EP1725717A1 - Method for construction of a supporting wall and blocks for carrying out said method - Google Patents
Method for construction of a supporting wall and blocks for carrying out said methodInfo
- Publication number
- EP1725717A1 EP1725717A1 EP04721822A EP04721822A EP1725717A1 EP 1725717 A1 EP1725717 A1 EP 1725717A1 EP 04721822 A EP04721822 A EP 04721822A EP 04721822 A EP04721822 A EP 04721822A EP 1725717 A1 EP1725717 A1 EP 1725717A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- chamber
- solid
- bricks
- stones
- cavity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 30
- 238000010276 construction Methods 0.000 title claims abstract description 7
- 239000007787 solid Substances 0.000 claims abstract description 31
- 239000000463 material Substances 0.000 claims abstract description 7
- 239000004575 stone Substances 0.000 claims description 44
- 239000011449 brick Substances 0.000 claims description 28
- 239000007788 liquid Substances 0.000 claims description 13
- 239000002969 artificial stone Substances 0.000 claims description 8
- 239000000835 fiber Substances 0.000 claims description 8
- 239000002994 raw material Substances 0.000 claims description 8
- 239000011230 binding agent Substances 0.000 claims description 6
- 235000008733 Citrus aurantifolia Nutrition 0.000 claims description 4
- 235000011941 Tilia x europaea Nutrition 0.000 claims description 4
- 239000000654 additive Substances 0.000 claims description 4
- 239000004568 cement Substances 0.000 claims description 4
- 239000002131 composite material Substances 0.000 claims description 4
- 239000004571 lime Substances 0.000 claims description 4
- 235000013311 vegetables Nutrition 0.000 claims description 4
- 239000002023 wood Substances 0.000 claims description 4
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 3
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 3
- 244000025254 Cannabis sativa Species 0.000 claims description 3
- 235000012766 Cannabis sativa ssp. sativa var. sativa Nutrition 0.000 claims description 3
- 235000012765 Cannabis sativa ssp. sativa var. spontanea Nutrition 0.000 claims description 3
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 3
- 230000000996 additive effect Effects 0.000 claims description 3
- 239000011425 bamboo Substances 0.000 claims description 3
- 235000009120 camo Nutrition 0.000 claims description 3
- 235000005607 chanvre indien Nutrition 0.000 claims description 3
- 239000011487 hemp Substances 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 244000082204 Phyllostachys viridis Species 0.000 claims 1
- 239000004567 concrete Substances 0.000 description 8
- 241000196324 Embryophyta Species 0.000 description 3
- 238000009413 insulation Methods 0.000 description 3
- 241001330002 Bambuseae Species 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000004566 building material Substances 0.000 description 2
- 230000001427 coherent effect Effects 0.000 description 2
- 229910052500 inorganic mineral Inorganic materials 0.000 description 2
- 239000011707 mineral Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000002349 favourable effect Effects 0.000 description 1
- 239000003365 glass fiber Substances 0.000 description 1
- 238000000265 homogenisation Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
- E04B2/04—Walls having neither cavities between, nor in, the solid elements
- E04B2/06—Walls having neither cavities between, nor in, the solid elements using elements having specially-designed means for stabilising the position
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
- E04B2/14—Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element
- E04B2/16—Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element using elements having specially-designed means for stabilising the position
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
- E04B2/14—Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element
- E04B2/24—Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element the walls being characterised by fillings in some of the cavities forming load-bearing pillars or beams
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C1/00—Building elements of block or other shape for the construction of parts of buildings
- E04C1/40—Building elements of block or other shape for the construction of parts of buildings built-up from parts of different materials, e.g. composed of layers of different materials or stones with filling material or with insulating inserts
- E04C1/41—Building elements of block or other shape for the construction of parts of buildings built-up from parts of different materials, e.g. composed of layers of different materials or stones with filling material or with insulating inserts composed of insulating material and load-bearing concrete, stone or stone-like material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
- E04B2002/0202—Details of connections
- E04B2002/0204—Non-undercut connections, e.g. tongue and groove connections
- E04B2002/0228—Non-undercut connections, e.g. tongue and groove connections with tongues next to each other on one end surface and grooves next to each other on opposite end surface
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
- E04B2002/0202—Details of connections
- E04B2002/0204—Non-undercut connections, e.g. tongue and groove connections
- E04B2002/023—Non-undercut connections, e.g. tongue and groove connections with rabbets, e.g. stepped
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
- E04B2002/0256—Special features of building elements
- E04B2002/0289—Building elements with holes filled with insulating material
- E04B2002/0293—Building elements with holes filled with insulating material solid material
Definitions
- the invention is formed by a method for creating a load-bearing masonry, in which at least one hollow chamber stone is placed in a first row of walls in addition to solid solid bricks, each having an opening on its top and bottom sides, in each case in the subsequent rows of walls between the solid bricks at least one chamber stone is placed in such a way that the openings of the chamber stones in adjacent rows of walls overlap at least partially, and a material of high load-bearing capacity is introduced into the coherent cavity formed by the chamber stones.
