EP1160395B1 - Assembly of guard rails - Google Patents

Assembly of guard rails Download PDF

Info

Publication number
EP1160395B1
EP1160395B1 EP01850099A EP01850099A EP1160395B1 EP 1160395 B1 EP1160395 B1 EP 1160395B1 EP 01850099 A EP01850099 A EP 01850099A EP 01850099 A EP01850099 A EP 01850099A EP 1160395 B1 EP1160395 B1 EP 1160395B1
Authority
EP
European Patent Office
Prior art keywords
pole
assembly according
tube
securing part
poles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP01850099A
Other languages
German (de)
French (fr)
Other versions
EP1160395A3 (en
EP1160395A2 (en
Inventor
Joakim Svedberg
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Combisafe International AB
Original Assignee
Combisafe International AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Combisafe International AB filed Critical Combisafe International AB
Publication of EP1160395A2 publication Critical patent/EP1160395A2/en
Publication of EP1160395A3 publication Critical patent/EP1160395A3/en
Application granted granted Critical
Publication of EP1160395B1 publication Critical patent/EP1160395B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3219Means supported by the building wall, e.g. security consoles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3266Safety nets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • E04G5/067Consoles; Brackets specially adapted for attachment to posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G2005/148Railings latticed or netted

Definitions

  • the invention relates to an assembly of guard rails in accordance with the preamble of Claim 1. It is known to assemble guard rails on building sites, among other reasons in order to prevent persons, building material or tools from dropping from one level to another as work on building frames progresses. Different building methods and frame constructions require different types of securing arrangements for poles and guard rail runners.
  • EP-A1-0417355 discloses a fall guard for a roof, comprising a number of constructions which are clamped to the roof gutter by means of upper and lower clamping members fitted to a bracket, said clamping members be intended to grip on the bottom of the gutter.
  • NL 1019494 refers to mounting of support frame, e.g. scaffolding, on building wall by hooking fasteners connected to frame parts into cavities in wall and discloses a support frame, the parts of which be connected to at least one fastener, which is hooked into one or more cavities provided in a wall.
  • Tube parts and elements included in the guard rail can advantageously be made as scaffolding tubes of conventional type which in general have a diameter of 48.3 mm. By this means it is also possible to use standard tube couplings adapted to scaffolding tubes for the purpose of joining the guard rail together.
  • the guard rail 2 is mounted between a first pillar 4 and a second pillar 6 in a building frame with the aid of a first pole 8 and a second pole 10 for supporting a screen arrangement 12.
  • a fastening arrangement 14 is anchored near the upper end of each pillar for supporting the lower end of a respective pole.
  • Each fastening arrangement comprises a securing part 16 anchored to the respective pillar in the assembled state, and a pole attachment 18 coupled to the securing part.
  • the securing part 16 can be of different designs, of which one design which includes tensioning belts of a conventional type is described below, while other designs will be described later.
  • the securing part 16 with tensioning belt is preferably intended for assembly on concrete pillars. It can also be mounted on other types of square pillars, for example steel pillars, with the exception of I-beams. It is made up of a square tube 20 on which two connection tubes 22 are welded one at each end. Two angle brackets 24 constructed from U-profiles are welded onto the opposite side of the square tube. At the free ends of the angle brackets there are holes which have been drilled for securing, for example, a pin for assembling of tensioning belts 26.
  • the belt is secured to one branch, and the tensioner in the other.
  • the tensioning belts 26 are guided round the respective pillar 4, 6 and tightened and locked with the tensioner.
  • the pole attachment 18 of the fastening arrangement 14 has a uniform configuration irrespective of the design of the securing part used in any given case.
  • Conventional securing arrangements are often located far down on the building frame, for which reason the pole attachment 18 is designed as an elongate framework which continues the length of the pole from the securing part 16 and upwards.
  • the pole attachment 18 can be coupled to the securing part 16 by means of conventional tube couplings, which permits adjustment inwards/outwards and upwards/downwards. In cases where rotatable tube couplings are used, it is also possible to mount the pole attachment at an inclination.
  • the framework of the pole attachment 18 comprises first 28 and second 30 tube elements joined together at a distance from each other, of which the first tube element is provided with a first pole sleeve 32 coaxial therewith at a first end and, at the other end, a second pole sleeve 34 angled towards the second tube element 30.
  • the pole attachment can be coupled together to the securing part with either the first 32 or second 34 pole sleeve directed upwards.
  • the straight first pole sleeve 32 is intended for a pole for the screen arrangement 12 which is designed as a framework, which will be described in more detail later.
  • the second pole sleeve 34 is angled as required but is intended to support a pole for a netting or guard net which will likewise be described in more detail below.
  • the pole attachment 18 the length of which between the pole sleeves can vary between ca. 1000 mm and ca. 1800 mm, is intended to support poles with a length of normally 1150 mm, although poles as long as 1800 mm are possible.
  • the tube elements 28, 30 are parallel and welded together, preferably by means of first 36, second 38 and third 40 stiffening members of flat iron at a mutual spacing of about 100 mm at the first end and second end and at the approximate centre of the pole attachment, respectively.
  • the first and second stiffening members 36, 38 each form an obtuse angle of approximately 120° to the second element 30, and the third stiffening member forms a right angle both to the first element and the second element.
  • the mutual distance between the tube elements should be increased if greater torques are to be taken up than is customary for normal guard rails. Trials have shown that the ratio between the mutual distance of the tube elements and the length of the pole attachment between the pole sleeves should not be less than 1 to 20 in order to ensure good functioning.
