EP1892171A1 - Procédé d'entrainement d'un poste d'aiguillage et procédé d'entrainement d'un centre de contrôle - Google Patents
Procédé d'entrainement d'un poste d'aiguillage et procédé d'entrainement d'un centre de contrôle Download PDFInfo
- Publication number
- EP1892171A1 EP1892171A1 EP06300892A EP06300892A EP1892171A1 EP 1892171 A1 EP1892171 A1 EP 1892171A1 EP 06300892 A EP06300892 A EP 06300892A EP 06300892 A EP06300892 A EP 06300892A EP 1892171 A1 EP1892171 A1 EP 1892171A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- network elements
- line center
- rail
- network
- interlocking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
- 238000000034 method Methods 0.000 title claims abstract description 20
- 238000010295 mobile communication Methods 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 3
- 230000003287 optical effect Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 238000004090 dissolution Methods 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L21/00—Station blocking between signal boxes in one yard
- B61L21/04—Electrical locking and release of the route; Electrical repeat locks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/20—Trackside control of safe travel of vehicle or train, e.g. braking curve calculation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L19/00—Arrangements for interlocking between points and signals by means of a single interlocking device, e.g. central control
- B61L19/06—Interlocking devices having electrical operation
- B61L2019/065—Interlocking devices having electrical operation with electronic means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/20—Trackside control of safe travel of vehicle or train, e.g. braking curve calculation
- B61L2027/202—Trackside control of safe travel of vehicle or train, e.g. braking curve calculation using European Train Control System [ETCS]
Definitions
- the invention relates to a method for operating an interlocking system for a rail network for rail vehicles and a method for operating a line center for a rail network for rail vehicles.
- ERTMS / ETCS European Rail Traffic Management System / European Train Control System
- the ETCS specification includes three technical equipment levels, designated Level 1, Level 2 and Level 3. Each level requires different infrastructure-side and train-side components.
- the present invention relates to ETCS Level 2, in which no trackside signals are provided in the final stage.
- the invention also relates to an ETCS level 2 operation, in which For redundancy reasons or for reasons of compatibility in addition or still track-side signals are present and are controlled by the interlocking.
- the location of the trains is carried out by so-called balises, which are attached to the infrastructure side of tracks. A balise is used to adjust the position of the train.
- the train reports its position via mobile communications, in particular GSM-R (Global System for Mobile Communications - Railway) to the Radio Block Center (RBC).
- GSM-R Global System for Mobile Communications - Railway
- RBC Radio Block Center
- the train receives from the line center via mobile, in particular GSM-R, his driving license, with which he is informed about the road to be traveled with their characteristics (eg speed profile and inclination profile).
- the line center communicates with at least one interlocking that monitors and controls trackside network elements, especially routes.
- the states of trackside network elements, especially roads, are detected and changed.
- Track-side network elements in particular information about the routes, depending on the type of interlocking z. B. transmitted by means of signal aspects and switch points or as routes with their states to the line center. Regardless of the concretely agreed interface between signal boxes and line center, status information about network elements is exchanged.
- the line center communicates with at least one interlocking, but usually with several interlockings in their area of the rail network.
- the line center assigns trains to routes that may be used by them. For this purpose, a current and accurate image of the rail network always has to be present in the line center, which has current and applicable states of the network elements. Information about the states of the network elements receives the line center of at least one interlocking that monitors the states of each associated network elements and changed if necessary.
- the object of the invention is now to ensure that the image of the rail network in the line center is always current and has no safety-critical deviations from the image in the signal box when issuing driving licenses to the train.
- This object is achieved by a method for operating an interlocking system for a rail network for rail vehicles according to claim 1 and a method for operating a line center for a rail network for rail vehicles according to claim 5.
- the states of the network elements are recorded in the interlocking.
- Network elements may be trackside signals and / or switches. For example, in the interlocking the states of trackside signals and / or points are detected. Then the signal position, z. B. "stop", the individual signals in the area of the interlocking and / or the points position of the individual switches in the area of the interlocking detected.