- the invention further relates to a solid stone and a chamber stone for carrying out the above method.
- the invention is therefore based on the object of specifying a method by means of which the load-bearing capacity of the masonry can be varied, in particular increased, after the masonry has been constructed from masonry, non-load-bearing stones.
- the object of the invention is also to provide building materials which are suitable for carrying out this method.
- the part of the task relating to the method is solved by the method described at the outset, which offers the advantages that, in a conventional manner known to bricklayers, masonry, for example with a 25 grid system with a conventional one
- Masonry dressing can be created by assembling the solid bricks and the chamber bricks and the load-bearing capacity of the masonry is increased to the required extent by filling the chamber bricks after completion of the masonry work, so that the masonry stacked one above the other within the brickwork when the masonry is visually uniform a highly resilient column made of high load-bearing material is provided.
- artificial stones are used for the solid stones and / or the chamber stones, which are made from renewable raw materials, in particular from vegetable fibers such as wood, bamboo, hemp or the like. and are formed from a binder.
- This design has the great advantage that a diffusion-open brickwork can be created from environmentally friendly building materials, which in addition to the properties that are favorable for the room and living environment still has the necessary load-bearing capacity without having to rely on a stable separate scaffolding made of steel, concrete or wooden stands to be.
- the openings of the chamber stones from adjacent rows of walls completely overlap. So that the edges of stacked solid stones do not align with each other, the solid stone is in at least two widths provided. It is advantageous if the narrower solid brick has half the width of the wider solid brick, so that the offset of the edges of adjacent rows of walls is determined to be half a brick width.
- the load-bearing capacity of the masonry is further increased if the side surfaces of the solid and chamber stones are provided with positive profiles.
- a very particularly preferred embodiment of the invention is characterized in that a liquid is filled into the cavity.
- Liquids have the property that they take up the entire volume made available to them, so that the cavity is completely filled and, in particular, air bubbles in the area of the offset of the artificial stones are avoided.
- the liquid is expediently chosen as a hardening or setting liquid which not only increases the load-bearing capacity of the masonry due to the incompressibility of a liquid in the sense of a hydraulic system, but also provides, for example, a concrete column in the usual way.
- the concrete column can also be fiber-reinforced by introducing steel or glass fibers into the still liquid concrete.
- At least one reinforcing strut is introduced into the cavity before the liquids are filled in, so that a steel-concrete structure can be used as a supporting column in the masonry.
- a flat masonry segment is prefabricated as a wall module and brought to the construction site in combination with other wall modules, the process step of filling the cavity being expediently carried out at the construction site. This then also gives the possibility that the cavity is cast together with the floor slab.
- the part of the task relating to the solid stones and the chamber stones is achieved in that bumpers and / or tongue and groove designs are realized on the side surfaces.
- These stones are preferably formed as artificial stones, in which chips obtained from renewable raw materials, in particular from vegetable fibers, are incorporated in a composite by means of cement as a binder and by means of lime as an additive.
- a better cohesion of the masonry can be achieved if bumpers and / or tongue and groove designs are implemented on the top and bottom.
- the cavity of the chamber stone is divided into compartments which are connected to one another by contact openings.
- the contact openings ensure that when the cavity is filled with liquid, the entire volume formed by the cavity is again filled, the compartment dividing it
- Material is suitable to vary the mechanical properties of the chamber stone. It is also preferred within the scope of the invention if the natural fibers are processed into chips which are incorporated in a composite by means of cement as a binder and by means of lime as an additive. The provision of renewable raw materials in chips causes one
- FIG. 1 is a perspective view of a part of a masonry formed from solid solid bricks and hollow chamber bricks
- FIG. 3 shows the section III-III from FIG. 1,
- FIG. 6 shows a representation corresponding to FIG. 1 of masonry with increased load-bearing capacity due to the adjacent arrangement of two chamber bricks in each row of masonry
- 7 shows section VII-VII from FIG. 6.
- masonry 1 which consists of artificial stones 2, which are formed from renewable raw materials, namely from plant fibers such as wood,
- each row of walls 6 contains at least one hollow chamber brick 4, one in each of the following, adjacent rows of walls 6 between the solid bricks 3
- Chamber stone 4 is placed such that the openings 7 of the chamber stones 4 in adjacent rows of walls 6 overlap.
