KR200413590Y1 - Scaffold and construction structure thereof - Google Patents

Scaffold and construction structure thereof Download PDF

Info

Publication number
KR200413590Y1
KR200413590Y1 KR2020060002181U KR20060002181U KR200413590Y1 KR 200413590 Y1 KR200413590 Y1 KR 200413590Y1 KR 2020060002181 U KR2020060002181 U KR 2020060002181U KR 20060002181 U KR20060002181 U KR 20060002181U KR 200413590 Y1 KR200413590 Y1 KR 200413590Y1
Authority
KR
South Korea
Prior art keywords
pair
vertical
scaffold
members
high load
Prior art date
Application number
KR2020060002181U
Other languages
Korean (ko)
Inventor
박학진
Original Assignee
박학진
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박학진 filed Critical 박학진
Priority to KR2020060002181U priority Critical patent/KR200413590Y1/en
Application granted granted Critical
Publication of KR200413590Y1 publication Critical patent/KR200413590Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/14Comprising essentially pre-assembled two-dimensional frame-like elements, e.g. of rods in L- or H-shape, with or without bracing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/17Comprising essentially pre-assembled three-dimensional elements, e.g. cubic elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • E04G2001/155Platforms with an access hatch for getting through from one level to another
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/28Scaffolds primarily resting on the ground designed to provide support only at a low height
    • E04G1/30Ladder scaffolds
    • E04G2001/302Ladder scaffolds with ladders supporting the platform
    • E04G2001/305The ladders being vertical and perpendicular to the platform

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ladders (AREA)

Abstract

작업자가 안전하고 신속하게 비계를 승하강하고 작업할 수 있으며, 수직재, 수평재 및 대각재가 용접을 통해 일체로 제공되기 때문에 연결재를 이용하여 비계조립을 용이하게 수행할 수 있으며, 지지력이 뛰어나 고하중에도 안전성을 유지할 수 있는 고하중 비계가 개시된다. 개시된 고하중 비계는 좌우 한쌍으로 마련되고 상단 및 하단에는 체결공이 천공된 플렌지부가 형성되며 각 플렌지부의 수직방향으로는 연결공이 형성된 연결편이 형성된 수직재와; 상기 한쌍의 수직재의 상단과 하단을 연결하도록 상기 수직재에 일체용접된 한쌍의 수평재와; 상기 한쌍의 수직재의 상단과 하단을 대각방향으로 연결하도록 상기 수직재와 수평재에 일체용접된 한쌍의 대각재와; 상기 한쌍의 수직재의 중앙부분을 연결하도록 상기 수직재에 일체용접된 발판걸이봉과; 상기 한쌍의 수평재의 중앙부분에 설치된 사다리를 포함하여 구성된 것을 특징으로 한다.The operator can lift and work the scaffold safely and quickly, and the vertical, horizontal and diagonal materials are provided by welding so that the scaffold assembly can be easily performed using the connecting material. Sustainable high load scaffolds are disclosed. The disclosed high load scaffolding is provided with a pair of left and right, the upper and the lower portion is formed with flanges perforated with fastening holes, and the vertical member formed with a connecting piece formed in the vertical direction of each flange portion; A pair of horizontal members integrally welded to the vertical member to connect the upper and lower ends of the pair of vertical members; A pair of diagonal members integrally welded to the vertical member and the horizontal member to connect the upper and lower ends of the pair of vertical members in a diagonal direction; A footrest hanger rod integrally welded to the vertical member to connect a central portion of the pair of vertical members; It characterized in that it comprises a ladder installed in the central portion of the pair of horizontal members.

수직재, 수평재, 대각재, 사다리, 발판 Vertical, horizontal, diagonal, ladder, scaffolding

Description

고하중 비계 및 이의 조립구조{SCAFFOLD AND CONSTRUCTION STRUCTURE THEREOF}High load scaffolding and its assembly structure {SCAFFOLD AND CONSTRUCTION STRUCTURE THEREOF}

도1은 본 고안에 따른 고하중 비계의 정면도이며,1 is a front view of a high load scaffold according to the present invention,

도2는 도1의 사시도이며,2 is a perspective view of FIG.

