CN203795459U - Foundation structure of tower crane for high-altitude roofs - Google Patents

Foundation structure of tower crane for high-altitude roofs Download PDF

Info

Publication number
CN203795459U
CN203795459U CN201420153223.7U CN201420153223U CN203795459U CN 203795459 U CN203795459 U CN 203795459U CN 201420153223 U CN201420153223 U CN 201420153223U CN 203795459 U CN203795459 U CN 203795459U
Authority
CN
China
Prior art keywords
altitude
foundation structure
transitional
girder steel
lower bolster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420153223.7U
Other languages
Chinese (zh)
Inventor
汪许林
汪勇华
陆学进
刘洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Pang Yuan Construction Machinery And Equipment Co Ltd
Original Assignee
Guangdong Pang Yuan Construction Machinery And Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Pang Yuan Construction Machinery And Equipment Co Ltd filed Critical Guangdong Pang Yuan Construction Machinery And Equipment Co Ltd
Priority to CN201420153223.7U priority Critical patent/CN203795459U/en
Application granted granted Critical
Publication of CN203795459U publication Critical patent/CN203795459U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a foundation structure of a tower crane for high-altitude roofs. The foundation structure comprises transitional girders, lower backing plates, hoops and flange plates. The flange plates are arranged above the transitional girders, the lower backing plates are arranged below the transitional girders, the outer sides of the lower backing plates are provided with the hoops used for fixedly connecting the lower backing plates with house structural beams. The foundation structure of the tower crane for the high-altitude roofs solves the problem of difficulty in directly mounting a roof hanger on the high-altitude roofs, can be applicable to roof structures with different spans of the structural beams by the aid of the mounting manner of the transitional girder; meanwhile, mounting of cross-shaped mudsills with different spans of the roof hanger can be met by adjusting the span of the transitional girder, stress is more reasonable and slab construction on site is unaffected by the aid of connection of the hoops and the structural beams, hoop screws are different in length and can be fixed with different sizes of the structural beams, and the foundation of the tower crane can be more reasonably and uniformly stressed by the aid of the arrangement of the transitional girder, and structure reinforcing cost is reduced.