- Network elements can also be the individual routes. For example, states of the roads in the area of the interlocking can be detected by this.
- the signal box detects and monitors the conditions of the roads, the z. B. may have the status "occupied” or "monitored".
- the detected states of the network elements are transmitted to the line center.
- This uses the status data transmitted by the interlocking to update the image of the rail network that exists in the line center.
- the image of the rail network serves to enable the trains in the area of the line center to obtain driving licenses for driving on roads.
- the line center transmits the trains via mobile communications, in particular GSM-R, their route and driving license data.
- the signal box transmits the status of the network elements to the line center according to the set route for the trains. This can be z. B. include the placement of switches and / or signals.
- the line center acknowledges the receipt and storage of the status data of the network elements in relation to the signal box by transmitting a receipt to the signal box.
- the interlocking does not change the states of network elements for the creation of new routes unless it is ensured that the line center has received the current status of the network elements. This is ensured by the fact that the interlocking only changes the states of network elements when a receipt from the line center, which confirms the receipt and optionally the filing of the status data arrives in the interlocking.
- the transmission component of the processes in the line center and receiving the receipt is part of the processes in the interlocking.
- it is provided in the process in the interlocking to respond to the absence of the receipt by the state change of network elements is blocked.
- an acknowledgment of the receipt and optionally an acknowledgment of the storage of the status data takes place only for safety-critical states.
- the acknowledgment of the storage in the same receipt as the acknowledgment of the receipt can take place or another, separate receipt can be transmitted for it.
- Acknowledged status data are, for example, a "stop" state of a signal, a "not monitored” state of a switch, the position of a switch or a "disengaged" state of a route or a "busy” state of a route.
- FIG. 1 schematically shows a rail-bound vehicle 20, which is in mobile communication with a line center RBC via GSM-R.
- About punctiform positioning means 30, called balises are in the train z.
- B. obtained via Doppler radar and / or odometer position data matched with transmitted from the balise data.
- the train also has information about where it is. This position information of the train is transmitted via mobile radio from the train in the line center RBC.
- FIG. 1 further shows a signal box 10, which is in data exchange connection 12 with the line center RBC.
- the signal box detects the status of network elements.
- the interlocking network elements include, for example, signals 40, which also include 42 Signalan Kunststoffmaschine, and switches 50. Signals 40 are controlled by the signal control 42 through the interlocking. Turnouts 50 are controlled by switch controls via the interlocking. Network elements may also include routes characterized by a start signal 40 and destination signal 44. The condition of routes is recorded in the signal box.
- the signal box 10 transmits the detected states of the network elements to the line center RBC.
- the interlocking 10 also changes the states of the network elements to set routes that have been assigned by the line center individual trains. In the case of signals 40, the signal state, for example "stop” or "green” or “yellow", via the signal driver 42 changed by the interlocking 10. Turnouts 50 are also adjusted by the signal box.
- the routes are assigned to the trains on the basis of the status data of the network elements reported by the interlocking station 10.
- a track includes successive network elements in the rail network, which are traveled by the respective trains. It must be ensured that routes are only traveled by one train at a time. Current and accurate state data of network elements are therefore important for security reasons.
- the line center RBC therefore confirms the reception of safety-critical status data by means of an acknowledgment which is sent to the interlocking via the data exchange connection.
- Safety-critical status data are, for example, signal state "stop", switch positions and / or "driving lane occupied” or "lane-resolved” messages.
- the interlocking may only set a lane again if the line center has confirmed the information about the previous driving or dissolution of the lane.
- ETCS Level 2 no longer provides optical signals 40.
