CN102418535A - 一种地下工程揭露冻结管的封堵及注浆方法 - Google Patents
一种地下工程揭露冻结管的封堵及注浆方法 Download PDFInfo
- Publication number
- CN102418535A CN102418535A CN2011103304611A CN201110330461A CN102418535A CN 102418535 A CN102418535 A CN 102418535A CN 2011103304611 A CN2011103304611 A CN 2011103304611A CN 201110330461 A CN201110330461 A CN 201110330461A CN 102418535 A CN102418535 A CN 102418535A
- Authority
- CN
- China
- Prior art keywords
- pipe
- grouting
- freezing
- freezing pipe
- buried
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开了一种地下工程揭露冻结管的封堵及注浆方法。在地下工程中揭露冻结管时,首先在冻结管外围进行掏槽,用钢板和锚杆将冻结管沿硐室顶、底板固定,对冻结管周围进行喷浆,再截断冻结管,预埋注浆管,进行焊接封堵,最后进行注浆,从而在硐室顶、底板的冻结管及环形空间中形成注浆隔水层,保护地下空间不受水害影响。该方法具有结构简单、安全、成本低、隔水作用显著的特点,可广泛应用于冻结法施工的地下工程防治水。
Description
技术领域
本发明涉及地下工程防治水的方法,具体涉及一种冻结法施工中揭露冻结管的封堵及注浆方法。
背景技术
冻结法凿井是在地下工程施工之前,首先在欲开挖地下空间的周围打一定数量的冻结孔,孔内安装冻结器,低温盐水在冻结器中流动,吸收其周围地层的热量,在松散、含水不稳定地层中形成冻结圆柱,冻结圆柱逐渐扩大并连接成封闭的、满足设计厚度和强度的圆筒—冻结圈,以抵抗土、水压力,隔绝地下水,以便安全穿过含水地层,是一种特殊的施工方法。
冻结法施工中冻结钻孔与冻结管之间的环形空间形成具有水力联系的导水通道,将从地面到冻结孔底所有的含水层连成一体,原来的隔水层失去隔水作用。随着冻结法施工应用的拓展,冻结深度也不断增加,在地下工程施工中难免再次揭露冻结管,冻结管揭露后不进行专门处理,在静水压力和围岩蠕变作用下,很容易造成支护破坏和巷道、硐室、隧道出水,事后处理存在施工困难且风险较大的缺陷。
发明内容
本发明的目的在于提供一种结构简单、安全、成本低,隔水作用显著的一种封堵冻结管的方法。
本发明的另一目的在于提供一种冻结管封堵后的注浆方法。
为了克服现有技术的不足,本发明的技术方案是这样解决的:一种地下工程揭露冻结管的封堵方法,该方法按以下步骤进行:
1)、首先在需要封堵冻结管的地方,在冻结管外围进行掏槽,完全揭露冻结管;
2)、当冻结管揭露后,用第一固定钢板、第二固定钢板和第一锚杆、第二锚杆将冻结管固定在硐室顶板、底板上;
3)、沿硐室顶板进行局部喷浆,将第一固定钢板包裹在喷浆层中,以防止注浆时跑浆,喷浆厚度150mm~200mm;
4)、将上部冻结管在硐室内外露300~400mm处截断,下部冻结管在巷道或硐室内外露150~200mm处截断;
5)、上部冻结管口截断处用第一封闭钢板将上部冻结管口进行焊接封堵,并预埋两根注浆管:其中冻结管内预埋第一注浆管与冻结管孔内相连,深入冻结管0.5m以上,并车丝、安装阀门;环形空间预埋第二注浆管通过钻孔深入冻结管壁外环形空间1.0m以上,环形空间预埋第二注浆管前端0.5m设置花眼,后端安装阀门;
6)、下部冻结管口截断处用第二封闭钢板将下部冻结管口进行焊接封堵,并预埋三根注浆管:其中冻结管内预埋第三注浆管、第四注浆管与冻结管孔内相连,并车丝、安装阀门,冻结管内预埋第三注浆管深入冻结管1.0m以上,用来注浆,第四注浆管插入冻结管深0.3m左右,用来返浆;冻结管壁外环形空间预埋第五注浆管深入环形空间1.0m以上,注浆管前端0.5m设置花眼,后端安装阀门;
