EP1553244A1 - Gerüstvorrichtung zur arbeit an einer innenwandfläche eines kesselturmkörpers und verfahren zur arbeit an einer innenwandfläche unter verwendung der gerüstvorrichtung - Google Patents
Gerüstvorrichtung zur arbeit an einer innenwandfläche eines kesselturmkörpers und verfahren zur arbeit an einer innenwandfläche unter verwendung der gerüstvorrichtung Download PDFInfo
- Publication number
- EP1553244A1 EP1553244A1 EP03730815A EP03730815A EP1553244A1 EP 1553244 A1 EP1553244 A1 EP 1553244A1 EP 03730815 A EP03730815 A EP 03730815A EP 03730815 A EP03730815 A EP 03730815A EP 1553244 A1 EP1553244 A1 EP 1553244A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- operations
- tower structure
- posts
- wall surface
- height adjustable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title claims description 12
- 239000000463 material Substances 0.000 claims description 24
- 230000009467 reduction Effects 0.000 abstract description 7
- 238000004140 cleaning Methods 0.000 description 16
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 11
- 238000010276 construction Methods 0.000 description 11
- 230000000694 effects Effects 0.000 description 9
- 230000006872 improvement Effects 0.000 description 6
- 238000009434 installation Methods 0.000 description 5
- 230000008439 repair process Effects 0.000 description 5
- 238000005422 blasting Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000009423 ventilation Methods 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 238000007689 inspection Methods 0.000 description 3
- 238000005304 joining Methods 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 235000011089 carbon dioxide Nutrition 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 239000010419 fine particle Substances 0.000 description 2
- 238000009408 flooring Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005299 abrasion Methods 0.000 description 1
- 230000001464 adherent effect Effects 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000005493 welding type Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/36—Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/18—Scaffolds primarily resting on the ground adjustable in height
- E04G1/20—Scaffolds comprising upright members and provision for supporting cross-members or platforms at different positions therealong
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/36—Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes
- E04G1/362—Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes specially adapted for tanks, silos or similar vessels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/24—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/24—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
- E04G3/246—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the inside contour of a building
Definitions
- the present invention relates to a scaffold apparatus for conducting operations on an inner wall surface of a tower structure, used for conducting a variety of operations on the inner wall surface of a tall tower structure with a blast furnace type structure, such as the digester provided in a paper production plant, as well as an operational method for an inner wall surface using such a scaffold apparatus.
- maintenance is essential in ensuring retention of the tower functions over an extended period, and the inner wall surface of the tower in particular is exposed to severe temperature and pressure conditions, or a corrosive environment of chemicals or the like, and consequently frequent maintenance operations such as inspections, cleaning, modifications and welding must be undertaken.
- a tower structure is tall, and the operational target zone extends over a wide height range, from regions near the bottom of the tower to regions near the top, and because the operations on the inner wall surface of such a tower structure require both operators and a variety of operational materials, an operations scaffold must be put up inside the tower structure.
- the most typical method of assembling this type of operations scaffold has usually involved assembling a scaffold framework inside the tower, and then providing an operations footing on top.
- an object of the present invention is to provide a scaffold apparatus for conducting operations on an inner wall surface of a tower structure, which enables operations on the inner wall surface of the tower structure to be conducted safely and with good operability, as well as an operational method that utilizes such a scaffold apparatus.
- a scaffold apparatus for conducting operations on an inner wall surface of a tower structure comprises either a single post or a plurality of posts put up inside a tower structure from a bottom section thereof toward a top section, and a height adjustable operations platform that is attached to the posts in a manner of freely movable in up or down direction.
- a scaffold apparatus for conducting operations on an inner wall surface of a tower structure comprises either a single post or a plurality of posts put up inside a tower structure from a bottom section thereof toward a top section, and a height adjustable operations platform that is attached to the posts in a manner of freely movable in up or down direction, and consequently, putting up the posts inside the tower structure and then attaching the height adjustable operations platform means that when any of a variety of operations are conducted on the inner wall surface of the tower structure, adjustments of the installation height of the height adjustable operations platform within the tower structure (that is, the height position at which operations are conducted using the height adjustable operations platform) are performed easily and quickly by moving the height adjustable operations platform up or down along the posts.
- a second aspect of the present invention is the scaffold apparatus for conducting operations on an inner wall surface of a tower structure according to the first aspect of the present invention, wherein the posts are put up by sequentially stacking and connecting a plurality of posts pieces, which are of dimensions that enable transport through a materials transport port provided in the tower structure, from the bottom section of the tower structure toward the top section.
- a scaffold apparatus for conducting operations on an inner wall surface of a tower structure according to this second aspect of the present invention offers the following characteristic effects in addition to the effects provided by the first aspect of the invention.
