The construction method of precast reinforced skeleton of sets of brackets on top of the columns of a kind of building in the style of the ancients and preparation method thereof and building in the style of the ancients steel concrete sets of brackets on top of the columns
Technical field
The present invention relates to the construction method of precast reinforced skeleton of sets of brackets on top of the columns of the construction method of a kind of building in the style of the ancients sets of brackets on top of the columns building operations accessory and building in the style of the ancients sets of brackets on top of the columns, particularly building in the style of the ancients band steel plate built-in fitting and preparation method thereof and building in the style of the ancients steel concrete sets of brackets on top of the columns.
Background technology
Flourish along with Tourism in China, building in the style of the ancients is built one after another in various places, and traditional wooden structures sets of brackets on top of the columns more and more can not meet the requirement of building practical and durability, so modern imitations building sets of brackets on top of the columns multi-form be greatly reinforced concrete structure; And sets of brackets on top of the columns girder construction of encorbelmenting is the form the most often adopted; Sets of brackets on top of the columns beam of encorbelmenting utilizes beam main tendon to anchor into the mode of main muscle tension+concrete anti-compression inside frame column, and the load in the deadweight of sets of brackets on top of the columns, the Large-area load of roofing and other directions is passed to frame construction; From anchor structure to beam-ends direction, utilize the method for the reduction sets of brackets on top of the columns beam section area, under ensureing the prerequisite of Cantilever Beams root effective cross-sectional area, reduce the deadweight of beam.
Traditional steel concrete sets of brackets on top of the columns construction is all that operation is with the form of main structure construction in work high above the ground: build enough large working platform; Lay bed die → assembling reinforcement → welding built-in fitting → installation side form → concreting, because sets of brackets on top of the columns girder construction of encorbelmenting needs the reduction sets of brackets on top of the columns beam section area; Thus, the manufacturing process operation of its sets of brackets on top of the columns beam steel cage is loaded down with trivial details, long construction period, and need to build on enough large operation platform in high-altitude to carry out, the scope of operation is limited to, and assembled operational danger is large, and the welding of built-in fitting and installation quality are difficult to ensure, sets of brackets on top of the columns scale error is comparatively large, and the spark simultaneously carrying out built-in fitting welding in high-altitude brings larger potential safety hazard to the construction of most of building in the style of the ancients for wooden structures.
Summary of the invention
The object of the present invention is to provide
oneplant the construction method of precast reinforced skeleton of sets of brackets on top of the columns of the building in the style of the ancients of isolating construction and preparation method thereof and building in the style of the ancients steel concrete sets of brackets on top of the columns; The method moves the making of the sets of brackets on top of the columns cage of reinforcement of building in the style of the ancients to ground from high-altitude, solves in the construction of traditional steel concrete sets of brackets on top of the columns, and the sets of brackets on top of the columns cage of reinforcement of building in the style of the ancients is with the weak point of main structure construction existing for the form of work high above the ground.
The technical scheme solved the problem is: a kind of precast reinforced skeleton of sets of brackets on top of the columns of building in the style of the ancients, comprise for fixing with support main steel bar stress, built-in fitting system for being connected with wooden construction after concreting is shaping, the main stress system of formation sets of brackets on top of the columns, for bearing and transmitting the sets of brackets on top of the columns skeleton reinforcing steel bar system of load; Coordinate cage of reinforcement, support whole sets of brackets on top of the columns shape and bear the sets of brackets on top of the columns stirrup of shearing force and torsional moment; Described built-in fitting system, sets of brackets on top of the columns skeleton reinforcing steel bar system and sets of brackets on top of the columns stirrup form one and pass through and reduce the whole reinforcement cage of section area for time;
Described built-in fitting system comprises two-sided rectangular steel plates built-in fitting, one side rectangular steel plates built-in fitting;
Described sets of brackets on top of the columns skeleton reinforcing steel bar system comprises the main muscle in bottom, the main muscle in middle part, the main muscle in top and the gluten that length does not wait, the main muscle in described top penetrates two-sided rectangular steel plates built-in fitting inside, top, is welded and fixed with two-sided rectangular steel plates built-in fitting, the main muscle in described middle part penetrates the two-sided rectangular steel plates built-in fitting of top two-sided rectangular steel plates built-in fitting and middle part successively and is welded and fixed with it respectively, and the main muscle in bottom penetrates the two-sided rectangular steel plates built-in fitting in middle part and is welded and fixed with it; Gluten passes the two-sided rectangular steel plates built-in fitting in top and is welded and fixed formation cage of reinforcement with it, one side rectangular steel plates built-in fitting is positioned on the two-sided rectangular steel plates built-in fitting in top, described sets of brackets on top of the columns stirrup is by the steel hoop hoop of minor diameter round steel brake forming, and it is outer and be connected with the main muscle in bottom, the main muscle in middle part, the main muscle in top and gluten colligation that sets of brackets on top of the columns stirrup is enclosed within cage of reinforcement.
