CN102116085B - Construction method of outpacking structure of steel pipe column with asymmetric steel hanging structure and scaffold - Google Patents

Construction method of outpacking structure of steel pipe column with asymmetric steel hanging structure and scaffold Download PDF

Info

Publication number
CN102116085B
CN102116085B CN 201110008645 CN201110008645A CN102116085B CN 102116085 B CN102116085 B CN 102116085B CN 201110008645 CN201110008645 CN 201110008645 CN 201110008645 A CN201110008645 A CN 201110008645A CN 102116085 B CN102116085 B CN 102116085B
Authority
CN
China
Prior art keywords
steel
steel pipe
pipe column
vertical rod
encorbelmenting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110008645
Other languages
Chinese (zh)
Other versions
CN102116085A (en
Inventor
陈云柱
林里
王勇
武琰玮
徐松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN 201110008645 priority Critical patent/CN102116085B/en
Publication of CN102116085A publication Critical patent/CN102116085A/en
Application granted granted Critical
Publication of CN102116085B publication Critical patent/CN102116085B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The invention discloses a construction method of an outpacking structure of steel pipe column with an asymmetric steel hanging structure, and a scaffold. After the construction of core tube steel pipe column with the asymmetric steel suspension structure is completed, the construction of the outerpacking structure of the steel pipe column is conducted; and the overhanging opening scaffold used for conducting outpacking structure construction on the steel pipe column is independently erected on each steel pipe string on the periphery of the core tube. Compared with a traditional scaffold building process, the construction method provided by the technical scheme has the advantages that as the overhanging opening type scaffolds are independently erected according to each steel pipe column and are not communicated, the scaffolds can be built and removed flexibly and conveniently, the engineering quantity is small, and the construction speed is high; and after the construction of the outerpacking structure of each section of overhanging opening type scaffold is completed, the corresponding overhanging opening type scaffold is removed immediately, which not only provides preferable technical measures and good technical guarantees for the construction of the outerpacking structure of the steel pipe column with the asymmetric steel hanging structure, but also effectively solves the problem of cross operation and the cooperation of the construction of the outerpacking structure and the hoisting of the steel hanging structure constructed later.