一种冻结管封堵后的注浆方法,按以下步骤进行:
1)、冻结管内注浆,对上部冻结管通过管内预埋第一注浆管、第三注浆管进行注浆处理,对下部冻结管进行置换注浆处理,注浆压力应介于静水压力与周围地下空间支护强度之间,当上、下部冻结管的注浆压力逐步升高达到设计终压或返浆管返浆,并有一定注入量即可结束注浆;
2)、冻结管外环形空间注浆,通过环形空间预埋第二注浆管和第五注浆管,对环形空间的裂隙和空洞进行注浆充填,环形空间充填注浆压力应介于静水压力与周围地下空间支护强度之间,当注浆压力逐步升高达到设计终压并有一定注入量即可结束注浆。
本发明与现有技术相比,具有结构简单、安全、成本低,隔水作用显著的特点,通过冻结管和环形空间内预埋注浆管注浆,从而在冻结管及环形空间上、下方形成注浆隔水层,彻底封堵被揭露冻结管及其环形空间,阻断其水力联系,保护地下空间不受水害影响,可广泛用于冻结法凿井施工中。
附图说明
图1为上部冻结管及环形空间处理示意图;
图2为下部冻结管及其环形空间处理示意图。
附图零件说明:环形空间(1);环形空间预埋注浆管(2);冻结管内预埋注浆管(3);冻结管(4);锚杆(5);固定钢板(6);喷浆层(7);密封钢板(8);返浆管(9);硐室顶板(10);硐室底板(11)。
具体实施方式
附图为本发明的实施例。
下面结合附图及实施例对发明的内容作进一步说明:
参照图1-图2,一种地下工程揭露冻结管的封堵的方法,该方法按以下步骤进行:
1)、首先在需要封堵冻结管4的地方,在冻结管4外围进行掏槽,完全揭露冻结管4;
2)、当冻结管4揭露后,用第一固定钢板6-1、第二固定钢板6-2和第一锚杆5-1、第二锚杆5-2将冻结管4固定在硐室顶板10、底板11上;
3)、沿硐室顶板10进行局部喷浆,将第一固定钢板6-1包裹在喷浆层7中,以防止注浆时跑浆,喷浆厚度150mm~200mm;
4)、将上部冻结管4在硐室内外露300~400mm处截断,下部冻结管4在巷道或硐室内外露150~200mm处截断;
5)、上部冻结管口截断处用第一封闭钢板8-1将上部冻结管口进行焊接封堵,并预埋两根注浆管:其中冻结管内预埋第一注浆管3-1与冻结管孔内相连,深入冻结管0.5m以上,并车丝、安装阀门;环形空间1-1预埋第二注浆管2-1通过钻孔深入冻结管壁外环形空间1.0m以上,环形空间1-1预埋第二注浆管2-1前端0.5m设置花眼,下端安装阀门;
6)下部冻结管口截断处用第二封闭钢板8-2将下部冻结管口进行焊接封堵,并预埋三根注浆管:其中冻结管内预埋第三注浆管3-2、第四注浆管9与冻结管孔内相连,并车丝、安装阀门,冻结管内预埋第三注浆管3-2深入冻结管1.0m以上,用来注浆,第四注浆管9插入冻结管深0.3m左右,用来返浆;冻结管壁外环形空间1-1预埋第五注浆管2-2,深入环形空间1.0m以上,注浆管前端0.5m设置花眼,下端安装阀门;
一种冻结管封堵后的注浆方法,按以下步骤进行:
1)、冻结管内注浆,对上部冻结管通过管内预埋第一注浆管3-1、第三注浆管3-2进行注浆处理,对下部冻结管进行置换注浆处理,注浆压力应介于静水压力与周围地下空间支护强度之间,当上、下部冻结管的注浆压力逐步升高达到设计终压或返浆管返浆,并有一定注入量即可结束注浆;
2)、冻结管外环形空间注浆,通过环形空间1-1预埋第二注浆管2-1和第五注浆管2-2,对环形空间的裂隙和空洞进行注浆充填,环形空间充填注浆压力应介于静水压力与周围地下空间支护强度之间,当注浆压力逐步升高达到设计终压并有一定注入量即可结束注浆。
实例1
某矿井掘进穿越多层含水层,采用冻结法施工,井筒完工开凿马头门、主井煤仓,多层穿越冻结圈,为防止冻结钻孔与冻结管间环形空间形成具有水力联系的导水通道损坏巷道支护,甚至出现突水,采用该方法对冻结管及其环形空间进行了封堵和注浆:
巷道掘进至接近冻结管时,在冻结管外围进行掏槽,完全揭露冻结管;紧贴硐室顶、底板在冻结管上焊接500mm×500mm×20mm钢板,钢板对角预制φ30mm钻孔,向岩层倾斜15°方向打入1.2m锚杆将固定钢板固定在硐室顶、底板上,锚杆托盘为150mm×150mm×8mmQ325钢板,每根锚杆使用1支K2335型和2支Z2335型锚固剂;对冻结管周围进行局部喷浆,喷浆厚度150mm;沿硐室顶板300、底板150mm处截断冻结管;冻结管截断后,下部冻结管会自然下沉,对底板锚杆进行紧固;上下冻结管口用150mm×150mm×20mm钢板焊接封口;采用φ25mm×1500mm×4.5mm镀锌钢管作为冻结管、环形空间注浆管,φ25mm×300mm×4.5mm镀锌钢管作为返浆管,安装φ25mm高压球阀;注浆压力3MPa。
采用该方法对揭露冻结管逐个进行封堵和注浆后,按设计进行巷道掘进、锚-网-喷和砌碹支护,巷道未发生较大变形,支护完整,没有出现巷道突水现象。
Claims (2)
1.一种地下工程揭露冻结管的封堵方法,该方法按以下步骤进行:
1)、首先在需要封堵冻结管(4)的地方,在冻结管(4)外围进行掏槽,完全揭露冻结管(4);
2)、当冻结管(4)揭露后,用第一固定钢板(6-1)、第二固定钢板(6-2)和第一锚杆(5-1)、第二锚杆(5-2)将冻结管(4)固定在硐室顶板(10)、底板(11)上;
3)、沿硐室顶板(10)进行局部喷浆,将第一固定钢板(6-1)包裹在喷浆层(7)中,以防止注浆时跑浆,喷浆厚度150mm~200mm;
4)、将上部冻结管(4)在硐室内外露300~400mm处截断,下部冻结管(4)在巷道或硐室内外露150~200mm处截断;
5)、上部冻结管口截断处用第一封闭钢板(8-1)将上部冻结管口进行焊接封堵,并预埋两根注浆管:其中冻结管内预埋第一注浆管(3-1)与冻结管孔内相连,深入冻结管0.5m以上,并车丝、安装阀门;环形空间(1-1)预埋第二注浆管(2-1)通过钻孔深入冻结管壁外环形空间1.0m以上,环形空间(1-1)预埋第二注浆管(2-1)前端0.5m设置花眼,后端安装阀门;
6)、下部冻结管口截断处用第二封闭钢板(8-2)将下部冻结管口进行焊接封堵,并预埋三根注浆管:其中冻结管内预埋第三注浆管(3-2)、第四注浆管(9)与冻结管孔内相连,并车丝、安装阀门,冻结管内预埋第三注浆管(3-2)深入冻结管1.0m以上,用来注浆,第四注浆管(9)插入冻结管深0.3m左右,用来返浆;冻结管壁外环形空间(1-1)预埋第五注浆管(2-2)深入环形空间1.0m以上,注浆管前端0.5m设置花眼,后端安装阀门。
2.一种冻结管封堵后的注浆方法,按以下步骤进行:
1)、冻结管内注浆,对上部冻结管通过管内预埋第一注浆管(3-1)、第三注浆管(3-2)进行注浆处理,对下部冻结管进行置换注浆处理,注浆压力应介于静水压力与周围地下空间支护强度之间,当上、下部冻结管的注浆压力逐步升高达到设计终压或返浆管返浆,并有一定注入量即可结束注浆;
2)、冻结管外环形空间(1-1)注浆,通过环形空间(1-1)预埋第二注浆管(2-1)和第五注浆管(2-2),对环形空间的裂隙和空洞进行注浆充填,环形空间充填注浆压力应介于静水压力与周围地下空间支护强度之间,当注浆压力逐步升高达到设计终压并有一定注入量即可结束注浆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103304611A CN102418535A (zh) | 2011-10-09 | 2011-10-27 | 一种地下工程揭露冻结管的封堵及注浆方法 |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110302593.3 | 2011-10-09 | ||
CN201110302593 | 2011-10-09 | ||
CN2011103304611A CN102418535A (zh) | 2011-10-09 | 2011-10-27 | 一种地下工程揭露冻结管的封堵及注浆方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102418535A true CN102418535A (zh) | 2012-04-18 |
Family
ID=45943155