  • the screen arrangement 12 comprises a cantilever framework 42 which is secured at each point of attachment to the building frame between two poles and which has upper 44 and lower 46 bars which are arranged at a distance from each other, approximately corresponding to a third to one half of a pole length, and near each end are connected to the first and second poles 8; 10, and with transverse stiffening tubes 48 arranged in a predetermined distribution between the poles.
  • the distribution is such that for a defined length of six metres of the bars 44, 46, which gives a corresponding span, the stiffening tubes 48 are three in number, with one situated transverse to the centre of the bars, i.e. three metres from each end. The other two are then situated one metre from each end and therefore two metres from the centrally located stiffening tube 48.
  • a toe board holder 52 for supporting a toe board 54 of a conventional type can be suspended from each stiffening tube 48 in such a way that each toe board is supported at the same level as is customary by means of a toe board bracket 55 arranged on the pole.
  • the cantilever framework 42 additionally has, on the side of each stiffening tube 48 directed away from the building frame, a central bar 58 which is connected to the central portion of each stiffening tube by means of a connection tube 56 in such a way that the connection tube 56 is situated in a vertical plane transverse relative to the upper 44 and lower 46 bars.
  • the central bar 58 is substantially parallel to the upper 44 and lower 46 bars and situated at a distance of approximately a third of a pole length from the stiffening tubes 48 in a horizontal plane transverse to the same.
  • the coupling to the central bar 58 permits a greater c-c distance between the poles 8; 10, without permitted deflection values being exceeded or a greater c-c distance infringing on the requirements set in respect of maximum strength.
  • the central bar 58 can also be connected to each first 8 and second 10 pole via its additional connection tube 56.
  • Figures 3 to 5 show a further embodiment of a guard rail 2' mounted between a first pillar 4' and a second pillar 6' in a building frame with the aid of a first 8' and a second 10' pole for supporting a screen arrangement 12'.
  • the fastening arrangement 14 is anchored near the upper end of each pillar for supporting the lower end of the respective pole.
  • the fastening arrangement in this case also comprises the securing part 16' anchored to the respective pillar in the assembled state, and the previously described pole attachment 18 coupled to the same.
  • the securing part 16' described here is in a form which comprises steel spar clamps of a conventional type, for example Combisafe®.
  • the securing part 16' with steel spar clamps is preferably intended for mounting on steel pillars, preferably I-beams. It is made up of two steel spar clamps 60 on which two connection tubes 22' are mounted, for example with tube couplings or weld seams, in such a way that the connection tubes 22' project at substantially a right angle with respect to the screen arrangement 12'.
  • the steel spar clamps 60 are tensioned on the flanges of the respective steel pillar 4', 6' and the pole attachment 18 is mounted on the connection tubes 22' in the same way as before, but with the difference that the angled second pole sleeve 34 is now directed upwards.
  • the screen arrangement 12' comprises a cantilever netting or guard net 62 which is secured between two poles at each point of attachment on the building frame and which has a net 64 supported by means of upper 44' and lower 46' runners arranged at a distance from each other and in the form of, for example, a wire or a tensioning belt, which are connected near each end to each pole 8', 10' via tube couplings with knots which are not shown.
  • a wire or tensioning belt can be guided through the net 64 before assembly. If, for example, the wire runners are tensioned after assembly, problems can arise on account of the fact that the poles bend inwards under the effect of the wire tensioning.
  • guard rails 12' on both sides of a pillar 6' in a corner this can be countered by two poles 8', 10' in the corner being joined together at the bottom by means of another pole attachment 18 mounted on the steel spar clamps 60 of the securing part 16', and at the top by means of for example a connection tube 56' or the like, as is shown in Figure 7 .
  • the pole in the corner can be braced by means of a stay 70 anchored at the securing part 16 of the pole attachment 18 and extending to the top of the respective pole 8', 10', as is shown in Figure 8 .
  • the stay 70 can be anchored in a further separate securing part 16, see Figure 9 .
  • Figure 6 shows an alternatively designed securing part 16" with which the pole attachment 18 is coupled in the same way as in the previous embodiments.
  • the connection tubes 22" are here provided with screws 66 which are screwed tightly into two securing seats 68 arranged in the pillar.
  • Concrete pillars are prefabricated with the securing seats 68 in the form of cast threads.
  • expander attachments are used which are mounted afterwards.
  • connection tubes 22" and screws 66 are unscrewed from the pillar and the securing seat 68 can be concealed by the joints between elements being covered over in the traditional way.
  • the securing parts 16, 16' and 16" combined in the various embodiments and the screen arrangements 12 and 12' are shown only as examples. Thus, every conceivable combination of framework 42 and netting 62 is possible with both the securing part 16 for assembly with tensioning belts 26, the securing part 16' for assembly with steel spar clamps 60, and the securing part 16" for assembly with screws 66.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Fencing (AREA)
  • Steps, Ramps, And Handrails (AREA)
  • Bridges Or Land Bridges (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)
  • Prostheses (AREA)
  • Diaphragms For Electromechanical Transducers (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention relates to an arrangement for the assembly of guard rails (2) comprising poles (8;10), a screen arrangement (12) supported by the poles, and a fastening arrangement (14) for securing each guard rail pole (8;10) to a building frame (4,6). Each fastening arrangement (14) comprises a securing part (16) which can be anchored to the building frame, and a pole attachment (18) which can be coupled to the securing part. The pole attachment comprises a framework of elongate first (28) and second (30) tube elements joined together at a distance from each other, and at least at one end it is designed to support a pole (8;10). In the assembled position, the pole attachment (18) is oriented with the elongate tube elements (28;30) lying in a vertical plane transverse relative to the screen arrangement (12). <IMAGE>

Description

  • The invention relates to an assembly of guard rails in accordance with the preamble of Claim 1. It is known to assemble guard rails on building sites, among other reasons in order to prevent persons, building material or tools from dropping from one level to another as work on building frames progresses. Different building methods and frame constructions require different types of securing arrangements for poles and guard rail runners.
  • EP-A1-0417355 discloses a fall guard for a roof, comprising a number of constructions which are clamped to the roof gutter by means of upper and lower clamping members fitted to a bracket, said clamping members be intended to grip on the bottom of the gutter.
  • NL 1019494 refers to mounting of support frame, e.g. scaffolding, on building wall by hooking fasteners connected to frame parts into cavities in wall and discloses a support frame, the parts of which be connected to at least one fastener, which is hooked into one or more cavities provided in a wall.
  • When constructing vestibules and industrial buildings around a pillar framework, there may be long spans where the distance between the pillars on which the pole attachments can be anchored often exceeds six metres and can sometimes be as great as ten metres or more. The maximum permitted c-c distance between the poles is determined by the admissible values of deflection and the demands concerning the maximum strength laid down by current building regulations. The regulations can vary between different countries.
  • It is an object of the invention therefore to make available guard rails with long spans which take account of the building regulations in force. This is made possible by the fact that the assembly of the type set out above has the characteristic features in attached Claim 1. Advantageous refinements and improvements of the invention will be evident from the description and from the subclaims.
  • The invention is explained in greater detail below with reference to the attached diagrammatic drawings.
    • Figure 1 shows an example of a guard rail with a cantilever framework which, by means of securing parts with tensioning belts, is secured between two pillars in a building frame,
    • Figure 2a shows the guard rail from Figure 1 viewed from one end,
    • Figure 2b is a perspective view of a securing part and a pole attachment according to Figure 1 on an enlarged scale,
    • Figure 3 shows an example of a guard rail with a cantilever netting which, by means of securing parts with steel spar clamps, is secured between two steel pillars,
    • Figure 4 is an enlarged view of the securing arrangement in Figure 3,
    • Figure 5 shows the guard rail according to Figure 3 viewed from one end,
    • Figure 6 is a view, on an enlarged scale, of an alternative securing part with screw connections,
    • Figure 7 shows guard rails joined together on both sides of a corner,
    • Figure 8 shows a guard rail on one side of a corner with a stay, and
    • Figure 9 shows a guard rail on one side of a corner with a separately secured stay.
  • Tube parts and elements included in the guard rail can advantageously be made as scaffolding tubes of conventional type which in general have a diameter of 48.3 mm. By this means it is also possible to use standard tube couplings adapted to scaffolding tubes for the purpose of joining the guard rail together.
  • The guard rail 2 according to Figures 1 and 2 is mounted between a first pillar 4 and a second pillar 6 in a building frame with the aid of a first pole 8 and a second pole 10 for supporting a screen arrangement 12. A fastening arrangement 14 is anchored near the upper end of each pillar for supporting the lower end of a respective pole. Each fastening arrangement comprises a securing part 16 anchored to the respective pillar in the assembled state, and a pole attachment 18 coupled to the securing part.
  • The securing part 16 can be of different designs, of which one design which includes tensioning belts of a conventional type is described below, while other designs will be described later. The securing part 16 with tensioning belt is preferably intended for assembly on concrete pillars. It can also be mounted on other types of square pillars, for example steel pillars, with the exception of I-beams. It is made up of a square tube 20 on which two connection tubes 22 are welded one at each end. Two angle brackets 24 constructed from U-profiles are welded onto the opposite side of the square tube. At the free ends of the angle brackets there are holes which have been drilled for securing, for example, a pin for assembling of tensioning belts 26. The belt is secured to one branch, and the tensioner in the other. To assemble the securing part 16, the tensioning belts 26 are guided round the respective pillar 4, 6 and tightened and locked with the tensioner. An easily adjustable securing can be obtained quickly and simply without any need for welding or drilling work or casting of attachments.