Description

The foundation structure of a kind of high-altitude roofing pillar crane
Technical field
The utility model relates to the foundation structure of a kind of high-altitude roofing pillar crane.
Background technology
Flourish along with domestic high-building construction, inside climb/plug-in swing arm tower crane because it has that area of effective coverage is large, complete machine drop into machinery expenses few, face upward that arm angle is large, the afterbody radius of gyration is little, make it in the construction of super highrise building vertical transport of big and medium-sized cities, there is incomparable advantage.Inside climb/hang over structure construction erection stage outward and brought into play huge effect, but after topping out, it is but a very thorny difficult problem that tower crane is removed.In large-scale tower crane, climb after having constructed and need to hang and removed with roofing, due to the restriction of structure, the roofing tower crane of moulding on market cannot be directly installed on existing roof structure equally.And roofing is installed, hang as the first step of removing tower machine, it is directly connected to safely the progress of follow-up tower crane dismounting work, for head it off need to design a kind of high-altitude roofing tower crane foundation, to meet at height, the construction needs that roofing hangs is installed in the air.
Utility model content
Primary and foremost purpose of the present utility model is to provide a kind of foundation structure that the high-altitude roofing pillar crane of the construction needs that roofing hangs is installed at height that meets in the air, and concrete scheme of the present utility model is as follows for achieving the above object:
A foundation structure for high-altitude roofing pillar crane, comprises transition girder steel, lower bolster, anchor ear and flanged plate;
Described flanged plate is located at described transition girder steel top, and described lower bolster is located at described transition girder steel below;
Described lower bolster outside is provided with for by described lower bolster, the affixed described anchor ear of room body structure beam.
Preferably, also comprise stiffener, described stiffener is fixedly arranged on described lower bolster top, and is positioned at the both sides of described transition girder steel.
Preferably, described anchor ear comprises hoop plate, lower hoop plate, and described lower bolster, room body structure beam bind round between plate, lower hoop plate and use bolt affixed on described.
Preferably, described flanged plate is fixed on described transition girder steel by bolt and/or welding manner.
Preferably, described transition girder steel lower bolster is affixed by welding manner and described anchor ear.
The foundation structure of the high-altitude roofing pillar crane that the utility model provides has solved directly installs roofing as high-altitude roofing and hangs difficult problem, the roof structure that can adapt to different structure beam span by the installation form of transition girder steel, by adjusting transition girder steel span, can meet the installation that different span roofings hang cross bottom girder simultaneously, type of attachment by anchor ear and structural beams makes rationally stressed and does not affect on-the-spot floor slab construction, anchor ear spiro rod length difference can be fixed with the structural beams of different size, arrangement form by transition girder steel makes foundation for tower crane stressed more even reasonable, reduce structural strengthening expense.
Accompanying drawing explanation
Accompanying drawing described herein is used to provide further understanding of the present utility model, forms the application's a part, does not form to improper restriction of the present utility model, in the accompanying drawings:
Fig. 1 is the utility model example structure and high-altitude roofing pillar crane scheme of installation;
Fig. 2 is the utility model example structure schematic diagram;
Fig. 3 is another visual angle structural representation of the utility model embodiment.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment, describe the utility model in detail, in this illustrative examples of the present utility model and explanation, be used for explaining the utility model, but not as to restriction of the present utility model.
Embodiment
As shown in Figure 1 to Figure 3, the foundation structure 100 of a kind of high-altitude roofing pillar crane, comprises transition girder steel 1, lower bolster 2, anchor ear 3 and flanged plate 4; Roofing hangs 200 bearings and is seated on transition girder steel 1, for adapting to different construction sites project construction situation, according to the transition girder steel 1 of on-the-spot actual structural beams 300 span processing different lengths, the span that the while is hung 200 undercarriage beas 201 according to roofing to be used is arranged different transition girder steel 1 spans; Described flanged plate 4 is located at described transition girder steel 1 top, roofing to be installed can be hung to 200 and be arranged on the flanged plate 4 of transition girder steel 1; Described lower bolster 2 is located at described transition girder steel 1 below, and described lower bolster 2 outsides are provided with for by described lower bolster 2, the affixed described anchor ear 3 of room body structure beam 300, can lower bolster 2 be fixed in structural beams 300 by anchor ear 3 and bolt 6.
Improvement as above-described embodiment scheme, also comprise stiffener 5, described stiffener 5 is fixedly arranged on described lower bolster 2 tops, stiffener 5 can or be welded on lower bolster 2 with lower bolster 2 integrated designs, and plural piece stiffener 5 lays respectively at the both sides of described transition girder steel 1, avoid transition girder steel 1 sidesway.
Part preferred version as above-described embodiment scheme, described anchor ear 3 comprises hoop plate, lower hoop plate, wherein go up anchor ear 3 plates more than flooring, described lower bolster 2, room body structure beam 300 bind round between plate, lower hoop plate and use bolt 6 affixed on described, by 2 armfuls of lower bolsters in structural beams 300, the transition girder steel 1 processing is placed on adjacent upper anchor ear 3 plates and welding, handles successively two transition girder steels 1 well placed side by side, controls its center to center distance and roofing to be used and hangs 200 identical.
As the part preferred version of above-described embodiment scheme, described flanged plate 4 is fixed on described transition girder steel 1 by bolt 6 and/or welding manner.
As the part preferred version of above-described embodiment scheme, described transition girder steel 1 lower bolster 2 is affixed by welding manner and described anchor ear 3.
The technical scheme above the utility model embodiment being provided is described in detail, applied specific case herein the principle of the utility model embodiment and embodiment are set forth, the explanation of above embodiment is only applicable to help to understand the principle of the utility model embodiment; , for one of ordinary skill in the art, according to the utility model embodiment, in the specific embodiment and range of application, all will change, in sum, this description should not be construed as restriction of the present utility model meanwhile.

Claims (5)

1. a foundation structure for high-altitude roofing pillar crane, is characterized in that:
Comprise transition girder steel, lower bolster, anchor ear and flanged plate;
Described flanged plate is located at described transition girder steel top, and described lower bolster is located at described transition girder steel below;
Described lower bolster outside is provided with for by described lower bolster, the affixed described anchor ear of room body structure beam.
2. the foundation structure of high-altitude as claimed in claim 1 roofing pillar crane, is characterized in that:
Also comprise stiffener, described stiffener is fixedly arranged on described lower bolster top, and is positioned at the both sides of described transition girder steel.
3. the foundation structure of high-altitude as claimed in claim 1 roofing pillar crane, is characterized in that:
Described anchor ear comprises hoop plate, lower hoop plate, and described lower bolster, room body structure beam bind round between plate, lower hoop plate and use bolt affixed on described.
4. the foundation structure of high-altitude as claimed in claim 1 roofing pillar crane, is characterized in that:
Described flanged plate is fixed on described transition girder steel by bolt and/or welding manner.
5. the foundation structure of high-altitude as claimed in claim 1 roofing pillar crane, is characterized in that:
Described transition girder steel lower bolster is affixed by welding manner and described anchor ear.
CN201420153223.7U 2014-03-31 2014-03-31 Foundation structure of tower crane for high-altitude roofs Expired - Lifetime CN203795459U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420153223.7U CN203795459U (en) 2014-03-31 2014-03-31 Foundation structure of tower crane for high-altitude roofs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420153223.7U CN203795459U (en) 2014-03-31 2014-03-31 Foundation structure of tower crane for high-altitude roofs