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011103304611A Pending CN102418535A (zh) | 2011-10-09 | 2011-10-27 | 一种地下工程揭露冻结管的封堵及注浆方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102418535A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104612694A (zh) * | 2015-01-06 | 2015-05-13 | 中煤第一建设有限公司 | 一种硐室处冻结管处理方法 |
CN109595000A (zh) * | 2018-11-14 | 2019-04-09 | 北京中煤矿山工程有限公司 | 一种金属矿山盲竖井井筒预注浆工程硐室群布置方式 |
CN111119952A (zh) * | 2020-01-06 | 2020-05-08 | 中煤第一建设有限公司 | 一种斜井井壁接茬复合钢筒补强防水方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB191223857A (en) * | 1912-10-18 | 1913-01-23 | Evence Coppee Fils | Improvements in or relating to the Congealing of Shifting Sand in the Sinking of Mine Shafts. |
CN101225740A (zh) * | 2008-01-29 | 2008-07-23 | 中煤第一建设公司特殊凿井处 | 冻结管与围岩间环状充填的方法 |
EP1978207A2 (de) * | 2007-04-02 | 2008-10-08 | Skumtech AS | Brandschutz an Bauwerken |
CN101660415A (zh) * | 2009-09-08 | 2010-03-03 | 中煤第一建设公司特殊凿井处 | 一种冻结钻孔施工堵漏工艺 |
CN101709651A (zh) * | 2009-12-21 | 2010-05-19 | 中铁隧道勘测设计院有限公司 | 海底隧道的注浆堵水方法 |
CN101839140A (zh) * | 2010-03-31 | 2010-09-22 | 中国矿业大学 | 一种巷道底板注浆加固方法 |
CN101864967A (zh) * | 2010-06-13 | 2010-10-20 | 中国矿业大学 | 高地压软岩巷道分层次注浆强化加固方法 |
-
2011
- 2011-10-27 CN CN2011103304611A patent/CN102418535A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB191223857A (en) * | 1912-10-18 | 1913-01-23 | Evence Coppee Fils | Improvements in or relating to the Congealing of Shifting Sand in the Sinking of Mine Shafts. |
EP1978207A2 (de) * | 2007-04-02 | 2008-10-08 | Skumtech AS | Brandschutz an Bauwerken |
CN101225740A (zh) * | 2008-01-29 | 2008-07-23 | 中煤第一建设公司特殊凿井处 | 冻结管与围岩间环状充填的方法 |
CN101660415A (zh) * | 2009-09-08 | 2010-03-03 | 中煤第一建设公司特殊凿井处 | 一种冻结钻孔施工堵漏工艺 |
CN101709651A (zh) * | 2009-12-21 | 2010-05-19 | 中铁隧道勘测设计院有限公司 | 海底隧道的注浆堵水方法 |
CN101839140A (zh) * | 2010-03-31 | 2010-09-22 | 中国矿业大学 | 一种巷道底板注浆加固方法 |