  • The pole attachment 18 of the fastening arrangement 14 has a uniform configuration irrespective of the design of the securing part used in any given case. Conventional securing arrangements are often located far down on the building frame, for which reason the pole attachment 18 is designed as an elongate framework which continues the length of the pole from the securing part 16 and upwards. The pole attachment 18 can be coupled to the securing part 16 by means of conventional tube couplings, which permits adjustment inwards/outwards and upwards/downwards. In cases where rotatable tube couplings are used, it is also possible to mount the pole attachment at an inclination.
  • The framework of the pole attachment 18 comprises first 28 and second 30 tube elements joined together at a distance from each other, of which the first tube element is provided with a first pole sleeve 32 coaxial therewith at a first end and, at the other end, a second pole sleeve 34 angled towards the second tube element 30. The pole attachment can be coupled together to the securing part with either the first 32 or second 34 pole sleeve directed upwards. The straight first pole sleeve 32 is intended for a pole for the screen arrangement 12 which is designed as a framework, which will be described in more detail later. The second pole sleeve 34 is angled as required but is intended to support a pole for a netting or guard net which will likewise be described in more detail below. New regulations which are expected will stipulate that a guard rail of this type must slope at least 15°, for which reason the second pole sleeve 34 is angled at an angle α of 15° and can advantageously be angled at an angle α of 18° or 20 °.
  • The pole attachment 18, the length of which between the pole sleeves can vary between ca. 1000 mm and ca. 1800 mm, is intended to support poles with a length of normally 1150 mm, although poles as long as 1800 mm are possible. The tube elements 28, 30 are parallel and welded together, preferably by means of first 36, second 38 and third 40 stiffening members of flat iron at a mutual spacing of about 100 mm at the first end and second end and at the approximate centre of the pole attachment, respectively. The first and second stiffening members 36, 38 each form an obtuse angle of approximately 120° to the second element 30, and the third stiffening member forms a right angle both to the first element and the second element. The mutual distance between the tube elements should be increased if greater torques are to be taken up than is customary for normal guard rails. Trials have shown that the ratio between the mutual distance of the tube elements and the length of the pole attachment between the pole sleeves should not be less than 1 to 20 in order to ensure good functioning.
  • The screen arrangement 12 comprises a cantilever framework 42 which is secured at each point of attachment to the building frame between two poles and which has upper 44 and lower 46 bars which are arranged at a distance from each other, approximately corresponding to a third to one half of a pole length, and near each end are connected to the first and second poles 8; 10, and with transverse stiffening tubes 48 arranged in a predetermined distribution between the poles. The distribution is such that for a defined length of six metres of the bars 44, 46, which gives a corresponding span, the stiffening tubes 48 are three in number, with one situated transverse to the centre of the bars, i.e. three metres from each end. The other two are then situated one metre from each end and therefore two metres from the centrally located stiffening tube 48. If a greater span is to be bridged between the poles, two frameworks 42 can be joined together by means of connector tubes 50 mounted in the ends of the bars. By this means, the total length of the connected frameworks is 12 metres and the number of stiffening tubes 48 is therefore six. The distribution here is once again two metres between all the stiffening tubes, and one metre between the stiffening tubes 48 located nearest to the poles and the respective first 8 and second 10 pole. A toe board holder 52 for supporting a toe board 54 of a conventional type can be suspended from each stiffening tube 48 in such a way that each toe board is supported at the same level as is customary by means of a toe board bracket 55 arranged on the pole.
  • According to a preferred embodiment, the cantilever framework 42 additionally has, on the side of each stiffening tube 48 directed away from the building frame, a central bar 58 which is connected to the central portion of each stiffening tube by means of a connection tube 56 in such a way that the connection tube 56 is situated in a vertical plane transverse relative to the upper 44 and lower 46 bars. The central bar 58 is substantially parallel to the upper 44 and lower 46 bars and situated at a distance of approximately a third of a pole length from the stiffening tubes 48 in a horizontal plane transverse to the same. The coupling to the central bar 58 permits a greater c-c distance between the poles 8; 10, without permitted deflection values being exceeded or a greater c-c distance infringing on the requirements set in respect of maximum strength.
  • In the present case, the central bar 58 can also be connected to each first 8 and second 10 pole via its additional connection tube 56.
  • Figures 3 to 5 show a further embodiment of a guard rail 2' mounted between a first pillar 4' and a second pillar 6' in a building frame with the aid of a first 8' and a second 10' pole for supporting a screen arrangement 12'. As in the preceding embodiment, the fastening arrangement 14 is anchored near the upper end of each pillar for supporting the lower end of the respective pole. The fastening arrangement in this case also comprises the securing part 16' anchored to the respective pillar in the assembled state, and the previously described pole attachment 18 coupled to the same. The securing part 16' described here is in a form which comprises steel spar clamps of a conventional type, for example Combisafe®. The securing part 16' with steel spar clamps is preferably intended for mounting on steel pillars, preferably I-beams. It is made up of two steel spar clamps 60 on which two connection tubes 22' are mounted, for example with tube couplings or weld seams, in such a way that the connection tubes 22' project at substantially a right angle with respect to the screen arrangement 12'. For mounting the securing part 16', the steel spar clamps 60 are tensioned on the flanges of the respective steel pillar 4', 6' and the pole attachment 18 is mounted on the connection tubes 22' in the same way as before, but with the difference that the angled second pole sleeve 34 is now directed upwards. In this way, it is possible to obtain the inclination of at least 15° of the poles 8' and 10' which is needed for guard nets. Here once again, an easily adjustable securing can be quickly and easily obtained without any need for welding or drilling work or casting of the attachments. No work therefore has to be done on the pillar.
  • The screen arrangement 12' comprises a cantilever netting or guard net 62 which is secured between two poles at each point of attachment on the building frame and which has a net 64 supported by means of upper 44' and lower 46' runners arranged at a distance from each other and in the form of, for example, a wire or a tensioning belt, which are connected near each end to each pole 8', 10' via tube couplings with knots which are not shown. In the present case, a wire or tensioning belt can be guided through the net 64 before assembly. If, for example, the wire runners are tensioned after assembly, problems can arise on account of the fact that the poles bend inwards under the effect of the wire tensioning.
  • In the case of two guard rails 12' on both sides of a pillar 6' in a corner, this can be countered by two poles 8', 10' in the corner being joined together at the bottom by means of another pole attachment 18 mounted on the steel spar clamps 60 of the securing part 16', and at the top by means of for example a connection tube 56' or the like, as is shown in Figure 7. In the case of guard rails on one side of a corner, the pole in the corner can be braced by means of a stay 70 anchored at the securing part 16 of the pole attachment 18 and extending to the top of the respective pole 8', 10', as is shown in Figure 8. Alternatively, in especially exposed positions where there is a risk of extremely high loading on account of snow and/or wind loads, for example, the stay 70 can be anchored in a further separate securing part 16, see Figure 9.
  • Figure 6 shows an alternatively designed securing part 16" with which the pole attachment 18 is coupled in the same way as in the previous embodiments. The connection tubes 22" are here provided with screws 66 which are screwed tightly into two securing seats 68 arranged in the pillar. Concrete pillars are prefabricated with the securing seats 68 in the form of cast threads. Alternatively, expander attachments are used which are mounted afterwards.
  • Steel pillars are provided with threaded holes directly in the steel or with welded-on nuts. The idea of this securing part 16" is that the screws are free and take up relatively little space, which means that it is possible to mount wall elements and leave the screws projecting from the joints. Holes for the screws are drilled in sheet metal walls. When disassembling the guard rail, the connection tubes 22" and screws 66 are unscrewed from the pillar and the securing seat 68 can be concealed by the joints between elements being covered over in the traditional way.
  • The securing parts 16, 16' and 16" combined in the various embodiments and the screen arrangements 12 and 12' are shown only as examples. Thus, every conceivable combination of framework 42 and netting 62 is possible with both the securing part 16 for assembly with tensioning belts 26, the securing part 16' for assembly with steel spar clamps 60, and the securing part 16" for assembly with screws 66.

Claims (19)

  1. Assembly of guard rails (2) with poles (8; 10), a screen arrangement (12) supported by the poles and fastening arrangements (14), each said fastening arrangement (14) comprising a securing part (16) and a pole attachment (18) coupled to the securing part by means of a framework of elongate first (28) and second (30) tube elements joined together at a distance from each other, which at least at one end is designed to support each pole (8; 10) and is configured to be oriented, in the assembled position, with the framework of elongate elements (28; 30) lying in a vertical plane transverse relative to the screen arrangement (12), characterized in that said securing part (16) is configured to be anchored directly to a pillar (4; 6) in a building frame and that the first tube element (28) has a first pole sleeve (32) coaxial therewith at a first end and, at the other end, a second pole sleeve (34) angled towards the second tube element (30), and in that the second pole sleeve (34) is angled by at least 15°.
  2. Assembly according to Claim 1, characterized in that the tube elements (28, 30) are substantially parallel and their distance from each other is related to the length of the pole attachment (18) between the pole sleeves in a ratio of at least 1 to 20.
  3. Assembly according to any one of Claims 1 to 2, characterized in that the first tube element (28) is joined to the second tube element (30) by means of at least first (36), second (38) and third (40) stiffening members at the first and second ends and at approximately the centre of the pole attachment (18), respectively.
  4. Assembly according to Claim 3, characterized in that the first (36) and second (38) stiffening members each form an obtuse angle to the second tube element (30), and the third stiffening member (40) forms a right angle to both the first (28) and the second (30) tube elements.
  5. Assembly according to Claim 4, characterized in that the obtuse angle lies between 110° and 130°.
  6. Assembly according to any one of the preceding claims, characterized in that the securing part (16) is made up of a square tube (20) on which two connection tubes (22) are welded each at one end, in that welded on the opposite side of the square tube there are two angle brackets (24) which are constructed from U-profiles, for bearing against a corner of a square pillar (4, 6), and in that tensioning belts (26) with tensioners are fitted at the free ends of the angle brackets.
  7. Assembly according to any one of Claims 1 to 5, characterized in that the securing part (16') is made up of two steel spar clamps (60) on which two connection tubes (22') are mounted in such a way that the connection tubes (22') project substantially at right angles to the screen arrangement (12'), which securing part (16') is mounted by means of the steel spar clamps (60) being clamped tight on the flanges of the respective steel pillar (4', 6').
  8. Assembly according to any one of Claims 1 to 5, characterized in that the securing part (16") is made up of two connection tubes (22") which are provided with screws (66) which are screwed tightly into securing seats (68) in the form of corresponding threaded holes arranged in the pillar (4").
  9. Assembly according to any one of the preceding claims, characterized in that the screen arrangement (12) comprises a cantilever framework (42) which is secured at each point of attachment to the building frame (4; 6) between two poles (8; 10) and which has upper (44) and lower (46) bars which are arranged at a distance from each other and near each end are connected to each pole (8; 10), and with transverse stiffening tubes (48) arranged in a predetermined distribution between the poles.
  10. Assembly according to Claim 9, characterized in that a toe board holder (52) for supporting a toe board (54) can be suspended from each stiffening tube (48).
  11. Assembly according to Claim 9 or 10, characterized in that, on the side of each stiffening tube (48) directed away from the building frame (4; 6), the cantilever framework (42) has a central bar (58) which is connected to the central portion of each stiffening tube (48) by means of a connection tube (56) in such a way that the connection tube (56) is situated in a vertical plane transverse relative to the upper (44) and lower (46) bars.
  12. Assembly according to Claim 11, characterized in that the central bar (58) is substantially parallel to the upper (44) and lower (46) bars and situated at a distance from the poles (8; 10) and the stiffening tubes (48) in a horizontal plane transverse relative to the same.
  13. Assembly according to Claim 11 or 12, characterized in that the central bar (58) is connected to each pole (8; 10) via its connection tube (56).
  14. Assembly according to any one of Claims 1 to 8, characterized in that the screen arrangement (12') comprises a cantilever netting (62, 64) between two poles (8; 10) and secured at each point of attachment to the building frame (4'; 6'), which netting (62, 64) has upper (44') and lower (46') runners which are arranged at a distance from each other and which near each end are connected to each pole (8; 10).
  15. Assembly according to Claim 14, characterized in that both the upper (44') and the lower (46') runners consist of a wire.
  16. Assembly according to Claim 14, characterized in that both the upper (44') and the lower (46') runners consist of a tensioning belt.
  17. Assembly according to any one of Claims 14 to 16, characterized in that in the case of guard rails (12') which are arranged on both sides of a pillar (6') in a corner, the poles (8', 10') in the corner are joined together (56').
  18. Assembly according to any one of Claims 14 to 16, characterized in that in the case of guard rails (12') on one side of a pillar (4) in a corner, the pole (8', 10') in the corner is braced by means of a stay (70) anchored at the securing part (16) of the pole attachment (18) and extending to the top of the pole.
  19. Assembly according to Claim 18, characterized in that the stay (70) is braced by means of a separate securing part (16).
EP01850099A 2000-05-31 2001-05-30 Assembly of guard rails Expired - Lifetime EP1160395B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
SE0002023 2000-05-31
SE0002023A SE0002023D0 (en) 2000-05-31 2000-05-31 Device at the guardrails