Description

The job practices and the scaffold of asymmetric steel suspended structure steel pipe column externally-packed structure
Technical field
The present invention relates to technical field of buildings, particularly relate to a kind of job practices and scaffold of asymmetric steel suspended structure steel pipe column externally-packed structure.
Background technology
Along with the continuous increase of national economy, urban construction is advanced by leaps and bounds, and asymmetric steel suspended structure is as a kind of novel labyrinth system; According to its structure feature, take into full account the stress deformation and steel work self strain of steel suspended structure part, it builds order the strict control of concreting of suspension floor; It is loading sequence; To guarantee that whole suspended structure is whole stressed even, so for asymmetric steel suspended structure system, its construction process requires nuclear core tube steel pipe column generally to construct prior to the suspension section; After the construction of core tube steel tubing string is accomplished; The part floor of externally-packed structure of steel pipe column (concreting layer) and core tube needs construction simultaneously, so the professional cross-operation of the steel work of core shell system and civil engineering, coordinative construction are frequent, its scaffold building is as adopting the routine property segmentation closed scaffold of encorbelmenting; The suspended structure of influence back construction is installed, can not satisfy the construction requirement of asymmetric steel suspended structure.
Summary of the invention
Technical problem to be solved by this invention is to overcome the existing segmentation closed scaffold of encorbelmenting can influence the defective of follow-up construction, and the used open-type scaffold of encorbelmenting in a kind of job practices and the construction of asymmetric steel suspended structure steel pipe column externally-packed structure is provided.
In order to solve the problems of the technologies described above, the present invention adopts following technical scheme:
The job practices of asymmetric steel suspended structure steel pipe column externally-packed structure provided by the invention is: after the core tube steel tubing string construction of said asymmetric steel suspended structure is accomplished; Carry out the construction of steel pipe column externally-packed structure; Every peripheral steel pipe column of core tube sets up the open-type scaffold of encorbelmenting separately and is used for steel pipe column is carried out the externally-packed structure construction; The open-type scaffold of encorbelmenting comprises vertical rod, leger and little cross bar; Vertical rod is positioned on the i iron supporting traverse, is provided with close order safety net in the outside of vertical rod, and the i iron supporting traverse is welded on the floor girder steel through round steel U type hoop; One end of wire rope is connected on the i iron supporting traverse through wire clips, and the other end is connected on the round steel U type embedded part of floor floor.
The open-type scaffold of encorbelmenting described in the above-mentioned job practices adopts i iron as supporting traverse, and the spacing between two supporting traverses is smaller or equal to 600mm, makes it not influence the installation of the horizontal girder steel of suspended structure of back construction.Said supporting traverse adopts round steel U type hoop and floor girder steel to weld together.To reserve the fixing clearance of follow-up steel suspended structure girder steel, make it not influence the installation of the horizontal girder steel of suspended structure of back construction at the thick steel plate of supporting traverse underlay 5cm.
In the aforementioned job practices; The said open-type scaffold of encorbelmenting is provided with the steel pipe diagonal brace, and an end of steel pipe diagonal brace is welded on steel pipe column and reserves on the steel corbel, and the other end adopts fastener to be connected with vertical rod; When building steel pipe column externally-packed structure concrete; Be embedded in together in the concrete, this diagonal brace can play the off-load effect to whole frame body, strengthens the stability of whole frame body.
In the aforementioned job practices, the inside and outside vertical rod array pitch of the said open-type scaffold of encorbelmenting is smaller or equal to 600mm, and interior vertical rod is 450mm from the steel pipe column back gauge, whippletree advance 600~1350mm, step pitch 1600~2000mm.
The present invention also provides used a kind of open-type scaffold of encorbelmenting in the aforementioned job practices: every peripheral steel pipe column of core tube is built the independent open-type scaffold of encorbelmenting respectively; The open-type scaffold of encorbelmenting comprises vertical rod, leger and little cross bar; Vertical rod is positioned on the i iron supporting traverse; Be provided with close order safety net in the outside of vertical rod; The i iron supporting traverse is welded on the floor girder steel through round steel U type hoop, and an end of wire rope is connected on the i iron supporting traverse through wire clips, and the other end is connected on the round steel U type embedded part of floor floor.
The array pitch of the inside and outside vertical rod of the above-mentioned open-type scaffold of encorbelmenting is smaller or equal to 600mm, and interior vertical rod is 450mm apart from the distance of steel pipe column, and the advance between the cross bar is 600~1350mm, and step pitch is 1500~1800mm, and little cross bar places on the leger.