Publications (1)

Publication Number Publication Date
CN203795459U true CN203795459U (en) 2014-08-27

Family

ID=51377688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420153223.7U Expired - Lifetime CN203795459U (en) 2014-03-31 2014-03-31 Foundation structure of tower crane for high-altitude roofs

Country Status (1)

Country Link
CN (1) CN203795459U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105731271A (en) * 2016-04-07 2016-07-06 上海市机械施工集团有限公司 Combined tower crane for roof construction and construction method thereof
CN107288151A (en) * 2017-08-17 2017-10-24 中国建筑第八工程局有限公司 Free-standing swing arm tower crane anchor ear and Anchored Bar structure
CN110700500A (en) * 2019-10-12 2020-01-17 中国十七冶集团有限公司 Roof crane steel structure foundation and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105731271A (en) * 2016-04-07 2016-07-06 上海市机械施工集团有限公司 Combined tower crane for roof construction and construction method thereof
CN107288151A (en) * 2017-08-17 2017-10-24 中国建筑第八工程局有限公司 Free-standing swing arm tower crane anchor ear and Anchored Bar structure
CN110700500A (en) * 2019-10-12 2020-01-17 中国十七冶集团有限公司 Roof crane steel structure foundation and construction method thereof

Similar Documents

Publication Publication Date Title
CN103114681B (en) High-altitude long-span reinforced concrete beam treat pouring structure
CN204040464U (en) A kind of slab form supporting construction
CN207268073U (en) Novel flexible formwork bearing frame
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN104343214A (en) Bracket prefabricated reinforcement framework of pseudo-classic building, fabrication method of reinforcement framework, and construction method of reinforced concrete bracket of pseudo-classic building
CN203795459U (en) Foundation structure of tower crane for high-altitude roofs
CN108049666B (en) A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction
CN103615111A (en) Silo top construction method
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN203947755U (en) A kind of large Steel Cantilever trussed construction high-altitude construction first floor steel truss erecting device
CN201972417U (en) Lightweight wood structure roof system
CN206233656U (en) Steel frame mill building structure
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN204059901U (en) A kind of high-altitude construction operation platform
CN206220248U (en) A kind of Column Joint structure
CN202596161U (en) Combined formwork device of HR heavy type gantry and reinforced concrete temporary structural column
CN102787717B (en) Self-supporting combined steel template construction method
CN205369875U (en) A operation protection platform collet for in shaft
CN204174848U (en) A kind of precast reinforced skeleton of sets of brackets on top of the columns of building in the style of the ancients
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
CN201778392U (en) Steel conical shell for coal silo
CN208717939U (en) A kind of efficiently molding building hoist foundation structure
CN206873922U (en) A kind of dismountable steel bar truss floor support plate cheek board attachment structure of end template

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 510000 Room 1130, 11th Floor, Traffic Building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province

Patentee after: GUANGDONG PANGYUAN ENGINEERING MACHINERY CO.,LTD.

Address before: Unit 212, Second Floor, Comprehensive Building of Science and Technology Innovation Base, No. 80 Lanyue Road, Science City, Guangzhou High-tech Industrial Development Zone, Guangdong 510800

Patentee before: GUANGDONG PANGYUAN ENGINEERING MACHINERY CO.,LTD.

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: Room 109-12, Building 3, 43 Yingbin Avenue West, Huadu District, Guangzhou City, Guangdong 510000

Patentee after: GUANGDONG PANGYUAN ENGINEERING MACHINERY CO.,LTD.

Address before: 510000 Room 1130, 11th Floor, Traffic Building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province

Patentee before: GUANGDONG PANGYUAN ENGINEERING MACHINERY CO.,LTD.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140827