Publications (3)

Publication Number Publication Date
EP1160395A2 EP1160395A2 (en) 2001-12-05
EP1160395A3 EP1160395A3 (en) 2004-01-07
EP1160395B1 true EP1160395B1 (en) 2010-08-18

Family

ID=20279900

Family Applications (1)

Application Number Title Priority Date Filing Date
EP01850099A Expired - Lifetime EP1160395B1 (en) 2000-05-31 2001-05-30 Assembly of guard rails

Country Status (4)

Country Link
EP (1) EP1160395B1 (en)
AT (1) ATE478212T1 (en)
DE (1) DE60142816D1 (en)
SE (1) SE0002023D0 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202015100594U1 (en) 2015-02-09 2015-04-15 SafetyNet GmbH Security system for building construction
DE102015101788A1 (en) 2015-02-09 2016-08-11 SafetyNet GmbH Security system for building construction and its use

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2258353B1 (en) * 2002-10-28 2007-05-01 Jose Maria Caballero Muñoz IMPROVEMENTS INTRODUCED IN SYSTEMS FOR PLACEMENT OF PROTECTION NETWORKS FOR WORK SAFETY.
FR2938568B1 (en) * 2008-11-17 2013-04-05 Fehr DEVICE FOR PLACING A GUARD ON A WALL
CN102116085B (en) * 2011-01-17 2012-10-03 中国建筑第四工程局有限公司 Construction method of outpacking structure of steel pipe column with asymmetric steel hanging structure and scaffold
NL2017004B1 (en) * 2016-06-20 2018-01-04 Totaaldak Dakbedekking B V Fall protection
CN107012949B (en) * 2017-05-10 2019-06-07 中国建筑第二工程局有限公司 Lifting method of large-span steel corridor
US11993942B2 (en) * 2021-07-15 2024-05-28 Mj Engineering & Design Safety cable system

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1447478A (en) * 1972-12-09 1976-08-25 Kwikform Ltd Scaffolding and like constructions
GB2113285B (en) * 1982-01-19 1985-08-14 Turnerised Roofing Roof scaffolding
BE1000428A4 (en) * 1987-03-24 1988-12-06 Palm S P R L T Building safety net structure - has supporting posts attached to wall by articulated parallelograms to allow mesh panels to be extended out from walls
US4892169A (en) * 1989-02-21 1990-01-09 Sinco, Inc. Perimeter debris net lifting system
ATE83024T1 (en) * 1989-09-14 1992-12-15 Weurtwand Exploitatie FALL PROTECTION DEVICE FOR ROOFS.
DE29808956U1 (en) * 1998-05-20 1999-09-30 Fritz, Hubert, 87746 Erkheim Fastening device
NL1019494C1 (en) 2000-12-05 2002-06-06 Hesja Dakrandbeveiliging B V Mounting support frame, e.g. scaffolding, on building wall, by hooking fasteners connected to frame parts into cavities in wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202015100594U1 (en) 2015-02-09 2015-04-15 SafetyNet GmbH Security system for building construction
DE102015101788A1 (en) 2015-02-09 2016-08-11 SafetyNet GmbH Security system for building construction and its use
DE102015101788B4 (en) 2015-02-09 2022-06-30 SafetyNet GmbH Security system for building construction and its use

Also Published As

Publication number Publication date
DE60142816D1 (en) 2010-09-30
EP1160395A3 (en) 2004-01-07
SE0002023D0 (en) 2000-05-31
EP1160395A2 (en) 2001-12-05
ATE478212T1 (en) 2010-09-15

Similar Documents

Publication Publication Date Title
US6540209B2 (en) Portable safety fence system for construction sites
US5353891A (en) Stanchion assembly
CA2912199C (en) Suspended scaffolding structure and connector therefor
CA2638490C (en) Scaffolding safety device
EP1160395B1 (en) Assembly of guard rails
US20080264725A1 (en) Hook-On Scaffold
EP0606948B1 (en) Universal supporting construction
KR200417314Y1 (en) Apparatus for supporting falling objects
JP5773469B1 (en) Suspended scaffolding
JP3850306B2 (en) Scaffolding plate support device for veranda handrail
KR200417902Y1 (en) Anchor frame assembly of tower crane
KR200413590Y1 (en) Scaffold and construction structure thereof
JP3027130B2 (en) Assembly structure of hanging scaffold
GB2253877A (en) Handrail system
US20050077108A1 (en) Horizontal support member for tube and clamp scaffold assembly
CA2830271A1 (en) Rescue winch support for scaffolds and method of securing a rescue winch to a scaffold using same
JPH0925718A (en) Bracket for hanging scaffold
KR200246690Y1 (en) A post jig for the hand rail
KR100668593B1 (en) Anchor frame assembly of tower crane
JP4001876B2 (en) Lifeline attachment device for roof work
KR101757279B1 (en) Building scaffolding equipment by way of wire rope in the boiler system
KR102610538B1 (en) Fall prevention safety ring fixture
RU2809450C1 (en) Bracket for installing canopy platform
KR101031466B1 (en) scaffold bracket.
KR200292597Y1 (en) A post jig for the hand rail

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Extension state: AL LT LV MK RO SI

17P Request for examination filed

Effective date: 20040619

AKX Designation fees paid

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

17Q First examination report despatched

Effective date: 20051018

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RTI1 Title (correction)

Free format text: ASSEMBLY OF GUARD RAILS

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 60142816

Country of ref document: DE

Date of ref document: 20100930

Kind code of ref document: P

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20100818

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100818

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101220

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100818

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100818

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100818

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101119

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100818

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100818

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101129

26N No opposition filed

Effective date: 20110519

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 60142816

Country of ref document: DE

Effective date: 20110519

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110531

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110531

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110531

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110530

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 60142816

Country of ref document: DE

Representative=s name: PATENTANWAELTE QUERMANN, STURM, WEILNAU, DE

Ref country code: DE

Ref legal event code: R082

Ref document number: 60142816

Country of ref document: DE

Representative=s name: QUERMANN STURM WEILNAU PATENTANWAELTE PARTNERS, DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110530

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100818

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 16

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 17

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FI

Payment date: 20180521

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20180524

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20190531

Year of fee payment: 19

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20190528

Year of fee payment: 19

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20190529

Year of fee payment: 19

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190530

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190531

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 60142816

Country of ref document: DE

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20200530

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200531

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200530

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201201