On the aforementioned open-type scaffold of encorbelmenting, the steel pipe diagonal brace is set, an end of steel pipe diagonal brace is welded on the reservation steel corbel of steel pipe column, and the other end adopts fastener to be connected with vertical rod.
The aforementioned open-type scaffold of encorbelmenting, the i iron supporting traverse is welded on the floor girder steel through round steel U type hoop, the thick steel plate of pad 5cm between i iron supporting traverse and floor girder steel.
Compare with traditional scaffold building technology; The job practices that technique scheme provides is owing to set up the open-type scaffold of encorbelmenting; Can satisfy asymmetric steel suspended structure core tube steel tubing string externally-packed structure particular structural demand because be to set up separately respectively, be not communicated with to every steel pipe column, and take tear open flexible; Engineering quantity is little; Speed of application is fast, and each section is encorbelmented after steel pipe column externally-packed structure construction accomplishes, and can remove the open-type scaffold of encorbelmenting accordingly immediately; Be not merely the construction of asymmetric steel suspended structure steel pipe column externally-packed structure technical measures and good technical guarantee preferably are provided, and can effectively solve itself and steel suspended structure lifting cross-operation, the matching problem of back construction.
Description of drawings
Fig. 1 is asymmetric steel suspended structure steel pipe column external wrapping concrete structure scaffold building floor map;
Fig. 2 is the enlarged drawing of a-quadrant among Fig. 1;
Fig. 3 is the A-A sectional view of Fig. 2;
Fig. 4 is the B-B sectional view of Fig. 2;
Fig. 5 is the enlarged drawing in B zone among Fig. 4.
Reference numeral: 1-i iron support rail, 2-vertical rod, 3-leger, the little cross bar of 4-, 5-girder steel, 6-round steel U type embedded part, 7-steel pipe column externally-packed structure, 8-reserve steel corbel, the close order safety net of 9-, 10-round steel Non-slip material, 11-steel pipe column, 12-steel pipe diagonal brace, 13-round steel U type hoop, 14-5cm steel plate, 15-wire rope, 16-wire clips, 17-floor floor.
The specific embodiment
The core tube of asymmetric steel suspended structure is as shown in Figure 1; Have 12 steel pipe columns 11; The externally-packed structure 7 of steel pipe column adopts concreting; Because be asymmetric steel suspended structure, its construction process requires nuclear core tube steel pipe column generally prior to the construction of suspension section, after the construction of core tube steel tubing string is accomplished; The part floor of externally-packed structure of steel pipe column (concreting layer) and core tube needs construction simultaneously, and the core tube is built the open-type scaffold of encorbelmenting 8 steel pipe columns 11 of periphery are carried out 7 constructions of concrete externally-packed structure.
Encorbelment the building of open-type scaffold:
8 peripheral steel pipe columns 11 of core tube are built the independent open-type scaffold of encorbelmenting respectively, and each open-type scaffold of encorbelmenting comprises vertical rod 2, leger 3 and little cross bar 4, and little cross bar 4 places on the leger 3; Completely spread bamboo basketry sheet scaffold floor, vertical rod 2 is positioned on the i iron supporting traverse 1, the spacing 600mm of two i iron 1; I iron supporting traverse 1 is welded on the floor girder steel 5 through round steel U type hoop 13, for reserving follow-up steel suspended structure girder steel fixing clearance, the thick steel plate 14 of pad 5cm between i iron supporting traverse 1 and floor girder steel 5; The array pitch of inside and outside vertical rod 2 is smaller or equal to 600mm, and interior vertical rod 2 is 450mm apart from the distance of steel pipe column 11, and cross bar 3, the advance between 4 are 600~1350mm; Step pitch is 1500~1800mm, is provided with close order safety net 9 in the outside of vertical rod 2, and i iron supporting traverse 1 is welded on the floor girder steel 5 through round steel U type hoop 13; The end employing wire rope 15 of encorbelmenting carries out off-load; One end of wire rope 15 is connected on the i iron supporting traverse 1 through 3 wire clips 16 and fixedly wire rope 15 is guaranteeing safety and to need reservation cushion the space with round steel Non-slip material 10, and the other end is connected on the round steel U type embedded part 6 of floor floor 17, and this open-type scaffold of encorbelmenting also is provided with steel pipe diagonal brace 12; One end of steel pipe diagonal brace 12 is welded on the reservation steel corbel 8 of steel pipe column 11; The other end adopts fastener to be connected with vertical rod 2, when building steel pipe column externally-packed structure concrete, is embedded in the concrete together; This diagonal brace can play the off-load effect to whole frame body, strengthens the stability of whole frame body.
The principle of afterwards tearing open is followed from top to bottom, taken earlier to its dismantle processes flow process, and worker's flow process is opposite with setting up.
The scaffold of every steel pipe column is set up separately respectively, is not communicated with; Take tear open flexible; Each section encorbelmented after the externally-packed structure construction of support body accomplishes, and removes corresponding scaffold immediately, can effectively solve itself and steel suspension segment structure lifting cross-operation, the matching problem of back construction.