- the invention is equally applicable to a railroad network without optical signals in which cab signaling by the line center RBC is via GSM-R to the train.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP06300892A EP1892171A1 (fr) | 2006-08-24 | 2006-08-24 | Procédé d'entrainement d'un poste d'aiguillage et procédé d'entrainement d'un centre de contrôle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP06300892A EP1892171A1 (fr) | 2006-08-24 | 2006-08-24 | Procédé d'entrainement d'un poste d'aiguillage et procédé d'entrainement d'un centre de contrôle |
Publications (1)
Publication Number | Publication Date |
---|---|
EP1892171A1 true EP1892171A1 (fr) | 2008-02-27 |
Family
ID=37685989
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP06300892A Ceased EP1892171A1 (fr) | 2006-08-24 | 2006-08-24 | Procédé d'entrainement d'un poste d'aiguillage et procédé d'entrainement d'un centre de contrôle |
Country Status (1)
Country | Link |
---|---|
EP (1) | EP1892171A1 (fr) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2112046A1 (fr) * | 2008-04-24 | 2009-10-28 | Abb Research Ltd. | Procédé, appareil et produit de programme informatique à utiliser dans des postes d'aiguillage |
CN102265531A (zh) * | 2011-06-22 | 2011-11-30 | 华为技术有限公司 | 列车行车过程中的通信方法、车载设备、无线闭塞中心及系统 |
WO2014114485A3 (fr) * | 2013-01-25 | 2014-12-18 | Siemens Aktiengesellschaft | Procédé et dispositif de commande automatique de trains par etcs de niveaux l1 et/ou l2 |
CN114954576A (zh) * | 2022-05-23 | 2022-08-30 | 北京交大微联科技有限公司 | 联锁系统中与无线闭塞中心通信时通信机的实现结构 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1510430A1 (fr) * | 2003-08-01 | 2005-03-02 | DB Netz AG | Procédé de l'allocation flexible de la responsabilité aux centres de contrôle |
EP1674371A1 (fr) * | 2004-12-22 | 2006-06-28 | Deutsches Zentrum für Luft- und Raumfahrt e.V. | Méthode et dispositif par la signalisation ferroviaire |
-
2006
- 2006-08-24 EP EP06300892A patent/EP1892171A1/fr not_active Ceased
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1510430A1 (fr) * | 2003-08-01 | 2005-03-02 | DB Netz AG | Procédé de l'allocation flexible de la responsabilité aux centres de contrôle |
EP1674371A1 (fr) * | 2004-12-22 | 2006-06-28 | Deutsches Zentrum für Luft- und Raumfahrt e.V. | Méthode et dispositif par la signalisation ferroviaire |
Non-Patent Citations (1)
Title |
---|
MILIUS B: "STELLWERKE VON MORGEN WELCHE ROLLE KANN DAS STELLWERK IN EINEM ETCS-LEVEL-3-SYSTEM NOCH SPIELEN? INTERLOCKINGS FOR TOMORROW HOW TO INTEGRATE INTERLOCKINGS IN ETCS LEVEL 3 SYSTEMS", ZEVRAIL - GLASERS ANNALEN, GEORG SIEMENS VERLAG, BERLIN, DE, vol. 126, no. 2/3, 2002, pages 106 - 114, XP001145097, ISSN: 1618-8330 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2112046A1 (fr) * | 2008-04-24 | 2009-10-28 | Abb Research Ltd. | Procédé, appareil et produit de programme informatique à utiliser dans des postes d'aiguillage |
WO2009130152A1 (fr) * | 2008-04-24 | 2009-10-29 | Abb Research Ltd | Procédé, appareil et produit programme d'ordinateur destinés à être utilisés avec des systèmes de verrouillage mutuel |
CN102265531A (zh) * | 2011-06-22 | 2011-11-30 | 华为技术有限公司 | 列车行车过程中的通信方法、车载设备、无线闭塞中心及系统 |
WO2012103697A1 (fr) * | 2011-06-22 | 2012-08-09 | 华为技术有限公司 | Procédé de communication dans un processus d'entraînement de train, dispositif embarqué, centre de blocs radio et système |