도3 및 도4는 본 고안에 따른 고하중 비계의 조립구조를 도시한 사시도이며,3 and 4 is a perspective view showing the assembly structure of a high load scaffold according to the present invention,

도5는 본 고안에 따른 고하중 비계의 조립구조를 도시한 정면도이다.5 is a front view showing the assembly structure of a high load scaffold according to the present invention.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

10: 수직재 11: 플렌지부10: vertical material 11: flange portion

11a: 체결공 12: 연결편11a: fastener 12: connecting piece

12a: 연결공 20: 수평재12a: connector 20: horizontal member

30: 대각재 31: 보강편30: diagonal 31: reinforcement

40: 발걸이봉 50: 사다리40: foot bar 50: ladder

60: 연결재 61: 체결공60: connecting member 61: fastener

70: 발판 71: 걸고리70: footrest 71: hook

72: 관통홀 A: 지지부재72: through hole A: support member

S: 스크류잭S: screw jack

본 고안은 고하중 비계 및 이의 조립구조에 관한 것으로, 보다 상세하게는 작업자가 안전하고 신속하게 비계를 승하강하여 작업할 수 있고, 수직재, 수평재 및 대각재가 용접을 통해 일체로 제공되기 때문에 연결재를 이용하여 비계조립을 용이하게 수행할 수 있으며, 지지력이 뛰어나 고하중에도 안전성을 유지할 수 있는 고하중 비계 및 이의 조립구조에 관한 것이다.The present invention relates to a high load scaffold and its assembly structure, and more specifically, the operator can safely and quickly work up and down the scaffold, and the vertical member, the horizontal member and the diagonal member are integrally provided by welding so that the connection member is used. The present invention relates to a high load scaffold and an assembly structure thereof capable of easily performing scaffolding assembly, and having excellent support and maintaining safety even at high loads.

일반적으로 건물이나 교량 등의 공사할 때 작업자가 높은 곳에서 작업할 수 있도록 하거나 거푸집등의 설치를 위해 지상으로부터 비계가 설치되는 데, 별도의 사다리나 안전발판이 마련되어 있지 않아 비계를 승하강할 때 수직재 또는 수평재에 의지하여 이동해야 하므로 추락사고등 안전사고가 번빈하게 발생하여 안전성에 크게 취약한 문제점이 있었다. 이를 방지하기 위해, 비계를 조립한 후 현장에서 사다리나 안전발판을 결속끈으로 결속하여 임시적으로 설치하여 작업하고 있으나, 결속끈의 결속작업으로 인해 본작업이 지연되고 비계의 흔들림이나 결속끈의 부식으로 인해 결속끈이 끊어질 우려가 있어 미봉책에 불과하여, 이에 대한 안전사고대책이 시급한 현실이다.In general, scaffolding is installed from the ground to allow workers to work in high places or to form formwork when constructing buildings or bridges. Vertical ladders are used when climbing up and down scaffolds because no ladders or safety steps are provided. Or it has to be moved to rely on a horizontal member, so safety accidents such as fall accidents are frequent, there was a problem that is very vulnerable to safety. In order to prevent this, after assembling the scaffolding, the ladder or safety scaffold is tied to the strap and temporarily installed at the site, but this work is delayed due to the binding work of the strap, and the shaking of the scaffold or the corrosion of the strap Due to the possibility of breaking the tie, it is only an unsolvable measure, and safety accident measures are urgently needed.

또한, 종래의 고하중 비계는 수직재, 수평재 및 대각재가 클램프로 체결되어 있기 때문에, 수직재, 수평재 및 대각재를 체결하고 분리하는 데 시간이 오래걸려 작업성이 떨어지게 되는 문제점이 있었다. 또한, 비계 사용시 고하중에 의해 클램프 결합이 약해져 고하중에 대한 안전성을 안정적으로 담보할 수는 없었다.In addition, the conventional high load scaffolding has a problem in that workability is deteriorated because it takes a long time to fasten and separate the vertical member, the horizontal member and the diagonal member by clamping the vertical member, the horizontal member and the diagonal member. In addition, when the scaffold is used, the clamp coupling is weakened by the high load, and thus the safety against the high load cannot be stably secured.

본 고안은 상기 문제점을 해결하기 위해 안출된 것으로, 본 고안의 목적은 작업자가 안전하고 신속하게 비계를 승하강하고 작업할 수 있고, 수직재, 수평재 및 대각재가 용접을 통해 일체로 제공되기 때문에 연결재를 이용하여 비계조립을 용이하게 수행할 수 있으며, 지지력이 뛰어나 고하중에도 안전성을 유지할 수 있는 고하중 비계 및 이의 조립구조를 제공하는 것이다.The present invention is devised to solve the above problems, the object of the present invention is to use the connecting material because the operator can safely and quickly lift and work the scaffold, because the vertical, horizontal and diagonal materials are provided integrally by welding. It is to provide a high load scaffold and its assembly structure that can be easily carried out, the scaffold assembly can be easily carried out, and the safety is excellent even under high load.