- a hardening or setting liquid is introduced, for which, in particular, the use of concrete is appropriate.
- reinforcing struts or insulating inserts 9 can also be introduced into the cavity 8 before the concrete is poured in, so that a column of reinforced concrete extending over the height of the masonry 1 is provided by the hollow, overlapping chamber stones 4 which the masonry 1, which is formed from artificial stones 2, which renewable raw materials exist, maintains sustainable properties, the level of resilience of the masonry 1 can be varied by the number of chamber stones 4 used per row of walls 6 and their arrangement (Fig. 1, Fig. 6).
- the full bricks 3 can - to increase the insulation value - be provided with an additional insulation insert 9 of any thickness.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Retaining Walls (AREA)
- Building Environments (AREA)
Abstract
Description
Claims
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/DE2004/000582 WO2005093182A1 (en) | 2004-03-19 | 2004-03-19 | Method for construction of a supporting wall and blocks for carrying out said method |
Publications (3)
Publication Number | Publication Date |
---|---|
EP1725717A1 true EP1725717A1 (en) | 2006-11-29 |
EP1725717B1 EP1725717B1 (en) | 2018-08-15 |
EP1725717B8 EP1725717B8 (en) | 2018-10-17 |
Family
ID=34957760
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP04721822.7A Expired - Lifetime EP1725717B8 (en) | 2004-03-19 | 2004-03-19 | Method for construction of a supporting wall and blocks for carrying out said method |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP1725717B8 (en) |
CA (1) | CA2560428A1 (en) |
DE (1) | DE112004002881A5 (en) |
RU (1) | RU92886U1 (en) |
WO (1) | WO2005093182A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR3111367A1 (en) | 2020-06-16 | 2021-12-17 | Gérald LAIGNEL | building brick |
DE102022213094A1 (en) | 2022-12-05 | 2024-06-06 | Herbert Groschup | Chamber brick, masonry and method for producing a chamber brick |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2961538B1 (en) * | 2010-06-18 | 2012-08-17 | Eurl Baumer Damien | METHOD FOR MANUFACTURING AN EDIFICE FROM BOILING BRICKS WITH DRY JOINTS |
EP2505730B1 (en) | 2011-03-30 | 2013-10-02 | Pavatex SA | Wood brick comprising soft wood fibre boards |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR795594A (en) * | 1935-07-08 | 1936-03-17 | hollow insulating and soundproof agglomerated elements for the construction of building walls in general | |
CH269728A (en) * | 1947-01-15 | 1950-07-31 | Oldrich Schueller Josef | Shaped stone with at least two cavities. |
FR1223851A (en) * | 1959-05-09 | 1960-06-21 | Brick for constructions reinforced by cast pillars | |
PT69641A (en) * | 1978-08-01 | 1979-05-31 | IMPROVEMENTS INTRODUCED IN THE CONSTRUCTION OF BUILDINGS | |
PT70322A (en) * | 1979-10-16 | 1979-11-01 | Coelho Dos Santos J | BUILDING BLOCK FOR BUILDING CONTRACTS EMPLOYING SAID BLOCKS |
GB2272462B (en) * | 1992-11-13 | 1996-03-06 | Boral Edenhall Concrete Produc | Masonry Block |
DE29618705U1 (en) * | 1996-10-26 | 1997-01-02 | ILA Bauen & Wohnen Ökologische Produkte und Bausysteme Vertriebsges. mbH, 74249 Jagsthausen | Building system for building buildings |
DE19735846A1 (en) * | 1997-08-19 | 1999-02-25 | Christof Ziegert | Adding hemp shives and/or fibers to clay building materials |
-
2004
- 2004-03-19 CA CA002560428A patent/CA2560428A1/en not_active Abandoned
- 2004-03-19 DE DE112004002881T patent/DE112004002881A5/en not_active Withdrawn
- 2004-03-19 WO PCT/DE2004/000582 patent/WO2005093182A1/en active Application Filing
- 2004-03-19 EP EP04721822.7A patent/EP1725717B8/en not_active Expired - Lifetime
-
2009
- 2009-08-13 RU RU2009130976/22U patent/RU92886U1/en not_active IP Right Cessation
Non-Patent Citations (1)
Title |
---|
See references of WO2005093182A1 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR3111367A1 (en) | 2020-06-16 | 2021-12-17 | Gérald LAIGNEL | building brick |
WO2021254791A1 (en) | 2020-06-16 | 2021-12-23 | Laignel Gerald | Building brick and method for building a wall with such bricks |
DE102022213094A1 (en) | 2022-12-05 | 2024-06-06 | Herbert Groschup | Chamber brick, masonry and method for producing a chamber brick |
EP4382688A1 (en) | 2022-12-05 | 2024-06-12 | Herbert Groschup | Hollow brick, masonry and method for producing a hollow brick |
Also Published As
Publication number | Publication date |
---|---|
WO2005093182A1 (en) | 2005-10-06 |
EP1725717B8 (en) | 2018-10-17 |
DE112004002881A5 (en) | 2007-05-31 |
CA2560428A1 (en) | 2005-10-06 |
EP1725717B1 (en) | 2018-08-15 |
RU92886U1 (en) | 2010-04-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102018100707A1 (en) | Shuttering device for the production of concrete columns, in particular for the production of parts of a wall forming vertical concrete columns | |
DE202004014003U1 (en) | Construction module | |
DE3432940A1 (en) | Prefabricated masonry structure | |
EP1725717B1 (en) | Method for construction of a supporting wall and blocks for carrying out said method | |
EP0832335B1 (en) | Concrete shuttering panel | |
DE4333981C2 (en) | Soundproofing block bricks | |
DE809961C (en) | Prefabricated component made of composite concrete | |
EP3299524B1 (en) | Wall made of prefabricated products and method for manufacturing the same | |
DE812368C (en) | Buildings (house, factory, etc.) made of prefabricated composite concrete panels | |
EP3456895B1 (en) | Wall provided with concrete supports and method for the construction of such a wall | |
DE10230963A1 (en) | Procedure for building of supporting wall uses construction elements with cavity of one element aligning with cavity of at least one element lying above it in overlap, with cavities filled with locally available material | |
DE20120365U1 (en) | Formwork stone wall with clay and straw filling | |
DE102017114619A1 (en) | Prefabricated wall element | |
EP3130718A1 (en) | Composite construction material element | |
EP1593792A2 (en) | Large wall panel | |
DE2351786A1 (en) | STRUCTURE AND METHOD FOR MANUFACTURING IT | |
DE823931C (en) | Ceiling hollow brick | |
DE853816C (en) | Ceiling stone made of fired clay or other pressure-resistant materials | |
DE933226C (en) | Reinforced hollow-core ceiling and method of manufacturing the ribs used for the ceiling | |
DE804117C (en) | Cross-reinforced ceiling | |
AT150119B (en) | Hollow stone masonry, especially for skeleton structures, high-rise buildings, silos, ceilings and the like. like | |
DE883198C (en) | Process for the production of ceilings and roofs with T-beams and ceiling panels arranged between these | |
DE202021101239U1 (en) | Ring beam formwork and ring beam | |
DE803942C (en) | Wall with panels as permanent formwork | |
DE804471C (en) | Ceiling made of prefabricated reinforced concrete beams without intermediate components |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20060913 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
17Q | First examination report despatched |
Effective date: 20061220 |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: GROSCHUP, HERBERT |
|
DAX | Request for extension of the european patent (deleted) | ||
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: GROSCHUP, HERBERT |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20180320 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 502004015710 Country of ref document: DE Owner name: GROSCHUP, HERBERT, DE Free format text: FORMER OWNER: ILA BAUEN WOHNEN OEKOLOGISCHE PRODUKTE UND BAUSYSTEME VERTRIEBSGES. MBH, 74076 HEILBRONN, DE Ref country code: DE Ref legal event code: R081 Ref document number: 502004015710 Country of ref document: DE Owner name: GROSCHUP, HERBERT, DE Free format text: FORMER OWNER: ILA BAUEN & WOHNEN OEKOLOGISCHE PRODUKTE UND BAUSYSTEME VERTRIEBSGES. MBH, 74076 HEILBRONN, DE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 502004015710 Country of ref document: DE Representative=s name: PATENT- UND RECHTSANWAELTE ULLRICH & NAUMANN P, DE Ref country code: DE Ref legal event code: R081 Ref document number: 502004015710 Country of ref document: DE Owner name: GROSCHUP, HERBERT, DE Free format text: FORMER OWNER: GROSCHUP, HERBERT, 74172 NECKARSULM, DE |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH Ref country code: AT Ref legal event code: REF Ref document number: 1029926 Country of ref document: AT Kind code of ref document: T Effective date: 20180815 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
RAP2 | Party data changed (patent owner data changed or rights of a patent transferred) |
Owner name: GROSCHUP, HERBERT |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502004015710 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PK Free format text: BERICHTIGUNG B8 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20180815 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181116 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181115 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502004015710 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20190516 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20190319 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190319 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190331 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190331 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190319 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190319 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190331 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181215 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20040319 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20220318 Year of fee payment: 19 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20220525 Year of fee payment: 19 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 502004015710 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 1029926 Country of ref document: AT Kind code of ref document: T Effective date: 20230319 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20231003 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230319 |