Claims (10)

1. the job practices of an asymmetric steel suspended structure steel pipe column externally-packed structure; It is characterized in that: after the core tube steel tubing string construction of said asymmetric steel suspended structure is accomplished; Carry out the construction of steel pipe column externally-packed structure; Every peripheral steel pipe column of core tube sets up the open-type scaffold of encorbelmenting separately and is used for steel pipe column is carried out the externally-packed structure construction, and the open-type scaffold of encorbelmenting comprises vertical rod, leger and little cross bar, and vertical rod is positioned on the i iron supporting traverse; Be provided with close order safety net in the outside of vertical rod; The i iron supporting traverse is welded on the floor girder steel through round steel U type hoop, and an end of wire rope is connected on the i iron supporting traverse through wire clips, and the other end is connected on the round steel U type embedded part of floor floor.
2. according to the job practices of the said asymmetric steel suspended structure steel pipe column externally-packed structure of claim 1, it is characterized in that: the said open-type scaffold of encorbelmenting adopts i iron as supporting traverse, and the spacing between two supporting traverses is smaller or equal to 600mm.
3. according to the job practices of the said asymmetric steel suspended structure steel pipe column externally-packed structure of claim 2, it is characterized in that: the steel plate that supporting traverse underlay 5cm is thick.
4. according to the job practices of the said asymmetric steel suspended structure steel pipe column externally-packed structure of claim 3, it is characterized in that: said supporting traverse adopts U type hoop and floor girder steel to weld together.
5. according to the job practices of the said asymmetric steel suspended structure steel pipe column externally-packed structure of claim 1; It is characterized in that: the said open-type scaffold of encorbelmenting is provided with the steel pipe diagonal brace; One end of steel pipe diagonal brace is welded on steel pipe column and reserves on the steel corbel; The other end adopts fastener to be connected with vertical rod, when building steel pipe column externally-packed structure concrete, is embedded in the concrete together.
6. according to the job practices of the said asymmetric steel suspended structure steel pipe column externally-packed structure of claim 1; It is characterized in that: the inside and outside vertical rod array pitch of the said open-type scaffold of encorbelmenting is smaller or equal to 600mm; Interior vertical rod is 450mm from the steel pipe column back gauge; Cross bar advance 600~1350mm, step pitch 1500~1800mm.
7. open-type scaffold of encorbelmenting; It is characterized in that: the peripheral every steel pipe column (11) of core tube is built the independent open-type scaffold of encorbelmenting respectively; The open-type scaffold of encorbelmenting comprises vertical rod (2), leger (3) and little cross bar (4); Vertical rod (2) is positioned on the i iron supporting traverse (1), is provided with close order safety net (9) in the outside of vertical rod (2), and i iron supporting traverse (1) is welded on the floor girder steel (5) through round steel U type hoop (13); One end of wire rope (15) is connected on the i iron supporting traverse (1) through wire clips (16), and the other end is connected on the round steel U type embedded part (6) of floor floor (17).
8. according to the described open-type scaffold of encorbelmenting of claim 7; It is characterized in that: the array pitch of inside and outside vertical rod (2) is smaller or equal to 600mm; Interior vertical rod (2) is 450mm apart from the distance of steel pipe column (11); Advance between the cross bar (3,4) is 600~1350mm, and step pitch is 1500~1800mm, and little cross bar (3) places on the leger (4).
9. according to the described open-type scaffold of encorbelmenting of claim 8, it is characterized in that: an end of steel pipe diagonal brace (12) is welded on the reservation steel corbel (8) of steel pipe column (11), and the other end adopts fastener to be connected with vertical rod (2).
10. according to the described open-type scaffold of encorbelmenting of claim 8; It is characterized in that: i iron supporting traverse (1) is welded on the floor girder steel (5) through round steel U type hoop (13), the thick steel plate (14) of pad 5cm between i iron supporting traverse (1) and floor girder steel (5).
CN 201110008645 2011-01-17 2011-01-17 Construction method of outpacking structure of steel pipe column with asymmetric steel hanging structure and scaffold Expired - Fee Related CN102116085B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110008645 CN102116085B (en) 2011-01-17 2011-01-17 Construction method of outpacking structure of steel pipe column with asymmetric steel hanging structure and scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110008645 CN102116085B (en) 2011-01-17 2011-01-17 Construction method of outpacking structure of steel pipe column with asymmetric steel hanging structure and scaffold

Publications (2)

Publication Number Publication Date
CN102116085A CN102116085A (en) 2011-07-06
CN102116085B true CN102116085B (en) 2012-10-03

Family

ID=44214997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110008645 Expired - Fee Related CN102116085B (en) 2011-01-17 2011-01-17 Construction method of outpacking structure of steel pipe column with asymmetric steel hanging structure and scaffold

Country Status (1)