CN101864967A (zh) * | 2010-06-13 | 2010-10-20 | 中国矿业大学 | 高地压软岩巷道分层次注浆强化加固方法 |
Non-Patent Citations (1)
Title |
---|
徐颖等: "冻结管爆破注浆加固技术研究", 《矿冶工程》, vol. 21, no. 2, 30 June 2001 (2001-06-30) * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104612694A (zh) * | 2015-01-06 | 2015-05-13 | 中煤第一建设有限公司 | 一种硐室处冻结管处理方法 |
CN104612694B (zh) * | 2015-01-06 | 2017-01-04 | 中煤第一建设有限公司 | 一种硐室处冻结管处理方法 |
CN109595000A (zh) * | 2018-11-14 | 2019-04-09 | 北京中煤矿山工程有限公司 | 一种金属矿山盲竖井井筒预注浆工程硐室群布置方式 |
CN111119952A (zh) * | 2020-01-06 | 2020-05-08 | 中煤第一建设有限公司 | 一种斜井井壁接茬复合钢筒补强防水方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106285738B (zh) | 一种用于深部巷道的“钢混-液压”巷旁支护装置及支护方法 | |
CN103410161B (zh) | 斜向控制注浆钢锚管框架及其施工方法 | |
CN101251017B (zh) | 孔口止浆钻杆分段后退式注浆方法 | |
CN107605498B (zh) | 富水砂卵石地层盾构隧道端头水平注浆加固结构施工方法 | |
CN206874310U (zh) | 一种适用于高压富水区隧道减压排水装置 | |
CN105041325A (zh) | 一种高压富水特大断层软弱角砾岩隧道的施工方法 | |
CN102518470B (zh) | 环形截水巷处理冻结管防治水方法 | |
CN105041333A (zh) | 一种先填后挖法处理隧道塌方的方法 | |
CN108119149A (zh) | 一种下穿既有建筑物的隧道支护结构及施工方法 | |
CN103334444A (zh) | 一种基坑降水井泄压式的封堵方法 | |
CN203924137U (zh) | 一种地下连续墙严重渗漏封堵结构 | |
CN102787846A (zh) | 海底隧道断层破碎带上堵下排的施工方法 | |
CN103670446B (zh) | 圆形引水隧洞2/3圆砼衬砌施工方法 | |
CN108797404A (zh) | 一种地下综合管廊横跨河流段河水引流结构及其施工方法 | |
CN202787334U (zh) | 一种隧道施工中深井管的封闭结构 | |
CN109372520A (zh) | 一种穿越泥石流堆积区隧道支护结构及其施工方法 | |
CN105134254B (zh) | 一种透巷道地面钻孔套管封固装置及其操作工艺 | |
CN204940315U (zh) | 一种用于富水地区大型竖井的止水系统 | |
CN101575859B (zh) | 地下连续墙防渗接头及其施工方法 | |
CN104358252A (zh) | 防治水中钻孔灌注桩穿孔漏浆的结构及施工方法 | |
CN102418535A (zh) | 一种地下工程揭露冻结管的封堵及注浆方法 | |
CN109989756B (zh) | 厚表土薄基岩钻井井筒突水溃砂的防治方法 | |
JP2009068213A (ja) | ケーソンを用いた地下構造物の構築方法および止水装置付ケーソン | |
CN109958461A (zh) | 一种煤矿断层防透水结构 | |
CN101250989A (zh) | 不具备启封条件的地面钻孔井下封闭技术 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120418 |