Its another relevant technical scheme is: a kind of preparation method of the precast reinforced skeleton of sets of brackets on top of the columns of building in the style of the ancients band steel plate built-in fitting, the method is the method for the precast reinforced skeleton of sets of brackets on top of the columns at the above-mentioned building in the style of the ancients of floor manufacture the present invention, it utilizes two-sided rectangular steel plates built-in fitting as temporary supporting system, penetrate and be welded and fixed sets of brackets on top of the columns beam main tendon and form cage of reinforcement, finally at cage of reinforcement, stirrup and one side rectangular steel plates built-in fitting are installed outward, form an overall reinforcing cage; It comprises the following steps:
A. preparation of construction, surveying and locating: the bar material and the steel plate built-in fitting that prepare the precast reinforced skeleton of sets of brackets on top of the columns; According to construction drawing, specify the relative position of sets of brackets on top of the columns reinforcing bar and steel plate built-in fitting, and setting-out on reinforcing bar, carry out mark;
B, lay steel plate built-in fitting: according to laying the two-sided rectangular steel plates built-in fitting in top after drawing unwrapping wire;
C. sets of brackets on top of the columns beam main tendon is laid and two-sided rectangular steel plates built-in fitting is welded and fixed formation cage of reinforcement:
C1, first by temporary fixed on the ground for two-sided for top rectangular steel plates built-in fitting, more main for top muscle is penetrated top two-sided rectangular steel plates built-in fitting inner, be welded and fixed with two-sided rectangular steel plates built-in fitting, form temporary support;
C2, lay middle part two-sided rectangular steel plates built-in fitting, main for middle part muscle penetrated successively the two-sided rectangular steel plates built-in fitting of top two-sided rectangular steel plates built-in fitting and middle part and be welded and fixed with it respectively, main for bottom muscle penetrated the two-sided rectangular steel plates built-in fitting in middle part and be welded and fixed with it;
C3, put gluten, and gluten is welded and fixed with it through the two-sided rectangular steel plates built-in fitting in each top successively;
D, colligation stirrup: be first inserted in by whole stirrup and lay in place outside cage of reinforcement, then the stirrup at sets of brackets on top of the columns beam two ends is fixed in colligation, then from two ends toward centre colligation stirrup one by one;
E, lay top one side rectangular steel plates built-in fitting:
Be inserted in the cage of reinforcement placed on top top one side rectangular steel plates built-in fitting of stirrup, and itself and top two-sided rectangular steel plates built-in fitting spot welding fixed being formed passes through reduces the reinforcing cage of section area for time;
F, inspection verification, check and correct installation of embedded parts precision; It is qualified to correct, and the precast reinforced carcassing of sets of brackets on top of the columns completes.