상기 본 고안의 목적은 좌우 한쌍으로 마련되고 상단 및 하단에는 체결공이 천공된 플렌지부가 형성되며 각 플렌지부의 수직방향으로는 연결공이 형성된 연결편이 형성된 수직재와; 상기 한쌍의 수직재의 상단과 하단을 연결하도록 상기 수직재에 일체용접된 한쌍의 수평재와; 상기 한쌍의 수직재의 상단과 하단을 대각방향으로 연결하도록 상기 수직재와 수평재에 일체용접된 한쌍의 대각재와; 상기 한쌍의 수직재의 중앙부분을 연결하도록 상기 수직재에 일체용접된 발판걸이봉과; 상기 한쌍의 수평재의 중앙부분에 설치된 사다리를 포함하여 구성된 것을 특징으로 하는 고하중 비계를 제공함으로써 달성될 수 있다.The object of the present invention is provided with a pair of left and right, and the top and bottom is formed with flanges perforated with fastening holes, the vertical member formed with a connecting piece formed in the vertical direction of each flange portion; A pair of horizontal members integrally welded to the vertical member to connect the upper and lower ends of the pair of vertical members; A pair of diagonal members integrally welded to the vertical member and the horizontal member to connect the upper and lower ends of the pair of vertical members in a diagonal direction; A footrest hanger rod integrally welded to the vertical member to connect a central portion of the pair of vertical members; It can be achieved by providing a high load scaffold, characterized in that it comprises a ladder installed in the central portion of the pair of horizontal members.

또한, 상기 본 고안의 목적은 좌우 한쌍으로 마련되고 상단 및 하단에는 체결공이 천공된 플렌지부가 형성되며 각 플렌지부의 수직방향으로는 연결공이 형성된 연결편이 형성된 수직재와; 상기 한쌍의 수직재의 상단과 하단을 연결시키는 한쌍의 수평재와; 상기 한쌍의 수직재의 상단과 하단을 대각방향으로 연결시키는 한쌍의 대각재와; 상기 한쌍의 수직재의 중앙부분을 연결하는 발판걸이봉과; 상기 한쌍의 수평재의 중앙부분에 설치된 사다리를 포함하여 구성되는 고하중 비계를 서로 마주보게 배치하고, 상기 마주보는 고하중 비계에 대해 다수개의 연결재를 상기 수직재의 연결편에 대각방향과 수평방향으로 각각 체결하고, 상기 고하중 비계의 발판걸이봉에는 걸고리가 장착된 발판을 설치한 것을 특징으로 하는 고하중 비계의 조립구조를 제공함으로써 달성될 수 있다.In addition, the object of the present invention is provided with a pair of left and right and the upper and lower flanges are formed in the perforated fastening hole and the vertical member formed with a connecting piece formed in the vertical direction of each flange portion; A pair of horizontal members connecting upper and lower ends of the pair of vertical members; A pair of diagonal members connecting the upper and lower ends of the pair of vertical members in a diagonal direction; Footrest hook rod for connecting the central portion of the pair of vertical members; A high load scaffold comprising a ladder installed at the center of the pair of horizontal members is disposed to face each other, and a plurality of connecting members are fastened to the connecting pieces of the vertical member in a diagonal direction and a horizontal direction with respect to the opposite high load scaffold, respectively. And, it can be achieved by providing an assembly structure of a high load scaffold, characterized in that the footrest is mounted on the footrest rod of the high load scaffold.

상술한 본 고안의 목적은 첨부된 도면을 참조하여 후술되는 본 고안의 바람직한 실시예로부터 더욱 명확해질 것이다.The object of the present invention described above will become more apparent from the preferred embodiment of the present invention described below with reference to the accompanying drawings.