- the posts are put up by sequentially stacking and connecting a plurality of posts pieces, which are of dimensions that enable transport through a materials transport port provided in the tower structure, from the bottom section of the tower structure toward the top section, and consequently, even though the operation must be conducted under the restricted operational space conditions unique to tower structures, a post of any height is put up easily by carrying the required number of post pieces into the tower structure and then sequentially combining the pieces.
- the scaffold apparatus is applied to inner wall surface operations within a variety of different tower structures of different heights, enabling an improvement in the general-purpose applicability of the scaffold apparatus.
- a third aspect of the present invention is the scaffold apparatus for conducting operations on an inner wall surface of a tower structure according to either of the first or second aspects of the present invention, wherein the bottom end of each post is supported by a lower support base, which is secured immediately above a tower bottom section via securing pieces provided on the side wall of the tower structure immediately above the tower bottom section.
- a scaffold apparatus for conducting operations on an inner wall surface of a tower structure according to this third aspect of the present invention offers the following characteristic effects in addition to the effects provided by the first and second aspects of the invention. Namely, in the scaffold apparatus for conducting operations on an inner wall surface of a tower structure according to this aspect of the present invention, the bottom end of each post is supported by a lower support base secured immediately above a tower bottom section via a securing piece provided on the side wall of the tower structure immediately above the tower bottom section, and consequently the entire weight, including the dead load of the posts and the attached height adjustable operations platform, and the weight of any operators and/or operating materials loaded onto this height adjustable operations platform, is supported directly by the side walls at a point immediately above the tower bottom section of the tower structure, via the aforementioned lower support base, and the application of load onto the tower bottom section is avoided.
- the weight of the posts and the like is supported more reliably and in a more stable manner, and both the reliability of the installation of the posts and the like, and the reliability of the various operations conducted using the posts and the attached height adjustable operations platform, are improved.
- the tower bottom section of the tower structure has the end plate structure described above, that section is more complex and more expensive to produce than the side wall section, and consequently by not needing to use this tower bottom section as the support site for the posts and the like, damage to the tower bottom section is effectively avoided, resulting in an improvement of the durability of the tower structure, or a reduction of the production costs.
- a fourth aspect of the present invention is the scaffold apparatus for conducting operations on an inner wall surface of a tower structure according to the first aspect of the present invention, wherein the height adjustable operations platform is a knockdown structure that is capable of being transported through a materials transport port provided in the tower structure.
- a scaffold apparatus for conducting operations on an inner wall surface of a tower structure according to this fourth aspect of the present invention offers the following characteristic effects in addition to the effects provided by the first aspect of the invention.
- the height adjustable operations platform is a knockdown structure that is capable of being transported through a materials transport port provided in the tower structure, and consequently even though the operation must be conducted under the restricted operational space conditions unique to tower structures, a height adjustable operations platform having any of a variety of different shapes (namely, a shape that corresponds with the internal dimensions of the target tower structure) is assembled easily by carrying the disassembled members into the tower structure and then sequentially combining the members, and as a result, the scaffold apparatus become applied to inner wall surface operations within a variety of different tower structures of different internal dimensions, enabling an improvement in the general purpose applicability of the scaffold apparatus.
- a fifth aspect of the present invention is the scaffold apparatus for conducting operations on an inner wall surface of a tower structure according to the fourth aspect of the present invention, wherein the height adjustable operations platform is equipped with elevation drive means that enables the platform to be raised and lowered under its own power, and the external periphery of the height adjustable operations platform is equipped with guide wheel units that are provided with a wheel, which displaces freely toward, and away from, the inner wall surface of the tower structure and is held in continuous contact with the inner wall surface by a predetermined pressure.
- a scaffold apparatus for conducting operations on an inner wall surface of a tower structure according to this fifth aspect of the present invention offers the following characteristic effects in addition to the effects provided by the fourth aspect of the invention.
- the height adjustable operations platform is equipped with elevation drive means that enables the platform to be raised and lowered under its own power
- the external periphery of the height adjustable operations platform is equipped with guide wheel units that are provided with a wheel, which displaces freely toward, and away from, the inner wall surface of the tower structure and is held in continuous contact with the inner wall surface by a predetermined pressure.
- the height adjustable operations platform is capable of being raised and lowered under its own power, during various operations using the height adjustable operations platform, adjustments to the height of the height adjustable operations platform is performed easily and quickly, for example in accordance with the requirements of an operator, and consequently both the operability and mobility are good, meaning the operating efficiency of operations that are conducted using the height adjustable operations platform is improved markedly.
- an operational method for an inner wall surface comprises the steps of loading people and/or an operating material onto a height adjustable operations platform, which is attached to a single post or a plurality of posts put up inside a tower structure from a bottom section thereof toward a top section in a manner that enables free up or down movement along the posts, and adjusting the operating height by moving the height adjustable operations platform up and down along the posts, while performing the required operations on the inner wall surface of the tower structure.