Its relevant another technical scheme is again: a kind of construction method of building in the style of the ancients steel concrete sets of brackets on top of the columns, the method be by the precast reinforced skeleton of sets of brackets on top of the columns of building in the style of the ancients steel concrete sets of brackets on top of the columns after ground overall processing is shaping again Integral lifting be in place and anchor into the integral method of carrying out concreting again of anchoring in frame column, comprise the following steps:
(1), at the precast reinforced skeleton of sets of brackets on top of the columns of floor manufacture building in the style of the ancients steel concrete sets of brackets on top of the columns;
The method of the described precast reinforced skeleton of sets of brackets on top of the columns at floor manufacture building in the style of the ancients steel concrete sets of brackets on top of the columns is the preparation method of the precast reinforced skeleton of sets of brackets on top of the columns of the present invention's above-mentioned building in the style of the ancients band steel plate built-in fitting; It utilizes two-sided rectangular steel plates built-in fitting as temporary supporting system, penetrates and be welded and fixed sets of brackets on top of the columns beam main tendon to form cage of reinforcement and finally install stirrup and one side rectangular steel plates built-in fitting outward at cage of reinforcement, forms an overall reinforcing cage; It comprises the following steps:
A. preparation of construction, surveying and locating: the bar material and the steel plate built-in fitting that prepare the precast reinforced skeleton of sets of brackets on top of the columns; According to construction drawing, specify the relative position of sets of brackets on top of the columns reinforcing bar and steel plate built-in fitting, and setting-out on reinforcing bar, carry out mark;
B, lay steel plate built-in fitting: according to laying the two-sided rectangular steel plates built-in fitting in top after drawing unwrapping wire;
C. sets of brackets on top of the columns beam main tendon is laid and two-sided rectangular steel plates built-in fitting is welded and fixed formation cage of reinforcement:
C1, first by temporary fixed on the ground for two-sided for top rectangular steel plates built-in fitting, more main for top muscle is penetrated top two-sided rectangular steel plates built-in fitting inner, be welded and fixed with two-sided rectangular steel plates built-in fitting, form temporary support;
C2, lay middle part two-sided rectangular steel plates built-in fitting, main for middle part muscle penetrated successively the two-sided rectangular steel plates built-in fitting of top two-sided rectangular steel plates built-in fitting and middle part and be welded and fixed with it respectively, main for bottom muscle penetrated the two-sided rectangular steel plates built-in fitting in middle part and be welded and fixed with it;
C3, put gluten, and gluten is welded and fixed with it through the two-sided rectangular steel plates built-in fitting in each top successively;
D, colligation stirrup: be first inserted in by whole stirrup and lay in place outside cage of reinforcement, then the stirrup at sets of brackets on top of the columns beam two ends is fixed in colligation, then from two ends toward centre colligation stirrup one by one;
E, lay top one side rectangular steel plates built-in fitting:
Be inserted in the cage of reinforcement placed on top top one side rectangular steel plates built-in fitting of stirrup, and itself and top two-sided rectangular steel plates built-in fitting spot welding fixed being formed passes through reduces the reinforcing cage of section area for time;
F, inspection verification, check and correct installation of embedded parts precision; It is qualified to correct, and the precast reinforced carcassing of sets of brackets on top of the columns completes;
(2) Integral lifting is installed:
" the precast reinforced skeleton of sets of brackets on top of the columns of the building in the style of the ancients steel concrete sets of brackets on top of the columns " Integral lifting made is put in place, fixes with the connection of building main body anchor structure;
(3) concreting, maintenance:
Concrete blinding is installed outward at the precast reinforced skeleton of sets of brackets on top of the columns of building in the style of the ancients steel concrete sets of brackets on top of the columns according to a conventional method, carries out concreting maintenance.
Compared with prior art, the present invention's it " construction method of precast reinforced skeleton of sets of brackets on top of the columns of a kind of building in the style of the ancients and preparation method thereof and building in the style of the ancients steel concrete sets of brackets on top of the columns " has following beneficial effect:
1, the sets of brackets on top of the columns cage of reinforcement of building in the style of the ancients is quality controllable, quality is more secure:
The precast reinforced skeleton of sets of brackets on top of the columns of the building in the style of the ancients of the present invention, at floor manufacture, utilizes two-sided rectangular steel plates built-in fitting as temporary supporting system, penetrates and be welded and fixed sets of brackets on top of the columns beam main tendon to form cage of reinforcement; Finally at cage of reinforcement, stirrup and one side rectangular steel plates built-in fitting are installed outward, form an overall reinforcing cage; Cage of reinforcement process for integrally manufacturing is perfect, effectively guarantees the globality of sets of brackets on top of the columns cage of reinforcement, improves the installation accuracy of steel plate built-in fitting, and by " Project quality inspection standard built by ancient building " evaluation, sets of brackets on top of the columns subitem is chosen as excellent.