Country Link
CN (1) CN102116085B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392532B (en) * 2011-10-28 2013-05-29 山东万鑫建设有限公司 Construction method for built-in hanging scaffold of high-rise building
CN102995889B (en) * 2012-11-14 2015-07-01 中冶天工集团有限公司 Method for building mould of honeycomb type reticulated shell high-altitude scaffold
CN107558720A (en) * 2017-10-18 2018-01-09 中交第四公路工程局有限公司 A kind of vertical rod fixture and scaffold
CN116771088B (en) * 2023-08-17 2023-10-17 上海建工一建集团有限公司 Cylinder frame deformable cylinder and column integrated integral climbing steel platform and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB623739A (en) * 1946-05-07 1949-05-23 Wates Ltd Improvements in or relating to erection jigs or the like
CN2152028Y (en) * 1992-09-17 1994-01-05 黄侠 Vertical pole assembling and disassembling device for building steel pipe frame
EP1160395A2 (en) * 2000-05-31 2001-12-05 Combisafe International Ab Device in guard railings
CN202023348U (en) * 2011-01-17 2011-11-02 中国建筑第四工程局有限公司 Hanging-opening type scaffold

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB623739A (en) * 1946-05-07 1949-05-23 Wates Ltd Improvements in or relating to erection jigs or the like
CN2152028Y (en) * 1992-09-17 1994-01-05 黄侠 Vertical pole assembling and disassembling device for building steel pipe frame
EP1160395A2 (en) * 2000-05-31 2001-12-05 Combisafe International Ab Device in guard railings
CN202023348U (en) * 2011-01-17 2011-11-02 中国建筑第四工程局有限公司 Hanging-opening type scaffold

Also Published As

Publication number Publication date
CN102116085A (en) 2011-07-06

Similar Documents

Publication Publication Date Title
CN203867216U (en) Detachable steel frame supporting structure for ultra-high-rise building cantilevered plate
CN102661054B (en) Lateral reinforcing structure in whole lifting of plane steel truss and whole lifting method
CN202023348U (en) Hanging-opening type scaffold
CN103452311B (en) A kind of erection method of shaped steel suspended structural support frame
CN103114681B (en) High-altitude long-span reinforced concrete beam treat pouring structure
CN102116085B (en) Construction method of outpacking structure of steel pipe column with asymmetric steel hanging structure and scaffold
CN104929364B (en) Auxiliary construction method for longspan cantilever entire laminated Vierendeel truss structure
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN103628680A (en) Construction method for large-area steel structure hanging layer
CN201962932U (en) Building construction segmented overhung outer scaffold
CN106436573A (en) Construction method of corbel and steel truss bracket of wide-span upper crossbeam of extra-high cable bent tower
CN110409319A (en) A kind of cast-in-place floorings bracket of large span steel reinforced concrete combination beam and construction method
CN102691269A (en) Main arch concrete encasement movable hanging basket
CN207268073U (en) Novel flexible formwork bearing frame
CN201288415Y (en) Subsection gradual change overhanging type external scaffold for tall building
CN106437188B (en) A kind of reinforced concrete structure girder adds the reinforcement means of steel construction box beam
CN202626841U (en) Device for concrete surrounding of main arch by using hanging method
CN105347142B (en) A kind of building hoist is mounted on the threading installation method on basement roof
CN102561689B (en) Construction method for cantilever lifting scaffold
CN104963495A (en) Suspension hanging basket for installation of roof surface bottom layer color plate
CN204282843U (en) The sliding hoisted in position device of steel girder erection in a kind of stiffness combination construction
CN103046743A (en) High-rise conversion layer type steel concrete girder hanging type template supporting system and construction method
CN203795459U (en) Foundation structure of tower crane for high-altitude roofs
CN203200719U (en) Hanging type slope pouring template device
CN202878454U (en) T-shaped beam template installing and dismantling device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA CONSTRUCTION 4TH BUREAU 6TH CORP.

Free format text: FORMER OWNER: CHINA CONSTRUCTION FOURTH ENGINEERING BUREAU LTD.

Effective date: 20130614

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 510665 GUANGZHOU, GUANGDONG PROVINCE TO: 230011 HEFEI, ANHUI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130614

Address after: 5, 230011 floor, Dongfang shopping mall, Yaohai District, Anhui, Hefei

Patentee after: China Construction 4th Engineering Bureau, 6th Co., Ltd.

Address before: 5, 510665 floor, B building, Guangzhou information port, No. 16, Yun Yun Road, Guangzhou, Guangdong, Tianhe District

Patentee before: China Construction Fourth Engineering Bureau Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20160117

EXPY Termination of patent right or utility model