- an operational method for an inner wall surfaces of a tower structure by using this type of operational method, in an operational method for an inner wall surfaces of a tower structure according to the sixth aspect of the present invention, people and/or operating materials are loaded onto a height adjustable operations platform, which is attached to a single post or a plurality of posts put up inside a tower structure from a bottom section thereof toward a top section in a manner that enables free up or down movement along the posts, and the operating height is adjusted by moving the height adjustable operations platform up and down along the posts, while the required operations are performed on the inner wall surfaces of the tower structure, and consequently, compared with a conventional case in which, for example, a level adjustment operation such as adding to the scaffold framework is required inside the tower structure every time the operating height is altered, the operating efficiency of inner wall surface operations improves markedly, and because level adjustment operations need not be conducted at great heights, the safety of the operations also improves, meaning operations realizes both cost reductions and improvement of safety.
- a level adjustment operation such as adding to the scaffold framework is required
- FIG. 1 shows a digester 1, with a scaffold apparatus for operations, which is used for conducting a cleaning operation of the inner wall surface, erected therein.
- the digester 1 is, for example, a large scale, tall, closed vessel with an internal diameter of 4 to 5 meters and a height of 40 to 50 meters, and is classified as a type-1 pressure vessel in the safety standards. Accordingly, the state of the inner wall surface must be inspected for safety purposes, and where necessary, required inner wall surface repair operations, such as the repair, by welding, of reduced thickness sections caused by cracking or abrasion of the inner wall surface, must be carried out. When this type of welding repair of the inner wall surface is required, the inner wall surface must first be subjected to a cleaning operation as a preparatory operation. In this embodiment, a cleaning operation using a CO 2 blast device, which acts as a preparatory operation for a welding repair operation, is described as an example of an operation that uses the scaffold apparatus for operations.
- the digester 1 is formed as a sealed vessel, comprising a main body section 2 with a large diameter cylindrical structure, and a digester bottom structure 3 with an end plate construction joined at the bottom end and a digester top structure 4 joined at the top end, and is fixed in a vertical position with a bottom section 1a of the digester bottom structure 3 supported on a base 5.
- the main body section 2 has a so-called “bamboo construction" wherein the diameter dimension reduces in a stepwise manner from the bottom section 1a of the digester 1 through to a top section 1b, and comprises a first main body section 21 that has the largest diameter and is joined to the top edge of the digester bottom structure 3, a second main body section 22, which is of a smaller diameter than the first main body section 21 and is joined so that the bottom end thereof is inserted inside the top end of the first main body section 21, and a third main body section 23, which is of a smaller diameter than the second main body section 22, is joined so that the bottom end thereof is inserted inside the top end of the second main body section 22, and which has the aforementioned digester top structure 4 joined to the top end thereof.
- a second main body section 22 which is of a smaller diameter than the first main body section 21 and is joined so that the bottom end thereof is inserted inside the top end of the first main body section 21, and a third main body section 23, which is of a smaller diameter than the second main body section 22, is
- an inner wall surface 1d of the main body section 2 has a stepped structure in which the internal diameter dimension varies at the joint regions between the first main body section 21 through the third main body section 23. Consequently, a height adjustable operations platform 8 described below, which is used during cleaning operations of the inner wall surface 1d, has a structure that enables vertical movement from the first main body section 21 through to the third main body section 23 without being affected in any way by the steps at the joint sections between the main body sections.
- the CO 2 blasting is a technique in which fine particles of dry ice are projected at the target surface as a blast material, and during the blasting operation, because CO 2 gas accumulates at the bottom inside the digester 1, in order to generate a downward ventilation flow inside the digester 1, an exhaust system 32 is attached to a bottom manhole 31 provided in a central position within the digester bottom structure 3, exhaust systems 33, 34 are disposed at a pair of upper and lower manholes provided toward the top section 1b, and an air supply device 37 is provided at a large diameter manhole 35 provided substantially halfway up the digester.
- This ventilation system ensures a good working environment inside the digester 1, and guarantees a highly safe operation.
- a manhole 36 provided near the joint section between the digester bottom structure 3 and the first main body section 21 of the digester 1 is used for carrying materials in and out of the digester 1, and for people to enter or exit from the digester 1.
- the aforementioned scaffold apparatus for operations comprises a left and right pair of posts 16, which are put up from the bottom section 1a of the digester 1 toward the top section 1b, and the bottom ends of which are supported by a lower fixed operations floor 6 and the top ends of which are supported by an upper fixed operations floor 7, and a height adjustable operations platform 8 which moves up and down along each of these posts 16.