2, Ground Operation, operating efficiency is high, saves the duration:
The present invention is by the form of general sets of brackets on top of the columns cage of reinforcement with the colligation operation of main structure construction high-altitude, change into ground overall processing shaping after again Integral lifting install construction, workman carries out reinforcing bar binding and built-in fitting construction in the processing space of ground, by Appropriate application operating space, compare high-rise working while ensureing sufficient construction operation space and reduce security risk, and improve operating efficiency, the making of sets of brackets on top of the columns cage of reinforcement and main structure construction are synchronously carried out, and shorten the construction period greatly.
3, standardized construction, remarkable in economical benefits: the construction method of the building in the style of the ancients steel concrete sets of brackets on top of the columns of the present invention makes construction technology more standardization by the erection sequence of reasonably optimizing cage of reinforcement and two-sided rectangular steel plates built-in fitting and mounting method, ensure that and once become excellent rate, and, without the need to building enough large operation platform especially in high-altitude, save artificial and material cost, remarkable in economical benefits.
4, safety factor is high: whole sets of brackets on top of the columns work progress is in safety, stable, controllable state, quality project, particularly avoid the fire safety evaluating hidden danger that the spark that carries out built-in fitting welding in high-altitude brings to the construction of building in the style of the ancients that major part is wooden structures, occur without security incident.
Be described further below in conjunction with the technical characteristic of drawings and Examples to the construction method of precast reinforced skeleton of sets of brackets on top of the columns of a kind of building in the style of the ancients of the present invention and preparation method thereof and building in the style of the ancients steel concrete sets of brackets on top of the columns.
Accompanying drawing explanation
Fig. 1-1 ~ Fig. 1-3: the precast reinforced cage construction schematic diagram of sets of brackets on top of the columns of building in the style of the ancients of the present invention:
Fig. 1-1: front view, Fig. 1-2: left view, Fig. 1-3: top view;
Fig. 2-1 ~ Fig. 2-2: the steel plate built-in fitting schematic diagram forming the precast reinforced cage construction of sets of brackets on top of the columns of building in the style of the ancients:
Fig. 2-1: two-sided rectangular steel plates built-in fitting, Fig. 2-2: one side rectangular steel plates built-in fitting;
Fig. 3 ~ Fig. 4-3: the preparation method step schematic diagram of the precast reinforced skeleton of sets of brackets on top of the columns of building in the style of the ancients band steel plate built-in fitting of the present invention:
Fig. 3: step B lays steel plate built-in fitting schematic diagram;
Fig. 4-1 ~ Fig. 4-3: step C. lays sets of brackets on top of the columns beam main tendon and two-sided rectangular steel plates built-in fitting is welded and fixed and forms cage of reinforcement schematic diagram:
Fig. 4-1: the main muscle in welding top, forms temporary support,
Fig. 4-2: lay the two-sided rectangular steel plates built-in fitting in middle part, the main muscle of main for middle part muscle and bottom is welded with top, the two-sided rectangular steel plates built-in fitting in middle part,
Fig. 4-3: put gluten and be welded and fixed with the two-sided rectangular steel plates built-in fitting in top;
Fig. 5: step D: schematic diagram after colligation stirrup;
Fig. 6: step e: lay top one side steel plate built-in fitting, forms reinforcing cage schematic diagram;
Fig. 7-1 ~ Fig. 7-2: in the construction method of a kind of building in the style of the ancients steel concrete of the present invention sets of brackets on top of the columns, after Integral lifting is installed, the precast reinforced skeleton of sets of brackets on top of the columns and the anchor structure of building in the style of the ancients band steel plate built-in fitting carry out anchor connection schematic diagram:
Fig. 7-1: front view;
Fig. 7-2: the schematic perspective view of band working platform.