이하, 첨부된 도면을 참고하여 본 고안을 보다 상세하게 설명한다. 첨부된 도1은 본 고안에 따른 고하중 비계의 정면도이고, 도2는 도1의 사시도이며, 도3 및 도4는 본 고안에 따른 고하중 비계의 조립구조를 도시한 사시도이고, 도5는 본 고 안에 따른 고하중 비계의 조립구조를 도시한 정면도이다.Hereinafter, with reference to the accompanying drawings will be described the present invention in more detail. Attached Figure 1 is a front view of a high load scaffold according to the present invention, Figure 2 is a perspective view of Figure 1, Figures 3 and 4 is a perspective view showing the assembly structure of the high load scaffold according to the present invention, Figure 5 This is a front view showing the assembly structure of the high load scaffolding according to the present.

상기 도면을 참고하면, 본 고안에 따른 고하중 비계는 수직재(10), 수평재(20), 대각재(30), 발판걸이봉(40) 및 사다리(50)를 포함한다.Referring to the drawings, the high load scaffold according to the present invention includes a vertical member 10, a horizontal member 20, a diagonal member 30, a footrest rod 40 and a ladder (50).

상기 수직재(10)는 소정의 길이를 갖는 원형의 강관 파이프로 마련되며, 좌측 및 우측 한쌍으로 서로 마주보게 마련된다. 그리고 상기 수직재(10)의 상단 및 하단에는 다수의 체결공(11a)이 형성된 플렌지부(11)가 형성되며 각 플렌지부(11)의 수직방향으로 수직재의 외면을 따라 다수의 연결공(12a)이 형성된 연결편(12)이 형성된다. 즉, 상기 플렌지부(11)는 상하방향으로 설치되는 비계를 서로 연결시키기 위한 부재이며, 연결편(12)은 전후좌우방향으로 설치되는 비계를 서로 연결시키기 위한 부재이다. 여기서, 도2에는 플렌지부(11)가 사각형상으로 도시되어 있지만, 다수의 체결공을 형성하여 체결력을 높일 수 있도록 육각이나 팔각등 다양한 형상으로 형성될 수 있으며, 연결편(12)은 전후좌우방향으로 비계가 정확히 연결 결합되도록 서로 직각을 이루면서 설치되는 것이 바람직하다.The vertical member 10 is provided as a circular steel pipe having a predetermined length and is provided to face each other in a pair of left and right sides. In addition, flanges 11 having a plurality of fastening holes 11a are formed at upper and lower ends of the vertical member 10, and a plurality of connecting holes 12a are formed along the outer surface of the vertical member in the vertical direction of each flange portion 11. The formed connection piece 12 is formed. That is, the flange portion 11 is a member for connecting the scaffold installed in the vertical direction to each other, the connecting piece 12 is a member for connecting the scaffold installed in the front, rear, left and right directions with each other. Here, although the flange portion 11 is shown in a rectangular shape in Figure 2, it can be formed in a variety of shapes, such as hexagon or octagon so as to form a plurality of fastening holes to increase the fastening force, the connecting piece 12 is front and rear, left and right It is preferable that the scaffold is installed at right angles to each other so that the scaffolds are connected exactly.

상기 수평재(20)는 상기 한쌍의 수직재 사이에 설치되어 한쌍의 수직재의 상단 및 하단을 연결 결합시킨다. 여기서, 수평재(20)는 상기 수직재의 직경보다 작은 외경을 가지며 견고한 결합을 위해 용접을 통해 수직재(10)에 결합되는 것이 바람직하다.The horizontal member 20 is installed between the pair of vertical members to connect the upper and lower ends of the pair of vertical members. Here, the horizontal member 20 has an outer diameter smaller than the diameter of the vertical member and is preferably coupled to the vertical member 10 through welding for firm coupling.

상기 대각재(30)는 상기 한쌍의 수직재(10) 사이에 설치되어 한쌍의 수직재의 상단 및 하단을 대각방향으로 연결 결합시킨다. 그리고, 대각재(30) 역시 상기 수직재의 직경보다 작은 외경을 가지며 견고한 결합을 위해 상기 수직재와 수평재에 용접으로 일체결합된다. 여기서, 상기 대각재(30)의 결합력을 높이기 위해 상기 수직재(10)의 상단과 하단에는 보강편(31)을 부착시켜 수직재(10)와 보강편(31)에 대각재(30)를 용접함으로써 수직재에 결합되는 대각재의 결합력을 향상시키는 것이 바람직하다.The diagonal member 30 is installed between the pair of vertical members 10 to connect the upper and lower ends of the pair of vertical members in a diagonal direction. In addition, the diagonal member 30 also has an outer diameter smaller than the diameter of the vertical member and is integrally welded to the vertical member and the horizontal member by welding for a firm coupling. Here, the reinforcing piece 31 is attached to the upper and lower ends of the vertical member 10 to increase the bonding force of the diagonal member 30 by welding the diagonal member 30 to the vertical member 10 and the reinforcing piece 31. It is desirable to improve the bonding force of the diagonal material bonded to the vertical material.