- the aforementioned lower fixed operations floor 6, the upper fixed operations floor 7, the height adjustable operations platform 8, and the posts 16 that make up the scaffold apparatus for operations are all divided structures, and are each carried into the digester 1 in a disassembled state through the manhole 36, and then assembled inside the digester 1.
- the aforementioned lower fixed operations floor 6, the upper fixed operations floor 7, the height adjustable operations platform 8, and the posts 16 that make up the scaffold apparatus for operations are all divided structures, and are each carried into the digester 1 in a disassembled state through the manhole 36, and then assembled inside the digester 1.
- the lower fixed operations floor 6 corresponds with the "lower support base 6" disclosed in the claims, and is the first structure assembled during erection of the scaffold apparatus for operations.
- the lower fixed operations floor 6 is secured near the boundary between the straight region and the curved region of the aforementioned digester bottom structure 3 of the digester 1 (see FIG. 4), and in addition to its original function as an operations platform, also performs the important function of acting as a support base for the posts 16 described below.
- the lower fixed operations floor 6 is constructed by assembling four support girders 43 in a cross girder arrangement, and then installing and securing a flooring material 44 in a circular shape, the periphery of which extends out to a position close to, and facing the inner wall surface 1d of the digester 1, onto the top of these support girders 43. Furthermore, a left and right pair of support bases 41, 41 for mounting and supporting the bottom ends of the posts 16 described below are provided in positions toward the center of the lower fixed operations floor 6, and positioning stoppers 42 for restricting the sideways movement of the bottom ends of the posts 16 are provided on these support bases 41 (see FIG. 5).
- the lower fixed operations floor 6 is carried from outside the digester 1, through the manhole 36 and into the digester in a disassembled state, where it is then assembled, and consequently all of the structural members must be formed from parts that are of a size capable of passing through the manhole 36, and must be bolt secured structures that are capable of being assembled and disassembled.
- the four support girders 43 are carried into the digester 1, and assembled in a cross girder arrangement inside the digester 1.
- eight securing pieces 45 are welded to the inner wall surface 1d at a position directly above the aforementioned digester bottom structure 3 of the digester 1 in advance, with a predetermined spacing in the circumferential direction.
- Each securing piece 45 is then attached to a connecting member 46 via a bolt 18, and the end section of a support girder 43 is then secured to the connecting member 46 via a bolt 19.
- the posts 16 are put up inside the digester 1 so as to extend from the aforementioned lower fixed operations floor 6 through to the upper fixed operations floor 7 described below, and in this embodiment two posts 16 are arranged in parallel with a predetermined spacing therebetween, and are connected by joint members 17, forming an approximately ladder type structure.
- the number of posts 16 to be installed is appropriately selectable upon the needs, and either a single post, or a set of three or more posts, may be used.
- the posts 16 are carried from outside the digester 1, through the manhole 36, and are then assembled inside, and in this embodiment, a plurality of truss structured post pieces 16a with a rectangular cross-section (see FIG. 9) and a length that represent a size capable of passing through the manhole 36 are prepared, and these are then joined together sequentially in an axial direction to form a column type structure.
- the post pieces 16a are carried onto the lower fixed operations floor 6 via the manhole 36. Then, as shown in FIG. 3 and FIG. 5, first, two post pieces 16a are put up on top of the aforementioned support bases 41 of the lower fixed operations floor 6, positioned in place by the positioning stoppers 42, and then secured in place with bolts (not shown in the drawings). Subsequently, a predetermined number of additional post pieces 16a are stacked on top of, and connected to, the bottommost post pieces 16a, sequentially increasing the height of the posts, and the uppermost post pieces 16a that are joined last are secured to the upper fixed operations floor 7 described below. Furthermore, a rack 15 (see FIG. 9) that extends in the axial direction is provided on the post pieces 16a, and when a plurality of post pieces 16a are joined together to form a post 16, these racks 15 also extend continuously from the bottom end of the post 16 to the top end.
- the operation for stacking and joining the post pieces 16a, the assembly of the upper fixed operations floor 7, and the operation for joining the floor to the top end of the posts 16, are carried out using the height adjustable operations platform 8 described below.
- the aforementioned height adjustable operations platform 8 is assembled on the lower fixed operations floor 6 and attached to these post pieces 16a, and is then raised and lowered along these post pieces 16a. This height adjustable operations platform 8 is then moved sequentially upward, while the post pieces 16a are sequentially stacked and joined together.
- the disassembled parts for the aforementioned upper fixed operations floor 7 are loaded onto the height adjustable operations platform 8, and following completion of the joining operation of the uppermost post pieces 16a, the upper fixed operations floor 7 is assembled on top of the height adjustable operations platform 8 and then secured to the top end of the posts 16 (namely, the top end of the uppermost post pieces 16a).