In figure:
The two-sided rectangular steel plates built-in fitting of 11-, the two-sided rectangular steel plates built-in fitting in 111-top, two-sided rectangular steel plates built-in fitting in the middle part of 112-, 12-one side rectangular steel plates built-in fitting;
Main muscle bottom 21-, main muscle in the middle part of 22-, the main muscle in 23-top, 24-gluten;
3-stirrup; The precast reinforced skeleton of 4-sets of brackets on top of the columns, 5-anchor structure system reinforcing bar; 6-working platform.
Detailed description of the invention
Embodiment one:
A kind of precast reinforced skeleton of sets of brackets on top of the columns of building in the style of the ancients, as shown in Fig. 1-1 ~ Fig. 1-3, the precast reinforced skeleton of this sets of brackets on top of the columns one of being made up of built-in fitting system 1, sets of brackets on top of the columns skeleton reinforcing steel bar system 2 and sets of brackets on top of the columns stirrup 3 passes through and reduces the whole reinforcement cage of section area for time;
Described built-in fitting system comprises two-sided rectangular steel plates built-in fitting 11, one side rectangular steel plates built-in fitting 12(see Fig. 2-1 ~ Fig. 2-2); Its effect be for fixing and support main steel bar stress, after concreting is shaping for the connection with wooden construction;
Described sets of brackets on top of the columns skeleton reinforcing steel bar system 2 comprises bottom main muscle 21, the main muscle in middle part 22, the main muscle 23 in top and gluten 24, and its effect forms the main stress system of sets of brackets on top of the columns, for bearing and transmitting load;
Described sets of brackets on top of the columns stirrup 3 is by the steel hoop hoop of minor diameter round steel brake forming, and its effect is cooperation cage of reinforcement, supports whole sets of brackets on top of the columns shape and bear shearing force and torsional moment;
The main muscle in described top 23 penetrates two-sided rectangular steel plates built-in fitting 11 inside, top, is welded and fixed with two-sided rectangular steel plates built-in fitting, the main muscle in described middle part 22 penetrates the two-sided rectangular steel plates built-in fitting 11 of top two-sided rectangular steel plates built-in fitting 11 and middle part successively and is welded and fixed with it respectively, and the main muscle in bottom 21 penetrates the two-sided rectangular steel plates built-in fitting 11 in middle part and is welded and fixed with it; Gluten 24 passes the two-sided rectangular steel plates built-in fitting 11 in top and is welded and fixed formation cage of reinforcement with it, one side rectangular steel plates built-in fitting 12 is positioned on the two-sided rectangular steel plates built-in fitting 11 in top, and it is outer and be connected with the main muscle in bottom 21, the main muscle in middle part 22, the main muscle 23 in top and gluten 24 colligation that sets of brackets on top of the columns stirrup 3 is enclosed within cage of reinforcement.
Embodiment two:
A kind of preparation method of the precast reinforced skeleton of sets of brackets on top of the columns of building in the style of the ancients band steel plate built-in fitting, the method is the method for the precast reinforced skeleton of sets of brackets on top of the columns of building in the style of the ancients described in floor manufacture embodiment one, it utilizes two-sided rectangular steel plates built-in fitting as temporary supporting system, penetrate and be welded and fixed sets of brackets on top of the columns beam main tendon and form cage of reinforcement, finally at cage of reinforcement, stirrup and one side rectangular steel plates built-in fitting are installed outward, form an overall reinforcing cage; It comprises the following steps: (see Fig. 3 ~ Fig. 6)
A. preparation of construction, surveying and locating: the bar material and the steel plate built-in fitting that prepare the precast reinforced skeleton of sets of brackets on top of the columns; According to construction drawing, specify the relative position of sets of brackets on top of the columns reinforcing bar and steel plate built-in fitting, and setting-out on reinforcing bar, carry out mark;
Described steel plate built-in fitting comprises two-sided rectangular steel plates built-in fitting 11, one side rectangular steel plates built-in fitting 12(see Fig. 2-1 ~ Fig. 2-2); In the present embodiment preparation method, for sake of convenience, according to the position at precast reinforced skeleton, two-sided rectangular steel plates built-in fitting 11 is divided into the two-sided rectangular steel plates built-in fitting 112 of top two-sided rectangular steel plates built-in fitting 111 and middle part; Its size is determined according to sets of brackets on top of the columns size;