상기 발판걸이봉(40)은 상기 한쌍의 수직재(10) 중앙부분의 사이에 용접결합되어 비계의 조립 후 후술할 발판이 설치되어 작업자가 안전하고 신속하게 작업할 수 있게 한다.The scaffolding rod 40 is welded between the central portion of the pair of vertical member 10 is installed scaffolding to be described later after the assembly of the scaffolding so that the operator can work safely and quickly.

상기 사다리(50)는 상기 한쌍의 수평재(20) 사이에 상하방향으로 설치되어 작업자가 용이하면서 안전하게 비계를 이용할 수 있도록 설치된다. 여기서 사다리는 수평재(20)에 용접을 통해 결합되며, 견고한 결합을 위해 교차되는 대각재(30)에도 용접을 통해 결합되는 것이 바람직하다.The ladder 50 is installed in the vertical direction between the pair of horizontal member 20 is installed so that the operator can easily and safely use the scaffold. Here, the ladder is coupled to the horizontal member 20 by welding, and it is preferable that the ladder is also coupled to the diagonal member 30 that is crossed for a firm coupling.

이와 같이 구성된 본 고안에 따른 고하중 비계는 무엇보다도 고하중 비계에 사다리가 일체로 형성되고 발판을 설치할 수 있으므로 작업자가 안전하고 신속하게 비계를 승하강하여 작업할 수 있으며, 수직재, 수평재 및 대각재가 용접을 통해 일체로 제공되기 때문에 후술할 연결재(60)를 이용하여 비계조립을 용이하게 수행할 수 있으며, 수평재와 대각재에 의해 하중이 균일하게 분산되어 고하중에도 안정성을 유지할 수 있다.The high load scaffold according to the present invention, which is constructed as described above, has a ladder formed integrally with the high load scaffold and can be installed with a scaffold, so that the worker can safely and quickly lift and work the scaffold, and the vertical, horizontal and diagonal materials are welded. Since it is provided integrally through the coupling member 60 to be described later can be easily performed scaffolding assembly, the load is uniformly distributed by the horizontal member and the diagonal member can maintain stability even under high loads.

이하, 본 고안에 따른 고하중 비계의 조립구조에 대해 대해 설명한다.Hereinafter, the assembly structure of the high load scaffold according to the present invention will be described.

본 고안에 따른 조립구조는 전술한 고하중 비계 및 이 고하중 비계를 서로 연결하는 연결재(60)와 발판걸이봉에 설치되는 발판(70)을 포함하는데, 도3에 도시된 바와 같이, 먼저 고하중 비계를 서로 마주보게 배치한 후, 상기 마주보는 고하중 비계에 대해 다수개의 연결재(60)를 체결부재를 통해 상기 수직재(10)의 연결편(12)에 대각방향과 수평방향으로 각각 체결한다. 여기서 연결재(60)는 다른 부재와 마찬가지로 원형의 파이프로 구성될 수 있지만 바람직하게는 "L"형의 앵글바로 마련하여 연결편(12)에 체결이 용이하도록 하는것이 바람직하다. 또한, 각각의 고하중 비계를 견고하게 결합하기 위해 마주보는 비계의 상측, 하측 및 대각 방향으로 서로 연결되는 것이 바람직하다.The assembly structure according to the present invention includes the above-described high load scaffolding and the connecting member 60 and the footrest 70 installed on the footrest rod connecting the high load scaffold to each other, as shown in FIG. After the intermediate scaffolds are disposed to face each other, the plurality of connecting members 60 are fastened to the connecting pieces 12 of the vertical member 10 in the diagonal direction and the horizontal direction with respect to the facing high load scaffold, respectively. Here, the connecting member 60 may be composed of a circular pipe like other members, but it is preferable to provide an angle bar of "L" type to facilitate fastening to the connecting piece 12. In addition, it is desirable to be connected to each other in the upper, lower and diagonal directions of the facing scaffold in order to firmly couple each high load scaffold.