- the upper fixed operations floor 7 corresponds with the "upper support base" disclosed in the claims, and as shown in FIG. 1, is disposed at a position immediately below the digester top structure 4 of the digester 1, and in addition to functioning as an operations floor as per its original function, also performs the important function of acting as a top end support base for the posts 16 as described above.
- the upper fixed operations floor 7 is a circular, flat shape, and is positioned inside the side walls 1c of the digester 1 with a predetermined space retained between the floor and the side walls 1c. Furthermore, the upper fixed operations floor 7 supports the top ends of the aforementioned pair of posts 16, 16 via a left and right pair of post securing members 50, 50 that are provided toward the center of the floor, while movement in the horizontal direction is regulated by bracing the tips of jacks 51, 51, .., which are provided at four locations around the outer periphery of the floor, against the inner wall surface 1d of the side walls 1c.
- this upper fixed operations floor 7 is also a knockdown structure that is bolted together, and is carried into the digester 1 through the aforementioned manhole 36, and then assembled on top of the height adjustable operations platform 8.
- the height adjustable operations platform 8 is used as an operations floor for the cleaning operation conducted on the inner wall surface 1d of the digester 1 as in this embodiment, but is also used as the operations floor for a wide variety of other operations such as inspection operations or repair operations conducted on the inner wall surface 1d, and for the transport and transfer of operating materials or operators during any of these operations.
- the height adjustable operations platform 8 is formed as a circular shaped flat structure by attaching a flooring material 49 to the top of girder members 47, 48 that are assembled in a cross girder arrangement, with a predetermined spacing maintained between the periphery of the platform and the inner wall surface 1d of the digester 1.
- a left and right pair of post guides 62, 62 are provided in the central region of this height adjustable operations platform 8, and the aforementioned posts 16, 16 pass through each of these post guides 62, 62.
- Pinion gears 40 that are rotated and driven by travel drive motors 30 (which correspond with the "elevator drive means” disclosed in the claims) via a pair of bevel gears 38, 39 are attached to one side of each of the post guides 62, 62, namely, on the side of the posts 16 to which the racks 15 are attached, as shown in FIG. 7 and FIG. 9, and these pinion gears 40 engage with, and travel along the racks 15 on the side of the posts 16, enabling the height adjustable operations platform 8 to move up and down along the posts 16 under its own power.
- guide wheel units 9 are provided at four locations around the outer periphery of the height adjustable operations platform 8. These guide wheel units 9 run along the inner wall surface 1d of the digester 1 when the height adjustable operations platform 8 is raised or lowered, restricting sideways deviation of the height adjustable operations platform 8 and ensuring stable up and down movement.
- the guide wheel units 9 are constructed by attaching a wheel 10 to the tip of a pivoted arm 11, which is provided on the height adjustable operations platform 8 and is free to swing in the radial direction of the digester 1, and then using a damper 12 to energize the arm 11 to apply pressure continually in the outward direction.
- the wheels 10 run along the inner wall surface 1d while being pressed against the inner wall surface with a constant, predetermined pressure, stability during the raising and lowering of the height adjustable operations platform 8 is ensured at all times, and because the wheels 10 are free to deviate along the radial direction of the digester 1, the wheels 10 are able to accommodate steps (namely, the joint sections between the first through third main body sections 21 to 23 of the main body section 2) in the inner wall surface 1d, and easily ride over such steps, meaning the reliability of the movement of the height adjustable operations platform 8 is ensured.
- steps namely, the joint sections between the first through third main body sections 21 to 23 of the main body section 2
- each structural member must be a knockdown structure formed from parts that are of a size capable of passing through the manhole 36, which are then bolted together.
- the aforementioned height adjustable operations platform 8 is freely raised and lowered along the posts 16 between the lower fixed operations floor 6 and the upper fixed operations floor 7, and consequently, as shown in FIG. 1 and FIG.
- an operator M is placed on the height adjustable operations platform 8
- hoses 24 extending from a CO 2 blast operations unit 20 located outside the digester 1 are passed through the bottom manhole 31 provided in the digester bottom structure 3 of the digester 1 and up onto the top of the height adjustable operations platform 8,
- the operator M holds a blast nozzle 54 attached to the tip of the hoses 24, and a blast material, namely fine particles of dry ice, projected from the blast nozzle 54 is sprayed onto the inner wall surface 1d, and the impact energy of the blast material removes adherents such as rust from the surface of the inner wall surface 1d, thereby producing a clean surface.
- the cleaning operation is performed in a uniform manner over the entire height of the inner wall surface 1d.
- the blast material sublimes after projection and becomes CO 2 gas
- a post-operation for recovering the blast material such as that required when steel spheres or the like are used as the blast material, is unnecessary, meaning the operation is very favorable in terms of improving the operating efficiency of the overall cleaning operation, and reducing the operating costs.