WO2014114485A3 (fr) * | 2013-01-25 | 2014-12-18 | Siemens Aktiengesellschaft | Procédé et dispositif de commande automatique de trains par etcs de niveaux l1 et/ou l2 |
CN114954576A (zh) * | 2022-05-23 | 2022-08-30 | 北京交大微联科技有限公司 | 联锁系统中与无线闭塞中心通信时通信机的实现结构 |
CN114954576B (zh) * | 2022-05-23 | 2023-10-13 | 北京交大微联科技有限公司 | 联锁系统中与无线闭塞中心通信时通信机的实现结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1897781B1 (fr) | Système de commande et contrôle des trains | |
DE102005042218B4 (de) | Eisenbahnkollisions-Warneinrichtung | |
EP3541682B1 (fr) | Logique de sécurité des voies côté train pour installations de sécurité ferroviaire | |
WO2016146365A1 (fr) | Procédé et dispositif servant à influencer de manière automatique des véhicules guidés sur rails | |
WO2009003837A1 (fr) | Procédé et dispositif d'exploitation d'une ligne de chemin de fer | |
EP3782870B1 (fr) | Procédé et poste de commande centrale destinés au fonctionnement d'une voie ferrée | |
EP2870047B1 (fr) | Fonctionnement d'un véhicule ferroviaire | |
WO2019243341A1 (fr) | Système de protection de train flexible | |
EP1892171A1 (fr) | Procédé d'entrainement d'un poste d'aiguillage et procédé d'entrainement d'un centre de contrôle | |
EP0719224B1 (fr) | Systeme permettant de piloter le fonctionnement et l'ecoulement du trafic ferroviaire | |
DE19828878A1 (de) | Verfahren zur Datenreduktion im Bahnbetrieb | |
EP2619067B1 (fr) | Procédé pour commander automatiquement une pluralité de véhicules guidés | |
EP2088051B1 (fr) | Procédé et dispositif destinés au réglage sécurisé d'une voie de circulation pour un véhicule sur rail | |
WO2017153132A1 (fr) | Installation technique ferroviaire et procédé de fonctionnement d'une installation technique ferroviaire | |
CH698679B1 (de) | Verfahren zur Steuerung eines Fahrzeuges, insbesondere eines Schienenfahrzeuges. | |
DE102005038386B4 (de) | Vorrichtung zur Sicherung der Zugfolge im Zugleitbetrieb | |
EP0768966B1 (fr) | Procede et dispositif de commande d'aiguillage par le convoi, dans un systeme exploite en voie unique | |
DE102004042979A1 (de) | System zum sicheren Betrieb von auf Fahrstrecken verkehrenden gleisgebundenen Zügen | |
DE19501993C2 (de) | Verfahren und Einrichtung zur sicherheitsrelevanten Erfassung und Verarbeitung von Zustandsinformationen dezentraler oder zentraler Steuereinrichtungen von Fahrwegelementen entlang eines Fahrwegs auf Triebfahrzeugen | |
DE19749697A1 (de) | Einrichtung zur Steuerung des Eisenbahnbetriebes | |
EP1561663B1 (fr) | Système et méthode de contrôle de l' intégrité des trains | |
EP1118522B1 (fr) | Procédé de sécurité de distance pour trains | |
DE10240376A1 (de) | Sicheres Zugmeldebuch | |
DE102016217913A1 (de) | Überwachung eines Schienenfahrzeugs | |
DE102004062987A1 (de) | Verfahren zur Realisierung eines virtuellen Streckenblocks unter Nutzung funkgesteuerter Fahrwegelemente |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK YU |
|
17P | Request for examination filed |
Effective date: 20080219 |
|
17Q | First examination report despatched |
Effective date: 20080327 |
|
AKX | Designation fees paid |
Designated state(s): AT CH DE FR GB IT LI |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN REFUSED |
|
18R | Application refused |
Effective date: 20090515 |