그 다음, 상기 고하중 비계의 발판걸이봉에는 발판(70)이 설치된다. 여기서 발판은 조립되는 비계의 평면적에 일치하도록 설치되며, 양단부에는 걸고리(71)가 일정간격으로 다수개 마련되어 상기 발판걸이봉(40)에 걸려 견고하게 지지 결합된 다. 또한, 바람직하게 상기 발판(70)에는 고하중 비계의 사다리(50)가 형성된 측으로 관통홀(72)이 형성되어 작업자가 사다리를 통해 고하중 비계의 내측으로 안전하고 승하강할 수 있도록 마련되는 것이 바람직하다.Next, the footrest 70 is installed on the footrest rod of the high load scaffold. Here, the footrest is installed to match the planar surface of the scaffold to be assembled, and both ends are provided with a plurality of hooks 71 at regular intervals and is firmly supported by the footrest rod 40. In addition, the scaffold 70 is preferably provided with a through-hole 72 toward the side where the ladder 50 of the high load scaffold is formed so that the worker can safely and descend the inside of the high load scaffold through the ladder. Do.

그리고, 도4에 도시된 바와 같이, 본 고안의 고하중 비계를 다단으로 설치 할 때는 적층된 상측과 하측 비계의 플렌지부(10)를 대응되게 맞대어 체결공(11a)에 체결부재를 체결하여 서로 결합한다. 그 다음 적층된 비계를 연결재(60)를 통해 적층된 비계의 발판걸이봉(40)에 발판(70)의 단부에 형성된 걸고리(71)를 걸어 발판(70)을 설치한다. 이와 같은 방식으로 비계를 설치할 높이 만큼 설치하면 된다. 바람직하게는 도시된 바와 같이 고하중 비계의 조립구조는 상하방향으로 상기 사다리(50)가 서로 엇갈리면서 적층되도록 조립하여 작업자가 사다리를 타고 승하강할 때 다리를 헛딛어 미끄러지더라도 발판(70)으로 안착될 수 있게 하여 작업자의 추락사고를 예방할 수 있게 함이 바람직하다.And, as shown in Figure 4, when installing the high load scaffolding of the present invention in multiple stages by fastening the fastening member to the fastening hole (11a) by abutting the flange portion 10 of the stacked upper and lower scaffold correspondingly To combine. Then, the scaffold 70 is installed by hooking the hook 71 formed at the end of the scaffold 70 to the scaffolding bar 40 of the scaffold stacked through the connecting member 60. In this way, the height of the scaffold can be installed. Preferably, as shown, the assembly structure of the high load scaffolding is assembled so that the ladder 50 is stacked alternately in the vertical direction so that the worker rests on the scaffold 70 even when the worker slips up and down the ladder. It is desirable to be able to prevent the fall of the worker to be possible.

한편, 도5에 도시된 바와 같이, 구조물의 폭이 넓을 경우 고하중 비계를 좌우로 연장하여 별도의 연결부재를 통해 이웃하는 고하중 비계의 수직재(10)에 마련된 연결편(12)을 연결하여 설치할 수 있다. 또한, 설치되는 고하중 비계의 최하단에 위치하는 수직재(10)의 하단에는 수평조절용 스크류잭(S)이 설치될 수 있으며, 설치되는 고하중 비계의 최상단에 위치하는 수직재(10)의 상단에는 구조물을 지지하는 지지부재(A)가 설치될 수 있다. 상기 스크류잭과 지지부재에 대한 설명은 종 래의 공지된 기술이므로 구체적인 설명은 생략한다.On the other hand, as shown in Figure 5, when the width of the structure is wide to extend the high load scaffold to the left and right by connecting the connection piece 12 provided in the vertical member 10 of the neighboring high load scaffold through a separate connection member Can be. In addition, the bottom of the vertical member 10 is located at the bottom of the high load scaffold to be installed, the horizontal adjustment screw jack (S) may be installed, the structure at the top of the vertical material 10 is located at the top of the high load scaffold to be installed Support member (A) for supporting the may be installed. Description of the screw jack and the support member is a conventional known technology, so a detailed description thereof will be omitted.