- the CO 2 gas accumulates at the bottom of the digester 1, and because a downward ventilation flow exists inside the digester 1, discharge of the gas outside the digester 1 is performed very efficiently, the operating environment inside the digester 1 is maintained at a good condition, and the gas causes absolutely no harm to the health of the operator M.
- an air line mask 53 is passed into the digester 1 from the aforementioned manhole 35, as shown in FIG. 1, and the operator M wears this mask.
- the wheels 10 of the guide wheel units 9 are capable of being displaced freely toward, and away from, the inner wall surface 1d, when the height adjustable operations platform 8 moves over the joint sections between the first main body section 21 through the third main body section 23 of the main body section 2, even if there are steps formed at these joint sections, by utilizing the aforementioned displacement function, the wheels 10 easily ride over such steps, and steps in the inner wall surface 1d cause absolutely no impediment to the movement of the height adjustable operations platform 8.
- stable vertical movement of the height adjustable operations platform 8 is achieved, meaning the general purpose applicability of the scaffold apparatus for conducting operations on the inner wall surfaces of tower structures of a variety of constructions is improved even further.
- the height adjustable operations platform 8 is equipped with the aforementioned motors 30 and is capable of being raised and lowered under its own power, during various operations that use the height adjustable operations platform 8, adjustments to the height of the height adjustable operations platform 8 is performed easily and quickly, for example in accordance with the requirements of an operator, meaning both the operability and mobility are good. As a result, the operating efficiency of operations that are conducted using the height adjustable operations platform 8 is improved markedly.
- the aforementioned lower fixed operations floor 6 is attached via the securing pieces 45 provided on the side wall 1c of the digester 1 immediately above the tower bottom structure 3, and the bottom ends of the aforementioned posts 16 are supported by this lower fixed operations floor 6, and consequently the entire weight, including the dead load of the posts 16 and the attached height adjustable operations platform 8, and the weight of the operator M and/or operating materials loaded onto this height adjustable operations platform 8, is supported directly by the side walls 1c at a point immediately above the tower bottom section 3 of the digester 1, via the lower fixed operations floor 6, and the application of load onto the tower bottom section 3 is avoided.
- the weight of the posts 16 and the like is supported more reliably and in a more stable manner, and both the reliability of the installation of the posts 16 and the like, and the reliability of the various operations conducted using the posts 16 and the attached height adjustable operations platform 8 are improved.
- the tower bottom section 3 of the digester 1 has the end plate structure described above, that section is more complex and more expensive to produce than the side wall section 1c, and consequently by not needing to use this tower bottom section 3 as the support site for the posts 16 and the like, damage to the tower bottom section 3 is effectively avoided, resulting in an improvement of the durability of the digester 1, or a reduction of the production costs.
- the digester 1 was described as one example of the "tower structure” that is the target of the present invention, but the “tower structure” is not restricted to structures such as the digester 1 with a blast furnace type construction, and for example, also includes comparatively low structures such as oil storage tanks and the like. Furthermore, the aforementioned"tower structure” is not restricted to pressure vessels such as the aforementioned digester 1, it may be used with comparatively low-pressure structures too.
- a cleaning operation conducted on the inner wall surface of the digester 1 was described as an example of an operation using the scaffold apparatus for operations, but the scaffold apparatus for operations according to the present invention is not restricted to this operation, and is also ideally applied to a variety of other operations including inspection operations, modification operations, and welding operations. Furthermore, each of these different types of operations is of course conducted individually, or a plurality of operations is conducted conjointly, in parallel.