Described sets of brackets on top of the columns skeleton reinforcing steel bar system comprises the main muscle in bottom 21, the main muscle in middle part 22, the main muscle 23 in top and the gluten 24 that length does not wait;
Described sets of brackets on top of the columns stirrup 3 is by the steel hoop hoop of minor diameter round steel brake forming;
B. steel plate built-in fitting is laid: according to laying top two-sided rectangular steel plates built-in fitting 111(after drawing unwrapping wire see Fig. 3);
C. lay sets of brackets on top of the columns beam main tendon and two-sided rectangular steel plates built-in fitting to be welded and fixed and to form cage of reinforcement (see Fig. 4-1 ~ Fig. 4-3):
C1, first by temporary fixed on the ground for two-sided for top rectangular steel plates built-in fitting 111, more main for top muscle 23 is penetrated top two-sided rectangular steel plates built-in fitting 111 inner, be welded and fixed with two-sided rectangular steel plates built-in fitting, form temporary support; (see Fig. 4-1)
C2, lay middle part two-sided rectangular steel plates built-in fitting 112, main for middle part muscle 22 penetrated successively the two-sided rectangular steel plates built-in fitting 112 of top two-sided rectangular steel plates built-in fitting 111 and middle part and be welded and fixed with it respectively, main for bottom muscle 21 penetrated the two-sided rectangular steel plates built-in fitting 112 in middle part and be welded and fixed with it; (see Fig. 4-2)
C3, put gluten 24, and gluten 24 is welded and fixed with it through the two-sided rectangular steel plates built-in fitting 111 in each top successively; (see Fig. 4-3)
D, colligation stirrup: be first inserted in by whole stirrup and lay in place outside cage of reinforcement, then the stirrup at sets of brackets on top of the columns beam two ends is fixed in colligation, then from two ends toward centre colligation stirrup (see Fig. 5) one by one;
E, lay top one side rectangular steel plates built-in fitting 12:
Be inserted in cage of reinforcement placed on top one side rectangular steel plates built-in fitting (12) of stirrup, and itself and top two-sided rectangular steel plates built-in fitting 111 spot welding fixed being formed passes through reduces the reinforcing cage (see Fig. 6) of section area for time;
F, inspection verification, check and correct installation of embedded parts precision; It is qualified to correct, and the precast reinforced carcassing of sets of brackets on top of the columns completes.
The shape of the built-in fitting of steel plate described in the present embodiment, sets of brackets on top of the columns reinforcing bar and sets of brackets on top of the columns stirrup 3 and material are the sets of brackets on top of the columns of those skilled in the art according to difformity size, existing knowledge can be utilized to calculate, repeat no more herein.
Embodiment three:
A kind of construction method of building in the style of the ancients steel concrete sets of brackets on top of the columns, the method be by the sets of brackets on top of the columns cage of reinforcement of building in the style of the ancients steel concrete sets of brackets on top of the columns after ground overall processing is shaping again Integral lifting be in place and anchor into the integral method of carrying out concreting again of anchoring in frame column, comprise the following steps:
(1) at the precast reinforced skeleton of sets of brackets on top of the columns (see Fig. 1 ~ Fig. 6) of floor manufacture building in the style of the ancients steel concrete sets of brackets on top of the columns:
The method of the described precast reinforced skeleton of sets of brackets on top of the columns at floor manufacture building in the style of the ancients steel concrete sets of brackets on top of the columns is the preparation method of the precast reinforced skeleton of sets of brackets on top of the columns of the building in the style of the ancients band steel plate built-in fitting described in embodiment two; Repeat no more herein;
(2) Integral lifting is installed:
" the precast reinforced skeleton of sets of brackets on top of the columns of the building in the style of the ancients steel concrete sets of brackets on top of the columns " Integral lifting made is put in place, with
The connection of building main body anchor structure 5 is fixed; (see Fig. 7-1 ~ Fig. 7-2);
(3) concreting, maintenance:
Concrete blinding is installed outward at the precast reinforced skeleton of sets of brackets on top of the columns of building in the style of the ancients steel concrete sets of brackets on top of the columns according to a conventional method, carries out concreting maintenance.