이상에서 설명한 바와 같이, 본 고안에 따른 고하중 배계의 조립구조는 고하중 비계에 사다리가 일체로 형성되고 발판을 설치할 수 있으므로 작업자가 안전하고 신속하게 비계를 승하강하여 작업할 수 있으며, 수직재, 수평재 및 대각재가 용접을 통해 일체형으로 견고하게 결합된 고하중 비계을 제공할 수 있기 때문에 비계의 설치와 분해가 용이한 잇점이 있다.As described above, the assembly structure of the high load system according to the present invention is a ladder is integrally formed on the high load scaffolding and can be installed on the scaffold, the operator can safely and quickly work up and down the scaffold, vertical materials, horizontal materials And since the diagonal material can provide a high load scaffolding that is integrally and rigidly welded, the scaffolding is easy to install and disassemble.

이상에서 설명한 바와 같이, 본 고안에 따르면, 고하중 비계에 사다리가 일체로 형성되고 발판을 설치할 수 있으므로 작업자가 안전하고 신속하게 비계를 승하강하여 작업할 수 있는 효과가 있다. 또한, 수직재, 수평재 및 대각재가 용접을 통해 일체로 제공되기 때문에 연결재를 이용하여 비계 조립을 용이하게 수행할 수 있으며 수평재와 대각재에 의해 하중이 균일하게 분산되어 고하중에도 안정성을 유지할 수 있는 효과가 있다.As described above, according to the present invention, since the ladder is integrally formed on the high load scaffolding and the scaffold can be installed, the operator can safely and quickly lift and work the scaffold. In addition, since vertical, horizontal and diagonal materials are provided integrally by welding, scaffolding assembly can be easily performed by using connecting materials, and the load is uniformly distributed by the horizontal and diagonal materials to maintain stability under high loads. have.

Claims (3)

좌우 한쌍으로 마련되고 상단 및 하단에는 체결공이 천공된 플렌지부가 형성되며 각 플렌지부의 수직방향으로는 연결공이 형성된 연결편이 형성된 수직재와;A vertical member provided with a pair of left and right sides, and a flange having perforated fastening holes formed at upper and lower ends thereof, and a connecting piece having connecting holes formed in a vertical direction of each flange; 상기 한쌍의 수직재의 상단과 하단을 연결하도록 상기 수직재에 일체용접된 한쌍의 수평재와;A pair of horizontal members integrally welded to the vertical member to connect the upper and lower ends of the pair of vertical members; 상기 한쌍의 수직재의 상단과 하단을 대각방향으로 연결하도록 상기 수직재와 수평재에 일체용접된 한쌍의 대각재와;A pair of diagonal members integrally welded to the vertical member and the horizontal member to connect the upper and lower ends of the pair of vertical members in a diagonal direction; 상기 한쌍의 수직재의 중앙부분을 연결하도록 상기 수직재에 일체용접된 발판걸이봉과;A footrest hanger rod integrally welded to the vertical member to connect a central portion of the pair of vertical members; 상기 한쌍의 수평재의 중앙부분에 설치된 사다리를 포함하여 구성된 것을 특징으로 하는 고하중 비계.A high load scaffolding comprising a ladder installed in the center portion of the pair of horizontal members. 좌우 한쌍으로 마련되고 상단 및 하단에는 체결공이 천공된 플렌지부가 형성되며 각 플렌지부의 수직방향으로는 연결공이 형성된 연결편이 형성된 수직재와; 상기 한쌍의 수직재의 상단과 하단을 연결시키는 한쌍의 수평재와; 상기 한쌍의 수직재의 상단과 하단을 대각방향으로 연결시키는 한쌍의 대각재와; 상기 한쌍의 수직재의 중앙부분을 연결하는 발판걸이봉과; 상기 한쌍의 수평재의 중앙부분에 설치된 사다리를 포함하여 구성되는 고하중 비계를 서로 마주보게 배치하고, 상기 마주 보는 고하중 비계에 대해 다수개의 연결재를 상기 수직재의 연결편에 대각방향과 수평방향으로 각각 체결하고, 상기 고하중 비계의 발판걸이봉에는 걸고리가 장착된 발판을 설치한 것을 특징으로 하는 고하중 비계의 조립구조.A vertical member provided with a pair of left and right sides, and a flange having perforated fastening holes formed at upper and lower ends thereof, and a connecting piece having connecting holes formed in a vertical direction of each flange; A pair of horizontal members connecting upper and lower ends of the pair of vertical members; A pair of diagonal members connecting the upper and lower ends of the pair of vertical members in a diagonal direction; Footrest hook rod for connecting the central portion of the pair of vertical members; A high load scaffold comprising a ladder provided at the center of the pair of horizontal members is disposed to face each other, and a plurality of connecting members are fastened to the connecting pieces of the vertical member in the diagonal direction and the horizontal direction, respectively, for the opposite high load scaffold. And, the scaffolding rod of the high load scaffolding assembly structure of the high load scaffold, characterized in that the footrest is installed on the scaffold. 제2항에 있어서,The method of claim 2, 상기 발판에는 작업자가 사다리를 통해 비계 내측으로 승하강할 수 있도록 관통홀이 형성된 것을 특징으로 하는 고하중 비계의 조립구조.The scaffold assembly structure of the high load scaffold, characterized in that the through-hole is formed so that the operator can move up and down inside the scaffold through the ladder.
KR2020060002181U 2006-01-24 2006-01-24 Scaffold and construction structure thereof KR200413590Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060002181U KR200413590Y1 (en) 2006-01-24 2006-01-24 Scaffold and construction structure thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060002181U KR200413590Y1 (en) 2006-01-24 2006-01-24 Scaffold and construction structure thereof