- the present invention comprises either a single post or a plurality of posts put up inside a tower structure from a bottom section thereof toward a top section, and a height adjustable operations platform that is attached in a manner that enables free up or down movement along the posts, and consequently, assembling the posts inside the tower structure and then attaching the height adjustable operations platform means that when any of a variety of operations are conducted on the inner wall surfaces of the tower structure, adjustments of the installation height of the height adjustable operations platform within the tower structure is performed easily and quickly by moving the height adjustable operations platform up or down along the posts, and consequently, a level adjustment operation such as adding to the scaffold framework is not required inside the tower structure every time the operating height is altered, enabling a marked improvement in the operability of inner wall surface operations, and in addition, because level adjustment operations need not be conducted at great heights, the safety of the operations improves, meaning the invention is also ideal for achieving both operating cost reductions and improved safety.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
- Working Measures On Existing Buildindgs (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002163776 | 2002-06-05 | ||
| JP2002163776A JP4209635B2 (ja) | 2002-06-05 | 2002-06-05 | 塔槽体の内壁面作業用足場装置及び該足場装置を用いた内壁面作業方法 |
| PCT/JP2003/007046 WO2003104585A1 (ja) | 2002-06-05 | 2003-06-03 | 塔槽体の内壁面作業用足場装置及び該足場装置を用いた内壁面作業方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP1553244A1 true EP1553244A1 (de) | 2005-07-13 |
Family
ID=29727552
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP03730815A Withdrawn EP1553244A1 (de) | 2002-06-05 | 2003-06-03 | Gerüstvorrichtung zur arbeit an einer innenwandfläche eines kesselturmkörpers und verfahren zur arbeit an einer innenwandfläche unter verwendung der gerüstvorrichtung |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20050247008A1 (de) |
| EP (1) | EP1553244A1 (de) |
| JP (1) | JP4209635B2 (de) |
| CN (1) | CN1659346A (de) |
| BR (1) | BR0309741A (de) |
| CA (1) | CA2482742A1 (de) |
| WO (1) | WO2003104585A1 (de) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9382719B2 (en) | 2013-09-10 | 2016-07-05 | Alstom Renewable Technologies | Platform for accessing a hydraulic machine and methods for installing and disassembling such a platform in a suction tube |
Families Citing this family (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| ES2283192B1 (es) * | 2005-09-16 | 2008-09-16 | GAMESA INNOVATION & TECHNOLOGY, S.L. | Metodo de montaje de elementos en el interior de la torre de un aerogenerador. |
| JP4843327B2 (ja) * | 2006-02-14 | 2011-12-21 | 雅明 五十嵐 | 中空の構造物の構造物内部に足場を仮設する工法 |
| US20110140437A1 (en) * | 2010-05-26 | 2011-06-16 | Satish Vemuri | Self-supporting platform for a wind turbine |
| HK1172197A2 (en) * | 2012-06-01 | 2013-04-12 | Wls Intellectual Property Limited | Improvements in building components and structures |
| DE102012109860A1 (de) * | 2012-10-16 | 2014-04-17 | Max Bögl Wind AG | Versorgungsgerüst für einen Turm,Turm mit einem Versorgungsgerüst sowie Verfahren zum Errichten eines Versorgungsgerüsts im Inneren eines Turms |
| CN104120870A (zh) * | 2013-04-28 | 2014-10-29 | 中际联合工业技术(北京)有限公司 | 一种临时作业平台 |
| DE102013217088A1 (de) * | 2013-08-27 | 2015-03-05 | Senvion Se | Verfahren zur Montage von Turmeinbauten |
| US9487960B2 (en) * | 2014-06-17 | 2016-11-08 | One Energy Enterprises Llc | Suspended deck systems, kits, and methods of installing, inspecting, and repairing a suspended deck system |
| CN104594631B (zh) * | 2015-02-05 | 2016-06-29 | 中化二建集团有限公司 | 滑模装置拖带施工平台施工造粒塔喷淋层的施工工艺 |
| DE102017002525B4 (de) | 2017-03-16 | 2020-06-04 | Goracon Engineering Gmbh | Arbeitsbühne für insbesondere den Aufbau von Turmsegmenten und Türmen von beispielsweise Windkraftanlagen |
| EP3425136B1 (de) * | 2017-07-05 | 2020-02-26 | Alimak Group Management AB | Transportsysteme, aufzugssysteme, kits, turmabschnitte und verfahren zur durchführung von montage- oder wartungsoperationen in türmen |
| US11136967B2 (en) * | 2018-07-02 | 2021-10-05 | Inventus Holdings, Llc | Articulating joint for wind turbine |
| ES2947465T3 (es) * | 2018-11-15 | 2023-08-09 | Vestas Wind Sys As | Aerogenerador de rotor múltiple que comprende un sistema logístico |
| CN109556978B (zh) * | 2019-01-23 | 2024-03-15 | 上汽大众汽车有限公司 | 跌落式冲击试验设备 |
| CN110410277B (zh) * | 2019-08-09 | 2023-11-24 | 戚永维 | 一种风力发电机塔架及其安装方法 |
| CN111441565A (zh) * | 2020-03-18 | 2020-07-24 | 航天海鹰(哈尔滨)钛业有限公司 | 用于热等静压机有限空间作业时的可升降装置及使用方法 |
| CN113898154A (zh) * | 2021-08-24 | 2022-01-07 | 上海宝冶集团有限公司 | 一种可调节式墙体润水装置 |
| CN116464255B (zh) * | 2023-03-29 | 2025-05-09 | 山东送变电工程有限公司 | 一种可调节安装尺寸的钢管塔站位平台 |
| CN117401530B (zh) * | 2023-12-14 | 2024-02-23 | 招远市河西金矿有限公司 | 一种盲竖井井口检修平台 |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3415925B2 (ja) * | 1994-04-22 | 2003-06-09 | 良忠 越原 | 工事用エレベータ |
| JP3258582B2 (ja) * | 1996-11-29 | 2002-02-18 | 三菱重工業株式会社 | 飲料タンク内用足場 |
| JP2001193278A (ja) * | 2000-01-07 | 2001-07-17 | Kajima Corp | 内部空間を有する構造物の施工法及びクライミング足場 |
-
2002
- 2002-06-05 JP JP2002163776A patent/JP4209635B2/ja not_active Expired - Fee Related
-
2003
- 2003-06-03 BR BR0309741-2A patent/BR0309741A/pt not_active Application Discontinuation
- 2003-06-03 CN CN038127717A patent/CN1659346A/zh active Pending
- 2003-06-03 WO PCT/JP2003/007046 patent/WO2003104585A1/ja not_active Ceased
- 2003-06-03 US US10/509,844 patent/US20050247008A1/en not_active Abandoned
- 2003-06-03 EP EP03730815A patent/EP1553244A1/de not_active Withdrawn
- 2003-06-03 CA CA002482742A patent/CA2482742A1/en not_active Abandoned
Non-Patent Citations (1)
| Title |
|---|
| See references of WO03104585A1 * |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9382719B2 (en) | 2013-09-10 | 2016-07-05 | Alstom Renewable Technologies | Platform for accessing a hydraulic machine and methods for installing and disassembling such a platform in a suction tube |
| EP2845966B1 (de) * | 2013-09-10 | 2020-10-28 | GE Renewable Technologies | Plattform für Zugriff auf eine hydraulische Maschine und Verfahren zur Installation und Demontage solch einer Plattform in einem Saugrohr |
Also Published As
| Publication number | Publication date |
|---|---|
| US20050247008A1 (en) | 2005-11-10 |
| WO2003104585A1 (ja) | 2003-12-18 |
| JP4209635B2 (ja) | 2009-01-14 |
| BR0309741A (pt) | 2005-03-22 |
| CN1659346A (zh) | 2005-08-24 |
| CA2482742A1 (en) | 2003-12-18 |
| JP2004011193A (ja) | 2004-01-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP1553244A1 (de) | Gerüstvorrichtung zur arbeit an einer innenwandfläche eines kesselturmkörpers und verfahren zur arbeit an einer innenwandfläche unter verwendung der gerüstvorrichtung | |
| CN110998042B (zh) | 用于在塔架结构中执行组装或维护操作的运输系统、套件和方法 | |
| CN105345288B (zh) | 一种使用电动倒链组合设备安装脱硫塔的方法 | |
| CN110374612B (zh) | 一种应用于临空状态下的盾构机接收平台及施工工艺 | |
| CN102235107B (zh) | 烟囱钢内筒的液压提升施工方法 | |
| EP1514636A1 (de) | Vorrichtung zur bearbeitung einer innenwandfläche eines tankturms und diese verwendendes verfahren zur bearbeitung einer innenwandfläche | |
| CN113585087A (zh) | 一种用于系梁施工的易装易拆模板支撑平台 | |
| CN109879179B (zh) | 一种装配式钢结构塔吊平台 | |
| WO2013002790A1 (en) | Work platform system configured for use structure with internal cavity, and related methods of assembly and use | |
| CN203486787U (zh) | 一种维金斯式煤气柜柜顶的整体提升装置 | |
| CN113309330A (zh) | 大型罐体组装用辅助装置 | |
| JPH09268778A (ja) | 有水式ガスホルダーの解体工法とその工法に使用する部材 | |
| JP5299982B1 (ja) | 円筒構造物建設・補修工事用壁つなぎバンドおよび該壁つなぎバンドを使用した移動昇降式足場による円筒構造物の建設・補修方法 | |
| JP2010090633A (ja) | 筒型コンクリート構造物用の組立式作業足場 | |
| CN118951264A (zh) | 一种等离子水下切割方法 | |
| CN118186912A (zh) | 一种装配式梁柱式支架及支架的施工方法 | |
| CN110847031A (zh) | 桥梁施工用移动吊篮 | |
| JP3757509B2 (ja) | 有水式ガスホルダーの工法 | |
| JPH07102793A (ja) | 塔体の解体方法およびその装置 | |
| CN212270670U (zh) | 桥梁施工用移动吊篮 | |
| CN114408735A (zh) | 一种可旋转多用式水车室起重检修平台 | |
| CN214701974U (zh) | 一种烟囱爆破拆除用单向作用推倒装置 | |
| CN222414066U (zh) | 适用于狭小空间的框架式混凝土布料支架 | |
| JP4839052B2 (ja) | 貯槽の回転解体工法 | |
| CN223317505U (zh) | 一种回转窑筒体高空组对施工操作平台 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20041222 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
| RBV | Designated contracting states (corrected) |
Designated state(s): ES FI SE |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: 8566 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
| 18D | Application deemed to be withdrawn |
Effective date: 20070103 |