renfermant des billes souples et compressibles et procedes de cimentation a mettre en oeuvre dans des formations souterraines |
-
2008
- 2008-02-29 DE DE102008012084A patent/DE102008012084A1/de not_active Withdrawn
- 2008-03-20 EP EP20080005234 patent/EP1978207A2/fr not_active Withdrawn
Patent Citations (60)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2127421A1 (en) | 1971-06-03 | 1972-12-14 | Beth, Franz, 6520 Worms; Heckendorf, Siegfried, 6841 Rosengarten | Concrete mouldings - contg prefoamed polystyrene beads by mixing preformed beads with cement and additives, treating with st |
FR2499453A1 (fr) | 1981-02-11 | 1982-08-13 | Mathis Systemtechnik Gmbh | Procede et dispositif pour la preparation de mortiers de grosse et de petite maconnerie |
US4547223A (en) | 1981-03-02 | 1985-10-15 | Nihon Cement Co., Ltd. | Cement-shrinkage-reducing agent and cement composition |
DE3244000C2 (fr) | 1982-11-27 | 1989-06-29 | Niederberg-Chemie Gmbh, 4133 Neukirchen-Vluyn, De | |
DE8632994U1 (de) | 1986-12-09 | 1987-02-05 | Niederberg-Chemie GmbH, 4133 Neukirchen-Vluyn | Rondelle |
DE8701969U1 (de) | 1986-12-09 | 1987-04-02 | Niederberg-Chemie GmbH, 4133 Neukirchen-Vluyn | Rondelle |
EP0295628B1 (fr) | 1987-06-17 | 1995-09-06 | Aqualon Company | Dérivés de 3-alcoxy-2-hydroxypropylcellulose et leur utilisation dans les matériaux de construction |
DE3838630A1 (de) | 1988-11-15 | 1990-05-17 | Niederberg Chemie | Frostsicherung im tunnel |
DE69010067T2 (de) | 1989-04-28 | 1994-10-13 | Trevi Spa | Verfahren und Gerät zum Herstellen von Tunneln. |
DD297386A5 (de) | 1989-10-07 | 1992-01-09 | Lorenz Kesting,De | Polystyrolbeton fuer betonfertigteile |
DE69006589T2 (de) | 1990-01-03 | 1994-06-23 | Strong Systems Inc | Verfahren zum Sanieren von Schächten durch Auskleiden. |
DE69118723T2 (de) | 1990-01-26 | 1996-11-28 | Blue Circle Ind Plc | Zementzusammensetzung und die Herstellung von Beton daraus |
DE4100902A1 (de) | 1990-02-26 | 1991-08-29 | Huels Troisdorf | Verfahren zum befestigen von folien oder bahnen zu abdichtungszwecken an einem untergrund |
EP0449360A1 (fr) | 1990-03-29 | 1991-10-02 | Sofitech N.V. | Ciment léger pour applications à haute pression |
DE69122267T2 (de) | 1991-01-08 | 1997-03-06 | Sandoz Ltd | Verfahren zum beimischen von zuschlagstoffen in eine versprühte betonmasse und wirkstoff zur anwendung des verfahrens |
DE4220274A1 (de) | 1992-06-20 | 1993-12-23 | Hans Jaklin | Gegen Abplatzungen bei Brandbeanspruchung beständiger Beton oder Mörtel |
WO1994005896A1 (fr) | 1992-09-04 | 1994-03-17 | Basf Corporation | Ameliorations apportees aux compositions additives pour les formulations d'obturation de puits de petrole |
DE69418316T2 (de) | 1993-02-25 | 1999-09-30 | Svensk Glasatervinning Ab | Verfahren zur herstellung von beton |
DE69407418T2 (de) | 1993-07-29 | 1998-05-14 | Lafarge Sa | ERSTARRUNGS- UND HäRTUNGSBESCHLEUNIGER FüR SILIKATISCHE HYDRAULISCHE BINDEMITTEL |
DE69403183T2 (de) | 1993-12-06 | 1997-10-09 | Sika Ag | Verfahren zur Abbindungs- und Erhärtungsbeschleunigung einem eines hydraulische Bindemittel enthaltenden Material, Abbindungs- und Erhärtungsbeschleuniger und Verwendung einer Zusammensetzung zur Abbindungs- und Erhärtungsbeschleunigung |
DE4406866A1 (de) | 1994-03-02 | 1996-02-01 | Hildegard Moedinger | Verfahren zur Herstellung von Granulaten mit porösem Kern und Gefüge unter Verwendung von Abfallstoffen |
DE4428200A1 (de) | 1994-08-09 | 1996-02-15 | Thermozell Entwicklungs Und Ve | Polystyrolgranulat, Verfahren zu seiner Herstellung, sowie Verwendung des Polystyrolgranulats |
EP0725043A2 (fr) | 1995-01-31 | 1996-08-07 | Sandoz Ltd. | Agent dispersant pour ciment |
US5618344A (en) | 1995-03-06 | 1997-04-08 | W. R. Grace & Co.-Conn. | Cement composition |
DE19519595A1 (de) | 1995-05-29 | 1996-12-05 | Niedlich Thorsten | Verfahren zur Befestigung von Bahnen oder Platten für Abdichtungs- und Schutzzwecke an einem Untergrund im Ingenieur-, Tief-Wasser- und Tunnelbau |
DE19529695A1 (de) | 1995-08-11 | 1997-02-13 | Hildegard Moedinger | Verfahren zur Herstellung von Granulaten mit porösem Kern und Gefüge unter Verwendung von versprödeten weichen Abfallstoffen |
DE19652811A1 (de) | 1995-12-27 | 1997-07-03 | Sandoz Ag | Verfahren und Einrichtung zum Beschichten von Tunnelinnenwänden mit Spritzbeton |
DE69721121T2 (de) | 1996-05-13 | 2003-12-24 | Denki Kagaku Kogyo Kk | Beschleunigungsmittel, Sprühmaterial und Verfahren das dieses Material verwendet |
DE69718705T2 (de) | 1996-06-14 | 2004-03-25 | Mbt Holding Ag | Zusatz für Spritzbeton |
DE69700205T2 (de) | 1996-07-17 | 1999-09-30 | Italcementi Spa | Schnellhärtender Zement, der Klinker auf der Basis von mit Kalk gemischtem Kalziumfluoraluminat enthält |
DE19650330A1 (de) | 1996-08-16 | 1998-02-19 | Johannes Junior | Verfahren und Vorrichtung im Tunnelbau |
DE29724212U1 (de) | 1996-08-16 | 2000-08-03 | Tachus Gmbh | Vorrichtung im Tunnelbau |
DE69701890T2 (de) | 1996-09-19 | 2000-10-05 | Eka Chemicals Ab Bohus | Verfahren zur herstellung einer abbindenden zusammensetzung |
DE69801995T2 (de) | 1997-04-30 | 2002-04-04 | Ineos Silicas Ltd | Wässrige silikatlösung und füllstoff enthaltende suspensionen mit hoher lagerstabilität |
DE19819660A1 (de) | 1997-05-27 | 1998-12-03 | Walter Prof Dr Lukas | Spritzdüse und Verfahren zum Trockenspritzen von Spritzbeton |
DE29710362U1 (de) | 1997-06-13 | 1997-08-14 | Ed. Züblin AG, 70567 Stuttgart | Vorrichtung zum Betonieren von bewehrten Decken, speziell Gewölben von Tunneln |
DE19733029C2 (de) | 1997-07-31 | 2002-03-28 | Ludwig Pfeiffer | Verfahren zur Sanierung einer Rohrleitung, insbesondere für den Tiefbau |
DE19746958C1 (de) | 1997-10-24 | 1999-06-17 | Friedhelm Eber | Vorrichtung zur Herstellung eines Feststoff-Luft-Flüssigkeitsgemisches, insbesondere zur Herstellung von Spritzmörtel oder dergleichen |
DE29718950U1 (de) | 1997-10-24 | 1998-01-02 | Eber, Friedhelm, 45701 Herten | Spritzdüse zum Ausblasen von fertigen Gemischen, wie Spritzbeton, Spritzmörtel, Schaumbeton, Schaummörtel o.dgl. |
DE19754446A1 (de) | 1997-12-08 | 1999-06-10 | Dyckerhoff Ag | Spritzbindemittel und dessen Verwendung |
DE29824278U1 (de) | 1997-12-08 | 2000-09-21 | Dyckerhoff Ag | Spritzbindemittel |
DE29824292U1 (de) | 1997-12-08 | 2000-10-26 | Dyckerhoff Ag | Spritzbeton |
DE69910173T2 (de) | 1998-01-14 | 2004-06-17 | SI Corp. | Fasern mit verbesserter sinusform, damit bewehrter beton und entsprechendes verfahren |
DE19819148C1 (de) | 1998-04-24 | 1999-12-16 | Mannesmann Ag | Faser zur Verstärkung gießbarer aushärtender Werkstoffe sowie Verfahren und Vorrichtung zu deren Herstellung |
DE19831295A1 (de) | 1998-07-13 | 2000-01-20 | Hubert Koertge | Leichtbeton für Fertighauselemente und Verfahren zu seiner Herstellung |
DE29812769U1 (de) | 1998-07-17 | 1998-11-12 | Hanisch, Wolfgang, 02826 Görlitz | Anhängefahrzeug, insbesondere an Personenkraftwagen, für Werbung und Information |
WO2000006515A1 (fr) | 1998-07-29 | 2000-02-10 | Holderbank Financiere Glarus Ag | Additif pour compenser le retrait du mortier ou du beton |
DE19838710C2 (de) | 1998-08-26 | 2002-03-21 | Spritzbeton Stuttgart Gmbh & C | Verfahren zur Herstellung spritzfertigen Spritzbetons |
DE29818934U1 (de) | 1998-10-23 | 2000-02-24 | Tepe Maschinen Anlagen Und Ind | Vorrichtung zur Herstellung gebrauchsfertiger Mischungen aus Schüttgut |
DE19851913A1 (de) | 1998-11-11 | 2000-05-25 | Rombold & Gfroehrer Gmbh & Co | Verfahren und Vorrichtung zum Herstellen eines Spritzbetons oder Spritzmörtels |
DE19854476C2 (de) | 1998-11-25 | 2002-04-11 | Dyckerhoff Ag | Sulfatträgerfreie hydraulische Bindemittelzusammensetzung sowie deren Verwendung |
DE29825081U1 (de) | 1998-11-25 | 2004-09-09 | Dyckerhoff Ag | Schnellsterstarrende hydraulische Bindemittelzusammensetzung |
DE19854476A1 (de) | 1998-11-25 | 2000-05-31 | Dyckerhoff Ag | Hydraulische Bindemittelzusammensetzung sowie deren Verwendung |
DE60001390T2 (de) | 1999-03-02 | 2003-12-11 | Italcementi Spa | Schnellhärtender zement enthaltend kalk und aluminate |
EP1122223A1 (fr) | 2000-02-01 | 2001-08-08 | Roger Lieber | Composition à base de ciment destinée à la construction, en particulier destinéee à la réalisation de chapes |
DE60010252T2 (de) | 2000-08-08 | 2004-08-26 | Denki Kagaku Kogyo K.K. | Beschleunigungsmittel, Spritzmaterial und seine Verwendung in einem Spritzverfahren |
DE20217044U1 (de) | 2002-11-05 | 2003-06-26 | Mohr Peter | Schutzschicht aus zweilagigem Vlies mit innenliegenden Schweißflächen |
EP1590308A1 (fr) | 2003-01-24 | 2005-11-02 | Halliburton Energy Services, Inc. | Compositions de ciment renfermant des billes souples et compressibles et procedes de cimentation a mettre en oeuvre dans des formations souterraines |
WO2004101460A1 (fr) | 2003-05-19 | 2004-11-25 | Epscement Ab | Traitement de particules de plastique expanse pour du beton leger |
DE10341299A1 (de) | 2003-09-04 | 2005-03-31 | Fagerdala Deutschland Gmbh | Leichtbeton mit flammhemmenden Eigenschaften |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ITMI20090943A1 (it) * | 2009-05-28 | 2010-11-29 | Elas Geotecnica Srl | Metodo e apparecchiatura per rivestire una parete di una galleria |
CN102418535A (zh) * | 2011-10-09 | 2012-04-18 | 陕西彬长胡家河矿业有限公司 | 一种地下工程揭露冻结管的封堵及注浆方法 |
CN102518470A (zh) * | 2011-12-27 | 2012-06-27 | 陕西彬长矿业集团有限公司 | 环形截水巷处理冻结管防治水方法 |
CN102518470B (zh) * | 2011-12-27 | 2014-07-09 | 陕西彬长矿业集团有限公司 | 环形截水巷处理冻结管防治水方法 |
Also Published As
Publication number | Publication date |
---|---|
DE102008012084A1 (de) | 2008-10-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2420648B1 (fr) | Soutènement pour le domaine du BTP et du génie civile | |
EP1845214B1 (fr) | Procédé pour le montage de panneaux d'isolation | |
DE102007026990A1 (de) | Ausbau im Hoch- und Tiefbau | |
WO2011022849A1 (fr) | Treillis d'armature pour une couche de mortier ou de mortier projeté armée sur une base, procédé de pose associé et revêtement de mortier armé ainsi obtenu | |
EP2295660B1 (fr) | Procédé pour le montage de panneaux d'isolation | |
EP1978207A2 (fr) | Pare-feu sur des constructions | |
WO2007028427A1 (fr) | Soutenement de tunnel | |
WO2009106310A1 (fr) | Procédé de fabrication d'un élément de construction en forme de plaque ou de profilé et élément de construction en forme de plaque ou de profilé | |
EP1267035A1 (fr) | Procédé pour la construction étanche de tunnels souterrains avec une paroi intérieure en béton | |
DE19702781A1 (de) | Wärmeisolierung für eisgefährdete Tunnel | |
DE102012012522A1 (de) | Ausbau im Hoch- und Tiefbau | |
DE3731124C2 (fr) | ||
EP2174776B1 (fr) | Dispositif de protection contre l'incendie | |
EP1108855B1 (fr) | Voûte étanche et autoportante pour l'étanchement des tunnels souterrains | |
DE102008014757A1 (de) | Tunnelausbau | |
WO2007062871A1 (fr) | Protection anticorrosion pour des éléments d’ancrage dans la roche | |
DE102005048118A1 (de) | Spritzbetonbau mit Foliendichtung | |
DE102008010657A1 (de) | Ausbau mit Spritzbeton | |
DE19633897C2 (de) | Verfahren zum Einbringen eines Wärmedämmstoffes | |
DE102008046055A1 (de) | Tunnelausbau mit Wärmeisolierung und Spritzbeton | |
DE102004024472B4 (de) | Verfahren und Vorrichtung zum Abdichten der Wandungen von Ingenieurbauwerken aus Beton, insbesondere von unterirdischen Tunnelbauwerken | |
DE10255265A1 (de) | Brandschutzbeschichtung für Bauten | |
DE19961633A1 (de) | Verfahren zur Herstellung einer brandbeständigen Tunnelkonstruktion aus Beton, insbesondere aus Spritzbeton, der auf das Deckgebirge aufgebracht wird | |
DE102008028147A1 (de) | Wärmeisolierung im Bergbau | |
DE4101133C2 (de) | Verfahren zur Befestigung von Bahnen an Holzwolle-Leichtbauplatten |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20080330 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA MK RS |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN |
|
18W | Application withdrawn |
Effective date: 20160719 |