Publications (1)

Publication Number Publication Date
KR200413590Y1 true KR200413590Y1 (en) 2006-04-07

Family

ID=41763873

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060002181U KR200413590Y1 (en) 2006-01-24 2006-01-24 Scaffold and construction structure thereof

Country Status (1)

Country Link
KR (1) KR200413590Y1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101011595B1 (en) 2010-09-14 2011-01-27 주식회사 한발 Assembly method of block scaffolding and block scaffolding with trolley and stand assembly type scaffold operated during uneven movement and assembling
KR200465039Y1 (en) * 2010-11-03 2013-02-05 남웅건설주식회사 High scaffolding pole installation work
CN109505402A (en) * 2019-01-11 2019-03-22 中铁十六局集团第四工程有限公司 A kind of full hall support system and construction method based on multilayer truss piece
KR102410377B1 (en) * 2022-02-17 2022-06-16 임진수 Module type workbench and setting method for moudule type workbench

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101011595B1 (en) 2010-09-14 2011-01-27 주식회사 한발 Assembly method of block scaffolding and block scaffolding with trolley and stand assembly type scaffold operated during uneven movement and assembling
KR200465039Y1 (en) * 2010-11-03 2013-02-05 남웅건설주식회사 High scaffolding pole installation work
CN109505402A (en) * 2019-01-11 2019-03-22 中铁十六局集团第四工程有限公司 A kind of full hall support system and construction method based on multilayer truss piece
KR102410377B1 (en) * 2022-02-17 2022-06-16 임진수 Module type workbench and setting method for moudule type workbench

Similar Documents

Publication Publication Date Title
US8978822B2 (en) Vertical frame of metal
KR100809886B1 (en) Coping form system and method for constructing bridge pier using thereof
EP2880228B1 (en) Scaffold structure
US20150068011A1 (en) Scaffold and methods for installing or removing such a scaffold
KR100841240B1 (en) Built-up scaffold for construction field
WO2014080998A1 (en) Suppot steel pipe for scaffolding or timbering
JP3181041U (en) Mounting member for scaffolding for bridge
KR200413590Y1 (en) Scaffold and construction structure thereof
KR101076562B1 (en) Supporting structure of slab form
US20170028232A1 (en) Lifeline device for temporary scaffold and lifeline support device
JP6498075B2 (en) Overhang passage of steel structure
JP6783011B1 (en) Suspended scaffolding
JPH08284439A (en) Heavy load type form timbering and member thereof
KR20120004756U (en) System Scaffolding
KR100808291B1 (en) A safety device for pierces
JP6842738B1 (en) Suspended scaffolding
KR200491378Y1 (en) Supporter for safety foot plate and scaffolding
CA2830271A1 (en) Rescue winch support for scaffolds and method of securing a rescue winch to a scaffold using same
CN113202281A (en) Building templates operation platform
KR100883186B1 (en) Scaffold installed between steel beam for girder of bridge
JP2021075967A (en) Suspended scaffolding
JP4091587B2 (en) Safety handrail
KR102289940B1 (en) A Study on the Hypothesis Tread Plates for Framed Construction
JP6276073B2 (en) Widening / narrowing scaffolding member and temporary scaffolding incorporating this scaffolding member
KR200285281Y1 (en) Supporting structure for concrete wall

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20121004

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20130218

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee